HomeMy WebLinkAbout09-15-2014 PUBLIC WORKS COMMITTEE AGENDA MODIFICATIONS (PDF ONLY) *
cn,roF �� . Memorandum
Engineering Division
WASHINGTON
To: Public Works Committee
From: Ingrid Gaub, Assistant Director of Engineering/City Engineer
CC: Mayor
City Clerk
Councilmembers
Kevin Snyder, Community Development & Public Works Director
Jacob Sweeting, Assistant City Engineer
Luis Barba, Project Engineer
Kim Truong, Project Engineer
Date: September 15, 2014
Re: Agenda Modification for the September 15, 2014 Meeting
This modifcation is to replace the exis4ing packet materials for the following agenda
items:
III. ACTION
D. Public Works Proiect No:CP1322" Barba)
Approve Auvartl of Contract No. 14-16, to American Electrical Services on their
low bid of$132,711.00 for Project No. CP1322, Annual Traffic Signal
Improvements
E. Public Works Proiect No. CP1208• (Truona)
Approve Award of Contract No. 14-10, to R.L. Alia Company on their low bid of
$994,822.00 plus Washington State sales tax of$94,452.09 for a total contraot
price of$1,089,274.09 for Project No. CP1208, Sewer Pump Station
Improvements
Page 1 of 1oAUBURN * MORE THAN YOU IMAGINED �
TiGe: Agenda Category: 6onsent Date: 9l11/14
Award Pro'ect No. CP1322
De arfinent: PW Bud et Im act: $0
Administrative Recommendation:
Public Works Committee recommend City Council approve award Contract No. 14-16, to American
Electrical Services on their low bid of$132,711.00 for Project No. CP1322,Annual Traffic Signal
Im rovements.
Background Summary:
The purpose of this project is to construct traffic signal system improvements including upgrades and
repairs to vehicle detection systems, installation of accessible pedestrian pushbuttons, and upgreding
traffic signal systems by installing flashing yellow arrow signal heads, installing auxiliary signal heads, and
instelling signal head backplates, at various locations throughout the City. See attached Vicinity Map for
details regarding specific improvements and locations.
This project included a procurement phase during which equipment that required long lead times, or items
that would be installed by City forces, were purchased by the City. Items not installed by City forces will
be installed by a Contractor during the construction phase of the project.
Funding for this project is from the Capital Signal Equipment and Improvement Funds (328 Funds). See
the attached Budget Status Sheet for atlditional details.
A project budget contingency of$67,362.00 remains in the 328 Fund.
List Attachments: Buii et Status Sheet and Vicini Ma
Reviewed by Councfl Committeea: Finance Muni Services PCDC PWC Les Gove Communuy Campus
❑Downtown Redevelo ment ❑Council O erations Committee
Other:
Meetin Date: 9/15/14 SWff: Barba
Page 2 af 10
i
BID TABULATION '
BID TOTALS SUMMARY �
Project Name: CP1322, Annual Traffic Signal Improvements, Contract 14-16 �
Prepared by: City of Aubum
Bid Date: 9/9114
ENGINEER'S ESTIMATE: $ 143,457.00 I
AVERAGE'BASIC BID AMOUNT: $ 144,349:30 i
BASIC BID SPREAD AMOUNT: $ 24,786:00 Baslc BID Amount Spread$ Spread% I
LOW BIDDER: Amerlcan Electrical Services $ 132,711.00 -$10,746.00 -7.49% I
Second Bidder. Transportation Systems, Inc $ 142,409.00 -$1,048.00 -073% �
Basic BID (Tax Not Applicable)
American Electrical Services S 132,711.00
Transportation Systems, Inc $ 142,409.00
Totem Eleclric of Tacoma $ 143,670.50
� Pioneer Contrectors $ 145;259.00
� Prime Electric $ 157,497.00
w
0
0
ii
�
�
I
I
9/9f2014(I:OI PM)
h:\projl6idlabslCPl322 DT.xls 3
BUDGET STATUS SHEET
Project No: CP1322 Project Title: Annual Treffic Signal Improvements
Project Manager. Luis Barba Date: September 11, 2014
p Project Update
Initiation Date: 1/21/2014 O Permission to Advertise
Advertisement Date: 8/18/2014 OO Contract Award
Award Date: O Change Order Approval
O Contract Final Acceptance
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Budgeted (Funds Available)
Fundin 2013 Actual 2014 Future Years Total
328 Fund - Capital Signal Epuipment Funds 0 45,234 45;234
328 Fund - Capital Signal Improvement Funds 0 324,267 324,267
Total 0 369,501 369,501
Estimated Cost,(Funds_Needed)
Activi 2013 Actual 2014 Future Years Total
Design Engineering -City Costs`
Equipment Procurement 0 142,885 0 142,885
Construction Bid 0 132,711 0 132,711
Project Contingency (20% of Construction Est.) 0 26,542 0 26,542
Construction Engineering - City Costs'
Total 0 302,138 0 302,138
"Engineering costs are charged to the Engineering Budget and not shown here.
328 Capital Improvement Budget Status
2013 Actual 2014 Future Years Total
"328 Funds Bud eted 0 369,501 369,501
328 Furids Needed 0 302,138 0 302,138
"*328 Fund Project Contingency ( ) 0 (67,362) (67,362)
328 Funds Required 0 0 0
" (#) in the Budget Status Sections indicates money the City has available.
H:\PROJ\CP1322-Annual Traffic Signal Improv\3.00 Project Management\3.20
Butlget\CP1322_BudgetStatusSFieet Page 4 0110 1 of 1
S.277TH STIFRONTAGE RD
VEMICLE DETECTION UPGRADE
AU9URN WAY N/37TN ST NE
TRAFFIC SIGNAL CABINET
i
W VALLEY MWY/75TH ST� W
TRAFFIC SIGNAL CABIN AUB - RN WAY Nl1 TH NE
� VEHICLEDETECTION UPGRADE
SIGNAL BACKPLATES
1 /� ,�-
A U WA IBTH ST AUBURN AVEI4TH ST NE
A A P SN UTTONS VEHICLE DETECTION LOOPS
I ' H-I-r-r1 \ \1 I I I I - '1 T rl 1
AUBURN WAY/MAIN ST �
ADA PUSHBUTTONS
BATTERY BACKUP COMPONENT8
AUBURN AV 12 T i Y
AD P SHBSITTON3
RD ST SE/A ST S U N. A S/2 D ST SE
RELOCATE TRAFFIC SIGNAL DA P,USHBUTTONS�
I I
A 8T SEII7TH ST SE
BATTERY BACKUP COMP NENTS
15TH ST SW CORRID
VEHIGLE DETEGTION UPGRADES
81GNAL BACKPLATES
Q
LAKELAND HILLS IIVAY SFJLAKE TAPPS PKWY SE
PLASMING YEILOW ARROW
ADA PUSHBUTTON8
SIGNAL BACKPLATES
Acm7T�oF _T�Tn���T CP1322 ANNUAL TRAFFIC SIGNAL IMPROVEMENTS
V B V 111V Page�I�t�b�l ITY MAP �
�-l� WASHINGTON
NOT TO SCALE
Title: Public Works Contrect No. 14-10 A enda Cate o : Consent Date: 9/72N4
De artment: PW Bud et Im act: $0
Administrative Recommendation:
Public Works Committee recommend City Council award Contract No. 14-10,to R.L.Alia Company on
their low bid of$994,822.00 plus Washington State sales tax of$94,452.09 for a total contract price of
$1,089,274.09 for Pro'ect No. CP1208 Sewer Pum Station Im rovements.
Background Summary:
This project will construct various improvements to 11 of the City's sanitary sewer pump stations including
upgredirig the ability of maintenance staff to access and maintain wet wells, install new back-up generator
systems, install site improvements such as fencing, lighting, and equipment shelters, and establish
cathodic protection systems. See the attached Improvement matrix for specific improvements proposed
at each pump station site.
ConstNction is anticipated to begin in October 2014 and be complete in April 2015.
The estimated total project cost is$1,350,953.00 which is equal to the amount budgeted for the projed.
List Attachments: Budget Status Sheet, Bid Tab Summary, Improvement Matrix, Map
RevleweA by Councll Commlttees: Finance Muni Services PCDC PWC Les Gove Community Campus
❑Downtown Redevelo ment ❑Council O erations Committee
Other:
Meetin Date: Se tember 15, 2074 Staff: Truon
Page 6 of 10
BID TABULATION
BID TOTALS SUMMARY
Project�Name: CP1208, Sewer Pump 5tation lmprovements, Contract 14-10
Prepared.by: City of Aubum
Bid�ate: 9/9114
ENGINEER'S ESTfMATE: $ 826,971.43 �
AVERAGE BASIC BID AMOUNT: $ 1,140;578.39
BASIC BID SPREAD AMOUNT: $ 291,512.76 Basic BID Amount Spread$ Spread % j
LOW BIDDER: R. L.Alia Company $ 884,622:00 $167,910.57 20.31%
Second Bidder: Jansen I�c. $ 1,286;334.78 $459,423.35 55.56% ;
Basic BID�Tax not Included) Total BID(Tax Included) �
R. L. Alia Company $ 994,822.00 $ 1,089,274.09 ;
Jansen Inc. $ 1,286,334.78 $ 1,408,417.75
v
a
�
m
J
O
I
O I
I
i
i
i
j
i
i
I
i
9/9/2014(2i42-PNn
h:\proj�bidtabs\CP1208 BT.xls (
BUDGET STATUS SHEET
ProJeet No: CP1208 Project Title: Sewer Pump Station Improvement Project
ProJect Manager:Kim Truong
Q Projeet Initiatlon
Initiation Date: 9!3/13 Q Pertnislon to Advertlse Date:Sept. 11,2014
Advertisement Date: 5/5/14 Q Contract Award
AwaM Date: Q Ctiange OrAar Approval
Carry Forwerd to 2074
The"Future Years"column indicates ihe projectetl amount to be requested in future budgets.
Funds Bud eted Funds Available
_Funtling 2012 2013 2014 Total
431 Funtl-Sewer 29,018 80,135 1,241,800 1,350,953
Total -29,018 80,135 1,241,800 1.350,953
Estimated Cost Funds Needed
Activity 2012 2013 2014 Total
Design Engineering-Ciry Costs 12.032 27,445 57,422 96,899
Design Engineering-Consultant Costs 16,986 52,689 22,404 92,078
Consiruction Estimale 1,089,274 1,OB9,274
Authorized Contingency 54,464 54,464
Easement Acquisition 3,237 3,237
Construction Engineering-City Cosis 10,000 10,000
Construclion En ineering-Consultant Costs 5.000 5,000
Total 29,01B 80,134 7,2at,B00 7,350,953
431 Sewer Bud et Status
2012 2013 2014 Total
'431 Funtls ButlgeteC () (29,018) (80.135) (1,247,800) 1,350,953)
431 Funds Needed 2g,018 80,135 1,241,800 1,350,953
'471.FuntlProjectCOntlngency�) 0 0 0 0
431 Funds Required 0 0 0 0
•(#)in the Budget Status Sections indiwtes Money ihe CiTy has available.
Page 8 0(10
CP1208
Sewer Pump Station Improvement Matrix
Generator Cathodic Wet Well Site Improvements
System Protection Access
System Improvements Fencing Shelter Lighting
22nd Street NE X X X X X X
8th Street NE X X X X X X
. -- _....
{ . � ,
Area 19 X ' ' ` � � " �
d F Street SE X X � � �
� -
� ; •, .
' North Ta s � X - �
0
Peasle Rid e X � � � ' � �
R Street NE X X X X X X
. ..
Rainier Rid e X X '
Riverside X '
. ;. ,.
Terrace View X ; ; . -
Valle Meadows X X X X X X
Sewer Pu.mp Station ImproVements Project
Vicinity Map
��-�'� ��'i �-�- ---�� e `�:r;�T' � �l l.-j'�-#.� JI
�� $- .�, I,,1 '.. 11 � r � �. %;�zr ' ' �—�
�-,7` s1 ' 1"� y 4 - . '• ",� :�� ,� '
N +—r�l'' t l �—�+� r.. � '� u
"��r�`:.�`,� s-z:;rti�s�r 1 : y' '' ` --5��'4 I ���, - � '`' �
�^� �� I �: � r~ ` �ti
, I , _ ,�5�. . J�bl
i� � � � i � - J _ ;, � � �, _
� r�a� �i� ; � '' "''�(-�_���-- _ �,,,,
� � - n� -•'• 'r-' P; Riverside ;
�' � 22nd Street '� '� ��
�� i 8th Street I � . �—�-��--- " Pump �{
��� Pum Pump � 7`'` !_S u . {,
J'�,[s P Y,'� — w — �-i � � J $[8t100 i!
$�8t10� �
StehOU � ' - - �'=� °� '[
;V,.,�i r��, �
� Y �i� i �, ��-:,;'
' lr-t'',YC- �i ' � f � .� � . �.��� i` � �=,f .r �_�-r`� r Raioier �
�+- --ti-�{' ; ' I �.T \?^���' �_ �� 1 � -.-- i
�� � �� ., � T�"� �` �, .t� F ,_�+ -'I Ridge G
A:���`�II �:� , } ,�, + � ��;�{- _ . � , :�
���� - 1`�Srl ' I3_n t.�'o--�vi W�:r-� ,�� _ Pump �
il i' l,r �+4r.laK � G�•'�-' "ri_ :�.
y� J'L�f + �;is I �K f 1 �-I i�.^1 . � �-� I� �� i J��u Station i
I 4 , (—:t.r.r-,�,
,n : . rI`i�l:l�,,, y� ] J.� �-��'`�i '� �ri[ � tj.0 • ` _ , s
����� F �l` ���; I �—�I {LrrJ, ������ . I����T^��_ � \' ,� r' J y �
' " � -i�F'�_�rr Valle �
i �� '��, � � b �,..� I � I;-{; ;�'t_�i�;-~�::� ���r: ' �, r .t�: Meadows '
.i= :ton1lt-.� - .�� i
�,^'i I.�'i:r,r a;
,�4�m�, `� `R' Street r:�n_�-'4�!-" � - � r�: c� � Pump )
�-�J � � Pum �i_k=`^`��� _ � �1 Station �
�� � Stati o �.,�„ ,�� � `'� 1 ���_', 7` "i?'��.r j ' '
�',�-r-�� - �.. -" �^ e I �-':� � '
; � � �. ,��-_ . ����. ;
Peasley � �;'!,��'��I t - "�li��- � �
� Ridge Pump , ! ` i^a 7 -�r'�,}_;,'aUa�i�-w-a�;;yir. ' -�� ';
! Station 1 I,����,,.���, _���-�-�- �• _'� •�e ' � I
� � I7 u'�Z �• �, f��� � ., `F' Street 7'ti` I2 '�
�rIL�'.�� � �� i �.�„y �rr.�-'� Pump \'`1,�
� _ �r r �� ui ���.iiJ.��,';v.f� , ,��,s?�
! x�����v � N"R 5 -I_�=#-'.��.��4 .Sf8t10� '..` 1' �.L.
�' l -�� �
�` Terrace �r �u�� '� �^�.� ��: Area-19 __ � ��
View Pump , �/ -'l:�'9 - • � Pum ��, �
,( �-�;,,:, r,;,, P I <���;
: I Station /� " `'" i�'�. Station --�� r ;
�J` }- �:, h':�l F•. ,
�..,.,�, i
i-�•,p1LL��1 vai� � � � i � t���?����� �.f—+;�� 1— ;
�� \ � t , ' (::2?�y`',�x.: � North
' � ff`��-' Tapps �
!� 7' � �y� r f�
{ ��� i � '`'��= " an ' Pump i
� �i r�"'' 't'_1;}-�^�
i r7�-�—r-- "•.; I '. l', 1' Statioo �����,� �
� �+� 1V,-' - '�6,�., r_R`_,�.�
!._�-,i._._�_:�-1�. �- -?- -y-�-- �-�---I_.. .h!.r� �ll`�� -a�.1 ._r�.
Page 10 of 10