HomeMy WebLinkAbout08-18-2014 Public Works Committee Agenda ModificationMemorandum
Engineering Division
To: Public Works Committee
From: Ingrid Gaub, Assistant Director of Engineering /City Engineer
CC: Mayor
City Clerk
Councilmembers
Kevin Snyder, Community Development & Public Works Director
Jacob Sweeting, Assistant City Engineer
Ryan Vondrak, Capital Projects Manager
Date: August 18, 2014
Re: Agenda Modification for the August 18, 2014 Public Works Committee Meeting
This modification adds the following item to the agenda:
IV. DISCUSSION ITEMS
I. S 277th Street Corridor Project — Agreement with City of Kent* (Vondrak)
Page 1 of 6
AUBURN * MORE THAN YOU IMAGINED
AGREEMENT REGARDING
S 277TH STREET CORRIDOR ROADWAY
THIS AGREEMENT is entered into between the City of Kent, a Washington Municipal
Corporation, located and doing business at 220 Fourth Avenue South, Kent, Washington 98032
( "Kent ") and the City of Auburn, a Washington Municipal Corporation, located and doing
business at 25 West Main Street, Auburn, Washington 98001 ( "Auburn").
277TH ST
WHEREAS, both cities de
277th Street Corridor; and
WHEREAS, Kent has con
the S 277th Street Corridor Projec
277th Street and 83rd Avenue S. (
RECITALS
■ i- l
TRUCTION
mutual and overall benefit of the S
ment project, commonly known as
ly from the intersection of SE
wor Central Avenue or Auburn Way
North) and runs generally east across the Green River, then along SE 274th Street in Kent, and
then north along 116th Avenue SE and terminating at Kent- Kangley Road in Kent. Kent's
project included a 2 -lane roadway with a left turn between Auburn Way North and L St NE, a 5-
lane roadway between L St NE. and 108th Ave. SE, a 4 -lane roadway with a left -turn lane
between 108th Ave. SE and Kent- Kangley Road, and a non - motorized trail between L St NE and
108th Ave. SE along with a pedestrian bridge over the Green River; and
WHEREAS, Auburn, as the lead agency on its project, commonly known as the South
277th Street Corridor Capacity & Non - motorized Trail Improvement project, has obtained
complete funding to design and construct its project; and
WHEREAS, Auburn has commenced environmental review and design on its project and
intends to construct the only remaining 2 lane segment on the S 277th Street Corridor between
SR -99 and SR -18, which generally commences at the intersection of Auburn Way North and
runs east to L St NE; and
WHEREAS, Kent completed all required wetland mitigation for its previous S 277th St
1
Page 2 of 6
Corridor Project as well as advanced wetland mitigation for Auburn's project; and
WHEREAS, Kent concurs that Auburn may utilize the advanced wetland mitigation
completed as credit towards any wetland mitigation as may be required by the regulating
agencies for completion of Auburn's S 277th St Corridor Project; and
WHEREAS, the project is a part of the S 277th St Corridor (from I -5 to SR 516) and the
cities will restrict private access to the extent possible; and
WHEREAS, Kent allowed a temporary traffic signal to be installed at L St NE to
facilitate development of the Trail Run residential plat, and the cities agree the intent was for the
signal to be removed in the future; and
WHEREAS, portions of Auburn's project abut properties located within Kent's corporate
boundaries; and
WHEREAS, Auburn's pro e' i 1 r • i . • � the south of the existing S 277th
St roadway and Auburn does not . t • - _ ' i - . of way from properties within
Kent's jurisdiction; and
WHEREAS, both cities in �-nd t • . e pi u o i S 277 St Corridor to clearly
define ownership and maintenance response
WHEREAS, an interlocal agreement exists between the Valley Communications Center
and Auburn and Kent for the establishment and use of fiber optic cable and equipment along S
277th St/SE 274th Way between Auburn Way North and 108th Ave SE; and
WHEREAS, Kent intends to maintain ownership of existing conduits in the roadway and
plans for possible future water line extension through the S 277th St Corridor;
NOW, THEREFORE, Kent and Auburn hereby agree as follows:
AGREEMENT
A. AUBURN'S S 277TH STREET CORRIDOR PROJECT
1. Auburn will be the lead agency for the overall funding, design, right of way
acquisition, permitting, construction and completion of its proposed S 277th
2
Page 3 of 6
Street Corridor Capacity & Non - motorized Trail Improvement Project which
includes, but is not limited to:
• A five lane arterial with left -turn lanes, curb, gutter, storm drainage,
landscaping, one traffic signal, street lighting and mixed use non - motorized
trail from Auburn Way North to L St NE.
• Repair of the existing pavement from Auburn Way North to approximately
260 feet east of the L St NE intersection, and provide a minimum 2 -inch
asphalt concrete overlay over the existing pavement.
2. Auburn will continue to coordinate its design and construction efforts to match
Kent's S 277th Street Project.
3. Kent and Auburn a
signal between Au
should be located a
available for an alt
development and
at it is their
ntent for there to be only one traffic
venue SE and that said signal
ion. Once funding becomes
for the Trail Run residential
that Auburn removes the temporary signal at
is no longer needed, it is the intent
St NE and any remaining
temporary pavement channelization along S 277th St./ S 274th Way.
B. KENT AND AUBURN CITY LIMIT REVISIONS
1. Kent will revise its corporate boundaries per RCW 35A.21.210 to convey its
complete jurisdiction of S. 277th St. corridor from Auburn Way North to
approximately 723 feet east of the L St NE intersection to the City of Auburn as
per the applicable portions of the attached exhibit maps "A" and "B" and the
attached legal descriptions Exhibits A -1, and B -1, B -2, B -3, B -4, and B -5.
2. Auburn will revise its corporate boundaries per RCW 35A.21.210 to incorporate
the complete jurisdiction of S. 277th St. corridor from Auburn Way North to
approximately 723 feet east of the L St NE intersection into the City of Auburn as
per the applicable portions of the attached exhibit maps "A" and "B" and the
attached legal descriptions Exhibits A -1, and B -1, B -2, B -3, B -4, and B -5.
3
Page 4 of 6
3. Kent will retain ownership of Kent's existing conduits within the S. 277th St.
Auburn agrees to cooperate with Kent on Kent's application for a Franchise
Agreement from Auburn for its facilities, including a future water main, along S.
277th St. from Auburn Way North to approximately 723 feet east of the L St NE
intersection in the City of Auburn.
4. Kent will have jurisdiction over the S. 277th Street corridor facilities within its
corporate boundaries.
5. Auburn will have jurisdiction over the S. 277th Street corridor facilities within its
corporate boundaries.
6. Kent will retain ow ersh , . and continu to intain the pedestrian bridge over the
Green River.
D. MISCELLANEOUS
1. Termination. This
construction of its th
aa n the date that Auburn completes
orn r rod ect.
2. Governing Law. This agreement shall be governed and construed in accordance
with the laws of the State of Washington. If any dispute arises between the cities
under any of the provisions of this agreement, resolution of that dispute shall be
available only through the jurisdiction, venue and rules of the King County
Superior Court, King County, Washington.
3. Modification. No waiver, alteration, or modification of any of the provisions of
this agreement shall be binding unless in writing and signed by a duly authorized
representative of each city.
4. Severability. If any one or more sections, subsections or sentences of this
agreement are held to be unconstitutional or invalid, that decision shall not affect
the validity of the remaining portions of this agreement and the remainder shall
remain in full force and effect.
4
Page 5 of 6
5. Entire Agreement. Written provisions and terms of this agreement, together with
any attached exhibits, supersede all prior verbal statements by any representative
of either city, and those statements shall not be construed as forming a part of or
altering in any manner this agreement. This agreement and any attached exhibits
contain the entire agreement between the parties. Should any language in any
exhibit to this agreement conflict with any language contained in this agreement,
the terms of this agreement shall prevail.
THE CITY OF KENT
SUZETTE COOK, MAYOR
APPROVED BY KENT CITY C
APPROVED BY AUBURN CI
ATTEST:
THE CITY OF AUBURN
BACKUS, MAYOR
2014.
ATTEST:
, 2014
(SEAL) (SEAL)
DANIELLE E. DASKAM
AUBURN CITY CLERK
RONALD MOORE
KENT CITY CLERK
APPROVED AS TO FORM: APPROVED AS TO FORM:
ARTHUR FITZPATRICK DANIEL B. HEID
KENT CITY ATTORNEY AUBURN CITY ATTORNEY
5
Page 6 of 6