HomeMy WebLinkAbout10-06-2014 PUBLIC WORKS COMMITTEE AGENDA MODIFICATION (PDF ONLY)CITY OF
"BURN
WASHINGTON
To: Public Works Committee
Memorandum
Engineering Division
From: Ingrid Gaub, Assistant Director of Engineering /City Engineer
CC: Mayor
City Clerk
Councilmembers
Kevin Snyder, Community Development & Public Works Director
Jacob Sweeting, Assistant City Engineer
Kim Truong, Project Engineer
Date: October 6, 2014
Re: Agenda Modification for the October 6, 2014 Meeting
This modification is to replace the existing packet materials for the following agenda
item:
III. ACTION
D. Public Works Project No. CP1308* ( Truong)
Award Contract No. 14 -04 to Pacific Civil & Infrastructure on their low bid of
$1,401,829.61 plus Washington State sales tax of $109,356.73 for a total
contract price of $1,511,186.34 for Project No. CP1308, BNSF Utility Crossings
This modification removes the following item from the agenda:
IV. DISCUSSION ITEMS
D. Street Selection for the 2015 Citywide Pavement Patching, Overlay, and Chip
Seal Project (Carter)
Page 1 of 5
AUBURN* MORE THAN YOU IMAGINED
Title: Public Works Contract No. 14 -04 Agenda Category: Action I Date: 10/1/14
Department: PW Budget Impact: $0
Administrative Recommendation:
Public Works Committee recommend City Council award Contract No. 14 -04 to Pacific Civil &
Infrastructure on their low bid of $1,401,829.61 plus Washington State sales tax of $109,356.73 for a total
contract price of $1,511,186.34 for Project No. CP1308 BNSF Utility Crossings
Background Summary:
This project will construct utility improvements required by the Burlington Northern Santa Fe Railway
(BNSF) to accommodate the new BNSF 3rd rail line that will extend within Auburn's City limits from
Ellingson Road to South 277th Street along the west side of the existing north -south tracks. This work must
be completed by the City as BNSF is the underlying owner of the Right -of -Way. BNSF requires that all
utilities are constructed in casings to protect them from train loadings and to allow maintenance and
replacement without impacting rail traffic. Several City utilities that cross the rail alignment were
constructed prior to the implementation of BNSF's casing requirement and are not encased adequately to
address the proposed 3rd rail. This project will replace these utilities in casings that meet BNSF
requirements and construct the associated roadway and other surface restoration.
A project increase of $25,000.00 within the Water Fund will be necessary, however it will not require a
budget adjustment since it is anticipated that the budgeted expenditures in the Water Fund will not be
exceeded this year.
The estimated total project cost for sewer improvements is $441,000.00, which is equal to the amount
budgeted within the Sewer Fund for the project.
The estimated total project cost for storm improvements is $566,101.00, which is equal to the amount
budgeted within the Storm Fund for the project.
A project budget contingency of $50,000.00 remains in the Arterial Preservation Fund.
List Attachments: Budget Status Sheet, Bid Tab Summary, Map
Reviewed by Council Committees: ❑Finance ❑Muni Services ❑PCDC ®PWC Les Gove Community Campus
❑ Downtown Redevelopment ❑ Council Operations Committee
Other:
Meeting Date: October 6, 2014
Staff: Truong
Page 2 of 5
BUDGET STATUS SHEET
Project No: CP1308 Project Title: BNSF Utility Crossings
Project Manager: Kim Truong Date: 10/2/14
Initiation Date: 5/13/13 0 Permision to Advertise
Advertisement Date: 9/2/14 * Contract Award
Award Date: 0 Change Order Approval
0 Budget Update
The "Future Years" column indicates the projected amount to be requested in future budgets.
Funds Budgeted (Funds Available)
Funding
Prior Years
2013 (actual)
2014
Total
430 Fund- Water (Bond Proceeds)
0
51,357
728,644
780,001
431 Fund - Sewer
0
14,440
426,560
441,000
432 Fund - Storm Drainage (Bond Proceeds)
0
42,328
523,773
566,101
105 Fund - Arterial Preservation
0
0
420,000
420,000
Total
0
108,125
r 2,098,977
2,207,102
Activity
Prior Years
2013 (actual)
2014
Total
City Design
0
26,683
24,713
51,396
Consultant Design
0
85,341
169,659
255,000
Construction Contract Bid
0
0
1,511,186.33
1,511,186
Authorized Contingency
0
0
268,949
268,949
BNSF Permits
0
0
44,469
44,469
Construction Engineering
0
0
55,000
55,000
Total
0
112,024
2,073,976
2,186,000
430 Water Budget Status
431 Sewer Budget Status
Prior Years
2013 (actual)
1 2014
1 Total
*430 Funds Budgeted()
0
(51,357)
(728,644)
(780,001)
430 Funds Needed
0
51,3571
753,644
1 805,001
*430 Fund Project Contingency ()
0
01
01
0
430 Funds Required
0
1 01
25,0001
25,000
431 Sewer Budget Status
432 Storm Budget Status
Prior Years
2013 (actual)
2014
Total
*431 Funds Budgeted()
0
(14,440)
(426,560)
(441,000)
431 Funds Needed
0
14,440
426,560
441,000
*431 Fund Project Contingency ()
0
0
(0)
(0)
431 Funds Required
0
0
01
0
432 Storm Budget Status
105 Arterial Preservation Budget Status
Prior Years
2013 (actual)
1 2014
1 Total
*432 Funds Budgeted ()
0
(42,328)
(523,773)
(566,101)
432 Funds Needed
0
42,3281
523,773
1 566,101
*432 Fund Project Contingency ()
01
0
(0)
(0)
432 Funds Required
0
1 01
01
0
105 Arterial Preservation Budget Status
* ( # ) in the Budget Status Sections indicates Money the City has available.
Page 3 of 5
Prior Years
1 2013 (actual)
2014
Total
*105 Funds Budgeted ()
01
0
(420,000)
(420,000)
105 Funds Needed
0
1 0
370,000
370,000
*105 Fund Project Contingency ()
01
0
1 (50,000)
(50,000)
105 Funds Required
01
0
1 01
0
* ( # ) in the Budget Status Sections indicates Money the City has available.
Page 3 of 5
BID TABULATION
BID TOTALS SUMMARY
Project Name: CP1308, BNSF Utility Crossings, 14 -04
CD
� Prepared by: City of Auburn
0, Bid Date: 9/30/14
ENGINEER'S ESTIMATE. $ 1,515,848.00
AVERAGE BASIC BID AMOUNT: $ 1,751,186.78
BASIC BID SPREAD AMOUNT: $ 513,993.39 Basic BID Amount
Spread $ Spread %
LOW BIDDER: Pacific Civil & Infrastructure $ 1,401,829.61
- $114,018.39 -7.52%
Second Bidder: James W. Fowler Co. $ 1,820,424.00
$304,576.00 20.09%
Basic BID (Tax not Included)
Pacific Civil & Infrastructure $ 1,401,829.61
James W. Fowler Co. $ 1,820,424.00
RW Scott Construction $ 1,866,670.50
R.L. Alia Company $ 1,915,823.00
Total BID (Tax Included)
$ 1,511,186.34
$ 1,957,901.64
$ 2,012,504.48
$ 2,067,443.29
10/2/2014 (12:00 PM)
h: \proj \bidtabs \CP1308 BT.xls 19
PROJECT SITE #3
(37th Street NW) _
r—Jm L-- sr Nw I I (.II..
V 1
d
w Q
14th
ST NW
01
PROJECT SITE #2
(3rd Street NW) —
a X ly // .1 9
VT. VIE W
METERY
PROJECT SITE #1 w
(Main Street) d �;
r-
In
U
30th ST NW
t
Il-
LEGEND
— W WATER MAIN CROSSING
— ST — STORM DRAINAGE CROSSING
— SS — SANITARY SEWER CROSSING
W
PAM
Z
K
NE t
Z
ST a r
NE
ST NE K
17th
ith ST NE 18th
z lii
AUBURN
GOLF
COURSE
a sra a
Page 5 of 5
�A
/ 8th
e.�� 'ab
°
PROJECT SITE #4
tF
-'
�, 7th
S
NE
9th
Mop
Bth NE
SUPERMALL
10th
6, U �' k PARK
d
B
11th
o
q w YMCA
� r
12th ST
� WELL 6
PARK
13TH
14th
w
16th
Y ST P
4sr
ww
PI
o
BOUNDARY BLVD 04 G.S.
P
VH1
vtn e
°
r
PuL ER
e u
AY
DI 6 `
ST
CITY OF
AUBURN VICINITY MAP
August 2014
Pa.
aW
d
U
VETERANS
ArR
PMLi
ata R °
V
W
W
ST
b
PARR A
PARK K =WE
L 2
ath'
Ng
d
4th
ST
NE
F
3rd NE a
a
AUBURN
a K
=—Z
r
HIGH
an
s
ar
1st
F
6
d z
e
1st
SCHOOL ti
LtL
BT
z
°
a
z
R P %
Q
MAIN
a
z
E
D
2nd
Page 5 of 5
u
/ 8th
e.�� 'ab
°
PROJECT SITE #4
8th ST
3W
�, 7th
I (!Jac k Diamond Rd)�
9th
Mop
SUPERMALL
10th
6, U �' k PARK
d
M & O
11th
o
q w YMCA
12th ST
v
16th ST SW
13TH
14th
w
16th
SE
e %
°
BOUNDARY BLVD 04 G.S.
P
VH1
18th
SE m
17th ST '° SE
AVE N
AY
DI 6 `
BNSF UTILITY CROSSINGS PROJECT
CITY OF
AUBURN VICINITY MAP
August 2014
WASHINGTON
W NOT TO SCALE N
Page 5 of 5