Loading...
HomeMy WebLinkAboutC196 - AS BUILT PLANScvry nr C:> F= AUBURN KING &PIERCE COUNTIES, WASHINGTON BI- ANNUAL SANITARY SEWER REPAIR REPLACEMENT CITY OFFICIALS Peter B. L Mayor ewis Dennis R. Dowdy, P.E. Director of Public Works Dennis L. Selle, P.E. City Engineer Assistant Director of Public Works Robert E. Lee, III Project Manager WASHINGTON PUBLIC WORKS DEPARTMENT 25 West Main Street Auburn, Washington PROJECT N0. CP0921 CONTRACT NO. 10 -02 VICINITY MAP NOT TO SCALE DRAWING INDEX: SHEET 1 THIS SHEET SHEET 2 GENERAL INFORMATION SHEET 3 SITE 1 - AUBURN WAY SOUTH at 7th ST SE, SEWER MAIN RELINING IN PLACE, THIS PLAN SET, SHEETS to PLAN and PROFILE, STA. 0 +00 to STA. 3 +00 SHEET 4 SITE 2 - On "D" ST SW, North of 3rd ST SW Date: STREET REPAIR AND SITE RESTORATION CM21 PLAN A PROFILE, STA. 30 +00 to STA. 33 +50 SHEET 5 SITE 2 - On "D" ST SW, North of 3rd ST SW SEWER MAIN REPLACEMENT, PLAN A PROFILE, STA. 30 +00 to STA. 33 +50 SHEET 6 SITE 2 - On "D" ST SW, North of 3rd ST SW Date: WATER MAIN REPLACEMENT, NUMBER PLAN & PROFILE, STA. 30 +00 to STA. 33 +50 SHEET 7 SITE 3 - On Sewer Easement, From "H" ST SE 10-02 SEWER MAIN REPLACEMENT, PLAN & PROFILE, STA. 40 +00 to STA. 41 +75 SHEET 8 SITE 4 (So) - On Sewer Easement, From 3rd ST SE Date: SEWER MAIN REPLACEMENT PLAN & PROFILE STA. 50+00 to STA. 51+25 SHEET 9 SITE 4 (No) - On Sewer Easement, From E MAIN ST SEWER MAIN REPLACEMENT Date: PLAN A PROFILE, STA. 55 +00 to STA. 56 +00 SHEET 10 SITE 5 - On Sewer Easement, From "K" ST NE Date: SEWER MAIN REPLACEMENT OF 13 1 PLAN and PROFILE, STA. 60 +00 to STA. 62 +00 SHEET 11 SITE 5 - On Sewer Easement, From "K" ST NE SEWER MAIN REPLACEMENT PLAN and PROFILE, STA. 62 +00 to STA. 63 +80 SHEET 12 SITE 6 - On "L" ST NE, North of 1 st ST NE SEWER MAIN SPOT REPAIR PLAN and PROFILE, STA. 70 +00 to STA. 70 +50 SHEET 13 TYPICAL CROSS SECTIONS 0 CITY x � M Z 0 ' C M r X 30 0 M M Z x CITY OF AUBURN APPROVALS PROJECT NUMBER THIS PLAN SET, SHEETS to 11 , AR PROVED FOR CONSTRUCTION BY: Date: CM21 DENNIS SELLE, P.E., CITY ENGI E REVIEWED BY: CONTRACT Ingrid Gaub, P.E., Asst. City Engineer Date: NUMBER Dan Repp, P.E., Utility Engineer Date: Q iZ 10-02 Robert Elwell, P.E., Sewer Utility Engineer Date: Cynthia Lamothe, P.E., Water Utility Engineer Date: Tim Carlaw, Storm Drainage Engineer Date: SHEET 7 Larry E. Dahl, Construction Manager Date: OF 13 1 Robert Lee, Project Engineer Date: No. I Date X 214980-0136 3RD ST SE �Vr T TREES E 1299208.03 50+ DO cri N 27' 37'E SANITARY _�EWER SS CC 3RD ST SE iK zi ' RT. 5 00 - - @6 1 F / 90- THICKENED Ex Sidewalk / Driveway EX Utility Easement (SSVVGr) THIS SHEET. RHODDY BUSH "XI 'x" 214980-0125 SE"NER MH NO. NEW SEWER Md, R ST SE Ex- _310­2(-_o TREE TREES 223 392040-0055 R ST SE R ST SE 90 90- New HMAReD8ir Ex Sidewalk / Driveway EX Utility Easement (SSVVGr) Restored Sewer Easement SE"NER MH NO. NEW SEWER Md, Ex- _310­2(-_o E 74.1 N NEW RIM ELEV 85.40 MH NO. 810-29 EX. SEWER < EX. GRADE 00 un (SERVICE LT.) Cn IFI EX 6 DR M 82 82- DRIVI CB 80 80- EX. STORM MH DI SERVICE LT 74- 74 STA. 51+13 A 51+65 72.00 49+50 50+00 50+50 51+00 51+50 52+00 52+25 Revision | DRAWN TO SCALE, SCALE MAY BE DISTORTED FROM REPRODUCTION These drawings conform 0mthe Contractor's construction records. � Drawn By: Date 0 FL C) W Constr* Inri In BY DATE Designed HLR 02/04/2010 Reviewed REL 02/01/2012 Approved IMG 05/06/2012 SCALE: Hor1^=20' Vmr 1^=2' ONE INCH AS DRAWN M. WA NV 10NAL '5 100 CONSTRUCTION NOTES: Surface �� `�N� ���� ����� ���N� �������� U�������=����� MATCH EX ROADWAY REPAIR TO FLOW LINE MATCH EXISTING OR LOCAllON/ | VARIES MIN 4" HK�A GRADE ' '~e�� VARYFS MATCH EX.r7, | O' SAW CUT AND REMOVE EXISTING A.C. PAVEMENT OR CEMENT ^~ CONCRETE FLAT WORK' EXTENT OF REMOVAL AS INDICATED OR AS DIRECTED BY THE ENGINEER. REMOVE E%|5llNG G*ASS SOD, IF IT EXISTS. RESOD AFTER SEWER LINE TRENCH RESTORATION. IF NO S{}O IS PRESENT RESTORE AS WELL, PER SPECIAL PROVISIONS OR AS DIRECTED BY THE ENGINEER. REMOVE EXISTING TREE/SHRUB WITHIN THE SEWER EASEMENT/ `—' CONSTRUCTION ZONE AS DIRECTED BY THE ENGINEER. INSTALL NEW HK4A PAVEMENT ROADWAY REPAIR PER SECTION `—^ DETAIL 3HOVVN, OR PER CITY OF AUBURN STANDARD DETAILS TRAFF|C-02 OR TRAFF|C—OJ' IF NO SECTION DETAIL IS PROVIDED. hn\ RESTORE EX SEWER EASEMENT WITH A MINIMUM OF 4" COMPACTED TOP SO|L, TYPE A. Water \l/ REPLACE EXISTING 3/4' WATER SERVICE WITH NEW WATER METER -- AND 1~ D|A. SERVICE LINE, PER PROJECT DETAIL WATER-13o AND CITY OF AUBURN STANDARD DETAIL WATER-16. RECONNECT EXISTING HOME SERVICE LINE AFTER THE NEW SHUT OFF VALVE. TEE LOCATION AT WATER MAIN AS INDICATED, AND METER BOX LOCATION AS SPECIFIED. Sewer �� < i�INSTALL NEW SANITARY SEWER PIPE. TYPE, SIZE, LENGTH, - AND SLOPE AS SPECIFIED. COST OF EXISTING PIPE REMOVAL IS INCIDENTAL TO COST OF NEW PIPE. INSTALL NEW TEE AND RECONNECT EXISTING ACTIVE SANITARY SEWER SERVICE. INSTALL PRIVATE SANITARY SEWER CLEAN OUT PER CITY OF AUBURN STANDARD DETAIL SEVVER-02. LOCATION AS SPECIFIED. �\ CONSTRUCT NEW CHANNELS AT EXISTING MANHOLE AFTER REPLACEMENT OF EXISTING PIPE CONNECTION AS DIRECTED BY THE ENGINEER. INSTALL NEW MANHOLE WITH NEW PIPE INVERT CHANNELS AS REQUIRED. LOCA7lON, TYPE, AND SIZE AS SPECIFIED. �� �u�'ABANOON EXISTING MANHOLE. REMOVE FRAME, LID, AND TOP ~/ SECTION TO 4' BELOW FINISH SUBGRADE DEPTH, PULVERIZE BASE SLAB AND FILL REMAINING MANHOLE 3ECT|ON/3\ WITH COMPACTED NEW GRAVEL BORROW. �ux ' � o K��� PUBLIC WORKS DEPARTMENT ��� Main ����� ���� ������� o�o���U� ��unm�x�u Auburn, Washington �����y�������'�y v��u`�uuux-w��u���-v LEGEND: New HMAReD8ir Ex Sidewalk / Driveway EX Utility Easement (SSVVGr) Restored Sewer Easement REVIEWED BY: �V'r �k Project Mariager (eZoristructiot Manager THICKENED EDGE CURB DETAIL Not to 3oo|o BURIED UTILITIES mAREA PLEASE CALL BEFORE YOU DIG PROJECT 131-ANNUAL SANITARY SEWER NUMBER REPAIR & REPLACEMENT CP0921 CONTRACT SITE 4 (So) - On Sewer Easement From 3rd ST SE NUMBER SEWER MAIN REPLACEMENT 10-02_ SHEET 8 PLAN and PROFILE, STA. 50+00 to STA. 51+25 OF 13 )&fb2e_&S pf azorV5 EX 15' WIDE 1/2 OF 15' WIDE SAN. SEWER EX. 60' R.O.W. SAN. SEWER EASEMENT EASEMENT „ 30' NEW CURB 4 MIN. HMA CL. B, AND GUTTER n a OR MATCH EX., 20'f WHICHEVER IS COMPACTED VARIES, 2.5'----Ni--- � 7.5� VARIES, 2.5'---o-- I 6.5' 4" MIN. HMA CL. B, a 6 5, OR MATCH EX., >, i THICKER. VARIES, 4" TOP SOIL I NEW CROWN 6' -g'f REPAIRED COMPACTED TYPE A. ; I LOCATION AT 3' SIDEWALK IN ' WHICHEVER IS THICKER. 4 I t 4 MIN. TOP I SOIL CL. A 4" TOP SOIL CENTERLINE SOME AREAS TYPE A, TYP. • • O L s O•O 0 0 0 0 0 0 O O O 0 0 0 0 0 0 "O O° NEW CURB - ° ° *3' MAX *3' MAX. STORM 1 1 AND GUTTER ,- D o °oo AX ?o IMPORTED PIPE TRENCH < o M - rn rn BACK FILL (IF REQUIRED) REPAIRED U'_ y rn I z °° °°° ° ° °o° °g °a °g 1 �1 :. < "" < IMPORTED PIPE TRENCH SIDEWALK IN I v z 1 �" ` �1 cp m -I n °g° °g° ° ° °° » rn m -i /� ° ° ° ° ° ° ° ° ° ° - cn = = 1 ° ° ° a °g C; + - '. -r .. 1 ' 1 = l l 1 °O °O° ° °O° °°° °°° °°° 1 `• ° CO C° C OCOR 1 .y - ._ SOME AREAS 6 1 -1 /4 - _ ° ° ° ° ° °° ° ° ° ° ° ° °° _ .: " P` ~ TM" ' ? y r. m � m BACK FILL (IF REQUIRED) ":, ..: m I.'� z 0 cn n MINUS CSB C o °; °o °; 8 °o°0 °g° .; ; , °o °u�o�e °o °pcococoo - �y 12" cn - = A 4�����,N 2" OF 5/8" I I� II _ _ SELECT PIPE TRENCH r NEW 8" DIA. N ° BACK FILL, 5/8" MINUS �? ° SEWER MAIN -� - * MINUS CSTC * , �1 8' f PIPE FOUNDATION 8 I I � CSTC , � CA CA (IF REQUIRED) NEW 8" NEW 8" DIA. � PIPE BEDDING, WATER -- I;��. 5" SL � %�jER MAIN * MAXIMUM DIMENSION FOR PAY QUANTITIES. PIPE BEDDING, TO BE ABANDONED SEWER MAIN » 5/8 MINUS - _ _ � CSTC 5/8" MINUS NEW 8" 12" 12" CSTC SEWER 10' SEPARATION *8' PIPE FOUNDATION PIPE FOUNDATION NOTE: � *8, (IF REQUIRED) (IF REQUIRED) WATER TRENCH REPAIR MATERIALS ARE Street * MAXIMUM DIMENSION FOR PAY QUANTITIES. * MAXIMUM DIMENSION FOR PAY QUANTITIES. SIMILAR TO SEWER TRENCH REPAIR. 2 -A Trench Restoration Sewer Easement 4,5,6 13 Not to Scale Street Crossing Trench Restoration 4_B Trench Restoration 4 -A SITE 2 - "Dow ST. SW. $ 13 Not to Scale $ 13 Not to Scale TYPICAL CROSS SECTION SITE 4 (South) - 3rd ST. SE. / SANITARY SEWER EASEMENT TYPICAL CROSS SECTIONS Vacant Viewport k" 4 MIN. HMA CL B, OR MATCH EX., WHICHEVER EX 15 SEWER EASEMENT y, EXISTING '` "^ CHURCH IS THICKER, ALLEY AT I BUILDING PROTECT BLDG. X EAST END. ENCROACHING (INSIDE) k'� 4" 5/8" 11' TYP t4ry + TEMP x R.O.W., STA 40 +35f TO X MINUS FENCE STA 40 +55t, LT. EX 12 WIDE CSTC (869860 -0345 � ALLEY R.O.W. F F- I f I i #x I I �. _ 804 EX CHAIN - -- -, -.:. .. „ 4 MIN. TOP vP R :` E MAIN ST) i 10' WIDE NEW �� GRAVEL ALLEY LINK FENCE SOIL CL. A G *' 3 MAX. FLOW LINE LOCATION, l STA. 40 +41 TO � STA 41+50 I k' I 2.00'' EX 2" GAS *3' MAX m < � 1 I 1 f -.M - n 3.3'- 3.5 _8--l-TOR �- �m rn z _�_ Fr - I_ rn IMPORTED PIPE TRENCH U! ° 1 BACK FILL (IF REQUIRED) NEW 12" DIA. STORM `,_; -j �— SELECT PIPE TRENCH _ OD _ BACK FILL, 5/8" MINUS << CSTC AT ROADWAY - IMPORTED PIPE TRENCH BACK FILL CROSSING. M (IF REQUIRED) AT ALLEY. *8 NEW 8" DIA. 12„ SEWER MAIN * MAXIMUM DIMENSION FOR PAY QUANTITIES. NEW 8" 5 SEWER PIPE FOUNDATION TYP (IF REQUIRED) Ailey * 8' Sewer Easement 3 -A Trench Restoration Trench Restoration 7 13 Not to Scale 5 -A 10,11 13 Not to Scale SITE 3 - ALLEY / "H" ST. SE. SITE 5 - SAN. SEWER EASEEMNT TYPICAL CROSS SECTION From "W" ST NE TYPICAL CROSS SECTION BURIED UTILIMS IN AREA PLEASE CALL BEFORE YOU DIG 811 No. Date ReVISIOn DRAWN TO SCALE, SCALE MAY BE DISTORTED FROM REPRODUCTION BY DATE REVIEWED BY: DATE: BI -ANN UAL SANITARY SEWER PROJECT NUMBER Designed HLR 02/04/2010 ��� c. c ti��� of " "gaJ���� o w �A � # �IS 2� �4V �z ssIONAL T. ��Y CITY OF PUBLIC WORKS DEPARTMENTy #> - 25 West Main Street Auburn, Washington WASHINGTON P�rojecrlWnader �r jZ,.., onstructi Manager REPAIR & REPLACEMENT TYPICAL CROSS SECTIONS CPO z z — o o < o These drawings conform to the Contractor's construction records. D By: Date f rC� Con t cti on Reviewed REL 02/01/2012 CONTRACT NUMBER 10 2 Approved PP IMG os /os/2o12 SCALE: NONE ASN�RAWN SHEET 13 of 13 File: CP0921- Base_AAap.dwg pf azorV5