HomeMy WebLinkAbout6541 ORDINANCE NO. 6 5 4 1
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON; RELATING TO PLANNING;
ADOPTING COMPREHENSIVE PLAN TEXT AMENDMENTS
PURSUANT TO THE PROVISIONS OF RCW CHAPTER
36.70A
WHEREAS, on August 18, 1986, the City Council of the City of Auburn adopted
a Comprehensive Plan by Resolution No. 1703 which includes a Map establishing the
location of the Comprehensive Plan Land Use Designations throughout the City; and
WHEREAS, on April 17, 1995, the Auburn City Council adopted Comprehensive
Plan Amendments by Resolution No. 2635 to comply with the Washington State Growth
Manageriment Act; and
WHEREAS, on September 5, 1995, the Aubum City Council reaffirmed that
action by its adoption of Ordinance No. 4788; and
WHEREAS, the City of Auburn published in the Seatf/e Times Newspaper an
advertisement that the City was accepting comprehensive plan amendment applications
and established a deadline for submittal of June 6, 2014; and
WHEREAS, the City of Auburn received two privately-initiated map amendments
(File Nos. CPA14-0002 & CPA14-0003) however these applications were not complete
for processing; and
WHEREAS, the City of Auburn initiated five text/policy amendments (File No.
CPA14-0001); and
WHEREAS, the Comprehensive Plan text/policy amendments were processed
by the Community Development & Public Works Department as proposed Year 2014
amendments to the City of Aubum Comprehensive Plan; and
Ordinance No. 6541
November 12, 2014
Page 1
WHEREAS, maintaining a current Capital Facilities Plan is required of the City in
order to meet regulations of the Growth Management Act under RCW 36.70A; and
WHEREAS, the environmental impacts of the proposed Year 2014
Comprehensive Plan amendments were considered in accordance with procedures of
the State Environmental Policy Act (File No. SEP14-0011); and
WHEREAS, the proposed amendments were transmitted to the Washington
State Department of Commerce, Growth Management Services Division and other
State agencies for the 60-day review period in accordance with RCW 36.70A.106; and
WHEREAS, after proper notice published in the City's o�cial newspaper at least
ten (10) days prior to the date of hearing, the Auburn Planning Commission on
November 5, 2014, conducted a public hearing on the proposed amendments; and
WHEREAS, at the public hearing the Aubum Gity Planning Commission heard
and considered the public testimony and the evidence and exhibits presented to it; and
WHEREAS, the Auburn City Planning Commission thereafter made
recommendations to the City Council on the proposed Year 2014 Comprehensive Plan
map and text amendments; and
WHEREAS, on November 10, 2014, the Planning and Community Development
Committee of fhe Aubum City Council reviewed the Planning Commission's
recommendations made a recommendation to the City Council; and
WHEREAS, on November 17, 2014, 4he Public Works Committee of the Auburn
City Council reviewed the Planning Commission's recommendations; and
Ordinance No. 6541
November 12, 2014
Page 2
WHEREAS, on December 1, 2014, the Auburn City Council considered the
proposed Comprehensive Plan amendments as recommended by the City of Auburn
Planning Commission.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, DO ORDAIN AS FOLLOWS:
Section 1. The 2014 Comprehensive Plan city-initiated Text Amendments
(CPA14-0001), are adopted and approved as set forth in Exhibit "A" attached heretb
and incorporated herein by reference. The City Clerk shall file Exhibit "A" along with this
Ordinance and keep them available for public inspection. The full text of the Capital
Facilities Plan of the City and the four school districYs Capital Facilities Plans are
adopted with the City's Comprehensive Plan, copies of which shall be on file with the
Office of the City Clerk. The City Clerk shall file them along with this Ordinance and
keep them available for public inspection. Council adopts bofh fhe Planning
Commission's recommendations, dated November 5, 2014, and the findings and
conclusions outlined in the November 6, 2014, staff report, attached as Exhibit '`B".
Section 2. The 2013 Comprehensive Plan amendments modify the
Comprehensive Plan adopted on August 18, 1986, by Resolution No. 1703 and
adopted by Ordinance No. 4788 on September 5, 1995.
Section 3. The adopted Comprehensive Plan as amended is de.signated as a
basis for the exercise of substantive authority under the Washington State
Environmental Policy Act by the City's responsible environmental official in accordance
with RCW. 43.21C.060.
--------------------------
Ordinance No. 6541
November 12, 2014
Page 3
Section 4. If any section, subsection, sentence, clause, phrase or portion of this
Ordinance or any of the Comprehensive Plan amendments adopted herein, is for any
reason held invalid or unconstitutional by any Court of competent jurisdiction, such
portion shall be deemed a separate, distinct and independent provision, and such
holding shall not affect the validity of the remaining portions thereof.
Section 5. The Mayor is hereby authorized to implement such administrative
proce.dures as may be necessary to carry out the directions of this legislation to include
incorporating into one document the adopted Comprehensive Plan map and text
amendments, attached hereto as Exhibit "A" and Exhibit "B" preparing and publishing
the amended Comprehensive Plan.
NOV 1 7 2014
INTRODUCED:
PASSED: NOV 1 7 2014
APPROVED: NOV 17 2014
ancy Back
MAYOR
ATTEST:
/����� �,��-�
Danielle E. Daskam,
City Clerk
APP ED A TO FORM:
D � B. Heid,
City Attorney
Published:�,�,��ca�l`,Cc�G�-�"�-��! °2��°�`�
--------------------------
Ordinance No. 6541
November 12, 2014
Page 4
Exhibit "A"
The Aubum, Dieringer, Federal Way and Kent School District
Capita/ Facilities P/ans,
City of Aubum Capital Facilities P/an,
(See "Comp. Plan PolicvLText Amendments" tab in the working binder, a
copy of which is on file in the office of the City Clerk, which copy is
incorporated herein by this reference )
--------------------------
Ordinance No. 6541
November 12, 2014
Page 5
� • • • � . • ' � �
:�� �, � :�,. � .� : _
_'�h�
� � , l � �I���� .�� � :�-E�,
..
� � '
,�� � ;a�, � �-��, �, .°�.- .t,�
, .� �y �- . ,— � ,� ��,, � , �,�. '
� � iPd ` 51 . '`� �. �� �.�.y� �,�� �� ��:a,�
� tir � � `�,. ��`�'_rw -
r�j� � �\ _ ___._.= '
� .�� 1,� �, , ��
� � ,
�,;,� �w•,� c;�
��� ��.�
����{��< <� �
�y�1 � � � �''j!1!
�,r; `'
��P""-- '\�'�I, ���y• _ .�.
f ' �`` ��,.,� .��.
<_t--� , � „ ' f .1
, � � � .
� , � � `-' Z �r-��'�,��
.� ��eS`w' -' .—x ��- . . .. �-.
` �i� < Y� /
�'�_.u_ L."�7�S���j�� �y�� � ��, � J`�u✓�.
� =�-- � �i/I� :�%������ I ',i 'N.
a� —5:,� "•`s- � -+` s t� I� ��i
t���i'a}�j'�'� i� i�f)i ; i� _ � l�:
� u ��ne� i. .i �t,� i ,
1 L t� . �;III � _✓ � c..l _
{ Ci �J.�p�I'����iY < �� T
'. �.1 � ��������� �1 !�f �� �'^l.:� T- �i ���
i� � I . � �
��iar��J ,� � ��1r i'���` f:-: � \ +'�, +1_
�, s4<'. ' f � I�'� � I �� r �: f `,� ��;� _
. .,.� �,. � a ✓.n,j , . , ( _
_ ���;� �:_�� -
_ '� �'%-; �=_G
, - i ,
. �i,-� ,.`.� _-
.., , ..,
_ _ ;
_ � -- . "�.`" _--:�. .1:�..�-
��::.. —.� ��:- .� '
` • • � - � � � o • � C � . • • \ •
1
�� � � � �
SCHOOL DISTRICT
ENGAGE - EDUCATE • EMPOWER
915 Fourth Street NE
Aubum, Washington 98002
(253) 931-4900
Serving Students in:
Unincorporated King County
City of Auburn
City of Algona
City of Kent
City of Pacific
City of Black Diamond
BOARD of DIRECTORS
Ray Vefik
Lisa Connors
Carol Seng
Anne Baunach
Laurie Bishop
Dr Dennis Kip Herren, Superintendent
Table of Contents
Section I Executive Summary Page 1
Section II Enroliment Projections. Page 6
Section III Standard of Service. Page 8
Section IV Inventory of Facilities. Page 15
Section V Pupil Capacity Page 19
Section VI Capital Construction Plan. Page 22
Section VII Impact Fees. Page 26
Section VIII Appendices. Page 30
Appendix A.1 -Student Enrollment Projections Page 31
Appendix A.2-Capital Facilities Plan Projections Page 45
Appendix A.3-Student Generation Survey Page 50
Aubum School District No. 408
Capital Facilities Plan
2014 through 2020
Section I
Executive Summary
Aubum School District No. 408
CAPITAL FACILITIES PLAN
2014 through 2020
I. Executive Summary
This Six-Year Capital Facilities Plan (the "Plan") has been prepared by the Auburn
School District(the "District") as the DistricYs principal planning document, in compliance
with the requirements of Washington's Growth Management Act and the adopted
ordinances of the counties and cities.served by the District. This Plan was prepared
using data available in the spring of 2014
This Plan is consistent with prior long-term capital facilities plans adopted by the District.
However, this Plan is not intended to be the sole plan for all of the DistricYs needs. The
District may prepare interim and periodic long-range Capital Facilities Plans consistent
with Board Policies and actions, taking into account a longer or a shorter time period;
other factors and trends in the use of facilities; and other needs of the District as may be
required. However, any such plan or plans will be consistent with this Six-Year Capital
Facilities Plan.
To enable the collection of impact fees in the unincorporated areas of King County and
within the City of Aubum arid City of Kent; the King County Council, the City of Aubum
and the City of Kent will adopt this Plan by reference as part of each jurisdiction's
respective comprehensive plan. To enable the collection of impact fees in the Cities of
Aigona, Pacific and Black Diamond, these municipalities must also adopt this Plan and
adopt school impact fee ordinances.
Pursuant to the requirements of the Growth Management Act and the local ordinances,
the Plan will be updated on an annual basis, and any changes in the fee schedule(s)
adjusted accordingly
The Plan estabiishes the DistricYs "standard of service" in order to ascertain the DistricYs
cuRent and future capacity While the State Superintendent of Public Instruction
establishes square footage guidelines for capacity, those guidelines do not account for
the local program needs of the District. The Growth Management Act and the school
impact fee ordinance authorize the District to define its standard of service based on the
DistricYs specific needs. In general, the Districfs current standard provides that class
size for grades K-2 should not exceed 25 students and 20.3 students for school
designated as serving high poverty areas; class size for grades 3-4 should not exceed
27 stuclents; class size for grade 5 should not exceed 30 students. When averaged over
the six elementary grades, this computes to 24.8 students per classroom. Class size for
grades 6-12 should not exceed 30 students, with some subject areas restricted to lesser
numbers. (See Section III for more specific information.)
The capacity of the schools in the District is calculated based,on this standard of service
and the existing inventory of facilities including transitional classrooms. The DistricYs
2013-14 capacity was 13,203. The actual number of individual students was 14,971 as
of October 1, 2013. (See Section V for more specific information.)
2
The Capital Construction Plan shown in Section VI addresses the additions and
proposed modemization to the DistricYs existing facilities. This provided for a new high
school, Aubum Mountainview, approved by the voters in February 2003 and opened in
September 2005, and the addition of two new elementary schools approved by the
voters in February 2005; with Lakeland Hills Elementary opening in the Fall of 2006 and
Arthur Jacobsen Elementary opening in the Fall of 2007 The plan includes the
construction of a new middle school and a new elementary school, as well as the
acquisition of a future school site to accommodate growth. The new facilities are
required to meet the projected student population increase to be generated from the
large development areas within the Auburn School District. Three areas that have
significant impact on the school district are the Lakeland South, the Lea Hill, and the
north Auburn valley areas of the district. There are other pockets of development that
impact the District as well. The City of Kent has an area of approximately 158 acres that
was sold to developers in 2004. The economic downtum has slowed development in
these areas, but recent new coristruction is beginning to pick back up.
The District completed a comprehensive review of all district facilities and in October
2008. A Steering Committee made recommendations to the Board for capital
improvements to existing facilitie.s and replacement of seven schools over the next ten
years. These recommeridations led to a capital improvements levy and a bond issue that
was placed on the ballot in March 2009 Both ballot measures were unsuccessful in
March. The board determined to rerun only the capital improvements levy in November
2009, which the voters approved. In the Fall of 2011 the school board determined to
move fonvard with the Aubum High School Modemization and Reconstruction Project
and placed the project before the voters in February of 2012. The bond issue was
supported by the community at nearly 57% approval rate, but was short of the super
majority requirement of 60%. In March of 2012 the school board determined to rerun the
bond again in November of 2012. In November 2012, the bond passed at 62% and
construction for the Auburn High School Modernization and Fteconstruction Project
began on February 25, 2013. Phase 1 of the three phase project is nearing completion.
Approximately 60% of the total new building area will be occupied by Aubum High
School studerits and staff in the fail of 2014
The School Impact Fee Ordinances adopted by King County, the City of Aubum and the
City of Kent provide for the assessment of impact fees to assist in meeting some of the
fiscal impacts incurred by a district experiencing growth and development. Section VII
sets forth the proposed school impact fees for single family and multi-family dweiling
units. The student generation factors have been developed using the students who
actually attend school in the Auburn School District from single family and multi-family
developments coristructed in the last five years. There have been dramatic changes in
the student generation factors for multi-family in 2013 and 2014. The District plans to
carefully monitor the numbers over the next several years to determine if this is a trend
or an anomaly The method of collecting the data is with the use of GIS mapping
software, data from King County and Pierce County GIS; and to integrate the mapping
with student data from the DistricYs student data system. This method gives the District
actual student generation numbers for each grade span for identified developments.
This data is coritained in Appendix A.3.
3
Aubum School District No.408
CAPITAL FACILITIES PLAN
zo�a cnro�en soso
EXECUTIVE SUMMARY
Listed below is a summary level outline of the changes from the 2013 Capital Facilities Plan that
are a part of the 2014 Plan. The changes are noted by Section for ease of reference.
Section i
Executive Summary
A. Updated to reflect new information within the Plan.
B. Summary level list of changes from previous year
Section II
Enrollment Projections
Updated projections. See Appendices A.1 & A.2.
Section III
Standard of Service
A. Increase of 11 full-day kindergarten classrboms at elementary level.
B. Reduction of maximum K-2 class size from 25 to 20.3 students
at 11 elementary schools designated as serving high poverty areas.
Section IV
Inventory of Facilities
A. Add 2 portables at Lakeland Hills Elementary
B. Remove 7 portables at Auburn High School due to the Auburn High School
Modemization and Rec.onstruction Project.
C. Add 2 portabies at Alpac Elementary
D Add 1 portable at Dick Scobee Elementary
E. Add 1 portable at Evergreen Heights Elementary
F Add 2 portables at Gildo Rey Elementary
G. Add 2 portables at Hazelwood Elementary
H. Add 2 portables at Ilalko Elementary
I. Add 2 portables at Pioneer Elementary
J. Add 1 portable at Terminal Park Elementary
K. Add 1 portable at Washington Elementary
Section V
Pupil Capacity
Removal of seven portable classrboms from Aubum High School results in a reduction in
student capacity of 210 students (7 classrooms x 30 students per ctassroom). No change in
student capacity results from the 16 additional elementary school portables which meet
facility needs resulting from transition to full day kindergarten and class size reduction rather
than increased enroliment.
4
Aubum School Dis6tict No.408
CAPITAL FACILITIES PLAN
2014 through 2020
EXECUTIVE SUMMARY
Impact Fees CHANGES TO IMPACT FEE DATA ELEMENTS 2013 to 2014
- - CPF CPF - -
DATA ELEMENTS 2013 2014 EXPLANATION
Student Generation FacWrs
Single Family Consistent with King County Ordinance 11621,
Elementary 0.2270 0.1650 Student Generation Factors are calculated
Mid School 0.0850 0.0760 by the school district based on district
Sr High 0.1290 0.0890 records of average actual student generation
Muiti-Family rates for new developments constructed
Elementary 0.1720 0.2230 over the last five years.
Mid School 0.0700 0.0910
Sr High 0.0960 0.0920
School Construction Costs
Elementary $25,000,000 $29,800,000 Updated estimates for 2014.
Middle School $48,800,000 $52,800,000 Updated estima;es for 2014.
Site Acquisition Costs
Cost per acre $308,155 $356,728 Updated estimate on land costs.
Area Cost Allowance aoeckn mde: $200.40 $200.40 Updated to projected SPI schedule. (July 2013)
Match % -State 59.19% 62.31% Updated to current SPI schedule.
Match % -District 40.81% 37.69% Computed
District Average AV
Single Family $199,919 $210,210 Updated from March 2014 King County
Dept of Assessments data.
Multi-Family $75,278 $78,449 Updated from March 2014 King Counry
Dept of Assessments data using weighted
average.
Debt Serv Tax Rate $2.11 $2.12 Current Fiscal Year
GO Bond Int Rate 3.74% 4.38% Current Rate(Bond Buyers 20 Index 3-14)
Section VIII
Appendices
Appendix A.1 -Updated enrollment projections from October 1, 2013
Appendix A.2-Updated enrollment projections with anticipated buildout schedule from March 2014
Appendix A.3-Student Generation Survey April 2014
5
Aubum School District No. 408
Capital Facilities Plan
zo,a m�o�9n zozo
Section II
Enrollment Projections
Aubum Sehool District No.408
CAPITAL FACILITIES PLAN
2074 through 2020
ENROLLMENTPROJECTIONS
The Auburn School District uses a modified cohort survival model to projeot future enrollment for all
of the DisVicYs operations. Table 11.1 is an eMract from the comprehensive projection model found in
Appendix A:2 titled "CAPITAL FACILITIES PLAN Enrollment Projections" This Table shows the
anticipated enrollment for the next six years based on the previous 6 year history of the District under the
assumptions set forth in the comprehensive projections, Appendix A.1, and the projection for additional
students generated from new developments in the disVict as shown in Appendix A.2.
TABLE ASD ENROLLMENT
11.1 PROJECTIONS March 2074
2013-14 2014-15 2015-16 2016-17 2017-18 201&19 2019-20
GRADE Actual Pro'ected Pro'ected Pro'ected Pro'ected. Pro'ected P.ro'ected
KDG 1170 1215 1258 1300 1342 '1381 1417
1 1188 1230 1272 1315 1357 1397 1432
2 1124 1211 1250 1293 1335 1375 1410
3 1125 1142 1227 1266 1308 1348 1384
4 1123 1163 1178 1263 1302 1341 1377
5 1075 1147 1185 1200 1284. 1321_ 1357
K-5 - - 6805 - - - 7108 7370 7637 7928 8163 - --8377
6 1076 1088 1157 1195 1210 1292 1324
7 1072 1106 1116 1186 1224 1236 1314
8 1116 1083 1115 1125 1194 1229 1238
6-8 3264 3277 3388 3506 3628 3757 3876
9 1159 1301 1267 1300 1310 1378 1409
10 1229 1171 1312 1277 1311 1319 1381
11 1240 1221 1160 1300 1266 1296 1299
12 1274 1313 1291 1232 1371 1335 1360
9- 12 4902 5006 5030 5109 _ _ 5258_ _._ 5328_ 5449
TOTALS 14,971 15,391- - 15,788 16,252 -16,614 17,248 - --17.702
GRADES K=12 Actual Pro ected Pro ected Pro'ected Pro'ected Pro ected Pro ected
K-5 6805 7708 7370 7637 7928 8163 8377
6-8 3264 3277 3388 3506 3628 3757 3876
9-12 4902 5006 5030 5109 5258 5328 5449
_K�12 _ 14,971 15,391 15,788 16,252 16,814 17,246 17,702
Note: The Districfis currently operating Full Day Kindergarten in fourteen eiementary schools. This
includes State funded Full Day Kindergartens at ten elementary schools. The State projects to fully
implement Full Day Kindergarten by 2018.
7
Auburn School District No. 408
Capital Facilities Plan
2014 through 2020
Section III
Standard of Service
Auburn School District No.408
CAPITAL FACILITIES PLAN
2014through 2020
STANDARD OF SERVICE
The School lmpact Fee Ordinances adopted by King County, the City of Auburn and the City of Kent indicate
that eaqh school district must establish a "Standard of Service"in order to ascertain the overal!capacity to house
its projected student population. The Superintendeni of Public Instruction establishes square fo6tage
capacity"guidelines for computing state funding suppoR. The fundamental purpose of the SPI guidelines
is to provide a vehide to equitably disfribute state matching funds for school consWction projects. By default
these guidelines have been used to benchmark the districf's capacity to house its student population. The SP!
guidelines do not make adequate provision for loca!district program needs, facility configuratioris, emerging
educational reform, or the dynamics of each studenYs educational program. The Au6urn School Disfrict Standard
of Service addresses those local considerations that require space !n excess of the SPI guidelines. The efiect
on the space requireinents for both permanent and relocatable facilities is shown below for each grade artioulation
pattem. Conditions that may result in potential space needs are provided for information purposes without
accompanying computations.
OVERVIEW
The Auburn School District operates fourteen elementary schools housing 6,805 students in grades
K through 5. The four middle schools house 3,264 students in giades 6 through 8. The District operates
three comprehensive senior high schools and one alternative high school, housing 4,902 students in
grades 9 through 12.
CLASS S/ZE
The number of pupils per classroom determines the number of classrooms required to house the
student population. Specialists create additional space needs. Class sizes are subject to collective
bargaining agreements. Changes to class size agreements can have sign�cant impact on available space.
The current pupil/teacher limit across all elementary programs is an average of 24.8 students per
teacher Consistent with this staffing limit, room capacities ar8 set at 24.8 studerits per room at.grades
K-5. At grades 6-12 the limit is set at 30 pupiis per room. The SPI space allocation for each grade
articulation level,less the computed reduction for the Aubum School Dishict Standard of Service,
determines the DistricYs capacity to house projected pupil populations. These reductions are shown
below by grade articulation level.
ELEMENTARY SCHOOLS
STRUCTURED LEARNING FOR DEVELOPMENTALLY DISABLED SPEClAL EDUCATION
The Auburn School District operates a structured learning program for students with moderate to severe
disabilities at the elementary school level which curzently uses ten classrobms to provide for 96 students.
The housing requirements for this program are provided for in the SPI space guideiines. No loss of
capacity is expected unless population with disabilities grows at a disproportionate rate compared to
total elementary population.
ADAPTIVE BEHAVIOR
The Auburn School District operates an adaptive behavior program for students with behavior
disabilities at the elementary school level.The program uses one classroom to provide for seven students.
The housing requirements for this program exceed the SPI space allocations by one classroom.
Loss of Permanent Capacity 1 room @ 24.8 each = (25)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (25)—-
9
Aubum Sch'ool District No.408
CAPITAL FACILITIES PLAN
2014 through 2020
STANDARD OF SERVICE
SPEClAL EDUCATION RESOURCE ROOMS
The Auburn School District operates a resource room program at the elementary level for special
education students requiring instruction to address their specific disabilities. Fourteen standard
classrooms are required to house this program.The housing requirements for this program exceed
the SPI space guidelines by seven standard classrooms. Continued loss of capacity is expected as growth
in program is larger than the total elementary population.
Loss of Permanent Capacity 7 rboms @ 24.8 each = (174)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
'I'otal Capaciry Loss (174)
NATIVE AMERICAN RESOURCE ROOM
The Auburn School District operates two resource rooms to support the education of Native American
students at the elementary level. Two standard classrooms are fully dedicated to serve these students.
Loss of Permanent Capacity 2 rooms @ 24.8 each = (50)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (50)
HEAD START
The Auburn School District operates a Head Start program for approximately 114 pre-school aged children
in six sections of 1%2 day in length. The program is housed at three elementary schools and utilizes
three standard elementary ciassrooms and auxiliary office spaces. The housing requirements
for this program are not provided for in the SPI space guidelines.
Loss of Permanent Capacity 3 rooms @ 24.8 each = (74)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (74)
EARLYCHILDHOOD SPECIAL EDUCATION
The Auburn School District ope�ates a pre-schobl program for young children with disabilities below
age five. This program is housed at seven different elementary schoois and currently uses 10
standard classrooms.The housing requirements for this program are not provided for in the SPI
space guidelines.
Loss of Permanent Capacity 10 rooms @ 24.8 each = (248)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (248)
READ/NG LABS
The Auburn School District operates a program for students needing remediation and additional
language arts instruction. These programs utilize non-standarii classroom spaces if available in
each elementary school. Four elementary schools do not have non-standard rooms available, thus
they are housed in a standard classroom.The housing requirements for this program are not
provided for in the SPI space guidelines.
Loss of Permanent Capacity 4 rooms @ 24.8 each = (99)
Loss of Temporary Capaciry 0 rooms @ 24.8 each = 0
Total Capacity Loss (99)
10
Auburn ScFiool Disfict No.408
CAPITAL FACILITIES PLAN
2014 throu9h 2020
STANDARD OF SERVICE
MUS/C ROOMS
The Distrid elementary music programs require one acousticaily modfied classroom at each elementary
school for music instruction. The housing requirements are not provided for in the SPI space guidelines.
Loss of Permanent Capacity 14 rooms @ 24.8 each = (347)
Loss of Temporary Gapacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (347) -
EIVGLISH AS A SECOND LANGUAGE PROGRAM
The Auburn School District operates a pullout program at the elementary school level for studgnts
lea�ning English as a second language. This program requires fourteen standard classrooms that are riot
provided for in the SPI space guidelines.
Loss of Permanent Capacity 14 rooms @ 24.8 each = (347)
Loss of Temporary Capacity 0 rooms @ 24.85 each = 0
Total Capacity Loss (347)
SECOND GRADE TOSA PROGRAM
The Aubum School Distrid provides a TOSA reading specialist program for eight highly impacted
elementary schools. This pullout model provides direct instruction to students who are not at grade
level and do not receive other services. This prograrii requires eight standard classrooms that are
not provided for in the SPI space guidelines.
Loss of Permarient Capacity 8 rooms @ 24.8 each = (198)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (198)
ELEMENTARY LEARN/NG SPECIALIST PROGRAM
The Aubum School District provides a learning specialist program to increase Iiteracy skills for
first and second graders. This program model was originally created from the I-728 funds and currenUy
has the specialist going into existing teacher classrboms, as well as pulling out studenfs into
designated classrooms. The district is utilizing classrooms at all fourteen elementary schoois.
Loss of Permarient Capacity 14 rooms @ 24.8 each = (347)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (347)
FULL DAYKINDERGARTEN
The Auburn School District provides Full-Day Kindergarten programs to increase academic skills for
kindergarten students. This program model has been created from tuition, Title I funds, LAP funds, and
currently there are ten schools receiving state funding for 2013-14 school year l'he district is utilizing 50
classrooms at all fourteen elementary schools. Housing requirements exceed the OSPI space
guidelines for this program by 25 classrooms.
Loss of Permanent Capacity 25 rooms @ 24.8 each = (620)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (620)
11
Aubum School DisVict No.408
CAPITAL FACILITIES PLAN
2014 tlirough 2020
STANDARD OF SERVICE
EARLY CHILDHOOD EDUCATION ASS/STANCE PROGRAM
The Auburn School District provides an Early Childhood Education program to meet local needs
for disadvantaged students. The State has fund an increase of 12 ECEAP seats. This program will
require one new classrooms for 2014-15.
Loss of Permanent Capacity 1 rooms @ 24.8 each = (25)
Loss of Temporary Capacity 0 rooms @ 24.8 each = 0
Total Capacity Loss (25)
MIDDLE SCHOOLS
SPECIAL.EDUCATION RESOURCE ROOMS
The Auburn School District operates a resource room program for each grade at the middie school level.
This is to accommodate special educatiomstudents needing remedial instruction to address their spec'rfic
disabilities. Eight classrooms are required at the middle school level to provide for approximately 316 students.
The housing requirements for this program are not entirely provided for in the SPI space guidelines.
ADAPTIVE BEHAVIOR SPECIAL EDUCATION
The Auburn School District offers a self-contained program for students with moderate to severe behavior
diabilities. The program is housed at one of the middle schools and uses two classrooms. One of the
riyo classrooms for this program are prbvided for in the SPI space allocations.
Loss of Permanent Capacity 1 rooms @ 30 each = (30)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss (30)
STRUCTURED LEARNING CENTER AND DEVELOPMENTALLY DISABLED SPECIAL EDUCATION
The Auburn School District operates five structured learning classrooms at the middle school level for
students with moderate to severe disabilities and one developmentally disabled classroom for students with
profound disabilities. Two of the five classrooms for this program are provided for in the SPI space allocations.
Loss of Permanent Capacity 3 rooms @ 30 each = (90)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss (90)
M/DOLE SCHOOL COMPUTER LABS
The Auburn School District operates a minimum of one computer lab at each middle school.This program
utilizes a standard classroom per middle school. The housing requirements for this program
are not prbvided for in the SPI space guidelines.
Loss of Permanent Capacity 4 rooms @ 30 each = (120)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss (120)
ENGLISH AS A SECOND LANGUAGE
The AubuFn School District operates a pullout program at the middle school level for students
learning English as a second language. This program requires four standard classrooms that are not
provided for in the SPI space guidelines.
Loss of Permanent Capacity 4 rooms @ 30 each = (120)
Loss of Temporary Capacity 0 rboms @ 30 each = 0
Total Capacity Loss (120)
12
Auburn School District No.408
CAPITAL FACILITIES PLAN
2074 through 2020
STANDARD OF SERVICE
ROOM UTILIZATION
The Auburn School District provides a comprehensive middle school program that includes
eiective options inspecial interest areas. Facilities to accommodate special interest activities are
not amenable to standard classroom usage. The district averages 95% utiliiation of all available
teaching stations. SPI Report#3 dated 12/14/11 identifies 148 teaching stations available in the
mid-levei faciiities. The utilization pattern results in a loss of approximatefy 8 teaching stations.
Loss of Permanent Capacity 8 rooms @ 30 each = (240)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss - (240)
SENIOR HIGH SCHOOLS
SEN/OR HIGH COMPUTER LABS
The Auburn School District operates two computer labs at each of the senior high schoois. This
program utiliies two standard classrooms at cbmprehensive high schools and one at West Auburn.
The housing requirements for this program are not provided for in the SPI space guidelines.
Loss of Permanent Capacity 7 rooms @ 30 each = (210)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss (210)
ENGLISH AS A SECOND LANGUAGE
The Auburn School District operates a pullout program at three comprehensive high schools for students
learning English as a second language. This program requires three standard classrooms that are not
provided for in the SPI space guideliries.
Loss of Permanent Capacity 3 rooms @ 30 each = (90)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss (90)
ADAPTIVE BEHAVIOR SPECIAL EDUCATION
The Auburn School District,offers a self-contained program for students with moderate to severe behavior
diabilities. The program is housed at one of the high schools and uses one classroom. The housing
requirements for this program are not provided for in the SPI space allocations.
Loss of Permanent Capacity 1 rooms @ 30 each = (30)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss (30)
STRUCTURED LEARNING CENTER PROGRAM
The Aubum School District operates nine structured_learning center classrooms for students with
moderate to severe disabilities. This program requires five standard classrooms that are riot provided
for in the SPI space guideiines.
Loss of Permanent Capacity 5 rooms @ 30 each = (150)
Loss of Temporary Gapacity 0 rooms @ 30 each = 0
Total Cap'acity Loss - -(150) -
13
Auburn School District No.408
CAPITAL FACILITIES PLAN
2074 through 2020
STANDARD OF SERVICE
SPECIAL EDUCATION RESOURCE ROOMS
The Aubum School District operates a resource room program at the senior high level for special
education students requiring instruction to address their specific learning disabilities. The current
high school program requires 10 classrooms to provide program to meet educational needs of
the students. The SPI space guidelines provide for one of the 10 teaching stations.
Loss of Permanent Capaciry 10 rooms @ 30 each = (300)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss (300)
PERFORMING ARTS CENTERS
Auburn High School includes 25,000 square feet used exclusively for a Performing Arts Center The
SPI Inventory inciudes this space when computing unhoused student capacity This space was
not intended for nor is it usable for classroom instruction. It was constructed to provide a
community center for the performing arts. Using SPI capacity guidelines, 25,000 square feet
computes to 208 unhoused students or 8.33 classrooms.
Loss of Permanent Capacity 8.33 rooms @ 30 each = (250)
ROOM UTILIZATION
The Auburn School District provides a comprehensive high school program that includes numerous
elective options in special interest areas. Facilities to accommodate special interest activities are
not amenable to standard classroom usage. The district averages 95% utilization of all available
teaching stations. There are 185 teaching stations available in the senior high facilities. The utilization
pattern results in a loss of approximately 10 teaching stations.
Loss of Permanent Capacity 10 rooms @ 30 each = (300)
Loss of Temporary Capacity 0 rooms @ 30 each = 0
Total Capacity Loss (300)
STANDARD OF SERVlCE COMPUTED TOTALS
ELEMENTARY
Loss of Permanent Capacity= (2,554)
Loss of Temporary Capacity 0
Total Capacity Loss (2,554)
MIDDLE SCHOOL
�oss of Permanent Capacity= (600)
Loss of Temporary Capacity 0
Total Capacity Loss (600)
SENIOR HIGH
Loss of Permanent Capaciry= (1,330)
Loss of Temporary Capacity 0
Total Capacity Loss (1,330)
TOTAL
Loss of Permanent Capacity= (4,484)
Loss of Temporary Capacity 0
Total Capacity Loss (4,484)
14
Aubum School District No. 408
Capital Facilities Plan
2014 through 2020
Section IV
F i
Inv nto of acil fiies
e
�
Auburn School DisVict No.408
CAPITAL FACILITIES PLAN
20'14 throu8h 2020
INVENTORY OF PACILITIES
Table IV 1 shows the current inventory of permanent district facilities and their OSPI rated capacities.
Table IV.2 shows the number and location of each portable unit by schooi. The district uses relocatable
faciiities to: I
1 provide interim housing in school attendance areas uniquely impacted by increasing school I
populations that would otherwise require continual redistricting,
2. make space available for changing program requirements and offerings determined by unique
student needs, and
3. provide housing to cover district needs until perma�ent facilities can be financed and constructed.
Relocatable facilities are deemed to be interim, stop gap measures that often place undesirable sVess on
existing physical plants. Core facilities(i.e. gymnasiums, resVooms, kitchens, labs, lockers, libraries, etc.)are
not of sufficient size or quantity to handle the increased school population served by adding relocatabie
classrooms.
Table PermanentFacilfties District School Facilities
IV 1 @ OSPI Rated Capaciry
(December2013)
Buildin Ca acit Acres Address
Elementa Schools
Washin ton Elementa 486 5.40 20 E Street Northeast,Aubum WA,96002
Tertninai.P.ark Elementa 408 6.70 1101 D Street Southeast,Aubum WA,98002
Dick Scobee Elementa 477 10.50 1031 14th Street Northeast,Auburn WA,98002
Pioneer Elementa 441 8.30 2301 M Street Southeast Aubum WA,98002
Chinook Elementa 440 8•75 3502 Aubum Wa .South,Aubum WA, 98092
Lea Hill Elementa 450 10.00 30908 124th Avenue Southeast,Aubum WA,98092
Gildo Re Elementa 551 10.00 1005 37th Street Southeast,Auburn WA 96002
Ever reen Hei hts Elem. 456 8.09 5602 South 316th Aubum WA,98001
AI ac Elementa 497 10.60 310 Milwaukee Boulevard-North, Pacific WA,98047
Lake Vew.Elementa 559 16.40 16401 Southeast 318th Street,Aubum WA,98092
Hazelwood Elementa 580 �Z•6� 11815 Southeast 304th SVeet Aubum WA 98092
Ilalko-Elementa 585 �Z•�� 301 Oravetr Place Southeast,Aubum WA,98092
Lakeland Hills Elementa 594 12.00 1020 Evergreen Way SE,Aubum WA,98092
Arthur Jacobsen Elementa 614 10:00 29205132""St�eet SE,Aubum WA,98092
ELEM CAPACITY 7,138
Middle Sehools
Cascade Middle School 829 17.30 1015 24th SVeet NoRheast, Aubum WA,98002
OI m ic Middle.School 921 17 40 �gp5 K Street Southeast,Aubum WA,98002
Rainier Middle School 843 26:33 30620 116th Avenue Southeast,Aubum WA.98092
Mt. Baker Middle School 837 3Q�88 620 37th$treet Southeast Aubum WA,98002
MS CAPACITY 3,430
Senior Hi h Schools
West Aubum Hi h School 233 5:10 401 West Main SVeet Aubum WA 98001
Aubum Senfor Hi h 2 101 �8•6� 800 Fourth Street Northeast,Aubum WA,98002
Aubum Riverside HS 1 387 33.00 501 Oravetz Road,Aubum WA, 98092
Aubum Mountainview HS 1,443 40.00 2gg00 124'^Ave SE,Aubum WA,98092
SH CAPACITY 5 164
TOTAL CAPACITY 15,732
16
�.cr3-�g t ' ; . y;� �� : �� S e . z�i� �'is , s � L'e�a, - ,r, . -.n .'_K i , � _
���a -��. ? _ -- 'i '�'-:��._ _ l rE i r 'r -1;� , �..w � ` �� .. .. � .. � .. Gwm I�_ .��'��- �ry, .� �.� �1 �...
Y 1 ' i y . : �7ti y. + • � y � e � •W'^ � c � f"
;!�• o � 'c. ��� �(�_,. 1 �� �t� , �� 1� MF � ., � rf 3 ,r,p �,� �r.
.K:L+'��`_ • �..��...0 m ��?2 _ ��, 6�:'. i `iol�t �,..�. i i} '�v ��,� i��I p, .5� , �• "'xY"^� ,-i�l,' .,� : I �'e� �. dA�a
` 1 o-
, . - - •Y � r �. sA4 iy 15'� I . ..i,,ji�ry�,. . � ..
1 -�S �ofTq�ef� � g...��'7ri ___ c� .s �� `�.�� f� Yij a:�� _a. _ _ w _ §, _y:._�"t�: -� 1 ��y�,�'� la� �� .s-��� ���5���yj� � . - e�T��
ri� _�_.--_ � , '�s- 5 � .. .L.�...�5ci i `�°i ` � .:.3 .. �. � f�aC ,.`96y�. �� � z i �1- '�_. � «. �y��P��� '+f � ._/" i:�
J �•�' � �i.lm I.' �� i51 - � ♦ `i�rm i.;� ; az .���e;3��� '� � i: " '__ � e �tl�Q yl�"�i-s���" � x�ly�. �� Pa E y ' / .
a
. . '� � ., . µ.: � ,,�� eex q S i�ij .
� ' � . .___j s� ..f ,� �..�. ; ? [� :ti r �.�.�a• �. ,"� . 1 �� �� §;. i.. ri��a.�ap_yril.� :._'E' 3 ;� a kau.J, �A l ��!�^�i `9 �_. . / _ +_
.v..r ' : a y�`-, ._ .4___..�- ' _-4y � " 7L�� ,3: ��s„ a.-,' s � i� ' a $ z�a. 7,yJ��� ��V-. $� ' � �- -
�� �
,."r � t. s �_�,,,_�e .__ ` � w � �r,. '� .� �i�` . j G d � � 165e� s"'- ' ,, �.",'�' : _ �� g .i - ._ � .�'` . `
. _. -�Y� �y
�, � ' C a`� ° � _I i �f. .. �`' i`�_ �.�"t � ' a y y a � � isl�..��' ���,��.5
.�''y,t�•� -'-�#� �Mijrtl i � � i( ��p,,;. �_Y —. .i�*� ..�., a / .. � +' I � 'r"`"y , � °��` ='t;� '' � ;��'• �� ✓' "si �'d
.: 7 f'+� k � \ LL�___ .�"�".fa � � �li ;C. :�C I i � i j i �� o � Lryn� �-"' I r �K_ i �J,�i .,1°�F �'�r �� i/ 1� � \
q _ ��. � � I ' .t� �-c �� c. y.�� __ � y_ _ _. 1,_ •`���y`" _. Q - wr 5 - `� vr-c; �x , /
t - '��, k�. 5 �y '"� 1 i �i-r Ent. , ._� 1_An�YWlaeai�: i r.� - �`"9. uL��� g �>.n� ..'4a� �i�� q . S/ y Y�� 'tb +u„� y ��j.�_ •
q �[ y m.� �
�Ri� '.s�S", C i� . �y� t �J'�~�'f°"Cnutwru ��. :�I� \� I. .��°, �•. y. C F� n.i� ���_ �yl� ��ee ce. � I .r R4'e�}' �, `c 'j � /+•+ ' �'�
x�34Y, 4 � � . 5F, . YF {i .. 1 ' .v.E I � ` 2 �' �7' . 1 , '� �1�\ g � �� � ���au// - - .� �i .,. c�.�o .y� �J i��F Y�U i `' �a: � .Ft'. ��
f E"_ q -� �� � . �
'-�"����� �� �w 3�} i� � Ji7�l., � � ��\. s�,'`'' i� ' ��'fb� � ; -.I= l + —' ---� `_' _._-+c � �.. t __� un..=:'-,�(� ,�ff_ � - - -
��',t���..�,� � 8 �� 1 rG` , A` q '' , ,
. i y' �`:i"'�`'a'i�. ��e .} .eS. a� ��.. :?,.. � +� 'S," �i I - f _ �..._�"�' '� ., i ` i�i f � ti( ��N.r. ' Ht'
�i.�. � ���� ! ��l �f �� s (T�` .s.-. '�j� , I �u�� i I �, , ..\ .Sc � ,e , �'�� � � s�. %� `li1F_.�°'^" \ � •
�'*�' � � ' `I (f'S i I �Ta li -����1 ��: � / � d i I ' � , � � � r' •�L � 1 I 1 B � x., �yf� . ''�
� w}�S�,Tt ! t �1� ; � �1 � �r• �. :a ..� '� i .a'9 :u�''Q 'i { -s^.,E-' r' ' e � ��i �b,). 1 `, _
+ I e� �; � 'y { � ..!` 'W ' � . � �o-C��.... �1i- :� '�f --��� `���I� � l; 4�. � �` \��
' ,-,� ii�� �� ' :�; i v 1-. � � � _ p�� _
q '- . . ic.�. � � �u- �r..v _ � � �� ���_ .-� ' � �-L'j
a y
��S.�j'.� �'�� � ��� - ���� . �� � `�° ? 2a�.. �A�I � �_ ��t ��� ' } j •. / � s��
� � -,-�, -�1 5'�- _ i __Q^i s � � a��= M t r.�'u.w .MOfpnvlll
� .� �� � �
a "�=&�. � ..="`�Li- �� ,�I � 5 e�c:. :" • r r ------ � . 3 # -- }- -�� J _�l r ,i- - _ 1 J _. �L ,, } � . "
� 4 M I� I � ,�, C p "z'1 t -' ' � � - _� �yQ ' � � � „ ,!� //__ �/ � 'S.' F -.A �.. a
�� ';''� � ' : � � �'�u � , b �' � �\�• °�'� �.' ti_. s 9µ , ��, , ;� ;� �°� �,�—�� • '�,,�-��''� 1� y = � . , ' , ' ` � ; � ��
. \,� .
y � '' �'i � ` - � ��., ' ,-' " � „ � ,� ° i . '
��J�, 9 l �. �\ �� � � _ __ �a-�}' ,°�- _. . . �` ` , _
} � � }ti i $, �'e •� '�,. r � i
' , ' ,r ' t � � f ,�
. " " � c" '� �ll� � �.1 �� - - I �� ', ' _''__._ "�t_ � .�� � �
�{, +� co c ,��s � a \�_� � � ��3a> - - ��
.
. �i � ., s e '. - n . I Y x � y�^,'�J _ — - _� / I f 1 ��� F� 1\ { t n • �_ �C� .
, ' . r � ' -r
� � ( _— � , _
� s • � "
;� � . .��..' � _ '�'tr� � 3 ,� �c: �$� r�.., �r, � � �„� .�. j � :�"� ', -��a�a K oia�'o�N� � ,�, � �
� . �`g� � �'. ,..��.o ��, ¢ �re ..
� ' t I � � ��� �p� � � '"�'� f' .. __ _< u�u.�. _ �� � �� �� � I�.tiR i . .� _ . � � � _ � _
f ��� a_i T��� ,r� � al `\ �g��� -�—R'w. � .•.-. . . .f�i •� .%� �.R ` j ' �n� � � � � ��_y - e� t :'� / BLei`D`I�m�< �___� �'.
�, �i fi � i_ rw�q f, - � " Al� , U3R1� �� `� ';`�,�- �,�;J %I � � �„,f,,� � �"� � pk``� ' :�'�� ,
� � , , .� «� '�s. ,' ' � t ' ___- „ � ` -ii-� - " u -t;' ��i " � `� .i � 9b=. - x5 a ' i � . �
}m��it � �l � . ' . ., . 'a ' WCRlESNOPi 3 2 'rti� .n . �.. G j ' . ` .,�+-�e __ _�_ - ' _____ _ — 3:?��,.5 ¢ .�- 't"' r,i` ,�'py�' ,� . . .V -�� � -fs _ '._' __
i �
'! ��� � I �,�, �0t :�. �f � , ,I�a,. PF� ; v� .:�.:�.. . i_._ �'�i � \ /I � !�7�{�� iz ��,'�y7' �.;�. � __ eH9�lp�.r.,/� �l l'7i% �. I I '� � � �
�\. r �� r �. �tJ � . 1� � - � ; . 1� I
. �� ! i 'Ir.�� � r � � ' ' I r' t ,___ �f�CiM..�- _ \ _ _ � `� � _ . .
, ,
� '- a� �: ..rt �, •-
. � � • , s g ' � ;
. � i .ei.av., ' ,- "-�- t -• : . M &�a y�: •1� 'F D- � `� .i '.r� �l{f lJ �-F��J�}`�"1` � ,_ G �D . �,.\� 0 •n �� '-'ti, '� � t x krlry'!e�., �
r
-.� ye C'. • ' i � ��\ , 'l t � "] .�r;;'g � t �� L t �
� • -t� i�� ,,'!,�'; �� �- -r ��j �P�^, '.'s"'a � � �� ' - (� .l i L � �.-�..i'`�.;,_ � P -t 1 uPo�n �_f � Fk1i�o� l R�� <z,'��:.i `�1� 1,.� ,(�°� \+ .;
Y - � ,/,. "�'� . : r. .•� 4
�1;,_ �' � . . �, i I we� HIOIAN _ _ _ __ r �___.___ _ �. _ -..w rk � , �4y\.. 4.t p 1�L� es � _ �. �� "�,. �..
I . /�. y. . ' � ,.. 3 19- ' � i I ' 1 ( � �'o � ���j . �l
a� ,� �
�.�� '� .� _ _"". - E ,' . � � � �� �y`'�� >.-. ' ` \ �B Y l ., � �� �� . �eL� muw. �si{
r � '� I I' ' � ✓ ., E � � � - � l �( S t C I °•I d� T` � i" ^[ L� i
1 as. �! i. � � „ !�}, i.i ...�\. � ,�i�� � t_ kl_ J. � � y ,.'�-�� ��.';*r -�- S� ,k:?i , y '�— i� ..___
i.. �.,�d � � � -fr /1�^�� E ^' .� . � r r � '�� � W I�.wa1 -'�-L �_ ��� � , ` � I - 1�• i ' � "�t �C,}•,�{� � �__'-
�� � 1 I � .J -_ il �I. � .. '�� )� _ t� ] _ _._r' r '� a Yv. r t _ i' -�. d � S .. �M` �rlL`Zst-�•i,oJ��E:� __ _ _
'kP � a ..l .' ��' F : €� aF�'-' .. hc, ,�1 j�`,y �1�� _�;°� �=-� ;' �'��~ 4���� , �a � 1�i ! :�.
J
I ���.� �__ v I a A '- �� ... � (c�aa , �i �x .. 1 -�U -� . �(r .
. � "� -N' u � j v� �� � K� ' � � . i
i � '- „ �
�_ p °� � '� r � � �r ��� �y��� r_ �`'i I �s � � .. '' I �t T 3 MI . � �� �i Y` � a !�` �
.� T I L �y �� _ �.�. qi Y`� � i » i�. __ 1 ' � - -� -r'-;-i\ ----- \n �- ---- �t- .� � - -
�'� �G1 I ' ..s' , " �� -i -II y-+,� - '31 [ �?'a - 4• � J � � � j p �� � " 'r "o . `�. ' - 'i
�� °i. ' � _, � � �Fd mFr" ;� % � i� •" , � ��,� 'i. , �^'�}, �' � � � , ��' a �; 1 �` ' AUBURN SCHOOL DISTRICT 408 `
, y �
.� Is"' � fj .' �i�`�y jf�'. �'���'' r . . �i �� I/ � � � i �ri 'i7',.>: � �A ': i � •.w=�rrru., ���� i'.:.:o.����.... �
! I ' 1 � .. {,aClfl ' F ti:�-c' a.�'��. _ 6a �. ;1_:3.__� y _i `�.. � ' • c �. �' � � _I `i ' O w�"r.` ea.�wW B sr�ud..
C � , / � � -' ' ' . 4 3 •rmwi. �.�i�.�e"' e�..`w
r �� + � )l F' ,� ��.\. � �.- i I y..re.. e..�.r.rar r.+rra.
� ' �`�� � �8 �� Yg, d , � ��� L"�4 . _ `� . '.�`..�vs y - �i}. .�i� _ _ _ '"',..6 _ _ al_" 5 +r,w� sn
� .p S
.
� .S'�`'-�7 ' ,>S ` e. � s, 'f� �.. � �e� � � Yt . .wuerr�cstroor wvwav ,�I p�r�.. 00"�'u"" S s`v....4u.
,
, \� ., .
I j w J� a rl, xn �...- yy t " 1ew t i ' �� rr+�rr �r.`�r rs w
� ,. . � ` � � ry o��rv,s�c �� �
l .i-�-� . .�., � s✓i �. : h r� � , l a b f � -_ _.._ 'e �m:o w..�
1 q � I �f ���, � c,. '� _" _ _+' . � - _ ool S.u. wr ss v r ���.rr4r.i
; - _- _. 2 ;'�,�e., Y .I ` i'iL7 , ,� _\" � '" � 'C 9 - �`i � w u �
, , ' „ ' � I � � m � . r ( . �� � Y �` �-�t i.. .... /Rscmn)xw O�r.rr. 'r'°" 0 si.r.nr p M�=u.�..
Q 1 \\C
:7 ' i 7 ,��_�� 4 �. �I , 4`� �.c �F ' � � �l�' �+� . \�i; ➢DS \��e 1 'r.'-'t �"_i � _ 'i.iTn� � I a 8 Ou::suW �!r'�e-"�r �wrrau.+n.. .
, � _'.� rJi�`�t�11 1 �`
' � • � 1 f "1 i wr�w
�.�}k,, � �� �, �-.�� : I� ,j ' �t� � ,�t � � ' �� ! ' � � - � :,:: ��o� ��.r'�,�..... t
E Y 6 E W�E QQ 9 • ' � °.��.- 7l,. ! � R���� _ � .�� ��r�� � . � . O a M'u' S'�"'r"'r' A::.'�"..'eru '
. a�� I , '� j •� __ _�• � �,-y.�. .. _ � t�r� � . i � .' _ - - � 7�I w. � u�..a'o r«v i.
f �+ � - a�- � � ���!'� �,)1 � �s' ' e�.�,. r ._-.r..' ` M_ 1- i p��;�rr 0..~.u�uaw �
Auburn School District No.408
CAPITAL FACILITIES PLAN
2ot4 through zOza
INVENTORY OF FACILITIES
TABLE TEMPORARY/RELOCATABLE
IV.2 FACILITIES INVENTORY
(March 2014
Elementa Location 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Washington 1 2 3 3 3 3 3
Terminal Park 3 3 4 4 4 4 4
Dick Scobee 4 4 4 5 5 5 5
Pioneer 5 6 6 6 6 6 6
Chinook 5 5 5 6 6 6 6
Lea Hill 5 5 5 6 6 6 6
Gildo Rey 4 5 5 6 6 6 6
Evergreen Heights 1 2 3 3 4 4 4
Alpac 4 4 5 5 5 5 5
Lake View 2 2 2 3 3 3 3
Hazelwood 2 2 3 3 4 4 4
Ilalko 4 5 6 6 6 6 6
Lakeland Hills Elementary 6 6 6 6 6 6 6
Arthur Jacobsen Elementary 0 0 1 1 2 2 2
TOTAL UNITS 46 51 58 63 66 66 66
TOTAL CAPACITY 1,141 1,265 1,438 1,562 1,637 1,637 1,637
Middle School Location 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Cascade 0 0 2 2 2 2 2
Olympic 0 0 2 2 2 2 2
Rainier 5 7 7 8 8 8 8
Mt. Baker 8 8 8 S 8 S 8
TOTAL UNITS 13 15 19 20 20 20 20
TOTAL CAPACITY 390 450 570 600 600 600 600
Sr. Hi h School Location 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
West Aubum 0 0 1 1 1 1 1
Auburn High School 0 0 0 0 0 0 0
Auburn High School-'TAP 1 1 1 1 1 1 1
Auburn Riverside 13 13 13 13 13 13 13
Auburn Mountainview 2 2 4 4 4 4 4
TOTAL UNITS 16 16 19 19 19 19 19
TOTAL CAPACITY 480 480 570 570 570 570 570
'TAP-Transition Assistance Program for 18-21 year old students with special needs.
COMBINED TOTAL UNITS 75 82 96 102 105 105 105
COMBINED TOTAL CAPACITY 2,071 2,795 2,578 2,732 2,807 2,807 2,807
'Note: Reduction of portables at Aubum High School is due to the Auburn High School Modernization and
Reconstruction Project.
18
Auburn School District No. 408
Capital Facilities Plan
2014 through 2020
Section V
Pupil Capacity
Auburn School District No.408
CAPITAL FACILITIES PLAN
2014 through 2020
PUPIL CAPACITY
While the Aubum School District uses the SPI inventory of permanent facilities as the data from
which to determine space needs, the DistricYs educational program requires more space than that
provided for under the formula. This additional square footage is converted to numbers of pupils in
Section III, Standard of Service. The DistricYs capacity is adjusted to reflect the need for additional
space to house its programs. Changes in the capacity of the district recognize new unfunded
facilities. The combined effect of these adjustments is shown on Line B in Tables V 1 and V.2 below.
Table V 1 shows the DisticYs capacity with relocatable units included and Tabie V2 without these units.
Table V 1
Capacity
WITH relocatables 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
A. SPI Capacity 15,732 15,732 15,732 15,732 15,732 15,732 16,532
A.1 SPI Capacity-New Elem 550
1/ A.2 SPI Capacity- New MS 800
B. Capacity Adjustments 2,529 2,473 2,289 1,906 (1,752 1,677 1,677
C. Net Capacity 13,203 13,259 13,443 13,826 13,980 14,855 15,405
D. ASD Enrollment 14,791 15,391 15,788 16,252 16,814 17,248 17,702
3/ E. ASD Surplus/Deficit (1,588) (2,132) (2,345) (2,426) (2,834) (2,393) (2,297)
CAPACITY ADJUSTMENTS
Include Relocatable 1,955 2,011 2,195 2,578 2,732 2,807 2,807
2/ Exciude SOS 14 4,4&4 4,484 4,484 4,484 (4,484 4,484 4,484
Total Adjustments (2,529) (2,473) (2,289) (1,906) (1,752) (1,677) (1,677)
Table V.2
Capacity
WITHOUT relocatables 2013-14 2014-15 2D15-16 2016-17 2017-18 2018-19 2019-20
A. SPI Capacity 15,732 15,732 15,732 15,732 15,732 15,732 16,532
A.1 SPI Capacity-New Elem 550
t/ A.2 SPI Capacity-New MS 800
B. Capacity Adjustments 4,484 4,484 4,484 4,4&4 4,484 4,484 4,484
C. NetCapacity 11,248 11,248 11,248 11,248 �1,248 12,048 12,598
D. ASD Enrollment 14,791 15,391 15,788 16,252 16,514 17,248 17,702
3/ E. ASD Surplus/Deficit (3,543) (4,143) (4,540) (5,004) (5,566) (5,200) (5,104)
CAPACITY ADJUSTMENTS
2/ Exclude SOS ( 14 4,484 4,484 4,484 4,484 4,484 4,4&4 4,484
Total Adjustments (4,484) (4,484) (4,484) (4,484) (4,484) (4,484) (4,484)
1/ New facilities shown in 2017-18 and 2018-19 are not funded under the current Capital Facilities Plan.
2/ The Standard of Service represents 26.61%of SPI capacity. When new facilities are added the Standard
of Service computations are decreased to 24.51%of SPI capacity
3/ Students beyond the capacity are accomodated in other spaces(commons, library,theater shared teaching space).
20
Aubum School DisVict No.408
CAPITAL FACILITIES PLAN
2014 through 2020
PERMANENT FACILITIES PUPIL CAPACITY
�SPI Rated Capacity
(March 2014
A. Elementa Schools
Buildin 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
Washington 486 486 466 488 486 486 486
Tertninal Park 408 408 408 408 408 408 408 ,
Dick Scobee 477 477 477 477 477 477 477
Pioneer 441 441 441 441 441 441 441
Chinook 440 440 440 440 440 440 440
Lea Hill 450 450 450 450 450 450 450
Gildo Rey 551 551 551 551 551 551 551
Evergreen Heights 456 456 456 456 456 456 456
Alpac 497 497 497 497 497 497 497
Lake View 559 559 559 559 559 559 559
Hazelwood 580 580 580 580 580 580 580
Ilalko 585 585 585 585 585 585 585
Lakeland Hilis 594 594 594 594 594 594 594
ArthurJacobsen 614 614 614 614 614 614 614
Elementa #15 550
ELEM CAPACITY 7,138 7,138 7,138 7,138 7,138 7,138 7,888
B. Middle Schools
Buildin 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
Cascade 829 829 829 829 829 829 829
Olympic 921 921 921 921 921 921 921
Rainier 843 843 843 843 843 843 843
Mt. Baker 837 837 837 837 837 837 837
Middle School#5 800 800
MS CAPACITY 3,430 3,430 3,430 3,430 3,430 4,230 4,230
C. Senior Hi h Schools
Buildin 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20
West Aubum 233 233 233 233 233 233 233
Auburn 2,101 2,101 2,101 2,101 2,101 2,101 2,101
Auburn Riverside 1,387 1,387 1,387 1,387 1,387 1,387 1,387
Auburn Mountainview 1,443 1,443 1,443 1,443 1,443 1,443 1,443
SH CAPACITY 5,164 5,164 5,164 5,164 5,164 5,164 5,164
COMBINED CAPACITY 75,732 15,732 15,732 15,732 15,732 76,532 17,062
21
Auburn School District No. 408
Capital Facilities Plan
2014 through 2020
Section VI
Capital Construction Plan
Aubum School District No.408
CAPITAL FACILITIES PLAN
2014through 2020
CAPITAL CONSTRUCTION PLAN
The formal process used by the Board to address current and future facility needs began in 1974
with the formation of a community wide citizens committee. The result of this committee's work was
published in the document titled 'Guidelines forDevelopment.' In 1985 the Board formed a second
Ad Hoc citizens committee to further the work of the first and address the needs of the District for
subsequent years. The work of this committee was published in the document titled 'Directions for
the Nineties.' In 1995 the Board corrimissioned a third Ad Hoc citizens committee to make
recommendations for improvements to the DistricYs programs and physical facilities. The committee
recommendations are published in the document titled 'Education /nfo The Twenty-First Century--
A Gommunity lnvolved.'
The 1995 Ad Hoc committee recommended the District develop plans for the implementation,
funding, and deployment of technology throughout the OistricYs programs. The 1996 Bond
proposition provided funding to enhance the capacity of each facility to accommodate technological
applications. The 1998 Capital Levy provided funding to further deploy technology at a level
suificient to support program requirements in every classroom and department. In 2005 and 2014,
replacement technology levies were approved to continue to support technology across all facets of
the DistricYs teaching, learning and operations.
In addition to the technology needs of the District, the Ad Hoc committee recognized the District
must prepare for continued student enrollment growth. As stated in their report, "the District must
pursue an appropriate high school site as soon as possible." The Ad Hoc recommendation included
commentary that the financing should be timed to maintain consistent rates of tax assessments.
A proposition was approved by the voters on April 28, 1998 that provided $8,000,000 over six years
to address some of the technology needs of the District; and $5,000,000 to provide funds to acquire
school sites.
During the 1997-98 school year, a Joint District Citizen's Ad Hoc Committee was appointed by the
Auburn and Dieringer School Boards to make recommendations on how best to serve the school
population from an area that includes a large development known as Lakeland South. Lakeland
South at that time was immediately adjacent to the southern boundary of the Auburn School District.
On June 16, 1998 the Ad Hoc Committee presented its recommendation at a joint meeting of the
Auburn and Dieringer Boards of Directors. On June 22, 1998 the Auburn School Board adopted
Resolution No. 933 authorizing the process to initiate the adjustment of the boundaries of the District
in accordance with the Ad Hoc Committee's recommendation. On June 23, 1998 the Dieringer
School Board adopted a companion Resolution No. 24-97-98 authorizing the process to initiate the
adjustment of the boundaries in accordance with the Ad Hoc Committee's recommendation. These
actions resulted in the transfer of an area from Dieringer to Auburn containing most of the Lakeland
South development and certain other undeveloped properties.
Property for the third comprehensive high school was acquired in 1999. The Board placed the
proposition on the ballot four times prior to passing in 2003. Each election was extremely close to
passing. After the fourth failure a community meeting was held and from that meeting the Board
determined need for further community study
In April of 2002, the Board formed a fifth citizen's Ad Hoc committee to address the following two
items and make recommendations to the Board in the Fall of 2002:
a. A review of the conclusion and recommendations of 1985 and 1995 Ad Hoc Committees
related to accommodating high school enroliment growth. This included the review of
possible financing pians for new facilities.
b. Develop recommendations for accommodating high school enrollment growth for the next 10
years if a new senior high school is not built.
23
Auburn School District No.408
CAPITAL FACILITIES PLAN
2014through 2020
CAPITAL CONSTRUCTION PLAN
This committee recommended the Board place the high school on the ballot for the fifth time in
February 2003. The February election approved the new high school at 68.71% yes votes. The
school opened in the Fall of 2005.
In the Fall of 2003 the school board directed the administratio�to begin the planning and design for
Elementary#13 and Elementary#14 In the Fall of 2004, the Auburn School Board passed
Resolution No. 1054 to place two elementary schools on the ballot in February 2005. The voters
approved the ballot measure in February of 2005 at 64 72%. Lakeland Hills Elementary(Elementary
#13) opened in the Fail of 2006. Arthur Jacobsen Elementary (Elementary#14) is located in the
Lea Hill area and opened in the Fall of 2007 These two elementary schools were built to
accommodate the housing growth in Lakeland Hilis and Lea Hill areas of the school district.
In the 2004-05 school year, the Board convened a sixth Citizen's Ad Hoc committee to again study
and make recommendations about the future impacts in the District. One of the areas of study was
the need for New Facilities and Modernization. The committee made a number of recommendations
including school size, the need for a new middle school, and to begin a capital improvements
program to modernize or replace facilities based upon criterion.
During the 2005-06 school year, a Joint District Citizen's Ad Hoc Committee was appointed by the
Auburn and Kent School Boards to make recommendations on how best to serve the school
population that will come from an area that includes a number of projected developments in the
north Auburn valley On May 17, 2006 the Ad Hoc Committee presented its recommendation at a
joint meeting of the Aubum and Kent Boards of Directors. On June 14, 2006 the Kent School Board
adopted Resolution No. 1225 authorizing the process to initiate the adjustment of the boundaries of
the District in accordance with the Ad Hoc Committee's recommendation. On June 26, 2006 the
Auburn School Board adopted a companion Resolution No. 1073 authorizing the process to initiate
the adjustment of the boundaries in accordance with the Ad Hoc Committee's recommendation.
These actions resulted in the transfer of an area from the Kent School District to the Auburn School
District effective September 29, 2006.
In October of 2008, after two years of review and study, a Steering Committee made
recomme.ndations to the school board regarding the capital improvements program to modernize or
replace facilities as recommended by the 2004-05 Citizen's Ad Hoc Committee. These
recommendations, based on specific criteria, led to the school board placing a school improvement
bond and capital improvements levy on the ballot in March 2009. Voters did not approve either
measure that would have updated 24 facilities and replaced three aging schools. The boarcJ decided
to place only a six-year Capital Levy on the ballot in November of 2009, which passed at 55.17%.
The levy will fund $46.4 million of needed improvement projects at 24 sites over the next seven
school years. Planning for the replacement of aging schoots has sta�ted with educational
specifications and schematic design process beginning in 2010 for Aubum High School. A future
bond issue will be necessary to fund these projects.
The school district acquired a site for a future middle school in 2009 and will need to consider
possibilities for a site for elementary school#15. The Special Education Transition Facility opened
in February of 2010. This facility is designed for students with disabilities that are 18 to 21 years old.
In the November 2012 election, the community supported the $110 million bond issue for the Auburn
High School Modernization and Reconstruction Project at 62%. The groundbreaking occurred in
February 2013 and construction began. This phased project is scheduled to be completed within the
next three years. Phase I is nearing completion. Approximately 60% of the total new building area
will be occupied by Auburn High School students and staff in the fall of 2014
za
Auburn School Distrid No.408
CAPITAL FACILITIES PLAN
zota u,roueh 2020
CAPITAL CONSTRUCTION PIAN
Within the six-year period, the District is projecting 2,172 additional students mostly from new
development in the Lakeland, Lea Hill, and north Auburn valley areas. This increase in student
population will require the construction of a new middle school and acquiring a new elementary
school site and constructing an elementary school during the six-year window
Based upon the DistricYs capacity data and enrollment projections, as well as the student generation
data included in Appendix A:3, the District has determined that approximately eighty-six percent of
the capacity improvements are necessary to serve the students generated from new development,
with the remaining additional capacity required to address existing need.
The table below illustrates the current capital construction plan for the next six years. The exact
timelines are wholly dependent on the rate of growth in the school age population and passage of
bond issues and/or capital improvement levies.
2014-20 Capital Construction Plan
March 2014
Projected Fund Project Timelines
Pro'ect Funded Cost Source 13-14 14-15 15-16 16-17 17-18 18-19 19-20
All Facilities- 2013
Technology Yes $22,000,000 6 Year XX XX XX XX XX XX )p(
Modernization Cap Levy
Pohables Yes $2,100,000 Impact � � � XX XX XX
11 Fees
�� Property Purchase Impaa
New Elementa No $3,500,000 Fees XX XX XX XX
Multiple Facility yes $46,400,000 Capital � � � �
Im rovements Levy
Bond XX XX XX
1/ Middle School#5 No $52,800,000 Impacc Fee plan const open
Bond )()( )()( )p(
1/ Elementary#15 No $29,800,000 Impad Fee lan const open
AHS Modernization Yes $110,000,000 Bond Issue � � �
const const o en
il These funds may be secured through local bond issues,sale of real property, impact fees,and state matching funds.
The District currently is not eligible for state assistance at the elementary school level for new construction. The tlistrict is eligible for
state matching funds for modernization.
25
Auburn School District No. 408
Capital Facilities Plan
2014 through 2020
Section VII
Impact Fees
Auburn Scho .rict No 408
CAPITAL FACILITIES PLAN
2014 through 2020
IMPACT FEE COMPUTAT/ON(SpNng 2014)
Middie School#5 within 5 year period
Elementary#15 within 5 year period
L SITE COST PER RES/DENCE
Fortnula: ((Acres x Cost per Acre)/Facildy Size)x Student Fador
SRe Costl Facildy Student Generation Fador CosU CosU
Acreage Acre Capaciry Single Famity Mutti Family Single Famiy Mulli Famiy
Elem(K-5) 12 $356,728 550 0.1&50 02230 $1,28422 $1,735.64
Middle Sch(6-8) 25 $0 800 0.0760 0.0910 $0.00 $0.00
Sr High(9 12) 40 $0 1500 0.0890 0:0920 $0.00 $0.00
51.284.22 $1,735.84
II. PERMANENT FAC/L/TY CONSTRUCTION COST PER RES/DENCE
Formula: ((Facility CosVFacilily Size)x Student Fador)x(Pertnanent to Total Square Footage Percentage)
Facility Facility °/a Perm Sq FU Student Generation Factor CosU Cost/
Single Family Cost Size Total Sq Ft Sin le Famiy Multi Famil Single Famity Multi Famity
Elem (K-5) $29,800,000 550 0.9626 0.1650 02230 $8,605.49 $11,630.45
Mid Sch(6 8) $52,800,000 800 0.9626 0.0760 0.0910 $4,828.31 $5,78127
Sr High(9-12) $0 1500 0.9626 0.0890 0.0920 $0.00 $0.00
$13,433.80 517,411J2
lll. TEMPORARYFACILITYCONSTRUCT/ONCOSTPERRESIDENCE
Fortnula: ((Facility CosUFaciliy Size)x Student Factor)x(Temporary to Total Square Footage Ratio)
Facility Faciliry %Temp Sq FV StudentGeneration Factor CosU CosV
Single Family Cost Size Total Sq Ft Sin le Famil Multi Family Single Famil Multi Famil
Elem(K-5) $150,000 24.8 00374 0.1650 0.2230 $37.34 $50.47
Mid Sch(6-8) $150,000 30 0.0374 0.0760 0.0910 $1422 $17.02
Sr High(9 12) $150,000 30 0.0374 0.0890 0.0920 $16.65 $17.21
568.20 884.70
IV. STATE MATCH CREDIT PER RESIDENCE
FormuW: (Boeckh index x SPI Footage x District Match x Student Fador)
8oeckh SPI State Stutlent Generation Fador CosU CosU
Indrac FooW e Match Sin le Family Muki Famiy Single Famiy Mutti Famiy
Elem�(K-5) $200.40 90 62.31°/, 0.1650 02230 $1,854.31 $2,50613
MidSch(6-8) $200.40 117 62.31% 0.0760 0.0910 $7,110:34 $1,329.48
Sr High(9-12) $0.00 130 62.31% 0.0890 0.0920 $0.00 $0.00
S2,9W.85 $3,835.82
27
Aubum Sch�_.��strid No 408
CAPITAL FACILITIES PLAN
2074 through 2020
V. T/!X CREDIT PER RESIDENCE
formula: Expressed as lhe present value of an annudy
TC=PV(interest rete,discount period,average assd value x tau rate)
Ave Resid Curr Dbt Serv Bnd Byr Indx Number of Tau Credd Tax Credit
Asstl Value Tax Rate Ann Int Rate Years Single Famity MuRi Family
SingleFamily $210,210 $2.12 438% t0 53,54716
Mutti Famiy $78,449 $2.12 4.38% 10 $1,323.78
Vl. PEVELOPER PROVIDED FACILITYCREDIT
Formula: (Value of Site or FacilityMumber ot dwelling unRs)
Value No.of Unks Facildy Credd
Single Famiry $0.00 1 50.00
Mulli Family $0.00 1 50.00
fEE PER UNIT IMPACT FEES
RECAP Single Multi
SUMMARY Famiy Famiy
Sile Costs $1,28422 $1,735.64
PertnanentFacilityConstCosts $13,433.80 $�74�172
Temparary Faciliry Costs $6820 $84.70
State Match Credd ($2,964.65) ($3,835.62)
Tax Cred'R ($3,547 16) ($1,323.78)
FEE(No Discount) $8,274.42 $14,072.67
FEE(50°/,Discount) $4,137.21 $7,036.34
Less ASD 50%Discount $0.00 ($3,5�8 17)
Faciliry CredN $0.00 $0.00
Net Fee Oblfgation $4,1J7.21 53,518.17
28
Aubum Scho. .rict No.408
CAPITAL FACILITIES PLAN
2014 through�2020
SINGLE FAMILY MULTI FAMILY
IMPACT FEE�ELEMENTS Elem Mid Sch Sr High Elem Mid Sch Sr High
K-5 6-8 9-12 K 5• 8-8' 9-12'
Student Factor Single Famiy-Aubum actual count(3/14) 0.165 0.076 0 089 0223 0.09f 0.092
New Fac Capaciry 550 800 1500 550 800 1500
New Facility Cast Elementary Cast Estimates April 2014 $26,000,000 $50,700,000 $26,000,000 $50,700,000
Middle Schaol Cost Estimate April 2014
Temp Rm Capacity ASD District Standard of Service. 24.8 30� 30 24.8 30 30
GradesK-5@24.Band6-12@30.
Temp Facility Cost Relocatables,inGuding site work,set up,and fumishing $150,000 E150,000 $150,000 $150,000 $150,000 $150,000
Site Acreage ASD Distrid Standard or SPI Minimum 12 25 40 12 25 40
Site CasVAcre Sce below $356,728 $356,728 $356,728 $358,728 $356,728 $356,728
Perm Sq Footage SPI Rpt#3 dated December 14,2011 1,695,317 1,695,317 1,695,317 1,695,317 1,695,317 1,695,317
Temp Sq Footage 75 poAables at 832/896 sq.ft.each+TAP 3500 65,900 65,900 65,900 65,900 65,900 65,90Q
Tolal Sq Footage Sum of Permanent and Temporary above 1,761,217 1,761,217 1,761,217 1,761,217 1,761,217 1,761,217
% Perm Facilkies Pertnanent Sq.Footage divided by Total Sq.Footage 9626°/a 9626% 96.26°h 96.26% 96.26% 96.26%
°�-Temp Facilities Temporary Sq.Footage divWed by Total Sq.Footage 3.74% 3.74% 3.74°/, 3.74% 3.74% 3.74%
SPI Sq FllStudenl From SPI Regulations 90 117 130 90 117 130
Boeckh Index From SPI schedule for December 2012 $200.40 $200.40 $200.40 $200.40 $200.40 $200.40
MatCh%-Stale FfomSPlWebpagBDecambef2012 62.31% 62.31% 62.31% 62.31% 62.31% 62.31%
MatCh% DiS�fICt CompUted 37.69°/a 37.69% 37.69% 37.69% 37.69% 37.69%
Dist Aver AV King County Department ot Assessments March 2014 $210,210 $210,210 $210,210 $78,449 $78,449 $78,449
Debt Serv Tax Rate Curtent Fiscal Year $2.12 $2.12 $2.12 $2.12 $2.12 $2.12
G.O Bond Int Rale Current Rate-(Bond Buyer 20lridex March 2014) 4.38% 4.38% 4.38'Yo 4.38% 4.38°h 4.38°h
Sit6 COS�Pf0 BCtfOI1S •student generation rares zatz tor mWtl-tami�y
Recent Property Purchase Purchase Purchase Adjusted �Projected Annual Sttes Latesl Date Projeded
Acquisitions Acreage Year Price CosUAcre Present Day Inflation Fador Re uired ot Acquisition CosUAcre
Lakeland 12.00 2002 $2,701,043 5225,087 $310,687
Labredor 35.00 2008 $7,601,799 E217194 $223,710
Lakeland East 27:00 2009 $9;092,160 5336,747 $336,747
Tofal 74.00 $19,395,002 $282,095 $290,381 5.00°/a Elementary 2017 $356,728
29
Auburn School District No. 408
Capital Facilities Plan
2014 through 2020
Section VIII
Appendix
Appendix A.1 - Student Enrollment Projections
Appendix A.2 - CAPITAL FACILITIES PLAN Enrollment Projections
Appendix A.3 - Student Generation Survey
Appendix A.1 - Student Enrollment Projections
Auburn School District #408
Student Enrollment Projections
October 2013
Introduction
The projective techniques give some consideration to historical and current data as a basis for
forecasting the future. In addition,the `projector' must make certain assumptions about the operant
vaziables within the data being used. These assumptions are"judgmental"by definition. Forecasting
can be defined as the extrapolation or logical extension from history to the future,or from the known
to the unknown. The attached tabular data reviews the history of student enrollment, sets out some
quantitative assumptions, and provides projections based on these numerical factors.
The projection logic does not attempt to weigh the individual sociological, psychological,economiq
and political factors that aze present in any demographic analysis and projection. The logic embraces
the assumptions that whatever these individual'factors have been in the past are present today, and will
be in the future. It further moderates the impact of singular factors by averaging data over thirteen
years and six years respectively The results provide a trend,which reflects a long(13-year)and a short
(6-year)base from which to extrapolate.
Two methods of estimating the number of kindergarten students have been used. The first uses the
average increase or decrease over the past 13 and 6-yeaz time frame and adds it to each succeeding
year The second derives what the average percentage Aubum kindergartners have been of live births
in King County for the past 5 years and uses this to project the subsequent four yeazs.
The degree to which the actuals deviate from the projections can only be measured after the fact.
This deviation provides a point of departure to evaluate the effectiveness of the assumptions and logic
being used to calculate future projections. Monitoring deviation is critical to the viability and
credibility of the projections derived by these techniques.
Tables
Table 1—Thirteen Year Hisiorv of October 1 Enrollments—page 3
The data shown in this table is the baseline information used to project future enrollment. This data
shows the past record of enrollment in the district on October 1 of each year.
Table 2—Historical Factors Used rn Proiections- page 4
This table shows the three basic factors derived from the data in Table 1 These factors have been
used in the subsequent projections. The three factors are:
• Factor 1—Average Pupil Change Between Grade Levels
This factor is sometimes referred to as the"holding power"or"cohort survival:' It is a
measure of the number of pupils gained or lost as they move from one grade level to the
next.
e Factor 2 -Average Pupil Change by Grade Level
This factor is the average change at each grade level over the 13 or 6-yeaz period.
o Factor 3—Auburn School District Kindergarten Enrollment as a Fuuction of King
County Live Births.
This factor calculates what percent each kindergarten class was of the King County live
births in the five previous years. From this information has been extrapolated the
kindergarten pupils expected for the next four years.
1
Table 3—Proiection Models—pages 5-13
This set of tables utilizes the above mentioned vaziables and generates several projections. The
models are explained briefly below
❑ Table 3 13 (pg 5)—shows a projection based on the 13-year average gain in kindergarten
(Factor 2)and the 13-year average change between grade levels(Factor 1). The data is
shown for the district as a whole.
❑ Table 3.6(pg 5)—shows a projection using the same scheme as Table 3 13 except it
shortens the historical data to only the most recent 6 yeazs.
❑ Table 3.13A aqd 3.6A(pg 6)—uses the same factors above except Factor 3 is substituted
for Factor 2. The kindergarten rates aze derived from the King Counry live births instead
of the average gain.
❑ Tables 3E.13,3E.6,3E.13A, 3E.6A(pg 7)—breaks out the K-5 grades from the district
projection. Summary level data is provided for percentage gain and pupil gain by grade
articulation.
❑ Tables 3MS.13,3MS.6, 3MS.13A,3MS.6A(pg 8)—breaks out the 6-8 gades from the
district projection. Summary level data is provided for percentage gain and pupil gain by
grade articulation.
❑ Tables 3SH.13, 3SH.6, 3SH.13A,3SH.6A(pg 9)—breaks out the 9-12 grades from the
district projection. Summary level data is provided for percentage gain and pupil gain by
grade articulation.
❑ Table 4(pg 10)—Collects the four projection models by grade group for ease of
compazison.
❑ Table S (pgs 11-13)—shows how well each projection model performed when compared
with actual enrollments. Data is provided in both number and percent formats for the
past 13 yeazs.
Summarv
This year is the second consecutive year of an increase in enrollment after three consecutive years of
declining enrollment.The increase of 375 students changes our historical average gain/loss in
students. Over the past 6 yeazs the average gain is now 48%annually,which equates to an average
annual gain of 69 students.
Using the cohort survival models,the data below is a summary of the range of vaziation between the
four models. This data can be used for planning for future needs of the district.
The models show changes in the next six years:
• Elementary level show increases ranging from 342 to 1328. (page 7)
• Middle School level show increases ranging from 489 to 538. (page 8)
• High School level show increases ranging from 353 to 410.(page 9)
The models show these changes looking forwazd thirteen years:
• Elementary level show increases ranging from 2341 to 2773 (page 7)
• Middle School level show increases ranging from 442 to 1248. (page 8)
• High School level show increases ranging from 795 to 1401 (page 9)
This data does not factor new developments that are currently under construction or in the planning
stages.
2
AUBURN SCHOOL DISTRICT STUDENT ' OLLMENT PROJECTIONS -October 2013
TABLE Thirteen Year History of October 1 Enroliments(Rev 10/13)
1 Actual
GRADE 01-02 02-03 03-04 04-05 05-06 06-07 07-OS OB-09 09-10 "10-11 it-12 12-13 13-14
KDG 846 905 922 892 955 941 996 998 1032 1010 7029 '1098 1170
1 968 900 982 960 � 963 1012 995 1015 1033 1066 7068 1089 1188
2 949 961 909 992 963 1002 1019 1024 998 1016 1097 1083 1124
3 966 940 996 918 1002 1031 997 1048 993 1013 996 '1111 1125
4 1077 973 ' 947 1016 939 1049 1057 1044 1073 1024 1022 1038 1123
5 1108 1062 1018 957 1065 998 1078 1069 1030 1079 1018 1070 1075
6 , 1028 1704 1111 1020 � 1004 1058 1007 1096 1040 1047 1063 1041 1076
7 '1017 1021 1731 '1124 1028 1074 . 1057 1034 1125 '1060 '1032 1086 1072
8 1004 1026 , 1052 �130 1137 �072 �033 1W6 1031 1112 '1046 1017 1116
9 1405 1441 1473 '1461 1379 1372 '1337 1256 1244 1221 1273 1200 1159
10 1073 1234 1249 1261 1383 1400 1368 1341 1277 1238 1170 1278 1229
11 1090 927 1010 1055 1782 1322 1352 1350 1303 1258 1233 '1164 1240
12 � 930 933 902 886 1088 1147 1263 1352 1410 1344 1316 '1321 �274
TOTALS �3,461 13,427 13,702 13,672 14,088 14,418 '14,559 14,703 14,589 14,482 14,363 14,596 14,971
Percent of Gain (025)% 2.05% (022)% 3.04% 2.34% 0 98% 0.99% (078)% (073)% (0.82)% 1 62% 2.57%
Pupil Gain (34) 275 (30) 4�6 330 141 144 i114� (�07� f�19) 233 375
Average°/a Gain for 1st 6 years 1.32% Average%Gain for lasf 6 years 0.48%
Average Pupil Gain for 1st 6 years. 183 Average Pupil Gain for last 6 years 69
Average°/ Gain for 13 years 0.90%
Average Pupil Gain for 73 years �26
TABLE
tA GradeGroupCombinaLons
KDG 846 905 922 892 955 941 996 998 1032 1010 1029 1098 1170
K,'1,2 2763 2766 2813 2844 2881 2955 3010 3037 3063 3092 3194 3270 3482
K-5 5914 5741 5774 5735 5887 6033 6142 6198 6159 6208 6230 6489 6805
K-6 6942 6845 6885 6755 6891 7091 7149 7294 7199 7249 7293 7530 7681
1 -3 2883 2801 2887 2870 2928 3045 30'11 3087 3024 3095 3161 3283 �� 3437
1 -5 5068 4836 4852 4843 4932 5092 5146 5200 5127 5198 5201 5391 5635
1 -6 6096 5940 5963 5863 5936 6150 6753 6296 6167 6239 6264 6432 67N
6-8 3049 3'151 3294 3274 3169 3144 3097 3206 3796 3213 3141 3144 3264
7-8 2021 2047 2183 2254 2165 2086 2090 2110 2156 2172 2078 2103 2188
7-9 3426 3488 3656 3715 3544 3458 3427 3366 3400 3393 3351 3303 3347
9-12 4498 4535 4634 4663 5032 5241 5320 5299 5234 506'I 4992 4963 4902
10-12 3093 3094 3161 3202 3653 3869 3983 4043 3990 3840 3719 3763 3743
prj'13-14 Page 3 Oclober 2013
AUBURN SCHOOL DISTRICT STUDENT f�LLMENT PROJECTIONS - October 2013
TABLE Factors Used in Projeciions Factor AUBURN SCHOOL DISTRICT KINDERGARTEN ENROLLMENTS
2 3 AS FUNCTION OF KING COUNTY LIVE BIRTH RATES
CAL- TOTAL YEAR ADJUSTED AUBURN KINDERGARTEN
Factor Average Pupil Change Between Grade ENDAR LIVE 2l3rds 1l3rds OF LNE KDG ENROLLMENT AS A%OF
1 Levels YEAR BIRTHS BIRTHS BIRTHS ENROLL BIRTHS ENROLL. ADJUSTED LIVE BIRTHS
13 YEAR BASE i 6 YEAR BASE 1973 13,449 8,966 4,483 79/80 13 478 618 4 585%
K to t I 53.92 K l0 1 49.33 1974 13 493 8 995 4 498 80/81 13,524 600 4.436%
1 ta2 'I 11A2 � to2 12.67 1975 73,540 9,027 4,513 8�/82 13,687 588 4296%
2 ta 3 13.08 2 to 3 8.17 1976 13 761 9'174 4,587 82/83 14,375 698 4.856%
3 to 4 24.50 3 to 4 27.67 1977 14,682 9,788 4,894 83/84 14,958 666 4.452°/
4 ta 5 21.67 4 to 5 13.83 1978 15,096 10,064 5,032 84/85 16,048 726 4 524%
5 ta 6 9.08 5 to 6 2 17 1979 16,524 11,016 5,508 85/86 16 708 792 4 740%
6 to 7 1425 6 to 7 20.17 1980 16,800 11 200 5,600 86I87 17,000 829 4.876°/
7to8 9.92 7108 0.67 1981 17;100 11,400 5,700 87l88 18;241 769 4216%
8 to 9 256.67 8 to 9 I 173.00 1982 18,811 12,541 6,270 88/89 16,626 817 4.386%
9 to 10 i 52.83) 9 to 10 ' 0.33 1983 18,533 �2,355 6;178 89l90 18 827 871 4 626°/
101011 t73.G0) �Oto�1 � �20�7) 1984 18,974 12,649 6,325 90191 19,510 858 4.398°/
11 to 12 i0.83) 1�to�2 � 59.50 1985 19,778 '13,785 6,593 9'1192 19,893 909 4.569%
total 287.83 total 346.83 �986 19,951 '13,301 6,650 92193 21,852 920 4210°/
Faclor � is the average gain or loss of pupils as Ihey 1987 22,803 '15,202 7,601 93194 21 624 930 4 301°/
move from one grade level to the nexl. Factor 1 uses �988 21 034 14 023 7,011 I 94195 24,062 927 3.853%
the past(12)OR(5)years of changes �989 25,576 17,051 8,525 i 95196 26,358 954 3.619%
1990 26,749 17,833 8,916 � 96/97 24,'116 963 3.993°/
Factor Average Pupil Change By Grade Level 1991 22,799 '15,199 7,600 97/98 20 973 978 4,663%
2 1992 2Q060 13,373 6,687 98/99 21,573 854 3.959%
13 YEAR BASE fi YEAR BASE 1993 22,330 14;887 7,443 99100 22,129 849 3.837°/
K 27.00 K 34.40 1994 22,029 14,686 7,343 00/01 24,013 912 3 798%
1 18.33 1 34.60 1995 25,005 16,670 8,335 07/02 22,717 846 3724%
2 14.58 2 20.00 1996 2�,573 14382 7,991 02/03 27,622 905 4'186%
3 1325 3 i 15.40 1997 21,646 14,431 7,275 03/04 22,023 922 4 786%
4 3.83 4 � 15.80 1998 22,212 14,808 7,404 04/05 22,075 892 4.041%
5 i275) 5 �' 120 1999 22,007 14,671 7,336 OSI06 22,327 955 4277%
6 4.00 6 ;4.00) 2000 22,487 14,99� 7 496 Ofi107 22 014 947 4 274°/
7 4.58 7 7.60 2001 21 778 14 519 7 259 07I08 21 835 996 4.562%
8 9.33 8 8.00 2002 21863 14,575 7,288 08/09 22,242 998 4.487%
9 120.50) 9 ' (19407 2003 22431 14,954 7,477 09I10 22,726 1032 4.541% Last5
10 13.00 70 I (22.40) 2004 22,874 15,249 7,625 10/11 22,745 1010 4.441% year
17 12.50 11 i (22D0) 2005 22,680 15,120 7,560 11112 23,723 1029 4.338% Average
12 28.67 12 I (15.50) 2006 24,244 16,163 8081 12/13 24683 1098 4.448% 4.480°/a
Faclor 2 is the averaqe change in grade level size 2007 24,902 16 601 8,301 13114 25,094 1162 Actual 4.631%
from 01/02 OR OS/09 2008 25,'190 16,793 6,397 14I15 25,101 1124 <--Pr�ctd Last 5
2009 25,057 16,705 8,352 15/16 24,695 1106 <-Pr�ctd l.ast5
2010 24,574 16,343 8,171 161�7 24,591 1f02 <--Prjctd Last5
2011 24,630 16,420 8,210 77/�8 24,898 1N5 <--Prjctd Last5
2012 25,032 16,688 8,344 �8/19 *number from DOH
Source Center for Health Statistics,Washington State Department of Health
prj13-14 Page 4 Oclober 20�3
AUBURN SCHOOL DISTRICT STUDENT F '7LLMENT PROJECTIONS - October 2013
TABLE DISTRICT PROJECTIONS
3 13 BaSed on 73 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 74115 15/16 16/17 17/18 78119 '19I20 20f21 21/22 22/23 23-24 24-25 25-26 26-27
KDG 1170 1197 1224 1251 1278 7305 1332 1359 1386 1413 7440 �467 1494 1521
1 1188 1224 1251 1278 1305 7332 1359 1386 1413 1440 1467 1494 1521 '1548
2 1124 1199 1235 1262 1289 1376 1343 1370 1397 1424 1451 7478 1505 �532
3 1125 1137 12'13 1248 1275 1302 1329 1356 1383 1410 1437 1464 1491 '1518
4 1123 1150 1162 1237 1273 130D 1327 1354 1381 1408 1435 1462 1489 1516
5 1075 1145 1171 1183 1259 1295 1322 1349 7376 1403 1430 1457 1484 15'I1
6 1076 1084 1154 1180 1192 1268 1304 1331 1358 1385 1412 1439 1466 "1493
7 1072 1090 1098 1168 1195 1207 1282 1318 1345 1372 1399 1426 1453 '1480
8 1116 1082 1100 1108 1178 1204 12'17 1292 1328 1355 1382 1409 1436 '1463
9 1759 1373 1339 1357 1365 1435 146t 1473 1549 1585 1612 1639 1666 "1693
10 1229 1106 1320 7286 1304 1312 1382 1408 1420 1496 1532 1559 1586 1613
11 1240 7156 1033 1247 1213 1231 7239 1309 1335 1347 1423 1459 1486 1513
12 1274 1239 1755 1032 1246 7212 7230 1238 1306 '1334 1347 1422 1458 1485
TOTALS 14,971 15,182 75,455 15,838 16.372 16,719 17,126 17.543 '17,9�9 18,372 18,765 19173 19,533 19,884
Percent of Gain 1 41°/ 7.80°/ 2.48°/ 3.37°/ 2 12% 2 44°/ 2.43% 2.48% 2 19% 2 14% 2 18% � 88% 1 80%
Pupii Gain 211 273 384 533 347 408 417 436 393 393 408 360 351
TABLE DISTRICT PROJECTIONS
3.6 Based on 6 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13l14 14/15 15I16 16/17 17/18 18l19 �920 20/21 2�/22 22l23 23-24 24-25 25-26 26-27
KDG 1170 1204 1239 1273 1308 1342 1376 1411 "1445 1480 1574 7548 1583 �617
1 1188 1219 1254 1288 1323 1357 1391 1426 1460 1495 1529 1563 1598 �632
2 1124 1201 1232 1266 1301 1335 1370 1404 1438 1473 1507 1542 7576 '1610
3 1125 1132 1209 1240 1275 1309 1343 1378 1412 1447 1481 1515 1550 1584
4 1123 1153 1160 1237 1268 1302 1337 1371 1405 1440 1474 1509 1543 '1577
5 1075 1137 1167 1174 1250 1282 1316 1350 1385 1419 1454 1488 1522 1557
6 1076 1077 1139 1169 1176 1253 1284 1318 1353 1387 1421 1456 1490 1525
7 1072 1096 7097 1159 1189 1196 1273 1304 1338 1373 1407 1442 1476 1510
8 7116 1073 7097 1098 1160 1190 1197 1273 1305 1339 1373 1408 1442 1477
9 7159 1289 7246 1270 1271 1333 1363 1370 1446 1478 1512 1546 158t 1615
10 1229 1159 1289 1246 1270 1271 1333 1363 1370 7447 1478 1512 1547 1581
11 1240 1208 1139 1269 1225 1250 1251 1313 1342 1349 1426 1457 1492 1526
12 1274 1300 1268 1198 1328 1265 1309 1310 1372 1402 1409 1486 1517 1551
TOTALS 14,971 15,248 15,534 '15,887 16,343 16,704 17,142 17,591 18.072 18,527 18,986 19,472 19,917 20,364
PercentofGain 185% 1,88% 227% 2.87% 221% 2.62% 2.62% 274% 2.51% 2.48% 2.56% 228% 225%
Pupil Gain 277 286 352 456 361 438 449 482 454 459 486 444 447
prj13-14 Page 5 October 2013
AUBURN SCHOOL DISTRICT STUDENT F 7LLMENT PROJECTIONS - October 2013
TABLE DISTRICT PROJECTIONS
3 13A Based on Birth Rates&13 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/74 14/15 15/16 16/17 17I18 18119 19/20 20/21 21/22 22/23 23-24 24-25 25-26 26-27
K �170 1724 1106 1�02 1115
1 1188 7224 1�78 1160 1156 N69
2 1124 1199 1235 1190 1172 1167 1181
3 1125 1137 1213 1248 1203 1185 'I180 1194
4 1123 1150 1162 1237 1273 1227 1209 1205 1218
5 1075 1145 1171 1183 1259 1295 1249 1231 1226 1240
6 �076 1084 1154 1'I80 1192 7268 1304 1258 1240 1235 �249
7 1072 'I090 1098 1�68 1195 12W 1282 1318 1272 1254 1250 1263
S 1116 '1082 1100 1108 1178 1204 1217 7292 1328 '1282 1264 '1259 1273
9 1159 1373 1339 1357 7365 1435 1461 1473 1549 '1585 1539 �521 1516 1530
10 1229 1106 1320 1286 1304 1312 �382 1408 1420 1496 1532 1486 1468 1463
�1 1240 1156 1033 1247 1213 1231 1239 1309 1335 1347 1423 1459 14�3 1395
12 1274 1239 1155 1032 1246 '12'12 1230 1238 1308 1334 1347 1422 '1458 1412
TOTALS 14,971 15,109 15,264 15,498 '15,869
PercentofGain 0-92% 103% 153% 2.39°/
Pupil Gain 138 155 234 371
TABLE DISTRICT PROJECTIONS
3.6A Based on Birth Rates 8 6 Year History
ACTUAI PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/15 15/16 16/17 �7118 18(19 19/20 20/21 21122 22/23 23-24 24-25 25-26 26-27
KDG 1170 1'124 1106 1102 1115
7 1'188 1219 1174 1156 1151 1165
2 1724 1201 1232 1186 1168 1164 1177
3 1125 �132 1209 1240 1195 1176 1172 1186
4 1123 1153 1160 1237 '1268 1222 1204 1199 1213
5 1075 1137 1167 1"174 1250 1282 �236 1218 1213 1227
6 1076 1077 1139 1169 1176 1253 1264 1238 1220 1215 1229
7 1072 1096 1097 1159 1189 1196 '1273 1304 1258 1240 1236 1249
8 1116 1073 1097 1098 1160 1190 1197 1273 1305 1259 7241 1236 1250
9 1159 1289 1246 1270 1271 1333 1363 1370 1446 1478 1432 1414 1409 1423
10 1229 1159 1289 1246 1270 127� 1333 1363 '1370 '1447 1478 1432 1414 1410
11 1240 1208 '1139 1269 1225 1250 1251 7313 1342 1349 1426 '1457 1412 1394
12 1274 1300 1268 1198 1328 1285 1309 1310 1372 1402 1409 '1486 1517 1471
TOTALS 14.971 15,168 15,322 15,502 15,766
PercentofGain '132°/ 101°/ 118% 1.70°/
Pupd Gam 197 154 181 264
prj73-14 Page 6 October 2013
AUBURN SCHOOL DISTRICT STUDENT F 7LLMENT PROJECTIONS - October 2013
3E 13 Based on 13 Year History
J J PR J J J J
GRADE 13/14 14115 15/16 16/17 17/18 18/79 79120 20/21 2122 22/23 23-24 24-25 25-26 26-27
K 777 4 5 7 1 5 1 1359 138 141 144 14 7 1494 15
1 7188 1224 1251 1278 1305 1332 1359 1386 1413 1440 7467 1494 1521 1548
2 7124 1199 1235 1262 1289 1316 1343 1370 1397 1424 1451 1478 1505 1532
3 1125 1137 1213 1248 1275 1302 '1329 1356 1383 1410 7437 1464 1497 1518
4 1113 11SU 111i2 113! 1L/3 13UU '13Z/ 1354 1381 140C t4Sb 141iL 1489 1J7ti
5 1075 1145 1171 1183 1259 1295 '1322 1349 1376 1403 1430 1457 1484 7571 year year
K-5 TOT 6805 7052 7256 7460 7679 7850 8012 8174 8336 8498 8660 8822 8984 9146 7207 2341
E�cent 0 ain . 2 0 2. 9 0 2.8 0 . 4 o . o . 2 0 1 0 1 4 0 0 0 l 4 0 1
Pupil Gam 247 204 204 219 171 162 � 162 162 162 762 162 162 162 a
TABLE -5 J
3E 6 Based on 6 Year History
A J
GRADE 13/�4 14115 15/16 16/17 17/18 18/19 19/20 20/21 21/22 22/23 23-24 24-25 25-26 26-27
7 2 4 3 127 7 4 445 14 5 1 17
1 1�88 1219 1254 1288 1323 1357 1391 1426 1460 7495 1529 1563 1598 1632
2 1124 1201 1232 1266 7301 1335 1370 7404 1438 7473 1507 7542 1576 1610
3 1125 1132 1209 1240 1275 1309 1343 1378 1412 1447 1481 1575 1550 1584
4 111J 7153 1�60 1237 11ti8 1JUY 13J7 73/7 1405 144U 14/4 1509 154:i 15I7
5 1075 1137 1767 1774 1250 1282 1316 1350 1385 1419 1454 1488 7522 1557 year year
K-5 TOT 6805 7046 7260 7478 7724 7927 8133 8340 8546 8753 8959 9165 9372 9578 1328 2773
ercent o ain . o . o . o . . . 0 54 0 2 47 0 . . . 5 0 .
Pupil Gain 247 274 218 246 � 203� 206 206 206 206 � 206� 206 0 206 206 �
TABLE -5 J TI N
3E 13A Basetl on Bidh Rates 8 13 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13114 14l15 15116 16/17 17118 18/19 19/20 20/21 21/22 22/23 23-24 24-25 25-26 26-27
7 4 1 1 111
1 1188 1224 1178 1160 1156 1169
2 1124 1199 1235 1190 1172 1167 1181
3 1125 1137 1213 1248 1203 1185 1180 1194
4 1113 11b0 1162 11'S/ 11/J "111/ 1LU9 11US iL1tl
5 1075 1145 1171 1183 1259 1295 1249 1231 1226 1240 year
K-5 TOT 6805 6979 7065 7120 7'177 372
ercent o ain .5 0 1. 7 0 . o
Pupil Gain 174 86 � 55 57
TABLE -5 P JE TI N
3E 6A Basetl on Birth Rates 8 6 Year History
ACTUAL PROJ PROJ PROJ PROJ PR J PROJ PR J PROJ PROJ PR J PR J PROJ PROJ
GRADE 13/14 14/15 15/16 16/17 17/18 18/19 1920 20/21 21l22 2Z23 23-24 24-25 25-26 26-27
17 4 11 1'I 2 'i"I 5
1 1188 1219 1174 1156 1�51 1165
2 1124 1201 1232 1186 7168 1164 1177
3 1125 1132 1209 1240 1195 1176 1172 1186
4 11YJ 1"15J 7160 1237 7268 1Y22 'IY04 1189 1213
5 1075 1137 7767 1�74 1250 1282 1236 1218 1273 1227 year
K-5 TOT 6805 6966 7047 7094 7147 342
ercent o ain - o . 6 0 75 0
Pupil Gain 161 81 � 47 53
prj13-14 Page 7 October 2013
AUBURN SCHOOL DISTRICT STUDENT F �LLMENT PROJECTIONS - October 2013
TABLE MIDDLESCHOOLPROJECTIONS
3MS 13 Based on 13 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/'15 15/16 16/77 17/18 18/19 19I20 20/21 21/22 22/23 23-24 24-25 25-26 26-27
6 1076 '1084 1154 1180 1�92 1268 1304 1331 1358 1385 1412 1439 1466 1493
7 1072 1090 1098 1168 1195 1207 1282 1318 1345 1372 1399 1426 1453 1480
8 1116 1082 1100 1108 1178 1204 1217 7292 1328 1355 7382 1409 1436 1463 6 year 13year
6-8 TOT 3264 3256 3352 3457 3565 3679 3802 3941 4030 41'11 4�92 4273 4354 4435 538 1171
POtCentOfG2in j024�','. 2.95% 311% 313% 320% 3.35% 3.64% 228% 201% 197% 193% 190% 186%
Pupil Gain i8� 96 104 108 114 123 138 90 81 81 81 81 81
TABLE MIDDIE SCHOOL PROJECTIONS
3MS 6 Based on 6 Year Hislory
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/�4 14/15 15/16 16/17 17/18 18l19 19/20 20/21 21l22 22123 23-24 24-25 25-26 26-27
6 1076 7077 1139 1169 1176 1253 1284 '1318 7353 1387 1421 1456 1490 1525
7 1072 '1096 1097 1159 1189 1196 1273 1304 1338 1373 1407 1442 1476 1510
8 1116 1073 1097 1098 1160 1190 1197 1273 1305 1339 �373 1408 1442 1477 6 year '13year
6-8 TOT 3264 3246 3333 3426 3525 3638 3753 3896 3996 4099 4202 4305 4409 4512 489 1248
Percent of Gain i 0.55)'>5 2.69%a 2 78% 2.88% 322% 3 17%o 3 79% 2.57% 2.58% 2.52% 2.46% 2.40% 2.34%
Pupil Gain (�8) 87 93 99 114 115 142 100 �03 103 103 103 103
TABLE MIDDLE SCHOOL PROJECTIONS
3MS'13A Based on Birth Rates&13 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 '14/15 15/16 16/17 17/18 18/19 19/20 20/21 21122 22/23 23-24 24-25 25-26 26 27
6 1076 1084 1154 ��80 1192 1268 1304 1258 1240 1235 1249
7 1072 1090 1098 1�68 1195 1207 1282 1318 7272 1254 1250 1263
8 1116 1082 7100 7108 1178 1204 1217 '1292 1328 1282 1264 1259 1273 6 year 10year
6-8 TOT 3264 3256 3352 3457 3565 3679 3802 3868 3840 3772 3763 538 499
PercentofGain (02=)�i 295% 311% 313% 320% 3.35% 173% (072)/0 (1 '8)% (024�`/�
Pupll Gain .d1 96 104 108 '1�4 123 66 (23) (u8) (9)
TABLE MIDDLESCHOOLPROJECTIONS
3MS 6A Based on Birth Rates&6 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/15 15/16 16/17 17/18 18l19 19/20 20121 21/22 22/23 23-24 24-25 25-26 26-27
6 1076 1077 1139 1169 1176 1253 1284 1238 1220 '1215 1229
7 1072 1096 1097 1159 N89 1196 1273 1304 1258 1240 1236 1249
8 N 16 1073 1097 1098 7�60 1190 �797 1273 1305 7259 1241 1236 1250 6year 10year
6-8 TOT 3264 3246 3333 342fi 3525 3638 3753 3816 3783 3715 3706 489 442
PercentofGain (055)% 2.69°/ 278% 2$S% 322% 317% 166% (0.65)°5 (18�p% (025)%
Pupil Gain (181 87 93 99 114 115 62 (32) fEBj (6)
prj13-14 Page 8 October 2013
AUBURN SCHOOL DISTRICT STUDENT F �LLMENT PROJECTIONS -October 2013
TABLE SR HIGH PROJECTIONS
3SH 13 Based on 13 Year History
ACTUAI PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/15 15/16 16/17 17/18 18/19 19I20 20121 21/22 22/23 23-24 24-25 25-26 26-27
9 1159 1373 1339 1357 1365 1435 1461 1473 1549 1585 1612 1639 1666 1693
10 1229 1106 1320 1286 1304 1312 1382 1408 1420 1496 1532 1559 1586 1613
11 1240 1156 1033 1247 1213 1231 1239 1309 1335 1347 1423 �459 1486 1513
12 1274 1239 1155 1032 1246 1272 1230 1238 1308 1334 1347 1422 1458 1485 6 year 13year
9-12 TOT 4902 4874 4847 4922 5128 5190 5312 5428 5612 5762 5912 6078 6195 6303 410 1401
PercentofGain �G ��-':rt; f0',�:��;', 155°/ 4l8°/ 121% 236% 219°/ 3.38°/ 2.67°/ 2.61°/ 2.80°/ 192% 774°/
Pupil Gain :231 :2%i 75 206 62 123 116 184 150 150 165 117 108
TABLE SR HIGH PROJECTIONS
3SH 6 8ased on 6 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 21122 2Z23 23-24 24-25 25-26 26-27
9 1159 1289 124fi 1270 1271 1333 1363 1370 1446 1478 1512 1546 1581 1615
10 1229 1159 1289 1246 1270 1271 1333 1363 1370 1447 1478 1512 1547 1581
11 �240 1208 1139 1269 1225 1250 1251 1313 1342 1349 1426 1457 1492 1526
12 1274 1300 1268 1198 1328 1285 1309 1310 �372 1402 1409 1486 1517 1551 6 year 13year
9-12 TOT 4902 4956 4942 4983 5095 5139 5255 5355 5531 5675 5825 6002 6136 6274 353 1372
Percent of Gain 1 10°/ i 0.30i'>; 0.83°/ 225°/ 0.86°/ 227% 1.90% 327% 2.62°/ 2.64% 3.04% 224% 224%
Pupil Gain 54 �15i 41 112 44 117 100 175 '145 150 177 135 138
TABLE SR HIGH PROJECTIONS
3SH 13A Based on Birth Rates& 13 Year Hisiory
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/15 15/16 16/17 17/18 18/19 19/20 20/21 2�122 22/23 23-24 24-25 25-26 26-27
9 1159 1373 '1339 1357 1365 1435 1461 1473 1549 1585 1539 152� 1516 7530
�0 1229 1106 1320 1286 1304 1312 1382 1408 1420 1496 1532 1486 1468 1463
�1 1240 1156 1033 1247 12'13 1231 1239 1309 1335 1347 1423 1459 1413 1395
'12 1274 1239 1155 1032 1246 1212 1230 1238 1308 1334 1347 1422 1458 1412 6 year ' 13year
9-12 TOT 4902 4874 4847 4922 5'128 5190 5312 5428 56�2 5762 5840 5887 5855 5800 410 898
PercentofGain (0.5T�'� l0561°,5 155% 418% 121% 2.36% 219% 3.38% 2.67% 135% 0.81% (OSS% (Oy3)4a
Pupil Gain !?31 12;) 75 206 62 123 116 184 150 78 48 i32i 155�
TABLE SR. HIGH PROJECTIONS
3SH.6A Based on Birth Rates&6 Year History
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/15 15/16 16/17 17/18 18/79 19/20 20121 21/22 22/23 23-24 24-25 25-26 26-27
9 1159 1289 1246 1270 1271 1333 1363 1370 1446 1478 1432 1414 '1409 1423
10 1229 �159 1289 1246 1270 127'I 1333 1363 7370 1447 1478 1432 14�4 1410
11 1240 1208 1"139 1269 '1225 1250 7251 1313 7342 1349 1426 1457 "14"12 1394
12 1274 1300 1268 1198 1328 1285 1309 1310 1372 1402 1409 1486 15'17 �471 6year 13year
9-12 TOT 4902 4956 4942 4983 5095 5139 5255 5355 5531 5675 5745 5789 5752 5697 353 795
PercentofGain 110% (G.30)i6 0.83% 225% 0.86°/ 227°/ 190% 327°/ 2.62% 123% 077% 10.64i'�6 f,055�'G
Pupil Gain 54 (15) 47 112 4A 1'17 100 175 '145 70 A4 137) i55)
prj13-14 Page 9 October 20�3
AUBURN SCHOOL DISTRICT STUDENT � 7LLMENT PROJECTIONS -October 2013
TABLE PROJECTION COMPARISONS
4 BY GRADE GROUP
KINDERGARTEN
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE �3/14 14I15 15/16 16/17 17/18 18/19 19/20 20/2'I 2V22 22/23 23-24 24-25 25-26 26-27 6year 13year
E 13 1170 1197 1224 1251 1278 1305 1332 1359 1386 1413 1440 1467 1494 1521 162 351
E 6 1170 1204 1239 1273 1308 1342 1376 1411 1445 �480 1514 1548 1583 1617 206 447
E 13A 1170 '1124 1106 1102 1115
E.6A 1170 1124 1106 1102 1115
GRD'I --GRD5
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 74/15 15/16 16/17 17l18 18l19 19I20 20121 21/22 22/23 23-24 24-25 25-26 26-27 6year I 13year
E 13 5635 5855 6032 6209 6401 6545 6680 68'15 6950 7085 7220 7355 7490 7625 1045 � 1990
E.6 5635 5842 6021 6205 6416 6585 6757 6929 710'I 7273 7445 7617 7789 796'I 1122 i 2326
E 13A 5635 5855 5959 6019 6062
E.6A 5635 5842 5941 5992 6032
GRD6--GRDS
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/15 15/16 16l17 17/18 18I19 19/20 20/21 21/22 22/23 23 24 24-25 25-26 26-27 6 year 13 year
MS 13 3264 3256 3352 3457 3565 3679 3802 3941 4D30 4111 4192 4273 4354 4435 538 1171
MS.6 3264 3246 3333 3426 3525 3638 3753 3896 3996 4099 4202 4305 4409 4512 489 1248
MS 13A 3264 3256 3352 3457 3565 3679 3802 3868 3840 3772 3763
MS.6A 3264 3246 3333 3426 3525 3638 3753 3816 3783 37�5 3706
GRD 9--GRD 12
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14/15 15/16 16117 17/18 18/19 79I20 20121 21122 22/23 23-24 24-25 25-26 26-27 6 year 13 year
SH 13 4902 4874 4847 4922 5128 5190 5312 5428 5612 5762 59�2 6078 6195 6303 410 1401
SH.6 4902 4956 4942 4983 5095 5139 5255 5355 5531 5675 5825 6002 6136 6274 353 I 1372
SH 13A 4902 4874 4847 4922 5128 5190 5312 5428 5612 5762 5840 5887 5855 5800 41D 898
SH.6A 4902 4956 4942 4983 5095 5139 5255 5355 5531 5675 5745 5789 5752 5697 353 j 795
DISTRICT TOTALS
ACTUAL PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ PROJ
GRADE 13/14 14l15 15/16 16117 17/18 18/19 19/20 20/21 21/22 22/23 23-24 2425 25-26 26-27 6year 13year
313 14,977 15,182 75,455 15,838 16,372 16,719 17,126 17543 17,979 �8,372 '18765 19,173 19,533 19,884 2155 4913
3.6 14,971 15,248 15,534 15,887 16,343 16,704 17,142 17,591 18,072 18,527 '18 986 19,472 19 917 20,364 2171 5393
3.13A 14,971 15,109 15,264 15,498 15,869
3.6A 14 971 15,168 15;322 15,502 15,766
pr�13-14 Page 10 October 2013
AUBURN SCHOOL DISTRICT STUDENT f 7LLMENT PROJECTIONS -October 2013
TABLE PROJECTION COMPARISONS
5 BY GRADE GROUP
Total = October 1 Actual Count AND Prqected Counts Pr�3 13- 13 YEAR HISTORY 8 Using Average Kdg Increase
Diff = Number Projection is under(-)or over Actual Prj 3.6 - 6 YEAR HISTORY & Using Average Kdg Increase
% = Percent Prqection is under(-)or over Actual Prj 3 13A 13 YEAR HISTORY & King Cty BiAh Rates
Prj 3.6A- 6 YEAR HISTORY & King Cty Birth Rates
Grades 2001-02 2002-03 2003-04 2004-OS 2005-06
K-5 Total Diff % Total Diff °/ Total Diff % Total Diff % Total D�ff °/
ACTUAL 5914 �ooc �oa 574� ra� z� 5774 ba �roc 5735 boc x�oc 5887 x�a poc
Pr�3E 13 5827 f871 ll 47j% 5723 (18) (0.31)% 5655 (li9) (2 GG)% 5761 26 0.45% 5750 (137) (2.33]°'�
Prj3E,6 5802 (112) 1.189�?:, 5735 (6) (010)% 5662 (li2) (19aj% 5821 86 150°/ 5795 (92) (l56)96
Prj3E'13A 5839 t75) (127�% 5743 2 0.03% 5605 (159j (293)% 5709 l��) 1a�45)'% 5750 ('137� (2.33)%
P�j3E.6A 5831 (83) (1.40)% 5776 35 0.61% 5631 (143) (248)°l0 5756 21 0.37% 5784 f'iG37 [175)%
Grades 2001-02 2002 03 2003-04 2004-05 2005-06
6-8 Total Diff % Total Diff % Total Diif % Tolal Diff % Total Diff °/
ACTUAL 3049 x�a pa 3151 �ooc � 3294 boc xu�c 3274 xoc x�a 3169 x�oc x�oc
Pfj3E13 3025 (24) (075196 3185 (80) 108% 3214 ($0) (243)�, 3295 2l 064% 3132 (37) (117)%
Pr�3E.6 3011 (38) (125�96 3192 (75) 130°/ 3216 (78) (237�'r_ 3311 37 113% 3137 (32) (101)%
Pf�3E 13A 3025 (24j (0 79)% 3185 �80) 1 08% 3214 (50) (2.4314;: 3295 21 0.64% 3132 (37) (1 17)%
Prj3E.6A 3011 (38) (125)% 3192 �75) 130% 3216 i�81 (2.377YL 3311 37 113% 3137 (32� (101)%
Grades 2001-02 2002-03 2003-04 2004-05 2005-06
9-12 Total Diff % Total Diff % Total Diff % Total Drff % Total Diff %
ACTUAL 4498 x�oc x�oc 4535 x�a pcx 4634 x�a pa 4663 r.� mc 5032 �xxc x�oc
Ptj 3E 13 4455 (43) (0 96)% 4577 42 0 93°/ 4630 14) (0.09)% 4783 120 2.57% 4898 f�34) (2_66)%
Prj 3E 6 4476 (22) (0.49)% 4594 59 1 30%a 4639 5 0.11% 4769 l06 227% 4880 �152) (3 02)"-/0
Pq3E13A 4455 (43) (0.96)% 4577 42 0.93% 4630 f4) 10.09)°4� 4783 120 257% A898 (134) (2-68)%
Pp3E.6A 4476 (22) (0.49)i5 4594 59 130% 4639 5 011% 4769 106 227% 4880 it52) (302)90
All 2001-02 2002-03 2003-04 2004-OS 2005-06
Grades Total Diff % Total Diff % Total Diff % Total Diff % Tolal Diff %
ACTUAL 13,461 a�a zax '13,427 znc za 13,702 z� boc 13,672 z�a �ooc 14 O88 � �oa
P�j3E73 13,307 (154) (114)% 13,485 58 0.43% 13,499 (203) (1.481°�� 13,839 167 122% 13,780 i3081 (219)%a
Prj3E.6 �3,289 (172) (128)% 13,521 94 070% 13,517 1�85) (135)�;5 13,901 229 167% 13,812 127G) (� 66)%
P�j3E13A 13.319 (142) (105)% 13,505 78 0.58% 13,449 (253) (185)`Y 13,787 115 0.84% 13,780 (308) (2l9)%
Prj3E.6A 13,318 (143) (l00)°6 13,562 135 1.O1% 13,486 (2�6) (1.58)G 13836 164 120% 13,801 (287) (2.04)%
prj13-14 Page 11 October 2013
AUBURN SCHOOL DISTRICT STUDENT F 7LLMENT PROJECTIONS -October 2013
TABLE PROJECTION COMPARISONS
5 BY GRADE GROUP(Continued)
Total = October 1 Ac[ual Count AND Projected Counts Prj 3 73- 13 YEAR HISTORY & Using Average Kdg Increase
Diff = Number Prqeclion is under(-)or over AcWal Prj 3.6 - 6 YEAR HISTORY 8 Using Averege Kdg Increase
% = Percenl Projection is under(-)or over Actual Prj 3 13A 13 YEAR HISTORY 8 King Cty Birth Rates
Prj 3.6A- 6 YEAR HISTORY 8 King Cty Birth Rates
Grades 2006-07 2007-OS 2008-09 2009-10 2010-77
K-5 Totai Diff % Total Diff °/ Total Diff % Total Ditf % Total Diff %
ACTUAL 6033 poc x�a 6142 �aoc �ooc 6198 x�c poc 6159 �ax z�oc 6208 �ax z�oc
Prj3E'13 5871 (162) (2.69)% 6085 �57) (093)°i� 6179 (15) (031�%; 8254 95 154% 6282 74 119°/
Prj3E6 5921 (112) (186)% 6138 (4) (007)%. 6237 39 0.63% 6294 135 2.19% 6323 115 185%
Prj3El3A 5869 (164) (2.i21`o 6059 l83) (135)% 6129 (69) (111)% 6237 78 127% 6252 44 071%
P�73E.6A 5912 (121) �[.011I-5 6�94 (4$) (078)`/0 6172 (20) (042)°/ 6264 105 170% 6269 61 098%
Grades 2006-07 2007-08 2003-04 2009-70 2010-77
6-8 Total Diff % Total Diff °/ Total D'rff °/ Total Diff % Total Diff %
ACTUAL 3144 �ooc �ooc 3097 �ooc �ooc 3206 �ooc �ooc 3196 �ax xnc 3273 pcx xuc
Prj3E13 3131 (73) (0411`b 3107 70 0.32% 3779 (27� (0.84i-6 3242 46 144°/ 3234 21 0.65%
Prj 3E.6 3146 2 0.06% 3116 19 0.67% 3195 i.i".i (0.34)`;:. 3243 47 1 47% 3236 23 0 72%
Prj3E13A 3131 (13) (0.41)°E 3107 10 032% 3179 (27) (0.84�% 3242 46 144% 3234 21 0.65%
Prj3E6A 3146 2 0.06% 3116 19 0.61% 3195 �111 (0.34)`/ 3243 47 1.47% 3236 23 072%
Grades 2006-07 2007-OB 2003-04 2009-10 2010-11
9-'12 Total Diff % Total Diff % Total Diff % Total Diff % Totai Diff °!
ACTUAL 5241 �ooc �ooc 5320 x�oc �ooc 5299 zbc �ooc 5234 x�oc zpc 5061 �ooc �occ
Pr�3E13 5085 (156) (298).0 5�90 (130) (2A4j% 5129 f170) (321iS0 5W4 i1607 (3.Ofi1`.6 4921 i140) (277)%
Pr7 3E.6 5086 1155) (2 56(i: 5192 (128) (2A1;% 5155 (144) i2 72)`h 5128 i 106j �2 031=�5 5027 @4) (0 67)%
Prj3E �3A 5085 1156) (298�Y., 5�90 (130� (244)% 5129 1170) i3217"6 5074 i160) f306�t6 4921 1140) (277)°i
Prj3E.6A 5086 (155) l2961io 5192 (128) (241)% 5155 f144) r_'=i'', 5129 1105) (20U'/o 5027 (34) (0-6%)%
AIl 2006-07 2007-08 2003-04 2009-10 2010-�1
Gredes Total Diff % Total Diff % Tolal Diff % Total Diff % Total Diff °/
ACTUA� 14,418 �oa x�a �4.559 w� znx 13:672 uoc axx 14 589 �ocz �ooc 14,482 � x�a
Prj 3E 13 14,087 (331) (2.30)°0 13,499 (173� (7 28)% 14,487 815 5 96% 14,570 it9l lG 13)% 14,437 (451 �0�t);,
Prj3E.6 14,153 (265) (184);'0 13,542 �130) (5.99);6 14,587 975 6.69% 14,665 76 0.52% 14,586 104 072%
Prj3E13A 14p85 (333) (2.31)% 13,447 (225) p64)% 14,437 765 6.60% 14,553 136i ip251�:: 14,407 p5� (052)�
Prj3E.6A 14,144 (274) (190)% 73,510 (162) Q21)% �4,522 B50 622% 14,836 47 032% 14,532 50 0.35%
prj13-14 Page 12 October 2013
AUBURN SCHOOL DISTRICT STUDENT F 7LLMENT PROJECTIONS -October 2013
TABLE PROJECTION COMPARISONS
5 BY GRADE GROUP(Conlinued)
Total = October 1 Actual Count AND Prqecled Counts Prj 3 13- 13 YEAR HISTORY & Using Average Kdg Increase
�iff = Number Projection is under(-)or over Actual Prj 3.6 - 6 YEAR HISTORY & Using Average Kdg Increase
% = Percent Projection is under(-)or over Actual Prj 3.�3A 13 YEAR HISTORY R King Cty Birth Rates
Prj 3.6A- 6 YEAR HISTORY 8 King Cty Birth Rates
Grades 201�-12 2012-13 2013-14 Average Average Historical Data is grouped by
K-5 Total Diff % Total Diff % Total Diff % Diff % K-5,68,9-12 aRiculation
ACTUAL 6230 �oa pa 6489 pa xxx 6805 x�oc � pa �c pattem
Prj3E13 6275 45 072% 6372 �177) (180)% 6659 �14G) (2�5)Y'� (51) �0787'/
Prj 3E 6 6267 3� 0.59% 6368 (121) (1 80)%, 6632 (173j (2.54)% (27j (0.39)% ARiculation pattem has no
Prj3E'13A 6266 36 0.58% 6346 (�43) (22C�% 6643 (162) (2.38)% (70) (� G9)°/ numericimpactonefficacy
Prj 3E 6A 6260 30 0.48% 6339 (150) (2 31)% 6611 (194) (2.85)% (50) (0 76)% of projeclion models
Grades 2011-12 2012-13 2013-14 Average Average
6-6 Total Diff % Total Diff % Total Diff % Diff %
ACTUAL 3141 zxx xzr 3144 �ooc x�a 3264 poc xpc �ax �
Prj3E13 3227 80 2.55% 3143 (l) (0.03)% 3230 (34) (1.04)% (15) (ODO)%
Pr�3E6 3211 70 223°/ 3132 (�2) (0-38)% 32�3 (51) (156)% �1's) Q05°/
Pq 3E 13A 3221 80 2S5% 3143 li) (0 0;5)% 3230 (34) (1 04)% (15j (0 00)%
Prj3E.6A 321� 70 223% 3132 (12) (038)% 32'I3 (51) (156)% (13) 005%
Grades 2011-12 2012-13 20�3-14 Average Average
9-�2 Total Drff % Total Diff % Total Diff % Diff %
ACTUAL 4992 zx�c pcx 4963 �ooc �ooc 4902 mc �oa �ooc pa
Prj3E13 4901 (91) (182Ji� 4813 (150) (302)% 4773 (129) (2.63j% (81) ('170)%
Pr�3E6 50'17 26 0.50°/ 4906 (57) (115)`% 4856 (C6) (094)% (521 (094)%
Pr�3E 13A 4901 (91) (1 82)9% 4813 (150) (3.02)°� 4773 (�291 RB3)% 187) (1 7D�%
Prj 3E 6A 5017 25 0.50% 4906 (57) (1 15)% 4856 (d6) (0 941`/, 152) (0 941`,f
AIl 2011-12 2012-13 2013-14 Average Average
Grades Total Diff % Total Diff % Total Diff % Diff %
ACTUAL 14,363 �cz zxx '14,596 � xxx 14,971 z� x�oc � �xt
Pr73E13 14,397 34 024°/ 14,328 (�68j (184)% 14,662 (3G9) 1205)°; (57) �G.84j%
Prj3E6 14,495 132 0.92% 14,0.06 (190) (130)% 14,701 f270) (180)% 5 (041)°;6
Pq3E13A 14,388 25 017% 14,302 (294) (2.01)°b 14,648 (325) (2171% (78) (0981%
P�j3E.6A 14488 '125 0.87°/ 14,377 (219) (150)'7. 14,680 (291) (194)% (17) �05Fi)%
prj13-14 Page 73 October 2013
Appendix A.2 - CAPITAL FACILITIES PLAN
Enrollment Projections
Buildout Data for Enrollm--' Projections-April 2014
BASE DATA -BUILDOUT SCHEDULE Student Generation Factors
ASSUMPTIONS: Auburn Factors il Single Multi-
1 Uses Build Ouf estimates received from developers 2074 SF 2014 MF Family Family
2 Studen[Generation Factors are updated Auburn data for 2014 as allowed per King Counry Ordinance Elementary 0 1650 I 0 2230
3 Takes area labeled Lakeland and Kersey Projects projects across 2014-2020 Middle School 0.0760 � 0.0910
4 Takes area labeled Bridges and other Lea Hill area developments and projects across 2014-2020 Senior High 0 0890 0 0920
5 Includes known developments in N Auburn and other non-Lea Hill and non-Lakeland deve/opments Total 0 3300 0.4060
Table Auburn School Distr
1 Development 2014 2015 2016 2017 2018 2019 2020 Total
LakelandlKersey Single Family 250 125 75 75 60 585
Lea Hill Area Single Family 100 100 125 125 50 50 50 600
Other Single Family Units 25 50 50 50 50 225
Total Sin le Famil Units 375 275 250 250 160 50 50 1410
Pro�ected Pupils
Elementary Pupils K-5 62 ! 45 41 41 26 8 8 233
Mid School Pupils 6-� 29 I __21 19 � 19 � 12 4 4 107
Sr. High Pupils 9-12 33 ' 24 �I 22 22 14 4 4 125
Total K-12 i 124 I 91 83 83 53 17 17 _ 465
Multi Family Units 50 50 75 60 50 0 0 285
Total Multi Famil Units 50 50 75 60 50 0 0 285
Pro�ected Pupils.
Elementary Pupils K-5 I 11 11 17 I 13 11 0 0 64
Mid School Pupils 6-8 i 5 5 7 5 5 0 0 26
Sr High Pupils 9-12 5 5 i 7 6 , 5 � 0 0 26
Total K-12 � 20 I 20 � 30 I 24 � 20 �, 0 � 0 116
Total Housing Units 425 I 325 ' 325 � 310 210 50 50 1695
M d School Pupils 6-8 I 33 25 26 I — 24 17 4 �l 4 133
3r_High Pupils 9-12 � 38 29 29 I 28 19 4 L 4 152
Total K-12 �� 144 i 111 ' 113 107 �� 73 � 17 ' 17 581
Cumulative Projection 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
Elementary- Grades K-5 I 73 130 �, 188 242 280 288 � 296
Mid School-Grades 6-8 33 � 59 84 109 125 129 133
Senior Wgh -Grades 9- 12 38 � 67 96 124 143 147 i 152
Total 144 I, 255 368 475 548 565 581
45
Buildout Data for Enrol' �t Projections-April 20�4
TABLE New Projects-Annual New Pupiis Added & Distributed
2 by Grede Level
6 Year Percent of average �� I,
GRADE Average Pupils by Grade 2013-14 2014-75 2075-16 2016-17 2017-18 I 2018-19 I 2019-20 2020-21
Enroll & Level I
KDG 1056 � 7 23°/, 1170 10 18 27 34 40 41 42
1 1077 I 7 36% 1188 11 19 27 35 40 42 43
2 1057 7.23% 43.43% 1124 10 18 27 34 40 41 42
3 1048 717°/, 1125 10 18 26 34 39 40 42
4 1054 � 7 21% 1123 10 18 27 34 40 41 42
5 1057 7 23% 1075 10 18 27 34 40 41 42
6 1060 7.25% 1076 10 18 27 34 40 41 42
7 1068 7.31% 21 85% 1072 11 19 27 35 40 41 42
8 1066 7 29% 1116 11 19 27 35 40 41 42
9 1226 8.36% 1159 12 21 31 40 46 47 49
10 1256 8 59% 34 72% 1229 12 22 32 41 47 48 50
11 1258 � 8.61°/a 1240 12 22 32 41 47 49 50
12 1336 9 14% 1274 13 23 34 43 50 52 53
TO�eIS 14617 100.00% TOt21 14971 144 255 368 � 475 548 565 581
TABLE 6 year Historical Data
3 Average Enrollment and Percentage Distributed by Grade Level
Grade os-o9 o9-to �o-�i i1-i2 iz-i3 13-74 6yrAve %
KDG 998 1032 1010 1029 � 1098 1170 1056 17 7 23%
1 1015 I 1033 1066 1068 1089 1188 1076 W�� 7 36%
2 1024 998 1076 1097 1083 � 1124 1057 00 7 23%
3 1048 993 1013 I 996 _� 1111 1125 1047 67� 717%
4 1044 I 1073 1024 1022 1038 1123 1054 00 721°/a
5 . 1069 1030 1079� 101 S i 1070 1075 1056 831 7 23%
6 1096 � 1040 1041 � 1063 � 1041 1076 1059.50 7 25%
7 1034 1725 1060 , 1032 1086 1072 1068 171 7 31%
8 1076 � 1031 1112 1046 ' 1017 1116 1066.33 729%
9 1256 1244 7221 1273 1200 1159 1225.5� 8 38%
10 1341 ' 1277 1238 i 1170 1278 1229 � 1255 50 8 59%
11 1350 i 1303 1258 1233 1164 1240 1258 00 8.61%
12 1352 � 1410 1344 ' 1316 � 1321 1274 1336 17} 914%
Totals 14703 14589 14482 14363 14596 14971 14617 33 100.00%
%ofchange -078% -073°/ -0.82% 162% 2.57%
change+l- �1I4� ��16'� i119i 233 375
46
Buildout Data for Enrollm��+ Pro�ections-April 2014
i ABLE 4 New Projects -Pupil Projection Cumulative
ND 3 13 by Grade Level Updated April 2014
Usesa 'cohortsurvival' GRADE 2013-t4 2014-15 2015-16 2016-17 2017-18 2018-79 2019-20 2020-21
model assuming 100%of Actual Projected Projected Pro�ected Pro�ected Projected Pro�ected Pro ected
previous year new KDG 1170 1207 1242 1278 1312 1345 1373 1401
eniollees move to the next 1 1188 1235 1270 1305 1340 1372 1400 1429
gradelevel 2 1124 1210 1254 1289 1324 1356 1384 1412
3 1125 1147 1231 1275 1309 1342 1370 1398
Kindergarten calculates 4 1123 1160 1180 1264 1307 1339 1368 1396
p�evious years number plus 5 1075 1155 1190 1210 1293 1334 1362 1391
K-5 6805 7114 7366 7620 7885 8088 8257 8426
Currentgeneration based on 6 1076 1095 1172 1207 1227 1307 1345 1373
% oftotalenrollment Other 7 1072 1101 1117 1195 1229 1247 1323 1360
factoruses 100% cohort 8 1116 1092 1119 1135 1213 1244 1258 1334
survival, based on 6 year GR 6-8 3264 3288 3408 3537 3669 3798 3926 4067
hiStory 9 1159 1385 1360 1388 1405 1481 1508 1522
10 1229 1119 1342 1317 1345 1359 1430 1458
11 1240 1168 1055 1279 1254 1278 1286 1359
12 1274 1252 1178 1066 1289 1262 1282 1291
GR 9-12 4902 4924 4935 5050 5293 5380 5508 5630
Total 14971 15326 15710 16206 16647 17267 17691 18124
%ofchange 237°/ 2.50°/ 3.16% 3.95% 2.49% 2.46% 2.45%
change+/- 355 384 497 640 420 424 433
TABLE 5 New Projects - Pupil Projection Cumulative
ND 3 6 by Grade Level Updated April 2014
Uses a 'cohort survival' GRADE 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2020-21 2021-22
model assUming 100% of Actual Projected Pro�ected Projected Pro ected Pro�ected Projected Projecled Projected Projected
previous year new KDG 1170 1215 1257 1300 1342 1382 1417 1453 1469 1486
enrollees move to the next 1 1188 1230 1273 1315 1358 1397 1433 1469 1485 1502
gradelevel 2 1124 1211 1250 1293 1335 1375 1410 1446 1462 1479
3 1125 1142 1227 1267 1309 1348 1384 1419 1436 1452
Kindergarten calculates 4 1123 1163 1178 1263 1302 1342 1377 1413 1429 1445
previous years numberplus 5 1075 1147 1185 1200 1285 1321 1357 1392 1408 1424
K-5 6805 7109 7370 7638 7930 8165 8379 8592 8690 8788
Currentgeneration based on 6 1076 1088 1157 1195 1210 1292 1325 136D 1376 1391
% oftotalenrollment. Other 7 1072 1107 1116 1186 1224 1236 1314 1346 1362 1377
factoruses 100% cohort 8 1116 1083 1115 1125 1194 1229 1238 1316 1331 1346
su rvival, based on 6 year GR 6-8 3264 3277 3389 3506 3628 3758 3877 4023 4068 4114
histOry 9 1159 1301 1267 1301 1311 1379 1410 1418 1434 1451
10 1229 1172 1311 1278 1311 1318 1382 1413 1429 1445
11 1240 1221 1161 1300 1266 1297 1299 1363 1378 1394
12 1274 1313 1291 1232 1372 1335 1361 1363 1379 1394
GR 9-12 4902 5006 5030 5110 5260 5329 5451 5557 5620 5684
Total 14971 15392 15789 16255 16818 17252 17706 18172 18378 18586
%Of ch2nge 2.81% 2.58% 295% 3.46% 2 58% 2.64% 2.63%a 7 14% 1 14%
change+/- 421 397 465 563 434 455 465 206 209
47
Buildout Data for Enro'' �t Pro�ections-April 2014
TABLE 6 New Developments-Pupil Projection Cumulative
ND3.13n by Grade Level Updated April 2014
Uses a 'cohort survival' GRADE 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
model assUO7ing 100% of AcWal Pro�ected Pro�ected Pro�ected Projected Pro�ected Projected Projeded
previous yearnew KDG 1170 1135 1125 1728 1150
enrollees move to the next 1 1188 1235 1197 1187 1190 1210
gradelevel. 2 1124 1210 125a 1216 1206 1207 1221
3 1125 1147 1231 1275 1237 1224 1220 1235
Kindergarten calculates 4 1123 1160 1160 1264 1307 1267 1250 1246
birth rate average plus 5 1075 1155 1190 1210 1293 1334 1290 1273
6805 7042 7176 7280 7383 6241 4982 3755
Currentgeneration based on 6 1076 1095 1172 1207 1227 1307 1345 1300
% oftotalenrollment Othe� 7 1072 1101 1117 1195 1229 1247 1323 1360
faCtOruSes 100% cohort 8 1116 1092 1119 1135 1213 1244 1258 1334
su rvival, based on 6 year 3264 3288 3408 3537 3669 3798 3926 3995
hiStOry 9 1159 1385 1360 1388 1405 1481 1508 1522
10 1229 1119 1342 1317 1345 1359 1430 1458
11 1240 1168 1055 1279 1254 1278 1288 1359
12 1274 1252 1178 1066 1289 1262 1282 1291
4902 4924 4935 5050 5293 5380 5508 5630
Total 14971 15253 15519 15867 16344
%of change 1 89% 1 74% 224% 3.01%
change+I 282 266 347 478
TABLE 7 New Projects -Pupil Projection Cumulative
ND 3.6A by Grade Level Updated April 2014
Uses a 'cohort survival' GRADE 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21
model assuming 100%of Actual Pro�ected Projected Projected Projected Projected Pro'ected Pro'ected
previous year new KDG 1170 1135 1125 1128 1150
enrollees move to the next 1 1188 1230 1193 1183 1186 1205
gradelevel. 2 1124 1211 1250 1213 1203 1203 1218
3 1125 1142 1227 1267 1229 1216 1212 1227
Kindergarten calculates 4 1123 1163 1178 1263 1302 1262 1245 1241
birth rate average plus 5 1075 1147 1185 1200 1285 1321 1277 1260
6805 7029 7158 7254 7354
Currentgeneration based on 6 1076 1088 1157 1195 1210 1292 1325 1280
°/a of total enrollment Other 7 1072 1107 1116 1186 1224 1236 1314 1346
factoruses 100% cohort 8 1116 1083 1115 1125 1194 1229 1238 1316
survival, based on 6 year 3264 3277 3389 3506 3628 3758 3677 3943
histOry 9 1159 1301 1267 1301 1311 1379 1410 1418
10 1229 1172 1311 1278 1311 1318 1382 1413
17 1240 1221 1161 1300 1266 1297 1299 1363
12 1274 1313 1291 1232 1372 1335 1361 1363
4902 5006 5030 5110 5260 5329 5451 5557
Total 14971 15312 15577 15871 16241
%ofchange 228% 173% 1.88% 2.34%
change+/- qi 5 4 71
48
Appendix A.3 Student Generation Survey
Auburn ' �I District
Developmenl �h since 1/1I07
March,2014
SINGLE FAMILY
Actual Students Projected Students
n urren O 6 StudentGenera6onFactors
Develo ment Name Parcels Occu nc Occu ied Elem Middle HS Total em i e o
Beaver Meadows 60 55 5 10 6 10 26 0.182 0.109 0.182 0.473
Brandon Meadows 55 55 0 13 9 11 33 0.236 0.164 0.200 0.600
Brid es 386 64 322 12 14 4 30 0.188 0.219 0.063 0.469
CaRin ton Pointe 24 24 0 5 2 1 8 0208 0.083 0:042 0.333
Greenacres 16 16 0 3 3 6 12 0.188 0.188 0.375 0.750
Kendall Rid e 106 89 17 7 4 5 16 0.079 0.045 0.056 0.180
Lakeland East: Portoia 130 114 16 18 76 13 47 0.158 0.140 0.114 0.412
Lakeland: Ed eview 373 347 26 14 2 10 26 0.040 0.006 0.029 0.075
Lakeland: Pinnacle Estates 76 66 10 35 14 13 62 0.530 0212 0.197 0.939
Lakeland:Villas At ... 81 16 65 4 0 1 5 0250 0.000 0.063 0.313
Lakeland: Vista Hei hts 125 125 0 39 12 15 66 0.312 0.096 0.120 0.528
Montere Park 239 191 48 13 7 7 27 0.068 0.037 0.037 0.141
Sterlin Court 8 8 0 2 2 1 5 0250 0.250 0.125 0.625
Trail Run 169 169 0 44 11 21 76 0.260 0.065 0.124 0.450
Vinta e Place 25 25 0 6 1 4 11 0240 0.040 0.180 0.440
Totals 1873 1364 509 225 103 122 450 0.765 0.076 0.089 0.330
Current Construction to be Occupied 2014 Estimated Students Based on Student Gen Factor
ACtu81 StudBnts Projected Students
Units/ CuITent To Be StudentGeneretion Factors
Develo ment Name Parcels Occu anc Occu ied Elem Middle HS Total Elem Middle HS Tota
Beaver Meadows 60 55 5 10 6 10 26 1 0 0 2
Brid es 386 64 322 12 14 4 30 53 24 29 106
Kendall Rid e 106 89 17 7 3 5 15 3 1 2 6
Lakeland East: Portola 130 114 16 18 16 13 47 3 1 1 5
Lakeland: Ed eview 373 347 26 14 2 6 22 4 2 2 9
Lakeland: Pinnacle Estates 76 68 10 35 14 13 62 2 1 1 3
Lakeland: Villas At ... 81 16 65 4 0 1 5 11 5 6 21
Montere Park 239 191 48 13 7 7 27 8 4 4 16
Totals 1451 942 509 113 62 59 234 84 38 46 168
50 5/5I2014
Auburn S �I District
Development� since 1/1l07
2014 811d'U March,2074
P Estimated Students�Based on Student Gen Factor
Projected Students
UOit81 CUIf611Y TO BB Student Generation Factors
Develo ment Name Parcels Occupanc Occu ied Elem Middle HS Total
Alicia Glenn 31 0 31 5 2 3 10
Anderson Acres 14 0 14 2 � � 5
Backbone Rid e 7 0 7 1 1 1 2
Sonata Hill 78 0 78 13 6 7 26
Bridle Estates 18 0 18 3 1 2 6
Cam-West 99 0 99 16 7 9 33
Estes Park 31 0 31 5 2 3 10
Ha reet Kan 8 0 8 1 1 1 3
Hazel Hei hts 22 0 22 4 2 2 7
Hazel View 20 0 20 3 2 2 7
Lakeland: Forest Glen At.. 30 0 30 5 2 3 10
Lakeland: Park Rid e 256 0 256 42 19 23 84
Lakeland: River Rock 14 0 14 2 1 1 5
Lawson Place 14 0 14 2 1 1 5
Me an's Meadows 9 0 9 1 1 1 3
Mountain View Estates 37 0 37 6 3 3 12
New Ho e Lutheran Plat 8 0 S 1 1 1 3
Pacific Lane 11 0 11 2 1 1 4
Rid e At Tall Timbers 104 0 104 �7 g g gq
S encer Place 13 0 13 2 � � q
Sti s Plat 29 0 29 5 2 3 10
Willow Place 18 0 18 3 1 2 6
Yates Plat 16 0 16 3 1 1 5
887 887 Totals 2014 and u 146 67 79 293
Grand Totals 230 105 725 461
51 5/5/2014
Auburn ; ol District
Development� .✓th since 1/1/07
March, 2014
MULTI FAMILY
UI11t5/ Current TO Be Student Generation Factors
Development Name Parcels Occupancy Occupied Elem Middle HS Total Elem Middle HS Total
Lakeland: Four Lakes Apts 234 234 0 14 8 6 28 0.060 0.034 0.026 0.120
Legend Townhomes 11 11 0 0 2 1 3 0.000 0.182 0.091 0.273
Pacific Ave Duplexes 12 12 0 4 1 2 7 0.333 0.083 0.167 0.583
Seasons at Lea Hill Villa e 332 332 0 125 48 54 227 0.377 0.145 0.163 0.684
Trail Run Townhomes 115 115 0 14 5 2 21 0.122 0.043 0.017 0.183
704 704 0 157 64 65 286 0.223 0.091 0.092 0.406
2014 and beyond
Auburn Hills AptITH 205 0 205 46 19 19 83
"D" Street Plat 32 0 32 7 3 3 13
Sundallen Condos 48 0 48 11 4 4 20
285 285 7otal 64 26 26 116
52 5/5/2014
�vg � � N
SCHOOL DISTRICT
ENGAGE • EDUCATE EMPOWER
7une 25, 2014
Kevin Snyder
Director of Community Development and Public Works
City of Auburn
25 West Main Street
Auburn, WA 98001
Dear Mr Snyder,
Enclosed you will find a copy of the Auburn School District Capital Facilities Plan for 2014
through 2020. The Plan has been prepared and adopted by the Auburn School District Board of
Directors on June 9, 2014, in conformance with the Growth Management statutes of the State of
Washington.
Included in the Plan aze the following:
❑ Six-Year Enrollment Projections
❑ Auburn School District Standard of Service
o The District's overall capacity of the 6-year period
❑ An inventory of existing facilities
❑ Impact Fee Computations
❑ District Capital Construction Plan
The Auburn School District Board of Directors is requesting the plan be adopted by reference as
part of the capital facilities element of the City of Auburn's Comprehensive Plan and that the
school impact fees be set in accordance with the plan for the 2015 fiscal year
The Auburn School District is also requesting a change in the fees for 2015 The calculated fee
for single-family is $4,137.21, a decrease of$1,261 72, and the calculated fee for multi-family is
$3,518.17, an increase of$130.33
Please advise if additional information is required or needed. Thank you for your assistance.
Sincet ly,
ichae e man ���'�����
eputy S erintendent
Business and Operations 'JUN 3 0 2014
Copy to� CITY OF AUt3UI�N
Kip Herren, Superintendent, Auburn School District w/o enclosure P�NNING 8 DEVELOPMENT
Denise Stiffarm, K&L GATES LLP w/o enclosure
Jeff Grose, Executive Director of Capital Projects w/o enclosure
James P Fugate Administration Building• 915 Fourth Street NE•Auburn,WA 98002-4499•253-931-4930
DETERMINATION OF NONSIGNIFICANCE
Issued with a 14-day comment and appeals period
Description of Proposal:
This threshold determination analyzes the environmental impacts associated with the
following actions, which aze so closely related to each other that they aze in effect a single course
of acrion:
1 The adoption of the Auburn School DistricYs 2014-2020 Capital Facilifies Plan by
the Auburn School District No. 408 for the purposes of plam�ing for the facilities needs of the
District; and
2. The amendment of the Comprehensive Plans of King County and the cities of
Auburn and Kent to include the Auburn School DistricYs 2014-2020 Capital Facilities Flan as
part of the Capital Facilities Element of each jurisdicrion's Comprehensive Plan. The cities of
Algona, Pacific, and Black Diamond may also amend their Comprehensive Plans to include the
Auburn School DistricYs Capital Facilities Plan as part of the Capital Faciliries Element of each
jurisdiction's Comprehensive Plan.
Proponent: Auburn School District No. 408
Location of the Proposal.
The Auburn School District incliides an azea of approximately 57 square miles. The
Cities of Auburn, Algona, Black Diainond, Kent, and Pacific and parts of unincorporated King
County fall within the District's boundaries.
Lead Agency
Auburn School District No. 408
The lead agency for this proposal has determined that the proposal does not have a
probable significant adverse environmental impact on the environment. An environmental
impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made
after a review of the completed environmental checkiist and other informa6on on file with the
lead agency This iriformation is available to the public upon request.
'This Deternunation of Nonsignificance (DNS) is issued upder WAC 197-11-340(2). The
lead agency will not act on this proposal for 14 days from the date of issue. Comtnents must be
submitted by 4•00 p.m., June 6, 2014 The responsible official will reconsider the DNS based on
timely comments and may retain, modify, or, if significant adverse impacts are likely, withdraw
the DNS. If the DNS is retained, it will be final after the expiration of the comment deadline.
Responsible Official. Mike Newman
Deputy Superintendent, Business and Operations
Auburn School District No. 408
Telephone: (253) 931-4930
Address: Auburn School District
915 4�' Street N.E.
Auburn, WA 98002
You may appeal tliis deternunation in writing by 4•00 p.m., June 6, 2014, to
Mike Newman, Deputy Superintendent, Anburn School District No. 408, 915 4�' Street N.E.,
Auburn, WA 98002.
Date of Issue: May 19, 2014
Date Published: May 23, 2014
ENVIRONMENTAL CHECKLIST
WAC 197-11-960 Environmental Checklist.
Purpose of Checklist:
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all
governmental agencies to consider the environmental impacts of a proposal before
making decisions. An environmental impact statement (EIS) must be prepared for all
proposals with probable significant adverse impacts on the quality of the environment.
The purpose of this checklist is to provide inforriiation to help you and the agency
ideritify impacts from your proposal (and to reduce or avoid impacts from the proposal, if
it can be done) and to help the agency decide whether an EIS is required.
Instructions for Applicants:
This environmental checklist asks you to describe some basic information about
your proposal. Governmental agencies use this checklist to determine whether the
environmental impacts of your proposal are significant, requiring preparation of an EIS.
Answer the questions briefly, with the most precise information known, or give the best
description you can.
You must answer each question accurately and carefully, to the best of your
knowledge. In most cases, you should be able to answer the questions from your own
observations or project plans without the need to hire experts. If you really do not know
the answer, or if a question does not apply to your proposal, write "do not know" or
"does not apply " Complete answers to the questions now may avoid unnecessary
delays later
Some questions ask about governmental regulations, such as zoning, shoreline,
and landmark designations. Answer these questions if you can. If you have problems,
the governmental agencies can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do
them over a period of time or on different parcels of land. Attach any additional
information that will help describe your proposal or its environmental effects. The
agency to which you submit this checklist may ask you to explain your answers or
provide additional information reasonably related to determining if there may be
significant adverse impact.
Use of checklist for nonproject proposals:
Complete this checklist for nonproject proposals, even though questions may be
answered "does not apply" In addition, complete the Supplemental Sheet for non-
project actions (part D).
For nonproject actions, the references in the checklist to the words "project,"
"applicarit," and "property or site" should be read as "proposal," "proposer," and
"affected geographic area," respectively
A. BACKGROUND
1 Name of proposed project, if applicable:
The adop6on of the Auburn School District's 2014 Capital Facilities Plan ("Capital
Facilities Plan") for the purposes of planning for the District's facilities needs. The cities
of Auburn and Kent and the King Counry Comprehensive Plans will be amended to
include the Auburn School District 2014 Capital Facilities Plan in the Capital Facilities
Element of each jurisdiction's Comprehensive Plan. The cities of Algdna, Black
Diamond, and Pacific Comprehensive Plans may be amended to include the Anbum
School District 2014 Capital Facilities Plan in the Capital Facilities Element of each
jurisdiction's Comprehensive Plan. A copy of the District's Capital Faciliries Plan is
available for review in the District's offices.
2. Name of applicant:
Aubum School District No. 408.
3. Address and phone number of applicant and contact person:
Aubum School District No. 408
915 4�' St. N.E.
Auburn, WA 98002
Contact Person: Mike Newman, Deputy Superintendent, Business/Operations
Telephone: (253) 931-4900
4 Date checklist prepared: May 12, 2014
2
5 Agency requesting checklist: Aubum School District No. 408.
6. Proposed timing or schedule (including phasing, if applicable):
The Capital Facilities Plan is scheduled to be adopted by the District on June 9, 2014
After adoption, the District will forwazd the Capital Facilities Plan to the cities of
Aubum, Algona, Black Diamond, Kent, and Pacific, and to King County for inclusion
in each jurisdiction's Comprehensive Plan. The Capital Facilities Plan will be updated
annually Site-specific projects will be subject to project-level environmental review
7 Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain.
The Capital Facilities Plan sets forth the capital improvement projects that the District
plans to implement over the next six years. The District plans to purchase property for
and construct a new elementary school and construct a new middle school over the neict
six yeazs to meet projected student population increases. The District may also add
portable faciliries at exisring school sites. The Disteict will also modernize Auburn High
School.
8 List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal.
The projects included in the Capital Facilities Plan have undergone or will undergo
additional environmental review, when appropriate, as they aze developed.
9 Do you know whether applications are pending for govemmental
approvals df other proposals directly affecting the property covered by your proposal? If
yes, explain.
None lmown.
10 List any govemment approvals or permits that will be needed for your
proposal, if known.
The cities of Auburn and Kent will review and adopt the Capital Facilities Plan for the
purposes of updating the cities' school impact fees and incorponting the updated Plan
as a part of the Capital Facilities Elements of both the Auburn and Kent Comprehensive
Plans. King Cotinty will review the Plan for the purposes of implementing the
County's iinpact fee ordinance and incorporating the Plan as a part of the Capital
Facilities Element of the King County Comprehensive Plan. The cities of Algona,
Black Diamond, and Pacific Comprehensive Plans may be amended to include the
Aubum School District 2014 Capital Facilities Plan in the Capital Facilities Element of
3
each jurisdiction's Comprehensive Plan and each jdrisdiction may adopt a school nripact
fee ordinance to iiriplement school impact fees.
11 Give a brief, complete description of your proposal, including the proposed
uses and the size of the project and site. There are several que§tion§ later in this
checklist that ask ybu to desc�ibe certain aspects df your proposal. You do not need to
repeat those answers on this page. (Lead agencies may modify this form to include
additional specific information on project description.)
This is a nonproject action. This proposal involves the adoption of the Auburn School
DistricYs 2014 Capital Facilities Plan for the purpose of planning the District's facilities
needs. This proposal also involves the amendment of the cities of Autiurn and Kent
Comprehensive Plans and the King County ComprehensiVe Plan to incltide the Auburn
School District 2014 Gapital Facilities Plan as a part of each jurisdiction's Capital
Facilities Element of their Comprehensive Plans. The cities of Algona, Black
Diamond, and Pacific Comprehensive Plans may be amended to include the Auburn
School District 2014 Capital Facilities Plan in the Capital Facilities Element of each
jurisdiction's Comprehensive Plan and each jurisdiction may adopt a school impact fee
ordinance to implement school impact fees.
12. Location of the proposal. Give sufficient information for a person to
understand the precise location of your proposed project, including a street address if
any, and section, township, and range, if known. If a proposal would occur over a range
of area, provide the range or boundaries of the site(s). Provide a legal description, site
plan, vicinity map, and topographic map, if reasonably available. 1Nhile you should
submit any plans required by the agency, you are not required to duplicate maps or
detailed plans submitted with ariy permit applications �elated to this checklist.
The 2014 Capital Facilities Plan will affect the Aubum School District. The District
includes an area of approximately 57 square miles. The cities of Auburn, Algona,
Black Diamond, Kent, and Pacific, and parts of unincorporated King County fall within
the District's boundaries.
B. ENVIRONMENTAL ELEMENTS
1 Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes,
mountainous, other
The Auburn School District is comprised of a variety of topographic landforms and
gradients. Specific topographic chazacteristics of the sites at which the projects
4
included in the Capital Facilities Plan aze located have been or will be identified
during project-level environmental review when appropriate.
b What is the steepest slope on the site (approximate percent slope)?
Spe.cific slope chazacteristics at the sites of the projects included in the Capital
Facilities Plan have been or will be identified during project-level environmerital
review
c. What general types of soils are found on the site (for example, clay, sand,
gravel, peat, muck)? If you know the classification of agricultural soils, specify
them and note any prime farmland.
Specific soil types found at the sites of the projects included in the Capital Facilities
Plan have been or will be identified during project-level environmental review when
appropriate.
d. Are there surFace indications or history of unstable soils in the immediate
vicinity? If so, describe.
Unstable soils may exist within the Auburn School District. Specific soil limitations
on individual project sites have been or will be identified at the time of project-level
environmental review when appropriate.
e. Describe the purpose, type, and approximate quantities of any filling or
grading proposed. Indicate source of fill.
Individual projects included in the Capital Facilities Plan have been or will be subject,
when appropriate, to project-level environmental review and local approval at the time
of proposal. Proposed grading projects, as well as the purpose, type, quantity, and
source of any fill materials to be used have been or will be idenrified at that time.
f Could erosion occur as a result of clearing, construction, or use? If so,
generally describe.
It is possible that erosion could occur as a result of the conshuction projects currently
proposed iri the Capital Facilities Plan. The erosion impacts of the individual projects
have been or will be evaluated on a site-specific basis at the time of project-level
environmental review when appropriate. Individual projects have been or will be
subject to local approval processes.
5
g. About what percent of the site will be covered with impervious surfaces
after project const(uctibn (for exainple, asphalt or buildings?)
The construction projects included in the Capital Facilities Plan have reqtiired or will
require the construction of impervious surfaces. The extent of any impervious cover
constructed will vary with each project included in the Capital Facilities Plan. This
issue has been or will be addressed during project-level environmental review when
appropriate.
h. Proposed measures to reduce or control erosion, or other impacts to the
earth, if any
The erosion potenrial of the projects included in the Capital Facilities Plan and
appropriate control measures have been or will be addressed during project-level
environmental review when appropriate. Relevant erosion reduction and control
requirements have been or will be met.
2. Air
a. What types of emissions to the air would result from the proposal (i.e.,
dust, automobile, odors, industrial wood smoke) during construction and when
the prbject is completed? If any, generally describe and give approxirimate
quantities if Known.
Various emissions, many construction-related, may result from the individual projects
included in the Capital Faciliries Plan. The air-quality impacts of each project have
been or will be evaluated during project-level environmental review when appropriate.
Please see the Suppleinental Sheet for Nonproject Actions.
b. Are there any off-site sources of emissions or odor that may affect your
proposal? If so, generally describe.
Any off-site sources of emissions or odor that may affect the individual projects
included in the Capital Facilities Plan have been or will be addressed during project-
level environmental review when appropriate.
c. Proposed measures to reduce or control emissions or other impacts to air,
if any
The individual projects included in the Capital Facilities Plan have been or will be
subject to project-level environmenta] review and relevant local approval pmcesses
6
when appropriate. The Dish-ict has been or will be required to comply with all
applicable air regulations and air permit requirements. Proposed measures specific to
the individual projects included in the Capital Facilities Plan have been or will be
addressed during project-level environmental review when appropriate. Please see the
3upplemental Sheet for Nonproject Acrions.
3. Water
a. SurFace:
1) Is there any surFace water body on or in the immediate vicinity of
the site (including year-round and seasonal streams, salfinrater, lakes,
ponds, wetlands)? If yes, describe type and provide names. If
appropriate, state what stream or river it flows into
There is a network of surface water bodies within the Auburn School Dishict.
The surface water bodies that aze in the immediate vicinity of the projects
included in the Capital Facilities Plan have been or will be identified during
project-leve.l environmental review when appropriate. When necessary, the
surface water regimes and flow pattems have been or will be researched and
incorporated into the designs of the individual projects.
2) Will the project require any work over, in, or adjacent to (within 200
feet) the described waters? If yes, please describe and attach available
plans.
The projects included in the Capital Facilities Plan may require work near the
surface waters located within the Aubuin School District. Applicable local
approval requirements have been or will be satisfied.
3) Estimate the amount of fill and dredge material that would be
placed in or removed from surFace water or wetlands and indicate the area
of the site that would be affected. Indicate the source of fill material.
Information with respect to the placement or removal of fill and dredge material
as a component of the projects included in the Capital Facilities Plan has been or
will be provided during project-level environmental review when appropriate.
Applicable local regulations have been or will be satisfied.
7
4) Will the proposal require surface water withdrawals or diversions?
Give general description, purpose, and approximate quantities if known.
Any surface watei withdrawals or diversions required in connection with the
projects included in the Capital Facilities Plan have been or will be addressed
during project-level environmental review when appropriate.
5) Does the proposal lie within a 100-year floodplain? If so, note
location on the site plan.
Each project included in the Capital Facilities Plan, if located in a floodplain area,
has been or will be required to meet applicable local regulations for flood azeas.
6) Does the proposal involve any discharges of waste materials to
surface waters? If so, describe the type of waste and anticipated volume
of discharge.
Specific information regarding the dischazge of waste materials that may be
required as a result of the projects included in the Capital Facilities Rlan has been
or will be provided during project-level environmental review when appropriate.
Please see the Supplemental Sheet for Nonproject Actions.
b. Ground:
1) Will growndwater be withdrawn, or will water be discharged to
groundwatei'? Give general description, purpose, and approximate
quantities if known.
Individual projects included in the Capital Facilities Plan may impact
goundwater resources. The impact of the individual projects included in the
Capital Facilities Plan on groundwater resources has been or will be addressed
during projeot-level environmental review wheri appiopriate. Each project has
been or will be subject to applicable local regnlarions. Please see the
Supplemental Sheet for Nonproject Actions.
2) Describe waste material that will be discharged into the ground
from septic tanks or other sources, if any (for exarriple: Domestic sewage;
industrial, containing the following chemicals ., agricultural; etc.).
Describe the general size of the system, the number of such systems, the
number of houses to be served (if applicable), or the number of animals or
humans the system(s) are expected to serve.
8
'Tl�e dischazges of waste material that may take place in connection with the
projects included in the Plan have been or will be addressed during project-level
environmental review
c. Water Runoff(including storm water):
1) Describe the source of runoff(including storm water) and method of
collection and disposal, if any (include quantities, if known). Where will
this water flow? Will this water flow into other waters? If so, describe.
Individual projects included in the Capital Facilities Plan may have stormwater
runoff consequences. Specific information regazding the stormwater impacts of
each project has been or will be provided during project-level environinerital
review when appropriate. Each project has been or will be subject to applicable
local stormwater regulations.
2) Could waste materials enter ground or surface waters? If so,
generally describe.
The projects included in the Capital Facilities Plan may result in the discharge of
waste materials into ground or surface waters. The specific impacts of each
project on ground and surface waters have been or will be identified during
project-level environmental review when appropriate. Each project has beBn or
will be subject to all applicable regulations regarding the discharge of waste
materials into ground and surface waters. Please see the Supplemental Sheet for
Nonproject Actions.
d Proposed measures to reduce or control surFace, ground, and runoff water
impacts, if any
Specific measures to reduce or control runoff impacts associated with the projects
included in the Capital Facilities Plan have been or will be addressed during
project-level environmental review when appropriate.
9
4 Plants:
a. Check or circle types of vegetation found on the site:
_ deciduous tree: alder, maple, aspen, other
_ evergreen tree: fir, cedar, pine, other
_ shrubs
_ grass
_ pasfure
_ crop or grain
_ wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
= other types of vegetation
A variety of vegetarive zones aze located within the Auburn School District.
Iriventories of the vegetation located on the sites of the projects proposed in the
Capital Facilities Plan have been or will be developed during project-level
environmental review when appropriate.
b. What kind and amount of vegetation will be removed or altered?
Some of the projects included in the Capital Facilities Plap may require the removal or
alteration of vegetation. The specific impacts on vegetation of the projects included in
the Capital Facilities Plan have been or will be identified during project-level
environmental review when appropriate.
c. List threatened or endangered species known to be on or near the site.
The specific impacts to these species from the individual projects included in the
Capital Facilities Plan have be.en or will be detennined during project-level
environmental review when appropriate.
d. Proposed landscaping, use of native plans, or other measures to preserve
or enhance vegetation on the site, if any
Measures to preserve or enhance vegetation at the sites of the projects includgd in the
Capital Faciliries Plan have been or will be identified during project-level
environmental review when appropriate. Each project is or will be subject to
applicable locallandscaping requirements.
10
5 Animals:
a. Circle any birds and animals which have been observed on or near the
site or are known to be on or near the site:
birds: hawk, heron, eagle, songbirds, other•
mammals: deer, bear, elk, beaver, other
fish: bass, salmon, trout, herring, shelifsh, other•
An inventory of species that have been observed on or neaz the sites of the projects
proposed in the Capital Facilifies Plan has been or will be developed during project-
level environmental review when appropriate.
b. List any threatened or endangered species known to be on or near the
site.
Inventories of threatened or endangered species known to be on or neaz the sites of the
projects includ.ed in the Capital Facilities Plan have been or will be developed dnring
project-level environmental review when appropriate.
c. Is the site part of a migration route? If so, explain.
The impacts of the projects included in the Capital Facilities Plan on migration routes
have been or will be addressed during project-level environmental review when
appropriate.
d. Proposed measures to preserve or enhance wildlife, if any
Appropriate measures to preserve or enhance wildlife have been or will be determined
during project-level environmental review when appropriate.
6. Energy and Natural Resources:
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be
used to meet the completed projecYs energy needs? Describe whether it will
be used for heating, manufacturing, etc.
The State Board of Education requires the wmpletion of a life-cycle cost analysis of
atl hearing, lighting, and insulation systems before it will permit specific school
projects to proceed. The energy needs of the projects included in the Capital Facilities
Plan have been or will be determined at the time of specific engineering and site
11
design plauning when appropriate. Please see the Supplemental Sheet for Nonproject
Actions.
b. Would your project affect the potential use of solar energy by adjacent
properties? If so, generally describe:
The impacts of the projects included in the Capital Facilifies Plan on the solaz
potential of adjacent projects have been or will be addressed during project-level
environmental review when appropriate.
c. What kinds of energy conservation features are included in the plans of
this proposal? List other proposed measures to reduce or contrbl ene�gy
impacts, if any
Energy conservation measures proposed in connecrion with the projects included in
the Capital Faciliries Plan have been or will be considered during project-level
environmental review when appropriate.
7 Environmental Health:
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If sb, describe.
Please see the Supplemental Sheet for Nonproject Actions.
1) Describe special emergency services that riiight be required.
Please see the Supplemental Sheet for Nonproject Actions.
2) Proposed measures to reduce or control environmenfal health
hazards, if any
The projects inciuded in the Capital Facilities Plan comply or will comply with all
current codes, standazds, rules, and regulations. Individual projects have been or
will be subject to project-level environmental review and local approval at the
time they aze developed, when appropriate.
12
b. Noise:
1) What types of noise exist in the area which may affect your project
(for example. tra�c, equipment, operation, other)?
A variety of noises from traffic, construction, residential, commercial, and
industrial azeas exists within the Aubiun School District. The specific noise
sources that may affect the projects included in the Capital Facilifies Plan have
been or will be identified during project-level environmental review when
appropriate.
2) What types and levels of noise would be created by or associated
with the project on a short-term or a long-term basis (for example: traffic,
construction, operation, other)? Indicate what hours noise would come
from the site.
The projects included in the Capital Facilities Plan may create normal
construction noises that will exist on short-term bases only The construction
projects could increase traffic azound the wnstruction sites on a short-term basis.
Because the construction of additional school capacity will increase the capacity
of the District's school facilities, this project may create a slight increase in
traffic-related or operations-related noise on a long-term basis. Similarly, the
placement of portables at school sites will increase the capacity of school facilities
and may create a slight increase in traffio-related or operations-related noise.
Neither of these potential increases is expected to be significant. Please see the
Supplemental Sheet for Nonproject Actions.
3) Proposed measures to reduce or control noise impacts, if any
The projected noise impacts of the projects included in the Capital Facilities Plan
have been or will be evaluated and mitigated during project-level envirorimental
review when appropriate. Each project is or will be subject to applicable local
regulations.
8 Land and Shoreline Use:
a. What is the current use of the site and adjacent properties?
There are a variety of land uses within the Auburn School District, including
residential, commercial, industrial, institutional,u6lity, open space,recreational, etc.
13
b. Has the site been used for agriculture? If so, describe.
The known sites for the projects included in the Capital Facilities Plan have not beexi
used recently for agricalture.
c. Describe any structures on the site.
The structures located on the sites for the projects inclnded in the Capital Facilities
Plan have been or will be identified and described during project-level environxnental
review when appropriate.
d. Will any structures be demolished? If so, what?
The structures that will be demolished as a result of the projects included in the
Capital Faciliries Plan, if any, have been or will be identified during project-level
environxnental review when appropriate.
e. What is the current zoning classification of the site?
The sites that are covered under the Capital Facilities Plan have a variety of zoning
classifications under the applicable zoning codes. Site-specific zoning information has
been or will be identified during project-level environmental review when appropriate.
f What is the current comprehensive plan designation of the site?
Inventories of the comprehensive plan designations for the sites of the projects
included in the Capifal Facilities Plan have been or will be completed during project-
level environmental review when appropriate.
g. If applicable, what is the current shoreline master Program designation of
the site?
Shoreline master program designations of the sites of the projects inclu_ded in the
Capital Facilities Plan have been or will be idenrified during project-level
environmental review when appropriate.
14
h. Has any part of the site been classified as an "environmentally sensitive"
area? If so, specify
Any environmentally sensitive areas located on the sites of the projects included in the
Capital Facilities Plan have been or will be idenrified during project-level
environmental review
i. Approximately how many people would reside or work in the completed
project?
The Auburn School District currently serves approximately 14,971 students.
Enrollment is expected to increase to approximately 1'7,702 students by the 2019-2020
school yeaz.
j. Approximately how many people would the completed project displace?
Any displacement of people caused by the projects included in the Capital Facilities
Plan has been or will be evaluated during project-level environmental review when
appropriate. However, it is not anticipated that the Capital Facilities Plan, or apy of
the projects contained therein, will displace any people.
k. Proposed measures to avoid or reduce displacement impacts, if any
Individual projects included in the Capital Facilities Plan have been or will be subject
to project-level environmental review and local approval when appropriate. Proposed
mitigating measures have been or will be developed at that time, when necessary
I. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any
The compatibility of the specific projects included in the Capital Facilities Plan tvith
existing uses and plans has been or will be assessed as part of the comprehensive
planning process and during project-level environmental review when appropriate.
9 Housing:
a. Approximately how many units would be provided, if any? Indicate
whether high, middle, or low-income housing.
No housing units wonld be provided in connection with the completion of the projects
included in the Capital Facilities Plan.
15
b. Approximately how many units, if any, would be eliminated? Indicate
whetlier high, middle, or low-income housing.
It is not anticipated that the projects included in the Capital Facilities Plan will
eliminate any housing units. The impacts of the projec.ts included in the Capital
Faciliries Plan on existing housing have been or will be evaluated during project-level
environmental review when appropriate.
c. Proposed measures to reduce or control housing impacts, if any
Measures to reduce or control any housing impacts caused by the projects included in
the Capital Facilities Plan have been or will be addressed during project=level
environmental review when appropriate.
10 Aesthetics:
a. What is the tallest height of any proposed structure(s), not including
antennas; what is the principal exterior building material(s) proposed?
The aestheric impacts of the projects included in the Capital Facilities Plan have been
or will be addressed during project-level environmental review when appropriate.
b. What views in the immediate vicinity would be altered or obstructed?
The aesthetic impacts of the projects included in the Capital Faciliries Plan have been
or will be addressed during project-level environmental review when appropriate.
c. Proposed measures to reduce or control aesthetic impacts, if any
Appropriate measures to reduce or control the aesthetic impacts of the projects
included in the Capital Facilities Plan have been or will be detemiined on a project-
level basis when appropriate.
16
11 Light and Glare.
a. What type of light or glare will the proposal produce? What time of day
would it mainly occur'?
The light or glaze impacts of the projects included in the Capital Facilities Plan have
been or will be addressed during project-level environmental review, when
appropriate.
b. Could light or glare from the finished project be a safety hazard or interfere
with views?
The light or glare nnpacts of the projects included in the Capital Facilities Plan have
been or will be addressed during project-level environmental review when appropriate.
c. What existing off-site sources of light or glare may affect your proposal?
Off-site sources of light or glare that may affect the projects included in the Capital
Facilities Plan have been or will be evaluated during project-level environmental
review when appropriate.
d. Proposed measures to reduce or control light and glare impacts, if any
Proposed measures to mitigate light and glare impacts have been or will be addressed
during project-level environmental review when appropriate.
12. f2ecreation:
a. What designated and informal recreational opportunities are in the
immediate vicinity?
There are a variety of formal and informal recreational facilities witliiu the Aubutn
School District.
b. Would the proposed project displace any existing recreational uses? If so,
describe.
The recrearional impacts of the projects included in the Capital Facilities Plan have
been or will be addressed during project-level environmental review when appropriate.
17
The projects included in the Capital Facilities Plan, including proposed new school
facilities, may enhance recreational opportunities and uses.
c. Proposed measures to reduce or control impacts on recreation, including
recreation opportunities to be provided by the project or applicant, if any
Adverse recreational effects of the projects included in the Capital Facilities Plan have
been or will be subject to initigation during project-level erivironmental review when
appropriate. School faciliries usually provide recreational facilities to the community
in the form of play fields and gymnasiums.
13. Histbric and Cultural Preservation:
a. Are there any places or objects listed on, or proposed for, national, state,
or local preservation registers known to be on or next to the site? If so,
generally describe.
There aze no known places or objects listed on, or proposed for, such registers for the
project sites included in the Capital Facilities Plan. The existence of historic and
cultural resources on or next to the sites has been or will be addressed in detail during
project-level environmental review when appropriate.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site.
An inventory of historical sites at or neaz the sites of the projects included in the
Capital Facilities Plan has been or will be developed during project-level
environmental review when appropriate.
c. Proposed measu�es to reduce or confrol impacts, if any
Appropriate measures will be proposed on a project-level basis when appropriate.
14 Transportation:
a. Identify public streets and highways serving the site, and describe
proposed access to the existing street system. Show on site plans, if any
The impact on public streets and highways of the individual projects included in the
Capital Facilities Plan have been or will be addressed during project-level
environmental review when appropriate.
18
b. Is site currently served by public transit? If not, what is the approximate
distance to the nearest transit stop?
The relationship between the specific projects included in the Capital Facilities Plan
and public iransit has been or will be addressed during project-level environinental
review when appropriate.
c. How many parking spaces would the completed project have? How many
would the project eliminate?
Inventories of parking spaces located at the sites of the projects included 'm the Capital
Faciliries Plan and the impacts of specific projects on parking availability haue been or
will be conducted during project-level environmental review when appropriate.
d. Will the proposal require any new roads or streets, or improvements to
existing roads or streets, not including driveways? If so, generally describe
(indicate whether public or private).
The need for new streets or roads, or improvements to existing streets and roads has
been or will be addressed during project-level environxnental review when apprbpriate.
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
Use of water, rail, or air transportation has been or will be addressed during project-
level environmental review when appropriate.
f. How many vehicular trips per day would be generated by the completed
project? If known, indicate when peak volumes would occur
The traffic impacts of the projects included in the Capital Facilities Plan have been or
will be addressed during project-level environmantal review when appropriate.
g. Prbposed measures to reduce or control transportation impacts, if any
The mitigation of traffic impacts associated with the projects included in the Capital
Facilities Plan has been or vi+ill be addressed during project-level environmental
review when appropriate.
19
15 Public Services:
a. Would the project result in an increased need for public services (for
example: fire protection, police protection, health care, schools, other)? If so,
generally describe.
The District does not anticipate that the projects identified in the Capital Facilities
Plan will sigriificantly increase the need for public services.
b. Proposed measures to reduce or control direct impacts on public services,
if any
New school facilities have been or will be built with automatic security systems, fire
alarms, smoke alazms,heat sensors, and sprinkler systems.
16. Utilities:
a. Circle utilities currently available at the site: electricity, natural gas, water,
refuse service, telephone, sanitary sewer, septic system, other
Electricity, natural gas, water, refuse service, telephone, and sanitary sewer utilities
aze available at the lrnown sites of the projects included in the Capital Faciliries Plan.
The types of urilities available at specific project sites have been or will be addressed
in inore detail during proje.ct-level environmental review when appropriate.
b. Describe the utilities that are proposed for the project, the utility providing
tFie service, arid the general construction aotivities on the site or in the
immediate vicinity which might be needed.
Utility revisions and construction needs have been or will be identified during project-
level environmental review when appropriate.
20
C SIGNATURE
The above answers are true and complete to the best of my knowledge.
I understand that the lead agency is relying on them to make its decision.
Signature:
Date Submitted:
21
D SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in
conjunction with the list of#he elements of the environment.
When answering these questions, be aware of the extent the proposal, or the
types of activities likely to �esult from the proposal, would affect the item at a greater
intensity or at a faster rate than if the proposal were not implemented. Respond briefly
and in general terms.
1 How would the proposal be likely to increase discha_rge to water;
emissions to air-; production, storage, or release of toxic or hazardous substances; or
production of noise?
To the extent the Capital Facilities Plan makes it more likely that school facilities,
including new middle school and elementary school capacity and a high school
modemizarion, will be constructed, some of these environmental impacts will be more
likely Additional impermeable surfaces, such as roofs, access roads, and sidewalks
could increase stormwater runoff, which could enter surface or ground waters.
Heating systems, emergency generators, and other school equipment that is installed
pursuant to the Capital Facilities Plan could result in air emissions. The projects
included in the Capital Facilities Plan should not require the production, storage, or
release of toxic or hazazdous substances, with the possible exception of the storage of
diesel fuel or gasoline for emergency generating equipment. The District does not
anticipate a,sigdificant increase in the production of noise from its facilities, although
the projects included in the Capital Facilities Plan will increase the District's student
capacities.
Proposed measures to avoid or reduce such increases a�e:
Proposed measures to mitigate any such increases described above have been or will
be addressed during project-]evel environmental review when appropriate.
Stormwater detention and runoff will meet applicable County and/or City
requirements and tnay be subject to National Pollutant Dischaige Elimination System
("NPDES") peicnitting requirements. Discharges to air will meet applicable air
pollution control requirements. Fuel oil will be stored in accordance with local and
state requirements.
2. How would the proposal be likely to affect plants, animals, fish, or marine
life?
The Capital Facilities Plan itself will have no impact on these elements of the
environxnerit. The projects included in the Capital Facilities Plan may reqiiiie clearing
22
plants off of the project sites and a loss to animal habitat. These impacts have been or
wiil be addressed in more detail during project-level environmental review when
appropriate. The projects included in the Plan aze not likely to generate significant
impacts on fish or marine life.
Proposed measures to protect or conserve plants, animals, fish, or marine life
are:
Specific measwes to protect and conserve plants, animals, and fish cannot be
identified at this time. Specific mitigation proposals will be identified, however,
during project-]evel environmental review when appropriate.
3. How would the proposal be likely to deplete energy or natural resources?
The construction of the projects included in the Capital Facilities Plan will require the
consumption of energy
Proposed measures to protect or conserve energy and natural resources are:
The projects included in the Capita] Facilities Plan will be constructed in accordance
with applicable energy efficiency standards.
4 How would the proposal be likely to use or affect environmentaliy sensitive
areas or areas designated (or eligible or under study) for govemmental protection; such
as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat,
historic or cultural sites, wetlands, floodplains, or prime farmlands?
The Capital Facilities Plan and individual projects contained therein should have no
impact on these resources.
Proposed measures to protect such resources or to avoid or reduce impacts are:
No specific measures are being proposed at this tune. Appropriate measures would
be proposed during project-specific review Arinual updates of this Plan will be
coordinated with the cities of Auburn, Algona, Black Diamond, Kent, and Pacific,
and King County as part of the Growth Management Act process, one of the
purposes of which is to protect environmentally sensitive areas. To the extent the
School District's facilities planning process is part of the overall Growth
Management planning process, these resources are more likely to be protected.
5. How would the proposal be likely to affect land and shoreline use,
including whether it would allow or encourage land or shoreline uses incompatible with
existing plans?
23
The Capital Facilities Plan will not have any impact on land or shoreline use that is
incompatible with existing comprehensive plans, land use codes, or shoreline
management plans. The District does not anricipate that the Capital Facilities Plan or
the projects contained therein will directly affect land and shoreline uses in the azea
served by the Dishict.
Proposed measures to avoid or reduce shoreline and land use impacts are:
No measures to avoid or reduce land use impacts resulting from the Capital Faciliries
Plan or the pmjects containeci therein aze proposed at this rime.
6. How would the proposal be likely to increase demands on transportation
or public services and utilities?
The construction projects included in the Capital Facilities Plan may create temporary
increases in the District's need for public services and utilities. The new school
facilities will increase the DistricYs demands on transportation and urilities. These
increases are not expected to be significant.
Proposed measures to reduce or respond to such demand(s) are:
No measures to reduce or respond to such demands aze proposed at this time.
7 Identify, if possible, whether the proposal may conflict with local, state, or
federal laws or requirements for the protection of the environment.
The Capital Facilities Plan will not conflict with any laws or requirements for the
protection of the environment.
24
IIIIIIIIIII�I1niu"'q
IEItIll�llGEit SCHOOI. DISTIZICT
Educating every child for
Confidence today and
Contribution tomorrow
August 22, 2014
Kevin Snyder
Director of Planning
City of Auburn
25 West Main Street
Auburn, WA 980011}998
Subject: Dieringer School District -Mitigation Impact Fees
Dear Mr. Snyder:
The Dieringer School District has completed the Dieringer School District Capital
Facilities Plan for 2015-2020. In preparing the updated Capital Facilities Plan the
District once more reviewed the question of the School Impact Fee Calculation. Based
on the analysis of the DistricYs site acquisition and permanent facility costs,the
Dieringer School District Board of Directars has determined that the appropriate
mi6gafion impact fee far the permitting of a single family residence is $5,231 and$1,839
per unit for a multiple family residence.
A review of the fees collected by the City of Auburn, on behalf of other school districts
within the city, serves to support the validity of the Dieringer requested fee of$5,231 and
$1,839 per unit for a multiple family residence.
The property values within the boundaries of the Dieringer School District aze the highest
in Pierce County;this causes site acquisition to be expensive and contributes to overall
higher construction costs than other school districts experience. Therefore, it is most
appropriate for the mitigarion iinpact fees coliected on behalf of the Dieringer School
District to be adjusted to more closely approacimate the fees collected for other local
school districts.
The Dieringer School District requests that the City of Auburn adjust the mitigation
impact fees collected on behalf of the Disirict to the $5,231 and $1,839 per unit for a
mulfiple faznily residence established in the Capital Facilities Plan for 2015-2020. Please
let me know if you need further information by contacting me at(253) 862-2537
Sincerely,
����� R���IVEC�
dy e r-Martinson
upe tendent A�G 2 6 2014
cirvoFauauaN
PLANNING&DEVELOPMENT
1320 17Rth Avem�e East • Lake Tapps,Washington 98391 • (253)862-2537 FAX(253)R62-R472
D+eri�vger Schoal District#393 is an Egvnl Opporhuirh�Las�iru�ion
I!�llltEqii�.
IIIN���f C��;,. ������ �
. �
I)ie�°in�e�° �'chool Dist�°ict
Cap�tal �i�cil�ties 1'la�
�015��020
BoaYd 14pproved
June 17, 2014
DIERINGER SCHDOL DISTRICT NO. 343
1320-178�'Avenue East
Lake Tapps,WasLington 98391
(253) 862-2537
BOARD OF DIRECTORS
Pete George
John McKenna
Corey Pawlak
Andrew Hart
Monfe St.Johns
Dr Jucly Neutueier-Martinson,Superintenilent
. .
��1��111��r
Educating every child for
Confidence today and
Contribution tomorrow
Dieringer Schooi District No. 343 Dieringer School Disfrict
An Overview
Established in 1890,Dieriager School Dishict consolidated with Lake Tapps School
District in 1936.The Dish-icYs three schools, Lake Tapps Elementary School,Dieringer
Heights Elementary School and North Tapps Middle School,proviile K tlirough 8th
grade education, and serve as hubs for oominunity activities as well. Dieringer Schoo]
District#343 is located in wrincorporated Pierce County,bounded on the east by the
White Riva, on the west by the Stuck River, on the north by the city of Auburn, and on
the south by the cities of Bonney Lake and Sumner 'I'he Aistrict suirounds the northern
two-thirds of Leke Tapps and covers appmximately 5.5 square miles.
The current student enrollment is appro�cimately 1,500 students in giades kindergazten
through eight 3tudents in gradas first through tivrd are housed at Lake Tapps
Elemenfary, constructed in 2005 as a replacement project.Dieringer Heights EIementary
opened in the fall of 2000 and is home to students in kindergarten, fourth and fifth grade.
Originaily consiructed in 1992 and added on to in 1998 and 2009,North Tapgs Middle
School houses students in grades sixth-eighth. The district supports an ailditional 500
high school students who may select to attend aay public high school.The majority chose
to attend Aubuin Rivecside, Sumner and Bonney Lake High Schools.
The district has a long standing history of groviding high quality education for all our
students. Our goal is for our students to gain the skills that will allow them to become
successful, confident, conhibuting members of society Dieringei is composed of
students who coiae to school well prepared and eager to]eam. Pazents are concemed with
stadent success and provide outstanding support for their children and the Dieringer
School Dishict. The PTA and many volunteers conhibute coundess hours and resources
to our schools and students. T6e community supports the schools through the gassage of
funding issues to support bus acquisition,student access to current technology and the
constr6ctioa of scbool facilities. Impact fees, including interest, are heid in zeserve until
used to meet District identified needs for site acquisition, additional facilities and
improvements and/or technology capital expenditvres.
DIERiNGER SCHOOL DISTRICT NO 343
Capital Facilities Plan Update, 2014
Current Facilities Inventory of Public Schools
TTAME CAPACITY LOCATION
Lake Tapps Elementary 396 1320-178�'Ave E., Lake Tapps
Dseringer Heights Elementary 547 21727—34�' St. E., Lake Tapps
North Tagps Middle School 567 20029- 1?'�St.,E., Lake Tapps
Iiigh School 0
TOTAL 1,510
� ,s - � + '�' �� - " e � 9 'e ° 'a �
1 o e P a a
� ,;_'-:,�� .�„��lIFI, � A U B U`A N I � � � �-�,;� � i �� . _
� w' � °rN,�'8 •
� ;�� �. �i i .
� � t;:l �, � , � f�� ` • • ' ! � ' � � �' i
" • } I ar u• '� i' �, � �i
� 1 � t :
f�' � •;' +.. i, � � ,, , �
l ��
, _ . . _ � ' I ' ' 8 " # -" -a - - . . .l - - �
�� ; sm�v !:� �� . 4 .:.� ,�u. �w i � ; MI/LI(LES�OOT � !NDIAN
4 '� ' ° .1fnLnfr � �m '�)`� T �� p � � , p
`� ,,•-��. ,� � ; � 'ab-~ 9� `�'• ` .G�'+, ;��1� � ;tE.�, [ , � 4�
-, I ��Fdf _ E � • � i � . 'G.,w � � _ .l` .��_, .
�� �,Y ♦
u : �.��, _ _;w. . a i"-�""S'^ '_ rx_.. d`•�: — '� __" �
` � 4;'�Z�� •l r FI'i-_. � �' 7�--.-( 1 " � i
I �' ---" .I:.y"''� '* �nn�l'L�`r ,:.^ \ �
� d. •I .. _. . y;,•''�' =s!x.� q..�.�,�.v h6�4 r'.�,',.:`•, a 1 i ' ¢�
�.��'''C^:i`, .il'�i','s.��� _ n� 'M'£` 1
�' ' :�.� - - ' ;�:.'„• '°
�i 4� � � ' n«: .2: . �_.. y=�,T;�''• ' ' . -rfp°.,..,: m��tn. y�
1 ♦ � '�� __s _ xi: • ���7fr.�°. _a _ �t. ��P;..:: � � RES�Vi11�
y?'i. Tr ✓i--• Y �.
I Q' � • •-�' .� 4.' {hy :. .��„i. " "'��"
II '7� 'r.mhi ' � - �.t-.._ n �L, Y?' �itr�'F� ••,i..(�e'ii i +� " _�p-� A
I ,.� :,� ., '��`' � . ri,� � ,a'rs!� � � '
� �• :'r;'J�+1 " . �
U f . .:� � . ' S•y :;`:�jr.;� SSef�'' [y , '%�'".�t t �� u
.p ��P' ` �'i%��. t -;� i
J' �'P�{ "f�.'Zi ♦ .:.Y.
I� .Y 5.'�� ��y�I '1�'� {I � 1!i . � �
. ��� �, � _ � .e' _.�~.rj•i �r } - Yl� � '.� ' .
n c g T� M�i— _ _-�-� ...-.'�... y
F � �� y y 'x A'.�.�•'�.q'a`u,'11�Y� � .. �'My1S 5w.� i
; �ti � �,` .14.�i `' 1 ��r r,�.:l�b.�`7: Y. .a 6 c..�' . 'WWW i+iy�R •y � � \ ' a7'S��� .ar
S .' t:' 1 t 4j�Y"^P=aT_"j y I 7��i�.3yt'' � �.�.�.�
1� 5C � :S. '� �, LYSi::1r.Y:- �I! S � �;���" ; L
•��..-.i„cy'j�t� _�iye � 1 �,
'?{:' � sy'�x,�'^'7;._~.�. . � = t '4' � i
m - _�S�_U M N ��R}i: ---- . - ' �'' '= .- ' `;`'"� +'' -'�� ' - -1 - '� �; ,A�"e - - ' --
!' _;. `38' - -o..� �';� 4 �.'��!`},�,'c'"g'�F x !a � �= i '19- a
��'- '':�'`,': � . o� i, �. 1 ����` -w.�'Fs.;�r8� j� t i i
u ;_.• . J - . , �. , � • ?t:'a• s ` .� , � u
- .... . .,.. . . .:�. �; �i- �. `n�i y;.r..�A.. "�.=•' .. ,
. .• . . . .:", 1 1 �}"':n� � '
,I 7:'''` � k `�' �;.k; '�� ,k� i ��� � � a
OIERINGEItsCH0OL�18TA14T.M0.913 . .v.� �� � `• ��z``'n'"�'.._'�;i ��.,.� tiR.�a{�"-. , r
u �ISTRICTBOUNOARYMAP � _ — - . y '« +... ., � -- ��
�� e •�. �{� ;�`��: 5. � � y^��' n u�c.,;.;� ' �, � —_�QG�t
o+,..awm�, w.,.ma.R�mm � ` '4, '••�'„`a;5�1r '�,^�ti � :t� ic.� M r ��
�nmr.c +�� �
� �uim� Pv1o�� . '� f � oa `Y 4• ' �i 4p�•[�.���;�,. �`�h� ,�'l�;��� i � � � n
aR+�WyP�-r�aa�+ �emtmwumr .'. � � � '�94� �f ` ���� �� � �
� �
i1MWCe am�tisa6
i� µw9m"'.m �w ne` ��`t 1 J.._._ ._--S. _ "� _•31_' 1 :�a=,��'�,���`.'�,',�r� . �- --- - -a<-- -�� u
y.�m�,.�ew , i � `'� ., i, �., , � �=^, :-,- � �
-+w Y� � e:' i
�p � �: , �,� a � p
�.,.vu..a,-,-..�. � I � � i�' 'i' � �.�,.i �r•
_..._ . �
u � � �
� � ' �Pl�rta}�ia .f-, •�. "�_ _y_
I
� _ 'a e 'e s '� E e' E� 8 8 b � � a s � � q � $� �a
Dieringer School District Proposed Housing
Potential Enrollment Increase
June 2014
Proposed Housing Units:
Single Family- 195 x 452 generation factor= 88 students K-8 grade
Multi-family-0 x .242 generation factor=0 students K-8 grade
Enrollment Impact:
88 students K-8
Estimated 18 students a yeaz over the period 2015-2020
Potenrial enrollment increase=5.6% (based on 1,506 enrollment 13-14)
Increase per grade level = 8.8 students (baseil on 10 grade bands)
Approximately students per school: LTES 26.4,NTMS 26.4; DHES 35.2
District enrollment based on 13-14 and potential growth=1,594 students
District program capacity** = 1,510
**current program capucity based oa full-and half-time landergertea
Enrollment Projections
The Dieringer School District is located in an area that continues to experience growth.
Tlvs grov✓th can be noted by reviewing the following indicators: enrbllment trend data,
proposed housing development, and the mitigation impact fees received for new
construction.
The District continues to experience steady growth in student enrollment This has
sligiifly exceeded the Pierce County and Puget Sound Edncatibnal Service I}istrict
(PSESD) enrollment growth over the same period. A review of proposed cons�uction
within the borders of the Dieringer School Dishict indicates that the growth trend can be
ezpected to continue over the neict four years and beyond. This growth trend was slowed I
in recent years by economic conditions, but has started to pick up again. There are 195
single family residents slated for construction within the next five years. The multi-
family projects will contnbute an additional 0 residential units during that time. These
projects, together with individual lots and general in-migiation, are anticipated to
generate an additiona188 students in kindergarten through eighth grade.
Information from Pierce county Planning & Land Services indicates that there is space
and zoning for approximately 1,2U0 additional hovsing lots in the western portion ofthe
districL This creates a potential for 542 additional students, kindergarten through eighth
grade that are not iricladed in the above numbers.
To partially address this growth, the District passed a 2006 bond issue to construct an
additional five classrooms at Dieringer Heights Elementary Those classmoms were
completed and occupied in 2009. The bond issue also piovided for the addition of an
suXiliary gym, health and fitness classroom, and four science rboms at North Tapps
Middle School. Those projects were completed in 2009 and the new instructional spaces
are in use. Futpre anticipated growth will create the need to acquire an additional schoo]
site and construct an additional school to house tl�e growing student enrollment
HOUSING DEVELOPMENTS
Spring 2014
#1 Fainveather Cove Estates (19) Pierce Co
-Norice of application ]/24/Ol
-26 Single Family Lots (26 homes will be built on 281ots)
- 1600-2000 block of 16`h St. @ the 17500-17800 block of Sumner-Tapps Hwy
- 6 houses completed; 1 under constivetion
#2 Rainier Plateau (10) Pierce Co
-Norice of application 10/13/OD
- 10 Single Family Lots
-End of 34`�St.
-Site wai-k completed; home conslruction TBD
#3 Grandview Ridge II and III (9)Pierce Co
- Off Sumner-Tapps Hwy across from Driftwood and Deer Island Dr.
- Grandview Ridge Notice of Application 1/13/99
-49 Single Family Lots; coiripleted
-III(91ots)no date (no change)
#6 Tagps Meadow (Van Der Hoek) (11) Pierce Co
-Notice of application 9/13/04
-1 1 ]arge lots
-Across from Snag Island
-Site work complete(no change)
#7 Country Creek Estutes (9) Pierce Co
-10 Single Family Lots -off 15�'near Edwards Road
- One (1) house completed
#8 Forest Canyon Estates (121) Pierce Co
-121 Single Family I.ots-0ff Forest Canyon Rd.
-Pernut expired
#11 Carter Estates (1� Aubum
-16 Single Family Lots—Lake Tapps Pazkway and 179'�
-16 homes (no construcrion scheduled)
195 Single FamiIy Units to 6e built
Standard of Service
The Dieringer School Dishict houses children in elementary schools serving students
kindergarten through fifth grade and a middle school that houses grades six through
eighth. High schobl students, grades nine through twelve, attend adj acent high schools,
primarily in the Aubum and Sumner 3chool Distri�ts.
Dieringer School District follows a traditional school calendaz beginning in early
September and completing in mid June. The daily school schedules begin beriveen 7•49
and 8:45 a.m. and end between 2:l 7 and 3.15 p.m.
The Dieringer School Dishict standard of service is based on class size and program
decisions adopted by the Dieringer School District Board of Directors. Based on the
district philosophy regarding class size, the targeted number of students per classroom
kindergarten through thircl grade is 23, fourth through fifth grade 2b and sixth through
eighth grade,29. These class sizes have an impact on facilities and the pemzanent
capacity of each school reflects these class sizes.
In the District,rooms designated and assigned for special use are nat counted as capacity
classrooms. At the elementary level students are provided music instruction,physical
education and art inshvction in separate,non-capacity classrooms. Computer labs are
provided at each school as non-eapacity spaces. Special eduoation anii remedial
programs are prbvided as pullout programs and do aot provide capacity At the middle
school level,instruction is organized around a six period day; classrooms are calculated
as providing 5/6 capacity to accommodate teacher planning time in the instructional
space.
DIERINGER SCHOOL DISTRICT NO 343
Capital Facilities Plan Update, 2014
Dieringer School District Service Standarils
Public School Facilities
LSquare Feet Per Student)
Elementary 5chool 120
Middle School 189
7unior High NA
High School NA
Dierineer Schooi District Individual Canaeitv Proiects (2015-20201
Elementary Schooi No. 3 400
High 3chool NA
DIERINGER SCHOOL DISTRICT NO 343
� PERMANENT CAPACITY PROJECTS
MAS'RER SCHEDULE
March, 2014
Name Current 6 - Year Total
Ca aci Caaacitv Ca aci 2013 2014 2015 2016 2017 2018
Lake Tapps Elementary 459 396
(LTES Replacement)
Dieringer Heights Elem. 537 547
Elementary School No. 3 400 400 X
North Tapps MS Incl 51D 567
NTMS Additlons 2009
TOTALS 1506 400 1940
DIERINGER SCHOOL DISTRICT NO. 343
Capital Facilities Plan Update, June 2014
CFP Projects and Financing Plan
Sources and Uses of Funds
(x $1,000)
Sources of Funds
Existing Revenue:
Reserve $855
New Revenue:
Bonds, Levies, Fees, State Matching
Funds, Dedications, Mitigation Payments $21.575
TOTAL SOURCES $22.430
Uses of Funds
Elementary School No. 3 ($21,375)
Non-Capacity Projects:
School Site , Technology Upgrades, I O55
And Board Approved Projects
TOTAL USES $22 430
BALANCE 0
DIERINGER SCHOOL DISTRICT NO 343
FINANCE�PLAN 2015-2020
June, 2014
Permanent Capaciry ProJects Unsecured Source of Funds Secured Source of Funds
Estimated Esdmated Estimated Impact Bond 8 State Impact
Cost Bond A . State Match ees Interes atch Fees
Elemenlary School No. 3 21,375,000 21,375,000 0 0 0 0 0
Total Capacity ProJects 21,375,000 21,375,000 0 0 0 0 0
Non-Capacity ProJects
School Site Elem. No. 3 500,000 0 0 0 0 500,000
Techrrology Improvements 465,000 0 0 200,000 0 0 265,000
Board Approved:Projects 90,000 0 0 0 0 90,000
Total Non-Capaciry Projects 1,055;000 0 0 20D,000 0 0 855,000
707AL PROJECTS 22,430;000 21,375,OOD 0 200,000 0 0 855,000
DIERINGER SCHOOL DISTRICT NO 343
CapitaI Facilities Plan Update, 2014
Capital Facilities Requirements to 2020
Tiine Period Student Student Net Reserve Total Cost
PopuIation Cnpacity Or(Deficiency) (CosUStuden[
X
Net Deficiency)
2014 Actual 1506 1510 4
2015-2020 Gmwtl� 88 400 312
Dieringer School District Cost Per Student
(2D14 D'ollazs)
Elementary Middle Junior High High
Schools Schaols Schools Schools
$22,SQ0 $34,000 NA NA
Sohool Im act Fee Calculation 6114 DISiRICT Diednger School District
School Sile Acquisitlon CosL•
AcresxCost er Acre /Focili Ca aci xStudent Generation Factor
Student Student _
FociG Cost/ Facili Factor Factor Cost/ Cost/
Ac�eage Acre Capacity SFR MFR SFR - MFR
Elementary 12.OD $5�0,000 400 0.322 0.172 $4,824 2,580
Mfddle 0.130 0.070
TOTAL $4,824 $2,580
School ConsVucBon Cost__ __ _ _ _
Focili Cost/Facil'rf Ca aci nStudent Generation factor x ermanenf/Total Sq Ft
_ _
Student Student
Facility Focllify Factor Factor Cost/ Cost/
Cast . Ca aci SFR MPR SFR MFR
Elerrientdry No.3 $21,375,000 400 0.322 0.172 $17.2D7 $9,197
0:130 0.070
� TOTAL $17,207 $9,191
Tempora Facilt Cost: � �
Facifi Cost/Facilif Ca ac x5tuderit Generation Factor x em ora /Total 5 uare Feet
Student Student Cost/ Cost/
%Tem / Facili _ Facili Factor Factor SFR MFR. .
ToialSq.F Cost Size SFR MFR
Bementa $0 0 0.322 0.172 .,_
Middle $0 0 0.130 0.070 _
TOTAL $0 $0
State Matchin Ctedit:
Boeckh Index X SPI 5 uore Foota e X District Match%X Sfudent Factor
Student Student.
BoeckYi SPI Dlstrict Factar Factor Cost/ Cost/
Indeic Footage �Match:� SFR MFR SFR MFR
Elementary
Middle
TOTAL - � - $D $0
Tax Pa meM Cradit: SFR � MFR
Avera e Assessed Value 2013 $359,423 $257,4�7
Ca 'tal Bond Interest Rate esf -6/13 3J5`� 3.15%
Net Preserif Value of Ave�a e Dwe111ng $3,042,614 I $2,128,229
70 10
Property Tax Levy Rate 2014 __$3.8026___ . $3.802G
Present Value of Revenue Stream - $11;570 - -- $8;093
Fee Sumary:__ Sfngle Mulli le
ami a il
Sifie Ac uistion Costs $4,824.00 2,580.00
Permonent Pacilit Cost 17,206.88 $9,191.25
Tem ora Facilit Cost 0.00 $O.OD
State Matcfi C�edit $0.00 0.00
Tax Pa ment Credit 11,569.84 $8,092.80
FEE $10,461 $3,678
FEE WITH DISCOUNT OF 50� $5,231
FEE WITH DISCOUNT OF 50% � $1,839
DETERMINATION OF NONSIGNIFICANCE
for
Dieringer School District No. 343
2014 Capital Facilities Pian
Issued with a 14-day comment and appeal period
Description of Proposal:
This threshold detertnination analyzes the environmental impacts associated with the following
actions,which are so closely related to each other that they are in effect a single action:
1 The adoption of the Dieringer School District 2014 Six-Year Capital Facilities Plan by the
Dieringer School District for the purposes of planning for the facilities needs of the District.
2. The amendment of the Pierce County Comprehensive Plan to include the Dieringer School
District 2014 Capital Facilities Plan as a part of the Capital Facilities Plan Element of the Pierce
County Comprehensive Plan.
3. The amendment of the Comprehensive Plan of the City of Aubum to include the Dieringer School
DistricYs 2014 Capital Facilities Plan as part of the Capital Facilities Pian Element of the
Comprehensive Plans of the City of Auburn.
4. The amendment of the Comprehensive Plan of the City of Sumner to include the Dieringer
School DistricYs 2014 Capital Facilities Plan as part of the Capital Facilities Plan Element of the
Comprehensive Plans of the City of Sumner
Proponent: Dieringer School District No. 343
Location of the Proposal:
The Dieringer School DisVict includes an area of approximately 5.5 square miles. Portions of the
cities of Aubum arid Sumner fall within the DistricYs boundaries, as do parts of unincorporated
Pierce County
Lead Agency
Dieringer School District No. 343 is the lead agency pursuant to WAC 197-11-926.
The lead agency for this proposal has determined that the proposal does not pose a
probable significant adverse impact to the environment. An environmental impact statement(EIS) is
not required under RCW 43.21 C.030 (2) (c). This decision was made after a review of the
completed environmental checklist and other information on file with the lead agency This
information is available to the public upon request.
This Determination of Nonsignificance (DNS) is issued under WAC 197-11-340(2), The lead
agency will not act on this proposal for 14 days frbm the date of issue. Comments must be submitted
by 4:00 p.m., June 17, 2014. The responsible official will reconsider the DNS based on timely
comments and may retain, modify, or, if significant adverse impacts are likely, withdraw the DNS. If
the DNS is retained, it will be final after the expiration of the comment deadline.
Responsible Official:
Dr Judy Neumeier-Martinson
Superintendent
Dieringer School District No. 343
Telephone: (253) 862-2537
Address: 1320 178'"Ave E.
Lake Tapps, Washington 98391
Appeals of this determination are govemed by Board Policy No. 6890 which can be obtained from
Dr Judy Neumeier-Martinson, Superintendent, Dieringer School District No. 343, 1320 178�'Ave E.,
Lake Tapps, Washington 98391 and pursuant to WAC 680 and RCW 43.21 C.075.
Date of Issue: June 17, 2014
Date Published June 3, 2014
ENVIRONMENTAL CHECKLIST
WAC 197-11-960 Environmental Checkiist.
Purpose of Checklist
The State Environmental Policy Act{SEPA), chapter 4321 C RCW, requires all
govemmental agencies to consider the environrriental impacts of a proposal before making
decisions. An environmental impact statement(EIS)must be prepared for all proposals with
probabie significant adverse impacts on the quality of the environment The purpose of this checklist
is to provide information to help you and the agency identify impacts from your proposai (and to
reduce or avoid impacts from the proposal, ff it can be done) and to help the agency decide whether
an EIS is required.
Instructfons for Applicants:
This enviranmental checklist asks yoL to describe some basic infortnation about your
proposal.Govemmental agencies use this checklist to detertnine whether the environmental impacts
of your proposal are significant, requirfng preparation of an EIS.Answer the questions briefly,with
the most precise infortnation known, or give the best description you can.
You must answer each question accurately and caref011y,to the best of ybur knowledge. In
most cases,you should be able to answer the questions from your own observations or projeot-plans
without the need to hire experts. If you really do not know the answer, or if a question does not apply
to your proposal,write"do not know"or"does not apply"Complete answers to the questfons now
may avoid unnecessary delays later
Some questions ask about govemmental regufations, such as zoning, shoreline, and
landmark designaUons.Mswer these questions if you can. If you tiave problems, the govemmental
agencies can assist you.
The checklist questions apply to ali parts of your proposal, even if you plan to do them over a
perfod of time or on different parcels of land.Attach any additfonal information that will help describe
your proposal or its environmental effects.The agency to which you submit this checklist may ask
you to explain your answers or provide addiUonal information reasonably related to detertnining if
there may be significant adverse impacL
Use of checklist for nonproject proposals:
Complete this checklist for nonproJect proposals, even though questions may be answered
°does not appiy." In addition, com¢lete the Supplemental Sheet for nonproject actions(part D).
For nonproject actions,the references in the checktist to the words"project,""appiicant,"and
"properly or site° should be read as"proposal,""prepares,"and "affected geogrephic area,"
respectively
A. BACKGROUND
1 Name of proposed project, if applicable
The adoption of a six-year Capital Facflitles Plan by the Dieringer School District.The
Comprehensive Plans of Pierce County, City of Aubum and City of Sumner have
been and/or will be amended to include the Dierirtger School Disfict 2014 Capital
Facifities Pian in the Capital Facilities Plan Element of each jurisdiction's
Comprehensive Plan.A copy of the DistricYs Plan is available for review in the
District Office.
2. Name of applicant:
Dieririger School District No. 343
3. Address and phone number of applicant and contact person:
Dieringer School District No. 343
1320178'"Ave E.
Lake Tapps,WA 98391
Contact Person: Dr Judy Neumeier-Martinson, Superintendent
Telephone:(253) 862-2537
4. Date checklist prepared:June 3, 2014.
5. Agency requesting checklist:
Die�nger School District No. 343
6. Proposed timing or schedule (including phasing, if applicabfe):
The 2014 Dieringer School Qistrict Capital Faciiities Plan is scheduled to be adopted in
June, 20i4 and forvvarded to Pierce County, Cities of Aubum and Sumner for possible
inclusion in each jurisdiction's Comp2hensive Plan.The Capital Facilities Plan wili be
updated annually. Slte-specific projects have been or will be subject to project-specific
environmenta{ review.
7 Do you have any plans for future additions, expansion, or further activity related to or
connected with this proposal7 If yes, explain.
The Capftal Facilities Plan reviews the purchase of addifional property and ttie construction
of a new elementary school.
8. List any environmental Information you know about that has been prepared, or will be
prepared, directly related to this proposal.
The above-referenced projects will undergo environmental review at the time of formal
proposal.
9. Do you know whether applications are pending for govemmental approvals of other
proposais directty affecting the property covered by your proposal?
Ifyes, explain.
No.
10. List any govemment approvals or pertnits that will be needed for"your proposal, if
known.
Pierce County and Cities of Aubum and Sumner will review and approve the Capital
Facilities Plan for the purposes of impact fee ordinances and will need to adopt the Plan as
an amendment to the Capital Facilfties Plan element of the Comprehensive Plans of Pierce
County and Cities of Auburn and Sumner
11. Give a brief, complete description of your proposat, including the proposed uses and
the size of the project and site.There are several questions later in this checkiist tha#ask you
to describe certain aspects of your proposal.You do not need to repeat those answers on
this page. (Lead agencies may modify this form to include additional specific information on
project description.)
This is a non-project action.This proposal invoives the adoption of the Dieringer School
DisVict 2014 Capital Facilities Plan for the purpose of planning the facilities neads of the
DisVict and for inclusion in the Capital Facfli6es Plan element and possible amendment of
the Comprehensive Plans for Pierce County, City of Aubum and Ciiy of Sumner A copy of
the Capital Facilities Plan may be viewed at the Dieringer School DisVict Office.
12. Location af the proposal. Gfve su�cient infortnation for a person to understand the
precise IocaUon of your proposed project, inciuciing a street address'rf any, and section,
township, and range, if known. If a propasal would occur over a range of area,provide the
range or 6oundaries of the site(s). Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available.While you should submit any plans reqLired by the
agency, you are not required to duplicate maps or detailed plans submitted with any permit
applications related to this checklist
The 2014 Capital Facilities Plan wfli affect the Dferinger School Qistrict.The District includes
an area of approximately 5.5 square miles. Portions of the City of Aubum and the City of
Sumner, and parts of unincorporated Pierce County,fall within the DistricYs houndaries.
B. ENVIRONMENTAL ELEMENTS
� Earth
a. Genera!description of the site (circie one): Flat, rolling, hilly, steep slopes,
mountainous,and mo2 than 2/3 of Lake Tapps. I
The Dieringer School District is comprised of a variety of topographic land forms and
gradients, incfuding all of those listed.Specific topographlc characteristics will
identified during the planning and permit process for each capital project.
b. What is the steepest slope on the site(approximate percent slope)?
Specific slope characteristics will be identified during the planning and permit
process for each capital project.
c. What general types of soils are found on the site (for example, clay, sand, gravel,
peat, muck)? If you know the classification of agricultural soils, specify them and note
any prime farmland.
Specific soii types will be identified during the planning and permit process for each
capital project
d. Are there surface indications or history of unstable soils in the immediate vicinity?
If so, describe.
Un"stable soils may exist within the Dieringer School District.Specific soil limitations
on individual project sites will be identified at the time of environmental review.
e. Describe the purpose,type, and approximate quantities of any filling or grading
proposed. lndioate source of fill.
Individual proJects fncluded in the Capital Facilities Plan will be subject to proJect
specific environmental review and local approval at the time of proposal. Proposed
grading proJects, as well as the purpose,type,quantity, and source of fili materials
wiil be identified as appropriate to each project.
f. Could erosion occur as a result of clearing, constructlon, or use? If so, generally
describe.
It is possible that erosion could occur as a resuit of construction projects currendy
proposed in the Capital Facilities Plan. Individual proJects and their erosion impacts
will be evaluated on a site-specific basis. Ind(vidual projects wfil be subject to
environmental review and local approva!at the time of proposal.
g. About what percent of the site will be covered with impervious project
construction (for example, asphalt or buildings?)
Percentage of impervious cover with vary with each capital factlides project and will
be addressed during project-specific environmental review.
h. Proposed measures to reduce or control erosion,or other impacts to the earth, if
any
Erosion potential on individual project sites witl be addressed during project-speafic
environmental review. Relevant erosion reduction and conVol requirements will be
met
2. Air
a. What types of emissions to the air would result from the proposal (ie., dust,
automobile, odors, industrial wood smoke)during construction and when the project
is completed? If any, generally describe and give approximate quanfities if known.
Various emissions, mariy construcfion-related, may result from individual projects.
Air-quaUty impacts will be evaluated during project-specific environmerrtal review.
Piease see the Supplemental Sheet for Nonproject Actions.
b. Are there any off-site sources of emissioris or odor that may affect your proposal?
If so, generally describe.
Off-site sources and neoessary mi8gation will be addressed during project-specific
environmental review.
c. Proposed measures to reduce or control emissions or other impacts to air, if any
Plans for individua! projects included in the Capital FaciliUes Plan have been or will
be subject to environmentai review and relevant local approval processes, includirig
obtaining of any necessary air quality permits, at the time individual projects are
formally proposed. Please see the Supplemental Sheet for Nonprojed Actions.
3. Water
a. Surface:
1) Is there any surface water body on or in the immediate vicinity of the
site (including year-round and seasonal streams, lakes, ponds,weUands)? If
yes, describe type and provide names. If appropriate, state what sVeam or
river it flows into.
There is a network of surface water bodies within the Dieringer School
District.The surface water regimes and flow pattems have been or will be
researched and iricorporated in the design of each individual project.
2) Will the project require any work over, in,or adjacent to(within 200
feet)the described waters? If yes, please describe and attach available
plans.
5ome projects may require work near these described waters. Individua!
projects in the Capital Facilities Plan will tie subject to environmental review
and local approvai requirements at the Bme the project is formaly proposed.
3) Estimate the amount of fill and dredge rtiaterial that be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
infortnation with respect to placement or remova]of fill or dredge materiai
will be addressed at the time of project-specific environmental review.
Applicabte local regulations have been or will be satisfied.
4) Will the proposal require surFace water withdrawals or diversiohs?
Give generai description, purpose, and approximate quantities if known.
Any surface water withdrawals or diversions have been or will be add2ssed
during project-specific environmental review.
5) Does the proposal lie within a 100-year floodplain? If so, note location
on the site plan.
Each capital facilities project, if located in a floodplain area, will be required to
meet applicabie local regulations for flood areas.
6) Does the proposal involve any discharges of waste materials to
surfaae waters7 If so, describe the fype ofwaste and anticipated volume of
discharge.
Specific information regarding discharges of waste materiais, if any, will be
addressed during project-specific environmental review. Please see the
Supplemental Sheet for Nonproject Actions.
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground
water? Give general description, purpose, and approximate quantlties if
known.
Individual projects included in the Capital Facilities Plan may impact ground
water resources. Each project will be evaluated during project-speciflc
environmental review. Applicable local regulations have been orwill be
satisfied. Please see the Supplemental Sheet for Nonproject Actions.
2) Descrihe waste material that will be discharged into the ground from
septic tanKs or other sources, if any(for example: DomesUcsewage;
indust�ial, containing the following chemicals. ., agricultural; etc.). Describe
the general size of the system,the number of such systems,the num6er of
hbuses to served (if applicable), or the number of animals or humans the
system(s)are expected to serve.
Impacts of discharged waste material, if any, have been or will be addressed
during site-specific, project-level environmental review.
c. Water Runoff(Including storm water):
1) Descri6e the source of runoff(including storm \water)and method of
collection and disposai, if any{include quantities, if known).Where will this
water flow?Will this water flow into other waters? If sa, describe.
lndividual projects included in the Capital Facilities Plan may have varying
storm water runoff consequences. Each project will be subject to
environmental review and applicable local regutations.
2) Couid waste materials enter ground or surface waters? If so,
generally describe.
Individual projects included in the Capital Facilities Pian will have varying
ernironmental impacts and will be subject to appropriate review and local
regula6ons prior to con"struction. Informatton regarding waste materials will
be presented at the time of such review. Please see the Supplemental Sheet
for Nonproject Actiohs.
d. Proposed measures to reduce or control surface, ground, and runoff water
impacts, if any
Specific measures to reduce or control runoff impacts have been or will be developed
on a project-specific basis in cooperation with the appropriate jurisdiction.
4. Plants:
a. Check or circle types of vegetation faund on the site:
_ deciduous tree: alder, maple, aspen, other
_ evergreen tree:fir, cedar, pine, other
_ shrubs
_ grass
_ pasture
_ crop or g2in
_ wet soil plants:cattail, butterdup, bulrush, skunk cabbage.Other
_ other water plarrts:water lily, eelgrass, milfoil,other
_ other types of vegetation
There are various vegetaSye zones within the Dteringer School District.An inventory
of species has been or will be pr6duced as part of project-specific environmental
review.
b. What kind and amourrt of vegeta8on will be removed or aitered?
Impacts on vegetation wiil be determined at the time of project-specific environmental
review at the time the project is formally proposed. Please see the Supplemental
Sheet for Nonproject Actions.
c. List threatened or endangered species known to he on or near the site.
Spegific impacts to these species from individual projects has been or be determined
at the time of project proposal and will be addressed during sita-specific, project-levei
environmental review
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
Individual projects included in the Capital Facilities Plan will be subject to
enviro�mental review and Iocal approval at the time of project proposal.
5. A�imals:
a. Circle any birds and animals which have been observed on or near the site or
are known to be on or near the site:
birds: hawk, heron, eagle, songbirds, other•
mammals:deer, bear, elk, beaver, other
fish:bass, salmon,trout, perch, crappies, tiger muskies other
An inventory of species observed on or near sites has been or wi[I be developed
during project specific environmental revfew.
b. List any threatened or endangered species known to be on or near the sfte.
Specific impacts to these species from individuai projects will be detertnined at the
time of project proposal and will be reviewed in cooperation with the affected
jurisdictions.
c. Is the site pa�t of a migration route? If so, explain.
Impacts on migretion routes, if any,will addressed during site-specific, project-level
environmental review.
d. Proposed measures to preserve or enhance wildlife, if any
Appropriate measures to preserve or enhance wildlife have been or will be
detertnined at the tlme of site-specific, project-levei environmental review.
6. Energy and Natural Resources:
a. What kfnds of energy (electric, natural gas,oil,wood stove, solar)will be
meet the compieted project's energy needs? Describe whether it will be used for
heaNng, manufacturing, etc.
The State Board of Education requires a life-cycle cost analysis of aU heating,
lighting, and insulating systems priorto allowing specific proJects to proceed. Energy
needs will be decided at the time of specific engineering and site design planning.
Please see the Supplemental Sheet for Nonproject Actions.
b. Would your project affect the potentlal use of solar energy by adjacent
properties? If sa, generally describe:
Individual projects of this Gapital FaciliBes Plan will be evaluated as to their impact
on the solar potential of adjacent projects during environmental review.
c. Whet kinds of energy conservation features are included in the plans of this
proposal?List other proposed measures to reduce or control energy impacts, if any:
Energy conservation measures will be considered at the project-specific design
phase and environmental review.
7 Environmental Health
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spili, or haiardous waste that could occur as a
result af this proposal? If so, describe.
Please see the Supplemental Sheet for Nonproject Actions.
1) Describe special emergency servfces that might required.
Please see the Supplemental Sheet for Nonproject Actions.
2) Proposed measures to reduce or conVol environmental health
hazards, if any
Proposed projects wilf comply with all current codes, standards, and rules
and regulallons. Individual projects have been or will be subject to
environmental review and local approval at the fime of fortnal submittal.
b. Noise:
1) What types of noise exist in the area which may effect you�project
(for example: traffic, equipment, operation, other)?
A varieiy of noises exist within the Dieringer School District. Specific noise
sources have been or will be identified during project-specific environmantai
review.
2) What types and levels of noise would be created by or associated
with the project on a sho�t-tertn ar a lorig-term basis(for example:traffic,
construction, aperation, other)? Indicate what hours noise would come from
the sita.
Normal construction noises wouid exist on a short term 6asis during school
construction.There could he an inerease in traffic or operations-related noise
which would be addressed during project specific ernrironmental review.
Please see the Supplemental Sheet for Nonproject Actions.
3) Proposed measures to reduce or control noise impacts, if any
Project noise impacts have been ar will be evaluated and midgated during
the pruject-specific environmental review. Each project is or will be subject to
applicable local regulations.
8. Land and Shoreline Use:
a. What is the current use of the site and adjacent properties?
There are a variety of land uses within the Dieringer School District, including
residential,commercial, industrial, institutional, utility, agricultural,forestry, open
space, recreational, etc.
b. Has the site been used for agrfculture? If so, describe.
This question will be addressed during site-specific, project-level environmental
review.
c. Describe any structures on the site.
Structures located on proposed sites have been orwfll be identified and described
during project-specific environmantal review when appropriate.
d. Wi{I any structures be demolished? If so, what?
Structures to be demoiished, ff any, will be identified as part of the project-specific
environmental review process_
e. What is the curre�t zoning classification of the site?
There are a variety of zoning classificaGons within the Dieringer School Oistrict. Site
specific zoning infortnation has been or will be fdentifled during project specifc
environmental review.
f. What is the current comprehensive plan designation of the site?
An inventory of comprehensive plan designations has been or will be completed
durtng project-specific environmental review.
g. If appticable,what is the current shoreline master program designation af the
site?
Any shoreline master program designations have been or will be identified during
project specific environmental review.
h. Has any part of the site been classified as an "environmentally serisitive"
area? tf so,specify
Environmentally sensitive areas, if any,will be identified during project-specifio
environmental review.
i. Approximately how many people would reside or work in the completed
project?
This information has been or will be provided at the time of p"roject-specific
environmental review.
j. Approximately how many people would the completed project displace?
It is not anticipated that proPoseii projects will displace any peop{e. Dispiacement of
people, if any, will be evaluated during project-speciflc environmental review
k. Proposed measures to avoid or reduce dispiacement impacts,if any�
Individual projects included in the Capitai Facilities Plan will be subject to project
specific envimnmental review and local approval at the time the project is formally
proposed.
I. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any-
CompatEbility of the proposai and specifc projects w'ith existing uses and plans have
been or will be assessed as part of the comprehensive pianning process and during
project-specific environmental review.
9. Housing
a. Approx(mately how many units would be provided if any? Indicate whether
high, middle, or low-income housing.
No housing units would be provided.
b. Approximately how many units, if any, would be ellminated? Indicate whether
high, mfddle, or low-income housing.
Any fmpact of project proposals on existing housing have been or would be
eva�uated during project-speciflc envimnmental review procedures.
c. Proposed measures to reduce or control housing impacts, if any
Measures to reduce or control any housing impacts have been or wifl be addressed
during site-specifia, project-level environmental review.
10. Aesthetics:
a. What is the tallest height of any proposed structure(s), not including
antennas;what is the principal exterior building material(s) proposed?
Aesthetic impacts have been or will be determined at the time of site-specific,
project-level environmentel review.
b. What views in the immediate vicinity would be altered or obstructed?
Aesthetic impacts have been or will be determined at the time of site-speci8c,
project-level ernironmental review.
c. Proposed measures to reduce or control aesthetic impacts, if any
Appropriate measures to reduce or control ae"sthetic impacts have been or will be
detertnined at the time of project-specific environmental review.
11 Light and Giare:
a. What type of light or glare will the proposal produce?What time of day would
it mainly occur7
�ight or giare impacts have been'or will be determined at the time of project-specific
envlronmental review.
b. Couid light or glare from the finished project be a safety hazard or interfere
with views?
Light or glare impacts have been or will be determined at the time of the project-
specific ernironmental review.
c. What exlst(ng off-site sources of light or glare may affect your proposal?
Off-site sources of fight or glare have been orwill be evaluated at the time of project
spec�c environmental review.
d. Proposed measures to reduce or control light and glare impacts, if any
Mittgatfon of light and glare impacts have been or will be addressed during project
specific erivironmental review.
12. Recreation:
a. WFiat designated and informal recreafional opportunities are in the immediate
vicinity?
There are a variety of fortnal and informal recreational facilities within the Dieringer
School District.
b. Would the proposed project displace any existing recreational uses? If so,
describe.
Recreational impacts have been or wiit be addressed during project specific
environmental review. Projects in the Capita! Facilities Plan may enhance
recreational opportunities and uses.
c. Proposed measures to redube or control impacts on recreation, including
recreation opportunities to be provided by the prbject or applicant, if any�
Any adverse effects on recreation stemming from individua! project proposals have
been or will be subject to mitigation during the environmental review procedure.A
school site usually provides recreatiorial facilities to the community in the form of
additional play fields and gymnasiums.
13. Historic and Cultural Preservation:
a. Are there any places or objects listed on, or proposed for, national, state, or
local preservation registers known to be on or next to the site? If so, generally
describe.
The existence of historic end cuitural 2sources will be determined at the time of
project-specific environmental review.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientiftc, or cultural importance known to be on or next to the site.
An inventory of historical sites has been or will 6e conducted as part of project
specific environmental review.
c. Proposed measures to reduce or control impacts, if any
Appropriate measures have been or wilt be proposed an a project-specific basis.
14. Transportation:
a. Identify public sVeets and highways serving the site and describe proposed
access to the existing street system. Show on site plans, if any
Impact on public streets and highways has been orwill be assessed during project
specific environmental review.
b. Is site currently served by publlc transit? If not,what is the approximate
distance to the nearest transit stop?
The relationship between specific projects and Public transit has been or wiil be
assessed during proJect-speci8c environmental review.
c. How many parking spaces would the completed project have? How many
would the project eliminate?
An inventory of parking spa�es and the impacts of specific projects on parking
spaces has been orwfll be conducted during project-specific environmental review.
d. Will the proposal require any new roads or streets, or improvements to
existing roads or streets, not including driveways? If so, generally describe (indicate
whether public or private).
The development of new schools may require new access roads or streets. This
issue vrrill be fuliy addressed during project-specific environmental review.
e. Will the project use (or occur in the immediate vicinity of�water, rail, or air
transportation7 If so, generally describe.
Use of water, rail or air transportation has been or will be addressed during site
specific, project-level environmental review
f. How many vehicular trips per day would be generated by the completed
project7 If known, indicate when peak voiumes would occur
Each project proposai has been or will be separately evaluated as to traffic impacts.
g. Proposed measures to reduce or controt transportation impacts, if any:
Mitigation of impacts on transportation has been or will be addressed during project
specific environmental review.
15. Public Services:
a. Wouid the project result fn an increased need for public services (for
example:fire protection, police protectfon, health care, schools, other)? If so,
generally describe.
The District does not anUcipate that the projects idenGfied in the Capital Facilkies
Plan wiil substantially increase the need for other public services. Impacts have beeri
or will be evaluated an a project-speciftc basis.
b. Proposed measures to reduce or control direct impacts on public services, if
any.
Schools are built with automatic security systems,fire alarms, smoke alarms, heat
sensors and sprfnkler systems.
i6. Utilities
a. Circle utilities cuRently available at the site: electricity,natural gas,water,
refuse service, telephone, sanitary sewer, septic system,other
Utilities available at project sites have been or will be identified during project specific
environmental review.
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate vicinity
whi6h might be needed.
Utiliiy revisions and consVuction needs will be identified during project-specific
environmental review.
C. Signature
The above answers are true and complete to the best of my knowledge. I understand that
the lead agency is relying on them to make its decision.
� �
Signatur •
Dr Judy eume' M rhnsan, Superin en ent
Date Submitted: June 3, 2014
D SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpfui to read them in conjunction with
the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal or the types of
activities likely to resuit from the proposal, would affect the item at a greater intensity or at a
faster rate than if the proposal were not implemented. Respond briefly and tn general tertns.
1 How would the proposal be likely to increase discharge to water, emissions to air,
producfion, storage, or release of toxic or hazardaus substances; or production of
noise7
To the extent this Plan makes it more likely that school facilities wiil be constru�ted,
andlor renovated or remodeled, some of these environmental impacts will be more
likely Additional impertneable surFaces, such as roofs, parking lots, sidewalks,
access roads and playgrounds will increase stortn water runoff,whfch could enter
surface or ground water. Emissions to air could result fram heating systems,
emergency generators and other equipment, and from additional car and bus trips to
and from the school for students and faoulty Arry emissions resulting frnm this Plan
should not require the production, storage, or release of toxic or haiardous
substances,with the possible exception of storage of diesel fuel or gasoline for
emergency generating equipment Noise may result from additional traffic and from
concentrating several hundred chitdren at a new facility, especially before and after
school and during recesses.
To the extent this proposal allows additional residential development to occur,these
impacts wouid afso increase somewhat, but it is not possible to quantify those
impacts at this time.The impacts would depend on the type, location and distribution
of housing,for example,whether single or multiple family and the location of the
school.
Proposed measures fo avoid or reduce such increases are:
Facilities implementing the Plan have been or will be evaluated at the project specific
level and impacts will be mitigated accordingly Storm water detention and runoff will
meet applicable County and/or City requirements and, depending on the date of
actual construction, may be subjecf to a National Pollutant Disch,arge Eliminatlon
System ("NPDES")pertnitting requirements. Discharges to air will be minirtiat, and
will meet any applicable requirements of the Puget Sound Air Poilution Control
Authoriiy Fuel oil will be stored according to local and state requirements.
2. How would the proposal be likely to affect plants, animals,fish, or marine life?
The Plan itself wftl have no impact on these elements of the environment Depending
on the particular site, construction of facilities may require clearing sites of piants and
loss of animal habitat.To the extent residential development is allowed, additional
area may be cleared and eliminated as habitat for animals.There are not likely to be
any impacts on fish or marine life, although some water quality degradation in
streams and rivers wuld occur due to increased residenfial development.These
impacts have been or will be addressed in m�re detail during project-specific
environmental review when appropriate.
Proposed measures to protect or conserve plants, animals, flsh, or marine life are.:
Individual projects will be evaluated and mitigated aPpropriately on a project-specific
basis, but specific mitigatio.n proposals cannot be identified at this time.
3. liow would the proposal be likely to deplete energy or natural resources?
Any actual projects resulting from this Plan would consume heating fuel and
electrical energy Increased traffic resulting from the construction of additional
facilities would consume petroleum based fuels. Reduced traffc resulting from
construction of another neighborhood school may also reduce amounts of fuel
consumed, 6ut it is not possible to quantify such reduction in consumption at this
time.These impacts have been or will be addressed in more detail during projeot-
spec�c environmental review when appropriate.
Proposed measures to protect or conserve energy and natural resources are:
Facilfties would be constructed in accordance with applicable energy efficiency
standards.
4. How would the proposal be likely to use or affect environmentaily sensitive areas or
areas designated (or eligible or under stucly)for govemmenta! protecfion; such as
parks,wildemess,wild and scenic rivers,threatened or endangered species habitat,
htstoric or cultural sites, wetlands,floodplafns, or prima farmlands?
The Plan and facilities constructed pursuant to the Plan shouid have no impact on
these resources. It is not possible to predict whether other deveiopment made
possibie by this Plan would affect sensitive areas.
Proposed measures to protect such resources or to avofd or reduce impacts are:
No specific measures are being proposed at this#ime.Appropriate measures have
been or will be proposed during project-speciflc review.Annuai updates of this Plan
will be coordinated w(th Pierce County, City of Aubum and City of Sumner as part of
the Growth Management Act process, one of the purposes of which is to protect
environmental(y sensitive areas.To the extent the School DistricYs facitities planning
process is part of the overell growth management planning process,these resaur�es
are more likely to be protected.
5. How would the proposal be likely to affect land and shoreline use, including whether
it would allow or encourage land or shoreline uses incompatible with existing pians?
The Plan wfll not have any impact on land or shoreiine use that is incompatible
exisfing wmprehensive plans, land use codes, or shoreline management plans.
Proposed measures to avoid or reduce shoreline and land use impacts are:
None are proposed at this time. Actual facilities constructed to implement the Plan
wiSl be sited and constructed to avoid or reduce Iand use impacts.
6. How would the proposal be Ifkely to increase demands on transportation or pu6lfc
services and utilities?
This proposai should not create substantial new demands for transportation. The
projects included in the Capital Facilities Plan may create an increa"se (n traffic near
new District facilities but also reduce traffic by creating the opportunity for more
students to watk to a closer school.The construc6on of the facilities induded in the
Capital Faciiities Plan may result in minor increases in the demand for public
services and utiiities, such as flre and polics protection, and water, sewer, and
e(ectric utiiities. None of these impacts are likely to be significant.The impacts o�
transportatio� and public services and utilities of the projects included in the Capitai
Facilities Plan wili be addressed during project-level review when appropriate.
Proposed measures to reduce or respond to such demand(s)are:
No measures to reduce or respond to such demands are proposed at this time.
7 Identify, if possible,whether the proposal may conflict with local, state, or federal
laws or requirements for the protection of the environment.
The Dieringer School District Capitai Facilities Plan will not conflict with any laws or
requirements for the protection of the environment
3�Qos 18d��re.S �C* e Federal Wa�/
Federa!Wpy, 4VA �v p —L +
98003-5433 o O I Ub�IC SC.f 10��$
Pkone:(153)-945-2000
nmw ficns.ore
July 1, 2014
Jeff Dixon
Principal Planner
City Of Aubum
25 West Main Street
Aubum WA 98001-4998
Deaz Mr Dixon,
Attached is a copy of the Federal Way Public Schools' 2015 Capital Facilities Plan. The
Federal Way Public Schools' Board of Education adopted this plan on June 24, 2014
The Federal Way Public Schools' Board of Education Resolution No. 2014-11 directs the
Superintendent to submit the adopted Federal Way Public Schools' 2015 Capital
Facilities Plan to the City of Aubum. A copy of the resolution is attached for your files.
The expenditure report for the 2013 calendaz year is also attached.
The Federal Way Public Schools' Boazd of Educarion requests the City of Aubum to
decrease the 2015 impact fee to $5,171 for each single-family development and decrease
the impact fee to $1,834 for each multi-farriily development.
Sincerely,
������
Sally D McLean
Superintendent
c: Board of Education
Tanya Nascimento, Student & Demographic Forecaster
Enclosure: 3
FEDERAL WAY PUBLIC SCHOOLS
School District No. 210 - IGng County
33330 - 8th Avenue South
Federal Way, WA 98003
RESOLUTION N0. 201411
A RESOLUTlON of the Board of Education of the Federal Way School
District No. 210, to provide to the City of Aubum the 2015 Cap'ital
Facilities Plan.
WNEREAS, the Federal Way School District Board of Education hereby provides
bo the City of Aubum the Distriet's 2015 Capftal Facil'�es Plan, documenting present and
future school facility requlrements of the District, and
WHEREAS, the Plan contains all elements required by the Growth Management
Act and Ciry of Aubum Ordinance No. 5078, which addresses concurrency, allows each
school district to establish their own standards of service, and provides for future school
impact fees.
NOW THEREFORE BE IT RESOLVED that the Superintendent be authorized and
directed to submit the adopted 2015 Capital Facilities Plan bo the City of Auburn.
ADOPTED this 24th day of 7une, 2014.
(��O�a�� i
Board S�ce retary -
r -
�r �
�GG�-e-�J �j-lf/.�.,�
Di'rector
Director
� � � � � � � l'�' � � �
. �s� ,..,�` �- . �
-..�, j �.�- .w��,�
C�' �~ �-= 'k� �
� � � � � ����
�"';. � f:s� �Y�rI
::xr �. i
�� ,.`,;
, �
I"��.µ �� RN
�� y//� R�
S I 7.i �
F �� � r rv
3 tA� 1 J �' ���y�, �i
ti{T t �if{ ., i���1��� I �\�_ �t:� i.. �S
l � ` �
/ V ' Y
If t J 2.,
t� ! .. 1� l� . (1j�
M fj / � �
± ��i�#ft yt r
�, � ,, `
� ' {
S. . .� � .,x x
[� c
��. ' � �
�: l�1
X � � 1
��
��
, - . _ '- _ _ _I . i . ' -. .
I
� � (r �I'� .� " : �'�' :�'�� -�� ��� - -� �-�,1- - -'- - -
FEDERAL WAY PUBLIC SCHOOLS
2015
CAPITAL FACILTTIES PLAN
Adopted June 24, 2014
BOARD OF EDUCATION
Cazol Gregory
Geoffery McAnalloy
Claire Wilson
Danny Peterson
OPEN
INTERIM SUPERINTENDENT
Sally D McLean
Prepared by Tanya Nascimento
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
TABLE OF CONTENTS
TABLE OF CONTENTS 1
INTRODUCTION 2-3
SECTION 1 THE CAPITAL FACILITIES PLAN
Introducrion 4
Inventory of Educational Facilities 5
Inventory of Non-Instructional Facilities 6
Needs Forecast- Existing Facilities 7
Needs Forecast-New Facilities 8
Six Year Finance Plan 9
SECTION 2 MAPS OF DISTRICT BOUNDARIES
Introduction I 1
Map - Elementary Boundaries 12
Map - Middle School Boundaries 13
Map - High School Boundaries 14
SECTION 3 SUPPORT DOCUMBNTATION
Introduction 15
Building Capacities 16-17
Portable Locations 18-19
Student Forecast 20-22
Capacity Suminaries 23-27
King County Impact Fee Calculations 28-30
SECTION 4 SUMMARY OF CHANGES FROM THE 2014 31-33
PLAN
1
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
INTRODUCTION
In response to the requirements of the State of Washington Growth Management Act
(SHB)2929 (1990) and ESHB 1025 (1991)), and under the School Impact Fee
Ordinances of King County Code 21A, City of Federal Way Ordinance No. 95-249
effective December 21, 1995 as amended, City of Kent Ordinance No3260 effective
March 1996, and the City of Auburn Ordinance No. 5078 effecrive 1998, Federal Way
Public Scliools has updated its 2015 Capital Facilities Plan as of May 2014
This Plan is scheduled for adoption by King County, the City of Kent, City of Federal
Way and the City of Auburn and is incorporated in the Comprehensive Plans of each
jurisdiction by reference. This plan is also included in the Faciliries Plan element of the
Comprehensive Plans of each jurisdiction. To date, the City of Des Moines has not
adopted a school impact fee ordinance. The City of Des Moines collects school impact
fees as part of the SEPA process.
The Growth Management Act requires the County to designate Urban Growth areas
within which urban growth can be encouraged. The Growth Management Plazining
Council adopted and recommended to the King County Council four Urban Growth Area
Line Maps with designations for urban centers. A designation was made within the
Federal Way plamiing azea, which encompasses Federal Way Public Schools boundaries.
King County will encourage and actively support the development of Urban Centers to
meet the region's need for hodsing, jobs, services, cultiire, and recreation. This Plau's
estimated popularion growth is prepared with trus underlying assumprion.
This Capital Facilities Plan will be used as documentation for any jurisdiction,which
requires its use to meet the needs of the Crrowth Management Act. This plan is not
intended to be the sole planning tool for all of the District needs. The District may
prepare interim plans consistent with Boazd policies or management need.
Currently, the District plans to replace Federal Way High School and to increase capacity
by approximately 200 students. Federal Way High School was built in 1938. The
esrimated cost to rebuild Federal Way High School is $106 million. The District will
begin Phase I in Sm7uner 2014 Phase I consists of site work and prepazation for the
portable village that will house students during the construction of the new building.
Placement of the portables should be complete by December 2014 and will be in use in
Jarivary 2015. Phase II, demolition of the existing classrooms and rebuild,will begin in
January 2015 The exisring cafeteria, gynuiasium, and kitchen will continue to be in use
during construction.
The District conrinues to monitor factors that may have an impact on enrollment and
capacity at our schools. One such factor is SHB 2776,reinforced by the McCleary
decision, which will phase in full-day kindergarten for all students and decrease K-3 class
size from 20 to 17 This is proposed to be fully funded by 2017-18. Using projected
enrollmerit for the 2017-18 school year, the decrease in class size would ci�eate the need
for an additiona180 classes for K-3 students. The District currently has 530 olassrooms,
in our 21 elementary schools &two K-8 schools and an additiona164 classrooms house.d
in portables. This is an average of 26 classrooms per school. The 80 additional
classrooms is the equivalent of 3 elementary schools.
2
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
Another factor that will unpact capacity is E2SSB 6552. The intention of this bill is to
improve student succ.ess by modifying instructional how and graduation requirements.
One of the ways to improve student success described in this bill is to decrease the class
size for laboratory science in grades 9-12. Current class size for grades 9-12 is 26
students. With the adoption of this bill, laboratory science classes will be decreased to 20
students per class. Using projected enrollmerit for the 2014-15 school yeaz, this decrease
in class size would require an additional 124 classes offered and 25 addirional
classrooms.
We will also continue to study school boundaries as new housing and fluctuating
populations nnpact specific schools. Some shifts in boundaries may be required in the
coming years. The maps included in this Plan reflect our current boundaries.
3
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
SECTION 1 - THE CAPITAL FACILITIES PLAN
The Sfate Growth Management Act requires that several pieces of informarion be
gathered to deternune the facilities auailabie and needed to meet the needs of a growing
community
This section provides information about current facilities, existing facility needs, and
expected fiiture faciliry requirements for Federal Way Public Schools. A Financial Plan
tliat shows expected funding for any new construction, portables and modernization listed
follows this.
4
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
INVENTORY OF EDUCATIONAL FACILITIES
ELEMENTARY SCHOOLS (K-51
Adelaide 1635 SW 304`" St Federal Way 98023
Brigadoon 3601 SW 336`" St Federal Way 98023
Camelot 4041 S 298t°St Aubum 98001
Enterprise 35101 5`"Ave SW Federal Way 98023
Green Gables 32607 47"'Ave SW Federal Way 98023
Lake Dolloff 4200 S 308`� St Auburn 98001
Lake Grove 303 SW 308`"St Federal Way 98023
Lakeland 35827 32nd Ave S Auburn 98001
Mazk Twain 2450 S Staz Lake Rd Federal Way 98003
Meredith Hill 5830 S 300`�St Aubum 98001
Mirror Lake 625 S 314�' St Federal Way 98003
Nautilus(K-8) 1000 S 289`� St Federal Way 98003
Olympic View 2626 SW 327`� St Federal Way 98023
Panther Lake 34424 ls`Ave S Federal Way 98003
Rainier View 3015 S 368�' St Federal Way 98003
Sherwood Forest 34600 12'"Ave SW Federal Way 98023
Silver Lake 1310 SW 325`"Pl Federal Way 98023
Staz Lake 4014 S 270�' St Kent 98032
Sunnycre"st 24629 42°d Ave S Kent 98032
Twin Lakes 4400 SW 320`� St Federal Way 98023
Valhalla 27847 42"d Ave S Auburn 98001
Wildwood 2405 S 300'"St Federal Way 98003
Woodmont(K-8) 26454 16�'Ave S Des Moines 98198
MIDDLE SCHOOLS (6-81
Federal Way Public Academy(6-10) 34620 9`"Ave S Federal Way 98003
Illahee 36001 ls'Ave S Federal Way 98003
Kilo 4400 S 308`" St Aubum 98001
Lakota 1415 SW 314�'St Federal Way 98023
Sacajawea 1101 S Dash Point Rd Federal Way 98003
Saghalie 33914 19`�Ave SW Federal Way 98023
Sequoyah 3450 S 360�' ST Aubum 98001
Totem 26630 40�Ave S Kent 98032
TAF Academy(6-12) 26630 40th Ave S Kent 98032
HIGH SCHOOLS(9-12)
Decatur 2800 SW 320�' St Federal Way 98023
Federal Way 30611 16`"Ave S Federal Way 98003
Thomas Jefferson 4248 S 288`� St Auburn 98001
Todd Beainer 35999 16`�Ave S Federal Way 98003
Cazeer Academy at Truman 31455 28`"Ave S Federal Way 98003
ADDTI'IONAL SCHOOLS
Intemet Academy (K-12) 31455 28`"Ave S Federal Way 98003
Merit School(6-12) 36001 151 Ave S Federal Way 98003
Employment Transition Program(12+) 33250 21s`Ave SW Federal Way 98023
5
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
CURRENT INVENTORY NON-INSTRUCTIONAL FACILITIES
Developed Propertv
Central Kitchen 1214 S 332°d Federal Way 98003
Federal Way Iviemorial Field 1300 S 308�' St Federal Way 98003
Educarional Services Center 33330 8`�Ave S Federal Way 98003
Support Services Center 1211 S 332°d St Federal Way 98003
Surplussed Space
MOT Site 1066 S 320`�' St Federal Way 98003
Notes:
In January 2012, the Administrative Building, Community Resource Center, and Student
Support Annex were combined into the Educational Services Center. Central Kitchen
will be relocated to this site in during 2013 The MOT Site has been surplussed and are
being inazketed for sale.
Undeveloped Propertv
Site Location
#
75 SW 360th Street& 3rd Avenue SW—9.2 Acres
65 S 351st Street & 52nd Avenue S— 8.8 Acres
60 E of lOth Avenue SW - SW 334th& SW 335�' Streets - 10.04 Acres
73 N of SW 320`�and east of 45�'PL SW—23 45 Acres
71 S 344th Street&46th Avenue S - 17 47 Acres
82 1�`Wav S and S 342°d St—Minimal acreage
96 S 308`� St and 14`''Ave S— .36 Acres
Notes:
Not all undeveloped properties are large enough to meet school construction
requirements. Properties may be traded or sold depending on what locafions are needed
to house students in the District.
6
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
NEEDS FORECAST-EXISTING FACILITIES
EXISTING FACILITY FUTURE NEEDS ANTICIPATED SOURCE OF
FUNDS
Purchase and Relocate Interim Capacity Anticipated source of funds is
Portables Im act Fees.
Federal Way High School Replace Exisdng Building, Capital levy request
Increase Ca aci
As part of the multi-phase plan, the District intends to increase capacity for high school
students with expansion at the Federal Way High School site. Increased capacity at
Federal Way High and Decatur High in later phases, supplant the need for construction of
a fifth comprehensive high school.
7
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
NEEDS FORECAST -ADDITIONAL FACILITIES
NEW FACILTl'Y LOCATION ANTICIPATED SOURCE
OF FUNDS
No current plans for additional facilities.
8
FEDERAL WAY PUBLIC SCHOOL., GO15 CAPITAL FACILITIES PLAN
Six Year Finance Plan
Secured Funding Sources
actFees(q $303,161
l�nd Sale Funds 2) (511.596,�6i)
Bond Funds 3) $4,709,857
StateMatch 4) $13,153,110
TOTAL S6 569 63
Projected Revenue Sources
Sta[e Match(5) $27,20Q000
Bond or Itv Funds(6) $7Q000,000
Land Fund Sales(7) $10,000,000
Impac[Fees(8) 5800,
'IOTAL 5108,000,000
Actual and Planned Expend'rtures Total SewredFunding andProjectedRe�enue $114,569,563
rrEwscxooi.s =�i�ine�eaena s� ei zoi6 xoi� ao�e ao�v Zo2a xozt T��i : :Tor�c�i;}'.
.?=P�ior,:Ye"ats"� 2014-15 2015-16 2016-17 2017-18 2018-t9 2019-20 2020-21 2015-2021 - _ ',��=1"x�',<
MODFRiVI7.ATlON ANDIXPANSION r - -t�=':;�i�.�:e ==-==�.i'�`.;��`;.,
Fedeml W a Hi h School(9 ==-_�$SOb00 000 $45.000.000 $11.000,000 $56,000,000 �'-5106' �00`000
_ _-_ _ �='�_--- -
Sl7'EACQNSITION _�:t�:.:•..+`_�:. -- --
Nortnan Center -----;r$7g5'004 5205,000 $215,000 $22Q000 $225,000 $235,000 $235,000 $1,335,000 �i-.�$2;120'000
lo mentTranstionPro ram)(]0) ,- � ,�-ti`?•':;�34 - '"`afi:'a
'I'FMPORARYFACILITIFS iy;l"�:`a,it�i'.t.``'.+=,;t'.' -" '- +..fi�t
Portables(11) �`='=,a�'�';?#t;'.�:•:��:Y_; $200.000 $200.000 $200.000 $200,000 $200,000 $200.000 $200,000 $1.400.000 °'.'..�,:SP'��00'000
TOTAL :;=550'785` OOi $45,405,000 $11,415,000 $420,000 $425,000 $435,000 $435,000 5200,000 $58,735,000 =�$109¢20� 00
NOTES.
1 These fces are currentty being held in a KingCounty Cit}'ofFederal Way and Ci[y of Kent impacl fee accoun[,and will be
avadeble for use by the Districc for sys[em improvemrnts. Tius is year end balance on 12l31/13.
2.These funds are capec[ed to come from the sale ofthe current ESC&MOT srtes and bond mtaest.Th�s�s year end balance on 12/31/13.
3. This�s the 12/31/13 balance of bond(unds This fiyvre mcludes mterest eaming.
4 Thts represents the balance of Stace Mazch Funds wh�ch will be used to m support the rebudding ofPederal Way H��h School
This is[he balance on 12/31/13.
5 This�s an[�c�pated State Mazch for the rebuddingofFederal Way H��School Applicaz�on for funds waz made m 1Wy 2013
6.These include$IOm ofvoter epproved,but noe issuW and a S60m su-yrar lery appruved in No�ember 2012.
7 Pro�ected sele ofsurplus properties These fuuds will be used to re[ire deb[mcwred for the acquismon of a replacemen[Educational Support Crnter
8.These are projec[ed fees based upon Imown residmt�al developmrnts in the Distnct over[he nent suyears.This fibvre assumes$25,000 per month for the ne.v s�years.
Tha figure has been adjus[ed to reflec[[he ewrent economy
9 Project budp�tt has been adjusted to match et�rwt pro�eM wst estimffies.
10 Nonnan Cen[er was purohased in 2010 to house the Employma�t Transition Pro�3am. The$2.1m purchase has been£manced throu�a state approved LOCAL pro�arn Ihrou�2020
l l.These fees represent[he cost of purchasmgaud ms[allmgnew portables. The portable e�.penditure m fu[ure}'ears may replue eustmg portables that are not func[ional.
These may not inQease capanty and are not mcluded in the capacity summmy
9
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
This page has been intentionally left blank.
l0
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
SECTION 2 -MAPS OF DISTRICT BOUNDARIES
Federal Way Public Schools has twenty-one elementary schools (grades K-5), two
schools with a K-8 grade configuration, seven middle school schools (grades 6-8), four
high schools (grades 9-12) and three small secondary s.chools. The Federal Way Public
Academy serves students in grades 6-10. The TAF Academy serves students in grades 6-
12 who reside in the Totem Middle School service azea. The programs at Career
Academy at Tnunan High Schooi serves students in grades 9-12.
The following inaps show the service area boundaries fdi each school, by school type.
(Cazeer Aoademy at Truman High School and Federal Way Public Academy serve
students from throughout the Disirict). The identified boundaries are reviewed annually
Any change in grade configurarion or adoption of programs that affect school populations
may necessitate a change in school service areas.
The Growth Manageinent Act requires that a jurisdiction evaluate if the public facility
infrastructure is in place to handle new housing developments. In the case of most public
facilities, new development has its major impact on the facilities immediately adjacent to
that development. School Districts aze different. If the District does not have permanent
facilities available, interim measures must be taken until new faciliries can be built or
until boundaries can be adjusted to match the population changes to the surrounding
facilities.
Adjusting boundaries requires careful consideration by the District and is not taken
lighfly It is recognized that there is a potential impact on students who aze required to
change schools. Boundary adjustments impact the whole district, not just one school.
It is unportant to realize that a single housing development does not require the
construction of a complete schooi facility School districts aze required to project growth
throughout the district and build or adjust boundaries based on growth throughout the
district, not just azound a single development.
11
FEDERAL WAY PUL�LIC SCHOOLS 2015 CAPITAL FACII,I"CIES PLAN
���� Federal Way
���� Public Schools
� EIEMENTqRYS[HCo�s . MIDDLEiCH00LS ;��� �`
_ A�ELAIOEELEM11ENTaRY 36 fLNPUBIJCAGlDENf/ ��"" -
t .. - _
2 BHIGAOOON ELEMENTAPY 3D ILL4HEE MIDL'LE$CFi00L 1. - ' ;' �
3 CAMELOTELEMENTAAY 31 KILOMIDDLESCHOOL }� �
a EN7ERPnISEELEMENTARY 32 LANOTAMIDDLESCF±OOL t
5 GPEEN GABLES ELEMENTMY 33 SAGUAYJFAMIDDLE SCHOOL I ��� � '
6 LAKE�OLLOFF EIEMENTAPY 3q SpGNALIE MIDDLE SCHOOL �� ;" �Y":�L'� �.
] LAI(EGAOVEEtFP�ENTAPY 37 SEQWVAHMIDDLFSCHOOI �-�— - �- - -' �� � -
8 LAKEIANOELEMENTA(tY 35 TpTEMMIDDLESCH�OI � I � _ I �' �
9 MANNPNAINEIEMENTARY 3B1 TAFACADEMY Lt� � { � �� -- . .
10 MENEDRHHILLEIEMENTAHY - - .
11 MIFHOfl LAKEELEMENTAHY i ° /�� �` - _ '
12 NAUTILUSK-SSCHDOL Hi'uH5CHO0L5 / '_ - �
30 DECATUP HIGH -- '
13 OLYMPICYIt1VELEMENTARY �� ���j I
ll FEDEPALWAYHIGH e
11 PANTHERIAKEEIEMENTMY li
15 RAINIE9 VIEIY ELEMENTAAY 321 THpM1W51EFfER50N HIGH � . � � e.6�'tJ
16 SHEFWOOOFDPESTEIEMENTAAY 15 TOOOBEAMEPHIGH � ,..' ;�
1] SILVERLAKEELEMENTAflY a90 CApEEPACADEMY[etTPUMAN i � f� ' 3
1B 4AN LAKE ELEMENTARY 51 ETP/NORM1IANCENTEA ; . ' -" " F-: ,
1.. �� "....,
' �. I
19 SUNNYCREAELEMENTARY = � �– '
20 TWM LAICESEIFMEMARY . ADMtNISTRATSVE SI1E5 –
21 VALHALLA ELEMENTARY ,.'�� � ,... � .� . `�
22 WILOWODOELEMENTAPv �
23 WOOOMDNT KA SCHDOL – � , _.`�
i � . � 7 I
a � y
�y .
� FWPS P0.0FERTY r"- ,�:j p� , r'i7 �= . � � ;�}� q ��:�
. ��� "�' , : � i � '•
' . , ; �
_1 , lt .; q ,_ , ,. ___..
- s; ai , + m_ .
_ � 'F: �� , i� ; - �
r �_ �
\� i • �� '`� , } � . � N� d ' :_� i_":; ' �I _
\ �. . i �.. r j .; yf
a y� .� . � � I ' " _
� VI.:� { � �4Ia
.C`'w 1`� , ��.:' �'� i :.
� � t _ (I
I ! ('.. _ ` `I
— . L .
,h •�
. f - � ��� .i..
..�p� �i". ,� :`.� t !�
_ 4 ✓_:. �f ..+. .
,. . � � . � 1 :{.'.
„ �: , ��,:� ;
� �� :� �� /��� -�r — _,
— J�� :_ �'-- d�� 'j �-. _
�t �1 j
ELEMENTARY � �,� ,;_'� fi� ;='-
BOUNDARIES = � �� ''�yl ''' '}
, , , � �� ,
� ��. ' -',
� y ,'.-_"- 3 .3�. .
: . �-�� r-'._,. � . d
i '
_ r '�, ��' �•
i-�� � ' �
�
N
�Oat83 46 Q9 L2
�Mles
DaGe:6.2 12
12
FEDF.RA[. WAY PiJBLIC SCHOOLS 2015 CAP[TAL FACILITIES PLAN
���� Federal Way
�`J� Public Schools
�
� ELEM1'.ENTNnY5CH00�5 ■ MIDDIFSCHOOlS ^ • ,j
1 ADEIAIOEEIEMENTAPY 36 RNPUBLICACADEMY +�A1 I�1 '� � �
I' '. �
2 BAIGAGOON ELEMENTARV 30 ILLAHEE MIDDLE$CHOOL �j�y�� �
3 CAMEIDTELEMENTAPY 31 KILOMIDOLESCkOOL -
1 ENTERPRISE ELEMENTANY 32 LAKOTA MIDDLE SCHOOL �
5 GREENGABLESELEMENTARV 33 SACAIAWEAMIDDLESCHWL � ��-
6 LAKEOOLLOPFEtfMENTARY 34 SAGHPLIEMIDDLESCHOOL d+ �
7 LAKEGFO4EElEMENTMY 1� �
37 SE4UOYAH MI��LESCHOOL � .
8 LAKElANO ELEMENTAPY � I — �- - �1*�, � .
35 TOTEMMIDDLESCHOOL -
9 MAAKRYAIN EIEMENTAPY � � �-}�; L� ` �
10 MEflEORHHILLEIEMENTpFY 3fl1 TAFACADEMV ,���F`�`I�'� � �
Y�-'
11 MIFROX LANE EIEMENTAPY ��_���� ��
HIGH XHOOLS �
12 NAUTIWSK-85CHOOL � � I
13 OLYMPICVIEW ELEMENTAXV a0 OKATtIP HIGH ��-�✓ M1 � µ I
dl FEOEflAL WAY HIGN „I 3 � nl�� � . r`� � 1�
1C PANTHERUKEEIEMENTARY d�y THOMASIEFFERSONHIGH ��-.a. � �7 � � '' ���
15 FAINIEP VIpN ELEMENTARY ���*'� L '
d5 TOD09EAR!ERHIGH � �� �l J-2L�
I6 SHER�I'OOOFORESTELEMENiARV ' "� � 4Y>I �\
49p CAREFAACADEMY@TRIIMTN ➢ ft j� ! � ��� �'
17 SIL4ERLAKEEI.EMENTARY �Z� �� - 1
IS STAR LAKE ELEMENT.t0.Y 51 ETP/NOflh1ANCENiEA 4 � ��-�� j �jY � ' �_ LLi[ I
19 SIINNYCPESTELEMENTARY Z - ,1'��r
20 PNINLAKESEIEMENTARY ■ AOMINIST0.ATIVESi'fE5 ����t�, �i � - �. - �..1 ��
21 4ALHALLA ELEMENTARY ��; l4� � �
22 K'ILOWOOD ELEMENTARY ����`� I `�.� Ipy.'� ' f f '��_�
23 4YOOOMONTKA KHOOL . -r �--�� } � � �Irf�� ' � .
■ FWPS PitOPERTY — L �` � �J~I�� � U i'� ` ��i�� �� � _ �' { �i
�' �
� �.
r-
�, ( � �k L � . _ � i'ti 1 Sf,�7� ��l}�-�
� ,�l�l- � �>-+'�_1
5�1 �I�I T . " �
��'t Y �r � �' .
� � �r�� F � Z' � � �� �
t ,.�i�� ��J, , � 1 L�- � �L� ` 1 + ...,y �''
—�I.� " ;�-,� . t-l . , ;�;,c i
� }
, ,
�� '�:1L s 4;' d .r�� E ; -
j� }� n 1( { r
� � 'iJ ,r� , l' , �` G�`N-� - �"{� �! �..�
L• �
tr ., � � r, �' ��1 �i�-r' r 1�§� S/_�, � '��� �
� — �y �--' -�.
i '� �„ �, '���' r ; y� '�� .
���' 4� ��- � , .
� ,: � C�
�-� -
�;— '�l�} �• 'C, �� � — �.
: �
r . ��j� _� �� 1�� ..-� �� _~ �
MIDDLE `yT;, � � � } ;' ��(- ,' —
}�r �i�,� , �_ ,;�;
SCHOOL ' j-__,, . � �q',��, r � _^ - ,;,��; ;s
BOUNDARIES Y �' `
� :�� a� ,.—a
,�,�-� -
F;,
� -
N 061H3 66 69 L2
Mks
Oate: 5.4.12
13
FGDERAL WAY PUBLIC SCHOOI,S 20(5 CAPITnL FACILITIES PLAN
���� Federal Way
�`�� Public Schools
:
� E(EM1:EM1TARYSCHOOLS ■ MIDDLESCNOOL$ �''''� a
1 A�EIniDEELEMENTARY 36 FWPUBLICAGDEMY �'+-�"-J1N - -� ,
i-i
2 8HIG4�ODNELEMENTARY 30 ILLANEEMIDDLESCHOOL �,j,4fy �.' ',
3 CAMEIDTELEMENTARY 31 KILOMIDDLESCHOCL I�p �- ,
d ENTERPRISEELEMENTARY 32 UIKOTAMI��LESCHOOL p '
5 GAEENGABLESELEh1ENTpRY 33 SAGJAWEAb!IDDLFSCHOOI M ' �
6 LAKE 60LLOFF EIEMENTARr ;q $(�GHALIE MID�LE SCIi00L
] LiKEG0.0VEELEMENTANY j� {� , � ' J� �^�
37 SEQWVAHMIDDLESCHOOL �. t c
8 IAKEUNO ELEM1IENTAPY � '"�, � J��' � 1
3 MARKiWAHiEIEMENTAflY 35 TO`FMMIDDLESCHOOI � 'r`� I_' /
381 T,:f ACADQNY � � I� �
r
10 MENEDRHHILLEIEMENTARY � ���r- /�
11 MIRflORLANEELEMENTqRY ' ��/ _ � f� !�
MIGH XHOOLS + +
12 NAUTiLU5K3SCHDOI . J'- il I
d0 DEGTUR HIGH n �
13 OLVMPICVIEW ELEMENTAAY i I
Gl FEDEflALWAYHIGH n l J
14 PANTHEPLAKEEIEMENTAPY �.��LIj�� . ��I, - '�`I,`�
C21 TIqMAS1EFFER50N HIGH �
?5 FIAINIER4IFNELEMENTARY j, � \
65 T0009EAMERHIGH i F� -I,� - \
lv SHE0.N'OODf-0flESfEIEMENTAIIY � � �
1J SILVEFL1KEEfFMENTFPY a90 �AREEflFCAOEMY@TPUMAN � � 4
18 SfAN W(EELEMENTARY 51 ETP/NORMANCENTER � y, . ',��� � `
19 SUNNVCNESfELEhffNTARY � -�}l� ��, _
N TWINIAKESELEMEhTARY ■ ADM➢JISTRATIVESITES ,-��'�yl ��{I, � ��_ �, � -
21 VALHALLAELEMENTAHY _{t{Ffl A� � t �' � i e -
22 WILOWOD�ELEMENTAflY } "l�J�l���'{ ? — I—
23 `NOOOMONTN-95CHOOL �,,,�^ -��J� ' �,y, u� i :�1I �-� l.r*5 � �
q �� t �
� /J I t r.
FWGS PROPEFTY // � ��II �I . . � '. ^I
/ i�- ff f ♦ ��.1+ 11y-t.�� �l' '��
��Lii � �, ,�I �`I_u., v , -1 Y ��J
� - ,l' ��1.,,� h�J ` .l `4t -� �� �- �
i � - � '
, ��.:�,�t r� �� � ,� �„
lf' �.r_,.� �"•: � �'r �_�, I
. , --
� �, r�
K,c.�' `� �� 1�„�; � �� :; , �- � .
� -�` -y 'r _�r r7 � -C'� `��i"" �� ..'i . .
�� .. ��1. 1 !�./� �� �i: , _I I ,� '
� �� � Y '- r
L�f _:. =4,i' '� � y� ' _; �I
� .r `}f�L{ l�;/ ./, '},�..�5 4
- � 1 V!i). :1 � TT� ry� /
I I I II
�,���; ., � ,� � ��r,,
�.r 9 -r�� �. 1 I� �l
{ =�f_ Y L.L�LC}a A ,
` � ���L f,� �f y.,i .. . � �� ��
HIGH I `r'�i�� � , � � "'
.
SC H 00 L , � I _ ,�_:� , , I ' �� � '� �
BOUNDARIES �� '�Il��f � � �` �
:,��� � ,_ � �
�� ;;-� �
N
�mtaa ae a9 �.z
�ies
�ate:3.4.i2
14
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
SECTION 3 - SUPPORT DOCUMENTATION
Building Capacities-The Education Program
Portable I,ocations
Student Forecast—2015 through 2021
Capacity Summaries
King County Impact Fees - Single and Multi-Family Units
15
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
Buildin¢Canacities
This Capital Facilities Plan establishes the DislricYs"standard of service"in order to ascertain the
DistricYs current and future capacity The Superintendent of Public Instruction establishes squaze
footage guidelines for capacity,but these guidelines do not take into consideration the education
program needs.
In general, the DistricYs current tazget class size provides that the average class size for a
standazd classroom for grades K through 2 should be 20 studenfs. Due to current economic
conditions, the target class size for K through 2 has been temporazily increased. With the
legislative compliance with McCleary, we intend to decrease K though 3 class sizes to 17 by the
2017-18 school yeaz. In grades 4-5 the target is 25 students. For grades 6 to 12 the tazget class
size is 26 students. Classrooms for students with Individualized Educarion Program (Special
Edueation)needs are calculated at 12 seats per classroom.
Using the OSPI sqpare footage calculation as a base line,the District has calculated a program
capacity for all schools. The following list clazifies the adjustments to the OSPI calculation.
Music Rooms:
Each elementary school requires a standazd classroom for music instruction.
All Day Kindergsrten:
Every elementary school operates only all day Kindergarten programs. These all day
Kindergarten programs require additional capacity because the standard classroom is available for
one all day sessiog rather than two half day sessions. The District will operate 76 sections of all
day Kindergartenin 2014-15
Special Education Resource Rooms:
Each elementary and middle school requires the use of a standard classroom(s)for special
education students requiring instruction to address specific disabilities.
English as a Second Lauguage Programs:
Each elementary,middle school and high school requires the use of a standard classroom for
students leazining English as a second language.
Middle School Computer Labs:
Each middle school has computer labs,except Totem Middle School. Wireless acce"ss has been
installed at all secondary schools. If additional classroom space is needed,these computer labs
may be converted to mobile carts.
High$chool Careei Development and Learning Center(Resource)Room:
Each high school provides special education resource room and cazeer development classrooms
for students requiring inshuction to address specific disabilities.
Preschool/ECEAP/Headstait:
Our district currently offers preschool progams for both special needs&typically developing
students at 8 elementary schools. We also have the ECEAP and Headstart program at 6 schools
(4 elementary&3 high schools). These programs decrease capacity at those sites.
Alternative Learning Experience:
Fedeial Way offeis students the opportuniTy to participate in an Alternative Learning Exp"erience
through our Intemet Academy These students have never been included in the capacity
calculation of unhoused students.
16
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
BUILDING PROGRAM CAPACITIES
ELEMENTARY BUILDING MIDDLE SCHOOL BUILDING
PROGRAM CAPACITY PROGRAM CAPACITY
SchoolName Headcount SchoolName Headcount FTE
Adelaide 361 Illahee 835 843
Bri adoo❑ 258 Kilo 804 812
Camelot 238 Lakota. _ 732 739
Ente rise 427 Saca'awea._ _ 659 �666�
Green ('mbles. 446 Sa halie 800 808
Lake Dolloff_ 415 Se uo afi 564 570
Lake Grove 352 Totem 759 767
Lakeland 361 Federal W a PubGc Academ 199 201
Mark'fwain 327 Technolo Access Foundation Academ **
Meredith Hill 425 Merit.School*'
Mirror Lake 337 TOTAL 5 52 5 406
Nautilus (K-8) 319
Olympic View 340 "Midtlle School Aver e '736 744
Panther Lake 410
Rainier Vi6w 401 HIGH SCHOOL BiJILDNIG
Sherwood Forest 395 PROGRAM CAPACITY
Silver Lake 402
Star Lake 345 School Name � Headcount FTE
�unn�crest 391 Decafur 1189 1 72
�in Lakes 309 Federal W a 1471 1 573.
.alhalla 401 Thomas Jefferson 1289 1 79
Wildwood _ 312 ToddBeamer 1103 1,180
Woodmont K,8 . _ 318 CareeiAcadem atTivman 153 164
TOTAL 8,290 Federal W ay Public Academy 109 117
Em lo ment Transition Pro ram 48 51
Technology Access Foundation Academy*•
FJementary_Average 360 Merit School'*
TOTAL 5 62 5735
*Hi h School A�xr e_ 1 63 1 51
Notes.
" Fedetal W ay Public Academy,Career Academy at Truman High School,and Employment Transition Program
are non-boundary schools. These schools are not used in ;he calculated averages.
"' Technology Access Foundation Academy is housed entirely in portables
on [he Totem Middle School site. Merit School is housed entirely in
portables on the Illahee Middle Schoo]site.
17
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAI.FACILITIES PLAN
Portable Locations
The Wasliington State Constitution requires the State to provide each student a basic
education. It is not an efficient use of District resowces to build a school with a capacity
for 500 students due to lack of space for 25 students when enrollment fluctuates
throughout the yeaz and from yeaz to year.
Portables aze used as temporary facilities or interim measures to house students when
increasing population impacts a school attendance area. Portables may also be reguired
to house students when new or changing programs require additional capacity They also
provide temporary housing for students unfil permanent facilities can be financed and
conshvcted. When permanent faciliries become available, the portable(s) is either used
for other purposes such as storage or child care programs, or moved to another school for
an interim classroom. Some poRables may not be fit to move due to age or physical
condition. In these cases, the District may choose to buy new portables and surplus these
unfit portables. It is the practice and philosophy of Federal Way Public Schools that
portables aze not acceptable as permanent facilities.
The District is investigating alternatives to portables. We aze currently in the planning
phase of designing buildings that would require shorter construction time and provide
permanent classmom space for our students. These buildings may replace the need for
portables in the future.
The followiitg page probides a list of the location of the pdrtable facilities, used for
temporary educational facilities by Federal Way Public Schools.
18
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
PORTABLE I,OCATIONS
PORTABLFS LOCATFD PORTABLFS LOCATFD
AT II.FINFIVTARY SCHOOLS AT IiIQ�SCHOOIS
NON NOry
INSTRUCTIONAL p`ST@pCT10NAL INSTRUCTION.�L IN5TRUCTION.�L
Adelaide 1 2 Decatur 5 4
Bri adoon 1 FedemlWa 3
Camelot 1 Thomas Jefferson 9 1
Fnt rise 2 1_ Todd Beamer 8
(}eenCables 1 TAFAcade - S 2
Lake Dolloff 1 1 TOTAL 33 7
Iake(�ove 1 1
i akelznd
Mark Twain 3
Meredith Hill 3
Maror Iake 6 PORTABI,�S LOCATID
NautIlus 1 AT SUPPORT FACQ.ITI6
Olympic Yew 1 1
PantherIake 2 MOT
RamierYiew 3 TDC � 5
Sherwood Forest 2 2 TOTAL 5
Silverlake 4
Staz Lake 3 1
Sunn�crest 4 HFr1DSTARTPORTABL�NSATDISTRICfSI1'6
Twm Iakes 1 2
Valhalla 4 SherwooH Forest - I
W ddwood 4
Woodmont 3 Total 1
TOTAL 40 23
PORTABLFS LOCATID
AT iNmDLESCHOOIS
NON
INSTHUCiIONAL �IVSTRUCTIONAL
Nahee 3
Kilo 7
Iakota
Saca awea 8
Sa halie . 1 3
Se uo ah 2
Totem
Merit 3
TAF Acade 8 2
TOTAL 22 15
� In the 201415 school yeaz,students at Federal W ay HS will be housed'm a portable village durmg
construction ofthe new classrooms.
19
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
Student Forecast
Student enrollment projecrions aze a basic component of budget development.
Enrollment projections influence many of the financial esrimates that go into budget
prepazation. The majority of staffing requirements aze derived directly from the
forecasted number of students. Allocations for instructional supplies and materials aze
also made on the basis of projected enrollment. Other expenditures and certain revenue
projections are d'uectly related to enrollment projections.
Enrollment projections are completed annually in the Business Services Department.
Projections must be detailed at various levels, district total, school-building totals, grade
level and program level to include vocarional and special education students.
The basis of projections has been cohort survival analysis. Cohort survival is the analysis
of a group that has a common statistical value(grade level) as it progresses through time.
In a stable population the cohort would be 1 00 for all grades. This analysis uses
historical information to develop averages and project the averages forward. This
method does not trace individual students; it is concerned with aggregate numbers in each
grade level. The districthas used this method with varying yeazs of history and weighted
factors to study several projections. Because transfers in and out of the school system are
common, student migration is factored into the analysis as it increases or decreases
survival rates. Enhy grades (kindergarten) aze a unique problem in cbh6rt analysis. The
dish-ict collects information on birth rates within the districYs census tracts, and treats
these statistics as a cohort for kindergarten enrollment in the appropriate years.
The Federal Way School District is using various statistical methods for projecring
student enrollments. The resultant forecasted enrollments aze evaluated below
The first method is a statisrical cohoR analysis that produces ten distinct forecasts. These
aze forecast of enrollment for one yeaz. The projections vary depending on the number of
years of historical infoiination and how they aze weighted.
A second method is a projection using an enrollment projection softwaze package that
allows the user to project independently at school or grade level and to aggregate these
projections for the district level. The Enrollment Mastei� software provides statistical
methods including trend line, standard grade progression (cohort) and combinations of
these methods. This softwaze produces a five-yeaz projection of school enrollment.
In December 2012, the District contracted a demographer to develop projections for the
Federal Way School District. The report was complete in Mazch 201.3 The model used
to forecast next yeaz's enrollment uses cohort survival rates to measure grade to grade
growth, assumes market share losses to private schools (consistent with county-wide
average), assumes growth from new housing or losses due to net losses from migration.
This forecast was provided as a range of three projections. The long-range forecast
provided with this report used a model with cohort survival rafes and growth rates based
on projected changes in the 5-19 age group for King County Most of the methods used
for long range enrollment reporting assume that enrollment is a constant percent of
soinething else(e.g. population)or that enrollment will mirror some projected trend for
20
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
the school-age popularion over time. The report included 5 different calculations to
provide a range of possible projecrions for the District to the yeaz 2022. Tliis mode]
produces a projection that is between 23,000 and 24,000 when applied to the low,
medium and high range modes. This provides a reasonable range for long-range planning
and is consistent with estimates from various models.
Long-range projections that establish the need for facilities aze a modification of the
cohort survival method. The cohort method of analysis becomes less reliable the farther
out the projections aze made. The Federal Way School District long-range projections
aze studied annually The study includes information from the jurisdicrional
demographeis as they project fiiture housing and population in the region. The long-range
projections used by Federal Way Public Sbhools reflect a similaz age trend in student
populations as the projections published by the Office of Financial Ivlanagement for the
State of Washington.
Neaz term projecrions asstune some growth from new housing, which is offset by current
local economic conditions. The District tracks new development from five pemutting
jurisdictions. Currently there aze three new multi-family complexes planned within the
District. These three complexes have a total of 819 units. Two of the three developments
will be open and ready for occupancy within the 2014-15 school-yeaz. Long range
plarining assutnes a student yield from proposed new housing consistent with historical
growth pattems.
Growth Management requires jurisdictions to plan for a minimum of twenty years. The
Federal Way School District is a partner in this planning with the various jurisdicrions
comprising the school district geography These projecrions create a vision of the school
district community in the future.
21
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
Full Time Equivalent Enrollment History and Projections
Simplified FTE(K Headcount=.5 FTE;Middle Schoo]FTE=.99 Headcount;Hi�School FTE_.935Headcount)
Total K-12 Percent
Caleodar Yr School Year Dementary Midme School Hlgh School FTE Chareg"e
2009 2008-09 8,865 5,155 6,456 20,476
2010 2009-10 8,738 5,119 6,594 20,451 -01%
2011 2010-11 8,753 5,142 6,544 20,439 -01%
2012 2011-12 8,800 5,134 6,448 20,382 -Q.i%
2013 2012-13 8,914 4,963 6,367 20,244 -0.7%
2014 2013-14 9,230 4,801 6,354 20,384 0.7%
2015 82014-IS 9,3/9 4,811 6,261 20,391 0.0%
2016 P2015-16 9,281 5,041 q092 20,415 0.1%
2017 P101617 9,398 5,145 5,950 20,493 0.4%
2018 P2017-18 9,477 5,154 5,971 20,542 0.1%
2019 P2018-19 9,575 5,130 6,063 20,768 l.l%
2020 P2079-10 9,645 5,264 6,707 21,016 LI%
2021 P2020-21 9,713 5,359 6,243 21,325 L6%
ElementaryK-S Midd[eSdrool 68 HighSchool9-72
Enrolimeot History and Six Year_ Foregast _ _
22,000 - - -� -- - ---- - - -
21,000
20,000
19,000
18,000
17,000
16,000
15,000
a a .�o ao �o �o m� '� '� r � � �
°o�, �Q �� r, ��, o� o� o� o�� o� o� ar,
� �o �i � �w v �is `ris �i� im �'�o `R�o 4a�
School Year
CFTE
Zz
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
Canacifv Summaries
All Grades, Elementary, Middle School, and High Schools
The Capacity Summaries combine Building Capacity information and the Student
Forecast information. The result damonstrates the requirements for new or remodeled
facilities and why there is a need for the District to use temporary facilities or interim
measures.
The informafion is organized in spreadsheet format, with a page suuunarizing the entire
District, and then evaluating capacity vs. number of students at elementary, middle
school, and high school levels individually
The notes at the bottom of each spreadsheet provide informarion about what facilities are
in place each yeaz.
23
FEDG1tAL WAY PUBLIC SCHOOLS 2015 CAPI'1'AL I�ACILI'I fFS P[.AN
CAPACITY S UMMARY-ALL GRADfS
Qud�ei - Projeci�d --
Calendar Year 2015 3016 2017 2018 2019 2020 2021
CAPACITY SchoolYear 2014-I� "_'01�-IG 2016-U 2017-IA '_018-19 2019-30 3030-3L
DUILDING PROGRn M
HF�DCO UN'r CA PA CfTY 19.004 19.004 19.001 19,304 l y 304 19,204 19,?04
FTE CAPACITY 19,4;1 19,431 19,431 19,631 19,631 19,631 19,631
Add or,auhtmc� chanacs to cnplcity
Increasc('apacily �t I�cilcral Wuy I IS 200
Adjusted Program Headcount Capacity 19,004 I9,004 19,204 19,304 19,304 19,304 19,204
Adausted Pro ram FTE Ca acity 19,431 19,431 I9,63I 19,631 19,G31 19,631 19,631
CNROLLMCNT
6asicl�'l�I:;I�inrullmcnL 20391 20,415 20,493 20,542 '?0,768 31.016 21,325
InLcrnclAuudemy �nrullnwnt (I�AF'TE) (;I�1 l;l�l 1�1>1 �;I�1 I;I�I (�I�1 (�I:�1
Basic PT'E Enrolhnent wdhout Intemet Academ 2Q076 20,100 2Q178 20,227 20,453 20,701 21,OI0
SURPI..US OR(UNI10UtiIsD)
PROCRAMFI'ECAPACITY ;:��) ((,6')) (il;) (59(il l42') (1.07D) 1.399
RELOCA"I'A13LL:CANACI'I�Y
CurrentPortableCapaciry 2.12� 2.37i 2_;75 ?.�00 °.;00 2.300 2.300
Deduct Portablc Cupacity ('�}
Add Nc�v Portablc Capacit�� 250
Ad usted Portable Ca acit 2,375 2,375 2300 2,300 '_',300 2,300 2,300
SURPI,US OR(UNIIOUSGD)
P HOC RA M AN U RGLOCA'1'A13 LE
CAPACIT'Y 1,730 1,706 1,753 1,704 1,478 1,230 921
24
FED�RAL WAY P[JBLIC SCIIOOLS 2015 CAPI"CAL FACIL("C[ES PI.AN
('APACITY S UMMARY-ELEMFN'PARY SCHOOI.S
Budget -- Pro�ected --
Calendar Year 3015 2016 2017 20L8 2019 2020 202L
CAPACITY SchoolYcar '_01=1-1> '_O15-IG 301(rl7 ?017-18 '_018-I�) 3019-20 30'_0-21
BUI L.DING PROGRAM
Hti,AD COUNT CAPACITY �290 S,Z90 8.390 8.390 8,290 S.290 8°90
FTECAPACITY 8,290 8,290 8,290 8,290 8.290 8.290 5,290
Add or subnnct chan�es m cap,icity
Ad,justed Proeram lloadcount Cap�city 8_'90 8.'_90 8 Z90 8?90 3,390 8,290 3.290
Adjusted Program F"1'ECzpacity R290 8,290 8,290 8,290 8,290 8,290 8,290
P�\'ROI.I,Nlfti�l�
6asic FTCI�:nrullmcnl 9.319 2283 9.398 9.�477 9.575 9.Cr}5 9J�i
lnternet Acadenn (:1AP��-p)� �.'�,�� ;-rv � ;ni i ;��i 1.;•.� i �r��, � ��n�
Basic FTEEnroLlment wrthout Internet Academy 9,283 9,246 9,362 9,441 9,539 9,609 9,687
SURPLUS OR(UNHOUtiGD)
PROGRAMCAPACITY I`H`�t� �95G) (1,072) (�.I51) (I.2�9 1�19) (1,397)
Rl?LOCATABLE CAPACITI�
Current Portable Capacrty 750 I,000 IA00 I.000 I,000 1.000 I,000
Add/Subtract portable capacity
Add ponablc capacrty at Panther Lakc I?S, 250
Sunirvcrest ES,& Valhalla GS
Ad'usted Portable Ca ac' ],000 1,000 1,000 I,000 1,OOD I,000 I,000
S URPLUS O R(UN HOl iS ED)
PROGRAM AND RELOCA'I'ABLI?
CAPACITY 7 44 72) (I51) (249 319 397)
NO�fLS:
I [nternet Academy students are included in pro�cctions but do not require full hme use ofschool facilitics
3 Relocatable Capac�ty is based on the numberofportables available and otheradministraGve techniques wh�ch
can be used to temporarily house studenfs until peimanent faciliUes are available �I'his is a calculated numberonly
The actual number oFportables that will be used will be based on actual studcnt population needs
Thc Distric[ m2y be�m to pull portables Iromdie instivctional invenrory Age and cond�tion of[hc portables
willdetennmefeasibihry forcon[mued instruc[ionaluse
25
FEDERAL W[�.Y PUBLIC SCHOOLS 2015 CAPITAL FACILI'CIFS PLAN
CAPACITY S UMMARY- MIDDLE SCHOOLS
Budgct -- Pro�ected --
Calendar Year 2015 2016 2017 2013 Z019 2020 2021
CAPACI'CY SchoolYear 207a-IS 201_5-I6 2016-17 20U-18 2018-19 2019-20 2020-21
DUILDiNG PROGRAM
HCADCOUNTCAPACITY 5,352 5.352 5,352 5,352 5,352 5,352 5,352
FTECAPACiTY 5,406 5,406 5,406 5,406 5,406 5,406 5,406
Add orsubtractchanges in capacity
Adjusted Program Hcadcount Capac�ty 5392 5,352 �,352 5,352 �,i52 5,352 5,352
Adjusted ProoramFTECapacity 5,406 5,406 5,406 5,406 5,406 5,406 5,406
ENROLLML;N'I'
BasicF7'EGnrollment 4,811 5,041 5,145 5,1�4 �,130 �?64 5.359
Inteme[ Academy (AAFTE)� (--t) ('J) (7�) (`�,i ;l�lj 1 -I�) (r-',)
Basic PT'L:Gnrollment without Intemet Acade 4,737 4,967 5,071 5,080 5,056 5,190 5,285
SURPLUS OR(UNHOUSGD)
PROGRAMCAPACTTY 669 439 335 326 350 216 121
CLOCATABLG CAPACI'Cl'�
� Current Portable Capacity �50 550 550 5�0 �50 550 :i50
Add/Subtract portable ca�acity
Adjusted Portable Capacity 550 550 550 550 550 550 550
SURPLUS OR(UNHOUSED)
PROGRAM AND 2ELOCATABLG
CAPAC('TY 1,219 989 885 876 900 766 671
NOTIS•
1 lnternet Acadeiny students are ineluded in pro,�ecTions but do not require full time use ofschoolfaeil�t�es
2 Relocatable Capacrty is based on the nuinber ofportables available and other admm�stratrve techn�ques wh�ch
can be used to temporarily house scudents uutdpennanentfacihties are avadablc This is a calculated number only
The actual numberofportables that will be used w�ll be based on actual studen[ population needs
Tl�e Distnct may begm to pull portables Cromthe instructional mventory Age and condrtion oftLle poitables
will determine feasibihty for continued mstruct�onal use
26
FEDERAL WAY PUBLIC SCHOOLS ?01� CAYI"I'AL FACILITIIiS PLAN
CAPACI"I'Y S UMMARY- FIIGH SCHOOLS
BO(��L`I -- �'OIl'CIl'1� --
C2lendar Year 2015 2016 2017 2018 3019 2020 ?021
CAPACITY Scl�uulYear 2014-IS 3015-16 3016-17 2017-IS 201R-19 2019-2U 2020-21
BUILDING PROGRA M
HEADCOUNTCAPACI�1'Y �,�6? >362 5,362 5.562 5562 5.562 5.562
FTE CAPACITY 5,735 5,735 5,735 5,935 5,935 5,935 5,935
Add orcubh��ct changcs in eeipocity
Add cupacity to F'edcial Wuy HS 200
Adjustcd Progrmn Headcount Capacity �362 �.363 5,5G2 �,563 �,>G2 �,�62 JS62
Ad�usted Pro ramFTECa acity 5,735 5,735 5,935 5,935 5,935 5,935 5,935
ENROLLMCNT
6as�cP'fI:�;Enrolhnent 6,261 6A9'_ 5950 �,911 6.OG3 6,107 6,243
IntcmctAcademy (tAN�"f�:)� i�i�zi i,��•i i�u�r i'u�l Gr.,i �,=n�i i,�n,i
Basic Ed wi[hout Intemet Academy 6.056 5,887 5,745 5,706 5,858 5,902 6,038
SURPLUS OR(UNI-IOUSED)
PROGRAM CAPACTTY l32 I 1 I I 5'_') 190 229 77 33 l I U3)
RELOCA'PABLF.CAPACII'Y�
Qtrrent Portable Capacrty 3?S 825 825 7�0 750 7�0 7�0
AddiSubhnc[ portablecspaaty
Subimct poitable capac�ty at Pederal Way HS 1'�1
Ad'usted Portable Ca aci 825 825 750 750 750 750 750
SURPLOS OR(UNIiOUSED)
PROCRAM AN D RELOCATA R 1 J�:
CAPACI7'l� 504 673 940 979 827 783 647
NOTPS
I ]ntemet Acadeiny students are inctuded in pro�ections but do not requn'c full tmie use of school faeihties
2 Relocatable Capacity is based on the numbcr ol'portables avadable and other administiative tcchn�ques which
can be used ro temporardy house students until permancnf f3cilihes are avndable This �s a calculated mm�ber only
The actual numbcrofportables that will be used will be based on actual student population needs
The D�stnct may begin to pull poitables fromthe mstnictional inventorv A,e and condition ofthe portables
w�71 determme feasibdity for contumed instructional use
3 Capacdy Ibr unhoused sWdcnts wi➢be aceommodated wdh (r�velmg teacheis and
no plannm� time u� some classrooms
27
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
Kine County, the City of Federal Wav, and the Citv of Kent Impact Fee Calculations
Single and Mulri-Family Residences
Each jurisdiction that imposes school impact fees requires that developers pay these fees
to help cover a shaze of the impact of new housing developments on school facilities.
To determine an equitable fee throughout unincorporated King County, a formula was
established. This formula can be found in King County Code 21A and was substanrially
adopted by the City of Federal Way and Kent. The formula requires the District to
establish a "Student Generation Factor" which estimates how many students will be
added to a school district by each new single or multi-family unit and to gather some
standard construction costs, which are driique to that district.
- STUDENT GENERATION FACTOR ANALYSIS
Federal Way Public Schools student generation factor was determined separately for
single-family units and multi-fatriily units. The factors used in the 2015 Capital Facilities
Plan were derived using actual generarion factors from single-family units that were
constructed in the last five (5) years.
- IMPACT FEE CALCULATION
Following the calculations for the student generation factoi is a copy of the Iiiipact Fee
Calcularion for single family and mulri-family units based on King County Code 21A and
the Growth Management Act.
➢ Temporary Facility Cost is the average cost of a portable purchased within the last 5
yeazs.
Plan Year 2014 Plan Year 2015
Single Family Units $5,363 $5,171
Multi-Family Units $1,924 $1,834
Mixed-Use Residential� $781 $917
City of Federal Way SF—$4,464 SF- $5,171
MF'—$1,562 MF-$1834
I In accordance with the City of Federal Way CounciPs changes to Ordinance No. 95-
249, which authorizes the collection of school impact fees.
28
FEDERAL WAY PUBLIC SCHOO J15 CAPITAL FACILITIES PLAN
STUDENT GENERATION
NE W CONST�RUCTION IN PRIOR 5 YEARS
Single Family Student Generetion
Number of Numberof Number of Number of Number of ' Elementary Middle School High School; Total
Single Family Multl-Family Elementary Mlddle School .High School' 9tudent Student Student ' ' Student
DEVELOPMENT Dwellin s Dwellin s 9tudeMs Studenls Students Fadw Factor Fador Factor
14 North'LakeRim 36 4 3' 9 0:11]1 0.0833. 0.2500 0.4444
14 �W s[one 43 12 7 7 02791 0.1628 0.1628 0.�47
(13);Saghalie,Firs 34 8 4' 4 02353 0.9176 0.1176 0.4705
(13)Lakepomt 22 4 2 4 OH818 0:0909 0:1818 0.4545
(12)Ming CouA 15 4 3 4' 02667 0.2000 02667 0.7334
(12)Sunset Gardens 12 12 0 1 1.0000 0:0000 0.0.833 1'.0633
(11)Brighton Park 25 10 7 6 0.4000 0.2800 0.2400 0.9200
(11)The'Greens 20 4 9 4 02000 0.4500 0.2000 0.8500
10 Geekside Lane 53 14 10 8 02642 0.1887 0.1509 0.6038
(.10)Grande Visla 31 10 1 7 0.3226 0.0323 0.2258 0.5807
Total 291 0 82 46 54
Student Generatlon* 0:2819 0 1581 0:1856 :Q.8254 .
'Student Genera[lon rate(s based on totals.
Mukl-Family Student Generation
Elerrrenta Middle Sdiool Hi h Schod Total
Aubum 0.723 0.091 0.092 0.406
Iss uah 0.165 0.052 0.051 0.268
Kerrt 0.324 0.066 0.118 0.508
Lake Washington 0.055 0.017 0.012 0.084
Average ( �0:192�" :OA57= .' 0.088: ;0:317 .. '
29 �
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
IMPACT FEE
Sc6001 Site Acquisition Cost: Student Smdent
Facility Cost/ Facility Factor Factor CosU Cost/
Acrea e Acre Ca aci SFR MFR SFR MFR
Elementary 0.2818 0.1920 __.$0 - - _ . �$0
Middle School 0.1581 0.0570 $0 $0
High School 4.85 $216,718 51 0.1856 0.0680 $3,821 $1,400
TOTAL $3 821 $1 400
Sc600l Construction Cost: Student Swdent
% Perm Fac./ Facility Facility Factor Factor CosU Cost/
Total Sq Ft Cos[ Capacity SFR MFR SFR MFR
Elementary 94.98% 0.2818 0.1920 $0 $0
. -------------- ---.._.. .. ---�-----. ..--------..__. ._..........- ---------------
Middle School 96.87% 0.1581 0.0570 $0 $0
High School ���� �96.65% $13,780,000 � 200 0.1856 0.0680 $12,359 $4,528
TOTAL $12,359 $4,528
Temporary Facility Cost: Student Student
%Temp Fac. Faciliry Facility Factor Factor Cost/ Cost/
Total S Ft Cost Ca aci SFR MFR SFR MFR
Elementary 5.02% $183,020 250 02818 0.1920 $10 $7
Middle School 3.13% 0.1581 0.0570 $0 $0
High School 335% 0.1856 0.0680 _ $0. _ $0
TOTAL $10 $7
ate Matching Credit Calculation: Student Sadent
Construction Cost Sq. Ft. S[a[e Factor Factor CosU Cost/
Allocation/S Ft Swdent Match SFR MFR SFR MFR
Elemenary $200.40 0.2818 0.1920 $0 $0
Middle School ��� u$200 40 � 0.1581 0.0570 $0 $0
High School $200.40 130 66.10% 0.1856 0.0680 $3,196 $1,17]
Totel $3,196 $1171
Tax Payment Credit Calculation SFR MFR _
Average Assessed Value (February 2014) $214,952 $88,900
Capital Bond Interest Rate (February 2014) ����w4 38^/0� �W�4 3$"/u���
Net Present Value of Average Dwelling $1,710,935 $707,610
Years Amortized 10 10
Property"Cax Levy Rate $1.55 $1.55
Present Value of Revenue Stream $2,652 $1 097
SingleFamily Multf-Family
Residences Residences
Mitigation Fee Summary
Site Acquisition Cost $ 3,821 $ 1 400
Pennanent Faciliry Cost $ 12,359 $ 4,528
7'emporary Facility Cost $ 10 $ 7
StazeMatchCredit $ (3,196) $ (],171)
TaxPaymentCredit $ (2,652) $ (1,097)
Sub-Totel $ 10,343 $ 3,668
50% LocalShare $ 5,171 $ 1,834
Calculated Im actFee $ 5171 $ 1 834_
2015 Im act Fee $ -5 171 $ 1 834
30
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
SECTION 4
SUMMARY OF CHANGES FROM THE 2014 CAPITAL FACILITIES PLAN
The 2015 Capital Faciliries Plan is an updated document,based on the 2014 Capital
Facilities Plan. The changes between the 2014 Plan and the 2015 Plan are listed below
SECTION I - THE CAPITAL FACILITIES PLAN
SIX-YEAR FINANCE PLAN
The Six Year Finance Plan has been rolled fonvazd to reflect 2015-2021 and adjusted fdr
anticipated Federal Way High School construction schedule. The plan is found on page
8.
SECTION III- SUPPORT DOCUMENTATION
CAPACITY
Elementary capacity includes space for All Day Kindergarten programs at every
elementary school. Changes to the Building Program Capaciries calculadon are found on
page 15.
PORTABLES
The list of portables reflects the movement of portables between facilities or new
portables purchased. Portable Locations can be found on page 20.
STUDENT FORECAST
The Student Forecast now covers 2015 through 2021 Enrollment history and projections
aze found on page 20.
CAPACITY SUMMARY
'I'he changes in the Capacity Smmnary aze a reflection of the changes in the capacities
and student forecast. New schools and increased capacity at current buildings aze shown
as increases to capacity Capacity Summaries aze found on pages 22-2b
IMPACT FEE CALCULATION- HING COUNTY CODE 21A
The Impact Fee Calculations have changed due to changes in several factors. 'The
adjustment made in the Impact Fee Calculation, causing a change in the Impact Fee
between the 2014 Capital Facilities Plan and the 2015 Capital Faciliries Plan can be
found on page 30 and 31
31
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
IMPACT FEE CALCULATION CHANGES FROM 2013 TO 2014
STUDENT GENERATION FACTORS
Student Generarion factors are based on rates for new developments constructed over a
period of not more than five yeazs prior to the date of the fee calculation. The changes in
student Generation factors between the 2014 Capital Facilities Plan and the 2015 Capital
Facilities Plan aze due to developments that were deleted or added based upon the age of
the developments and the yeaz placed in the survey The Student Generation worksheet
is found on page 27
SCHOOL CONSTRUCTION COSTS
The anticipated cost based on Z013 estimate for replacing Federal Way High is
$106,000,000. The replacement will add 200 additional seats. The current capacity of
Federal Way High is 1538. The addition of 200 seats will increase capacity by 13%.
Total Cost $106,000,000x.13 =$13,780,000
SCHOOL ACQUISITION COSTS
The district purchased the Norman Center to house the Employment Transition Program
and to allow for the expansion of the ECEAP program. The purchase and use of this site
increased our high school capacity by 51 students.
Total Cost $2,100,000/2=$1,050,000
Cost per Acre $1,050,000/4.85=$216,718
The District will use the above formulas created as a base for the 2015 Capital Facilities
Plan. The capacity of Federal Way High may vary from yeaz to year as programs aze
added or changed and construcrion cost may increase over rime.
32
FEDERAL WAY PUBLIC SCHOOLS 2015 CAPITAL FACILITIES PLAN
IMPACT FEE CALCULATION CHANGES FROM 2014 TO 2015
IMPACT FEE
Item From/To Comment
Percent of Permanent Facilifies 95.65%to 95.23% Report#3 OSPI
Percent Temporary Facilities 435%to 4.77% Updated portable inventory
Average Cost of Portable $185,012 to $183,020 Updated 5-yr mlling average of
Classroom portables purchased and placed in
2013
Construcfion Cost Allocation $188.55 to $200.40 Change effecrive July 2014
State Match 65.18%to 66.10% Change effecrive July 2013
Average Assessed Value SFR— Per Puget Sound Educational
$208,480 to $214,952 Service District (ESD 121)
MFR—
$80,075 to $88,900
Capital Bond Interast Rate 3 74% to 438% Market Rate
Property Tax Levy Rate $1.61 to $1.55 King County Treasury Division
Single Family Student Yield Updated Housing Inventory
Elementary .3271 to .2818
Middle School 1487 to .1581
High School 1896 to .1856
Multi-Family Student Yield Updated County-Wide Average
Elementazy 1710 to .1920 Nate: The last district multi family
Middle School .0490 to .0570 development, built in 2008, generates
High School .0690 to .0680 a higher student yield than the county-
wide average.
Iiripact Fae SFR—
$5,363 to $5,171 SFR based on the updated calculation
MFR— MFR based on the,updated calculation
$1,924 to $1,834
33
GLOBAL END
Each student will graduate with the skills and academic
knowledge to succeed as a responsible, contributing
member of a global sociefy
STUDENT ACHEIVEMENT
Each student at every grade level will perform at or above the
state or district standard in all disciplines. Each student's
progress shall be measured annually by academic growth.
RESPONSIBILITY
Each student will take responsibility for their academic success, �
exhibiting positive and ethical personal behaviors, treating
others with respect, courtesy, and dignity
PAREIVT ENGAGEMENT
Each student will benefit from the relationship each school will
establish with each parent, guardian or advocate
� �
�p���l ,A��� Federal Way Public Schools
� � 'M� 33330 Sth Avenue S
� � ���I'y �ti+1 'D�IS (253) 9 5 20 Oashington 98003
This document is published by the Business Services Department of the Federal Way Public Schools. May 2014
DETERMTNATION OF NONSIGNIFICANCE
Issued with a 14 Day comment and appeals period
Description of Proposal.
This tlueshold determinarion analyzes the environmental impacts associated with the
following actions, which aze so closely related to each other that they are in effect a single action.
1 T'he adoprion of the Federal Way Public Schools' 2015 Six Yeaz Capital Facilities
Plan by the Federal Way Public Schools for the purposes of planning for the faciliries needs of
the District.
2. The amendment of the King County Couiprehensive Plan by King County to
include the Federat Way Public Schools' 2015 Capital Facilities Plan as part of the Capital
Facilities Plan Element of the King County Comprehensive Plan.
3 1'he amendment of the Comprehensive Plans of the City of Pederal Way, City of
Kent and the City of Auburn to include the Federal Way Public Schools' 2015 Capital Facilities
Plan as part of the Capital Facilities Plan Element of the City of Federal Way's, City of KenYs
and the City of Aubum's Comprehensive Plan.
This proposal may also involve the amendment of the Comprehensive Plans of the City of
Des Moines to incorporate the Federal Way Public Schools' 2015 Capital Facilities Plan into the
Capital Facilities Element of the City of Des Moines' Comprehensive Plan.
Proponent: Federal Way Public Schools
I.ocation of the Proposal:
The Federal Way Public Schools District includes an azea of appmximately 35 squaze
miles. Areas of the ciries of Federal Way,Kent,Des Moines and Aubum fall within the District's
boundaries, as do parts of unincorporated King County
Lead Agency
Federal Way Public Schools is the lead agency pursuant to WAC 197-11-926.
The Iead agency for this proposal has deteimined that the proposal does not have a
probable significant adverse environmental impact on the envirdnment. An environmental
impact statement(EIS)is not required under RCW 43.21 C.030(2)(c). This decision was made
aRer a review of the wmpleted environmental checklist and other information on file with the
lead agency T'his information is available to the public upon request.
This Detennination of Nonsignificance (DNS) is issued under WAC 197-11-340(2). The
lead agency will not act on this proposal for 14 days from the date of issue. Comments must be
submitted by 430 p.m., May 16, 2014. The responsible official will reconsider the DNS based
on rimely comments and may retain,modify, or, if significant adverse impacts aze likely,
withdraw the DNS. If the DNS is retained,it will be final a8er the expiration of the comment
deadline.
Responsible Offibial. Ms. Tanya Nascimento
Enrollment and Demographics
Federal WayPublic Schools
Telephone: (253) 445-2071
Address: 33330 Sth Avenue South
Pederal Way WA 98003
You may appeal this determinarion in writing by 430 p.m., May 16, 2014 to Tanya
Nascimento, Federal Way Public Schools, 33330 8th Avenue Soath,Federal Way, WA 98003
Date of Issue: May 2, 2014
Date Published: May 2, 2014
2
ENVIRONMENTAL CHECKLIST
WAC 197-11-960 Environmental Checklist.
Purpose of Checklist:
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all govemmental
agencies to consider the environmental impacts of a proposal before making decisions. An environmental
impact statement (EIS) must be prepared for all proposals with pmbable significant adverse impacts on
the quality of the environment. The purpose of this checklist is to provide informarion to help you and the
agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be
done) and to help the agency decide whether an EIS is required.
Instructions for Applicants:
This envimnmental checklist asks you to describe some basic information about your proposal.
Governmental agencies use this checklist to determine whether the environmental impacts of your
proposal are significant, requiring preparation of an EIS. Answer the quesrions briefly, with the most
precise information known, or give the best descriprion you can.
You must answer each question accurately and cazefully, to the best of your knowledge. In most
cases, you should be able to answer the questions firom your own obsetvarions or project plans without the
need to hire experts. If you really do not know the answer, or if a question does not apply to your
proposal, write "do not laiow" or "does not apply" Complete answers to the questions now may avoid
unnecessary delays later
Some questions ask about govertunental regularions, such as zoning, shoreline, and landmazk
designations. Answer these questions if you can. If you have problems, the govemmental agencies can
assist you.
The checklist quesrions apply to all parts of your proposal, even if you plan to do them over a
period of time or on different parcels of land. Attach any additibnal informarion that will help describ"e
yow proposal or its envimnmental effects. The agency to which you submit this checklist may ask you to
explain your answers or provide additional information reasonably related to determining if there may be
significant adverse impact.
1
ENVIRONMENTAL CHECHI.IST
Use of checklist foi nonproject proposals:
Complete this checklist for nonproject proposals, even though questions may be answered "does
not apply" In addition, complete the Supplemental Sheet for nonproject actions (part D).
For nonproject actions, the references in the checklist to the words "project," "applicant," and
"property or site" should be read as "proposal," "proposer," and "affected geographic atea,"respectively
2
ENVIRONMENTAL CHECKLIST
A. BACKGROUND
1. Name of proposed project, if applicable:
The adoprion of a Six-Yeaz Capital Faciliries Plan by the Federal Way School District No. 210 for
the purposes of pianning for the DistricYs facilities needs. The King County, City of Federal Way,
City of Kent and the City of Aubum's Comprehensive Plan will be amended to include the
District's 2015 Capital Facilities Plan in the Capital Facilities Plan Element. 1'his project may also
involve the amendment of the Comprehensive Plans of the city of Des Moines to incorporate the
DistricYs 2015 Capital Facilities Plan.
2. Name of applicant:
Federal Way School Dish-ict No. 210.
3 Address and phone number of applicant and contact person:
Federal Way School District No. 210
33330 Sth Avenue South
Federal Way WA 98003
(253) 945-2000
Contact Person. Ms. Tanya Nascimento
Enrollment and Demographics
Telephone: (253) 945-2071
4 Date checklist prepazed:
May 2, 2014
5. Agency requesting checklist:
Federal Way School District No. 210
6. Proposed timing or schedule(including phasing, if applicable):
The Federal Way School DistricYs 2015 Capital Facilities Plan is scheduled to be adopted by the
District in June 2014. The Capital Facilities Plan will be forwazded to King County, the City of
Federal Way, City of Kent and the City of Auburn for inclusion in each jurisdicrion's
Comprehensive Plan. It will also be forwazded to the city of Des Moines for possible inclusion in
this jwisdicdon's Comprehensive Plans. The District will continue to update the Capital Facilities
Plan annually The projeets included in the Capital Faciliries Plan have been or will be subject to
project-specific environmental review
7 Do you have any plans for future addirions, expansion, or further activity related to or
connected with this proposal? If yes, explain.
3
ENVIRONMENTAL CHECKLIST
The Capital Facilities Plan sets forth the capital improvement projects that the District is curredtly
implementing. This includes construction of Federal Way HS. Additionally the plaa cdvers the
purchase and siring of temporary facilities at various locarions. Current plans aze f6r all the
projects to be complete by 2016 with atbletic fields to be coiripleted by 2017
8. List any environmental information you I�ow about that has been prepared, or will be
prepared, directly related to this pioposal.
T'he projects included in the Capital Facilities Plan will undergo addirional environmental review,
when apprbpriate, as they ate developed.
9 Do you know whether applicarions are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
Permits will be applied for with the appmpriate jurisdicrion for minor projects during the 2015
calendar year
10. List any govemment approvals or pe�mits that will be needed for your proposal, if kndwn_
The District anticipates that King County, the City of Federal Way, the City of Kent and the city of
Aubum will adopt this Capital Facilities P3an into their Comprehensiv8 Plan. The city of Des
Moines may also adopt ttvs Capital Faciliries Plan irito the Capital Facilities Elements of their
Comprehensive Plans(when issued).
11 Give a brief, complete description of your proposal, including the proposed uses and the
size of the project and site. There are several questions later in this checklist that ask you to
describe ceitain aspects of your proposal. You do not need to repeat those answers on this page.
(L,ead agencies may cnodify this forin to include additional specific information on pmject
descriprion.)
This is a non-project action. This proposal involves the adoption of the Federal Way School
District's 2015 Capital Faciliries Plan for the purpose of planning the DistricYs facilities needs.
'The District's Capital Facili6es Plan will be incorporated into King County's, the City Federal
Way's, the City of KenYs and the City of Aubuin's Comprehensive Plans. It rriay also be
incorporated into the Comprehensive Plans of the city of Des Mdines. The projects included in the
Capital Facilities Plan have been or will be subj act to project-specific envirbnmental review
4
ENVIRONMENTAL CHECKLIST
12. Location of the proposal. Give sufficient information for a person to understand the
precise locarion of your proposed project, including a street address if any, and section, township,
and range, if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal desoription, site plan, viciniry map, and topographic map,
if reasonably available. While you should submit any plans required by the agency, you aze not
required to duplicate maps or detailed plans submitted with any pemrit applications related to this
checklist.
The Capital Facilities Plan will affect the Federal Way School Dish-ict. The District inciudes an
azea of approximately 35 square miles. The City of Federal Way, parts of the ciries of Kent, Des
Moines and Auburn, parts of wiinoorporated King County, fall within the District's boundaries. A
detailed map of the DistricYs boundaries can be viewed at the DistricYs offices.
5
ENVIRONMENTAL CHECKLIST
B. ENVIRONMENTAL ELEMENTS
1 Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, moUntainons,
other
The Federal Way School District is comprised of a variety of topograpHic land forms and
gradients. Specific topographic characteristics of the sites at which the piojects included in Yhe
Capital Facilities Plan aze located have been or will be identified daring project-level
environmental review when appropriate.
b. What is the steepest slope on the site(approximate percent slope)?
Specific slope characterisrics at the sites of the projects included in the Capital Facilities Plan
have been or will be idenrified during project-level environmental review
c. What genezal types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any prime
farmland.
5pecific soil types found at the sites of the projects included in the Capital Faciliries Plan have
been or will be identified during project-level environmental review when appropriate.
d. Are there surface indicarions or history of unstable soils in the immediate vicinit}/? If so,
describe.
Unstable soils may exist within the Federal Way School District. Specifio soil limitations on
individual project sites have been or will be identified at the time of project-level envirorimental
review when appropriate.
e. Describe the purpose, type, and approximate quanrities of any filling or gading proposed.
Indicate source of fill.
Individual projects included in the Capital Facilities Plan have been or will be subject, when
appmpriate, to project-specific environmental review and local approval at the tiiae of proposal.
Proposed �ading projects, as well as the purpose, type, quantity, and source of any fil]
maYerials to be used have been or will be identified at that time.
f. Could erosion occur as a result of clearing, construction, or use? If so, generelly describe.
It is possible that erosion could occur as a result of the conshucrion projects currently proposed
in the Capital Facilities Plan. The erosion impacts of the individua] projects have been or will
be evaluated on a site-specific basis at the time of project-specific environmental review when
appropriate. Individual projects have been or will be subject to local approval processes.
6
ENVII20NMENTAL CHECKLIST
g. About what percent of the site will be covered with impervious surfaces after project
construction(for exampie, asphalt or bixildings?)
The proposed renovation projects will require the construction of impervious surfaces. 1'he
extent of any impervious cover constructed will vary with each capital facilities project
included in the Capital Facilifies Plan. This issue has been or will be addressed during project-
specific environmental review when appropriate.
h. Proposed measures to reduce or control erosion, or other impacts to the earth,if any
The erosion potential of the projects inclyded in the Capital Faciliries Plan and appropriate
control measures have been or will be addressed during project-specific environmental review
when appropriate. Relevant erosion reduction and control requirements will be met.
2. Air
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile,
odors, industrial wood smoke) during construction and when the project is completed? If any,
generally describe and give approzimate quantiries if known.
Various emissions, many construction-related, may result from the individual projects included
in the Capital Facilities Plan. The air-quality impacts of each project have been or will be
evaluated during project-specific environmental review when appropriate. Please see the
Supplemental Sheet for Nonproject Actions.
b. Are there any off=site sources of emissions or odor that may affect your proposal? If so,
generally describe.
Any off-site sources of emissions or odor that may affect the individual projects included in the
Capital Facilities Plan have been or will be addressed during project-specific environmental
review when appmpriate.
c. Proposed measures to reduce or control emissions or other impacts to air, if any
The individual projects included in the Capital Facilities Plan have been or will be subject to
project-specific environmental review when approgriate and relevant local approval processes.
The Dishict will be required to wmply with a11 applicable air regulations and air permit
requirements. Proposed measures specific to the individual projects included in the Capital
Faciliries Plan have been or will be addressed during project-specific envimnmental review
when appropriate.. Please see the Supplemental Sheet for Nonproject Actions.
7
ENVIRONMENTAL CIiECHI.IST
3 Water
a. Surface:
1) Is there any surface water body on or in the nnmediate vicinity of the site (including
ye.ar-round and seasonal streams, saltwater, lakes, ponds, wetiands)? If yes, describe type
and provide names. If appropriate, state what stream or river it flows into.
There is a netv✓ork of surface water bodies within the Federal Way School District. The
surface water bodies that are in the immediate vicinity of the pmjects included in the
Capital Faciliries Plan have been or will be identified dvring project-specific environmental
review when appropriate. When necessary, the surface water regimes and flow paitems
have been or will be researched and inaorporated into the designs of the indivicival
projects.
2} Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes,please describe and attach available plans.
The projects included in the Capital Facilities Plan may reguire work near the surface
waters located within the Federal Way School District. Applicable local approval
requirements have been or will be satisfied.
3) Estimate the amount of fill and dredge materiel that would be placed in or removed
from surface water or wetlands and indicate the area of the site that would be affected.
Indicate the soisce of fill material.
Informarion with respect to the placement or removal of fill and dredge material as a
component of the projects included in the Capital Facilities Plan has been or will be
provided during project-specific environmental review when appropriate. Applicable local
regulations have been or will be satisfied.
4) Will the proposal require surface water withdrawals or diversions? Give general
description,purpose, and approximate guantities if known.
Any surface water withdrawals or diversions required in connection with the projects
included in the Capital Facili6es Plan have been or will be addressed daring project-
specific environmental review when appropriate.
5) Does the proposal lie within a 100-yeaz floodplain? If so, note location on the site
plan.
Each project included in the Capital Facilities Plan, if located in a floodplain azea, v✓ill be
required to meet applicable local regulations for flood areas.
6} Does the proposal involve any discharges of waste materials to surface waters? It
so, describe the type of waste and anUcipated volume of discharge.
8
ENVIRONMENTAL CHECKLIST
Specific information regarding the discharge of waste materials that may be required as a
result of the projects included in the Capital Facilities Plan has been or will be provided
during project-specific environmental review when appropriate. Please see the
Supplemental Sheet for Nonproject Actions.
b. Ground:
1) Will groundwater be withdrawn, or will water be dischazged to goundwater? Give
general description, purpose, and appm�cimate quantiries if known.
Individual projects includecl in the Capital Facilities Plan may impact groundwater
resources. The impact of the individual projects included in the Capital Facilities Pian on
groundwater resources has been or will be addressed during project-specific environmental
review when appropriate. Each project is or will be subject to applicable local regulations.
Please see the Supplemental Shaet for Nonproject Actions.
2) Describe waste material that will be discharged into the ground frbm septic tanks or
other sources, if any (for example: Domestic sewage; industrial, contauung the follorving
chemicals ., agicultural, ete.). Describe the general size of the system, the numbet of
such systems, the number of houses to be served (if applicable), or the numbei of anunals
or humans the system(s)are expected to serve.
The discharges of waste material that may take place in connection with the projects
included in the Plan have been or will be addressed during project-specific environmental
review
c. Water Runoff(including storm water):
1) Describe the source of runoff(including storm water) and method of collection and
disposal, if any(inclnde quanrities, if known). VJhere will this water flow? Will this water
flow into other waters? If so, deseribe.
Individual projects included in the Capital Faciliries Plan may have storm wates runoff
consequences. Specific information regarding the storm water impacts of each project has
been or will be provided during proje.et-specific environmental review when appropriate.
Each project is or will be subject to applioable local storm water regulations.
9
ENVIRONMENTAL CHECKLIST
2) Could w"aste materials enter ground or surface waters? If so, generally descrilie.
The projects included in the Capital Facilities Plan may result in the dischazge of waste
materials into ground or surface waters. The specific unpaots of each project on ground
and surface waters have been or will be identified during project-speoific �vironmental
review when appropriate. Each project is or will tie suliject to all applicable regularions
regazding the dischaxge of waste materials into ground and surface waters. Please see the
Supplea►ental Sheet for Nonproject Actions.
d. Proposed measures to reduce or control surface, gound, and rwioff water impacts, if any
Specific measures to reduce or control runoff impacts associated with the pmjects included in
the Capital Facilities Plan have been or will be addressed during project-specific environmental
review when appropriate.
4. Plants:
a. Check or circle types of vegetation found on the site:
deciduous tree: alder,maple, aspen, other
_ evergreen tree: fir, cedar,pine, other
shrubs
_ grass
_ pasture
_ crop or gain
_ wet soil plapts: cattail,buttercup,bullrush, skank cabtiage, other
_ water plants: water lily, eelgass, milfoil, other
_ other types of vegetation
A variety of vegetadve zones are located within the Federal Way School District. Inventories of
the vegetarion located on the sites of the projects proposed in the Capital Facilities Plan have
been or will be developed during project-specif c environmental review when appropriate.
b. What kind and amount of vegetarion will be removed or altered?
Some of the projects included in the Capital Facilities Plan may require the removal or
alterarion of vegetation. The specific impacts on vegetation of the projects inoluded in the
Capital Facilities Plan have been or will be identified during project-specific environmental
review when apprbpriate.
a List thr8atened or endangered species known to be on or near the site.
The specific impacts to these species from the individual projects included in the Capita]
Pacilities Pian have been or will be determined during project-specific environniental review
when appropriate.
10
ENVIRONMENTAL CHECKLIST
d. Proposed landscaping, use of native plans, or other measures to preserve or enhance
vegetation on the site, if any
Measures to preserve or enhance vegetation at the sites of the projects included in the Capital
Facilides Plan have been or will be identified during project-specific environmental review
when appropriate. Each project is or will be subject to applicable local landscaping
requirements.
5. Animals:
a. Circle any birds and animals which have been observed on or near the site or are known to
be on or neaz the site:
birds: hawk,heron, eagle, songbirds, other�
mammals: deer,beaz, elk, beaver, other:
fish: bass, salmon,trout, herring, shellfish, other•
An inventory of species that have been observed on or near the sites of the projects proposed in
the Capital Facilities Plan has been or will be developed during project-specific environmental
review when appropriate.
b. List any threatened or endangeted species known to be on or near the site.
Inventories of threatened or endangered species known to be on or neaz the sites of the projects
included in the Capital Facilities Plan have been or will be developed during project-specific
environmental review when appropriate.
c. Is the site part of a migration route? If so, explain.
The impacts of the pmjects included in the Capital Faciliries Plan on migrarion routes have
been or will be addressed during project-specific environmental review when appropriate.
d. Proposed measures to preserve or enhance wildlife,if any
Appropriate measures to preserve or enhance wildlife have been or will be determined during
project-specific environmental review when appropriate.
11
ENVIRONMENTAL CHECKLIST
6. Energy and Nahual Resources:
a. What kinds of energy(electric, natural gas, oil, wood stove, solar) wil] be used to meet the
completed project's energy needs? Describe whether it will be used for heating, manufacturing,
etc.
The State Board of Education requires the complerion of a (ife cycle cost analysis of all heating,
lighring, and insulation systems before it will permit specific school projects to proceed. The
energy needs of the pmjects included in the Capital Facilities Plan have been or will be
determined at the ame of specific engineering and site design planning when appropriate.
Please see the Supplemental Sheet for Nonproject Acrions.
b. Would your project affect the potential use of solaz energy by adjacent properties? If so,
generally describe:
The impacts of the projects included in the Capital Facilities Plan on the solaz potential of
adjacent projects have been or will be addressed during project-specific environmental review
when appropriate.
c. What kinds of energy conservation features are included in the plans of this proposal? List
other proposed measures to reduce or control energy impacts, if any
Energy conservation meastires proposed in connection with the projects included in the CapiYal
Facilities Plan have been or will be considered during project-specific environmental review
when appropriate.
7 Environmental Health.
a. Are there any environmental health hazards, inclyding exposure to toxic chemicals, risk of
fire and explasion, spill, or hazardous waste, that could occur as a result of this proposal? If so,
describe.
Please see the 5upplemental Sheet for Nonproject Actions.
1) Describe special emagency services that snight be recjuired.
Please see the Supplemental Sheet for Nonproject Actions.
2) Pmposed measutes to reduce or control environmental health hazazds, if any
The projects included in the Capital Facilities Plan will comply with all current codes,
standards, rules, and regulations. Individual projects have been or will be sub�ect to
projeot-specific edvironmental review and local approval at the time they are developed
when appropriate.
12
ENVIRONMENTAL CHECKLIST
b. Noise:
1) What types of noise exist in the azea which may affect your project (for example:
tr�c, equipment, operation, other)?
A variety of noises from traffic, construction, residential, commercial and industrial areas
exists within the Federal Way School District. The specific noise sources that inay affect
the projects included in the Capital Facilities Plan have been or will be identified during
project-specific envimnmental review when appropriate.
2) What types and levels of noise would be created by or associated with the project
on a short-term or a long-term basis (for example: traffic, consintcrion, operation, other)?
Indicate what hours noise would come from the site.
The District does not anticipate that the projects will create long-term increases in traffio-
related or operations-related noise levels.
3) Proposed measures to reduce or control noise impacts,if any
The prbjected noise unpacts of the projects inclpded in the Capital Facilities Plan have
been or will be evaluated and mitigated during project-specific environmental review when
appropriate. Each project is or will be subject to applicable local regularions.
8. Land and Shoreline Use:
a VJhat is the current use of the site and adjacent pioperties?
There are a variety of land uses within the Federal Way School District, including residential,
commercial, industcial, institutional,utility, open space, recreational, etc.
b. Has the site been used for agriculture? If so, describe.
The project sites covered under the Capital Facilities Plan have not been used recently for
agriculture.
c. Describe any structures on the site.
The structures located on the proposed sites for the pmjects included in the Capital Faciliries
Plan have been or will be identified and described during project-specific environtnental review
when appropriate.
13
ENVIRONMENTAL CHECKLIST
d. Will any structures be demolishe3? IF so, what?
The remodeling and renovarion projects will require the demolishment o£school structures. The
stnictares that will be demolished as a result of the projects included in the Capital Facilities
Plan have been or will be identified during project-specific environmental review when
appropriate.
e. What is the current zoning classification of the site?
The sites that aze covered under the Capital Facilities Plan have a variety of zoning
classifications under the applicable zoning codes. Site-specific zoning information has been or
will be identified during project-specific environmental review when appropriate.
f. What is the current comprehensive plan designation of the site?
Inventories of the comprehensive plan designations for the sites of the projects included in the
Capital Facilities Plan have been or will be completed during project-specific environmental
review when appropriate.
g. If applicable, what is the current shoreline master program designarion of the,site?
Shoreline master progam designations of the sites of the projects included in the C.apital
Facilities Plan have been or will be identified during project-specific environmental review
when appropriate.
h. Has any part of the site been classified as an "euvironmentally sensitive" area? If so,
specify
Any environmentally sensitive areas located on the sites of the projects ingluded in the Plan
have been or will be iiientified during project-specific environmental review
i. Approximately how many people would reside or work in the completed project?
The Federal Way School District currently serves approximately 22,200 students. The student
population is expected to increase to 23,000 by the yeaz 2021 This projectiop has been
adjusted to reflect the current economic conditions. The District employs approximately 3,200
people.
j. Approximately how many p�ple would the completed project displace?
Any displacement of people caused by the projects included in the Capital Facilities Plan has
been or will be evaluated during project-specific environmental review when apgropriate.
However, it is not anticipated that the Capital Facilities Plan, or any of the projects contained
iherein, will displace any people.
14
ENVIRONMENTAL CHECKLIST
k. Proposed measures to avoid or reduce displaceinent impacts, if ariy
Individual projects included in the Capital Faciliries Plan will be subject to project-specific
environmental review and local approval when appropriate. Proposed mirigating measures will
be proposed at that time,if necessary
1. Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any
The comparibility of the specific projects included in the Capital Facilities Plan with existing
uses and plans has been or will be assessed as part of the comprehensive planning process and
during project-specific environmental review when appropriate.
9 Housing:
a. Approximately how many units would be provided, if any? Indicate whether high, middle,
or low-income housing.
No housing units would be provided in connection with the completion of the projects included
in the Capital Facilities Plan.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
It is not anticipated that the projects included in the Capital Facilities Plan will eliminate any
housing units. The impacts of the projects included in the Capital Faciliries Plan on exisring
housing have been or will be evaluated during project-specific environmental review when
appropriate.
c. Proposed measures to reduce or control housing impacts, if any
Measures to reduce or control any housing impacts caused by the projects include.d in the
Capitai Facilities Plan have been or will be addressed during project-specific environmental
review when appmpriate.
10. Aesthetics:
a. What is the tallest height of any proposed structure(s), not including antennas; what is the
principal exterior building material(s)proposed?
The sesthetic impacts of the projects included in the Capital Facilities Plan have been or wil] be
addressed during project-specific environinental review when appropriate.
15
ENVIRONMENTAL CHECKLIST
b. What views in the immediate vicinity wouid be altered or obstructed?
The aesthetic impacts of the projects included in the Capital Facilities Plan have been or will be
determined during project-specific environmental review when appropriate.
c. Proposed measures to reduce ar control sesthetic unpacts, if any
Appmpriate measures to reduce or wntrol the aesthetic impacts of the projecu included in the
Capital Faciliries Plan liave been or will be determined on a project-specific basis when
appropriate.
11 Light and G1aze:
a. What type of light or glare wiil the proposa! produce? What time of day would it mainly
occur?
The light or glare impacts of the projects included in the Capital Faciliries Plan have been or
will be addressed during project-specific environmental review
b. Could light or glaze from the finished prbject be a safety hazard or interfere with views?
The light or glaze impacts of the projects included in the Gapital Facilities Plan have been or
will be addressed during project-specific environmental review when appropriate.
c. What existing off-site sources of light or glare may affect}roiu proposal?
Off-site sources of light oi glare that may affect the projects included in the Capital Facilities
Plan haue been or will be evaluated during project-specific environmental review when
apgropriate.
d. Proposed measures to reduce or control light and glaze impacts, if any
Proposed measures to mitigate light and glaze imgacts have been or will be addressed during
project-specific environxnental review when appropriate.
12. Recreation:
a. What designated and infonnal recreakional opporiuniries are in the immediate vicinity?
There are a variety of formal and informal recrearional facilities within the Federal Way School
Dish-ict.
16
ENVIRONMENTAL CHECKLIST
b. Would the proposed project displace any existing recrearional uses? lf so, describe.
The recreational impacts of the projects included in the Capital Facilities Plan have been or will
be addressed during project-specific environmental review when appropriate. The pr6jects
included in the Capital Facilities Plan, including proposed renovated school and support
facilities, may enhance recreational opportunities and uses.
c. Proposed measwes to reduce or control impacts on recrearion, including recreation
opporiunities to be provided by the project or applicant, if any
Adverse recreational effects of the projects included in the Capital Facilities Plan have been or
will be subject to initigation during pYoject-specific environmental review when appropriate. A
school site usually provides recreational facilities to the community in the form of play fields
and gymnasiums.
13 Historic and C�Itural Preservation:
a. Are there any places or objects listed on, or proposed for, natioual, state, or local
preservation registers known to be on or next to the site? If so, generally describe.
There aze no lrnown places or objects listed on, or proposed for such registeis on the sites of the
projects included in the Capital Facilities Plan. The existence of historic and cultural resources
on or next to the sites has been or will be addressed in more detai] during project-specific
environmental review when appropriate.
b. Generally describe any landmazks or evidence of historic, azchaeological, scientific, or
cultural importance lrnown to be on or next to the site.
An inventory of historical sites at or near the sites of the projects included in the Capital
Facilities Plan has been or will be developed during project-specific environmental review
when appropriate.
c. Proposed measures to reduce or control impacts, if any
Appropriate measures have been or will be proposed on a project-specific basis when
appropriate.
14. Transportation:
a. Identify public s�eets and highways serving the site, and describe proposed access to the
existing street system. Show on site plans, if any
The impact on public streets and highways of the individual projects included in the Capital
Facilides Plan has been or will be addressed dgring project-specific environmental review when
appiopriate.
17
ENVIRONMENTAL CHECKLIST
b. Is site cdrrently served by public transit? If noG, what is the approximate distance to the
nearest transit stop?
The relationship between the specific projects included in the Capital Faciliries Plan and public
ttansit has heen or will be addresse.d during project-specific environrnental review when
appropriate.
c. How many pazking spaces would the completed project have? How many would the
pmject eliminate?
An inventory of pazking spaces located at the sites of the projects included in the Capital
Facilities Plan and the impaots of specific projects on pazking availability has been or will be
conducted during project-specific environmental review when appropriate.
d. Will the proposal require any new roads or streets, or improvements to existing roads or
streets,not including driveways? If so, generally describe(indicate whether public or private).
The need for new sueets or roads, or improvements to exisring streets and roads has been or
will be addressed during project-specific environmental review when appropriate.
e. Will the project use(or occur in the immediate vicinity o fl water, rail, or air transportation?
If so, generally describe.
Use of water, rail, or air transportation has been or ivill be addressed during project-specific
environmental review when appropriate.
£ T-Iow many vehiculaz trips per day would be generated by the completed project? If known,
indicate when peak volnrimes wbuld occur.
The traffic impacts of the projects included in the Capital Facilities Plan have been or will be
addressed during pmject-specific environmental review when appropriate.
g. Proposed measures to reduce or control transportation impacts, if any
The mitigation of traffic impacts associated with the projects included in the Capital Facilities
Plan has been or will be addressed during project-specific environmental review when
appropriate.
15. Public Services:
a. Would the project result in an increased need for public services (for example: fire
protecrion,police protection,health caze, schools,other)? If so, generally describe.
The District does not anticipate that the projects identified in the Capital Facilities Plan will
substantially increase the need for other public services.
b. Proposed measwes to reduce or control direct impacts on public services,if any
18
ENVIRONMENTAL CHECKLTST
Remodeled/renovated school or facilities will be built with automatic security systems, fire
alarms, smoke alazms,heat sensors, and sprinkler systems.
16. Utilities:
a. Circle urilities currendy available at the site: electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other.
Electricity, natural gas, water, refuse service, telephone, and sanitazy sewer utilities aze
available at the sites of the projects proposed in the Capital Facilities Plan. The types of utilities
available at specific project sites have been or will be addressed in more detail during project-
specific environmentai review when appropriate.
b. Describe the udlities that are proposed for the project, the utility providing the service, and
the general construcdon activities on the site or in the immediate vicinity wtiich might be
needed.
Utility revisions and construction needs have been or will be identified during prbject-specific
environmental review when appmpriate.
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the lead
agency is relyin on them to ma s decision.
Signature:
Date Subinitt : May 2, 2014
19
ENVIRONMENTAL CHECKLIST
D SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project acrions)
Because these questions aze very general, it may be helpful to read them in conjunction with the
list of the elements of the environment.
When answering these questions, be aware of the eictent the proposal, or the types of acrivities
likely to result from the proposal, would afFect the item at a greater intensity or at a faster rate than if the
proposal were not implemented. Respond briefly and in general teims.
1 How would the pmposal be likely to increase dischazge to water; emissions to air;
production, storage, or release of toxic or hazazdous substances; or production of noise?
To the extent the Capital Facilities Plan makes it more likely that school facilities will be
constructed and/or renovated and remodeled, some of these environmental impacts will be more
likely Additional impermeable surfaees, such as roofs, parking lots, sidewalks, access roads,
and playgrounds could increase storm water nxnoff, which could enter surface or ground waters.
Heating systems, emergency generators, and other school equipment that is installed pursuant to
the Capital Facitities Plan could result in air emissions. The projects included in the Capital
Facilities Plan should not require the production, storage, or release of toxic or hazardous
substances, with the possible exception of the storage of diesel fuel or gasoline for emergency
generating equipment. The District does not anticipate a significant increase in the producrion
of noise from its facilities, although the projects included in the Capital Facilities Plan will
increase the District's student capacities.
Proposed measures to avoid or reduce such increases aze:
Proposed measures to mitigate any such increases described above have been or will be
addressed during project-specific environmental review when appropriate. Storm water
detention and runoff will meet applicable County and/ar City requirements and may be subject
to National Pollutant Discharge Eliminarion System ("NPDES") perxnitting requirements.
Discharges to air will meet applicable air pollution control requirements. Fuel oil will be stored
in accordance with local and state requirements.
2. How would the proposal be likely to affect plants, animals, fish, or marine life?
'The Capital Facilities Plan itself will have no imp"act on these elements of the environment.
These impacts have been or will be addressed in more detail during project-specific
environmental review when appropriate. T'he projects included in the Plan are not likely to
geaerate severe impacts on fish or marine life.
20
ENVIRUNMENTAL CHECKLIST
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
Specifio measures to pibtect and wnserve plants, animals, and fish gannot be identified at this
tiine. Specific mitigation proposals have been or will be identifred, however, during project-
specific en4irbntnental review when appropriate.
3 How wodld the proposal be likely to deplete energy or natura] resources?
The constrncrion of the projects included in the Capital Facilities Plan will require the
cdnsnmpdon of energy.
Proposed meas�ues to protect or conserva energy and naturai resources are:
The projects included in the Capital Facilities Plan wiil be constructed in accordanoe with
applicable energy efficiency standazds.
4. How would the proposal be likely to use oz af'fect environmentally sensitive areas or areas
designated (or eligible or under study) for govemmedtal protection; such as pazks,wilderness,wild
and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands,
floodplains,or prime farmlands?
The Capital Facilities Plan and individual grojects wntained therein should have no impact on
these resources.
Proposed measures to protect such resources or to avoid or reduce impacts are:
Appropriate measures have been or will be proposed during project-specific envimnmental
review when appropriate. Updates of this Plan will be coordinated with King County and the
ciues of Federal Way, Kent, Des Moines, and Aubum as part of the Crrowth Management Acf
process, one of the pwposes of which is to protect envirbnmentally sensitive areas. To the
eactent the Dishict's faeilities planning process is part of the overall growth manage;nent
planning process,these resources are more likely to be protected.
5. How wbuld the proposal be likely to affect land and shoreline use, including whether it
would atlow or encourage land or shoreline uses incompataible with existing plans?
The Capital Facilities Plan will not have any impact on land or shoreline use that is
incompatible with existing domprehensive plans, land use codes, or shoreline management
plans. The District does not anticipate that the Capital Facilities Plan or the pmjects contained
therein will directly affect land and shoreline uses in the azea served by the bistrict.
Proposed meastires to avoid or reduce shoreline and land use impacts are:
No measures to avoid or reduce land use impacts resulting from the Capital Facilities Plan o�
the projects coritained therein aze proposed at this rime.
21
ENVIRONMENTAL CHECKLIST
6. How would the proposal be likely to increase demands on transportarion or public services
and urilities?
The projects included in the Capital Facilities Plan may create temporary increases in the
DistricYs need for public services and utilities. Upon the completion of the projects included in
the Capital Facilities Plan, however, the District does not anticipate that its need for public
services and utilities will increase substantially beyond existing]evels.
Proposed measures to reduce or respond to such demand(s) are:
No measures to reduce or respond to such demands aze proposed at this time.
7 Identify, if possible, whether the proposal may conflict wiYh local, state, or federal laws or
requirements for the protection of the environment.
The Capital Facilities Plan will not conflict with any laws or requirements for the protection of
the environment.
22
� ( � � � � ��� 1 �� i
t , , 9 r 1 { i i � � ° '
� � } ] � j I � � � I ti � �
,
<< � '_.-� � _� `� '� �j� _ _ _1 . �' - f - � -i '� - � - '_� i
,J � ' � _
�_ � j �_ �� .�
� ' � � r� , � , . 1 ,
i�a� . l�� a: � �a?c�_ _>; _'���� � �a_�ni
s
��� � a ��� � - ��� � g ����
TM
� �
SCHOOL
DISTRICT
April 2014
' J ;' f � \ � �j ; �S
� � � - { �' � �' � i I � � � � �:
� _i � . � � t , � - � � ^ � � ''
� � �` J' � � ._ _...� _� � ,�__. � .__ � .
� �a , ; � �� �' '�' I
; � ' � � ' , _, ?
i �a :i� � � ��;c'. _:�� ���� s= a�n�
_ _ � _
- - -' - -f - - ./� _ � ' - - -- -
��� ����� �✓ � 6�a�� �4����
TM
�� �
SCHCJOL
DISTRICT
ApriC 2014
" i
q � ��
� �� } � � a j ; fi '
� � ' �� — ' ; � ; p � i r ; , s :
; i � i s _�
, ' � � i
-� - � �.� ` .9 � � � � ; 'i ` � � � , ' j a � fi j �
� ' '_� � ,. � --_i . j _� ...�'� -:� - . ��' __3 �,'� ... � _..1 _.- r
�'� � �Om�9 � V@'8����� ���4J�LS��'�� ��P��
Z014-2015 � 2019 - 2020
April 20'�4
Kent Schooi District No. 415
12033 SE 256'"Street
Kent, Washington 98030-6643
(253) 373-7295
����
5'L`HC7t3:v
Ct t�:RiC7
BOARD of DIRECTORS
Ms. Debbie Straus, President
Ms. Karen DeBruler, Vice President
Ms. Agda Burchard, Legislative Representative
Mr Russ Hanscom, Director
Ms. Maya Vengadasalam, Director
ADAAINISTRATION
Dr Edward Lee Vargas
Superirrtendent af Schoois
Dr Richard A. Stedry, Chief Business Officer
Ralph Fortunato, CSBS, Director of Fiscal Senrices
Fred Long, Director of Facilities Services
Gwenn Escher-Derdowski, Planning Administratar
Kerrt School Datrict Six-Year Capital FacilRies Plan April 2014
� �.
f
-_ : . , ,0 , Y , : . , ; ; ., , ' ' ' ,
'. � : : ; ; ` : :
Si.�2'earCap�itaC�FaciCties �Can
7a6Ce af Contents
Section Page Number
I Executive Summary 2
I I Six-Year Enroiiment Projection 8� History 4
I I I District Standard of Service 8
I V Inventory, Capaciiy & Maps of Existing Schools i l
V Six-Year Planning & Construction Plan—Site Map 14
V I Portable Ciassrooms 17
V I I Projected Classroom Capacity 18
V I I I Finance Plan, Cost Basis and Impact Fee Schedules 23
I X Summary of Ghanges to Previous Plan 31
X Appendizes 32
Kent School Dishiet S&-Year Cap(tal Fadlities Plan DRAFT April 2014
I Executive Summary
This Six-Year Capita! Facilities Plan (the "Pian") has been prepared by the Kent
School District (the "District") as the organization's capital facilities planning
8ocument, in compliance with the requirements of Washington's Growth
Management Act, King County Code K.0 C 21A.43 and Cfies of Kent,
Covington, Renton, Aubum, Black Diamond, Mapie Valiey, and SeaTac. This
annual Plan update was prepared using data available in the spring of 2014 for
the 2013-2014 school year
This Pian is consistent with prior long-term capital facilities plans adopted by the
Kent School District. This Ptan is not intended to be the sole planning document
for ail of the DistricYs needs. The District may prepare interim and periodic Long
Range Capital Facilities Plans consistent with Board Policies, taking into account
a longer or shorter time period, other factors and trends in the use of facilities,
and other needs of the District as may be required.
Prior Capital Facilities Plans of the Kent School District have been adopted by
Metropolitan King County Council and Cities of PCent, Covington, Aubum and
Renton and included in the Capital Facilities Plan element of the Comprehensive
Plans of each jurisdiction. This Plan has also been submitted to cities of Black
Diamond, Maple Valley, and SeaTac for their information and inclusion in their
Comprehensive Plans.
In order for impact fees to be collected in the unincorporated areas of Kent
School District, the Metropolitan King County Council must adopt this Plan and a
fee-imptementing ordinance for the District. For impact fees to be collected in the
incorporated portions of the District, the cities of Kent, Covington, Renton and
Aubum must also adopt this Plan and their own school impact fee ordinances.
This Capital Facilities Pfan establishes a standard of service in order to ascertain
current and future capacity While the State Superirrtendent of Public Instruction
establishes square footage guidelines for capacity, those guidelines do not
account for local program needs in the District. The Growth Management Act,
King County and Cily codes and ordinances authorize the District to make
adjustments to the standard of service based on specific needs for students of
the District.
This Plan includes the standard of service as established by Kent School District.
Program capacity is based on an average c�pacity and updated to reflect
changes to special programs served in each building. Portables in the capacity
calculation use the same standard of service as the permanent facilities.
(wminued)
Kent School Dlstrict Stz-Year Capltal FaGlttles Plan April 2014 Page 2
I Exscutive Summary ��orn���eu>
The capacity of each school i� the District is caiculated based on the District
standard of service and the existing inventory of permanerit facilities. l'he
District's program capacity of pertnanent faalities reflects program changes and
the reduction of class size ta meet the standard ot service for Kent School
District. Portables provide addftional transitional capacity
Kent School District is the fourth largest disfiot in the state. Enrollment is
eleetronically reported morithly to the Office of the Superintendent of Public
Instruction ("OSPI") on FoRn P-223. Afthough funding apportionment is based on
Annual Average Full Time Equivalent (AAFTE), enro(Iment on October 1 is a
widely recognized °snapshot in time" that is used to report the DistricYs
enrollment for the year as reported to OSPI.
The Board of Directors approved Full Day Kindergarten ("FDK") for all
Elementary Schools in 2011=12 and FDK projections are used to forecast
Kindergarten enrbllment in future years.
The District received authorization from the Office of Superintendent of Public
{nstruction to temporarily re-open the former Kent Elementary School at 317
Fourth Ave South in Kent. This facility will be used to house the kindergarten and
� early child education classes for both Kent and Neely-O'Brien Elementary to
alfeviate overcrowding at those schools. This bui{ding will re-open in fall 2014 as
the Kent Va{ley Early Leaming Center
The Distrid's standard of service, enrollment history and projections, and use of
transitional facilities are reviewed in detail in various sections of this Plan. The
District plans to continue to satisfy concurrency requirements through the
transitional use of portables.
A financing plan is included in Section V I I I which demonstrates the DistricYs
ability to implemeM tfiis Plan. Pursuant to the requirements of the Growth
Management Act, this Plan will be updated annuatly with changes in the impact
fee schedules adjusted accordingly
Kent School Dishict S�-Year Capital Fecillhas Plan Apol 2014 Page 3
I I Six-Year Enroliment Projection
For capital facilities planning, enrollment growth projections are based on cohort
survivai and student yield from documented residentiai construction projected
over the next six years. �s� reeie z� The student generation factor is the basis for
the growth projec6ons ftom new developments. �s�a�s�
King County live births and the DistrieYs relational percentage average were used
to determine the number of kindergartners entering the system. tsae Ten��� 8.67%
of 25,057 King Counry live births in 2009 is projected for 2,172 students expected
in Kindergarten for October 1, 2014 This is an decrease of 165 live births in King
County over the previous year �s�rearez�
Fuil Qay Kindergarten ("FDK") pragrams at all 28 elementary schools require an
adjustment to the Kindergarten forecast for projeeting FDIC at 1.0 FTE for capital
facilities planning. P-223 Reports will continue to include FDK students at 1.0 for
twelve schools with FDK funded by state apportionment, and all other
kindergarten students will be reported at .5Q FTE for state funding in 2013-2014
Early Chitdhood Education stuiients (also identified as "ECE'}, "Preschool
Inclusive Education ("IE") students are forecast and reported to OSPI separately
on Form P-223H for Specia! Education Enrollment. Capaciiy is reserved to serve
students in the ECE programs at elementary schools.
The first grade population of Kent School District is traditionally 7 - 8% larger
than the kindergarten population due to growth and transfers to the District from
private kindergartens. Cohort survival method uses historical enrollment data to
forecast the number of students projected for the following year Projections for
October 1, 2014-2019 are from OSPI Report 1049 — Determination of Projected
Enrollments.
Within practical limits, the District has kept abreast of proposed developments.
The District will cantinue to track new develapment activity to determine ir»pact to
schools. Information on new residential developments and the completion of
these proposed developments in all jurisdiations wifl be considered in the
DistricYs future analysis of growth projections.
The Kent School District serves eiglit permitting jurisdictions: unincorporated
King County, the cities of Kent, Cavington, Reriton, and Auburn and smaller
portions of the cities of SeaTac, Black Diamond, and Maple Valley
rconsnuea)
Kent School District Sbc-Year Cap'�tal Fadlities Plan Aprii 2014 Page 4
1 I Six -Year Enroliment Projection �c«m„�
STUDENT GENERATION FACTOR
"Student Factor" is defined by King County code as "the number derived by a
school district to describe how many students of each grade span are expected
to be generated by a dwelling unit" based on district records of average actual
student generated rates for developments completed within the last five years.
Following these guidelines, the sfudent generation rate for Kent School District is
as follows:
Single Family Elementary 484
Middle School 129
Senior High .249
Total 862
Multi-Famiiy Elementary .324
IVliddle School .Q66
Senior High .118
Total .508
The student generation factor is based on a survey of 2,163 single family
dwelling units and 1,478 multi-faniily dwelling units with no adjustment for
occupancy rates. Please refer to Appendix E on Page 36 of the Capita{ FacilRies
Plart for details of the Student Generation Factor survey
The actual nurriber of stude�ts in those residential developments was determined
using the District's Education Logistics (EDULOG) Transportation System v�ihich
provides a count of enrolted students in identifiable new development areas.
KeM School Distrid Sa-Year Capital Faalities Plan April 2014 Page 5
KENT SCHOOL DISTRICT Mo. 415
OCTOBER REPORT 1251 H (HEADCOUNT) ENROLLMENT HISTORY
l�.B=LNe Bl�ihs LB n 1999 LB M zOW LB In 2001 l6ln 2002 LB M 20W LB in�4 LB in 20p3 IB N 2006 LB In 2d17 LB in 2DOB
October HC Enrdlment 2004 2005 2008 2007 2008 2009 2010 2011 2012 2073
Idnp Caunry Ltve BatDs� 22.p07 22.487 21.778 21.883 22,431 22,874 22.880 24,244 24,899 25,712
Incresse/Oecrease -205 480 -709 85 5B8 443 794 1,564 855 323
Kindatparten I Blrlh%' 8.34% 8.41% 8.23°k 8:30°k 8.4796 8.33% 8.13% 8.18% 8.57°/a 8.40%
Klndergarten 1836 1992 t793 1b75 1901 1905 1845 1983 2134 2119
Gr2de 1 1,958 1939 2009 1878 1923 196t 1996 1888 2017 2186
Grade 2 1,937 1985 2001 2051 1918 �966 is42 2016 1905 2055
Grade 3 2,023 1967 2031 2036 2087 1977 2002 1983 2062 1922
Orede 4 2,059 2031 2017 2052 2066 2052 7956 2024 2000 2087
Grade 5 2,709 2097 2057 2023 2050 2091 2086 1974 2044 2008
Gf2dB 6 2,145 2173 2708 F705 2062 2075 2135 2135 2028 2079
Grade 7 �uam,su„a 2,z47 2206 22oe 2198 2122 21t7 2095 2105 2739 2048
Gf2de 8 " " 2,225 2297 2267 2185 2148 2173 2153 2111 2138 2121
Grade 9-SenlorHiph 2,709 2774 2782 2564 2579 2472 2440 2471 2455 2483
G�ade 10 2.131 2179 2218 2481 2248 2217 2238 2272 2092 2046
Grede 11 1;974 te�o 1962 1962 2059 2046 2048 799b 1933 1873
Grdde 12 1,538 1560 1555 5576 t648 1712 1894 1858 1646 1538
7otal EnrollmerA' 28,891 28,970 28,996 26,882 28,831 26,764 28,630 26,815 26,811 26.563
Yearly Headcourrt
Irxaeaea/Detrease M2 79 26 -134 -31 -87 -134 -15 -4 -0B
Cumutstive lncrease M2 527 547 413 382 315 181 766 162 714
7 Thls number hMicales aclual births In IQng County 5 yea/s prbr to enrolhnent year es uplated by WaeM1i�gton State DeparhneM M
H�Ith.CeMer for Health Statlsfics.KeM School Dislrki percenlaBe beeed an edual qrMeigerten eruolM�ent 5 years Wter.
2 Enrollment repmteU to Ne s(ale on form P-223 generates baek educelion fuMing a�exGudes Earty ChiltltrooU Edueation
("ECE"8'B2"a Birth to 2 Preschool Indusive Educetion)erW college-ony Running Start stude�s.
Kent School DlsWct Six-V�r Capflel FacJlUes Plen Teble 1
Ap�ll 2014 Page 8
ICENT SCHOOL DISTRICT No.415
SIX-YEAR ENROLLMENT PROJECTION
Full Day KifWB�g9nen et all Elam LB in 2�8 I.B in 2008 LB in 20�o LB in 2017 LB In 2Dt2 CB Est 207s LB Est.207�
.ACTUAL. P. R O J E C T I. O N
October 20'!3 2b14 2015 2016 2017 2016 2019
King County Live BiAhs' 25,222 25,057 24,514 24,630 25,032 25,890 26,490 '
IncreaealDacrease 323 -185 -543 NB 402 858 600
Kindergarten/Birth °h � 8.40% 8.67°k 9.08% 926% 9.33% 923°h 9.23%
FD Kindergarten� 1.0 2119 2,172 2,227 2,281 2,336 2;390 2,445
Grade 1 2186 2,179 2,234 2,291 2,346 2,403 2,459
Grade 2 2055 2,208 2,201 2,256 2,314 2,369 2,427
Grade 3 1922 2,101 2,257 2,250 2,306 2,366 2,422
Grade 4 2087 1.920 2,098 2;254 2,247 2,303 2,363
Grade 5 2008 2,108 1,940 2,120 2,277 2,270 2,327
Grade 6 2079 2,048 2,15d 1,979 2,162 2,323 2;315
Grade 7 2046 2,088 2,057 2,160 1,988 2,172 2,333
Grade 8 2121 2,069 2,111 2,080 2,184 2,010 2,196
Grade 9 2483 2,438 2,378 2,426 2,391 2,510 2,310
Grade 10 2046 2,175 2,134 2,081 2,123 2,093 2,197
Grede 11 1873 1,830 1,945 1,908 1,861 1,898 1,872
Grade 12 1538 _ 1,532 1,497 1,591 1,561 _ 1,522. _ . 1,553
Totai Enrolimerrt Projection' 26,563 26,868 27,229 27,677 28,096 28,629 29,219
Yearlyln9rease/Decrease 3 305 sev aas atia �a 5eo
Yearly lncreaSBlDeaea58% 1.15% 1.34% 1.65% 1.51% 1.90% 2.O6Yo
TotaLEnrollment Pro'ection 28,563 26 868 27,229 27,677 28,086 28,629 29,219
� Kindergarten enrollment prvJection ta 201415 basetl on Kent SD percantage of iive births in Kirre CourRy Me years previous.
2 Kindergarten projecNon is calculated by using the Distrid's previous year perwMage M King Courtty births five years eaAier
canpared to actual kindergarten enrollment in ihe previous year.(Exdudea ECE-EaAy Guldhocd Educedon prasd+oolers)
' Headcount ProjacGons tor 2014-2018 from OSPI Report 1049-DetertninaCmn of Pro)ected Enrollmerrts
4 OcL 2013 P223 HeadcauM is 28,583&FTE 25,745.Full HeadwuM with ECE Preschool&Running Start etudents=27,945.
G R O W T H P R O J E C T I 0 N S - Ad'ustments for ouRent economic factors
For facilities planning purposes, this six-year enroilment projection anticipates conservative enrollment
growth from new development CURently in some phase of planning or consiruction in the district
Kent School DisMct S�c-Vear Capifai Pacilides Plan Table 2 nPm zo�a a�a �
III Current Kent School District °°Standard of Service"
In order to determine the capacity of facilities in a school district, King County
Code 21A.06 references a "standard of service" that each school district must
establish in order to ascertain its overafl capadty The standard of service
identifies the program year, the c.lass size, the number of classrooms, students
and programs of special need, arid other factors determined by the district which
would best serve the student population.
This Plan includes the standard of service as established by Kent School Disfrict.
The District has identified schools with sign�cant special needs programs as
"impact" schools and the standard of service targets a lower class size at those
facilities. Portables included in the capacity calculation use the same standaM of
service as the permanent facilities. (see append�x a, e a c)
The standard of service defined herein wil! continue to evolve in the future. Kent
School District is continuing a long-term strategic planning process combined
with review of changes to capacity and standard of service. This process will
affect various aspects of the District's standard of seroice and future changes wil!
be reflected in future capital facilities plans.
Current Standards of Service foc Elementary Students
Class size for Kindergarten is planned for an average of 23 or fewer students.
Class size for grades 1 - 3 is planned for an average of 23 or fewer students.
Class size for grades 4 - 6 is planned for an average of 27 or fewer students.
Class size for Kindergarten and grade 1, for schools that qualify for high poverty
funding (18 elementary schoo�s for 2014-15) is planned for an average of 20 or
fewer students.
All elementary schools meet the criteria required to provide full day kindergarten
programs (FDK = Full Day Kindergarten) with the second haff of the day funded
by state apportionment or the Educational Programs and Operatio�s Levy I
Twelve schools with FQK Programs have state apportionment funding. �
Some special programs require specialized classroom space and the program
capacity of some af the buildings housing these programs is reduced. Some
students, for example, leave their regular classroom for a short period of time to
receive instruction in special programs and space must be allocated to senre
these programs.
Some s#udents have schedufed time in a computer lab. Students may also be
providad music instruction and physical education in a separate classroom or
facility
KeM School D(strict Siz-Year Capftaf Facilities Plan Apd! 2014 Page 8
Some identified students will aiso be provided educational opportunities in
classrooms for special programs such as those designated as foflows:
English Language Leamers (E L L)
Education for Disadvantaged Students (Title I} — Federal Program
Leaming Assisted Programs (LAP) — State Program
Highly Capable Students-State Program
Reading, Math or Science Labs
inciusive Education Service for Elementary and 5econdary students with
disabifities may be provided in a separate or self-contained classroom sometimes
with a capacity of 1�-15 depending on the program:
Early Childhood Education {ECE) -3-4 yr old students with disabilities
Tiered Intervention in Inc{usive Education Support Center Programs
Integrated Programs & Resource Rooms (for speciat remedial assis#ance)
Self-contained Inclusive Educafion Support Center Frograms (SC)
Schoal Adjustmen# Programs for students with behavioral disorders (SA)
Adaptive Support Center for Mild, Moderate & Severe Disabilities(ASC-oD)
Speech & Language Therapy & Programs fo� Hearing Impaired students
Occupational & Physical Therapy Programs (OT/P�
The Outreach Program (TOP) for 18-21 year old secondary students
Some newer buildings have been constructed to accommodate most of these
programs; some older buildings have been mod�ed, and in some circumstances,
these modifications reduce the classroom capacity of the buildings. VVtien
programs change, program capacity is updated to reflect the change in program
and capacity
Current Standarcis o#Service for Secondarv Students
The standards of service outlined below reflect only those programs and
educational opportunities provided to secondary students which directly affect the
capacity of the school buildings.
Class size for grades 7 —8 is planned for an average 6f 28 or fewer studerits.
Class size for grades 9- 12 is planned for an average of 30 or fewer students.
Similar to Incfusive Education Programs listed above, many other secondary
programs require specialized classroom space which can reduce the program
capacity of the permanent school buildings.
Kent School District Siu-Year Capitel FacAitles Plan AprN 2014 Pa9e 9
Iderrtfied secondary students wiil also be provided other educational
opportunities in classrooms for programs designated as follows:
Computer, Multi-Media &Technology Labs 8 Programs
Techno{ogy Academy at Kent-Meridian High School & Milf Creek Middle School
Science Programs & Labs — Biology, Chemistry, Physics, Oceanography,
Astronomy, Meteorology, Marine Biotogy, General Science, etc.
English Language Leamers (E L l)
Music Programs— Band, Orchestra, Chorus, Jazz Band, etc.
Art Programs—Painting, Design, Drawing, Ceramics, Pottery, Photography, etc.
Theater Arts—Drama, Stage Tech, etc.
Joumalism and Yearbook Classes
Highly Capabie (Honors or Gifted) and Advanced Placement Programs
Intemationai Baccalaureate (°I B") Program
JROTC -Junior Reserve Officers Training Corps
Career&T�hnical Education Programs (CTE-Vocational Education)
Family 8 Consumer Saertce—Cufinary Arts, Sewing, Careers w/Children/Educ., etc.
Child Development Preschool and Daycare Programs
Health& Human Services—Sports Medicine, Sign Language, Cosmetology, eYc.
Business EduCation — Word Processing, Accounting, Business law 8� Math,
Marketing, Economics,Web Design, DECA, F6LA(Future Business Leaders).
Technicai & Industry — Woodworking, Cabinet Making, Buiiding Trades, Metals,
Automotive 8 Manufacturing Technology, Weiding, DraRing, Drawing, CAD
(Computer-aided Design), Efectronics, Engineering& Design,Aviation,ASL, etc.
Graphic & Commercial Arts, Media, Photography, Theater & Stage, Ag 8
Horticuliure.
Kent Phoenix Academy — Performance Leaming Center, Gateway, Virtual High
School 8� Kent Success program with evening dasses for credit retrieval
Space or Classroom Utilization
As a resuft of scheduling conflicts for student programs, the need for specialized
rooms for certain programs, and the need for teachers to have a wbrk space
during their planning periods, it is not possible to achieve 100% utilization of
regular teaching stations at secondary schools. Based on the analysis of actual
utilization of classrooms, the District has determined that the standard utilization
rate is 85°� for secondary schools. Program capacity at elementary schools
reflects 100% utilization at the elementary level.
Kent School Distrid Six-Year Caplpl FacilR3es Plan Aprll 2014 Page 10
I V Inventory and Capacity of Existing Schools
CurrenNy, the District has permanent program capacity to house 27,475 students
and transitional (portable) capaciiy to house 1,143. This capacity is based on the
District's Standard of Service as set forth in Section T I I. Included in this Plan is
an inventory of the DisficYs schoots by type, address and current capacity (see
rad�s 3 on Page �2). The ratio between permanent capacity and portable capaciiy is
96%-4%.
The program capacity is periodically updated for changes in programs, additional
classrooms and new schools. Program capacity has been updated in this Pfan to
reflect program changes implemented in the Fall of 2013.
For the 2014-15 school year and beyond the state has mandated lower class
sizes in 18 elemerrtary schools that are cfassifted as high poverty The new class
size in grades K-1 will be 20 students for every teacher This is a reduction of 3
students per dass from the district's current standard of service. The overall
effect for those schaols is to reduce capacdy districtwide by 342 studen#s (ses
Table 3A on Page 92A).
Calculation of Elemerrtary, Middle School and Senior High School capacities are
set forth in Appendices A, B and C. The calculation for Elementary School
capacity for 2014-15 is shown in Appendix A-1 A map of existing schools is
included on Page 13.
For clarification, the following is a brief description of some of the non-traditional
programs for students in Kent School District:
Kent Mountain View Academy serves Grades 3 — 12 with transftion, choice and
home school assistance programs. It is located in the former Grendview Schooi
in the westem part of the district in Des Moines. This school was originally
designed as an elementary school and is included in the etemerrtary capacity for
this Plan.
Kent Phoenix Academy is a non-traditional high school which opened in Fall
2007 in the renovated site and building that formeriy seroed Sequoia Middle
School. Kent Phoenix Academy has four specia.l programs including the
Performance Leaming Center, Gateway, Yrtual High School and Kent Success.
iGrad - In parfiership with Green River Community College, Kent Schoal District
has pioneered the Individualized Graduation and Degree Program or °iGrad"
iGrad offers a second chance to students age 16-21 who have dropped out of
high school and want to earn a high school diploma, iGrad is not included in this
Capital Facili�es Plan because it is served in leased space at the Kent Flill Plaza
Shopping Center Over the past two years, enrollmerrt in the iGrad program has
averaged over 400 students.
KeM School Distric[Sa-Year Capital Faalities Plan Apdt 2014 Page 11
KENT SCHOOL DISTRICT No.415
INVENTORY and CAPACITY of EXISTING SCHOOLS
20'13-14
Year
SCHOOL openea p,BR ADDRESS Progrem
- — -- - .__..- -- --
Ca ac'
Carriage Crest Elementary 1990 CC 16235-140M Avenue SE, RenOon 98058 452
CeOer VaAey Elemarrtary 1871 CV 26500 Timberlene Way SE, Covington 98042 360
CovingWn�ementary 1961 CO 17070 SE Wax Roed, Covington 98042 504
Cresrirood Elernentary 1980 CVJ 25225-180th Avenue SE, Covington 98042 432
East Hill ElemeMary 1953 EH 9825 S 2401h SUeet, KeM 98031 4gp
Emerald Patk 1999 EP t t B00 SE 216th SUeel, Kent 98031 504
Fainvood ElemeMary 1969 FW t6600-748th Avenue SE, Renton 98058 408
George T.Darriel Elementary 1992 DE t 1310 SE 248M Street, Kert 98030 456
Glenridge ElemeMary 1998 GR 194D5-120th Avenue 5E,Rerrton 98058 458
Grasa Lake dementary 1971 GL 28700-191st Place SE. KerR 96042 452
Horizon EJementary 1990 HE 27641-144M Avernm SE, KeM 98042 504
Jenkins Cr�c Elementary 1987 JC 26915-1 B6th Avenue SE, Covfngtun 98042 404
Kenl Elementary 1999 KE 24700-64Th Avenue South, Ifent 98032 480
Lake Youngs Elementary 1965 LY 19660-142nd Rvenue SE, KeM 98042 510
Mertln Sortun Eiemerrtary 1987 MS 12711 SE 248th Street, Kent 98030 480
Meadow Ridge Elementery 1994 MR 27710-106th Avenue SE,KerR 98030 476
Merldian Elemenfary 1939 ME 25621-140th Avenue SE, Kerrt 98D42 524
Millennfum EfemeMary 2U00 ML 11919 SE 270ih Street, Kent 98030 504
Neely-O'Brien Elementary 1990 NO 6300 SoWh 236th Slreet, Kerrt 98032 480
PaMher Wke Elementary 2009 PL 20831-108fh Avenue SE, Kerrt 96031 524
Park Orchard�ementary 1963 PO 11 U10 SE 232rM Street, ICeM 98031 486
Pine 72e Elemerrtary 1867 PT 27825-1181h Avenue SE, Kent 98030 514
Ridgewoud Elemerrtary 1987 RW 18030-162�d Place SE, ReMon 98058 504
Sawyer Wootls Elementary 1994 SW 31135-228th Ave SE,Bladc DiamorW 98010 504
Scenic Hi0 Elementary 1960 SH 26025 Woodland Way South, KeM 9803U 476
Soos Creek ElemeMary 1971 SC 12651 SE 218Ih Place, Kenl 98031 380
Springbrook Elemerrtary 1969 SB 20035-700th Avenue SE, Kerrt 98031 418
Sunrise Elementary 1992 SR 22300-132rM Avenue SE, Kent 98042 504
Elementary TOTAL 13,206
Cedar HeigMs hLddle School 1993 CH 19640 SE 272 Street,Covington 98042 885
Mattson N6ddle School 1961 MA 16400 SE 251 st Street, Covington 98042 T8T
Meeker Middle School 1970 MK 12600 SE 192nd Suaet, Rerrton 98058 832
Meridian Mkidle School 1958 MM 23480-120tli Avenue SE, Kent 98031 78S
Mill Creek Middle School 2005 MC 620 North CeMrel Avenue, KeM 98032 816
Northwood Middle School 1996 NW 17007 SE 1841h SVeet Renton 98058 926
Middie School TOTAL 5,146
Kent-Meridian High Scbool 1951 KM 10020 SE 256th SVeet, Kent 9803D 1,904
Kentlake Senior H3gh School 1987 KL 21401 SE 300th Sheet,KeM 88042 7,g57
Kentridge Senior High Sdiool 1968 KR 12430 SE 206th Sheet, Kerrt g8031 2,277
Kentwood Senior High Sdiool t 981 KW 25800-164th Avenue SE, Cwington 98042 2,759
Sanior High TOTAL g�yy�
Kent Mourrtain�ewAcademy 1997 NIVlLC 22420 MilRary Roatl, Des Moinas 98198 410
Kent Phoena Academy 2007 PH 11000 SE 264th Street, KeM 98030 414
DISTRICT TOTAL 27 475
KeM School Dfshict S&-Year CapHal Fadlrties Plan Table 3 nP��i zoia Pege �z
f�NT SCHOOL DISTRICT No.415
INVENTORY and CAPACITY of EXISTING SCHOOLS
2014-2015
Year
SCHOOL opened qBR ADDRESS Program
Ca
Carriege Creat Elemerrtery 1990 CC 7 8235-140th Avenue SE, Rerrton 98058 456
Ceder Valley�ementary 7 871 CV 26500 Timbarlane Way SE, CoWngton 98042 364
Covingfon Elementary 1961 CO 17070 SE Wak Roed, Covington 98042 488
CresN+oad Elementa�y 1980 CVJ 25225-1 BOth Avenue SE, Covington 98D42 432
Eest Hill 9emertlery 7953 EH 9825 S 240th Street, KeiG 980.31 466
EmereW Park 1999 EP 11800 SE 216th Straet, Kent 96031 484
Fafr�wod Elamerrtery 1969 FW 16600-146th Avenue SE, Rerrton 96058 408
Gaorge T.Daniel Elertiar�tary 1992 DE 11310 SE 248th Street, Kent 98030 428
Glenridge ElemeMary 1998 GR 19405-120th Avenue SE.,ReMon 98058 438
G2ss Lake�ementary 197� GL 28700-'191 st Place SE, Kerrt 98042 438
Horizon EkmeMary 1990 HE 27B41-144M Avenue SE, KeM 98042 477
Jenkins Creek Elemerdery 1987 JC 26915-186th Aven�SE, Covington 98042_ _ 459_ .
Kerrt Elementery 7999 KE 24700-64th Avenue South, Kent 98032 460
Lake Yowga ElemeMary 1965 LY 19660-142nd Avenue SE, Kerrt 98042 510
Martin Sortun Elementary 1987 MS 12711 SE 2481h Sbeet, Kent 98030 452
Meadow Rldge Eiemernary 1994 MR 2771�-108fh Aven�SE,Kent 98030 440
Meridtan FJamentary� 1939 ME 25621-140th Avenue SE, Kent 98042 524
Milennfum demerMsry Z000 ML tt919 SE 270th Street, Kent 96030 484
Neey-O'Brien EMmerkery 1990 NO 6300 South 2361h Street Kent 98032 460
PaMher Lake Elemantary 2D09 PL 20631-1 OBth Avenue SE, Kent 98031 504
Perk Orcharcf Elementary 1963 � PO 11U10 SE�232�Street,�Kerit 88031 476
Pine Tree Elementary 1967 PT 27825-118th Avenue SE, Kerrt 96030 477
Ridgewood Elertie�rtary 1987 RW 18030-762nd Plece SE, ReMon 980� 504
SeHyer Woods EkmeMery 1994 SW 31135-228th Ava SE.Bladc Diemond 98010 486
Scenic Hfll Elementery 1960 SH 2602b Woodland Way SoWh, KeM 98030 448
Soos Creek Elemefrtary 1971 SC 12651 SE 218th Place, Kent 98031 342
Springbrook Elementery 1969 SB 2DD35-100th Avenue SE, Kerrt 98031 41 B
Sunrise Elementary 9992 SR 22300-132nd Aven�SE, Kent 98D42 543
ElemeMary TOTAL 1$864
Cedar Heights M�dle Sdiool 1993 CH 19640 SE 272 SVeet,Covington 98042 88B
Mattson Mkldie Sdiool t 981 MA 16a00 SE 251 at Street, Ccvington 98042 787
Meeker Middle�hoM 1970 MK 12600 SE 192nd Streat, ReMon 98058 832
Meridian Middle Sdrool 7958 MM 23480-720th Avenue SE, Kerd 98031 782
Mill Creek Middie School 2005 MC 620 NOM CeMrat Av�iue, KeM 96032 876
Northwood Middle Sdwot 7996 NW 17p07 SE 184ih Street, ReMon 96058 826
Middle School TOTAL 5,146
Kent�AeriCian High School 1951 KM 10020 SE 256ih Street, Kerrt 98030 7,804
Kenllake Senior Fi�h Schod 1997 KL 21401 SE 300th StreM,Kent 98042 1,867
KeMridge Sersor High School 1968 16i 12430 SE 2081h Street, Kent 98031 2,277
KeMwaod Senia�gh SchoW 1981 KW 25800-764Ui Avenue SE, Covington 98,042 2,759
Senior High TOTAL 8,297
Kent Mountain V'�ew Academy 1997 MV/LC 22420 Mllitary Road, Des Moines 96198 410
K�t Phoena Awdemy 2007 PH 11000 SE 264th Street, Kerrt 98030 414
DISTRICT TOTAL 27,133
Kent Sdw_ol Distriet Six-Yeer Capitel Fadlitles Plan Table 3-A ar�� zo�a Page 72-A
� Nd
'�' /� � HBmBn qry � s
� l'v � � �e�� Scho�l Dist�ec� �oa 415
� SEPetro���sk Rldgewood Lake
W E�m�ry , °a�e Serving r�sidents of
� � ca�nage c.esr
� ; E �„��,, . o l9nincoeporated King Coun4y
< r� b�S�� CiPy oi Kent
� � GlenHtlge 0 MM��g �ke ' CI4y o4 Renton
� stpdngbrook e�emantarv ovoun s �_ �': Ciry of Auburn
lementary Element ���`e! •.,
T ° KB^TM� Ci4y of Sea Tac
d H�Scnoo� '. �,;.t.,• '�
= ° � 5�2°°'"S' -' ,�kB CIty of Covington
� 52721hSt m pcntherloke 6neraldPark �'°�` Vou�e pn
� T Elemenotury E 0^fary F � e C9}�/ O� 'v1�1p�e VQ'���
' a �c�ko City of Black Dlamond
� Elemeniary OSumiae
ElemeMary
0 Kenf �) Park Orehcad
Mounfain Vfew � b^ Eiert�eniary
AcademY a.� 0 MerkBan
Neety O'&ien .�?' �Middle School
T Eleme�lrnY p .t? East H01 y SL 2q01h Sf
�' Elemen SE 240 S m �
'� lemeniory MN Creek 0 Danlel a oi d{,
�+s� p e SChool p ElemenMry Q � MaMwn r'�
� 4, Middle 9e ��
0 o,�es�ct SMo�hin� ^� v�� Cresfwoo
� K H gh Schoo� Elamanbry SE 2561h Et �^ 0 Elem tory
G � y 0 0 Ma�ldlan OKeniwood' Pipe Lake
c a Scenio Hm p j A�lenrehcrt�°n -�\Hementary High School Ce�e�n�ry
Q Elemenfary '�c K�t Ptro M \\
� o ACademY \ �MereWlan �reekp � CedarHelghfa
�J 0 �J Elemq�q �Mlddle Sch 1 SE 272nU St
^ MiOernlum �g Y.en6Kcngley Road
Q Elemen NorizonO o�1 �Covinalon
Meptlow Rldge � Elementary �.s� Elemanlary
Elemeniary Plne hee N .N9 Grau Lake
Elementory Q � 0 Elemeniary
�
� ��� SEG��in9��n-So�vYork
a.
� d Wke
•p 8mvyer
��� Inke KentWkeA
Hlgh Sc�ool
9 28 Elementary Schools a �""'°" ,
0 6MIddleSchools � s�ve�w�a.�
p 4 Senlor Hlgh Schools ElemeniCry
Kent Mountain View Academy (Grades.3-12)
� Kent Phoenix Academy (9-12)
m
m
m
w
V Six-Year Pianning and Construction Plan
At the time of preparation of this Plan in spring of 2014, the following projects to
increase capaaty are in the planning phase in Kent School Disfict:
. The D�strict received authorization from the Office of Superintendent af Public Instruction
to temporarily reopen the former Kent Elementary school at 317 Fourth Ave South in
Kent.This facility wiil be used to house the kindergarten and early child educaGon(ECE)
classes for both Kent and Neely-0'Brien Elementery W alleviate overcrowding at those
schools.This building will re-open in fa112014 as the Kent Valley Early Learning Center
This disfict wili fvnd this project without the use of impact fees.
o Planning is in progress for a replacement school for Covington ElemenYary School in
2016 or heyond. The project is pending satistactory financial resources to fund the
projecf.
o Pianning is in progress for additionai classroom space for Neely-0'Brien Elemerdary
School.This addition will add approximatety 25°h to buiiding capacity and is expected to
come oniine in fall of 2017 pending satlsfactory financial resources to fund the project
• Enrollment projections neflect future need for additional capacity at the eiementary school
level. Future facility and site needs are reflected in this Plan.
• Some funding for lease or purchase of additional portables may be provided by impact
fees as needed. Sites are based on need for additional capacity
As a critica) componetrt of capital facilities planning, county and city planners and
decision-makers are encouraged to consider safe walking conditions fo� all studerrts
when reviewing appliqtions and design plans for new roads and developmeMs. This
should inGude sidewalks for pedestrian safety to and from school and bus stops as weti
as bus pull-outs and tum-arounds for school buses.
Included in this Pian is an inventory of potential projects and sites iderrt�ed tiy the
District which are potentially acceptable sRe altematives in the future. �see 7able a on Page
15&Site map a�Page 18)
Voter approved bond issues have inctuded funding for the purchase of sites for some of
these and future schools, and the sftes acquired to date are inGuded in this Piart. Some
funding is secured for purcfiase of additional sftes but some may be funded with impact
fees as needed. Not ay undeveloped p�operties meet current school construction
requirements and some property may be traded or sotd to meet future facility needs.
2Q06 voter approval of $106M bond issue for capital improvement inctuded the
construction funding for a new elemerrtary school, replacement of Partther Lake
Elementary, and classroom additions to high schools. Some impad fees have been
utilized for those projects.
In March 2013 the Board of Directors reallocated the funding for the new elemerrtary
school to capitat projeds for safety and security
The Board wiI! continue annuai review of standard of service and those decisions will be
reflected in the each update of the Capital Facilities Plan.
Kent School DisUid&tx-Year Cepltal Facilities Poan April 2014 Page 14
F�NT SCHOOI DISTRlCT No.415
SKe Acquisitlons and ProJecta Planned to Provfde Additionai Capacity
Projecied Projeded %Tor
SCHOOL ! FACILIIY / SITE IOCATION T Status Comp�etion progrsm new
� - -�- �ate Capadty GmNh
#,on ��m� ���
M� ELEMENTARY
Elemertlary
Kerrt Valley EaAy Leaming Cerrter-Addtdun 3'17 Fouth Ava.5 Avenue S,Kent ACCPoon In Process 207415 270 100%
14 Classroomc ad0ed to provide New Capadry lGndergarten Students from Pkely O'Brien Funded
inr T70 sWderrts. and Ke'rt ElemeMary-No Impact Fees
Replacemerrt
6 Replacemerrt for Covirgton ElemeMary (U) SE 256Yh Street&154th Ave SE ElemeMery PlannMg 2016-17 600 16%
CoWnglon Elem- Capadty to ba replaced 17U70 SE Wax Road, Covington demerrtary Utiiizetl -504
Elemerrtary
Neely-0'Brien demeMary School-Addition(ln 6300 S 236th Street,KeM 98032 Addkion Plennirg 2017-18 600 25%
Classrooms adtled to provitle New Capadty QirteM CapaUry 480+�Zp New=600 PlenNng
MIDDLE SCHOOL 8 SENIOR HIGH
No new projeds required for Sec:ondary Schools at this time&Secondary Schools are eaccluded from Impact Pee formula.
TEMPORARY FACIt.IT1E3 Atlditlonal
���Y
Portables' TBD-Fw placemerrt as rreeded New Planning 2013+ u-si eacn 100%
#°� ° OTHER SITES AC�UIRED �ena uce �antl use
� �m� T e Jurisdiction
4 Covington area NOM (Near Mettson PAS) SE 251 8 184 SE, Covington 98042 Urban EfemeMary Gty of CovirigMn
7 Covinpton area South (Scerselia) SE 290 8166 SE, Kerd 98042 Rurel ElameMery King CpuMy
S Covinptan area West (Halleson-Wikstrom) SE 256&154 SE, Co�rington 88042 Urban ElemenWry City of CoWnpton
3 tlam Lake area (Pollard) 76620 SE 240, KaM 88042 Rura1 �IemeMary png Cqu�ty
8 SE of Leke Morton area (West property) SE 332 8 204 SE, Kent 98042 Rurai Secondary King CouMy
2 Shady Lk area(Sowere,BIaUre,Drahota,Paroltrre) 17428 SE 182 Street, ReMon 88058 Urban ElemeMary King County
1 So.King Co.AcNviry CeMer(Pormer Nike slte) SE 167 8170 SE, Renton 98058 Rura1 TBD Z w�8�p��y
72 Sou[h Central site (Plemmons-Yeh-Wms) SE 286th St 8 124th Ave SE,AuDum 98092 Ufban TBO� p�g�p�y
Notes:
' Unfunded faGlity neeOs will be reviewed In the hrture.
Z TBD-To be determined-Srnne sites are iderttified biR piacement,Oming and/or configura5on of porfables has rrot been detertninetl.
'Numbers cortespond to sites on Site Bank Map on Pege 18.OUrer Map ske locatlons are parcels idaMified in Tabk 7 on Page 28.
Kent Schaol Distrid Six-Year Capital Fatllities Plan Table 4 April 2074 Page 15
�'
�
� �
O �
� ;� ��
e� � � Sw_
�
� ��
0
� � � � 9 � � �
� � s h g �� �� t
� � � �� �
� � �� �
� � � s .
� ��� � � �► � �
� °� �� � �
� �
Y$
n O� s �l�E P� �
�✓ �r
�/J �'u YO W �� `�X
�� �� � �� , �� °W �a
_
��� �R y � 3sa�vwvc� --
nw 9 � � °� �
�� � � � �*���
LL�� � �� �
� y �
� �� � �� ��� ��
ase,�vwovt m� �t �� � �$
�
� �� �� �>^vw+zst �� �, � � as��o�zsi
� t� �� � ��
� �3 � ����� �_ �� ��� �� �� �� ��
� g z � �E ��
� rrAA��o ppm�
� �'� ��� N 2� �a� _
p �
35BM4F80� 6I � m� � � Y
3 �
�� ���� � {�g 35�V4iVOL
�� WP� �Yc �
8a ��y� ��
� U �
� �
m� �
�
y fp� �V N:1We�
g � a
w
� }y'
� 99[y�}�
�� ���° o�
� E
� �€ � � �
�
om
��Y K�``.
n a,o,�,a,�
Karrt SchoW Dlstrlct Six.Yaar Capiial Facilides Plan
Apri12014 Qa6e18
V I Portable Classrooms
The Plan references use of portable as interim or transitional capacity and
facilities.
Currently, the District utilizes portables to house students in excess of
permanent capacity and for program purposes at some school locations. (Piease
see n�e��ces a e c��
Based on enrollment projections, implementation of iv:l day kindergarten
programs, program capacity and the need for additional permanent capacity, the
District anticipates the need to purchase or lease additional portabtes during the
next six-year period.
During the time period covered by this Plan, the District dces not anticipate that
all of the DistricYs portatrles will be replaced tiy permanent facilities. During the
useful life of some of the portables, the school-age population may decline in
some communities and increase in others, and these portables provide the
flexibility to accommodate the immediate needs of the community
Portables may be used as interim or transitional facilities:
1 To prevent overbuilding or overcrowding of permanent school
facilities.
2. To cover the gap between the time of demand for increased
capacity and completion of permanent school facilifies to meet
that demand.
3. To meet unique program requirements.
Portables currenUy in the District's inventory are continually evaluated resulting in
some being improved and some replaced.
The Plan projects that the District wiJl use portables to accommodate interim
housing needs for the next six years and beyond. The use of portables, their
impacts on permanent facilities, life cycle and operational costs, and the
interrelationship between portables, emerging technologies and educational
restructuring will continue to be examined.
Kent School District Six-Year CapRal Facilifies Plan April 2014 Page fl
V I I Projected Six-Year Ciassroom Capaci4y
As stated in Section N, the program capaciry study is periodically updated fo�
changes in special programs and reflects class size fluctuations, gracie level
splits, etc. As shown in the Inventory and Capacity chart in Table 3 on Page 12,
the program capacity is also reflected in the capacity and enrollment comparison
charts. rsea rearBs s a s a-ac on aeges ts-zz/
Enrollment is electronical_ly reported to OSPI on Form P-223 on a monthly basis
and funding apportionment is based on Annual Average FTE {AAFTE). The first
school day of October is widely recognized as the enrbllment "snapshot in time"
to report enrollment for the year
Kent School District continues to be the fourth Iargest district in the state of
Washington. P-223 Headcount for October 2013 was 26,563 with kindergarten
students counted at 1.0 and excluding ECE and college-only Running Start
students. A full headc6unt of all students enrolled in October 2013 tbtals 27,942
which includes ECE and college-only Running StaR students.
In October there were 760 students in 11'" and 12�' grade participating in the
Runnirtg Start program at 10-21 different colleges and receiving credits foward
both high school and college graduation. 392 of these students attended classes
only at the colfege ("college-only") and are excluded frbm FTE and headcount for
capacity and enrollment comparisons. Kent School District has one of the Highest
Running Start program participation rates in the state.
Based on the enrollment forecasts, permanent facility inventory and capacity,
current standard of servics, portable capacity, and future additional classroom
space, the District plans to continue to satisfy concurrency requirements thrbugh
the transifional use of portables. �sea rawa s a�a r�s s a-s-c oR P�s,e-zz�
This does not mean that some schools will not experience overcrowding. There
iriay be a need for addifional portables and/or new sohools to accommodate
growth within the District New schools may be designed to accommodate
placemerrt of future portables.School attendance area changes, limited and
costly movement of relocatables, zoning changes, market candifions, and
educational restructuring will all play a major role in addressing overcrowding and
underutilization of faciJities in difFerent parts of the District.
Kent School Distri�3 Six-Year Capital FaGlitiea Plan AprEl 2014 Page 18
4CENT SCHOOL DISTRICT No. 415
PROJECTED ENROLLMENT and CAPACITY
To�A� DIS�R'CT
SCHOOL YEAR zo�a-�a 2o�a�s' 201578 zo�e-n zo��-�e zo�e-is zo��2o
nctue� P R 0 J E C T E D
PermaneM Program Capacity ' 27,475 27,133 27,403 27,403 27,499 27,619 27,819
Changes to Permarient Capaciry '
Kent Valley Eerty Leaming CeMer? 270
Capacity Increase(�
Replecemerrt schaol wkh projected increase In eapacity
Covington Elementary Repiacement (u) 3 600
7o Reqece curtent Covington Elemer�tery capaaty -504
Neely-O'Brien Elemenffiry Addition-Capacity increase (u) ' 120
Permenent Propram Cepaeity SubWfel y�,475 27,403 27,403 27,499 27,619 27,618 27,818
Interim Portable Capadty 5
ea�+,emaryaonaaece�aiyReyWrea 836 1,200 1,584 1,800 2,232 2,670 3,000
r,name saroa aarsaa c�rny R�rea � 0 0 0 0 0 Q 0
swiwr Hqn scnaoi porteme cepacny aeqW�a � 0 D 0 0 D 0 0
936 1,200 1,584 1,800 2,232 2,670 3,000
TQTAL CAPACITY ' 28,411 28,603 28,987 29,299 29,851 30,289 30,619
TOTq�ENROLunENT/pttOJECTION° 26,588 26 868 27,229 27,677 28 096 28,629 29,219
DISTRICTAVAILABLECAPACITY� ��8q,y 1,735 9,758 1,622 1,755 1,660 1,400
� Capaary is based on standard of service for programa pravided and is updated periodicaNy to reflect program charges.
2 Kent Valley Early Leamirg Center will open in the Toimer Kent ElemaMary School.This Is designed to house Kindergarten and ECE
programs at Neely O'Brien and Kent Elemerdaries to ease overcrowding
3 RepWcement school for Covingfon Eementary will inaease capeclty and will be bullt on e diffe2nt existing urban site.
° Addition W Neely-0'Brien Elementary will increase capaciry approxfmatey 25%.
5 201&2014 totel clessroom poRable capecky Is 936.Same additbnaf 2locatables used tor prog2m purposes.
e ACWaI October Headcount Enrollment with Projedions from OSPI Report 1049-Detertnination oF Projectetl Enrollments.
Enrollment counts and proJecb6ons have bean adjuated for Fulf Day KirWergarten at all Elementary Schools.
� School capadty meets conwrtency requirements and no impaG fees are proposed for secondarq schools.
e fn 20t415 capaGty wil�decrease by 342 because of change in standand of servlce in gratles K-1 to 20:1 in 18 high poverty schools
�,t sG,00i o;s��a s�-v�.caPasi Facuroas P�en Tebie 5 r�i za�a Paga 19
KENT SCHOOL DISTRICT No.415
PROJECTE� ENROLLMENT and CAPACITY
ELEIVIEIVTARY - Grades K - 6
SCHOOL YEAR 201314 201476� 2015-16 201&17 2017-18 201&f9 2019�20
acwei P R O J E C 7 E D
Elementa Permanent Capa ' 13,206 13274 13,544 93,544 13,640 13,760 73,760
KerrtMountainVrewAcademy2 410
Changes to ElemeMary CapeGty
Kent Valley Eerty Leaming Ce�ter 270
Capacity Increase(�
Covington ElemeMary Replacement (u)° 800
v�ix reW�e«u,enc co��mn eieme�n�b s0a
Neely-O'Brien Eiementary Addition Capaciiy increase (u>b 120
Subtotal 13,616 13,544 13,544 73,640 13,760 13,780 13,760
Portable Capacity Requir�' � 936 12� 1584 1800 2232 2,670 3,000
TOTAI CAPAC(lY '�Z 14,552 14,744 15,128 15,440 15,992 76,430 - . 16,780 _
Atl'usted Por FULL Da Kinder artaa HeadcounL
ENROlLN1ENT(PROJECTION ° 14,456 14,738 . 15,107 15,431 .15,988_. 18,424 16,758
SURPLUS DEFICI CRPACITY 86 8 21 9 4 6. 2
Number oT Portables Repui� 39 50 80 75 93 �11 125
725 Classroom Portables required in 2019-20. Some adaltlonei porteb�ea usetl for progrem purposes.
� Capacity ia based on standarcl of sarvica for progrems provided and is updated periadically to reflect progrem changes.
Z Ke�t Mourdein U�ew Academy is a apecial program at the fortner Grandview School aerving students in GraOes 3-72.
The school building(fomreAy Kent Learning Center&GraMview Elem J was designed as an elementary school.
3 Kent Valley Earty Leaming Cantar reflecta 12 dassroom capadty increese for Kindargarten and ECE programs from
Neety O'Brien and Kent Elementaries.
° ReplacemeM achool fw Cwington ElameMary witl inerease capacity arM is plenned for a difiereM e�dstlng urban site.
5 AddRion to Neely-O'Brien Elemeirtary will inaease capacity approximately 25%.
e Actual OGo6er Head�urR Enrollment wlth Projections from OSPI Report 7PA8-Determination of Projeded Enrollme�s.
Enrollment&Projections reflect FUIL Dey Kindergarten at ALL ElemeMary schools�tA 8 exdude ECE Preschoolers.
' In 2b74-15 capeCity will tlecrease by 342 because of changa in starMaM of service In grades K-7 to?A:1 in 18 high poverty
schools.
Kent Sehod Distrid Sa-Yeer Capital Faalldes Plan Tabie 6 A n�,ni Zo�4 P�, zo
KENT SCHOOL DISTRICT No. 415
PROJECTED ENROLLMENT and CAPACITY
nAIDDLE SCFi00L - Grades 7 - 8
SCHOOL YEAR 207314 201415 201516 2018-17 2017-18 2018-19 2019-20
Actual P R O J E C T E D
Middle School Permanent Capacity� 5,148 5,148 5,148 5,148 5,148 5,148 5,148
No Cha�ges to Middie School Capacity
Subtota! 5,148 5,148 5,148 5,148 5,148 5,148 5,148
Portable Capacity Required ' � 0 0 0 0 0 0 0
TOTAL CAPACITY 'a3 5,148 5,148 5,148 5,148 5,148 5,148 5,148
ENROLLMENT/PROJECTION Z 4,167 4,157 4,168 4,240 4,172 4,182 4,529
SURPLUS(DEFICIT CAPACITY° 981 991 980_ 908 976 966 619
Number af Portables Required 0 0 0 0 0 0 0
No Ciassroom Portables required a!middle achoois at this time.Some Portables used for classroom and progrom purposes.
� Capaclty ia based on standard of service for programs provided and is updated periaiically to reflect pmgram changes.
Z Actuai October Headcourit EnroOment with Projec4ions from OSPI Report 1049-Detertnina2ion of Projeded Enrollme�rts.
' Surplus capacity due to grade level reconfiguration-All 9th grade studeMs moved w the high schoois in Fa1120�4.
4 Middle School capacity meets concurrency requirements and no impact fees are collected for middle schools.
Kent School Disfict Sin-Year Capital Faclilties Plen Tabie 5 $ aP�i zo�a Pa9a z�
KENT SCHOOL DISTRICT Ido. 415
PROJECTED ENROLLMENT and CAPACITY
SENIOR HIGH - Grades 9 - 12
SCHOOL YEAR 2o�3ia 2oia�5 2ois�s zo�s-n 2o»-ia 2oaats 2ot�-zo
Acwa1 P R O J E _C T _ E D
Senior Hi h_Pertnanent Capaci ' 8,71 t 8,711 8,711 8,711 8,711 8,711 8,711
I�ciudes Kent PhcertixAcademy Z
No Changes to High School Gapacity
suhtote� 8,711 8,711 8,711 8,711 8,711 8,711 8.711
Portables Capac R uired 1 0 0 0 0 0 0 0
TOTAL CAPACITY ' 8,711 8,711 8,711 . 8 711 8,711 6,711 8,711
ENROLLMENT/PROJECT[ON 3 7,940 7,975 7,954 8,008 7,936 8,023 7,932
SURPLUS DEFICI CAPACIN 771 736 757 705 775 688 779
Number of PoAaWes Required o 0 0 0 0 0 0
No Classroom Porteb3es required et thia time.Some Portables used for dassroom and program purposes.
t Capaaly is based on sfandard of setvice for programs provided and is updated periodicaly ta refted program changes.
2 Kent Phoena Academy opened in Fali 2007 serving grades 9-72 with four speciel programs.
3 Actuai October Enroilment with ProJections from OSPI Report 1049-Determinadon of Projected EnrollmenGs.
` High School capacity meets conourrency r�uirements and no impact fees are collected for high schoofs.
Kent Schoof District Shc-Year Capital Fadtilies Plen Table 5 C �,ni zo�a Page z2
V I I I Finance Plan
The finance plan shown on Table 6 demonstrates how the Kent School District pians to
finance improvemer�ts for the years 201415 through 2019-20. The financi�g
components include secured and unsecured funding and impact fees. The plan is based
on voter app�ovai of future bond issues, collection of impact fees under the State Grawth
Management Act and voluntary mitigation fees paid pursuant to State Environmental
Policy Act.
in February 2006, voters approved a $106 milEion bond issue that included funds for
replacemerrt of Panther Lake Elementary 5chool with increased capacity, as weli as
construction of a new Elemerrtary School to accommodate growth. The new Panther
Lake Elementary School replaced the previous Panther lake Elemeritary in Fall of 2009
The bond issue aiso funded Phase II of the renovation for Mill Creek Middle School and
renovation of Sequoia Middle Schoo{for reconfiguration as a non-traditional high school,
Kent Phoenix Academy, which opened in September 2007
2006 construction funding also provided for additional classrooms at Kentlake Fligh
Schoot and two projects at Kent-Meridian HS. The projects at Kent-Meridian provide
addiiionai capacity with several new classrooms and gymnasium space. The projeds at
K-M are completed and the new Main Gym added capacity for two more PE classrooms.
Some impact fees were utifized for new constniction that increased capacity
Originaliy, the district designated $16 miilion of the 2006 bond authorization toward the
construction of an additionat elementary schooi, ident�ed as Elementary#31 in previous
Plans. Dus to a change in circumstances, the Board of Directors reallocated fhe $16
million for capital projects for safety and security.
The District received authorization from the Office of Superintender�t of Pubiic instruction
to temporarily use the previous site of Kent Elementary Schoof at 317 Fourth Ave South
in Kent. This facility wiil be used to house the kindergarten and early child education
(ECE) classes for Kent and Neely O'Brien elementary school to afieviate overcrowding
at those schbols. This building will re-open in fa{12014 as the Kent Valley Early Leamig
Center This district will fund this project without the use of impact fees.
Replacement of Covington Etementary School in 2016-17 or beyond wiil increase
capacity of ther current schooi by app�oximately 16%. 5ome impact fees wili be utilized
as part of the Finance Plan.
A building addition is also planned to provide approximately 25% additional ciassroom
capacity at Neely-O'Brien Eleinentary School in 2017-18. Some impact fees wili be
utilized as part of the Finance P1an.
The Finance Ptan includes new portables to be purchased or leased to provide
additionai capacity and some may be funded from impact fees.
Enroltment projections reflect future need for additional capacity at the e{ementary (evef
and unfunded facility needs will be reviewed in the future and reported in annual updates
Kent Schoot District Six-Year Capital Facilities Plan ApriI 2014 Page 23
V I I I Finance Plan
of the Capital Fac"ilities Plan. No impact fees are requested for secondary schools in this
Plan.
For tlie-Six-Year Finance Plan, costs of future schools are based on estimates from Kent
School District Facilities Department. Please see pages 26-27 for a summary of the cost
basis.
Kent School District Six-Year Capital Faciliues Plan Apri12014 Page 24
KENT SCHOOL D13TRICT No.415
SIX-YEAR FINANCE PLAN
Sewred Unsewred Impad
SCHOOL FACIUTIES 2014 2015 2018 2017 2018 2019 TOTAL Locel 8 Sfete S�ate Z or Loml� Feas 5
EsUmsted Eatlmafed
PERMANENT FACILITIES
KeM Valtey Early Leaminp Center
F E3,700.000 53,100.000 53,100.000 $Q
Covinplon Elemerdary Replacement� U E31,840,000 s31,840,000 $28,745,000 56,095,000
AddlNon to Neely-0'Btien Elementary� U ;14,100,000 $74,100,000 510,800,000 b3,500,000
NO Secondary School Pmjects at thW time: �
i
iEMPORARY FACILI71E5
Additbnal porlables 9'' U $1,695,000 E2,388,400 51.357,722 $2,772,000 E2.828,000 52,240,000 $13,167,122 513,757 122
17 PMadee 18 ponadee 9 pMebles 16 poila6ks 18 poAebbe 10 porte6tas
07HER
N/A
Totals y1,695,000 $2,388,400 $1,357,722 534,812,000 $16,928,000 $2,240,000 562,197,122 53,100,W0 537,345,000 521,752,122
' F = Funded U = Unfunded
NOTE9:
' Based on estlmates of adual m fulure construGion costs from Fecilities Departmerrt.(See Pege 28 for Cost 8asts Summary)
Z The DlsUkt antidpates recaiving soma Stafe Funding Construdion Asslstance(formedy known as"matching funda")for some projecls.
' FeGllty needs eie pendinp review.Some of theae proJects mey be Tunded with impecl feea.
4 Coat of pmtaMes based on curtent cwst a�M adJustetl for infladon tor fidu�e'yeare.
S Fees tr�Uvs wlumn a�e based on amount of fees coilectetl to date a�d es6mated fees on hHure units.
Kent School District S6c-Vear Capflal FaGllties P1an Tabte 6
April 2014 Pege 25
V I I I Finance Ptan -Cost Basis Summary
For impact fee caJculations, construction costs are based on cost of the last
elementary school, adjusted for inflation, and projected cost of the next
elemenfary school.
Etementary School Cost Projected Cost
Cost of Panther Lake Elementary $28,700,000
Replacement (Opened in Fa112009)
Pro}eeted cost- Covington Eleme�tary $31,840,000
Replacemerrt (Projected to open in 2017)
Projected cost of Neely-O'Brien Addition $14,100,000
(Projected to open in 2018)
Elementary Cost based on $31,840,000
Covington Elementary Replacement
Site Acquisition Cost
The site acquisition cost is based on an average cost of sites purchased or built
on within ihe last ten years. Please see Table 7 on page 27 for a list of site
acquisition costs and averages.
District Adjustment
The impact fee calculations on pages 29 and 30 include a "District AdjustmenY'to
reduce the fees calculated by the impact fee formulas. For the past four years the
district has not increased its impact fees and based on current economic
conditions, the District has adjusted the impact fees to keep the same rates as
those currenUy in place and made no adjustment for increase in the Consumer
Price Index.
Kent School Disffid Siz-Year Capitel FaciliUes Plan ApNI 2014 Pege 28
KENT SCHOOL .9YRICT �No. 415
Site Acquisitions & Costs
Averege of Sifes Purohased or Built on wHhin last 15 Years
TYPB$ Vear Open I
�on Mep SCho01 1 Site Purchased Lxation Apeage Cost Av cosVacre ToFel Avera Coat/Aae
Elementery
13/Uiban Panther Lake Elementary Repla�ment Site zooe 10200 SE 218 st�t 98031 9.40 $4,465,013 $477,129
5 i Urban Elementery Site(Halleson&WiksVom) 2ooa �6a35 se 26s st,Covn�gan seo42 10.00 $1,093,910 $109,391
Elemarnary s�te subtom� 19.40 $5,578,923 $287,573
Elem site a
Middle Sdpol
Urban NorthW00d Middle SCilool 1996 170W SE 184 St, Rent«i 98o5B 24.42 $655,138 $26,828
t0l Urben Mtii Creek MS(Kent JH)/McMillan St asaemblage 2002 471-432 McMlllan Sl,KeM 98032 1.23 $844,888 $886,863
12/Urben So Central Site-Unincorp KC(Plemmw�s,Yeh,Wms) t998 E ot 124 SE btw 286-288 PI(UKC) 39.38 $1,938,020 $49,188
Miad�e sclwo�S�ta subarel 65.01 $3,436,024 $52,854
MlAOb Sdii Slle Avg.
Sertior High
at r ur�an K-M High School Addilion�Kents&srin smim) 2on2 a 2aa3 �0002 se 2ss�n street 6.37 $3,310,000 $524,584
se�uor Ht�h Kentlake High School (Komboi Mofis) tas� 21401 SE 300 St,KeM 98042 40.00 $537,534 $13,438
s�Uroan Kentwood Sr Hi Addition (sandnu) �sss 16807 SE 258th SUeet 3.83 $302,117 $78,882
Senia High Site Subtotel 50.14 $4,149,851 $82,761
Sr HI Site Avera
nae:ai n,rai snes were omd,a�a a�«ro adov�or ume�orowm aea.
Numbe�s to locsdons on SFte Bank 8 sitlans m Page 77.
PropeNee �chased br to 1988
�/Rural So.King County Adivity Center(Nike site)purdiased prror to 1988
4!Urban Site-CovingWn aree NOKh (So of Matteon MS) 1984 TWeI Acreage&Cosl Total Averege Coat!Acre
3/Rura� Siae-tiam�ekeeest (Pollard) 1es2 134.55 $13,164,598 $97,842
7!Rurel Sita South of Covingtnn(Scersella) 1983
8/Rural Site SE o(Lake hbAnn area (Wast qoperty) 1993
2/Urben Site-Shady Lake(SoNeis-Blalne-Orehote-Pamlirre) ,1995
9/Urban Old K�t FJementsry replaced arM wrrently leased out.
Kent Sclrod DiaMct Slx-YeerCapifal Fealitles Plan Tab�e 7 ApriI2014 Page 27
KENT SCHOOL DISTRICT
FACTORS FOR ESTIMATED IMPACT FEE CALCULATIONS
Studeirt Generation Factors-Singie Family Student Generation Factors-Muki-Family
Elementary (Grades K-6) 0.484 Elementary 0.324
Middle 5chool {Grades 7-8) 0.129 Middle School 0.066
Senior High (Grades 9- 12) 0.249 Senior High 0.11 S
Total 0.862 Total 0.608
Projected Increased SWdent Capacity OSPI-Square Footage per Student
Elemer�ry 936 Elementary 90
Middle Schoot 0 Middle School 117
Senior High Addition 0 Sen'ror High 130
Special Educatlon 144
Recjuired Site Acreage per Faciiity
Elementary (required) 11 Average Site Cost!Acre
Middle School (required) 21 Elementary $287,573
Senior High(required) 32 Midd(e School $0
Senior High $0
New Faciiky Construction Cost
Elemeirtary' $31,840,000 Temporary Facility Capacity & Cost
Middle School $0 Elemerrtary (c� 24 $145,000
Senior High ' $0 Middle School @ 29 $0
�see eose basis on ag.zs Senior High (H 31 $0
Temporary Facility Square Footage State Funding Assistance Credit c�nr•smreen.m,ti
Elementary 70,882 DfsMct FurWing Assistance PerceMage 58.14%
Middle School 16,376
Senior High 22,064
Total 4% 109,332 Construction Coat Allocatlon
cca.-cossssy,Ft. (EPFective July 2014) $200.40
Permanent Facflity Square Foo4age
Elementary pridudesKnnvn� 1,470,543
Middle School 660,904 District Average Assessed Value
SeniorHigh 1,110,415 sir�greFamiryResidence $245,8T1
Total 96% 3,241,862
Totai Facllities Square Footage District Average Assessed Value
Elerimentary 1,541,435 Multi-Family Residence $87,860
Middle School 667,829 Apar6neMs 70%Condos 30°k
Senior High 1,132,478
Total 3,341,743 Bond Levy Tax Rate/$1,00�
CurreM /$t,000 Tax ReEe(1.8842) $1.68
Developer Provtded Sites!Facilkies
Value 0 General Obligation Bond Interest Rate
Dweiling Units 0 cur,em aomi irrterest Rete 4.04%
KeM Schabi Distrkt Siz-Year Capifal FacilRies Plan April 2014 Page28
KENT SCHOOL DISTRIC7
IMPACT FEE CALCUTATION for SINGLE FAMILY RESIDENCE
Ske AcquisiHon Cost per Single Fami{y Residence
Formula: ((Acres x Cost per Acre)/Faclliry Cepa ' x SWtlerrt Generation Factor
Requiied Site Aveepe Averega Site CosVAae Fadlily CapeGty SWderrt Fecbr
A t (Elamentary) 11 $287,5T3 600 D.4$4 $2,551.73
A 2 (Middle Schod) 21 SO 1,065 0.129 $p
A 3 (Senlor High) 32 $0 1,000 0249 $0
0.862
A `> $2,551.73
PermaneM Facili4y Construction C�t per Single Famlly Realdence
Fortoula: ((Facsiry Cost/FacN Ca )ic St�e�[Factor)x(PermanenUTobl S uare Footage Rstio)
Construction Cost Fedlid C�ry SWtleM Fecmr Foohge Ratio
B 1 (Elemernary) $31,840,000 B00 0.484 0.96 $24,656.90
B 2 (Middle Schooq $0 900 0.729 0.96 $0
B 3 (Senior High) $0 1,600 9.249 0.96 $p
0.862 B b y24,656.9Q
Temporary Facility Cost pe�Single Family Residenca
Fortnula: ((Facdtty Cost!faal' Cepacily)x Student Faclor)x emporary!Total re Footage Ratio)
Fetlliry Cost Fadlity Capacfly StuiieM Factor FoWega RaUo
C 1 (Elemenisry) g145.D00 24 0.484 0.04 $718.97
C 2 (AAiddie Sehool) $0 29 0.129 0.04 $0
C 3 (Senior High) $D 31 Q.249 p.p4 gp
fl.862 C K' _$i16.97
��
&tate Funding Assistance CrpolC per Single Famiry Raaldence (formarly"State Metch'�
Formula: Area Cost Allowan� x SPt Square Feel per studerrt x Funtlir�Assisqnce^k x Stutlerrt Factor
Cw�stuctkn Cos[Muiation SPI SQ.R!5tuEmit Aasisfanca% S[udent FaIXor
D t (ElemeMery) $200.40 90 Q.5614 0.484 $5,075.29
D 2 (Middle School) $200.40 117 0 0.129 $D
D 3 (Senior High) $200.40 130 0 .Q�?4� $p
D `� _ . $5.07529
Tax Credit per SNgle Famfty Residence
Aveiage SF Resldential Assessed Value $2a6,871
Cwrent Debt Service Rate!$1,000 $1.68
CurteM Bond Interest Rete 4.pq°,y
YearsAmortized {10Years) 10 7C a $3,258.50
Developer ProvFdsd Facility Credit Facal' /Site Value Dwelling Units
0 0 FC b p
F�Recap
A = Site Acquiaition per SF Residence $2,551.73
B = Permanent Facility Cost per Residance $24,656.90
C = Temporary Facility Cost per Residexe $116.97
Subtotal $27,325.59
0 = SEete Metch Credk per ResiUence g5,67519
TC=Tax Cred@ per Residence $3,258.50
Subtotal � - $8,333.79
Totai Ur�funded Need $18,991.81
50%Developer Fee Obiigation $8,496
FC=Facility CredN(ff applicebie) 0
rngma nd�us+me�c cs�a��zs ro��u�> tsa,o+o>
Net Fee Obllgation per Residence-Single Family $5,4gg
Kent School Distria Suc-Year Capital Facilities Plan
April 2014 Page 29 I
KENT SCHOOL DISTRICT
iMPACT FEE CALCUiAT10N for MULTI-FAMILY RESIDENCE
Slte Aequ(sMion Cost par MuIG-Famlly Realde�te Unk
Fortnula ((Acres x C6st r Acre !Factl Ca a x Sludent Garreraffon Fac[or
ReqWietl Sita Acreape Averape Stte Coet/Ave Fadlity Cepedry SlutleM Fe�r
A 1 (ElemeMary) 17 $287,573 500 0.324 $2,049.82
A2 (MidtlleSchool) 27 $0 1,065 0.068 $0
A 3 (Senbr High) 32 $0 t,� 0,118 $0
0.508
A b sz.oa9.s2_
Pertna�M PacNiry Cmntrurdon C�t per Muld•Famlty Residence Unft
Ftirtnula: ((FedCdy Cost 1-Faefi Ca a )x Student Pac{ot�z(Permanerd/Tote15 uare F � s Ratlo
ConeLuctian Cost FacNhy Cepadty StutleM FecMr Footege Retlo
B 1 (ElemeMary) $31,840,000 600 0.324 0.96 $18,5E15.88
B 2 (MMdle Sctiooq $0 9�0 0.066 0.88 $0
8 3 (Sanior High) $Q 7,600 0.118 O.BB $0
0.5�8 B -0 _.516.505.88
Temporary Facliity Cost per Nultf-Femiy Residecree Unit
Formuia: ((Faafdy Cost!Fea Capa )x S[udent Facto�x em orary I Total Square Fookage Raflo
- � FatllLLy Coat Fedlity CapaUty SWdent Factor Foo(ege Retio
C 1 (Elamenfar» $145,000 24 0.324 0.04 578.30
C 2 {Mitldle School) $0 28 0.066 O.Q4 $0
C 3 (Senior FFigh) SO 31 0.118 0.04 $0
0.598 C `� $78.30
State Funaing Assisfance Cradtt pe�Nu1H-Family Residance (fortnery"Stale Match"j
Pormufa: Area Cost AAowatxe x.SPI uare Feet r sNtlent x fundf Assiatanw% x Student Fador_
AreaCoetANoa+er�ce SPISq.FtlSWtleM Eqwiizetion% SWdentFecPor
D 1 (Elamarrtar)/) $200.40 90 0.5814 0.324 $3,387.51
�2 (Middle Schooq $200.40 117 0 O.D88 $0
D3 (SenlorNigh) $200.40 130 0 0.118 $0
D `> 53.397.51
�
Tax Cretltt per Muid-Famfly Resldence Unit
Averege MF ResldeMtal Assessed Value 587,880
CurreM Debt Servk:e Rate/$1,000 $1.68
Current Bond IMerest Rate 4.04%
Yesrs Amortized (10 Years) 10 TC a $1.16a.66
Devebper Provitled Fadlity Credit Faclllry/Sfte Value Dwelfing Units
0 0 FC b 0
Fee Recap
A = Sfta ACquisitfon per Muld-Famlry Unit $2,049.82
B � Permanent Facitity Cost per MF UNt $18.505.86
C = Temporary Fadifly Cost per MF UnR $78.30
SuMotal $18,633.98
0 = Stabe Match Credlt per MF UMt $3.397.5'I
TC a Tax Credit per MF Unk $t,t 64.66
Subtolal - $4,582.17
Fotal UnNrided Need $14,071.81
50%r Developer Fee Obligation $7,036
FC=Fadtlty Credit Qf appBcable) 0
�iskict Atljushnent (5en Pape z5 tar mylenetion) (i3,658)
NM Fee Obligation per Resldential Unit-Muldfiamity $3 378
Kent SchoW Distrid Shc-Year CapiNal FaGlities Plan April 2014 Page 30
IX Summary of Changes to April 2014 Capital Facilities Plan
The Capital Faciiities Plan (the "Plan") is updated annuaily based on previous Plans in
effect since 1993. The primary ctianges from the April 2013 Plan are summarized here.
Changes to capacity continue to reflect fluctuations in class size as well as program
changes. Changes in poRables or transitionai capacity refiect use, lease or purchase,
sale, surplus andlor movement between facflities.
The student headcount enrollment forecast is updated annualiy All Elementary schoois
now have Futl Day Ki�dergarten so six-year Kindergarten projections were previously
mod�ed to meet the requirements for Fuil Day Kindergarten programs at ail Elementary
schools.
The district expects to receive some State Funding Assistance (formerly called "state
matchi�g funds") for projects in this Plan and tax credft factors are updated annually
Unfunded site and facility needs will be reviewed in the future.
Based on currerit economic conditions, the District Adjustmerrt resuits in no change to
the current impact fees.
Changes to Impact Fee Calculation Factors include:
ITEM G�d�YPe FROM TO Comments
Student Generation Factor �+ o.asa o.aea
Single Family(SF) Ms o.�2s o.�zs
SH 0249 0.249
Total 0.866 0.862 • �
Student Generation Factor Eiem o.32a o.aza
Multi-Family (MF) nns o.oes o.oss
SH 0.118 0.118
Totai 0.522 0.508 -.UO
Sfate Funding Assistartce Ratios c•swse�m,•� 57.89% 5S.1a% Per OSPi Webs�te
AI'88 COSt A110w2nCC(Pormer Boeckh Index) $188.55 $200.40 Per OSPI Website
Average Assessed Valuation (A� SF $228,242 $245,871 Puget Sound ESD
AV-Average of Condominiums&Apts. MF ses,eoz Sa�,sso Puget 3ound ESD
Debt Service Capital Levy Rate/$1000 Si•es S�.ea Per King Co.Assessor Report
Generai Obligation Bond interest Rate 3.�a% a.oa�o Bloomber�Bond Buyet Index
Impact Fee-Single Famiiy sF SS,ae� Ss,aa6 No Change to Impad Fee
� IR1p8Ct F�-MUfU-Famlly MF 53,378 53,378 No Cfiange to Impact Fee
Kent School Dietria Siz-Year Capital Faciikies Plen April 2014 Page 37
X
Appendixes
Appendix A. Calculations of Capacities for Elementary Schools
Appendix B: Calculations of Capacities for Middie Schools
Appendix C: Calculations of Capacities for Senior High Schools
Appendix D: Use of Relocatables
Appendix E: Studen#Generation Factor Survey
KeM School D�MG Sa-Year Capifaf Fadlibas Plan April 2014 Page 32
KEMT SCHOOL lRICT �No.415
STANDARD of SERVICE - PROGRAM CAPACITY - IMVENTORY oEPORTABLE3 • FTE and HEADCOUNT ENROLLMENT
KSO Numherof SldMiphCap 'SE/IP �Spacial� ]01&id Pmpiam Claseroorn RabceWbin 10/t/2073 10/1/2013 HI
ELEMBMARY ABR; Sta w Hph Cep Cepecity Program Roqlem Use Use C8p8CRy P223 FTE 3 P223 HtlCount POV
SCHOOt Class�owns ata4ewrepa' CR Ca Capedty� Portables Portables m�.w�w' Enmtmeih Enropment
e.c-cE a n=�y ca�nb erowams
CeRlepaCreet CC 18 432 5 20 4b2 1 0 0 382.53 427 N
Cadu Valley CVfa 1S 380 8 ZO 380 2 0 0 �OB.00 �O6 Y
CovingWn CO/a yp 480 6 24 604 1 0 0 142.00 474 Y
Crastwaod CW 18 432 4 0 4S2 4 1 24 ae2.34 493 N
Eest Hill EH 20 480 6 10 490 3 � 72 674.03 616 Y
Eln6reM Perk EP 21 604 2 0 604 2 0 0 45A60 481 Y
Fei'wootl FWle 17 408 3 0 408 3 0 0 388.10 434 N
6 T.DaniN Elem DE 78 412 S 14 468 7 1 24 614.00 614 Y
6lenritlge 6R 18 468 4 0 486 2 0 0 453.80 d88 Y
Grass leke GLm 18 432 4 20 452 9 0 0 408.50 427 N
HOAun ItE 21 SOa 2 0 604 3 0 0 44Z00 �69 Y
Jenkln9Craek JC i6 360 p M 4pq 3 1 24 318.�0 348 N
Kent Elementery Heten Yp A80 3 0 4H0 Y 4 98 B42tl0 BA2 v
LekeYou�ga LVfi 21 504 7 20 570 0 0 0 478.33 S00 N
hbNn9o�Wn NIS 78 468 3 2a 480 1 2 48 686.60 616' Y
Nleedow R MRIe 17 408 8 88 478 0 6 720 646.00 646 Y
Mefidl0n ElemeMery MEtn 21 504 3 20 524 3 2 48 668.50 B12 N
AAOlannium Ekme�rtcry YL 20 C80 7 PA 604 0 1 S4 687.00 867 Y
NeBly-O'Brien NO 20 /80 8 0 480 7 6 120 788.00 788 Y
PaMherLake ) PL 27 904 g 20 624 4 1 24 860.00 660 Y
�ParkOrchaM PO 18 {32 7 Sd 488 2 0 0 641.OB &0.1 Y
Pim Trea Vfm Y7 Wd 4 70 61d 1 0 0 SI0.03 821 Y
RldpaMoOd RWIh 21 Sd4 � 0 504 1 2 48 483.53 527 N
SawyerWoods SW 21 504 2 0 Sd4 0 0 0 41322 148 N
SCeniC Hill SH 71 408 8 88 478 � 3 72 64200 842 Y
SoDe Cnek SC/e 16 360 4 20 980 3 0 0 113.00 348 Y
Sprin9brook S8 17 40B 4 10 418 2 0 0 997.00 487 Y
Sufplae SRM 27 504 2 D 504 3 0 0 495.53 534 N
Kent Mtn.View Aced�em� MV 74 356 9 BO 410 0 0 0 112.a0 112 N
EIemBMaryTOTALM 514 19,078 .1211 580 13,81fi 81 37 744 13,92420 74,458
'EJememary clessroom capecily Is besetl on averape of 24:20-22 in K-3 8 28 in Gratles 4-8.Indudes etlluatrnenta fa ciase size reduc0on or spedel{xogrem diarges.
'KerR Schod Dfatrkt SYendard oF SeMce iasmea earre raome for Pu&out prop�ems.Ie.20 Totel=18 SlerMard+1 Computer Lab r i Musii+i Integreted Pmprem dauroom.
3 AN elemeMery achools heve Full Oay IGndergarten-12 FUK pragrame are State-Nntled:FfE repmts IOiM�.5&SF-F�K�1.0-PYL3 Heetlmuirt reporls Kinderyerten�1.0.
"Elementary achools heve 700%space WNtretion rate xiM�ro adjuatmeMe tor per4limm use M dessrooms.CwMs excWtle ECE Presclppien&space is reserved Por ECE claseroortis.
Kant Sclwd Diatrid Six•Veer Capnal FaNli6es PHn APPEPIDIX A nu�i zoia Page 33
KENT SCHOOL DISTRICT No.475
3TANDARD of SERVICE - PR06RAM CAPAC(PY • INVENTORY of PORTABLE3 • FTE and HEADCOUPIT ENROCCMENT
KSD Numbar� S�dMiphCup 'eEIIP TSpeciel� 2p1M2018 Progrem � Claeeroom aenca�eEie 1017/2013 ' 10/1/2013 HI
ELEMEMARY A8R SltlofHqhCAP �O�H P�B� P�8/em UBB U&B � CBpeCily P223,FTE3. 'P223HdC0ufrt POV°
SCHOOL Gaesfoome &a4avwWa� CR CepaGlY� Pdfeble8 Portehlee m2l�wqp' Enwtlment� EnroXment
a�ECEBnnKpHyGpeW Hapwm
Carriege Cfest CC 18 436 5 20 458 1 0 0 782.53 427 N
Cadar Valley CWe 16 344 8 20 380 4 0 0 ]OS.00 �09 Y
Coviigton CO/e 70 /84 6 24 4B8 1 �0 0 A4f.00 474 Y
GeslwoOd CW 1B 432 4 0 45Y 4 1 24 .482.34 493 N
EqtHill EH 20 468 6 10 d66 3� ] M 814.03 818 Y
Emewid Park EP 21 .184 4 0 IM 2� 0 0 184:80 �91 Y
Felrvraod Fwle 17 408 3 0 408 3 0 0 399.10 434 N
e T.Danfel Ebm DE 76 � 6 26 428 1 7 34 -614.00 674 Y
GNnrttlge OR 19 0.18 1 0 48B 2 0 0 467.60 �86 Y
Greae Lake 61�h 78 478 4 20 438 1 0 0 406.50 427 N
HarUnn FIE� 27 477 4 0 477 S 0 0 444.U0 469 Y
JenkinsCreek JC 15 416 7 44 458 3 1 24 918.00 348 N
KartHlemeMary KEhh 20 480 7 0 480 Y 4 88 842.00 84Y Y
lekeYounpe LYM 21 501 ) ZO 5f0 0 0 0 476.33 500 N
Meftln 3oAun NS 79 428 � 21 t6] 1 2 /8 688.60 616 Y
Meatlow Ritl MR/e 77 372 8 66 440 0 8 120 6t6A0 646 V
Meridien Elementery MFJh 21 504 3 ZO 524 3 2 48 688.50 812 N
NNIIe�Num Eleme�Aary ML 20 480 3 2d �84 0 1 14 887.00 687 Y
Nwly.p'&lan NO 20 460 6 0 480 7 6 130 786.00 768 Y
Parqha laM New PL 27 484 6 20 604 4 1 ?A 660.00 860 Y
PerkO�chBfd PO 1B 422 7 64 478 4 0 0 547.08 849 Y
Plna Tree v7m 21 A87 4 10 477 3 0 0 � 6R0.03 527 Y
RidpewooA RW/h 21 6W 1 0 504 1 2 48 483.53 527 N
r Woods SW 21 A66 2 0 486 0 0 0 � 473.72 448 N
8cenk Hill S1i 77 �BO 8 BB 4a8 4 E 72 ' 842A0 642 Y
SoosCreak� SC/a 16 322 4 20 S42 3 0 0 , 325.00 349� Y
SpA�gbrook SB 17 A08 4 10 418 2� 0 0 49TAU 497 Y
Sunriee �SRlh 21 543 2 0 543 3 0 0 '� 495.53 �534� N
KerR Mfn,Vlan AcadBm� AAV 1�1 356 9 60 410 0 0 0 112.00 112 N
, Ekmerltary TOTAItQ 544 12.739 120 58U 19.274 81 31 744 . 18.924.2D 14.468
'Ebmantary deseroom rapa�.ity b'6eaed on avaaye N 24:7A-72 in'K-3 8 291n Grades A-6.�I�udas edjUslmenG fM tless aiza reduGion or apecGO prog�in chen9es.
�Kent Schod DISMd Standerd d Servke recerves sama�oama for pW4wt progrems.ie,20 Tolel=18 SlaMerd+i Computer Lab+�,dlucic +tilnteprated Proprem daeemom.
a N elemmtary achoob hare Ful Oay KxMmgaAen-72 FDK proprame are SlatNuntleO.FTE reporta IGnA�.b 8 SF-FDK�1.D-P223 HeaticWM reporle Idndarperten�7.0.
�Ekmenfery echods heve 100%apece utll"uation re�wM rw�uahnmis hx part-tlme use ddesa�ooms.Carrrrb exdude ECE Preschoalen&space ia reserv�for ECE cleaaroans
s Elementmy Schods in bokl typa are dasslfieE ea HIBh Povarty erM Wsa ske in p�edes K-t la 20:1
Kenc sciw�. six-raar ceu�Fean�s� APPEPI 4-1 aau 2a+a ae�
f�NT SCHOOL ,fWCT No.415
STANDARD of SERVICE - PROGRAM CAPACITY - INVENTORY ot PORTABLES - FTE and HEADCOUNT ENROLLMENT
K3D #of •SteMsd sellP BpedalEa 3pec Specrai' 20132014 � Progfam Cleasroom Rebmlabb t011/2013 10/1/2013
MiDDIE ABR S�G C�eci7Y' Eu Prprli Pmgram Pttprem Uce Use Ca�cily P223 FfE° HeaOcount 3
BCFroO� dsrtns et 26=29 Cls Cepea'ty Clerme Ca Capadty' Porqbles Pqlebigs a�2g ea. Enrdlment Enrolp�ent
0 p eax � o-auo�
Cetlar He1gMs Mitldle Schooi CH 30 740 8 84 3 71 BBS 2 0 0 827.24 829
MatlsonNFddleSGrool AAA 24 592 8 7B 5 178 7H7 4 0 D B21.B0 822
MeakerMiAdle3chool MK 29 775 8 93 1 24 832 0 0 0 881.00 B81
Meridien Mltltlle School MJ 28 841 5 SB 4 96 792 8 0 0 845.05 &t7
Mill Creek Midtlle School MC 33 813 5 65 2 46 918 0 2 58 858.00 869
NathwoodMk7tlleSchool NW 33 873 2 18 4 95 928 0 0 0 839.82 641
Ke�t Maln}efn ViaxAcedemy(Oredes 3 12) MItldIB SChooi C�retle 7-e EnrdlRlBnt See Ekm 88.00 88
MlAdle Sc11po1 TOTAL 175 4.314 34 382 19 462 6,108 14 2 58 4.181.71 4.187
APPENDIX B
KSD Rot smrxlera sei�r eoaorea Spec Spedal' 20132014 Progrem Geaeropn aeqrsmda 10/112013 10NIZot3
SENiOR HIGH ABR St0 Cepar�ry eu. eu Prgm Progrem Pragrem Uae Uee Capedty P223 FTE' Headcount'
SCHOOL Cferme at25-31 Cla Cepedb Clsrms Ca Capedry� PortaWes Portablea at3lea. Enrdlment Enrdlmerrt
O �esz mesx
Ke�l�ridian5eni�Nigh KM SB 7,478 12 167 12 271 1,804 8 3 93 1.992.80 2.072
KenllakeSBnbrHigh KL 68 1,428 73 153 18 381 1,857 2 0 0 1,420.83 1,4%
Kenlritlge 3enior High IRi 85 1,713 13 138 18 428 2,277 0 4 124 1,997.80 2,073
KenlWoodSeNofNigh KW BO 1,667 8 102 20 478 2,169 6 4 124 1,840.00 1,811
Kent MDunfaln View Acatlemy(GradBs 3-12) Senbr Hgh Grade 9 12 Enrdlment See Ekm 131.48 136
KeM Phoenix Acedemy PH NorHratlitiaial Hig�School 414 274.80 282
RegionelJusticeC� � RJ WA N/A 200 2
Senbr H' h TOTAI 239 8.193 47 546 BB t.558 8.711 13 71 341 7.859.51 7,940
APPENDIX C F�dudesRunningStart&
eary cniarrooa ed sa,aems
DISTRIC7 TOTAL ese Y3,583 zo� �,aeo es 2,00e zt,a�s sa• aa �,�a3 zs,�asaz ze,ce�.00 '
' Sptrlal Program cepadty IrrcJutles dassroome requlAng spedelhed use sud7 es Special Etlucatbn,Career S Technkal Education Pmgreme,Computer Labs,etc
Z Secnndery achool cepadfy�adjuafed for 85%uBlhadon fate.FaolNy Use 3tutly was updaled lor progiam dianpea In 201&7a.
3 Enrdlmarrt le�epaled on FTE 8 H�wuM bmis.P223 HeadmuM exdudea ECE 8 CollegeoMy Runnhg Stmf stu0erds.Full headcount InduMng ECE 6 RS=27,842
Some Mtals mey be dightly diflerent due b roundhg.
� 13 Juverbes eerved at png County RegbnBi Jus6oe Cen[er are repofted SBpeia�ely tor InatiWUmel Fu�ng an Form E-872.Total RJ WUM in Odobef 2013 is 10.
Kent School DisMd StX-Yeer Capifel FarAlities Plan Total' of Appendices A B 8 C April 2014 v�e aa
KENT SCHOOL DISTRICT No. 415
USE of PORTABLES
Schopl Year 201&2074 20142016 ?A1S2018 201&2017 ' •2017-2018 2(11&2019 20132020
Reloqtable Use � rro.a siw�i rm.a sn�n rw.or snn�a rm.a s��men rm.a swaem rio.or swdem No.a swaent
RaocalaWes CapordY Relodam� CaPad�Y RebeamMea Capv9S Rebcelmlw CaparAy Rebcmedec Capadty Reloml�les CeO�Y R�es CaP�Y
RBIOqt8b185 fOf CI838�OOIf1�US8 39 50 86 '!5 93 111 125
Relocatabies for program,use sa ee ea ee as ee ee
(ie.Canputer labs,muaic,etc.)
Elerrien�ary Capedty Required�24 Z 39 8�8 60 1,206 88 1.684 75 1.800 93 2,ZJ2 117 2,884 128 3,W0
Middle Schoot Capacity Required g 29 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Saniar Hi�Capacity Required�31 0 0 0 0 0 0 0 0 0 0 0 0 0 0
11 of Relocatables Urilized �z� ��e �sa �aa �s� �as 2�a
Class�aom Rebcateble/Capadly Required 39 938 50 1;200 86 1,5&L 78 1,800 93 Y.232 1�1 2,864 12S 3.000
Plan for Allocatiomof Required Classroom Relocatable Facilities included�in Finance Plan:
Eleme�rtary ��2 3s so ss �s e3 t�� �2e
MWdIe School o 0 0 0 0 0 0
Seniw High 3 0 0 o a o 0 0
Tofai 3B 50 88 75 93 771 726
� Use oi additlonal relocateMen for clessrooma o�speelal proprama la baeed on need and flueWatlone o}enrollment e!eech school.
= FWI Oay K6Meipar�en at all Elementary achools MII i�wrease tlre need for relorafablea at tha elamerrtery level untll permarreat eepacity cen be provided.
� Alfhough rebcalables are uUNmd for a wide varlety oi purpoaee,�v w�q6uctlon and boutMary ad�ushneMs ere dmed to mlrtimim the requlremeM for.relocatables.
icentsax. w�5�-vearcaptaiFad�roesP�an APPEI D avrii zot4 �5
KENT SCHOOL DiSTRfCT Na. 415
Survey for Student Gerreration Fador
��a Elemenfary Taal S 1 u d e n t s Student Generafion�'actor
s Sin le Falnily Develo ments nrea unas To�e� eiem nts Hs ro�a� eiem ats Hs
sfe Adlets Cove SV11 92 75 50 73 12 0.815 0.543 0.141 0.130
sfo CaMerra PT 14 11 6 2 3 0.786 0428 0.143 0.214
et2 CreeksldeatRiverview NO B1 44 36 2 8 0,643 0.444 0.025 0.074
na Eagle Creat Perk Vlew-Soutl�ridga HE 219 203 124 27 52 0 927 0.586 0.123 0237
te� EasllandMeado�Ag Kent SC 13 20 8 5 7 t538 0.815 0.385 0538
aee Eastpdnte MS 99 58 39 7 10 0.588 0.394 0.071 0.101
sw Fem Creat East Kent SR 177 156 82 21 43 0.912 0.538 0.123 0.261
�to Hlghlend&RliododeMron Eefates ML 41 39 23 7 9 0,851 0.561 0.171 0.220
zze KenUaka HlBhlamie SW 177 144 69 2a 35 0.814 0 503 0.113 0.198
�at Meridi�Ridge HE 70 45 32 5 8 0.843 0.467 O.W1 O.N4
see North Parke Meadowa&Perlte Meadows South CW 708 172 59 72 31 1.057 0.557 0.208 0 282
�2x PeMherMeadows GR 32 32 22 3 7 1.000 0.688 0.094 0219
su Rai�ierVista CW 92 43 25 8 10 0.487 0.272 0.087 0.108
tse Rose's Meadow ML 37 24 12 5 7 0.849 0 324 0.135 0.188
�e 3evane!The Raserve/Stonefield!Crofton Hilla CO 351 385 172 54 139 1.090 0.480 0.154 0.398
�oo Shadow Brook R(dge(FCWesi)-Kent SR 128 114 89 14 31 0.891 0 639 0.709 0242
+m Temareck Ridge CW 134 78 41 70 27 0.582 0.30e 0.0T5 0201
�n The Parke FeirwoodlRenton RW 772 159 77 29 59 0.924 0.413 0.189 0.343
�te TrovitskyPa�ic-Renton RW 167 140 94 2P 28 0.838 0.583 0.120 0.158
♦fl WoodCreek Cpvitpton CW 154 134 74 22 38 0.870 0.4Bt 0.143 0247
Totel 2,163 1,864 1,046 279 539 0.862 0.484 0.128 0.249
E�a Elementery row S t u d e n t s Student Generetion Fador
: Aflulti-Family Develo ments a� u��� Taa� eiem �ns Hs rwai Fxm Ms Ns
ae Ada�bApeAmgnts Covington CO 200 78 45 8 25 0.390 0.725 0.000 OJ25
Iu AMBrbrookAparknBnfe-Kent EH 2�7 141 94 22 25 0.881 0.454 0.708 O.f21
ise ArterteApe�tmenfs KeM SH 81 85 43 11 11 0.802 0.531 0.138 0.136
fae Fai�woodPondApaMrents Renton FW 194 72 47 8 17 0.371 0242 O,p41 0.068
+a� Retl Mill at Painwod Renton CC 98 29 f e 3 8 0.302 OJ88 0.031 0.083
oa� Riverview-TheParka Keat NO 150 � 59 36 8 �7 0.383 0240 0.040 0.113
ioz Rock Creek Landing-Kent S6 211 ' 703 72 13 78 0.488 0 341 0.062 0.085
na SilverSprings/lperhneMs KeM PL 251 771 112 20 39 0.881 0.448 0.080 0.155
�9z Sunrise at Benson Condos-KeM GR 88 33 12. 7 f 4 0.375 0 136 0.080 0.759
rotai 7,478 757 479 98 174 0.508 0.324 0.068 0.778
Kent Schod Dblrkt Six-Year CepNal Fadirtes Plan APPEPIDIX E
Aprll 2014 Page 38
DETERMINATION OF NONSIGNIFICANCE
For
Kent School District No. 415
2014 Capital Facilities Plan
Issued with a 14-day commerrt and appeal period.
DescripUon of Proposai:
This threshold determination analyzes the environmental impacts associated with the
following actions, which are so closely related to each other that they are in eTfect a single
action:
1 The adoption of the Kent School District 2014 Six-Year Capftal Facilities Plan by
the Kent School District for the purposes of planning for the facilities needs of the Distrid.
2. The amendment of the King County Comprehensive Plan to include the Kent
School Distri�2014 Capital Facilities Pian as a part of the Capital Facilities Plan Element of the
King County Comprehensive Plan.
3. The amendment of the Comprehensive Plan of the City of KeM to include the
Kent Schooi DistricYs 2014 Capital Facilities Pian as part of the Capital Facilities Pian Element
of the Comprehensive Plans of the City of Kent.
4. The amendment of the Comprehensive Plan of the City of Covington to inGude
the Kerrt School DistricYs 2014 Capital Facilities Plan as part of the Capital FaCilities Plan
Element of the Comprehensive Plans of the City of Covington.
5. The amendment of the Comprehensive Plan of the City of Renton to include the
Kent School District's 2014 Capital Facilities Plan as part of the Capftal Faalities Plan Element
af ihe Comprehensive Plans of the Ciry of Renton.
6. The amendment of the Comprehensive Plan of the City of Aubum to include the
Kent School DistricYs 2014 Capitai Facilities Pian as part of the Capital FaciiRies Plan Element
of the Comprehensive Plans of the City of Aubum.
7 This proposal may also involve amendment of Comprehensive Pians of the Cities
of Biack Diamond, Mapie Valiey, and/or SeaTac to incorporate the Kent School District 2014
Capital Facilities Plan into the Capital Facilities element of that jurisdiction's Comprehensive
Plan.
1
Proponent: Kent School District No. 415
Location of the Proposal:
The KeM School District includes an area of approximately 70 square miles. The City of
Covington and portions of the cities of Kent, Renton, Aubum, Black Diamond, Maple Valley, and
SeaTac fall within the District's boundaries, as do parts of unincorporated King County
Lead Agency
Kent School Distrid No. 415 is the lead agency pursuant to WAC 197-11-926.
The lead agency for this proposai has determined that the proposal does not pose a
probabfe significant adverse impact ta the environment. An environmerrtal impact statement
(EIS) is not required under RCW 43.21C.030 (2) (c). This decision was made after a review of
the compfefed environmerttal checkiist and other infortnation on file with the lead agency This
information is availabie to the public up6n request.
This Determination of Non-sign�cance(DNS) is issued under WAC 197-11-340(2). The
lead agency wrill not act on this proposal for 14 days from the date of issue. Comments must be
submitted by 4:00 p.m., June 13, 2014 The responsible official will reconsider the DNS based
on timely crortimer�ts and may retain, modify, or, if significant adverse impacts are likely,
withdraw the DNS. If the D is retained, it will be final after the expiration of the commerrt
deadline.
Responsible Official: �
D Richard A. Stedry,
C ief Business Offic.er for
Kent School Dishict No. 415
Telephone: (253) 373-7295
Address: 12033 SE 256th Street#A-G00
Kent, Washington 98030-6643
Appeals of this detertnination are govemed by Board Policy No. 6890 which can be obtained
from Dr Richard A. Stedry, Chief Business Officer, Kent School District No. 415,
12033 SE 256th Street#A-600, Kerrt, VNashington 98030-6643 and pursuant to WAC 197-11-
680 and RCW 4321 C.075.
Date of Issue: May 30, 2014
Date Publishetl: June 6, 2014
2
ENVIRONflAENTAL CHECKLIST
UPDATED 2014
WAC 197-11-960 Environmental Checklist.
Purpose of Checklist:
Govemmerrtat agencies use this checklist to help determine whether the environmentai
impacts of your proposal are significant. This information is also helpful to detertriine 'rf available
avoidance, minimization or compensatory mitigation measures will address the probable
sign�cant impacts or if an environmental impact statement wiil be prepared to further analyze
the proposal
instructions for Applicants:
This environmental checklist asks you to describe some basic information about your proposal.
Piease answer each question accurately and carefuily, to the best of your knowiedge. You may
need to consuit with an agency specialist or private consultarrt for some questions. You may use
"not applicable" or"does not apply" only when you qn explain why it does not apply and not
when the answer is unknown. You may also attach or incorporate by reference additional
studies reports. Complete and accurate answers to these questions often avoid delays with the
SEPA process as well as later in the decision-making process.
The checklist questions appty to all parts of your proposal, even if you plan to do them over a
period of time or on different parcels of land. Attach any add�ional information that will heip
describe your proposal or its environmental effects. The agency to which you submit this
checklist may ask you to explain your answers or provide additional information reasonably
related to determining if there may be significant adverse impact.
Instructions for Lead Agencies:
Piease adjust the format of this template as needed. Additional information may be necessary to
evaluate the existing environment, all interrelated aspects of the proposal and an analysis of
adverse impacts. The checklist is considered the first but not necsssarily the only source of
information needed to make an adequate threshold determination. Once a threshold
determination is made, the lead agency is responsible for the compieteness and accurecy of the
chedclist and other supporting doouments
Use of checklist for nonproject proposals:
For nonproject proposals (such as ordinances, regulations, plans and programs), complete the
appiicable parts of sections A and B plus the SUPPLEAAENTAL SHEET FOR NONPROJECT
ACTIONS(part D). Please completely answer all questions that apply and note that the words
"project," "applicant," and "property or site"should be read as "proposal," "proponent," and
"aifected geographic area," respedively The lead agency may exclude (for non-projects)
3
questions in Part B- Environmental Elements—that do not contribute meaningfully to the
analysis of the proposal
A. BACKGROUND
1 Name of proposed project, if applicable:
The adoption of a six-year Capital Facilities Plan by the Kent School District. The
Comprehensive Plans of King Courrty, City of Kent, City of Covington, City of Renton,
City of Aubum and possibly Cities of Maple Valley, Black Diamond and SeaTac have
been andlor will be amended to indude the Kent School District 2014 Capital Facilities
Pian in the Capital Facilities Ptan Element of the Comprehensive Plan for each
jurisdiction. A copy of the Capital Facil'�ies Plan is available for review in the Kent
8chool District Business Services Department.
2. Name of applicant:
Kent School District No. 415.
3. Address and phone number of applicant and contact person:
Kent School District No. 415
12033 SE 256th Street #A-600
Kerrt, WA 98030-6843
Contact Person: Dr Richard A. Stedry, Chief Business Officer
Telephone: (253)373-7295
4 Date checklist prepared: May 12, 2014
5. Agency requesting checklist:
Kerit School District No. 415
6. Proposed timing or schedule (including phasing, 'rf applicable):
The 2U14 Kerrt SchQol District Capital Facilities Plan is scheduled to be forwarded to
King Courtty, Cities of Kent, Covington, Rerrton, Aubum, Maple Valley, Black Diamond,
and SeaTac for possible inclusion in each jurisdiction's Comprehensive Plan. The
Capital Facil'dies Plan will be updated annually Site-specific projects have been or will
be subject to project-speafic environmental review.
7 Do you have any plans for future additions, expansion, or further activity related
to or cannected with this proposal? If yes, explain.
The Gapital Facil'�ies Plan reviews proposed dassroom addition at Neely-O'Brien
Elementary School, re-opening of the fortner Kent Elementary School as Kent Valley
4
Early Learning Center and proposed construction of a new school that is intended to
replace the current Covington Elementary School. The expanded use of portables is
pianned to alleviate overcrowding at elementary schools.
8. List any environmental information you know about that has been prepared, or
will be prepared, directly related to this proposal.
The above-referenced projects wil� undergo environmental review at the time of formai
proposal.
9. Do you know whether applications are pending for govemmental approvals of other
proposals directly affecting the property covered by your proposai?
If yes, expiain.
No.
10. List any government approvais or perm�s that will be needed for your proposai, if
known.
King Courrty and Cities of Kent, Covington and Aubum will review and approve the
Capital Facilities Plan for the purposes of impact fee ordinances and will need to adopt
the Plan as an amendmeM to the Capital Facilities Plan element of the Comprehensive
Plans of King Courrty and Cities of Kent, Covington, Renton and Aubum. Cities of Maple
Valley, Biack Diamond, and SeaTac may also review and approve the Plan for the
purposes of any schobl impact fee ordinances and may adopt the Plan as an
amendment to the Capital Facilities element of their Comprehensive Plans.
11 Give a brief, complete description of your proposal, including the proposed uses
and the size of the project and site. There are several questions later in this checklist
that ask you to describe certain aspects of your proposal. You do not need to repeat
those answers on this page. (Lead agencies may modify this form to include adiiitional
specific ir�formation on project description.)
This is a non-project action. This proposal invoives the adoption of the Kent School
District 2014 Capital Facilities Plan for the purpose of planning the facilities needs of the
District and for indusion in the Capitai Faal'�ties Plan element and possible amendment
of the Comprehensive Pians for King County, City of Covington, City of Kent, City of
Renton, City of Aubum, City of Black Diamond, City of SeaTac and City of pAaple Vailey
A copy of the Capital Facilities Plan may be viewed at the Kent School District Business
Services Department office.
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address if any, and
section, township, and range, if known. If a proposal wouid occur over a range of area,
provide tha range or boundaries of the site(s). Provide a legal descrfption, site plan,
vicinity map, and topographic map, if reasonably available. HVhile you should submit
any plans required by the agency, you are not required to duplicate maps or detailed
plans submitted with any permit applications related to this checklist.
s
The 2014.Capital Facilities P{an will affect the Kent School District. The District includes
an area of approximately 70 square miles. The City of Covingtan, and portions of the
Cities of Ke�, Aubuin, Renton, Biack Qiamond, Maple Vailey, SeaTac and parts of
unincorporated King Gounty fall within the boundaries of the Kent School District.
B. ENVIRONMENTAL ELEMENTS
1 Earth
a. General desoription of the site (circle one): Flat, rolling, hilly, steep slopes,
mountainous, other
The Kent School District is comprised of a variety of topographic land forms and
gradier�ts, inciuding all of those listed. Specific topographic characteristios wiil be
identified during the planning and permit process for each capital project.
b. What is the steepest siope on the site (approximate percent slope)?
Specific slope charactenstics will be identified during the planning and pertnit process
for each capital projed.
c. Whaf general types of solls are found on the site (for example, c{ay, sand, gravel,
peat, muck)? If you know the class�cation of agricultural soils, specify them and note
any prime farmland.
Spec�c soil types will be identified during the planning and pertnit process for each
capitaf project.
d. Are there surFace indications or history of unstable soi{s in the immediate vicinity?
If so, describe.
Unstable soils may exist within the Kent School District. Spec�c soil limitations on
individual project sites will be identified at the time of ertvironmental review.
e. Describe the purpose, type, total area and approximate quarrtities and total
affected area of any filting or grading proposed. Indicate source of fill.
Individual projects inGuded in the Capital Facilities Plan will be subject to projed-
specific environmental review and local approval at the time of proposal. Proposed
grading projects, as well as the purpose, type, quantity, and source of fill materials will
be icientified as appropriate to each project.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
It is possible that erosion could occur as a result of construction projects currently
proposed in the Capital Facilities Plan. Individual projects and their erosion impacts
will be evaluated on a site-spe�c basis. Individual projects witl be subject to
environmental review and local approval on the time of proposal.
6
g. About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buiidings?)
Percentage of impervious cover will vary with each capital facilities project and will be
addressed during project-specific environmental review.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, "rf
any
Erosion potentia! on individual project sites will be addressed during project-spec�c
environmental review. Relevant erosion reduction and control requirements will be
met.
2. Air
a. What types of emissions to the air wouid resuft from the proposal during
construction operation and rriaintenance when the project is completed? If any,
generally describe and give approximate quantities 'rf known.
Various emissions, many construction-related, may resuit from individual projects.
Air-quafity impacts wiil be evaluated during project-specific environmental review.
Please see the Supplemental Sheet for Non-project Actions.
b. Are there any off-site sources of emissions or odor that may affect your
proposal? If so, generalty describe.
Off-sfte sources and necessary mitigation will be addressed during project-spec�c
environmental review
c. Proposed measures to reduce or control emissions or other impacts to air, if any
Plans for individual projects included in the Capital Facilities Plan have been or will be
subject to environmental review and relevant local approval processes, including
obtaining of any necessary air quality permits, at the time individual projects are
formaily proposed. Please see the Suppiemental Sheet for Non-project Actions.
3. Water
a. Surface:
1) is there any surtace water body on or in the immediate vicinity of the site
(including year-round and seasonal streams, salfinrater, lakes, ponds, wetlands)?
If yes, describe type and provide names. If appropriate, state what stream or
river it flows into.
There is a network of surtace water bodies within the Kent School District. The
surface water regimes and flow patterns have been or will be researched and
incorporated in the design of each individual project.
2) Wiil the project require any work over, in, or adjacent to (within 200 feet)
the described waters? If yes, please describe and attach availabie plans.
�
Some prbjects may require work near these desaibed waters. Individual
projects in the Capitai Facilities Plan will be subject to environmental review and
iocal approval reciuirements at ttie time the project is formally proposed.
3) Estimate the amount of fili and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be aff'ected. Indicate the source of fill materiai.
Information with respect to placemetrt or removal of fill or dredge material wili be
addressed at the time of project-spec�c environmental review. Appiicable local
regulations have been or wili be sati�ed.
4) Will the prbposal require surface water wfthdrawais or diversions? Give
general description, purpose, and approximate quantities if knov�in.
Any surface water withdrawals or diversions have been or will be addressed
during prnject-speafic envirorimenfal review.
5) Does the proposal lie within a 100-year floodplain? If so, note location on
the site plan.
Each capital facifities project, if located in a floodplain area, will be required to
meet applicable Iocal regulations for flood areas.
6) Does the proposal involve any discharges of waste materials to surtade
waters? If so, describe the type of waste and anticipated volume of discharge.
S�cific infortnation regarding discharges of waste materials, if any, will be
addressed during project-spe�c e�vironmerrtal review. Please see the
Supplemental Sheet for Non-project Actions.
b. Ground:
1) Will ground water be withdrawn, from a well for drinking water or other
purposes? If so, give general description of the well, proposed us.es and
approximate quantities withdrawn from the++vell. Will water be discharged to
groundwater?Give general description, purpose, and appro�mate quantities rf
known.
Individual projects included in the Capital Facilities Plan may impact ground
water resources. Each projed will be evaluated during project-spec�c
environmental review. Applicable local regulations have been or will be satisfied.
Please see the Supplerimental Sheet for Non-project Actions.
2) Describe waste material that will be discharged into the ground from
sep#ic tanks or afher sources, if any (for example: Domestic savirage; industrial,
containing the following chemicals ., agricultural; etc.). Describe the generdl
size of the system, the number of such systems, the number of houses to be
8
served (if applicabls), or the number of animals or humans the system(s) are
expected to serve.
Impads of discharged waste materiai, if any, have been or will be addressed
during sit�specific, project-level environmenta� review.
c. Water Runoff(including storm water):
1) Describe the source of runoff(inciuding storm water) and method of
coliection and disposal, ff any (inGude quarrtities, 'rf known). Where will this water
flouY?Will this water flow irrto other waters? If so, describe.
Individual projects included in the Capital Facilities Plan may have varying storm
water runoff consequences. Each project will be subjed to environmerrtal review
and applicable local regulations.
2) Could waste matenals enter ground or surtace waters? If so, generally
describe.
Individual projects included in the Capital Facil�ies Plan will have varying
environmental impacts and wiil be subject tb appropriate review and local
regulations prior to construction. Information regarding waste materials will be
presented at the time of such review Please see the Supplemental Sheet for
Non-project Actions.
3) Does the proposal aiter or othervvise affed drainage pattems in the vicinity of
the site? If so, describe.
Individual projects included in the Capital Facilities Plan may have varying
drainage pattem consequences. Each projed will be subject to erivirbnmental
review and appiicable local regulations
d. Proposed measures to reduce or control surFace, ground, and runoff water
impacts, if any
Specific measures to reduce or control runoff impacts have been or will be developed
on a project-specific basis in cooperation vuith the appropriate jurisdiction.
4 Plants:
a. Check or circle types of vegetation found on the site:
_ deciduous tree: alder, maple, aspen, other
_ evergreen tree: fir, cedar, pine, other
_ shrubs
_ grass
_ pasture
9
b. List any threatened or endangered species known to be on or near the site.
Spec�c impacts to these species from individuai pmjects will be determined at the
time of project proposal and will be reviewed in cooperation with the affected
jurisdictions.
c. Is the site part of a migration route? If so, explain.
Impacts on migration routes, ff any, will be addressed during site-specific, project-
level environmentai review.
d. Proposed measures to preserve o�enhance wildiife, 'rf any�
Appropriate measures to preserve or enhance wiidlife have been or wiA be
determined at the time of site-specific, project-level environmerrtal review
e. List any invasive animal species known to be on or near the site.
An inventory of invasive animal species observed on or near sites has been or will be
developed during project-spec�c environmer�tal review
6. Energy and Natural Resources:
a. What kinds of energy (electric, natural gas, oii, wood stove, solar)wiil be used to
meet the completed projecYs energy needs? Describe whether it will be used for
heating, manufacturing, etc.
The State Board of Education requires a life-cyGe cost anaiysis of all heating,
lighting, and insulating systems prior to allowing specific projects to proceed. Energy
needs will be decided at the time of specific engineering and site design planning.
Please see the Supplemental Sheet for Non-project Actions.
b. Would your project affect the potentiai use of solar energy by adjacent
properties? If so, generally describe:
Individual projects of this Capital Facil'�ties Plan will be evaluated as to their impact on
the solar potential of adjacent projects during environmental review.
c. What kinds of energy conservation features are inGuded in the plans of this
proposal7 List other p�oposed measures to reduce or control energy impacts, ff any
Energy conservation measures will be considered at the project-spec�c design
phase and environmerrtal review
7 Erivironmental Health:
11
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spiil, or hazardous waste, that could occu�as a
resutt of this proposal? if so, describe.
Please see the Supplemental Sheet for Non-project Actions.
1) Describe any known or possible contamination at the site from present or
past uses.
Please see the Supplemental Sheet for Non-project Actions.
2) Describe existing hazardous chemicals/conditions that might affect
project development and design. This includes underground hazardous liquid
and gas transmission pipelines located within the project area in the vicinity
Piease see the Supplemental Sheet for Non-project Actions.
3) Describe any toxic or hazardous chemicals that might be stored, used, or
produced during the projecYs devetopment or construction, or at any time during
the operating life of the project.
Please see the Supplemental Sheet for Non-project Actions.
4) Describe special emergency services that might be required.
Please see the Supplemental Sheet for Non-project Actions.
5} Proposed measures to reduce or control environmental health hazards, if
any
Proposed projeds will compiy with all current codes, standards, and rutes and
regulations. Individual projects have been or will be subject to environmental
review and loca� approvai at the time of formal submittal.
b. Noise:
1) What types of noise exist in the area which may affect your project (for
example: traffic, equipment, operation, other)?
A variety of noises exist within the Kent School District. Spec�c noise sources
have been or will be identified during project-specific environmental review.
2) What types and levels of noise wbuld be created by or associated with
the project on a short-term or a long-term basis (for example: tra�c,
construction, operation, other)? indicate what hours �oise would come from the
site.
Normal construction noises wouid exist on a short-term basis during school
construction. There could be an increase in tra�c or operations-related noise
iz
which would be addres§ed during project specific environmentai review. Please
see the Suppiemental Sheet for Non-project Actions.
3) Prbposed measures to reduce or control noise impacts, if any:
Project noise impacts have been or will be evaluated and mitigated during the
project-specific environmental review Each project is or wiil 6e subject to
app(icabls local regulations.
8. Land and Shoreline Use:
a. What i§the currerd use of the site and adjacent properties?
There are a variety of land uses within the Kerit Schooi District, including residential,
�mmercial, industrial, institutional, utility, agricuttural, forestry, open space,
recreational, etc.
b. Has the site been used as working farmfands or working forest lands? If so
describe. How much agricuRural or forest land of long-term commercial sign�cance
will be �nverted to other uses as a resuft of the proposal, if an�? If resource lands
Kave not been designated, how mariy acres in fartnland or forest land tax status will
be converted to nonfarm or nonforest use?
1)Will the proposal affect or be affected by suRounding working farm orforest
land normal business operations, such as oversize equipment access, the application
of pesticides, tilling, and harvesting? If so, how•
This question witl be addressed during site-spe�c, projed-level environmerital
review.
c. Describe any structures on the site.
Structures lorated on proposed sites have been or will be identified and described
during project-specific environmental review when appropriate.
d. Will any structures be demolished? If so, what?
Structures to be demolished, 'rf any, will be ident�ed as part of the project-specific
environmental review process.
e. What is the current zoning classification of the site?
There are a variety of zoning class�cations within the Kent School District. Site
specific zoning ir�formation has been or will be identified during project-specifc
environmental review.
f. What is the current comprehensive plan designation of the site?
An inventory of comprehensive plan designations has been or will be completed
during project-specific environmental review.
13
g. If applicable, what is the current shoreline master prbgram designation of the
site?
Any shoreline master program designations have been or will be iderrt�ed during
project-spec�c environmental review.
h. Has any part of the site been classified as a critical area by city or county7 If so,
specify
Environmentally sensitive areas, ff any, will be ident�ed during project-specific
environmental review.
i. Approximately how many people would reside or work in the completed project?
This information has been or will be provided at the time of project-spec�c
environmerrtal review.
j. Approximately how many people would the completed project displace?
It is not anticipated that proposed projects will displace any people. Displacement of
people, if any, will be evaluated during project-specific environmental review
k. Proposed measures to avoid or reduce displacement impacts, 'rf any�
Individual projects included in the Capital Facil"dies Plan witl be subject to project-
specific environmental review and local approval at the time the project is formally
proposed.
I. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any
Compatibility of the proposai and specific projects with existing uses and pians have
been or will be assessed as part of the comprehensive planning process and during
project-specific environmental review.
m. Proposed measures to ensure the proposal is compatible with nearby agri6ultural
and forest lands of long-term commercial signficance, 'rf any
Compatibility of the proposal and specific projects with existing uses and plans have
been or will be assessed as part of the comprehensive planning process and during
project-specific environmental review.
9. Housing:
a. Approximately how many units would be provided, if any? Indicate whether high,
middle, or low-income housing.
No housing units would be provided.
14
b. Approximately how many units, if any, would be eliminated? Indicate whether
high, iniddle, or low-income housing.
Any impact of project proposals on existing housing has been or would be evaluated
during project-specific environmental review prooeiiures.
c. Proposed measures to reduce or control housing impacts, if any
Measures to reduce or control any housing impacts have been or wiil be addressed
during site-spec�c, project-level environmental review.
10. Aesthetics:
a. What is the tallest height of any proposed structure(s), not including antennas;
what is the principal exterior buiiding material(s) proposed?
Aesthetic impacts have been or will be determined at the time of site-specific, project-
level environmerrtal review.
b. What views in the immediate vicinity would be altered or obstructed?
Aesthetic impacts have been or will be determined at the time of site-spec�c, ptoject-
level environmental review.
c. Proposed measures to reduce or control aesthetic impads, if any
Appropriate measures to reduce or control aesthetic impacts have been or will be
detertnined at the time of project-specific environmental review.
11 Light and Glare:
a. What type of IigM or glare will the proposal produce? What time of day wrould it
mainfy occur?
Light or glare impacts have been or will be determined at the time of project-specific
environmental review.
b. Could light or glare from the finished project be a safety hazard w interfere with
views7
Light or glare impacts have been or will be determined at the time of project-specfic
environmental review.
c. What existing off-site sources of light or glare may affect your proposal?
Off-site sources of light or glare have been or will be evaluated at the time of project
specific environmental review.
is
tribes and the department of archeology and historic preservation, archaeological
surveys, historic maps, GIS data, etc.
Appropriate measures have been or will be proposed on a project-spec�c basis.
d. Proposed measures to avoid, riminimize, or compensate for loss, changes to, and
disturbance to resources. Please include plans for the above and any permits that
may be required.
Appropriate measures have been or will be proposed on a project-specific basis.
14 Transportation:
a. IdeMify public streets and highways serving the site, and describe proposed
access to the existing street system. Show on site pians, if any
impact on public streets and highways has been or will be assessed during project-
specific environmental review.
b. Is sfte or affeded geographic area currently served by pubiic transit? If not, what
is the approximate distance to the nearest transit stop?
The relationship between specific projects and public transit has been or will be
assessed during project-specific environmental review.
c. How many additional parking spaces would the completed project or non-project
proposal have? How mariy would the project or proposal eliminate?
An inventory of parking spaces and the impacts of spec�c projects on parking spaces
have been or will be conducted during project-specific environmental review.
d. Will the proposal require any new or improvements to existing roads, streets,
pedestrian, bicycle or state transportation facilities not including driveways? If so,
generally describe (indicate whether public or private).
The development of new schools may require new access roads or streets. This
issue wiil be fully addressed during project-specfic environmental review.
e. Wiil the project or proposal use (or occur in the immediate vicinify o� water, rail,
or air transportation? If so, generally describe.
Use of water, rail or air transportation has been or will be addressed during site-
spec�c, project-level environmental review.
f. How many vehicular trips per day wauld be generated by the completed project?
If known, indicate when peak volumes would occur and what percerrtage of volume
would be trucks (such as commercial and nonpassenger vehicles). What data or
transportation models were used to make these estimates?
Each project proposal has been or will be separately evaluated as to traffic impacts.
17
g. Wiil the proposal intertere with, affect or be affected by the movement of
agricultu�al and forest products on roads or streets in the area? If so, generally
describe.
Each project prbposal has been or wiii be separately evaluated as to traffic impacts.
h. Proposed measures to reduce or control transportation irripacts, if any
Mitigation of impacts on transportation has been or will be addressed during project-
specific envirorimerital review.
15. Public Services:
a. Would the projed resuk in an increased need for pubiic services (for example:
fire protection, police protection, heafth care, schools, other)? If so, generalty
describe.
T`he District does not anticipate that the projects identified in the Capital Facilities
Plan will substarrtially increase the need for other public services. impacts have been
or will be evaluated on a project-specitic basis.
b. Proposed measures to reduce or control direct impads on public services, if any.
Schools are built with automatic security systems, fire alarms, smoke alartns, heat
sensors and sprinkler systems.
16. Utilities:
a. CirGe utilities curcently available at the site: electricity, natural gas, water, refuse
service, telephone, sanitary sewer, septic system, other
Utilities available at project sRes have been or will be ident�ed during project spec�c
environmental review.
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the generai construction activities on the site or in the immediate vicinity
which might be needed.
Utility revisions and construction needs will be identified during project-spec�c
erivironmental review.
ie
C. SIGNATURE
The above ers are true and compiete to the best of my knowledge. I understand
that the ad ency is reiying on them to make its decision.
�
Signature:
r Richard A. Stedry
hief Business Officer
Date Submitted: May 30, 2014
19
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project adions)
Because these questions are very general, it may be helpful to read them in conjunction
with the list of the elements of the environmeM.
When answ�ring these guestions, be aware of the exterrt the proposal or the types of
activfties IiKely to resuft from the proposal, would affect the item at a greater intensity or
at a faster rate than if the proposal were not implemenYed. Respond briefly and in
general terms.
1 How would the proposal be likely to increase discharge to water emissions to air;
productian, storage, or release of toxic or hazardous substances; or production of
noise?
To the extent this Plan makes it more tikely that school facilities will be constructed,
and/or renovated or remodeled, some of these environmental impacts will be more
likely. Additional impertneable surfaces, such as roofs, parking lots, sidewalks,
access roads and playgrounds will increase storm water runoff, which could enter
surface or ground water Emissions to air could result from heating systems,
emergency generators and other equipment, anii from additional car and tius trips to
and from the schooi for students and faculty Any emissions resulting from this Plan
should not re.qui2 the production, storage, or release of toxic or hazardous
substances, with the possibie exception of storage of diesel fuel or gasoline for
emergency generating equipment. Noise may resuit from additional traffic and from
concentrating several hundred children at a new facility, especially before and after
school and during recesses.
To the extent this proposal allows additional residential development to occur, these
impacts wouid also increase somewhat, but it is not possible to quantify those
impacts at this time. The impacts wouid depend on the type, location and distribution
of housing, for example, whether single or multipie family and the location of the
school.
Prop6sed measures to avoid or redu6e such increases are:
Facilities implemerrting the Plan have been or will be evaluated at the project specific
level and impacts will be mitigated accordingly Storm wate�detention and runoff will
meet appiicable County and/or City requirements and, de�nding on the date of
actual construction, may be subject to a National Poliutarrt Discharge E{imination
System ("NPDES'� permitting requirements. Discharges to air will be minimal, and
wili meet.any applicable requirements of the Puget Sound Air Pollution Confrol
Authority Fuel oil will be stored according to local and state requirements.
20
2. How would the proposal be likely to affect plants, animals, fish, or marine li�e?
The Plan itself will have no impact on these elements of the environment. Depending
on the particular site, construction of facilities may require clearing sites of plants and
loss of animal habitat. To the extent residential development is allowed, additional
area may be cleared and etiminated as habitat for animals. There are not likely to be
any impacts on fish or marine life, although some water quality degradation in
streams and rivers could ocair due to increased residential development. These
impacts have been or will be addressed in more detail during project-speciflc
environmental review when appropriate.
Proposed measures to protect or conserve plants, animais, fish, or marine life are:
Individual projects will be evaluated and mitigated appropriately on a project-spec�c
basis, but specific mitigation proposals cannot be identified at this time.
3. How would the proposal be likely to deplete energy or natural resources?
Any actual projects resufting from this Plan would consume heating fuel and electrical
energy Increased traffic resulting from the construction of additional facilities would
consume petroleum based fuels. Reduced tra�c resuiting from construction of
another neighborhood schooi may aiso reduce amounts of fuel consumed, but it is
not possibie to quaMify such reduction in consumption at this time. These impacts
have been or will be addressed in mare detail duririg project-specific environmental
review when appropriate.
Proposed measures to protect or conserve energy and natural resources are:
Facilities would be constructed in accordance with appiicable energy efficiency
standards.
4. How would the proposal be likely to use or affiect ernironmentally sensitive areas or
areas designated (or eligibie or under study)for govemmental protection; such as
parks, wildemess, wild and scenic rivers, threatened or endangered species habitat,
historic or cultural sites, wetiands, floodplains, or prime farmlands?
The Plan and facilities constructed pursuant to the Pian should have no impact on
these resources. It is not possible to predict whether other development made
possible by this Plan would affect sensitive areas.
Pro�sed measures to protect such resources or to avoid or reduce impacts are:
No spec�c measures are being proposed at this time. Appropriate measures have
been or will be proposed during project-specific review. Annuai updates of this Plan
will be coordinated with King County, Cities of Kent, Covington, Renton, Aubum,
Black Diamond, SeaTac, anii Maple Valley as part of the Growth Management Act
process, one of the purposes of which is to protect environmentally sensitive areas.
To the extent the School DistricPs facilities planning process is part of the overall
growth management planning process, these resources are more likely to be
protected.
2�
5. How wouid the proposal be likely to affect land and shoreline use, inGuding whether it
would allow or encourage land or shoreline uses incompatible with existing plans?
The Pian will not have any impact on land or shoreline use that is incompatible with
existing comprehensive plans, land use codes, or shoreline management plans.
Proposed measures to avoid or reduce shoreline and land use impacts are:
None a2 proposed at this time. Adual facifities constructed to implemerrt the Plan
wiil be sited and constructed to avoid or reduce land use impacts.
6. How would the proposai be iikely to inaease demands on transportation or public
services and utilities?
This proposal should not create s,ubstarrtial new demands for transportation. The
projects included in the Capital Fecilities Plan may create an increase in traffic near
new Distrid facilities but a(so reduce traffic by creating the opportunity for more
studerrts to walk to a closer school. The construdion of the facilities included in the
Capital Facilfties Plan may result in minor increases in the demand for public services
and utilities, such as fire and police protection, and water, sewer, and electric utilities.
None of these impacts are Iikely to be sign�carrt. The impacts on transportation and
public services and utilities of the projeds induded in the Capital Facilities Plan will
be addressed during project-level review when appropriate.
Proposed measures to reduce or respond to such demand(s) are:
No measures to reduce or respond fo such demands are proposed at this time.
7 Identify, if possible, whether the proposal may conflict with local, state, or federal laws
or requirements for the protection of the environment.
The Kent School District Capital Facilities Plan will not conflict with any laws or
requiremertts for the protection of the environment.
22
*
cmr oF *�' * Memorandum
� �1
WASHINGTON
To: Planning and Community Development
From: Finance Department, Capital Projects
Date: October 2,2014
Re: DRAFT 6-Year Capital Facilities Plan(20152020)
Please find attached the final copy of our 20152020 Draft Capital Facilities Plan (CFP), the capital facilities
element of the Citys Comprehensive Plan. For questions or additional information on the preparation of
this document, please contact Consuelo Rogel at (253) 8045023 or croqelC�aubu�nwa.pov Questions
regarding specific projects contained in the document should be directed to the department managing the
project(s).
A capital facilities plan is one of the comprehensive plan elements required by Washington's Growth
Management Act (GMA). The GMA requires that a capital facilities plan include an inventory of existing
ppital facilities (showing locations and capacities), a forecast of future needs for such qpital facilities,
proposed locations and capacities of new or expanded capital facilities, and a minimum of a six-year plan to
finance capital facilities vvith ideM�ed sources of funding. The attached CFP satisfies the GMA requi'rement
for a Capital Facilities Element as part of the Comprehensive Plan.
The following projects have been added, removed or revised from the previous year's CFP (20142019)
due to the creation of new projects, completion of projects or changes in project titles andlor priorities:
Water,Sewer,Stortn Utilities
Additions
• Coal Creek Springs Rehabilitation (Water, page 105)
. Reservoir Seismic Rehabilitation (Water, page 121)
• Lea Hill-132ntl Ave DisVibution System Modifications (Water, page 122)
• Aubum Way S6uth Flooding Imprbvements Phase 2 (Water, page 123&Sewer, page 138)
• Auburn Way South-0ogwood to Fir (Water, page 124)
• Auburn Way South—Fir to Hemlock (Water, page 125)
• Auburn Way South—Muckieshoot Plaza tb Dogwood (Water, page 126)
• Reservoir Painting (Water, page 127)
• 24"White River Crossing (Water, page 128)
Page 1 of 4
AUBURN * MORE THAN YOU IMAGINED
Water,Sewer,Stortn Utilkies
Additions(corrtinued)
. BNSF Utility Crossing (Sewer, page 139)
• Sewer Pump Station Replacement/Improvement (Sewer, page 140)
• M Street SE Stortn Improvement (Storm, page 148)
. Howard fZoad Improvements (Storm, page 149)
• 37'"St. NW Stortn Improvement (Stortn, page 150)
• M&O Storm Drainage Improvements (Stortn, page 151)
. Hillside Drainage Assessment (Stortn, page 164)
• North Airport Area Improvements (Stortn, page 165)
. D Street SE Storm Improvement (Stortn, page 166)
. Anne�cation area Small Storm Improvement (Storm, page 167)
Deletions
• Well 5 Upgrade(Water)
• We117 Emergency Power(Water)
. Maintenance&Operations Expansion(Water,Sewer, Storm)
• U6lities Field Operations Center(Sewer,Storm)
• Vactor Decant Facility(Stortn)
Transportation Projects(see TIP for further details)
Additions
. 46"'Place S Realignment (page 42)
• Tra�c Management Center Improvements (page 49)
• West Valley Highway Improvements-15"'St NW to W Main St (page 50)
. Lake Tapps Parkway ITS 6cpansion (page 51)
. Evergreen Heights Safe Routes to School Improvements (page 55)
• I Street N_E and 22ntl St NE Roundabout Safety Improvement (page 64)
• West Valley Highway Improvements SR-18 to 15'"St SW (page 65)
. A Street SE 8 6"'Street SE Safety and Access Improvements (page 77)
• Lake Tapps Parkway Preservation (page 86)
. Auburn Way North Preservation-22ntl Street NE to 45"'Street NE (page 89)
• 15�'Street NEINW Preservation SR-167 to 8"'SVeet NE (page 90)
Page 2 of 4
riVBURN * MORE THAN YOU IMAGINED
Deletions
• I Street NE Corridor
• A Street NW, Phase 2
• D Street NW, 37"'to 44"'
. Environmental Park Roadway Improvements Study
. Downtown to Les Gove Non-Motorized Improvements Study
• S 316'"Street Bicycle 8 Pedestrian Improvement Study
. East Valley Highway ITS Expansion
• Citywide Guardrail Improvements
• Annual Bridge Structure PreservaGon
• Lea Hill Safe Routes to School Improvements
• West Valley Highway System Preservation(15'"St NW to 37"'St NW)
• Arterial Bridge Deck Rehabilitation
Parks,Arts&Recreation Projects
Additions
• SunsetPark (page190)
Deletions
• Veteran's Park Improvements
• Centennial Viewpoint Park
• Williams Pipeline Trail
. Dysktra Park Improvement
Community Improvements/General Municipal Buildings
Additions
. M80 Small Equipment and Tool Storage Building (page 203)
• M80 Lunchroom Expansion (page 204)
• Aubum Environmental Park Boardwalk Phase 2 (page 216)
• Downtown Wa�nding Program (page 217)
• Green River Park Design (page 218)
• Les Gove Campus Master Plan (page 21 g)
• Main SVeet Streetscape Urban Design (page 220)
• City Downtown Public Parking Lot Reconfiguration (page 221)
Page 3 M 4
AUBURN * MORE THAN YOU 1MAGWED
Deletions
. City Hall HVAC System Upgrade
• City Hall Remodel, Phase 2 8 3
• Future Capacity Project Funding
Airport
Additions
• South T-Hangar Row 3 EnGosure (page 229)
• Obstruction Survey for NexGen/GPS Approach (page 230)
• Land Acquisition for Future Approaches (page 231)
. Runway 6ctension (page 233)
. Automated Weather Observation System (page 234)
• Fuel Farm (page 235)
• Land Acquisition-ArmsVong (page 236)
. Precision Approach Path Indicator(PAPI)for Runway (page 237)
• West Side Fencing (page 238)
. Taxiway Seal Coat 8 Reshipe (page 240)
Deletioris
• Hangar Roof Repair/Replacement
• Airport Master Pian Update
• Asphalt Rehabilitation and Seal Coat
Cemetery
Detetions
. Memory Heights New Development
Page 4 of 4
AUBURN * MORE THAN YOU IMAGINED
City ofAuburn Draft Capital Facilities Plan
�
CITY OF �� �, *
r -
- a `
* WASHINGTON
CAPITAL FACILITIES PLAN
(2015 - 2020)
Adopted by Ordinance No xxxx, December_, 2014 as part of the
City of Auburn Comprehensive Plan
City of Auburn
25 West Main
Auburn, WA 98001
(253) 931-3000
www.auburnwa.gov
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
� -
�k MORE THAN YOU IMAGINED
Ciry ofAuburn Draft Capital Facilities Plan
CAPITAL FACILITIES PLAN
2015 —2020
TABLE OF CONTENTS
Executive Summary 1
1 Introduction
Purpose 7
Statutory Requirement for Capital Facilities Elements 7
Concurrency and Level of Service 8
Implementation g
2. Goals and Policies
1 Capital Facilities Response to Growth 11
2. Financial Feasibility 11
3. Public Heaith and Erivironment. 13
4. Consistency With Regional Planning 13
3. Capitallmprovements
Introduction 15
Transportation 17
Arterial Street(102) Capital Projects. 22
Local Street (103) Capital Projects 82
Street Preservation Fund (105) Capital Projects 84
Water 93
Sanitary Sewer 131
Storm Drainage 141
Solid Waste 169
Parks, Arts and Recreation. 171
General Wlunicipal Buildings 197
Community Improvements 2p7
Airport, 2z5
Cemetery 241
Golf Course 243
Police Department. 245
Valley Regional Fire Authority 247
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
�
�k MORE THAN �OU IMAGINED
City ofAuburn Draft Capital Facilities Plan
EXECUTIVE SUMMARY
A capital facilities element is one of the comprehensive plan elements required by
Washington's Growth Management Act (GMA). Capital facilities generally have long useful
lives, significant costs and tend to not be mobile.
The GMA requires that capital facilities elements include an inventory of existing capital
facilities showing locations and capacities, a forecast of future needs for such capital
facilities, proposed locations and capacities of new or expanded capital facilities and at
least a six-year plan tb finance capital facilities with identified sources of funding. The
GMA also requires that the land use element be reassessed if probable funding falls short
of existing needs.
This document is the City's six-year Capitai Facilities Plan (CFP). The CFP, in conjunction
with other City adopted documents, satisfies the GMA requirement for a Capital Facilities
Element. It addresses one of the GMA's basic tenets: to provide adequate facilities to
support development in accordance with locally adopted level of service standards.
This CFP will enable the City to: (1) make informed decisions about its investment of public
dollars, and (2) make timely decisions about maintaining level of service in accordance with
this CFP and other adopted plans.
CAPITAL FACILITIES PLAN CONTENT
This CFP consists of the following:
Chapter 7 Introduction Purpose of CFP, statutory requirements,
methodology
Chapter 2. Goals and Policies Goals and policies related to the
provision of capital facilities.
Chapter 3. Capital Improvements Proposed capital projects, which include
the financing plan and reconciliation of
project capacity to level of service (LOS)
standards.
This CFP is a companion document to the Capital Facilities Element of the Auburn
Comprehensive Plan (Chapter 5). The Capital Facilities Element of the Auburn
Comprehensive Plan identifies the Citys planning approach and policy framework for the
provision of capital facilities. This CFP provides the background inventory, identifies
proposed projects and establishes the six-year capital facilities plan for financing capital
facilities.
The comprehensive plan contains timeframes which are the intended framework for future
funding decisions and within which future actions and decisions are intended to occur
However, these timeframes are estimates; depending on factors involved in the processing
of applications and project work, and the availability of funding, the timing may change from
the included timeframes. The framework does not represent actual commitments by the
City of Auburn that may depend on funding resources available.
1
City ofAuburn Draft Capital Facilities Plan
GROWTH ASSUMPTIONS
In planning for capital facilities, contempiation of future growth needs to be considered. The
CFP is based on the following City population forecast:
Yea� Population
2013 73,235
2014 74,630
2020 85,288
The popula.tion forecasts are based on information from the State of Washington Office of
Financial Management (OFM) as well as estimates developed by the City of Aubum
Planning and Community Development Department.
CAPITAL.COSTS OF FACILITIES
Based on the analysis of capital improvements contained in this document, the cost of City-
owned and mariaged capital improvements for 2015-2020 is summarized as follows:
Type of Facility 2015 -2020
Transportation -Arterial (102) $ 102,923,867
Transportation -Local (103) 10,600,000
Transportation - Street (105) 16,347,850
Water 30,832,065
Sanitary Sewer 11,345,160
Storm Drainage 14,710,042
Parks, Arts & Recreation 24,205,000
General Municipal Buildings 5,537,223
Cor»muriity lmprovements 5,323,161
Airport 3,893,170
To.tal $ 225,717,538
2
City ofAuburn Draft Capital Facilities Plan
FINANCING FOR CAPITAL FACILITIES
The financing plan for the citywide capital improvements includes:
Funding Source 2015 - 2020 Gapital Facility
Grants 85,704,577 Transportation
(Includes grant funding that has not 5,580,000 Parks, Arts & RecPeation
been secured) 1,150,000 Community Improeements
259,887 Storm Drainage
3,188,362 Airport
User Fees/Fund Balance 15,033,065 Water
11,845,160 Sewer
12,942,680 Storm Drainage
379,620 Community Impro�,ements
1,270,000 Equipment Rental
704,808 Airport _
Arterial Street Fund 3,426,000 Transportation
Local Street Fund 850,000 Transportation
Arterial Street Preservation Fund 632,420 Transportation
BondProceeds 15,999,000 Water - --
1,482,392 Storm Drainage
6,000,000 Parks, Arts & Recreation
Municipal Parks Fund 400,000 Parks, Arts & Recreation_ _ _ _
PropertyTax 775,000_ _ Parks, Arts_& Recreation
Sa/es Tax 8,850,000 Transportation
UtilityTax 10,932,850 TranspoRation
Mitigation/Impact Fees 15,200,870 Transportation
900,000 Parks, Arts & Reoreation
201,568 Communit Impro�ements
REET 1 1,059,219 Parks, Arts & Recreation
3,967,223 General Municipal Buildings
REET2 3,341,973 Gommunit Im ro�,ements
Othe�Sources 3,375',000 Transportation
525,083 Storm Drainage
250,000 Community Impro�,ements
9,490,781 Parks, Arts & Recreation
Total $ 225,717,538
3
City of Auburn Draft Capital Facilities Plan
SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS
The forecasted impacts of new capital facilities on the City's future oPerating budgets
(2015-2020) are as follows:
BudgetYear 2016 2077 2018 2019 �2020 2021 ToWI
1 Transportation $100,807 $103,307 $107,407 $121,007 $182,607 $235,957 $ 851,092
2 Water 2,400 2,400 2,400 3,000 3,000 3,000 16,200
3 Sanitary Sewer - - - - - - -
4 Storm Oralriage - - - -
5 So/id Waste - - - - - - -
6 Parks,ArtsaiWRecreation - 171,000 171,000 183,000 183,000 183,000 891,000
7 Genera/MunicipalBulldings - - - - - -
8 Communitylmpovements 500 500 10,500 10,500 10,500 10,500 43.000
9 Airport - - - - - - -
10 Cemetery - - - - - - -
11 Go/f Course - - - - - - -
12 SeniwCenter - - - - - - -
13 Pollce Department - - - - - -
14 Fire Protection - - - - - - -
Tota� 5103,707 8277,207 $291,307 5377,507 5379,107 5432,457 E1,801,292
Project summary details are located on the following pages:
Transportation page 91
Water page 129
Parks&Recreation page 194
Community Improvements page page 223
4
City of Auburn Draft Capital Facilities Plan
LEVEL OF SERVICE (LOS) CONSEQUENCES OF THE CFP
Based on the proposed six-year capital projects and the projected population increase of
10,658 (14.3%) between 2014 and 2020, the LOS for the following City-owned public
facilities will change as follows:
The LOS for the following facilities will be increased as a result of the CFP, comparing the
2014 LOS to the projected 20120 LOS.
CAPITAL FACILITY LOS UNITS 2014 LOS 2020 LOS
Pro'ected
Cemetery Burial Plots per 1,000 Pop. 30.03 40.80
Community Parks Acres p.er 1,000 Pop. 3.16 3.46
The LOS for the following facilities will be maintained as a result of the CFP
CAPITAL FACILITY LOS UNITS 2014 LOS 2020 LOS
(Projected
Roads Volum e/Ca aci Rah'o "D" "D"
Arrport %AirOperations Support 100% 100%
Sanitary Sewer Residential GPCPD (Nofe 1) 171.00 171.00
Storm Draina e N/A
Water ResidenGal GPCPD (Note 1)_ 230.00 230.00
Note 1 GPCPD = Gallons per Custom er per Day
The LOS for the following facilities will be decreased as a result of the CFP, comparing the
2014 LOS to the projected 2020 LOB.
CAPITAL FACILITY LOS UNITS 2014 LOS 2020 LOS
(Pro'ected
Nre Profection Apparatus per 1,000 Pop. 0.21 0.20.
General Municipal Bu!ldings Sq. Ft. p"er 1,000 Pop. 3,503.07 3,130.98
GolfCourse Acres per 1,000 Pop. 0.24 0.21
Linear Parks Acres_per 1,000 Pop. 0.44 0.38
Nei hb orhood Parks Acres per 1,000 Pop. 0.86 0.86
Open Space Acres per 1,000 Pop. 4.66 4.08
Senior Cente� Sq. R.per 1,000 Pop. 168.83 14773
3pecial Use Areas Acres per 1,000 Pop. 0.73 0.64
Level of Service (LOS) is a common measure used to determine the efficiency or
effectiveness of services. For the City of Auburn, LOS targets serves as a means to assess
the adequacy of public facilities in meeting the needs of the population for which it serves.
5
City ofAuburn Draft Capital Facilities Plan
For example, in the case of park space, when there is an increase in population without a
corresponding increase in park acreage, the LOS unit of ineasure (acres per 1,000
population) will decline, indicating a potential need to increase the total amount of park
acreage to keep pace with population growth. On the other hand, a slight increase in
population, coupled with a large increase in facilities, will result in an increased LOS. For
example, facilities such as buildings or burial plots may be constructed or expanded to keep
pace with anticipated population growth. While this will have the effect of increasing LOS in
the short-term, in the longer-term, the LOS wiil gradually decline to the targeted level based
on forecasted population. The impact of population growth to the LOS for facilities will vary
depending on the type of facility and long range pianning by the City
CFP ELEMENT SOURCE DOCUMENTS
Documents used in preparing this Capital Facilities Plan (CFP) are principally the
comprehensive plans for the various public facilities included in this CFP These individual
comprehensive plans provide detailed identification of projects and identify their(projects)
proposed funding sources.
City documents include:
• City-wide Comprehensive Land Use Plan Element (2013);
• City Municipal Airport Master Plan Update (2001-2020);
• City Comprehensive Water Plan (2009);
• City Comprehensive Transportation Plan (2012)and Six Year Transportation
Improvement Program (2015-2020);
• City Comprehensive Drainage Pian (2009);
• City Comprehensive Sewer Plan (2009);
. City 2015-16 Biennial Budget and 2013 Annual Financial Report; and,
• Master plan update for parks, as weil as numerous other planning and financial
documents.
All documents are available for public inspection at the City of Auburn.
6
City ofAuburn Draft Capital Facilities Plan
CHAPTER 1
INTRODUCTION
PURPOSE
The Capital Facilities Plan (CFP) is a 6-year plan (2015-2020) for capital improvements that
support the City of Auburn's current and future growth.
In this plan, funding for general government projects is identified. To maintain consistency
with individual master and utility comprehensive plans, applicable projects in the 6-year
window of those master/utility plans are included in tliis CFP The CFP also identifies LOS
standards, where applicable, for each public facility
STATUTORY REQUIREMENTS FOR CAPITAL FACILITIES ELEMENTS
RCW 36.70A.070(3)(d) requires thaf the comprehensive plan capital facilities element
include "a six-year plan that will finance such capital facilities within projected funding
capacities and clearly identifies sources of public money for such purposes." RCW
36.70A.070(3)(e) requires that all capital facilities have "probable funding" to pay for capital
facility needs, or else the City must"reassess the land use element."
In addition, the capital facilities element must include the location and capacity of existing
facilities, a forecast of future needs, and their proposed locations and capacities. The State
Growth Management Act (GMA) guidelines suggest that this analysis be accomplished for
water systems, sanitary sewer systems, storm water facilities, schools, parks and recreation
facilities, police and fire protection facilities.
The GMA also seeks the selection of level of service standards for capital facilities. As a
result, public facilities in the CFP should be based on quantifiable, objective measures of
capacity such as traffic volume, capacity per mile of road and acres of park per capita. In
some insfances, though, level of service may best be expressed in terms of qualitative
statements of satisfaction with a particular public facility Factors that influence local level
of service standards include, but are not limited to, community goals, national and local
standards, and Feilerai and State mandates.
To be effective, the CFP must be updated on a regular basis. State GMA guidelines
suggest that the CFP be updated at least every hvo years. In 2007, the City transitioned to
a biennial budget. With this in mind, the City will follow these guidelines and update the
CFP at least every two years, incorporating the capital facilities improvements in the City's
biennial budget process.
7
City of Auburn Draft Capital Facilities Plgn
CONCURRENCY AND LEVEL OF SERVICE
Concurrency
The GMA requires that jurisdictions have certain capital facilities in place or available within
a specified time frame when development occurs. This concept is called concurrency
Uniie�the GMA, concurrency is required for transportation facilities and is re.c.ommended by
the State for certain other public facilities, namely potable water and sanitary sewer
Concurrency has a direct relationship to level of service. The importance of concurrency to
capital facilities planning is that development may be denied if it reduces the level of service
for a capital facility below the locally adopted minimum. The level of service is unique for
each type of facility and ispresenfed in the subsequent sections.
Expla�ation of Level of Service
As indicated earlier, the GMA requires that level of service be established for certain
transportation facilities for the purposes of applying concurrency to development proposals.
The State GMA guidelines recommend the adoption of level of service standards for other
capital facilities to measure the provision of adequate public facilities.
Typically, measures of level of service are expressed as ratios of facility capacity to
demand (i.e., actual or potential users). Table 1-1 lists generic examples of level of service
measures for some capital facilities:
TABLE 1-1
Sample Level of Service Measurements
T e of Facili Sam le Level of Service Measure
General Municipal Buildings Square feet per 1,000 population
Parks Acres per 1,000 population
Roads and Streets Ratio of actual wlume to design capacity
Sevtier/ Water Gallons r customer r da
The need for capital facilities is largely determined by a communit�s adopted LOS
standards and whether or not the community has formaily designated capital facilities, other
than transportation, as necessary for development to meet the concurrency test. The CFP
itself is therefore largely influenced by the selection of the level of service standards. Level
of service standards are measures of the quality of life in the City The standards shouid be
based on the City's vision of its future and its values.
IMPLEMENTATION
Implementation of the CFP requires constant monitoring and evaluation. The CFR is
sensitive to funding and revenue availability and therefore needs to be constantly monitored
against variatioris in available resources. To facilitate its implementation, the CFF should
be kept current.
8
City ofAuburn Draft Capital Facilities Plan
Update of Capital Facilities Plan
Perhaps the most desirable way to keep the CFP current is to update it regularly so the six-
year plan is a rolling CFP Again, the State recommends that the CFP be updated at least
biennially
The City of Auburn will seek to update the CFP at least biennialiy in conjunction with the
budget process. Future updates will consider•
A. Revision of population projections, including annexations;
B. Update of inventory of public facilities;
C. Update of costs of public facilities;
D Update of public faciiities requirements analysis (actual level of service
compared to adopted standards);
E. Update of revenue forecasts;
F Revise and develop capital improvement projects for the next six fiscal
years; and,
G. Update analysis of financial capacity
Amendments to the CFP, including amendments to level of service standards, capital
projects, and/or the financing plan sources of revenue are all actions that can keep the CFP
current and relevarit to City decision-making.
9
City ofAuburn Draft Capital Facilities Plan
�o �
CITY OF �
�
�
1VIORE '�'I�Al� �'OiJ IIVIAGIIVED
�o
City of Auburn Draft Capital Facilities Plan
CHAPTER2
GOALS AND POLICIES
This chapter identifies goals and policies specific to the Citys provision of capital facilities.
Goal 1 Provide a variety of responses to the demands of growth on public
facilities.
Policy 1 1 Establish land use pattems that optimize the use of pubiic facilities.
Policy 1.2 Provide additional public facility capacity when existing facilities are used to
their maximum level of efficiency (consistent with adopted standards for level
of service).
Policy 1.3 Encourage development where new public facilities can be provided in an
efficient manner
Policy 1 4 Exempt the following from the concurrency management program:
1 4.1 Development vested by RCW 19.27.095, 58.17.033 or 58.17 170.
1 4.2 Development that creates no added impact on public facilities.
1 4.3 Expansions of existing development that were disclosed and tested
for concurrency as part of the original application.
Goal 2 Provide needed public facilities that are within the ability of the City to
fund or within the City's authority to require others to provide.
Policy 2.1 Establish level of service standards that are achievable with the financing
plan of this Capital Facilities Plan.
Policy 2:2 Base the financing plan for public facilities on realistic estimates of current
local revenues and external revenues that are reasonably anticipated to be
received by the City
Policy 2.3 Match revenue sources to capitai projects on the basis of sound fiscal
policies.
2.3.1 The City shall continue to fund utility costs through utility enterprise
funds, based on user fees and grants. Public facilities included in
utilities are sewer, solid waste, storm drainage, anii water
2.3.2 Where feasible pursue joint venture facility construction,
construction timing, and other facility coordination measures for City
provided facilities, as well as with school districts and other
potential partners in developing public facilities.
2.3.3 The City shall continue to assist through direct participation, LIDs
and payback agreements, where appropriate and financially
feasible. Where funding is available, the City may participate in
developer initiated facility extensions or improvements, but only to
the extent that the improvements benefit the broader public interest,
and are consistent with the policies of this Capital Facilities Plan.
11
City ofAuburn Draft Capital Facilities Plan
�olicy 2.4 If the projected funding is inadequate to finance needed public facilities and
utilities based on adopted level of service standards and forecasted growth,
the City will do one or more of the following to achieve a balance between
available revenue and needed public faciiities: —
2.4 1 Lower the level of service standards;
2.4.2 Increase the amount of revenue from existing sources;
2.4.3 Adopt new sources of revenue; ,
2.4.4 Require developers to provide such facilities at their own expense;
and/or
2.4.5 Amend the Land Use Element to reduce the need for additional
public facilities.
Policy 2.5 Both existing and future development will pay for the costs of needed capital
improvements.
2.5.1 Ensure that existing development pays for capital improvements
that reduce or eliminate existing deficiencies, and pays for some or
all of the cost to replace obsolete or worn out facilities. Existing
development may also pay a portion of the cost of capital
improvements needed by future development. Existirig
developmenYs payments may take the form of user fees, charges
for services, special assessments and taxes.
2.5.2 Ensure that future development pays a proportionate share of the
cost of new facilities which it requires. Future development may
also pay a portion of the cost to replace obsolete or worn-out
facilities. Future developmenYs payments may take the form of
voluntary contributions for the benefit of any public facility, impact
fees, mitigation payments, capacity fees, dedications of land,
provision of public facilities, and future payments of user's fees,
charges for services, special assessments and taxes.
Policy 2.6 The City will determine the priority of public facility capital improvements
using the following criteria as general guidelines. Any revenue source that
can�ot be used for the highest priority will be used beginning with the highest
priority for which the revenue can legally be expended.
2.6.1 Projects that eliminate hazardous conditions.
2.6.2 Refurbishment of existing facilities that contribute to achieving or
maintaining standards for adopted level of service.
2.6.3 New or expanded facilities that reduce or eliminate deficiencies in
level of service for existing demand.
2.6.4 New or ekpanded facilities that provide the adopted level of service
for new development and redevelopment during the next siic fiscal
years.
2.6.5 Capital improvements that significantly reduce the operating cost of
providing a service or facility, or otherwise mitigate impacts of
public facilities on future operating budgets.
12
City ofAuburn Draft Capital Facilities Plan
2.6.6 Capital improvements that contribute to stabilizing and developing
the economy of the City
2.6.7 Project priorities may also involve additional criteria that are unique
to each type of public facility, as described in other elements of this
Comprehensive Plan.
Policy 2.7 Ensure that the ongoing operating and maintenance costs of a capital facility
are financially feasible prior to constructing the facility
Goal 3 Protect public health, environmental quality, and neighborhood
stability and viabiiity through the appropriate design and installation of
public facilities.
Policy 3.1 Promote conservation of energy, water and other natural resources in the
location and design of public facilities.
Policy 3.2 Require the separation of sanitary and storm sewer facilities wherever
combined sewers may be discovered.
Policy 3.3 Practice efficient and environmentally responsible maintenance and
operating procedures.
Policy 3.4 The siting, design, construction and improvement of all public buildings shall
be done in full compliance with the American"s with Disabilities Act (ADA).
Policy 3.5 Promote economic and community stability and growth through strategic
investments in public facilities and public private/partnerships.
Goal 4 Make the Capital Facilities Plan consistent with other elements of the
comprehensive plan, and - to the e�ctent feasible - with othei city,
county, regional and state adopted plans.
Policy 4.1 Ensure that the growth and development assumptions used in the Capital
Facilities Plan are consistent with similar assumptions in other elements of
the comprehensive plan.
Policy 4.2 Coordinate with non-city providers of public facilities on a joint program for
maintaining applicable level of service standards, concurrency requirements,
funding and construction of public facilities.
Goal 5 Provide public facilities that p�ovide a sense of community that is
inclusive of diverse populations.
Policy 5.1 Contribute to community pride and foster a sense of community through
provision of public facilities that create a community gathering place for
neighbors, family and friends.
Policy 5.2 Through prbvision of public facilities offer a broad range of activities
promoting social interactions especialiy with new residents.
Policy 5.3 Provide maximum fleicibility and multipie uses through design of public
facilities that are adaptable to changing interests.
Policy 5.4 Provide a community center facility that is financially feasible, affordable for
participants, and can generate revenue to offset a portion of the operating
costs.
13
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
�
�k MORE THAN YOU IMAGINED
14
City ofAuburn Draft Capital Facilities Plan
CHAPTER 3
CAPITAL IMPROVEMENTS
1 INTRODUCTION
This CFP includes City capital improvement projects and the financing plan to pay for those
projects. It also contains the inventory of existing City facilities, and identifies level of
service standards, where applicable. Each type of City public facility is presented in a
separate subsection that follows a standard format. Throughout this section, tables of data
are identified with abbreviations that correspond to the type of facility For example, Table
W-1 refers to Table 1 for Water (Supply and Distribution). Each abbreviation corresponds
to the name of the type of facility
1. Narrative Summarv
This is an overview of the data, with sections devoted to Current Facilities, Level of Service,
Capital Facilities Projects and Financing, and Impact on Future Operating Budgets.
2. Inventorv of Facilities (Table X-11
This is a list of existing capital facilities, including the name, capacity (for reference to level
of service), and location. This table also includes any proposed capital projects and the
planned inventory total through December 31, 2020.
3. Caoital Proiects and Financina Pian (Table X-2. X-2A and X-26)
This is a list of capital improvements that identifies existing deficiencies, identifies facilities
needed for future growth, and identifies the need to repair or replace obsolete or worn out
facilities through December 31, 2020. Each list shows the proposed financing pian followed
by individual worksheets showing the project detail.
4. Imoact on Future Ooeratinq Budaets (Table X-31
This is a list of new capital projects and the forecasted impacts on the City's future
operating budgets (2016—2021).
15
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
�
� MORE THAN YOU IMAGINED
16
City ofAuburri Draft Cgpital Facilities Plan
TRANSPORTATION
Current Facilities
F2oadwavs: The Citys street system consists of a network of 216 miles of arterials, collectors,
local streets and alleys. Existing non-motorized facilities include a mix of sidewalks, bicycle
lanes and sharrows.
Transit: King County Metro Transit, Sound Transit and Pierce Transit serve the Auburn area.
Auburn is currently served by eight Met�o bus routes, two Sound Transit bus routes, and one
Pierce Transit bus route. Twenty Sound Transit "Sounder" commuter rail trains stop at Auburn
each weekday at the Auburn station located at 23 A Street SW The Sounder also prbvides
special event service to selected sporting events. Bus and rail service is supported by park and
ride facilities and the Aubum Transit Center
Level of Service (LOS)
Washington's Growth Management Act (GMA) requires Level of Service (LOS) standards for
both arterials and transit routes. The GMA requires that each jurisdiction's LOS standards be
coordinated within the region and be supported by local ordinance, but the actual standards and
the methods used are determined by each local jurisdiction.
Under GMA, the focus is on the performance of the whole road system, not on individual
intersections or roadways. LOS standards are a tool to help keep the transportation system in
balance with the needs of forecast population growth and development. Table T-1a
suinmariies the LOS definitions.
17
City ofAuburn Draft Capital Facilities Plan
Table T-1a Definition of Urban St�eet Level of Senrice (LOS)
LOS A • describes primarify free flow operations a[ a�.erage traeel speeds, usually ab'out 90 percent of th'e
free flow speed for the gi�.en street class. Vehicles are completely unimpeded in their ability to maheueer
within the tratfic stream. Control delay a( signalized intersections is minimal.
—e. _....--- `-'-- -- --- ' --- - -- --- . .. . . , .. . .. . - -� - - - -
LOS B - describes reasonably unimpeded operatio�s at aeerage traeel speeds, usually about 70 percent of
the free flow speed for the street class. The ability to maneu�.er within the traffic stream is only slightly
restricted, and stopped delays are rwt bothersome.
LOS C - describes stable conditions; howeaer, ability to maneu�.er and change lanes in midblock locations
may be more restricted than in LOS B, and longer queues, ad�,erse signal coordination, or both may
contribute to lower aaerage tresel speeds of about 50 percent of the free flow speed for the street class.
LOS D - borders on a range in which small increases in flav may cause substantial increases in delay and
decreases in traeel speed. LOS D may be due to adeerse signal progression, inappropriate signal timing,
high wlumes, or some combination of these factors. Aeerage traeel speeds are about 40 percent of free flow
speed.
LOS E • is characterized by significant delays and a�erage traeel speeds of 33 percent or less of the free
flow speed. Such operations are caused by a combination of ad�.erse progression, high signal density high
wlumes, extensiee delays at critical intersections, and inappropriate signal timing.
LOS F - is characterized by urtian street flow at extremely low speeds, typically one-third to one-fourth of
the free flow speed. Intersection congestion is likely at critical signalized locations, with high delays, high
wlumes and extensiee queuin .
Source: 2010 FigMx ay CapacRy Manual, Special f�port 209, Transportffiion Research Board,Washington, D.G 2000, page '10-5
A methodology and set of standards have been drafted for the City of Auburn ComprehensiVe
Plan. The standards help determine concurrency (i.e., balance) between transportation and land
use elements of the City's Comprehensive Plan, as required by the GMA. The City has four
choices if it finds the standards cannot be met.
. Modify the land use plan, placing tighter controls on the amount and type of development to
reduce traffic.
• Construct additionai transportation facilities to support increased travel demand from new
development.
• Implement Transportation Demand Management (TDM) measures to increase use of non
single occupant vehicle travel modes.
• Relax the LOS standards; the City can accept lower level of service standards to encourage
further growth and minimize the need for additional transportation facilities.
The transportation land-use balance will be monitored through the City's Concurrency
Management System as part of the State Environmentai Policy Act (SEPA). Transportation
concurrency will be evaluated for key facilities and on a system-wide basis. By having system-
wide and facility-based roadway LOS standards, the City of Auburn can define preliminary
capacity needs.
The City can then identify locations where standards are not anticipated to be met in the future
and identify appropriate imprbveinents. At the project level, the State Environmentai Policy Act
(SEPA) process will continue to guide the more specific planning and analysis efforts.
18
City ofAuburn Draft Capital Facilities Plan
Level of Service Standards
LOS standards can help identify where and when transportation improvements are needed, and
when development or growth will impact system operations. LOS provides a standard below
which a transportation facility or system is not considered adequate.
LOS standards can also be used to evaluate the impact of proposed developmerSts to the
surrounding street system. They can assure that all developments are served by a safe,
efficient and cost-effective street system. They can also be used to disclose impacts, identify
remedial actions, and apportion costs beiween public and private sources.
The LOS standards shown in Table T-1b apply to the facility's location and its functional
classification. A more detailed description of the level of service methodology is provided in the
City of Au.burn Comprehensive Transportation Plan (2012), page 5-4
Table T- 1b Draft Roadway Capacity/Congestion LOS Standards
Roa dway/I nte rse cti on Max i m u m_V/C_Rati olLOS
A�terial Corridor O•
Si nalized_lnte�section D
Unsignalized lntersection D
'Unless otherw ise specfiied in Chapter 2 of the of Auburn Corrprehensive Transportation Ran, 2012
LOS standards are aiso the basis of an equitable fraffic impact fee system, which require
developments to pay a portion of the costs for capacity improvements to the transportation
infrastructure.
In 2001, the City implemented a traffic impact fee program. The purpose of the fee is to mitigate
tra�c impacts more equitably while making the costs of development more predictable to
developers. In 2007, the City implemented an additional transportation impact fee to address
the impacts of heavy truck usage on the City's transportation system. Both fees are regularly
updated to enable the City to construct road capacity to meet the traffic demand of
development.
Measuring Transportation System Performance
The level of service for street segments or links is analyzed with two primary purposes in mind.
First, this site-specific LOS can be used, with the help of a travel demand model, to evaluate
areas of congestion within a transportation network, leading to the development of a long-range
transportation facilities plan. Second, arterial corridor LOS analysis can be used to assess
concurrency or if facilities are meeting the LOS standards.
The City of Auburn currently uses Highway Capacity Manual methodologies to calculate levels
of service. For arterials LOS are based on average travel speeds along a defined corridor
Table T-1 c shows the 42 defined street cor�idors, LOS standards and most recent calculated
LOS.
19
City ofAuburn Draft Capital Facilities Plan
TABLE T-1 c
Auburn Corridor Level of Service
• •
� . . . . . .. . i �•
1 Auburn Wey NorCh 15th St NE Northerri City Limits_ D C!D
_aY � _ �asf_Mai!i,St:-:..--....-=- TSth$t NE..__ .___.__.___ ._;- •E:---... _u_R�.._.�..
:2" AnbuPia,W_- � __^_—----- -
3 Aubum WaySouth - � EasfMain St. M SfSE � �Dv --F/E -
4 Au6um W ay 5outh.:--- :,"," " M;St'SE`-; ' `-� : ' ;, Eas'teFn Gity L"imits:-�_� " :�"D " " "':."C"," '
5 M St.lHarvey Auburn W ay North East Main St. E C
"'6" M-St.7Fta��:---��_'� F�st:Nlain S'�_.�_,._.�_ ""= �_6ur"ti_VYayScsutti_ -_r ___��__; -_p7_��
7 Eve_rgreenWay LakelandHillsWay KerseyWay D Futu�e
8 37tH St NE/NW "'W,est;Valley Mwy. ' f Sf: NE ` � D. _ „ B/C, -
9 15th St NE/NW West Valley Hwy Aubu�n Way`NoRlS F'* D
'!D Aubum Ave/"A�'St�=�-'_,-SR�1_8��_�;= Southem�Ci�Limi3s== :_-�-�D- �___,';:,�v:
11 Main St W est Valley Hwy R St D C
12. 15tii_St SW_ ._�_ _... ________...:�!est Valley Hdi'Y___� C Sf SW ._ , _:.__�..._ --,--4�_�.____..._��
13 C_St SW_ _ Ellings_on_ _ SR 18___ ___ ____ _ _. _D _ __CPE _
�14 West Valley Hwy" - -- - __�"_ , f�orttie`m City L'ttnits' -. lfitli Sfreet NW. _ _. , -- E _ .. BJG' .
15 S 277th St Frontage Rd, 108th Aye SE E E/B
16 RmS,t.lKeCsey Way:.r_.. ._�._... Auburn Way S:_�___.._. _ Oravetz,Road;m._._�._ v.__.�D'__�_ __��_�
17 Lake Tapps Parkway " -- - -- East Valley Hwy. 182nd Ave E- - - -D - -- B--
�,�._.
1;_,8 "A,��$fSWYNW/'"S"uS�idUl!:. .-=;:4tli St_Ml,W'_.._____ S`277t1i'Sf- __-.__._,_ ___Q-_-- ---Future-,
19 8th St NE/Lea Hill Rd. Auburn Way North 132nd Ave SE E C/6
20,p'�C NVV1EmeraltlLLDowns Dr�--_5�277t1i St�"-"-.�,1'Stti St`NW�T-T �-Dl;._;_:AlB'—
21 I St NE __ 8 277th St_ _ , _____ __ Harvey Rd____ D AIB _
22 '132nd 9ve�SE'-"_'"_�" "_" _ SE 28?rid St _ _ SE-312tfi Sf , _ �.- —p,_.�r --B, .
23 124th Ade SE SE 282nd St SE 320th. St D C
241, :#hAv.e;SE7SE:3�4tfiSt_�... 8thS2NE�:=�_m,._�.� 1_32nii�AyeSE_�,..�.. `_� Q'- ' �B1A'�
25 105th PI SE/SE 320thi Sf----- Lea Hill Road- - 124th Ave SE - D B
26 _L`akel�n�:N�ls Way SE_�=_. ,. L"ake T�pjis Parkway�'_ = Orabeti Rd- - _ . ; . . ' ;D ' __, ..�C/D _
27 29[h St SEIRiverwalk Dr A 8treet SE Auburn W ay_South D _ C
281a8thA5e�S�JJ'f1�tfi�\ye.:SE"'-`5-277th:SY-',"_ '.",'�."` SE`304th5t'�'__�._.�p__u. �_ �;�-
29 49th St NW B St NW S 277th St D Future
-- -- . _ _ _ .
�30 .R 5tieet SE' ... . _..�. .. ._..__.;_ 8tii St;NE�:`�rv�.r"�4th;St�egt'S�`..'�.�, ��� D�; ;.�BFG;�_'.
3T 3rd St SWlCross St" C Street Auburn Way South E E
,. .... . _.. . _ . . .f� __ � _�
321,7tliSfSE. , . ..__ . __ _---� A�St'_SE.:_ T...__.m._.:k.:_Aubu"m�WaySoyth__�.�:.�'---�Q.�� :.�8�•--�
33 41 st St SEIEllingson Rd____ _ A St_SE____ _ _ Western City Limits_ _ _ ___E__ _ . __ F_ ._
"34 Eakeland!Hiil§WaylOraveti� "'" EastVaileyHwjr: " ' ' Kersey�Way', E " A/B
. ... .
35 West_Valley Hwy 15th Street NW Southern_City Limits E C/B
36 KerseyWay . , .. ,_ �revefzFtoad: ._�..._T,rSoyf#�grnrGity-timits._.... '_.�...�='_,.�..�A`_..�:
37 S_. 316th St�eeUTerrace D�ive " West Valle Hi hwa Westem Ci ' Limits - - D" - --" B-
v s v �v .'—• -- -
38 5:29.6th,8treet/65tIi:Ave�:;_�.Wes�Valley.1i'��livuay�Westem City�imits:"�"� v_�:"D�� ;"-`8" '
39 51 st Ave S.-- --- �- -y- -- S: 288th Street Peasley Canyon Rd D B
�5:284tfiSYfeef:�`=_�_�.= 112thAve:SE'._� �. _ . 124th"A4eSE .., ." .., ._.. ,D` ;" , �B/A- _ '
4T S'. 284th Street 124th Ave SE 132nd Ave SE D Future
42 R Sf:$ypass/BIacK piamondw . I(A Street 5E'.: -_�._„_ SR,�`$-T. .. _ _ _'',_ —__p__� �yFu`tTe.-
* Split LOS indicates directional LOS in either the East-West or NoRh�South direclion. Otherwise,the LOS is the same in both directions.
** Total travel time in the eastbound direction cannot exceed 1000 seconds forthis corridorto meet the LOS Standard.
20
City ofAuburn Draft Capital Facilities Plan
Concurrency(Adequate Public Facilities)
Concurrency involves matching public facilities and new development. The GMA extends
concurrency to transportation facilities by requiring that new development be served by
adequate roads and public transportation service, and that development is not permitted to
cause these transportation facilities to operate below level of service standards that are adopted
by local governments in their comprehensive plans.
In compliance with the GMA, adequate transportation system faciiities must be available within
six years of the time of occupancy and use of new development.
Capital Facilities Projects and Financing
The Citys transportation facilities include projects totaling $129,871,717 Tables T-2, T-2A and
T-2B show the proposed financing plan followed by individual worksheets showing the project
detail.
Impact on Future Operating Budgets
As Table T-3 shows, operating budget impacts of$851,092 are forecasted for transportation
facilities during the six years 2016 —2021
21
City ofAuburn Draft Capital Facilities Plan
TABLE T-2
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
TRANSPORTATION -ARTERIAL STREET
2015 2016 2017 2018 2019 2020 Tofal
TIP# CanaCiN PrOie cls
1 A Street NW, Phase 1
Capital Costs 350,000 25,000 25,000 25,000 25,000 25,000 475,000
Funding Sources:
Unrestncted Street Re�snua
G2M5 -
T2ific Impact Fees 350,000 25,000 25,000 25,000 25,000 25,000 475,000
O[her
2 AWS Pedestrian Imp. -0ogw ood St SE to Fir St SE
Capital Costs 115,000 115,000
Punding Soumes:
Unrestncted�Street �te�enue -
Trafic Impact Fees 115,000 175,000
Other
5 M Streat Underpaa
Capital Costs
Long-Term Debt 131,233 130,654 730,080 129,500 728,920 128,350 778;737
Funding Sources:
Unrestncted Street Re�enue -
Grants - -
Tratfic Mpacl Fees 131,233 130,654 130,080 129,500 128,920 128,350 778,737
PWIF Loan
Other lOther Aaenciesl
6 S 272nd1277th St Corridor Cepacity &Non-Motorized Trail Improvemenffi
Capital Costs 5,581,800 5,581,800
Fundirg Sources:
Unrestricted Street Re�enue
G2nts 4,000,000 - 4,000,000
Traffic Impact Fees 581,800 581,800
Other/Develooment Fundsl 1.000.000 1.000.000
10 F Street SE, 4M to AWS
CaplWl Costs 400,000 250,000 1,800,000 2,450,000
FurWing Sources:
UnrestActed Street Reeenue -
Grents 320,000 200,000 1,440,000 1,960,000
Trafic Imoact Fees 80.000 50.000 360.000 490.000
11 M Street NE, E Main to 4th
CaDltal Cos.ts 100,000 275,000 1,150,000 1,525,000
Fundirg Souroes:
Unrestncted Streat Re�enue
Grarrts 220,000 920.000 1,140,000
Traffic Imoact Fees 100 ODO 55 000 230 000 385.000
14 M St SE antl 12th St SE-Tretfic Slgnal
Capi[al Costs 625,000 - 625,000
FurWinB Sources:
Unrestncted Street Re�enue -
GraMs 500,000 500,000
haiflc Impact Fees
Other 125.000 125.000
15 8th Slreet NE Widenfng (Pike Street ro R Street NE)
Capital Costs 450.000 1,000,000 1,450,000
Funding Sources:
Unresttic[ad Street Re�enue
Grarrts 360,000 800,000 7,160,000
REET 2
Traific Imoact Fees 90.000 200.000 280.000
22
City ofAuburn Draft Capital Facilities Plan
TABLE T-2(continued)
2015 2016 2017 2018 2079 20?A Tofal
TIP#CaoadN Profecls:
17 Harvey Road 8 8th Street NE Intersection Improvements
Lorg-Term Debt 86,010 85,383 85,200 84,800 84,400 84,400 570,193
Funding Sources�
Unrestrictetl Street Re�enue - -
Grants -
PWiF ' '
Traffic Imoact Fees 86.010 85.383 85.200 84.800 84.400 84.400 510.193
18 8th Street NE and SE 104th St Intersectlon Improvements
Capital Costs 5,000 - 5,000
Funding Sources:
Unrestricted Street Re�enue 5,000 - 5,000
Grents - -
REET2 -
Traffic Imoact Fees
20 Auburn Way South and M Street SE Intersectlon Improvemenls
CapRai Costs 5,000 - - 5,000
Funding Souices.
Unrestricted Street Re�enue 5,000 5,000
GraMs
Traffic Mitiaation Fces
23 A St SE Non�Jlotorized and Accea Improvemenis
Capital Costs 69,029 - - 89,029
Funding Sources:
Unrestrictetl Street Reeenue
Grarits 89,029 - 89,OP9
Other
24 Atademy Drive MulU�lse 7rail
Capital Costs - 425,000 425,000 850,000
FurMing Sou�ces:
Unrestricted Street Re�enue 42,500 42,500 85,OU0
G2rRs 382,500 382,500 765,000
anar
25 46th Place S Realignment
Capital Costs - 825,000 825,000
Funding Sources.
Unrestnctetl Stree[Re�enue - -
Grants - - 575,000 575,000
Trafiiclmoact Fees 250.000 250.000
33 BNSF 3rG Rall ExpanSon Roatlway Improvemenis
Capital Costs 25,000 - 25,000
Funding Sou�ces:
Unrestncted Street Re�enue 25,000 - - 25,000
Grants - - -
Other
39 1241h Ave SE Cortidor &320tl�Intersection Improvemenfs
Capital Costs 100,000 800,000 900,000
Funding Sources:
UnresMcted Strcet Re�enue - - - _
GraMs 80,000 640,000 720,000
_Trafic Impact Fees 20.000 160 000 180.000
40 724th Ave SE Corridor Improvements Phase 2
Capital Costs 500,000 1,100,000 2,500,000 4,100,000
Funding Sources:
Unrestncted Street Re�enue - - -
G2nts 400,000 880,000 2,500,0�0 3,780,000
Traffic Imoact Fees 100.000 220.000 320.000
23
City ofAuburn Draft Capital Facilities Plan
TABLE T-2(continued)
2015 2016 2017 2078 2079 2020 Toql
TIP#Capsdri Proiects:
41 R Street Bypass
Capital Costs - 500,000 500,000
Fundirg Sources:
Unre"stncted Street Re�eriue - - - -
GraMs - - - -
Othe� 500.000 500 000
42 SE 3ZOth Street Corridor Imp�ovements Phase 7
Capttal Costs 250,000 4,000,000 - 4,250,000
Fundirg 3ources:
Umestricted Street Re�enue - - - - -
G2Ms 200,000 4,000,000 - q200,000
Treffic Imoact Fees 50.000 50.000
43 Auburn VYay South Cmridor Safety Improvements
Capital Costs 2,333,108 - - - 2,333,108
Funtling Sources:
Unrestricted Stieet Re�enue - - - -
Grants 2,083,108 - - 2,093,108
Tratfic Imoact Fees 250.000 250.000
47 TratficManagementCenLerlmprovements
Capital Costs 150,000 - 150,000
Funtling Sources:
Unrestncted Stieet Reeenue - - - - -
G2nts - - -
_ Traffic Impact Fees 150.000 150.000
49 West Valley Highviay lmprovements(75th St NW to W Main 5U
Capifal Costs 100,000 800,000 3,000,000 - - 3,700,000
Funding Sources:
Unrestncted Street Re�nue
Grants 480,000 2,400,000 2,680,000
haiAc Imoact Fees 100.000 120,000 600.000 -820.000.
51 WkeTappsParkwaylTSExpansion
Capital Costs 900,000 - 900,000
Fundirg Sou�ces:
Un2stricled Slreet Re�enue -
GreMs 711,000 - - 717,000
TrafFc Imnact Fees 189.000 189.000
53 AWS and 72tl�Street SE InfersecUon Improvements
Capital Costs 50,000 350,000 - - - 40Q000
Fundirg Souices:
Unrestricted Street Re�nue - -
Grants 250,000 - 250,000
Traific Imoact Fees� - 50.000 100.000 150.000
54 Kersey Way SWdy
Capital Costs 50,000 - 50,000
Funding Sources:
Unrestricted Street Re�enue - -
Traffic Mitidation Fces 50.000 50.000
55 W Main Street Multlmodal Corridor and ITS Improvemenis
Capital Costs 946,000 3,494,400 - - - 4,440,400
Funding Sources:
Unrestrictetl Stieet Re�enue -
Olher•Fund 105 85,410 314,510 - 399,920
haific Impact Fees 56,490 209,650 - 268,140
G2rrts 804.100 2,970,240 3.774.340
24
City ofAuburn Draft Capital Facilities Plan
TABLE T-2(continued)
2015 2076 2077 2016 2019 2020 Total
TIP#CaoaciN Proiects:
58 Evergreen HeightsSafe Routesto School Improvements
Capital Costs �90,000 563,000 4,620,000 5,973,000
Funding Sources:
Unrestricted Street Rewnue NS,500 84,500 693,000 896,000
Grants 671,500 478,500 3,927,000 S,on,000
Other
58 Auburn Way South Conidor Improvements,Fir ST SE to Hemlock ST SE
Capital Costs 20�,000 200,000
Funding Souices:
Unrestricted Street Re�enue
Grants - -
Traffic Impact Fees 200,000 - - - 200,000
Other(Mfll
59 Auburn Ave NE 8 3rd St NE Pedestrlan 8 Acce$Improvemenfs
Capital Costs 50,000 300,000 350,000
Funding Sources�
Unrestricted Street Reeenue
Grarrts - 250,000 - 250,000
Tratfic Imoact Fees 50.000 50.000 100.000
60 M Street SE Corridor(8th St SE to AWS)
Capital Costs 1,900,000 4,750,000 - 6,650,000
Fundirg Sources�
Unrestricted Street Reeenue -
Grants 925,000 3,750,000 4,675,000
Traffic Impact Fees - 725,000 750,000 1,475,000
Other 250.000 25D.000 500.000
81 Auburn Way South Bypass-Riverwalk Dr to SR-19 at R St SE
Capital Costs - - 6,000,000 6,000,000
Funding Souices:
Unrestricted Street Re�enue
G2Ms - - 4,800,000 4,800,000
O[her 1200.000 1.200.000
63 29fhStreetSE&RStreetSElntersectionlmprovements
Capkal Costs 1,800,000 7,800,000
Funding Sources.
UnresMcted Street Re�enue - - -
GraMs - 7,300,000 1,300,000
REET2 - - -
Traffic Imoact Fees 500.000 500.000
64 Lea Hill Segment 1 (R St NE to 105th PI SE)
Capital Costs 150,000 2,450,000 10,000,000 12,600,000
Funtling Sources:
Unrestricted Street Re�enue - - - -
G2nts - 7,950,000 8,000,000 9,950,000
Tra�ic Impact Fees 150,000 - 500,000 2,000,000 2,650,000
Other
85 Lea Hill Rtl Segment 2(105th Ave SE M 112th Ave SE)
Capital Cqsts - 3,500,000 8,500,D00 12,D00,000
Fundirg Sources:
Unrestricled Stree[Re�enue - - - -
Grarrts - - 2,900,000 7100,000 70,000,000
haffic Impact Fees 600,000 1,400,000 2,000,000
aner
25
City ofAuburn Draft Capital Facilities P[an
TABLE T-2 (continued)
2015 2076 2017 2078 2019 2020 Total
�CaoaaN Proiects:
86 Lea Hill Rd Segment 3(112tli Ave SE to 124th Ave SE)
Capital Costs 1,000,000 3,ODD,000 - 4,000,000
Funding Sources:
Unrestricted Stieet Re�enue - - -
Grants 3,000,000 3,000,000
T21fic Impact Fees - 1,000,000 7,000,000
_9ther
89 I Street NE and 22ntl St NE Roundabout Safety Improvement
Capital Costs 200,000 1,175,000 - 1,375,000
Fundirg Sou�ces:
G2M5 160,000 940,000 1,100,000
Traific Impact Fees 40,000 235,000 - - - 275,000
Other
72 West Valley Higliway Improvements(SR-18 to 15th St SW)
Capital Costs 100,000 - 500,000 2,500,000 - 3,100,�0
Funding Soufces:
Grants - 400,000 2,000,000 - 2,400,000
Tra�ic Impact Fees 100,000 100,000 500,000 - - 700,000
Other
Subtotal.CaoadN Prolecls:
CapiplCosls 73,657780 1t,173,437 71,285,280 16,189,300 22,713,320 76,062,750 91,081,267
T�Non-CaoadN Proiects
3 Auburn Way Cmrldw Improvemenfs
Capital Costs 876,700 3,00O,OOU - 3,818,700
Funding Sources:
Unrestricted Stree[Re�enue 110,000 600,000 - 770,000
Grarrts - 708,700 2,400,000 3,706,700
Other
19 Aubum Way NorthNst Street NE Sfgual Improvemenis
Capital Costs 50,000 550,000 800,000
Funding Sources:
Unresftictetl Stfeet Re�enue 50,000 125,000 175,000
GraMs - 425,000 425,000
OtFier
21 Main Street Signal Upgradas
Capital Costs 5,000 - 5,000
Funding Sources:
UnrestriCled Street Re�enue 5,000 5,000
Grants -
Other
27 A Street SE Safety Improvemen5 Sludy
Capital Costs 5,000 5,000
Fu�ding Sou�ces:
Unrestrictetl Street Re�enue 5,000 5,000
G2Ms - -
Other
29 So.2771h,Wetland Mitlgation
Capital Costs 25,000 - - 25,000
Funding Sources:
Unrestricted Street Re�enue 25,000 - 25,00�
Grants - - -
anar,
26
City ofAuburn Draft Capital Facilities Plan
TABLE T-2(eontinued)
2015 2016 2017 2018 2019 2020 Toql
TIP# Non-Caoaciri Proiects:
30 Citywide Pede�rian Accessibflity&Safety Program
Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Funding Sources:
UnresMcted Streef Re�enue 100,000 100,000 100,000 100,000 100,000 100,000 600,000
G2nts - - - -
Other
31 Citywide ArOerial Bicyde 8 Safety Improvements
Capital Costs - 100,000 100,000 100,000 300,000
Funding Sources:
Unrestncted Street Reeenue 100,000 100,000 100,000 300,000
Grants - -
Other
38 37th St NW 8 B St NW Railroad Crossing SafeTy ImprovemenLs
Capital Costs 5,000 5,000
Funding Sources:
Unrestricted Street Re�enue 5,000 - - - - 5,000
Grams - - -
Other -
44 A Street NE Pedestrian Improvements
Capital Costs 150,000 - 150,000
Funding Sources:
UnresMcted Street Re�enue -
Grants 150,000 - 150,000
Other
45 Interurban Trailhead Improvements
Capital Costs - - 210,OU0 210,000
Funding Sources:
Unrestricted Street Re�enue - - -
Grams 210 000 210 000
46 104N Ave SE 8 Green River Road Study
Capital Costs S,OUO - 5,000
Funding Sources:
Unrestricted Street Reeenue 5,000 - - 5,000
GraMs
48 A St SE 6 6th St SE Safety and Access Improvements
Capital Costs 50,000 - - - 50,000
Funding Sources:
Unrestricted Street Retienue - - -
Grents - -
Other 50.000 50 000
50 ITS Dynamic Message Signs
Capital Costs - 100,000 200,000 200,000 - 500,000
Funding Sources:
Unrestricted Street Reeenue 15,000 30,000 30,000 75,000
Grants _ 85.000 170 000 170 000 425 000
27
City ofAuburn Draft Capital Facilities Plan
TABLE T-2(continued)
2015 2016 2017 2018 2079 2020 Tofal
T�NornCaoaaN Proieels:
62 AWS Streetscape Improvements(SR 78 to M St SE)
Capital Costs 1,950,000 2,800,000 - 4,750,000
Funding Sources:
Unrestr{cted Street Re�enue - - 200,000 240,OW - 400,000
G2Ms 1,750,000 2,6UO,U00 - 4,350,OU0
REET 2
67 Gtywfde 7reflic SignalsSaTety ImprovemeMs
Capital Costs 5,000 - 5,000
Funtling Souices:
Un2stricted Streel Re�enue 5,000 - - 5,000
Grents
68 37th St SE 8 A St SE Tratfie Signal Safety Improvement
Capltal Costs 178,400 637,SOD - - 613,900
Funtling Sources:
UnresMcted Street Re�enue 55,000 45,000 - - 700,000
G2M5 . . .. . 121,400 440.000 581,400
Other-Fund 105 152.500 152500
SuMotal.NonCaoadN Prolecls:
Cepital Co'sts � 426,400 937.500 850.000 3,528,700 5,900,000 Z00,000 11,84],600
2075 2076 2017 2018 2019 2020 Tofal
SUMMARY•
CAPITAL COSTS
Capacity Projects 13,439,937 10,957400 71,070,000 15,975,000 22,500,000 15,&50,000 89,782,337
Non-Capacity Prqects 428.400 937,500 850,000 3,528.700 5.900.UD0 2U0,000 11,84P,BU0
Long-Tertn DeM 277243 276.03� 215.280 214.300 273.320 212.750 1.288.930
Total Costs 74,083,580 72,710,937 12,135,260 19,778,000 28,673,320 16,282,750 102,923,867
FUNDING SOURCES:
UnresMctetl Street Re�ern�e 408,500 344,500 948.000 582,500 942,500 200,000 3,426,000
Grarrts 9,560,137 10,243,740 10,172,000 14,248,200 23,672,500 12,475,000 80,369,577
Trafic Impact Fees 2,929,533 1,055,687 1,015,280 4,514,300 3,748,320 1,887,750 15,150,870
halfit Mitigation Fces 50,000 - - - 50,000
REET2 ' ' ' _ '
PWTF Loan - - -
Fund 105-Artenal St.Preserv. 65,410 487,010 - - - 552,420
Olhar(OtherAgencies) 1050000 - - 375.OW 250.000 1:700.000 3.375.000
TotalFuntling 14,083,SSD 12,110.937 72,735,280 19,718,OD0 28.673,320 76,282.750 702,923,887
2g
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital FaciiRies Plan
Six Year Capiql Facilkies Plan, 2015-2020 Special Revenue Fund
Project Title: A Street NW - Phase 1 (3rd St NW to 14th St NVU) TIP # 1
Project No: c207a0
Project Type: Capacity
Project Manager: Ingrid Gaub LOS Corridor ID# 18
Description:
Construct a new mutti-lane arterial from 3rd Street NW to 14th Street NW This project will improve mobility and is tied to
cortidor developmerit. tt is consisteM with the Compreherisive Plan and cortipletes a missirg link of a rSortFJsouth arterial
cortidor The project length is approximatelythree-quarters of a mile. The City purchased rigM-of-wayfrom the northem
property owner. lf the property develops,some or a portion of those funds may be reimbursed to the City(total cost was
$251,000).
Progress Summary•
Pre-design was completed prior to 2007 Final design and ernironmeMal pertnitting were completed in 2011 and
construction was completed in 2013. Major plarNings are scheduled in 2015 as part of the weUand monitoring that is
required to continue ur�il 2023.
Future Impact on Operating Budget:
The annual mairrtenance cost for this project is estimated to be $25,830.
ACfIVIh/'
2014 YE 20t5 Year End
FunCing Sources: Prior to 2074 ESUmate 2015 Budget 2016 Budget Project Total
UnresMcted Street Revenue 187,712 66,028 253,74�
Grants- Secured (Fed,Stafe,Local) 6,562,702 6,562,702
Traff7c Impact Fees 956,198 101,672 350,000 25,0�0 7,407,870
Other Sources -MuPocare Contrrbution 382,817 382,817
Total Funtling Sources: 8,089,429 167,700 350,000 25,000 8,607129
Capital Expenditures:
Deslgn 2,247.331 50,000 10,000 2,297,331
RigM o/ Way 621,341 821,341
Consfruc6on 5,020,757 167,900 300,000 75,000 5,488,45Z
Total F�cpenditures: 8,089,429 167,700 350,000 25,000 8,607 129
Forecasted Project Cost:
Total
2017 2078 2019 20]0 2015-2020
Funtling Sourte5:
Unrestncted Sfreet Revenue
Grdnts- Secured (Fed,Stafe,Lceap
Traff�c lmpacf Fees 25,00� 25,000 25,000 25,000 475,000
Othe�Somces -Multicare Contnbution
Total Fundin9 Sources: 25,000 25,00.0 25,000 25,000 475,000
Capital F�[pendiWres:
Design 10,000 70,000 10,000 10,000 100,000
Right W Way -
Construction 15,000 15,000 15,000 75.000 375,000
Total Expenditures: 25,000 25,000 25,000 25,000 475,000
Grants /O[her Sou�ces: � -
29
City ofAuburn Draft Cgpital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 20152020 Special Reveriue Fund
Project Title: Auburn Way South Pedestrian Imp. (Dogwood St SE to Fir St SE) TIP # 2
Project No: cp1118
Project Type: Capacity, Non-Motorized
Project Manager Jacob Sweeting LOS Corridor ID# 4
Description:
This project will construct pedestrian improvemeMs alorg Aubum Way South between Dogwood Stieet SE and Fir SVeet
SE that are consisteM with WSDOTs SR-164 Rou[e Development Plan. The project includes sidewaik improvemerrts,
access managemeM, a mid-block pedestrian crossing, construction of a U-tum wedge for @astb'ountl vehicles at Fir$treet
SE and street lighting.
Progress Summary•
The City was awarded $100,000 in federal Tunding and $740,830 in sTate funding in May 2011 Other funding source is
Muckleshoot Indian Tribe conbibution. Project design began in 2012. Design is e�ected be completed in 2014 and
construction to be completed in 2015.
Future Impact on Operating Budg'et: --
This project will Fiave rio impact on fhe operatirg budget for street mairrtenance.
Activity• � - - -�
2074 YE 2015 Year End
Funding Sources: Pdor to 2014 Fstimaoe 2015,Budget 2016 Budget Projed Tofal
Unrestnctetl,'Streef Revenue 6,446 92,554 - 99,000
GrarRs-Secmed(Feo',State,Lxa/J 211,454 629,376 - - 640,830
T2Kc Impacf Fees - 115,000 - 115,000
Other Sources(Muck leshoot) 330,000 330,000
Total Funding Sources: 217,900 1,051,930 115,000 - 7,384,830
Capital ExpendiNres:
Design 217,900 71,930 289,830
Right of Way - -
Construction 980,OOD 715,000 1,095,000
Tofal EzpendiWres: 217,900 7,051,930 115;000 - 7;384,830
Foiecasted Project Cost:
ToUI
2017 2018 2019 2020 20752020
Funding Sources: --- --- -"- �- -
Unresfncted Street Revanue -
GraMs-Secured(Fed,State,Loca/)
TraKc lmpact Fees 115,000
Other Sources(�ck leshoot)
Tofal Funding Sources: - N5,000
Capital ExpendiWres
Design -
RigM o/ Way -
Conshuction __115,000
Tofal Ezpentlilurea - 115,000
GraMs/Other Sources:
30
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilitles Plan
Six Year Capifal Facilities Plan,20�5-2020 Special Revenue Fund
ProjectTitle: M Street Underpass (3ri1 St SE to 8th St SE) TIP # 5
ProjectNo: c201a0
Project Type: CapacRy
Project Manager Ryan Vondrak LOS Corridor ID# 6
Description:
Constrvction of a grade separated railroad crossing of M Street SE at tlie BNSF Stampede Pass 4acks.
Progress Summary�
100%Design Drawings and rigM of way acquisi0on were completed in 2011 Construction started in early 2012 and will be
complete during 20'14. Debt Service is scheduled each year through 2041
Future Impact on Operating Budget:
The arnual mairrtenance cost Tor this projectis estimated to be $21,827
Activiry.
2014 YE 2075 Veai En'U
FunOing Sources: Prfor to 2014 Estimate 2075 Butlget 2016 Butlget Prqeet Tofal
UnrestActetl Stieet Revenue t63,958 163,958
Giants-Secured(Fed,State,Local) 8,599,948 8,599,948
REET2 1,140,000 7,740,000
TreNrc Impect Fees (Construcbon) 4,255,428 4,255,428
Tre/fic Impact Fees (Oebt Service) 38,640 127 490 131,233 130,654 297,363
Trafhc Mlbgation Fees 660,000 660.000
PWTFL�30 years) 3,044,491 215,500 3,259,991
OtherSources(OtherAgencies)' 3,090,5'I4 3.090.574
Tofal Funtltng Sources: 20.992,979 342.980 t37.233 130.6% 21.467.202
Gpital Expendi[ures:
Design 2.688,924 2,688,924
Right ol Way 3,358,443 3,358,443
Consbuction '14.906,972 215,500 75.'122,472
PWTFL Debf Service 38,640 127,490 '137,233 130,654 297,363
Total Expentlitures 20.982.879 342.990 131.233 130.654 21.467.202
Forecasted Project Cost:
Total
2077 2018 2018 2020 2075-2020
Funding Sources: ' '
Unrestnctetl S1reeP Revenue _
Grants-Secured(Fetl,Sta[e,Locel) _
REET2 _
Tre((ic Impact Fees (Consfn�ction)
Traf(ic lmpact Fees (Debt Service) 130.080 �29,500 128,920 128,350 778,737
Tral/ic Mrti9ation Fees
PWTFL(30 ysars)
Ot/rerSources(OtlrerAgencles)'
Total FunOing Sourcea 730,080 729,500 126,920 128,350 778,737
Gpibl Ezpenditures:
Des�gn _
Wght o/ Way
COIlS[rtlGl%W1
PWTFL Debt Service 130,080 129,500 t28,920 128,350 �78,737
Tofal EzpentliWres: 13D,080 729,500 128,920 728,350 778,737
GreMs/Other Sources� Other Agencies a�e King County Metro Sewer, Port of Seattle, Port of Tacoma, and BNSF Railway
31
City of Auburn Draft Capital Facilities Plan
i4RTERIAL STREET FUND (102) caP�wi Feci�nies Pian
Six Year CaPital Facilities Plan, 20152020 Special Revenue Fund
Project TiUe: S 272nd/277th St Corridor Capacky& Non-Motorized Trail Improvement TIP # 6
Project No: c222a0 STIP►A AUB-42
ProjectType: Capacity
Project Manager Ryan Vondrak LOS Corridor ID# 15
Desoription: � - -� �
This project inc,ludes preliminary engineering, design, rigM-of-way acqLisition and construction of major widehing on S
277th Street, including the addition of three lanes, one westbound and iwn eastbound,a Class 1 trail, and storm
improvemeMs. The project is approwmately0.9 miles long.
Progress Summary�
Staff is coordinating with the City of Kent and Kirig CouMy to complete anne�iation of the roaHway irrto the Ci_ty of Autium.
Robertson Properties Group is participating in tivs project and is dedicating all necessary roadway frdrrtage M the City.
Future Impact on Operating Budget:
The anrwal mairKenance cosis for this project is estimated to be $27,250.
Activity•
2014 YE 2075 Year Entl
Funtling Sources: Prlor l0 2014 F�lmata 2015 Budget 2076 Budget Pro�ect Total
UnresMctetlSheet Revenue 33,011 357,590 39D,601
G2nfs- Secured State 90,503 930,197 4,000,000 5,020,700
Treff'�c Impact Fees 58t,800 581,800
Other (Development Funtls)` 1,000,000 1,000,000
Other
7otal Funtling Sources: �23,514 1,287,787 5,587,800 6,993,1D7
Capifal ExPendiWres:
Design 723,514 1,267 787 1,391,301
Right W Way 20,000 20,000
Consfruction 5,561,800 5,581,800
Total Expenditures: 123,574 7.287.787 5.567.800 6,993.107
Forecasted Project Cost:
Tofal
2017 2078 2019 2020 2075-2020
Funding Sources:
Un2stncted Straet Revenue
G2nts- Secured State 4,000,000
T�all'ro Impac[ Fees 581,800
Other (Development Funds)' 1,000,000
Other
Total Funding Sources: 5,561,800
Capttal ExpendiWres:
Des/gn -
Right ol Way -
ConsWcNon 5,581,800
Total F�cPendlWres: - 5,587;SOr
GrarRs /Other Sources:
32
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facili[ies Plan
Six Year Capkal Facllities Plan, 2015-2020 Special Revenue Fund
ProjectTitle: F Street SE Non-Motorized Improvertients (Downtown to Les Gove) TIP # 10
Project No: Cp0911
Project 7ype: Capaci[y, Non-Motorized
Project Maroger TBD LOS Corridor ID# WA
Description:
The F St SE project includes pavemeM rehabilihation,iretallation of ciabs, gulters, bike lanes, sidewalks,ADA
improvemeMs,utility undergrounding, LED street IigMing, new two way ceMer left turrrlane,crash attenuation at the
supports for tYie BNSF railroad bridge, initiation of Aubum Staff Bike share pilot program,wayfirxling signage and a
"Bicycle Boulevard"designabon of roadway connections between Aubum City Hall and the Les Go�re Park Campus. This
project improves mobility and safety al6ng the corridor and will complete a gap in the non-motorized network beriveen
Aubwn's Dowrrtown and the Les Go�e Community Campus.The major infrastructure improvemerrts are approidmately 0.3
miles bng and the "Bicycle Boulevard"improvemerrts are just o�er a mile long.
Progress Summary:
Preliminary design and swrey wvrk evas completed in 2009. Federal grarrt was secured in 2014 for Design ard ROW
phases.
Future Impact on Operating Budget:
The annual maintenance cost for this projed is estimated to be $4,100.
Activity:
2074 YE ?A15 Year End
Funding Sources PNor Oo 20t4 Esdmate 2015 Budget 2016 Budgat Proje�t Total
UnresMcteU Sf�eef Revenue
Granfs- Securetlfederal 320,000 200,000 320,000
REET _
TraH7c Impact Fees 7,620 80,000 50,000 87,620
Other
Tofal Funding Sources: 7,820 400,000 250,000 407,620
Capipl Expendinlres:
Design 7,620 400.000 200.000 607.620
Right W Way 5p,ppp
COIISfNCIkN1
Tobl F�cpenAiWres: 7,630 - 400.ppp 250,000 4p7.620
Forecasted�Project Cost:
Tota I
2077 2078 T018 2020 20152020
FunEing Sources -
Unrestricted Street Reirenue _
Gianfs- Unsecured(Fed) 1,440,000 1,960,000
REET
Tral/ic Impact Fees 360,000 q9p,ppp
Othei
Total Funding Sources: 7,800,000 - 2,450,000
Capifal FxpendiNres:
Deslgn 600.000
Poght ol Way 50,000
Cwrstmction 1,800,000 1,800,000
Tofel F�cpenditures: 1,800,000 2,450,000
Grarrts /6ther Sources:
33
City of Auburn Draft Capital Facilities Plan
- -
ARTERIAL STREET FUND (102) Capital Facnities Plan
Slx Year Capital Faellltles Plan, 2015-2040 Speclal Revenue Fund
Project Title: M Street NE (E Main St to 4th St NE) TIP # 11
Project No: asbdl2
Project Type: Capacity
Project Manager. TBD LOS Corridor ID# 5
Description:
This project will construct a four-lane street section that includes sidewalks, gulters, landscaping and sVeetlighfs on M St
NE,between sou�of E Main St and 4th St NE.
Progress Summary•
Pre-design will be cortipleted durirg 2015 to refine project scope, alig"nment, and cost.
Future Irtip'act on Operating Budget:
The annual mair�enance cost forthis project is estimated to be$1,500.
Activity:
2074 YE 2075 Year End
FunAing Sources Pdor tn 2010 Eslimaffi 2015 Budget 2016 Budgat ProJect Total
Unrestricted Sheef Revenue
Grants- Unsecured(Fed,Stete,Local) -
REET -
7reHic Impact Fees 100,000 100,000
OtFrer
Tofal Funding Sources: 700,000 � 700,000�
Capital ExpentllWres
Design - 100.000 - 100.000
Right o/ Way - -
ConstNct7on
Toml ExpendiWres - 700,000 - 100,000
ForeoasteH Project Cost:
Totel
2017 2078 2019 2020____ _ 20752020, _
Funding Sources: � �_ �-�� _
Unrestricted St�eet Re�snue - -
Grants- Unsecured(Fed,State,Loca/) 220,000 920,000 - 1,140,000
REET -
Trallic Impetf fees 55.000 230,000 385,000
Ofher
Total Funding Sourcex 275,000 1,750,000 - 7,525,000
Capital Expentlltures
Design 75,000 175,000
R/ght o/ Way 200,000 200,000
Constructlon 1,150,000 1,150,000
Total Expendltures: 275,000 7,750,000 1�,525,00�
Grams /Other Sources:
34
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year CapiWl Facilkies Plan, 2015-2020 Special Revenue Fund
Project Title: M Street SEl12th Street SE Traffic Signal T1P # 14
Projed No: cpx�oa
Project Type: IMersectan Improvement, Capacky
Project Manager. TBD LOS Cwridor ID# 11
Description:
This project includes the design, rigM-of-way acquisition and corutruction of a new lraffic sigrnal.
Progress Summary:
Future Impad on Opereting Budget:
The anmial mairrtenance cost fur ihis project is estimated to be$6,600.
Activity
2014 YE 2015 Vear End
Funding Sources: Prlor ro 2014 Estlmate 2015 Budget Y076 Budget Project Total
Unrestncted Sneet Rerenue -
Gwnts- Unsecured(Fed,Sfate,Locaq '
REET 2 '
Trd/lic Impact Fees '
Other- Developer •
Tofal Funding Souroes: _
CaDltal Expenditures:
Design •
Righf o/ Way •
COIISfNCt1011 �
Total ExpenGltures
Forecasted Project Cost:
Total
2017 2078 2079 2020 2075-2020
Funding Sources:
UnresMcfed Street Revanue
Grants- Unsecured(Fed,State,Loca!) 500,000 500,000
REET 2
irallic Impecf Fees
Other- �evelqoer 125,000 125.000
Total Fundlnp Sources: 625,000 625,OOD
Capifal ExpendlWms:
Design 75,000 75,000
Right o/ Way Sp,Opp 5p,ppp
COIIS�NCl/O� $QQ,QQQ �,�
Total EzpendiWres: 625,000 625,000
Grarrts /Other Sources:
35
City of Auburn Draft Capital Facilities Plan
- — - --= -- -_- -
ARTERIAL STREET FUND (102) Capi[al Facilities Plan
Six Year Capkal.Facilities Plan,20152020 ._ _ ___ __ _. Special Revenue Fund
ProjectTitle: 8th Strcet NE Wldening (Pike St NE to R St NE) TIP # 15
Project No: cp�000c
ProjectType: Capacity
Project Manager• TBD LOS Corridor ID# 19
Description:
Widen Sth Street NE ro eMerid the five-lane cross-section which currently epsts to the west of Pike St f� to R St NE by
providing an additional traoel lane alorg the soiAh side of the roadway.TYtis is a plannirg le�l cost estimate.
Progress Summary:
Future Impa¢t on Operatlng Budget:
"(Yds project will have ro impad on the operatlng budgetfor street mairrtenarxe.
Activity
2014 YE 2015 Year End
Fundfng Sourca8: Prlor b 2014 EstlmaU 2075 Budget 2078 Butlget Project Total
UniesMcted S[reet Revenue -
Granfs- Unsecured(Fed,State,Local) -
REET -
Trelfic /mpact Fees -
Other
Tofal Funding Sources: - - -
Gpftal Expendllures:
Deslgn
R/ght W Wey
Construct/on
Total F�cpendlWres: - -
Forecasted Project Cost:
Total
2017 2018 2019_ 2020 . __2015-2020_
Funding Sources � �
UnrestActetl Street Re�snue -
G2M5- Unsecured(Fed,Sfate,Loca/) 360,000 800,000 - 1,160,000
REET
TraN�c Impact Feas 90,000 200,000 - 290,000
Other
Total Funtling Sources: d50,000 1,000,000 - 1,450,000
Capltel EcpendlN'ea
Deslgn 200.000 200.000
RigM W Way 250,000 250�000
ConSWCtlon 1.000,000 1.000.000
Total EzpendiWres 450,000 1.000,000 - 7:450.00�
Grarrts !Other Sources:
36
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capkal Facilities Plan
Six Year Capital Facilities Plan,2015-2020 Spaela)Revenue Fund
ProjectTitle: Harvey Rd NE/Sth St NE Intersection Improvements TIP # 17
ProJect No: cp0611
ProjectType: Capacity
ProJectManager None LOS Corridor ID# 5,19
De§cription:
Add one eastboimd ttvough/ngM Nrtrlane on Bth St NE to ttie west of Harvey Rd. Modify traffic signals and traflic
chamelimtion to accommodate the new lane. The additional lane v.vll retluce traffic delays and que�ring at tlie irrtersection of
Han.ey Rd ard 8th St NE in all directiors. This projectwill recorstruct M St NE from 4th St NE to BM St NE, a segmerrt of
roadway appmbmately 0.3 miles lorg Hith a fo��ane crosssection. Tha recorefructlon will add2ss the ebstlng poor
paeemerrt condition and fill in arry gaps in the sidewalk network.
Progress Summary:
Projectwas completed in 2010. Orgoing budget is tor Public Works Trusf Furxl Loan debt paymeMs scheduled through
2028.
Future Impact on Operating Budget:
This projectwill ha�.ero impacton ihe operatingbudgetfor 57eetmaintenance.
Activiry:
2016 YE 2015 Year Entl
Funding Sources Prior ro 2016 Estlmato 2015 Budget 2076 Budget ProJect Tofal
UnresMc/etl Sheet Revenue
GreMs-Secured(Fed,Stete,Local)
Trelfic Impact Fees (Debt Service) 349,000 86,500 86,010 85,383 52t,510
Traffic lmpect Frees 204,500 204,500
PWTF 1,521,300 1 527300
Tobl Funding Sourees: 2,080,800 88,500 86,0�0 85,383 2,253,310
Capibl Expendihrtea
Design 327.500 327.500
7?i9M d WeY 200.400 200.400
ConsWction 1.203.900 1203.900
Lorrg Teim Oebf PWTF 349.000 88,500 86,010 85.383 527,570
Tofal Expendltures 2,080,800 88,500 86,070 85,383 2,253,370
Forecasted PFojeet Cost:
Total
2017 2078 2018 2020 2075-2020
Funding Sou�ces: -
Un2sMctetl S[reet Revenue
Grants-Secured(Fetl,State,Loca/)
ha7/ic/mpact Fees (Oebt Service) 85,200 84,800 84,400 84,400 510,193
7raK�c lmpact Fees
PWTF
Total Funtling Sources: 85,200 84,800 84,40D 84,400 510,193
Gpital FspendlWrea
Desgn
Righf d Wey _
COIISfNG�l0l1 _
Long Term Debt PWTF 85.200 84.800 q4.400 84.4pp 570,193
Total ExpendlWres 85,200 84,800 84,400 84,400 570,793
Grznts/Other Sources� I
37
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facili[ies Plan
Six Year Capital Facilities Plan, 20152020 Speclal Revenue Fund
Pmject TiUe: 8th St NEI104th Ave SE Intersection Improvements TIP # 18
Project No: cp1104 STIP# AUB-40
ProJect Type: IrMersectlon ImprovemeM, Capacky
Project Manager Matt larson LOS Corridor ID# 19
Descriptioii:
Tlvs project includes the design, rightof-way acpuisition ard constniction of irrtersection improvements including a Vaific
signal with accdmmodationfor an eastbourd irtirn movemerrt.
Progress Summary•
The design tiegan in 2011 with corutruction scheduled for 2014.
Future Impact on Operating Budget:
The annual maintenance cost Tor this project is estimated to be $6,600.
Activity:
2010 VE 2075 Year End
Funtling Sources: Prbr ro 2016 Estlmate 2015 Butlget____ 2016 BUCBet Profact Total
Unrastncted Street Revenue 8,600 148,400 5,000 162,000
Grants- Secuied(Fed,State,Local) 40,816 59,184 100.000
REET2 2,fi08 119,000 - 721,608
Traffic Impact Fees
Other (Red/IexJ
Total Funding Sourcas: 52,024 328,5&L 5,000 383,608
Capital ExpendiWres:
Design 50.546 38.000 - 86,546
Right ol Way 1,478 1.478
Constn�ct/on 288,584 5,000 293,584
Tofal Ex�pendiNres: 52,02d 326,566 5,000 - 383;608"
Foieoasted Prqect Cost:
Totel
2017 2018 2079 2020 20152020
Funding Sources:
UnresMcted Sheet Revenue 5,000
Grants- Secured(Fed,State,Local)
REET2 -
TraNic Impacf Fees
Other(Redllex)
Total Funding Sources - - - 5.000
Capital ExpendiWres
Des�9n -
RigM ol WaY '
COIISfNCfJWI
Total 6cpendlturos: - -
Grerrts /Olher Swrces:
38
City of Auburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capipl Facilities Plan
Six Year Capital Facilkies Plan, 2015-2020 Special Reyenue Fund
Project Title: Auburn Way South/M St SE IMersection Improvements TIP # 20
Project No: cp1024
Project Type: Capacity
Project Manager Jatob Sweeting LOS Corridor ID# 3,4
Description:
TFus project is the first phase of improvemeMs at the Aubum Way South/M St SE irrtersection. The project will construct
new westbound to northbound rigM-tum pockets,improved tirrrng radius on the northeast comer, realignmerrt of the
westbound 17th St SE approach to Aubum Way South, IigMirg improvemeMs,related traffc signal modifications arxl right
of way abquisition.
Progress Summary�
Pre-design was completed in 2012. Final design and rigM-of-way acquisition began in 2013 and consWction is planned
for 2014.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street mairrtenance.
Activity. � -
2014 YE 4015 Year End
Funding Sources Prior to 2014 Estlmate 2015 8udget 2076 Budget Project Total
UnrestnctedStreet Revenue 38,815 61,185 5,000 105,000
G2nts- Secured(Fed,State,Lxal) 59,060 390,920 450,000
irelfic Impacf Fees 125,000 125,000
Tre(/ic lvbtigation Funds 37,368 112,632 150,000
Ofher
Total Funding Sources 135,2W 689,737 5,000 830,000
Capitel F�cpentliture5:
Design 121,174 163,000 163,000
Right o/ Way 14,089 85,737 99,826
ConSINCIIon 447,000 S.00O 446,000
Toqi ficpenditures: 735,2W 689,737 5,000 830,000
Forecasted Project Cost:
Total
2017 2018 2019 2020 20152020
Fundfng Sources:
UrnesMcted Street Rewnue 5,000
Grants- Secured(Fed,State,Local) _
Trallic Impact Fees
TraH�c hfitlgat/on Funds _
Other
Total Funding Sour�es 5,000
Capifat Expenditures
Des�gn
Poght ol Way
Constiuction
Tofal F�cpendiares: _
Grants /Other Souroes:
39
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) capita� Faci�itie"s P�an
Six Year Capitai FacilRies Plan, 2015-2020 Special Revenue Fund
Pmject Title: A Street SE Non-Motoriied and Access Improvements TIP # 23
Project No: asbd03
Project Type: Class 1 Trail (Capacity)
Project Manager Ryan Vondrak LOS Corridor ID# N/A
Description:
Preliminary design of improvemerrts to A Street SE behveen the Wtute Riv�er Bridge and 41st S1reet SE, including a
signalized pedestrian crossing and access managemerrt including consolidation of commercial driveways.
Progress Summary•
Remainirg grant furds from the BNSF/E Valley Highway Pedestrian Underpass project�are in the process of being
reprogrammed to tltis project. Preliminary design work has not begun. E�enditures prior to 2013 were for project c229a0.
FuWre Impact on Opereting Budget:
The armual maiMenance cost for tivs project is estlmated to be $2,500.
Actjvity
2014 YE 2075 Year Entl
Funtling Sourcex Prior to 2074 Estimate 2015 ButlBet 2016 Budget ProJect Tofal
UnresMcted Streef Revenue - - - -- -53,900 � � 53,900�
G2nts- SecureC(FeA,State,Loca/) 170,400 89,029 259,429
REET -
Tra((ic Impxt Fees
Other
Total Funtltng Sourcex 224,300 89,029 313,329
Capital Expendittires:
Deslgn 224,300 89,029 - 313,329
RigM of Way
Construction
Total Expendidires: 2Z4,300 89,029 313,329
�Forecasted Project Co§t:
7om1
2017 2018 2079 20TA 2015-2020
Funding Sources:
UnresMcted Street Rerenue -
Grents- Secmeo'(Fed,State,Locaq 89,029
REET -
T2Nic lmpact Fees
Ofhe� (O[her Agenc/es)'
Tofal Funding Sources: 89,029
Capital ExpentliWres:
Design 89,029
Righf of Way -
Constiuction
Toml Expenditures: 89,02�
Grants /Other Souices: Expenditures pnor to 2013 were fur p�oject c229a0
40
Ciry ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilkies Plan
Six Year Capital FacllRies Plan, 20152020 Spebial Revenue Fund
Project TiUe: Academy Drive Muki-Use Trail TIP # 24
Project No: Cp�000c
Project Type: Class 1 Trail (Capacity)
Project Manager TBD LOS Corr'idor ID# N/A
Description:
This project will ise ebsting Academy Dr rigM-of-wayto create a mutti-use trail on between the Green River Rd and Aubum
Way S.
Progress Summary:
Fulure Impact on Operating Budget:
The arnual maintenance cost foY tFds project is estimated to be $5,000.
Activity: -
201d YE 2015 Year Entl
Funding Sources PAor b 2014 Eatlmate 2015 Budget 2016 Budget Project 7ote1
UnrestAcfed St�eet Revenue
Grdrrts- Unsecured(Fed,State.Lxal)
REET _
T2flic Impacf Fees
Ofher Sources
ToUI Funding So�rces:
Capimt ExpendiWres
Design
R/ght oi Way
Construction
Total Expenditures: _
Forecasted Project Cost:
7ofal
2017 _2018 2019 2020 20752020
Funding Saurces
UnresWcted Street Revenue 42,500 42,500 85,00p
Grarrts- Unsecured(Fed,State,LocaQ 382,500 382,500 765,000
REET _
TraHic Impact Fees
Othar Somces
Total Funding Sources 425,000 425,000 850,000
Capital Ezpentlitures:
Design 100,000 700,000
Right o/ Way
consrrucrion azs.000 azs,000 �so.000
Tofel FspendiWres: - 425,OOD 425,000 - 850,000
Grams /Other Sources:
41
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capifal Facilities Plan
Six Year Capital Facilitfes Plan, 2015-2020 Special Revenue Fund
Project Title: 46th Place S Realignment TIP # 25
Project No: cp�ooc
Project Type: Capacity
Project Manager TBD LOS Corridor ID# N!A
Description:
The project will realign 46th Place S to the south of S 321st Street. The realignmerrtwill mo�e the 46fh Place S intersaction
with S 321st Street approximately 350 feet to the east of the curerR location.This will create lwv T-irrtersections(44th
Avenue S aM 46th Place S) in place of the existirg four-leg irdersection.The ewsting 46th Place S will be dead-ended to
the south of S 321st SVeet. The projec[ will improve safety and Vaffic operations at the intersections.
Progress Suiiimary• �
RigM-of-wayfor the realigned roadwaywill be dedicated as part of an adjacerK development project.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,750.
ActNity:
2014 YE 2015 Year Enil
FunCing Sources Prlor to 2014 EstimaU 2015 Butlget 2916 Budpet ProJect Total
Un2sMcted Street Revenue
Grants- Urtsecu�ed,(Fed,State,Locaq -
REET
T2fflc Impact Fees
Other Sou2es
Tofal Funding Sources - -
Capital Ezpendiwres
Deslgn
R/gM W Way
ConSINCIIon
Tofel Expenditiires:
Forecasted Project Cost:
Tolal
2017 2018 2079 2020 20152020
Funding Sources
UrvesMcted Street Re�nue - - -
Grarrts- Unsecurad(Fed,Stafe,Local) 575,000 575,000
REET -
Trelllc Impact Fees 250,000 250,000
Other Soulces
Toml Funding Sourcex 625,000 825,000
CePital Ex{ienditures:
Design 125,000 125,000
Right o/ Way 25,000 25,000
Construction 675,000 675,000
Total Expenditures - - 825,000 825,000
G2nts /Olher Sou�ces:
42
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (702) Capital Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund
Project Title: BNSF 3rd Rafl Expansion Roadway Improvements TiP # 33
Project No: asbd06
ProjectType: Capacity
Project Manager TBD LOS Corridor ID# 13, 18
Descriptan:
T}ds project will design and consVuct roadway improvemerrts associated with the construction of the 3rd rail lire by BNSF
Pr'ogress Summary•
Future Impad on Oparating Budget:
This project will have no impacl on the operating budget for street maintenance.
Activity.
2014 YE 2015 Year End
Funding Sourees: Prlor tu 2074 Estlmafe 2015 Budget 2016 Budget ProJect Total
Unrestdcted Street Revenue 25,000 25,000
Grants- Secured(Fed,Sfate,Local) _
REET
TraNlc Impact Fees
Ofher Sources
Total Funding Sources: 25,000 -25,000
CapHai Expenditurex
Design 5,000 5,000
Rlght o/ Way -
Con3tn�Ctlon 20,000 20,000
Total ExpendiNres: 25,000 25,000
Forecasted Projeet Cost:
Tofal
2077 2018 2078 2020 20152020
Funtling Sources: -
UnrasMcted Street Revenue 25,000
Grants- Secured(Fed,Sfate,Local) _
REET _
Tralbc /mpact Fees
OMrer Sourcas
Toml Funding Sources: - - 25,000
Capipl ExpentliNrea
I7es/gn 5.000
Right o/ Way
ConSINCIion ZO.000
Total ErzPendiWres 25.000
G2M5 !Other Sources:
43
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Cap(tal Facilities Plan, 2015-2020 Special Revenue Fund
Project Title: 124th Ave SE Corrido► & 320th IMersection Improvements TIP # 39
Project No: cp�000c
Pmject Type: Capacity
Project Manager TBD LOS Corridor ID# 23, 25
Descriptlon:
This project will fund the design, rigM-of-way acquisition, and construction of improvements to the signatized SE 320th St
and 124th Aee SE intersection. trnpro�ements include constructing bike lanes, sidewalks, dual southboimd Ie8-tum lanes
into Green River Commimity College, arxf URelligerR Transportation System impm�emerds. The intersection is located at
the main enhance to Green River Commurrity College and will require additional orFsite impro�emerds to be constructeC by
Green Rieer Commurrity College.
Progress Summary:
Future Impact on Operating Budget:
This project will ha�.e no impac[on tlie operating budget for street maiMenance.
Activky.
2074 YE 20'IS Year End
Funding Sourtex PAor to Z014 Estlmate 2015 Budget 2016 Budget Pro�ect Tofal
Unrestncted Street Rewnue - - -
Grants-Unsecmed(Fed,Stefe,Locap - - -
TrsHic/mpacf Fees - - -
Other
Total FunCing Sourees: • • -
Capifal Expendltures
Design -
Rlght oi Way - - -
C0/iS�NCt1011
Total ExpendlStires:
Forecasted ProJect Cost:
Toml
2077 2078 2019 2020 20152020
FundingSourws: - ---- ---- ---- ---- ---- --- - -
UnresMcted Street Revenue - -
Grants-Unsecured(Fed,State,Locap 80,000 640,000 - 720,000
TraNic Impact Fees 20,000 160,000 - 180,000
Other
7ofal Funtling Sourees: 100,000 800,000 - 900,000
Capiql ExpendiWrex
Design - 700,000 - 700,000
Right of Way - 50,U00 - 50,000
consrn,sta� �so.000 - �so.000
Total ExpendiWres: - 100,000 800,000 900,000
Grarits/Other Sources:
�
City ofAuburn Draft Capital Facilities Plan �
ARTERIAL STREET FUND (102) Capital Facilkies Plan I
Six Year CapiWl FaciliUes Plan, 2075-Y020 Special Revenue Fund
Project TiUe: 124th Ave SE Corridor Improvements - Phase 2 TIP # 40
Project No: asbd0l
Project Type: Capacky
Project Manager. TBD LOS Corridor ID� 23
Description:
Tlus project will fund the design, rightof-way acquisition, and consiruction of a lour-lane section with bicy�le and pedestrian
facilities on 124th Aue SE between SE 318th St and SE 312th St,and improvemerRs to the signaiized intersection of SE
312fh St and 124th Ave SE (incfudirg adding bike lanes, dual westbourxl left-tum lanes, dual soufhbound fhrougF�lanes, a
rrorthbound rigM-tum pocket, ffS improvemerRs, and pedestrian safety improvements).
Progress Summary:
Phase 1 improvemerds between SE 318th and SE 316th were completed by GRCC in 2012.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity.
20�4 YE 2015 Year Entl
Funtling Sources Prior to 7A14 EsEmate 2015 Budget 2076 Budget_ _Project Tofal
Unrestncted Street Revenue _ _ _ _
Grants-Unsecured Fede21 400,000 680,000 400,000
Traffic Impact Fees 100,000 Y10,000 100,000
Ofhei
Tofal FunA'ing Sources 500,000 7,100,000 500,000
Capltal ExpendiWres
Design - SOp,000 500,000
Right W Way - 1,100,000
Construction
Total FxpenAiWres 500,000 1,100,000 500,000
Forecasted ProJect Cost:
To181
2017 2018 2019 2020 20152020
Funding Sourcex
Unrestnctetl Street Revenue - -
' #REF! _ _ _
Grants-Unsecured Federa/ 2,500,000 3,7gp,ppp
Trefflc Impact Fees - 320,000
Other
Toml Funding Sources: 2,500,000 - 4,100,000
Capital ExpendlWres:
Design - 500,000
Right d Way �,jpp,ppp
Construchon 2,SOD.00D 2.500.000
Tofal FxpendiWres: 2,SOU,000 - 4,100,000
G2nts/Other Soumes:
45
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital FaciliNes Plar
Six Year Capital Facilities Plan, 201Y2020 Special Revenue Fund
ProjectTitle: R Street Bypass(M Street SE to SR-18) 'I� # 4�
Project No: cp�oacx
Project Type: Capacity
Project Manager TBD LOS Corridor ID# N/A
Desoriptlon:
This project will complete the design and construction of the Bypass Rd, an arterial connection between M Street and
Aubum Black Diamond Road, parallelirg the rail line. The project will provide an arterial oonrrection from the newly
constructed M Street Underpass to the Aubum Black Diamond Road irrterchange with SR-18 to keep both vehicular and
freigM traffic out of residential neighborhoods abng R SVeet SE rorth of the Stampede Pass tine. The arterial conrrection
may also provide opporhmities for partriering with the Muckleshoot Indian Tribe as they redevelop ttie Miles Pit area and as
more definitive plans are developed for a potenlial new WSDOT irRerchange on SR-18 in the vicirity of the project.
Progress Summary•
Future linpact on Operating Budget:
The annual maintenance cost for this project is estimated to be $2,500. ��
Activity -- -
2074 YE 2015 Year Entl
Funding$ources P.rtor fo 2014 F9lmate 2015 Butl et 2016 Butl et Projett Totai
Unrestdcfed Stieet Revenue - " - '"" " " - - - � - ---- - - - —--_ -
Grants- Secured(Fed,Slate,LocalJ -
REET - -
TraHlc Impact Fees - -
Other Sowces (De�rolopment) -
Toml Funding Sources: - - -
Capitel Expen0ltures:
Design ' '
Right ol Way -
r.0/IS�NCI10lI
Tofal Expendlwres -
Forecasted ProJect Cost:
ropl
2017 20t8 2019 2020 2075-ZOZO
Funding Sourma:
UnresMcted Street Revenue -
Grenfs- Secured(Fed,State,Local) -
REET -
Trafl/c Impact Fees
Other Sources (DeWlopment) 500,000 500,000
Toml Funding Sources: 500,000 -500,000
Capltal 6pendituros:
Desfgn 500.000 SOU,000
RfgM ol Way -
CO/lSINCt/OII
Toml Expendiwrea - 500,000 W0,000
GraMs /Other Sourcw: �
46
City of Auburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund
Project Title: SE 320th Street Cor�idor Improvements Phase 1 TIP # 42
Pmject No: cpxxxx
ProjectType: Capacity
Project Manager TBD LOS Corridor ID# 25
Description:
SE 320th St is a primary route servirg Green River Community College and adjacerrt neighborhoods.There are very high
volumes of pedestrians,bicyclists, and transit utiliang the corridor This project will fund the design, rigM-of-way acquisition,
arxl construction of norrmotorized roadway and safety imprdvemeMs iriclutlirig a roundabout at 116th Ave SE, adding
bicycle lanes, sidewalks,and street IigMing between 122nd Ave SE and 116th Ave SE. Projed length is appropmately 45
miles.
Progress Summary: -
GRCC completed the design and constniction for the segmerrt belween 124th Ave SE and 122nd Ave SE in 2013.
Corridor design is scheduled to start in 2015. Constniction is planned for 2017
Future Impact on Operating Budget:
This project will have no impact on the operating budget for sVeet maiMenar�e.
Activity:
2014 YE 2015 Year End
Funding Sources: Prior to 2014 Estlmate 2015 Budget 2076 Budget ProJect 7ota1
Unrestrlcted St2et Revenue - "
Grants- Unsecured Federal 640,000 200,000 4,000,000 840,000
Traffic Impact Fees 760,000 50,000 270,000
PWTFL -
Other
Tofal Funding Sources: 800,000 250,000 6,000,000 1,050,000
Capipl ErzpendiWres:
Design 800,000 800,000
Right o/ Way 250,000 250,000
Construcfion 4,000,000
Total ErzpendiWres: 800,000 250,000 4,000,000 1,050,000
Forecasteii Project Cost:
Tota I
2017 2018 2019 2020 207&YOYO
Funtling Sourrns
Un2stncfed Street Revenue _
Grants- Unsecuiad Federa/ 4,200,000
TraH�c Impact Fees 50,000
PWTFL _
Other
Toql Funding Sources: 4,250,000
Capipl Expenditures:
Deslgn
Righ! o( Way 250,000
Constmct�on _ 4,000,000
Total Ezpenditures: 4,250,000
G2rrts I Other Sources:
47
City ofAu.burn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund
Project TiUe: Auburn Way South (SR-164) Corridor Safety Improvements TIP # 43
Projeot No: cp1218 STIP# AUB-44
Project Type: Capacity
Project Manager Matt Larson LOS Corridor ID# 4
Description:
Tfus project will improve access managemert,including U-tums,upgrade transit stops and street Iighting,widen W
accommodate turrrlanes and pedestrian ard bicycle facilities,upgrade pavemerrt markings,iretall pedesVian signals and
audible pedestrian push buttons,and upgrade traffc signals to ctiarge tlie pha:sing anil to improve tha visibilityof the signal
Fieads.
Progress Summary• �
Grarrt fuidirig was awarded in 2012 and dces not require a local match.
Future Impact on Operating Budget:
This project will have ra impact on the operating budget for street maintenance.
Activity•
2014 YE 2015 Yeai End
Funding Sources Prlor to 2014 Fstimate 2075 Budget 2016 Budget ProJect Totsl
Unrestncted Street Revenue 2,684 2,684
Grants- Secured(Fed,State,Locap 2,738 247,262 2,083,108 2,333,108
TreH'rc Impact Fees 250,000 250,000
PWTFL
Other
Total Funding Sources: 5,422 247,262 2,333,108 2,585,792
Capifal Expendi[ures:
Des�gn 5,422 239,762 93,000 338,184
R�ght o/ Way 7.500 62,000 89.500
Construction 2.178,108 2,178,108
Total Expentlltures: 5,422 7A7,262 2,333,108 2,585,792
Forecasted Prqect Cost: �
Total
201T 2018 '2019 2020 20152020
Fundin9 Sources:
Uruastr/cfed Street Revanue -
Grants- Secuietl(Fed,State.Local) 2,083,108
Traff'�c Impact Fees 250,000
PWTFL
Othei
Total Funding Sources: - 2,333,108
Capital F�cpendiWres:
Des/gn 93,000
Righf of Way 62,000
r.0(IS�2C�IW1 2.�78���
Toql 6cpendltures: � � — 2.333;108
Grairts 7 Other�Souices:
48
City of Auburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Faeilities Plan
Six Year Capifal Facflkies Plan,20152020 Speefal Revenue Fund
Project Title: Traffic RAanagement Center Improvements TiP # 47
Project No: asbd'10
Projact Type: Capaeity, ITS
Project Manager TBD LOS Corridor ID# WA
Description:
The rapid growtli of the City traffic signal arq trrtelligerrt Transportation Systems irttrastruchue has seeerey strained the
capacityand reliabilityof the existing network processirg capabilities.This projectwill implementnetwork comm�aricatiore,
software,�ideo,and physical impro�meMs to the T2ffic Marogemerrt Cerrter which will improee tlie network data
processing speed,reliability, and 2durWancy impro�.ing the Citys abilityto maroge the traruportation system and respord
to emergencies.AddiGonally,tliese impro�.emerrt�vill allow hifo�rmation& Teclmology staff h� isolate tlie Traffic Management
data processing demands from tlie Citys general facility securiry data processing demands resulting in impro�emer�ts to
both processes.
Prog�ess Summary:
Future Impact on Operating Budget:
There is rq impactM the streetmairitenanbe budget.
Activity:
20�4 VE 2075 Veer Entl
Funding Sources: Prlor to 2014 Estlmate 2075 Budget 20'16 ButlBet Brofeet Total
Unrasfncted Stiaet Revenue _
Grants-Secured(Fed,Stete,Loce/)
Tref(ic Impect Fees �5p,ppp isp,ppp
PWTFL
Other
Total Fun0ing Sourcec �50.000 150,000
Capifal Expentliturec
�esign 25,000 25,000
R1Aht d Wey
Construc7/on t25,000 125,000
7obl ExpandiNrec t50.o00 150.000
Forecasted Project Cost:
Toml
2017 2018 2079 2020 20152020
Funding Sources:
Urnestrtcted Streef Reyenue _
Grants-Securad(Fed,Sfafe,Locaq
TraNrc/mpact Fees 750,000
PWTFL _ _
Other
To}al Funding Sourpa: 150,000
Capltal Expendituras
Dasi9� 25.000
Right W Wey
Constructlon 125,000
Total Expentlitures: 750.000
G2nts/Olher Sou�ces:
49
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan,2015-2020 Special Revenue Fund
ProjectTitle: West Valley Highway Improvements(15th Street NW to W Main Street) TIP# 49
ProjectNo: asbdl3
ProjectType: Capacity
Rroject Manager. TBD LOS Co rridor ID#35
Description:
This project scope includes pavement rehabilitation arid re-channelization, roadway widenirig,bicycie lanes,pedestrian
facilities,roadway lightiing,required stortn system improvemeMs, and IrrtelligentT2nspoRation 3ystem trnprovements.
Progress Summary:
Survey,base mapping arxl pre-design are planned to be completed in 2015;o complete preliminary plans and refine
project cost�sti mate.
Future Impacton Operating Budget:
This project wi II Fiave no i mpact on the opereting budget for street mairrtenance.
Activity:
zo�a ve 2015 Yea�Entl
Funtlin0 Sourees: Prlor to 2014 EsMmate 2015 Budget 2018 Budget ProJed Total
Unrestncted Straet Revenue
Giants-Unsecured(FeC,Stafe,LocalJ -
TraH7c Impact Fees 700,000 100,000
Total Funding Sourees: 100,000 700,000
CaPltal ExpentliWrex
Design - 100,OW 10U,000
Rlght ol WaY - - - -
COIISrNC1I0li -
Tofal ExpendiWres: - - 100,000 - �100,000
Forecasted Project Cost:
Tmai
Zon zo�a zo�s zozo 2o�s2ozo
Funtling Sources
Unres6icted Stre�Rewnue - - -
Grants-Unsecured(Fed,State,locaq 480.000 2,400,000 - - 2,880,000
T21/IclmpactFees 120,000 600,000 - 820,000
Total Funding Sourcea 600,000 3,OOD,OOD - - 5,700,000
Capifal ExpendiWrex
Des)gn 60D,000 - - 700,000
Right o/ Way - -
Construction 3,000,000 3,000,000
Tofal Ex�penElSures: 600,000 3,000,000 3,700.000
GraMs/Othar Sources:
$�
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year CapiWl Facilities Plan, 2015-2020 Special Revenue Fund
Project Title: Lake Tapps Parkway ITS Expansion TIP # 51
Project No: cpxx�oc
Project Type: Capacity
Project Manager• TBD LOS Corridor ID# 10
Descriptlon:
The project funds ttie design, coordination, permitdng, and construction of new ffS inhastructure along Lake Tapps
Parkway from Lakeland Hilis Way to East Valley Highway, and along East Valley Highway to Lakeland Hills Way. The
proposed fTS iMrastructure includes conduit, fiber, VMS signage, cameras, network communication upgrades, and
weather shations along the route.
Progress Summary:
Federal Grant application was submitted to PSRC in May 2014.
Future Impact on Operating Budget:
The annual mairRenance cost for this project is estimated to be $5,000.
Activity•
2074 YE 2075 Year Entl
Funtlin9 Sources: Prfor to 2014 FsYimate 2015 Budget 2016 BuAget Project Total
Unrestncfed Sfreet Revenue _
G2nts- Unsecured Federal 82,950 711,000 793,950
REET
T2ffic Impact Fees 22,050 789,000 211,050
Other
Tofal Funding Sources 105,000 90U,000 - 7,005,000
Capiml F�cpenditures
Design 705,000 105,000
Right of Way
Construction 900,000 900,000
Total Expenditures: 105,000 900,000 1,005,000
Forecasted Project Cost:
Tota I
2017 2018 2079 2020 20152020
Funding Sources:
Unrestnctetl Shaef Revenue _
Granls- UnsecuredFederal 711,000
REET
Treflic Impact Fees �gg,ppp
Otirer
Total FunGing Sources: 900,000
CapHal Expenditures:
Design _
Poght ol Way
Constn�cfion gpp ppp
Total F�cpendiWres: 900,000
Grants /Othar Sources:
51
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) caPira� Fac+iKies Pia�
S& Year Capital Facilitles Plan, 20752020 Capital Projects Fund
Project Title: Auburn Way South and 12th Street SE IMersection Improvements TIP # 53
Project No: cp1114
Project Type: Capacity
Project Manager TBD LOS Corridor ID# 3
Description:
The project will design and construct multi-modal irr[ersection improvemeMs at the AWS/12th SVeet SE intersection.The
improvemerrts will include pedesVian access, bicycle lanes, signal phasing ard timing, and fTS upgrades.
Progress Summary�
Design is scheduled to be completed in 2015.
FuWre Impact on Opereting Budget:
This project will have no impact on the operating budget tor street maintenance.
Activity.
2074 YE 2015 Year End
Funding Sources Prfor in 20Y4 Eatimate 2014 Budget 2078 Budget Prqect Tofal
UnmsMctetl Street Revenue
Ci2nfs- Unsecured Federal 250,000
I7EET2 -
TraNic Impacf Fees 50,000 100,000 50,000
Othe�
Totel Funding Sources: 50,000 350,000 50,000
CapNal F�cpenditures:
Deslgn 50,000 50,000
Rlght o/ Wey -
ConsWction 350,000
Toial Expenditures: 50,000 350,D00 50,000
Forecastetl ProJect Cost: �
Total
2017 2018 2018 2020 201b2020
Funtling Sources:
Unrestncted Sheet Revenue
Grants- UnsecuredFedera/ 250,000
REET2
Tralirc Impact Fees 150,000
Other
Tofal Funding Sources: - - - 400,000
Capital ExpendiNres:
Design 50,000
ftight o/ Way -
ConSINCNon 350,000
ToUI Expendltures: 400.000
Grarrts /Othet Sources:
52
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 20152020 Special Revenue Fund
Project Title: Kersey Way SE Corridor Study TIP # 54
Project No: asbdll
Project Type: Capacity
Project Manager TBD LOS Corridor ID# 4
Description:
This project will study improvemerrts to tlie Kersey Way SE corridorfrom the Wtnte River Bridge to the southem city limits.
The study will develop the scope and costs for horimrrtal Nertical geometric roadway improvemerrts, provide roadside
hazard mitigation,street IigMing and norrmotorized trail construction.The project length is approbmatelytwo miles.
Progress Summary:
Design will begin in 2015 following the completion of the update to the Comprehensive Plan.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maiMenance.
Acti4ity.
2014 YE 2075 Year End
Funding Sources Ptlor fo 2016 Estimate 2015 Budget 2076 Budget Prqect_Total
Unrestncted Street Revenua -
Gialrts- Secured(Fed,Sfate,Local) -
REET
Tral/ic lvStigation Fees 50,000 50,000
Other
Total Funding Sources 50,000 50,000
Capilal Fxpenditures:
Design 50,000 50,000
Right o/ Way
Constructlon
Total Ezpenditures: 50,000 50,000
Forecasted Project Cost: � -
Total
2077 2018 2019 2020 20152020
Funding Sources:
Unrestncted Sfreef Revenue
Grants- Secured(Fed,State,Loca/)
TraNic fv5tigation Fees 50,000
Othaz (Developer)'
7otal Funtling Sources: 50,000
Capital 6cpenditures
Design 50,000
Right o/ Way
ConstrucLon
Toql F�cpenditures: 5p,ppp
GraMs /Other Sowces'
53
City of Auburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capi[al Facilities Plan
Six Year Capital FacilRies PWn,2015-2020 Spe¢ial Revenue Fund
P'roject Title: W Main Street Multimodal Corridor and RS Improvements T1P # 55
Project No: Gp1414
ProjectType: Capacity
Project Manager• Kim Truong LOS Corridor ID# 11
Description:
This project will repurpose the ebstlng W Main St corridorwithin AWum s designated Regional Growtl�Cerrter and will
coru4uct tritelligerrt Traruportation System(fT5)improvemerrts senring local and regiorial transpbrlatioh rietworks and a
majorcommercial retail ceMer Impro�emeMs include corrverting the ezsting fourvlane roadwaysectionto a three-lane
section including cerrter two-way left hm lane with new bike lanes,new sidewalks,new LED street lighting,and streetscape
impro�.emeMs tietween West Valley HigFnvay and the trrterurban Trail. RS hnpro�.emer�ts include iMercormecting�and
coordinating traific signals From C St NW along W Main St to W Valley Highway soutli to 151h St SW including two
interchanges with SR-'IS arid orie with SR-167
Progress Summary•
Federal graM was secured in 2014.Arterial Preservadon Furid 105 is participatirig in the pavement rehabilitation portion of
tlrs project . ..
Futu�e Impaet on OPerating Budget:
Tlds projectwill havero impacton ihe operating budgetfor streetmaintenarice.
Activity.
2014 VE 2075 Vear End
Funding Sources: Prlor to 2014 Estlmate 2015 Budget _ 2016 Butlget ProJect Total
Unrestncted Street Revenue -'' '" - " - - -" --' -- -- '
Orants-SecmetlFedera/ 804,�00 2,970,240 804,100
REET -
Traf/ic Impact Fees 56,490 209,650 56,490
Ottier(Aitenal Preservation Fund f05) 85,410 314,510 85 470
Total Funtling Sourcei: 946,000 3,494,400 416,000
Capftal Expenditures:
Design 946,000 966,000
Right o/ Way
ConstNct/on 3,494,400
Total ErzpendiWros 946,000 3,494;400 -946,000
Forecasted Projeot Cost:
Tofal
2017 2018 2078 2020 20152020
Funding Sources
Unrestncted Streef Rewnue
Grents-Secured Federel 3,774,340
REET
Traffic Impact Fees 266,740
Ofher(Artenal Preservation Fund f05) 399,920
Tobl Funtling Sources 4,M0,400
Capibl Erzpentliwres:
Design 948,000
Righf ol Way
Constmction 3,494,400
TotalF�Pentlilures: - - - -- - ----- -4.440.400
Granls/Other Sources�
54
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital FacilRies PWn
Six Year Capital Facilkies Plan,2015-2020 Special Revenue Fund
ProjectTitle: Evergreen Heights Safe Routes to School Improvements TIP # 58
Project No: cpXXXX STIP#AUB-39
ProjectType: Capacity, Non-Nbtorized
Projebt Manager. TBD LOS Corridor ID# 19
Desoription:
The project will widen S 3161h Street from 51 st A�enue S to the west of the E�rgreen Elemer�tary School froniage,and
S6th A�,enue S belween S 316th Street antl 5 318th Street The proposed widening will allow the addition of bike lanes and
sidewalks on both sides of the street to match Ihe ebstlng rdadway cross-section to ihe east of the school.A roundabou[
will be coretructed at the S 3'161h StreeU56th Averwe S irrtersection replacing the ebsting all-way stopcorrtrol and the
school drivewaywill be relocated to the west to align Knih tlie roundabouL The recoretruction of S 3161h Street inGudes the
vartical aligrvnerrt of the ezsting roadway along the school fror�fage which creates sfgM-distance problems associated with
the school driveways,and at the irrtersection with 56th Avenue S. Other project elemerhs include �mdergrowding of aerial
utilities,street lighting,and upgrades to tlie stortn water system.
Progress Summary•
Design phase Grarrt tunding application was submitted in May 2014.
Future Irrmpact on Operating Budget:
This projeotwill ha"eno impac[on the operatingbudgetfor streetmairrtenance.
Activity.
2074 YE 2015 Vear End
FunAing Sources Prlor fa 20�4 6tlmate 2015 Budgat 2018 BUAgst Projeet Total
UrmesMcteo'StreetRevenue ��8,500 84,500 178,500
Grants-Unsecureo'Federal 877,500 478,500 671,500
RaNic Impacf Fees
REET2 _
Other
Total Funding Sources 790,000 563,000 780,000
Gpibl Ecpenditures
Design 790,000 790,000
Poght a/ WaY 563.000
COAS1NCf%On
Tdal6cpentlitures 790.000 583,000 79U,OD0
Forecasted Project Cost:
7om1
2017 2078 2079 2020 2015-2020
Funding Sources
Unrestncted Sbeet Revenue 693,000 ggg,ppp
Grants-UrrsecuiatlFetleia/ 3,927,OD0 5,077,OW
TrdKic Impact Fees
REET2 _
anor
rorai Funa�n9 so�rce: a,sso,000 s,s�s,000
Capital FspenAitures
Des�gn �gp ppp
Right d Way 563,000
ConSINCfIon 4,620,000 4,620,000
Total EzpenCftures d.620.000 5,973,000
Grants/Other Sources'
55
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilltles Pian
Six Year CapitaJ Facilities Plan, 20152020 Special Revenue Fund
Project Title: Auburn Way S Corridor Improvements(Fir St SE to Hemlock St SE) TIP # 58
Project No: cp1119 STIP# AUB-38
Project Type: Capacity
Project Manager Jacob Sweeting LOS Corridor ID# 4
Description:
This project will widen Aubum Way$outh behveen Fir St SE and Hemlock St SE to five lanes with curb, gutter, sidewalks,
illumination and storin impro�emer�s. A new traffic signal will be corisVucted at Hembck Street SE arid cornect to Aubum's
IrrteJligerrt Transportafion System.
Pr'ogress Sumrima 'ry�
Washington State Transportation Impro�ment Board (T18) awarded the City grant funds in the amount of$2,426,400 on
Nooember 19, 2010. The MucklesFaot Indian Tribe is a project partner and is cor�6ibufirg ROW dedications and project
funding in the amount$836,601
Future Impact on Opereting Budget:
This annual mairdenance cost for this project is estimated to be$9,300.
Activity.
2074 YE 2015 Year End
Funding Sources: Pdor to 2014 Estlmate 2075 Budget 2076 Budget Pr ec[Total
Unrest/icted Street Revanue 150 - - - 150
Grarrts-Sec�red State 364,449 2,061,951 - 2,426,40U
T2//ic Impact Fees 200,000 200,000
OflrerSouiCes(Muckleshoot) 91,112 745489 838,601
Total Funding Sourees: 455,711 2,807,440 200,000 - " 3;463,151
Capifal ExpendiWres
Design 425,088 90,OD0 - 515,068
Right o/ Way 30,643 406,000 - 438,643
Consfruction 2,311,440 200,000 2,511,440
Tofal ExpendiWres 455,771 2,807,440 20D,000 - 3,453,151
forecasted Projed Cost:
Tofal
2017 2018 2079 2020 20152020
Funding Sources
Unrestrictetl Street Revenue - - -
Grants-Secured State - - - -
T2Krc Impacf Fees - - - - 200,000
Ofher Sources(Muckleshoot)
Total Funding Sources - - - - 200,000
Capital EipenCihires
Oesign ' -
Right o/ Way
ConStNCfion 200,000
Total FxpendiWres - - • 200,000
Gran[s I Other Sources:
56
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capifal Facilities Plan
Six Year Capital Facilkies Plan, 20�5-2020 Special Revenue Fund
Project Title: Auburn Ave NE & 3rd St NE Pedestrian & Access Improvements TIP # 59
Project No: cp1023
Project Type: Capacky
Project Manager TBD LOS Corridor ID# 2
Description:
This project will improve access,safety and operations for pedesVian, bicyclists and motorized vehicles at the iMersections
of 3rd St NE/Aubum Ave, 4th St NE/Aubum Ave, ard 4th St NE/Aubum Way North. Improvemerrts include a new traffic
signal at 3rd St NE to add a missing pedestrian crossing and accommodate the northbound left-tum mbvemerrt;improving
pedesVian facilities to meet ADA requiremeMs, restricfing uncoMrolled accesses near the irrtersection,and modiTying the
traffc sigrial at Aubum Way North and 4th St NE to eliminate the easUwest split phase operation.
Progress Summary:
Survey and pre-design were started in 2010-2011 Pre-design will be completed in 2015, with construction scheduled for
2017 pending grarrt funding.
Future Impact on Operating Budget:
This projec[ will have no impact on the operating budget for street maintenance.
Activity:
2074 YE 2015 Year End
Funtling Sources: Prior fn 2074 Es[Imate 2015 Budget 2016 Butlget ProjeQ Total
Unmstncted Street Revenue 8,778 8,77g
G2nfs- Unsecured(Fed,State,Loca/) _
TraHlc Impact Fees 50,000 50,000
REET2
Other
Total Funding Sources: 8,T78 50,000 58,778
Capital Fxpenditures
Design 8,778 50,000 58,778
Riqht of Way _
Construction
Total 6cpendiwres: 8,n8 50,000 58,778
Forecasted Project Cost:
Tofal
2017 2018 2019 2020 20152020
Funding Sources: � - -�
Unrestncted Stieet Revenue
Grants- Unsecured(Fed,Stete,Local) 250,000 250,000
TrdNic Impact Fees 50,000 100,000
REET2
Other
Total Funding Sources: 300,000 350,000
Capitel Expenditures:
Design 50.000
R�ght of Way _
Construction 300,000 300,000
Total F�cpenditures: 300,000 350,000
Grants 1 Other Sources:
57
City of Auburn Draft Capital Facilities Plan
ARTERIAL STI2EET FUND (102) CapiWl Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund
Project Ttle: M Street SE Corridor (8th St SE to AWS) TIP # 60
Project No: cp�oaoc
Project Type: Capacky
Pruject Manager TBD LOS Corridor ID# 6
Desc�iption:
Widen M SVeet.SE irdo a mulfi-lane arterial beriveen 81h St SE and AWS. This projeat will improve mobility and is tied to
cortidor devebpmerrt. fl is consisteM with the Gomprehensive Plan and corrtributes to the completion of a norttJsouth
arterial corridor.
Progress Summary•
Future Impad on Operating Budget:
This annual maintenance cost for this project is estimated to be $8,000.
Activity.
2014 YE 2015 Year End
Funtling Sources: Prior to 2014 Eatlmate 2015 Budget 1016 Budget Project Totel
Uniestrlcted StrecM Revenue -
Grants- Unsecured(Fed,Stafe,Local)
haHic Impact Fees
REET2
Other(Development)
Total Funding Sources �--� _ - - - --- � - - -
Capital Expenditures
Des�gn -
Right of Way
QOIIS�NCNOII _ _- ____
Tofal ErzpenCiNres:
Forecasted Project Cost:
roml
2017 2018 2079 2020 20152020
Funiling Sources:
Unrestncted Shset Revenue - -
Grants- Unsecured(Fed,State,Local) 925,000 3,750,000 - 4,675,000
T215c Impact Fees 725,000 750,000 1,475,000
REET2 -
Other(Deve/opmenf) 250,000 250,000 500,000
Total Funding Sources: 7,900,000 4,750,000 6,650,000
Capital ExpendiWres:
Design 650,000 650,000
Right ol Way 1.250,000 1,250,000
Constniction 4,750,000 4,750,000
Total ExpendiWres: 1,900,000 4,750,000 6,650,000
Grarns /Other Souices:
58
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capitai Facilities Plan, 2015-2020 Specia,l Revenue Fund
Project TiBe: Auburn Way South Bypass- Riverwalk Dr to SR-78 at R St SE TIP # 61
Project No: cp�omc
Project Type: Capacity
Project Manager TBD LOS Corridor ID# N/A
Description:
This project will consVucta rew roadwaycortidorM bypass Aubun Way South. The new roadwaywill e#end from
Rivervvalk Drive to R SVeet SE to the rorth of SR-18. A r�ew connection to a new irrterchange with SR-18.
Progress Summary:
FuWre Impact on Opereting BudgM:
This armual maiMenarice cost for this project is estimated to be $25,000.
Activily.
2074 YE 2015 Year EnE
Funding Sourcex Prior W 2014 Esfimate 2015 BuOpet 2016 Budget Pro eet Tofal
Umesficted Stieet Revenue - _ - � - _
G2nts- Unsecured(Fetl,Stffie,LocalJ _
REET _
TraNic lmpact Fees
Other (Developmenf)
Tofal Funtling Sour�es - .
Capiql F�cpentlitures:
Design
Righf of Way
Construction
Toql ErzpendiWres: - .
Forecasted Project Cost:
Total
2017 2018 2078 2020 2015-2020
Funtling Sources
UnresMcted Sheef Revenue -
G2nfs- Unsecured(Fed,Stafe,Local) 4,800,000 4,800,000
REET
Tra/lic Impact Fees _
Other (De�lopment) 1,200.000 1.200,000
Tofal Funding Sources: 6,000,000 6,000,000
Capital Erzpenditures:
Des79� 6,000,000 6,000,000
Rlght ol Way _
Construction
Topl F�cpentllWres: 6,000,000 6,00O,OOD
G2nts I Oiher Sources:
59
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capifal Facilkies Plan
Six Year Capifal Facilkies Plan, 20152020 Special Reve�ue Fund
Project TiUe: 29th St SEIR St SE Intersection Improvements TIP # 63
Project No: cpinooc
Project Type: Capacky
Project Manager TBD LOS Corridor ID# 18, 27
Descriptfon:
This project funds the design, rigMof-way acquisition and consVuction of intersection capacity and safery improvemerrts at
the 29th St SEIR St SE irrtersection.Tivs project will include creating eastbowdN✓estbound dual left-tum laries, a�ndlia_ry
signal heads and pedestrian safety enhancemerrts.
Progress Summary:
Future Impaot on Operating Budget:
This project will have ro impact on the opereting budget for street mairRenance.
Activity.
(Predous Vrs) 2074 YE 2015 Vear End
FunOing Sourcea Ptlor to 2014 EsYlmate 2015 Budgat 2016 Budgat Projact Total
Unrestricted Sheet Reoenue -
Grants- Unsecurad(Fed,State,Local)
T�c Impacf Fees -
REET -
ONrer
Total Funtling Sourcax -
Capital 6cpendlWres:
Deslgn -
RigM o/ Wey
Construction
Toal Espendltures: - - • - -
Forecasted Prcject Cost:
rotal
2017 2018 Z019 2020 20152020
Funding Sources
Unrastncted Sheet Revenue - -
Grants- Unsecured(Fed,State,Local) 1,300,000 7,300,000
Tra�c Impact Fees 500,000 500�000
REET
Other
Total Funding Sources - 1.800,000 1.800,000
CepNal EzpentliWres:
Design 350,000 350,000
Rlgbt W Wey 450,000 450,000
Constructlon 1,000,000 1,00O,OOU
Total Expenditures: 7,800,000 � � - 1.800,000
GraMs I Other Swrces:
60
City ofAuburn Draft Capital Facilities Plan
ARTERIAI STREET FUND (102) CapiTal Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund
Project TUe: Lea Hill Rd SegmeM 1 (R St NE ta 105th PI SE) TIP # 64
Project No: cpxu�ac
Project Type: Capacity
Project Manager TBD LOS Corridor ID# 19
Desc�iption:
Widen the ebs6ng roadway to provide a fourvlane cross section pedestrian and bicycle facilities. The project includes
widenirg the Green River Bridge.
Progress Summary:
Two parcels along the future roadway alignmeM were prdcured in 2014. Corridor pre-design eHort is plahned to begin in
mid 2015 foliowing adoption of the ComprehensivE Transportation Plan major update.
Future Impact on Opereting Budget:
This annual maintenance cbst for this project is estimated to be$18,300
Attivity:
(PreHous Yrs) 2074 YE 2015 Year End
Funding Sources: Prior to 2014 Estimate 2015 Budget 2016 Butlget Project Total
Unrestncted Street Revenue
Granfs- Unsecured(Fed,Sfate,Locap
Treff�c Impact Fees 600,000 150,000 750,000
OtFrer
Total Funding Sources: 600,000 150,000 750,000
Capifal ExpendlWres:
Design 150,000 150,000
Right o/ Way 600,000 600,000
Construchon
Tofal Erzpenditures: 600,000 150,000 750,000
Forecasted Project Cost:
rura�
2017 2018 2079 2020 2075-2020
Funding Sources:
Unrestncted Street Revenue
Grants- Unsecurad(Fed,State,Local) 1,950,000 8,000,000 9,950,000
Traffic Impact Fees 500,000 2,000,000 2,650,000
Other
Tofal Funding Sources: 2,450,000 10,000,000 12,600,000
Capltal 6cpendiWres:
Design 1,950,000 2,100,000
Poght of Way 500.000 500.000
Construction 10,000,000 10,000,000
Total Expenditures: 2,450,000 10,000,000 12,600,000
GrdMs /Othef SoufGes:
61
City ofAubuYn Draft Capital Facilities Plan
- - -
- - - - - — --
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 20152020 Special Revenue Fund
Project Title: Lea Hill Rd SegmeM 2 (105th PI SE to 772th Ave SE) TIP # 65
Project No: cp�oocx
Project Type: Capacity
Pmject Manager TBD LOS Corridor ID# 19
Description:
Project includes widenirg the e�sting roadway to provide a four-lane cross-section including pedestrian and bicycle
facilities.
Progress Summary�
Future Impact on Operating Budget:
This anrival mairitenance costforthis project is esdmated to be $24,100.
Activity -
2014 YE 2015 Year End
Funding Sources: Pdor to 2014 Estlmate 2015 Budget 2016 Butlget_ Project Total
Unrestncted Street Revanue -
Grarrts-Unsecured(Fed,State,Local)
Traffic Irrmpact Fees -
Other
Tofal FunAing Sources -
Capifal F�cpendiWres:
Design -
RigM o7 Way - -
Construction -
Total ExpendiWres: - - -
Forecasted Project Cost:
Total
2017 2018 2019 20TA 20152020
Funding Sources
Unrestricted Street Revanue - -
G2nts-Unseqmed(Fed,State,Local) 2,900,000 7 700,000 10,000,000
T2ffic/mpact Fees 800,000 1,400,000 2,000,000
Other
Total Funding Sources: - 3,500,000 5,500,000 72,000,000
Capital Expenditures:
Design 2,000,000 2,000,000
Right of Way 1,W0,000 - 1,500,000
Construction 8,500000 8,500,000
Total-Eipendihires 3,500,000 8,500,000 12,00O,OOr
G2nts/Other Sources:
62
City of Auburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) capiral Paci�ities P�an
Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund
Pmject Titie: Lea Hill Rd Segment 3(112th Ave SE to 124th Ave SE ) TIP # 66
Projact No: cpiaxx
Project Type: Capacky
Project Manager TBD LOS Corridor ID# 19
Description:
Project includes widening fhe epsting roadway to provide a four-lane crosssection includirg pedestrian and bicycle
facilities.
Progress Summary:
Future Impact on Operating Budget:
This annual mairRenance cost for this projed is estimated to be$20,300.
Activity:
2014 YE 2015 Year End
FunAing Sources: Prlor to 2014 Esdmate 2075 Budget 2018 Budget ProJeet 7otal
UnrasMcted Street Revanue -
Giants-Unsecmed(Fed,State.Lxan -
Traffic Impect Fees -
Other
Totai Funding Sourcex - - - -
Capifal ExpentliWres
Design - - -
Right of Way - - - -
Construction
Total ExpenCitures: - - - • -
Forecasted Project Cost:
Total
2017 2018_ 2019 2020 20752020
FunNng Sourees: -
UnresMcted Street Revenue
Grants-Unsecured(Fed,State,Local) 3,000,000 3,000,000
TreKc Impact Fees - 1,000.000 1,000.000
Other
Total Funding Sources: 1,000,000 3,000,000 4,000,000
Capital F�cpentliWrex
Design 500,000 500,000
Right o( Way 500,000 500,000
Constiucfian 3,000,000 3,000.000
Total ExpendlWres: - 1,000,000 3,000,000 - 4,000,000
G2Ms/Other Sources:
63
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facfli8es Plan, 2015-2020 _ Special Re"venue Fund
Project Title: I Street NE and 22nd Street NE Roundabout Safety Improvement TIP # 69
Project No: cpxXX
Pmject Type: Capacky (Safety)
Project Manager TBD LOS .orridor ID# 21
Description:
TFus project inciudes ihe design and construction of a roundabout at the 22nd Street NE irRersection with I Street NE. This
is currently a 4-way stop controlled iMersection.
Progress Summary• -
Mul6ple grant applications vYere submitted in May/Juy 2014.
Future Impad on Operetlng Budget:
TheYe is rm impact to the street maiMenance budget
Activity
(PreHous Yrs) 2014 YE 20'IS Yea�Entl
Funding Sources: PAor to 2014 Estlmate 2015 Budget 2016 Butlget Projee!Total_.
Unrestricted Street Revenue _ _ _
Grmrts-Unsecured Federal - - 160,000 940,000 160,000
Traffic Impact Fees - qp,ppp p�,ppp pp,ppp
REET2
Other
Total Funding Soureex - 200,000 1,175,000 Z00,000
Capital Ezpenaiwres:
Design 400.000 - 200.000
RigM of Way - - -
ConstruCtion 1,175,000
Totel Expendifures - 2Q0,000 1,175,000 200,000
Forecasted Project Cost:
rota�
2077 2018 2019 20211 2U'IS2020
Funding Sources:
Unrestiicted Street Re�nrre _ _ _
Grants-Unsecured Federal - - 1,100,000
T�c Impact Fees - - 275,000
REET2 _ _ _
Other
Totel Funding Sourcex - - - 1,375,000
Capftal Expendilurex
Desi9� - ' 200,000
Right o/ Way - -
Conshuction - 1,175,000
Toql Expendiwres • - - 7,375,OM
Grants/Other Sources: - -
64 I
City of Aubum Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capltal Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund
Project Title: West Valley Highway Irtiprovements (SR-18 to 15th Street SW) TIP � 72
Project No: cp�000c
Project Type: Capacky
Project Manager TeD LOS Corridor ID# 35
Description:
This project scope includes pavemerrt rehabilitation and re-channelization, pedestrian and bicycle facility improvements,
improved roadway ligh6rg, required stortn system improvemerRs, irrtersection signal replacemerrt at 15ih St SW, and
trdelligerrt Transportation System trnprovemeMs.
Progress Summary:
Survey, base mappirg and pre-design are plarmed to be completed in 2015 to complete preliminary plans and refine
project cost-esNmate.
Future Impact on Operating Budget:
There is no impact to the street maiMenance budget.
Activity.
(PreNous Yrs) 2014 YE 2075 Year End
Funding Sources: PMor to 2014 Estimate 2015 Budget 2076 Budget ProjeU Tofal
Unrestricted Street Revenue - -
Grants-Urtsecured(Fed,Stafe,Lxal) -
T2//ic Impact Fees - 100,000 100,000
REET2
Ofher
Total Funding Sources: - 100,000 700,000
Capifal Expendi4ues:
Des�9^ 100.000 100�000
Right o/ Way '
Construction -
Total Ezpenditures: 100,000 100,000
Forecasted Project Cost:
TOTaI
2017 2018 2019 2020 2075-2020
Funding Sources:
Unresfnctetl§treef Revenue _ ,
Grants-Unsecured(Ferl,State,Lxal) 400,000 2,000,000 - 2,400,000
TraKc Impact Fees 100,000 500,000 700,000
REET2
Other
Tofel Punding Sources: 500,000 2,500,000 - 3,100,000
Capital ExpendlWres:
Design 500.000 - 6pp.ppp
R�ght of Way
Conshuchon - 2.500,000 2.500.000
Tofal Expendituras: 500,000 2,500,000 - 3,700,000
Grants/Other Soumes:
65
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilkies Plan, 20152020 Special Revenue Fund
Project THe: Auburn Way Corridor(4th St NE to 4th St SE) TiP �F 3
Project No: c409a0, cpiooa
ProjectType: Non-Capacky
Project Manager TBD LOS Corridor ID# 2, 3
Description:
Tvs project is based on a pre-design study to improve pedestrian accessibility, appearance, and link tlie downtown area
abrg Aubian Way SouN between4th Street NE and 4th Street SE. The project may include some pavementrepairs.
However an oveday was compieted as part of the Citys ARerial Pavemerrt Preservation Program in 20W AtThough this
was considered a temporaryfix the scope has been modified to accoim[for the pavemertwork. The project is
appropmately0.5 miles lorig.
_ _ _
Prdgres's Summary• -
The pavemeM portion has been minimized due to the work completed in 2007 under the Arterial Pavement Preservation
Prog2m.
Futtire Impact ori Operating Budget:
This project will have rio impact on the operatirg budget for street maiMenance.
Activity.
2074 YE 2015 Year Entl
Funding Sources: Prlor ro 2014 Estlmate 2015 Budget Y018 Budget Project Total
Unrestncted Sheet Revenue 78.251 78,251
Granfs- Unsecured(Fed,State,LocaQ
REET -
T�t Impact Fees
Other Sources
Total Funtling Sources: 78,251 - - • - 78.251
Capltal bcpendlturas:
Desfgn 78.251 78.251
RigM o( Wey
Constructlon
Total F�cpendih�res: 78,251 - 78,251
Forewsted Project Cost:
Totel
2017 2018 2019 2020 2015-2020
Funtling Sources:
UnrestActed Street Revenue 71�,000 600,000 710,000
C,rants- Unsecured(Fed,State,Local) 708,700 2,400,000 3,108,700
REET
TraHic Impect Fees
OBrer Somces
Total Funding Sources 878,700 3,000,000 3,818,�00
CaPltal Fxpenditures
Deslgn 618.700 618.700
Right o/ Wey 200.000 200,000
Construct/on 3,000,000 3,U00,000
Tofal Expendiwres: 818,700 8,000,000" - 3,818,70�
Grarrts /Olher Sources:
66
Ciry ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Special Revenue Fund
Project Title: Auburn Way Northllst Street NE Signal Impravements TIP # 19
Project No: asbd05
Project Type: Non-Capacity
Project Manager TBD LOS Corridor ID# 2
Description:
This project will construct a new traf�c signal with corriroller cabine[and battery backup along with necessary intersection
improvemeMs.
Progress Summary�
Design will be completed in 2015. Construction will be completed when funding is secured.
Future Impact on Operatlng Budget:
This project will ha�e ra impact on the operating budget for street mairrtenance.
Activity.
2014 YE 2p15 Year End
Funding Sources: Prlor M 2076 Esdmate 2075 Budget ?A18 Budget ProJeet Total
Unrestricted Street Revenue 50,000 - 50,000
Grants-Unsecmed(Fed,State,Loca!) _ _
T2ff�c Impact Fees _ _
Other
Total Funding Sources: - 50,000 50,000
Capital ExpendiWres
Des�gn - 50,000 50,Opp
Right o/ Way - _
COIISINCIIOII
Toial F�cpentli4ires: - 50,000 - 50,000
Forebasted Project Cost:
Toql
2017 ZO18 2019 20Z0 201&2020
Funding Sourees
Unmstricted Street Re�nue 125,000 �75,ppp
Grants-Unsecured(Fed,State,Local) 425,000 - 425,000
T�c Impacl Fees _ _
Ot/rer
Tofal Funding Sourcex 550,000 600,000
Capital EzpendiWres:
Design - - 50,ppp
RigM o/ Way 100,000 - 100,000
Construction 450,000 - q5p.ppp
Tofal ExpendiWrex 550,000 - - 600,000
Grarrts/Other Souices: G2nt(unds a�e unsecure
67
City ofAuburn Draf't Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilitles Plan
Six YeaY Capital, Fa¢ilkies Plan, 2015-2020 Special Revenue Fund
Project Title: Main Street Signal Upgrades TIP # 21
Project No: cp140.6
Project Type: Non-Capacity
Project Manager Seth Wickstrom LOS Corridor m# 11
Description:
Reconstruct the ebsting traFic signals at C St NW and W Main St and at E Main St and Auburn AvelA St SE. The new C S
NW signal vYould provide protected left-tum phasing for C St, and wo�9d provide additional safely related to the reilroroad pre-
emption.The Aubum Ave/A St signal would replace one of the Citys oldest sigrols which has exceeded its design life.
Progress Summary•
Future Impact on Operating B'udget:
This project will have ro impact on Uie operating budget for street mairrtenance.
Activky.
2074 YE 2014 Year End
Funding Sotirces Prlor b 2014 Estlmata 2015 Bud et 2018 Budgal ProJeG Totel
Umestncted Sheet Reoenue 315,000 5,000 320,000
GrarRs- Unsecurad(Fed,State,Lncaq -
REET -
Tra/fic Mitigation Fees 150.000 t50,000
ane.
Total Funtling Sources 465,000 S,ODO 470.000
Cnpipl �pendi[urea
Design 50.000 50,000
Righf d Way -
Consfrucfion 475,000 5.000 420,000
Tofal Expe_ndiWres: 465,000 S.OUO - 470,000
Forecasted Project Cost:
rom�
2017 2018 2019 2020 20152020
Funding Sources
Un25Mcted Street Re�nue 5,000
Grants- Unsecured(Fed,State,Local) -
REET - -
TraNic Mt�gatron Fees
Ofher
Total Funding Sourcex - 5•��
Capital ExpendiWrex
Design - -
RigM o/ Way - -
Construction 5•�
rorai �Pana�mres: - s.oa
Grarris /Other Sources:
68
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) CapiWl Facilitles Plan
Six Year Capital Facilifles Plan, 2015-2020 Special Revenue Fund
Project Title: A Street SE Safety Improvements Study TIP # 27
Project No: cp1110
Project Type: Safety (Non-Capacity)
Project Manager. James Webb LOS Corridor ID# 10,33
Description:
Shrdy the A Street SE corridor between 6th SVeet SE and Lakeland Hills Way SE including 41st St SE from D St SE to C
St SE. The study will review the safety and access needs ofUie Vavelirg public and the adjacent properties.
Progress Summary•
hrFwuse pre-design will be dor�to 2fine project scope, alignment, and cost will be complete in 2013. 2014 design will
complete deTailed corridor plan for�uture improvemerrts.
Future Impad on Operating Budget:
This study will ha�,e rro impact on the opera6rg budget for street maiMenance.
Activity:
2074 YE 2015 Year End
Funding Sources: Prlor l0 2014 ESimate 2015 Budget 2016 Butlget ProJect Total_
Unrastdcted Sfieet Revenue 1,230 45,000 5.000 51,230
Grants- Secured(Fed,Sfate,Local)
REET
T2ffic A�Stigatian Fees _
Other
Total Funding Sources 1,230 45,000 5,000 51,230
Capital F�cpentlitures
Des/gn 1,230 45,000 5,000 51,230
Righf ol WaY _
Construcnw
Toql F�pendleures: 1,230 dS,000 S,OUO "51,230-
Forecasted Project Cost:
Total
2017 2078 2019 2020 20752020
Funding Sources
Unrestncfed Street Revenue 5,000
Granfs- Securad(Fed,State,Local)
REET _
Tra((ic Impact Fees _
Other
Toql Funding Sources: 5,000
Capital EzpenEitures
Dasign 5,000
Righf ol Way
CAOSWC�IO/I
Total Expenditures: 5,000
Grarrcs /Other Sources:
69
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Faeilities Plan
Six Year Capital Facilities Plan, 20152020 Special Revenue Fu�d
?roject TiUe: S 277th Street -Wetland Mitigation TIP # 29
Project No: c410a0
Project Type: Non-Capacity
Project Manager. Nlatt Larson LOS Corridor ID# N!A
Desoription:
Wetland mitigation for ihe S 277th St grade separation project.
Progress Summary•
This is a 10-year obligation, which began in 2004.
Puture Impaet on Operating Budget
This pmject will ha� ra impact on ihe operatirg budget for street maiMernance.
Activity.
2014 YE 2015 Year Entl
FunAing Sources: PAor ro Y014 Fstimate 2015 Budget 2076 BudBet Pro�ect Total
Unrestncfed Streef Revenue 264,084 55,000 25.000 344,084
Gianfs- Secwed(Fed,Stffie,Loca/) - -
REET - -
TraKx Impect Fees
Other
Total Funding Sourees 264,0&1 55,000 25,000 - 366,084
Capltal ExpentliWre9:
Design 730,997 10.000 70,000 iW,997
RIgM ol Way -
Construcfion 733,087 95.000 15.000 193.087
Total �penAiluros: 264,084 55,000 25,000 - 344,084
Forecasted ProJect Cost:
Tota I
2017 2018 2019 2020 20152020
Funtling Sourcex
UnresMcted Sheet Re�enua 25,000
Grents- Secured(Fed,Sfate,Lxal) -
REET - -
Traffic Impact Fees
Other
Total Fundin9 Sources: - 25,000
Capital Expenditures
Design 10,000
RigM o1 Wey -
Construct/on 75,000
Toal ExpendlWres: • - 25,000
Grarrts/Other Sources�
��
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capitai Facilkies Plan
Six Year Capital FacilRies Plan, 2015-2020 Special Revenue Fund
Project Ttle: Citywide Pedestrlan Accessibility and Safety Program TIP # 30
Project No: asbd08
Project Type: Non-Capacity(Mnual)
Project Manager Pabio Para LOS Corridor ID# N/A
Descrlption:
This is an annual program to fund pedesVian access and safety improvemerrt projects at locations Woughout the City.
Projects are prioritized annualy based on pedesUian demands,epsting deficiencies, and citiaen requests.
Progress Summary•
Future Impact on Opereting Budget: �
This project will have ra impact on the operating budget for street maiMenance.
Activity.
2014 YE 2015 Year End
Funding Sources: Prfor to 2014 Eslfmate 2015 Bud9et 2016 Budget Project Total
Unresfncted Sfinet Rerenue 100,000 1�0,000 100,000
Grenfs- Secmad(Fetl,Stafe,Locaq
REEr _
T2�c Impacf Fees _
Otbei
7otel Funding Sourcex 700,000 100,000 100,000
CaPital EzpenAiWres
Deslgn 15,000 15,000 30,000
Poghf of Way _
COnSfNCf%On $$,000 85,000 &5,000
Total Ficpanditures: - 100.OW 700,000 115.000
Forecasted Project Cost:
Toml
2077 2018 2019 2020 20152020
Funding Sources:
UnrestnctedStreet Revenue 100,000 100,000 100,000 100,000 600,000
Grents- Secured(Fed,State,Lxal)
REET
T2f/ic Impacf Fees
Other
Total Funding Sources 100,000 100,000 100,000 100,000 600,000
Capiql Ezpenditures
Design 15,000 15.000 15,000 15,000 90.000
Right ol Way '
ConSWCllon 85.000 85.000 85.000 85.000 S1O.000
Total Fi�pendiWrea: 100,000 100,000 100,000 700,000 600.000
GraMs !Other Sources: I
71
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilkles Plan
Six Year Capihal Faciltties Plan, 2G15-2020 Special Revenue Fund
Project Title: Ckywide Arterial Bicycle & Safety Improvements T1P # 37
Project No: astid07
Project Type: Non-Capacky(Safety)
ProJect Manager Various LOS Corridor ID# N/A
Description:
This is a bi-annual program to fuM bicycle and safety improvemerds on classified roadways. Projects are prioritized
annualy based upon field studies.Project was previousry called "Citywide Roadway Safety trfiastruchae ImprovemeMs"
Progress Summary:
Future Impact on Operating Budge;:
This project will have ro impact on the operatirg budget for street maintenance.
ActWiry.
2014 YE 2015 Year End
Funtling Sourcea Pdor tu 2074 EStlmate 2015 Butlpet_ __�18.Budgat __ _ P.roJact Toial
UnresMcted Street Rerenue - 100,000
Grents- Secured(Fed,State,lxal) -
REET -
TlaNic Impecf Fees -
Other
Tofal Funtling Sources: - 70Q000 -
cawm� �aa�mmrea
Deslgn 70.000 -
RigM o1 Way
COnS(NCfiOn 90,000
Total F�cpendilures: - 100,000
Forecasted Project Cost:
Tmai
2017 4018 2079 2020 201&2020
Funtling Sources:
UnrestnctedStreet Revenue 100,000 100,000 300,000
Grants- Securetl(Fed,Stata,Local)
REET -
Tra�c /mpacf Fees
Ofhei
Total Funding Sourtes 10U,000 � 700.000 300,000
Capifal ExpendiWrea
Design 70.000 10.000 30.000
Righf o/ Way - -
COl15�2C��0lI �.� �.�� 27�,��
Total EupandiWres: 100,000 �oo.000 aoo,00r
GraMs /Other Sources:
�2
Ciry ofAuburn Draft Capital FaciJities Plan
ARTERIAL STREET FUND (102) CapiWl Facilitles Plan
Six Year Capital Facilitles Plan, 2015-2020 Speciat Revenue Fund
Project TiUe: 37th St NW & B St NW Railroad Crossing Safety Improvements TIP # 38
Project No: cp1304 STIP# AUB-43
Pmjed Type: Intersection Safety (Non-Capacity)
Project Manager. Jacob Sweeting LOS Corridw ID# N/A
Description:
This project will fund the design and consWction ofa pre-signal atthe 37th SVeet MNB Street NW imersection adjacent to
the atyrade BNSF rail crossing, and to mitigate impacts from the proposed BNSF third rail project. The project will include
communication improvements and advanced train detection for new wamirg times for advanced railroad preemption at the
si nal.
Progress Summary•
Future Impad on OperaUng Budget:
The annual maintenance cost for this project is estimated to be $2,500.
Activity:
2U14 YE 2075 Year End
Funding Sources: PAw W 2014 Estimate 2015 Budget 2076 Budget _ProJect Total
UnresMcted Straet Rewnue 12,310 64,590 5,000 - 81,900
G2nts-Secured(Fed,State,Locaq 7t,112 285,438 307,550
REET -
Other
Total Funding Sources: 34,4Y2 350,028 5,000 389,450
Capital Ezpendihires
Design 34.422 50,000 84,422
Right o/ WaY ' '
Construchon 300,028 5,000 .305,028
Total Expenditures 34,422 350,028 5,000 389,450
Forecasted Project Cost:
Tofal
2077 20'IS 2019 2020 2015-2020
Funding Sources:
Un2stncted Street Revenue - 5,000
Giants-Secured(Fed,State,local)
REET -
Other
Total Funding Sources - - - 5,000
Capipl Expendttures
Design -
Rlght ol Way - -
Construction 5,000
Total Expenditures - - - 5,000
Grants /Other Sources:
73
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Cap'Ral Facilities Phan
Six Year Capital Faoilltles Ptan, 2015-2020 Special Revenue Fund
Project Title: A Street NE Pedestrian Improvements TIP # 44
Pr�ject No: cp�000c
Project Type: Sidewalk Improvements(Non-Capacity)
Project Manager. TBD LOS Corridor ID# N!A
Descriptlon:
This project completes a pedestrian connection between Dowrrtown Aubum and the 8th St NE business district. This project
will improve a pedestrian crossing at 3rd St NE, and construct sidewalks/access 2mps along the A St NE cortidor
Progre§s Summary•
Future Impact on Operatlng Budget:
The armuai maintenance cost forUtis project is es6mated to be $500.
Activity.
2014 YE 2015 Year End
Fundfng Sources Prlor b 2014 6Umate 2075 ButlAet 2076 Budget Pro)act Tofal
Unrestncted St�aet Revenue -
Grents- Unsecured(Fed,Sfate,Loca/)
REET
PWTFL
Other
Total Funding Sources -
Gapital ExpenAiturcx
Design
RigM of Way
COIIS�NC�IO/1
7ofal ExpentllL�res: -
Forecasted ProJect Cost:
Total
TA17 2018 2079 2020 2075-2020
Funding Sources
Un2sMcted Street Revenue
Granfs- Unsecured(Fed,State,Local) 150,000 1d0,000
REET -
PWTFI -
Other
Total FunCing Sourcez 150,000 - 150,000
CapNal ExpentliWres
Deskjn 15,000 15,000
R/ght oi Way
Constn�ction 135,000 135,000
Total Expenditures: 150,000 - - 150,000
Grants /Olher Souices: Grarn funds are unsecure.
74
City of Auburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Faciii8es Plan
Six Year Capital Faciiities Plan, 20152020 Special Revenue Fund
Pmject Title: IMerurban Trailhead Improvements TiP # 45
Project No: cp�000c
Project Type: Class 1 Trail (Non-Capacky)
Project Manager TBD LOS Cwridor ID# N/A
Description:
This projed pro�des enhancements to epsting Uailheads and consVuction of new trailheads. Improvements include bike
racks, kiosks, parkirg and access.
Progress Summary•
Future Impact on Opereting Budget:
This project will have rro impact on the operatirg budget for street mairrtenance.
Activity.
2014 YE 2015 Year End
Funding Sources: Prior b 2014 Estlmate 1A15 Budget 2016 Budget ProJect Total
UnrasMcted Street Revenue
Granfs- Unsecured(Fed,State,Lxal)
TraHic Mrtlgatlon Fees -
PWTFL
Other
Total Funding Sources: - -
Capfpl Expenditures:
Deslgn -
RipM a/ Wey
Consfmction
Total ExpenAituros: - - - -
Forecasted Project Cost:
roal
20t7 2076 2018 2020 20152020
Funding Sourwa:
Unresfrlcted Sfreet Revenue -
Granfs- Unsecured(Fed,State.Locaq 210,000 210,000
T�c MngaOon Fees -
PWTFL -
Other
Total Funding Sources: 210,000 210,000
Capifal FxpendiNras:
Deslgn 20,000 20,000
Right ol Way -
Construclion 190.000 190.000
Toml ExpentliWres: 270,000 - 210,000
Grarrts /O[her Swrces: GraM funds a�e unsecu�e.
75
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (702) Capifal Facili[ies Plan
Slx Year Capital. Facil@les Plan, 20152020 Speclal Revenue Fund
Projact Title: 104th Ave SE & Green River Road Study TIP # 46
Pmject No: cp1021
ProjectType: Noo-Capacity (Intersection Safety)
Project Manager James 1Nebb LOS Corridor ID# 24
De.scriptbn: - - -
This project fimds a pre�esign study to detertnine the rigM-of-way,ernironmental and construction requiremerrts for
irrtersection safety improvemerds.The project is anticipated to inGude sigM-distance improvemerhs,constructing tum-
lanes, charmelization,ernironmerdal mitigation,signage and clear mre improvemerNs.
Progiess Summary•
Future Impact on Operating Budget:
Tlvs project will have ro impact on the operaGrg budget for street maintenance.
Aetivily: - --
zo�a re zo�s rea� eoa
Funding Sources: PAor b 2014 ESUmafe 2015.Butlget_ _ 2016 Btitlget ProJact Total
Umestdcted5treet Reoenue 3,228 5,000 - � "- --� 8,22g
Grents- Secured(Fed,State,l.ocap
REET
PWTFL _
Other
Total FunAing Sources 3,728 5,000 8,228
Cepital EicpendiWres
Design 3,228 5,000 8,228
R/BM o! Way
COIIS(NC�kVI
Total EipandiWres: 3.278 5,000 " - - "8.228
Forecasted ProJebt Cost:
Total
2017 2016 2019 2020 20152020
FunAing Sources: -
UniasMcted Sfreet Revanue 5,000
cranrs- secureA(r-ed,srare,Local) _ _"
REET
PWTFL _
Other
Total Funding Sourcex - " - - - - 5,000
Capltal ExpendlNrea:
Des19� 5.000
RigM o/ Way
CdIStNCt%011
rom� Expeocitures: s,w�
Grarrts /Othar Sou�cas:
76
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) CapiYal Facilities Plan
Six Year Capital Faciiities Plan, 2015-2020 Special Revenue Fund
Project Title: A St SE 8 6th St SE Safety and Access Improvements TIP # 48
Project No: asbd09
Project Type: Non-Capacky
Project Manager James Webb LOS Corridor ID# N/A
De"scription:
This project is a partnership between Aubum and Burlington Northem Santa Fe Railway to improve the irrtersection of A St
SE and 6th St SE.The scope of the project includes addirg a phase to the traffic signal for traffic eMering and ebtirg tfie
BNSF railyard.
Progress Summary•
Design and consVuc6on is planned to be completed in 2015 pending agreemerrt with BNSF
Futuie Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity.
2074 YE 2015 Year End
Funtlin9 Sources: Prlor to 2014 Esfimate 2015 Budget 2076 Budget ProJec[ Total
Unrestncted Street Revenue -
G2nfs- Secured(Fed,State,Local)
TreNic Impact Fees
PWTFL
Other(BNSF) 50,000 50,000
Total Funding Sources 50,000 50,000
Capifal FJcpentlitures:
�eslgn 70,000 10,000
RigM o/ Way
ConStNCtiOn 40,000 40,000
Total Ezpentlitures: 50,000 50,000
Forecasted Project Cost:
Tofa I
2077 2018 2079 2020 2015-2020
Funding Sources:
Unrestncted Street Revenue
GraMs- Secured(Fed,Stafe,Local)
TraRic Impact Fees
PWTFL
Other(BNSF) 50,000
Tofal Funding Sources: 50,000
Capitel Erzpenditures:
Design 10,000
Right ol Way
Construction 40,000
Tofal Expendltures: 50,000
Gran[s /O[her Saurces: - "�� � �
77
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capita� Facnn�es P�an
Six Year Capifal F.acilities Plan, 20152020 Special Revenue Fund
Project TiUe: ITS Dynamic Message Signs TIP # 50
Project No: cp�000c
Project Type: Non-.Capacity(ITS)
Project Manager TBD LOS Corridor ID# N/A
Description:
This project funds the design and construction of Dynamic Message Sigris at various looatioris throughout the City.
Dynamic message sigrs are an importarrt fTS tool for providing infortnation to roadway users. Pnonty locations for sign
placementare based on the Comprehensive Trarsportation Plars fTS map and include Aubum Way N, Aubum Way S, W
�Ualley High✓uay,E Valley Highway and Lea Hill Rd.
Progress Summary: " -- -- -- -
ihe first phase of this project is scheduled to begin in 2016 or sooner if grarrt fimdirg becomes available.
Futuje Im{iact on Op�ratirig Budget:
lYie amual mairrtenance cost for this project is estimated to be $5,000.
Activity
2074 VE 2015 Year End
Funding Sources: Prior fn 2014 Estlmate 2075 Budget 2016 Butlget ProJect Tofal
UnresttictetlSfreet Revenue - " - -"- - - "- 15,000 -
Grants- Unsecu2dFederal 85,000 85,000
REET
PWTFL
OtFrer
Total Funtling Sources: 100,000 85,000
Captfel Eipendltures:
Des/gn 10,000 70,000
Right oi Way
Construcfion 90,000 90,000
Tofal ExpentliWres: 100,000
Forecasted Projed Cost: - --- - -�-- � —
Total
2017 2018 2019 2020 201i2020
Funding Sourcex
UnrestncfedStreet Revenue 30,000 30,000 75,000
Grants- UnsecuredFederel 170,000 170,000 425,000
REET - _
PWTFL _
Other
Tofal Funding Sources: 200,000 200,000 500,000
Capital ExpendiNres:
Design 20,000 20,000 50,000
Right of Way - -
Construction 180,000 180,000 450,000
Total Ezpentlitures: T00,000 200,000 � -"� -- - - SOO,OOP
Grarns /Othe� Souices:
78
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilkies Plan
Six Year Capital Facilkies Plan, 20152020 Special Revenue Fund
Project Title: AWS Streetseape Improvements (SR-78 to M St SE) TIP # 62
Project No: cpxxzx
Project Type: Miscellaneous
Projeot Manager TBD LOS Cwridor ID# 3
Desbriptfon:
This project will revitalize and beautlfyAWS from the SR-18 irrtercharige to the intersection with M Street SE. Proposed
improvemerAs inciude:enhancemerrt of crosswalks and pedestrian linkages; new and repaired sidewalks;ciub aM gutter
pedestrian ramps; new landscaped medians;sVeet Vees; new lighfirg; pedesVian benches;trash receptacles; recycling
containers arxl other appropriate amenities.A significarrt portion of project costs are associated with rigMof-way
acquisition.
Progress Summary•
Future Impact on Opereting Budget: �
TFus armual maiMenance cost for this project is estimated to be $10,000.
Activity:
2074 YE 2015 Yeet End
Funding Sources: Prior to 201d Estimate 2075 Budget 2U78 Budget Project Total
UnresMcfed Street Revenue - -�
Grents- Unsecured(Fed,State,Locel)
Tra//ic Impact Fees
REET2 _
ONrer
Tofal Funtling Sources: :
Capipl ExpandiWrex
Design _
Right o/ Way _
Construct/on
Tolal Fspendltures: - -
Forecasted Project Cost:
Toml
2017 2U18 2019 2020 20152020
FunAing Sources
Unrestncted Sfreet Revenue 200,000 200,000 400,000
�2nts- Unsecurad(Fed,State,Local) 1,750,OD0 2,600,000 4,350,000
TrdNic Impacf Fees
REET2 -
Other
Toinl Funding Sources: 1,950,000 2,800,000 - 4,750,000
Capiral Expendlturex
Des/gn 500.000 500,000
Right W Way 1,450.000 1,450,000
ConStNCNon 2.800.000 2.800,000
7otal Expendiwras: - 7,950,000 2,800,000 4,750,000
Grarris /Olher Souaes:
79
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capifal Facilitles Plan
Six Year Capital Facilkies Plan, 2015-2020 Special Revenue Fund
Project Title: Citywide Traffic Signal Safety Improvements TIP# 67
Project No: cp1222 STIP# AUB-45
Projed Type: Non-Capacity
Project Manager Matt Larson LOS Corridor ID# WA
Description: -
This project wiil improue traffic signal phasirg and timing, improoe visibility of 6affic signai heads, install couMdown
pedestrian signai dispiays, and ADA pedestrian pushbuttons.
Progress Summary:
G2nt funding was awarded June 2012 with no bcai match requiremerrt. Projed will be designed and coretructed in 2013
and corutructed in 2014.
Future Impad on Operating Budget:
There is no impact to the street maiMenance budget.
Activky
2014 YE 2075 Year End
Funding Sourcea Prlor b.2014 EsUmate 2015 Budget 2018 Butlget Project Total
Unrestricfed Street Reeenue 6,916 55.000 5.000 86,916
G2Ms- Secured Federal 31,626 368,376 400,000
TreNic Impact Fees
REET2 4,316 20,684 25,000
Other
Total Funding Sourcea: 42,85fi 444,060 5,000 - 491,916
Cepifal ExpendlWres:
Deslpn 41,075 - 41.075
Rlght ol Way -
Constmcflon 1,781 444,060 5,000 450,841
Total F�cpendiausc 42.856 44t.060 S,OOD - 497.9t6
Forecasted Project Cost:
Tofal
2017 2018 2079 2020 20752020
Funtling So6rces: --�- - - � - --� - � - . .
UnresMcted Sfreet Revenue 5,000
GraMs- Secured Federel -
Tralfic Impact Fees -
REET2
Other
Tofal Funding Sourcex 5,000
CaPital ExPendlWres:
Design -
R/ght o/ Way - -
COlIStNG�1011 _ S,OOO_
Totel Expentlitures 5,00'
Grants I Olher Soutces:
g�
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET FUND (102) Capital Facilities Plan
Six Year Capital Faci,lides PWn, 2015-2020 Special Revenue Fund
Project Title: 37th St SE & A St SE Traffic Signal Safety Improvement TIP # 68
Project No: asbd02
Pmject Type: IMersection Improvement, Non-capacity
Project Manager TBD LOS Corridor ID# 10
Description:
This project consists of the design, rigM of way acquisidon and constructlon of a new traffic signal at 37th St SE &A St SE.
Piogre'ss Summary•
Grant application is being submitted in July 2014. Arterial Presenation Fimd 105 will participate in this projed to overtay
portions of A St SE.
Future Impack on Operating Budget:
The annual mairrtenance cost for this project is es6mated to be$2,500.
Adivity:
2074 YE 2015 Year End
Funding Sources: Prior to 2074 EstimaOe 2015 BUAget 2016 BUAget Pro ect Total
Umestricfed Street Reeenue 55,000 � 45,000 55,000
G2rits-Unsecured Federel 121,400 440,000 121,400
T�a//ic/mpact Fees �
Other(Artenal P�eserv. FurM 105) �52�5pp
Tolal Funding Sources: 176,400 637,300 176,400
Capifal Ezpenditures:
Design - - 110,000 N0,000
Right o/ Way - 68,400 66,400
Construction 637.500
Tofal F�cpendlWres: 176,400 637,500 776,400
Fore.casted Project Cost: -
Total
2017 2018 2019 2020 201&2020
Funding Sources:
Unrestricted Stree�Re�enue - 100,000
GraMs-Unsecurad Federal 587 qpp
TraNic/mpact Fees _
O[her(Artenal Preserv FurM f05) 152,500
Tofal Funding Sourcex - - 873,900
Capital ExpendlWrex
�s�9^ 170.000
Right o/ Way 66,400
ConStniChon 637.500
Total ExpendtLires - - - 813,900
�rants/Other Sources: O[her Funds are Fund 105 Arterial Presenatwn Funds
gi
City of Auburn Draft Capital Facilities Plan
TABLE T-2A
CAPITAL FACILITIES PL-AN PROJECTS AND FINANCING
TRANSPORTATION — LOCAL STREET
2015 2016 2017 2018 2019 2020 Total
CeDeeIN Pfdeefs:
None
Non�CaontiN Prolecls:
1 Local Street Improvemen!Progrem
CapitalCosLs 2,600,000 1,600,000 1,BOO,ODO 1,600,000 1,800,000 1,600,000 70,600,000
Funding Sources:
Fund Balance 2,600,000 1,600,000 1,600,000 7,600,000 1,800,000 1,600,000 10,6U0,000
Transferin(W/S/SWMUGIit» - - - -
SalesTaxonConstructlon - - - - •
Bond Proceeds -
UtiliryMidgation - - - - -
SUMMARY:
CAPRALCOSTS
CapacityProjecis - -
Non-CapaGryProjec4s .2,600,000 1,600,000 1,800.000 1,600,000 1,600,000 1,600,OD0 10,600,000
Total Cosfs 2,600,000 1,600,000 1,600,000 1,600,000 7,600,000 7,600,000 10,600,000
FUNDINGSOURCES:
Funtl Balance 2,800,000 1,600,000 1,800,000 1,600,000 1,600,000 1,800,000 10,6D0,000
Trensferin(WlSSWMUUIiry) - - - - -
SalesTaxonConsWction - - - -
Bond Proceeds - - -
UtlIiryPADgauon - -
Total Funding 2,600,000 7,600,000 1,600,000 7,600,000 7,600,000 1,600,000 10,600,000
g2
City ofAuburn Draft Capital Facilities Plan
LOCAL STREET FUND (103) Capital Facilities Plan
Six Year Capital Facilities Plan, 20152020 Special Revenue Fund
Project TiUe: Local Street Improvement Program TIPq 37
Project No: Various
Project Type: Non-Capacity, Preservation
Project Manager Jai Carter LOS Corridor ID# N/A
Descriptfon:
The progrem preserves bcal (unclassified)streets. The work includes crack sealing,asphaR patching,pre-leveling,asphatt
overlays and roadway reconstruction. Beginning in 2013 funding sources irnclude armual sales tax on constnrction.
Progress Summary•
TFds progrem has successTWly crompleted overlays,chip seals and complete reconsfructions since 2005. The program will
focis on recorstruction in 2015 aM 2016.
Future Impact on Operating Budget:
There is ro impact to the street maintenance budget.
Activky:
(PreWous 2vrs ) 2014 VE 2075 Year End
Funding Sources Prlor ro 2014 E9lmate T075 Budgat 2076 Butlget Pro ect Total
Lacal Sfreet FurM 4,162,733 2.545.396 2.600.000 1.600,000 9.308.129
T2ns/er ln _
PropeRy Tax
Sa/es Tax on Construction
6aM Proceeds
Other
Total Funding Sources 4,162,733 2,545,398 2,600,000 1,800,000 9,308,129
cav�a� Ecpenmwres:
Design 453,750 400,000 400,000 300.000 1.253.750
Rlght ol Way
Consfmction 3,708,983 2,145,398 2,200,000 1,300,000 8,354,379_
Totel FspentliOirec 4,t62,733 2,545,396 2,800,000 1,600,000 9,308,129
Forecasted Project Cost:
Tofe I
2077 2078 2019 2020 20752020
Funding Sources:
Loca/ Streef Fund 1,600,000 1,600,000 1,800,000 1,600,000 10,600,000
Trdns/er ln
Property Tex _
Sa/es Tax on Construction -
Bond Proceetls _
Other
Total Fundtnp Sources 1,600,000 1,6D0,000 1,600,000 1,600,000 10,600,000
Capipl EzpendiWres:
Deslgn 300,000 300,000 300,000 300,000 1,900,000
Right of Way _
Consmlction 1.300.000 1,300.000 1,300.000 1.300,000 8,700,000
Total FxpenNtures: 1,600,000 1,60D,000 1,600,000 1,600,000 10,600,000
G2Ms /Other Sourcas: 20152019 Sales tax Is increase0 by 7% per year -
83
City ofAuburn Draft Capital Facilities Plan
TABLE T-26
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
TRANSPORTATION - STREET PRESERVATION
2075 2018 2017 2018 2079 20Z0 Total
CaoacttvProbcb:
Nare
NonLamcHvProlects:
1 15th Street SW Recmetructlon
Caphal Costs 375,000 3,000,000 3,375',D00
Funtling Sources:
Fund Belence - 75,000 500.000 575,000
Grants 300,000 2.500,000 2,SU0,000
Bond Proceeds
2 lake Tapps ParkwayPreservaLon
Capital Cosfs 124.380 828,470 952,850
Funtling Sources:
Fund 8alance 26,480 176,370 Z�Z,850
Gran15 97,900 652,100 - 750,000
Bontl Proceeds - -
3 Mnual Artarlal Street PreserveUon Program
CaplhalCosS 1,700,000 600.000 700,000 1250,000 1,800,000 1,800,000 7,850,000
Funtling Sources:
FunCBalance 1.700,000 600,000 700,000 1,250.000 1,800,000 1,800,000 7,850A00
UfiliryTax
Bond Proceeds
4 MnuelArterlalCrackSealProgram
Capital Cos6 100,000 100,000 100,000 100,000 100.000 100,000 600,000
Fundinp Sources:
Fund Balance 100,000 700.000 100,000 100,000 100,000 100,000 600,000
Bontl Proceetls -
5 Auburn W ay N Preservetlon(22nd Street NE to 45N Street N�
CaD�ml Cosls 160,000 1,775,000 7,935,000
Funtling Sources:
Fund Balance 80.000 887,500 - 887,500
GfanS 80,000 887.500 987,500
8 15th SVeet NHNW Predervatlon(SR•1671q BN Street Nq
Capital Cos6 135,000 1,500,000 - 1,635,000
Funding Sources:
Fund Balance 67,500 750,000 817,500
CuanS 67,500 750,000 877,500
Note:Hnancial plan utllizes Me kllo�a+ng orderlor use o/Nnds to Bnance pro%ec1s:grenf 2vanues(it available),uh"Ifry tax revenues endluntl balance.
SUMMARY:
CAPRALCOSTS
CapaclryProjects
Non-CapadryProJects 1.960,000 2.734,360 3.503,470 4,350,000 1.900.000 _1.900,000_ ___ 16.347,850-
TotalCosts 7,960,000 2,734,360 SSO3A70 4,350,000 7,900,000 1,900,000 78,347,8_50
RINDING SOURCES:
FundBalance 1.880,000 1,681480 1.801.370 1,850,000 1,900,000 1,90D,000 11,012,850
U611ry7ax - - -
G2nts 80,000 1,052,900 1,702.100 2,500.000 5,335,000
Bond Proceeds
To�l Funding 1,960,000 2,734,380 3,503p70 4,350,000 7,900,000 1,900,000 18.347;85�
84
City of Auburn Draft Capital Facilities Plan
ARTERIAL STREET PRESERVATION FUND (105) Capitai FacilRies Plan
Six Year Capital Facilkies Plan, 2075-2020 Special Reveriue Fund
ProjectTitle: 15th Street SW Reconstruction TIP # 7
Project No: cp�oaoc
ProjectType: Preservation
Project Manager• TBD LOS Corridor ID# 12
Description:
1Yus project will evaluate improvemerds to the Union Pacifc aFgrade rail-crossings as well as the vertical sigM distance to
the triterurban Trail crossing to the west of the tracks. 1Yus project co�9d include pavemerrt preservation and may be
accomplished through the PavemeM Preservation Progrem. A cost estimate for plannirg purposes is provided below.
Progress Summary:
Future Impact on Opereting Budget:
llvs pmject will have ro impad on the operating budgetfor street maintenance.
Activity:
2014 VE 2015 Year Entl
Funding Sources: Prlor [0 2014 Estlmate 2015 Budget 2018 BUAget ProJect Tofal
Artenal Preservation Fund Balence _
Grents- Unsecured(Fed,Stffie,Local)
Utlllty Tax
TraNic Mffgafion Furnis _
BwM ProceeUs
Total Funding Sources: _
Capiql ErzpendlWres:
Deslgn
RigM W Way _
C.OnSINCf/0I1
Total EzpendiNres: _
Forecasted Project Cost:
Tofal
2017 2078 2019 2020 2015-2020
Funding Sources
Artede/ Preservation Fund Balance 75,000 500,000 575,000
Grants- Unsecu�ed(Fed,State,LocaQ 300,000 2,500,000 2,800,000
Uhllty Ta< _
TraNic fv9tipation Funds
Bond Proceeds
Tofel Funding Souices: 375,000 3,000,000 3,375,000
Capifal Expenditures:
Deslgn 375,000 375,000
Right W Way _
Constructlon 3,000,000 3,000,000
Tofal EzpendiWres: 375,000 3,000,000 3,375,000
G2rrts /Other Sources:
85
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET PRESERVATION FUND (105) Capital Facilities Plan
Six Year Capkal Facilities Plan,2015-2020 Special Revenue Funds
Project Title: Lake Tapps Parkway Preservffiion TIP#22
Project No: cp�ooc STIP#AUB-TBD
ProjectType: Non-Capacity, Preservatan
Project Manager Jai Carter LOS Corridor ID#17
Deseription: The Lake Tapps Parkway Preservadon project will complete a patoh anii ove�lay"of pavemerrt between tlie
AubiaNSumner City limit arid Lakeland Hills Way including all required ADA improvemerris to curb remps,sidewalks,and
pedestrian signals.
Progress Summary:
Federal Grantwas sec�ued in 2014.
Future Impacton Operating Budget:
There is rw impact to the street maintenance budget.
Activity:
(PreNous Yrs) 2074 YE Zf175 Year Erid
Funtling Sources: Prlor Oo 2014 Estlmate 2015 Budget 2018 Budget Pro)eG Total
Arterial Preservation FurM Balance 28,480
G2rrts-Secwed.Federal - W,900 -
Utllity Tax -
REET2 -
BwM Proceeds
Total FunAing Sources - • 124,380 -
Capitel ExpendiLrres
Oesqn
Right o/ Way 124,380
r.OIIS�NChOII
Total ExpendiWres: - 126.380 -
Forecasted Project Cost:
Total
2017 2018 2019 2020 20152020
Funding Sources:
AReria/PreseMation FuM Balance 176,370 - 202.850
G�aMs-Securetl Fetleral 852,100 750,000
Utility Tax - - -
REET2 -
Bond Proceeds
Total Funding Sourcex 628,470 - - 952,650
Capifal ExpendlWres:
Design - - -
Rlght of Way - 124,380
Construction 828,470 .828,470
Total ExpendlWres 828,470 - - 952,BY
GraMs I Ottrer Soufces: �
86
City ofAuburn Draft Capital Facilities Plan
ARTERIAL�STREET PRESERVATION FUND (105) Capital Facilities Plan
Six Year Caprtal Facil'rties Plan,2015-2020 Special Revenue Funds
ProjectTitle: Mnual Arterial Street Preservation Program TIP#35
Project No: cp1302
ProjectType: Non-Capacity, Preservation
Project Manager Jai Carter LOS Corridor ID# N/A
Description: Implemerrt regular pavemerrt maintenance and/or rehabilitation of various classified sVeets city�vide. These
projects may include a combination of overlays,rebuilds,and spot repairs. This program is fiuxled through a 1% idility tax
that was adopted by City Cour�cil during 2008.
Progress Summary:
Program cor�nues to successiully complete annual patching and overlay projects citywide.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity:
(PreNous 2Vrs.) 2014 YE 2015 Year Entl
Funding Sources: Prlor M 2014 Estimate 2015 Butlget 2016 Budget ProJeU Tofal
Artenal Preservatron Fund 1,367.984 2.620,579 1,700.000 600,000 5,688,563
Property Tax - _
Utiltty Tax - _ _
REET2 - .
Bmd Proceeds
Total Funding Soureex 1,367,984 2,620,579 7,700,000 800,000 5,688,583
Capital FxpenCiWres
Design 36,838 100,000 50,000 50,000 238,838
RigM o( Way _ _ _
Construction 1,329,746 2,520,579 1,650,000 550,000 6,049,725
Total F�cpenditures 7,367,986 2,620,579 7,700,000 600,000 5,688,583
Forecasted Project Cost:
rotai
2017 2018 2019 2020 20752020
Funding Sources:
Artenal Pieservation Fund 700,000 1,250,000 1,800,000 1,800,000 7,&50,000
PropeRy Tar - - '
Utility Tax
REET2 _
Bmd Proceeds
Total Funding Sources 700,000 -7,250,000 1,800,000 1,80U,000 7,850,000
Caplfal Ezpenditures:
Design 50,000 50,000 50,000 50,000 300,000
Rrght o/ Way - - _
Construction 650,000 1,200,000 1,750,000 1,750,000 7,550,000
Tofal Expe,nditures: 700,000 1,250,000 1,800,000 1,800,000 7,850,000
Grarrts/Other Sources:
g�
City ofAu.burn Draft Capital Facilities Plan
ARTERIAL STREET PRESERVATION FUND (105) Capital Fac.ilities Plan
Six Year Capital Facilities Plan,2015-2020 Special Revenue Funds
ProjectTitle: Annual Arterial Craek Seal Program TIP#36
ProjectNo: varies
ProjectType: Non-Capacky, Preservatbn
Project Manager. Jai Carter LOS Co��idor ID#N/A
Deseription:
trnplemeM reg�dar maiMenance of various classified streets by sealing newly fortned cracks. Sealing the cracks will
prolong the life of the pavement by stopping waterfrom dreining into the sub�ase of the road.
Progress Summary:
Progrem cor�Gnues to successfuly extend pavement life pavement cirywide.
Future Impact on Operating BudgeY.
There is no impactto the street maintenanae budget.
Activity:
(PreNous Yrs) 2074 YE 20151'ear End
Funding Sources: Prior to 2074 Estlmate 2015 Butlget 2016 Budget Projeet Total.
ARenal Preservation Furrd 100,000 100,000 100,000 200;000'
Util"Ry Tax -
REET - -
Ba�tl proceeds
Total Funding Sources: - 700,000 100,OOD 100,000 200,000
Capital ExpenAilures
Oesign 10,000 10,000 10,000 20,000
Right o/ Way
co�srNot;o� eo,000 so.000 so.000 s�o,000
rorai �pend�tures: �oo,000 too,000 �oo,000 zoo,000
Forecasted Project Cost:
Total
2017 2078 2019 2020 20752020
Funding Source_s:
Arteria!Preservation Ftmd 100,000 100,000 100.000 100,000 600,000
Util'Ry Ta�c
REET - -
Ba�d procseds -
Total Fundl�g Sources 100,000 100,000 100,000 100,000 600,000
Capital ExpendlWres
Design 10,000 10,000 10,000 70,000 60,000
Right o/ Way
Canshuction 90,000 90,000 90,000 80,000 540,000
Tofal Erzpe_ntliWres 100,000 100,OOD 100,000 100,000 600,000
Grerrts/Other Sources:
8g
Ciry ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET PRESERVATION FUND (105) Capiqt Facilities Plan
Six Year Capital FaciliHes Plan, 2075-2020 Special Revenue Fund
Project Title: Auburn Way N Preservation (22nd Street NE to 45th Street NE) TIP # 70
Project No: cpx�cx
Project Type: Non-Capacity, Preservation
Project Manager. Jai Carter LUS Corridor ID# 21
Descrfption:
The project proposes to grind and overlay Aubum Way N from tl�e 22nd Street NE to 45th Street NE. The project will
restore 7.3 lane miles of pavemerrt, upgraiie 26 curb ramps to meet currerrt ADA staridard, as we as rertiove unused
driveway openings as an upgrade to rron ADA compliarR pedestrian facilities. The project fiuids the design, coordination,
permitting, and construction ofthe pavemeM preservation project.
Progress Summary':
Federal g2rrt was secured in 2014.
Future Impact on Operatlng Budget:
There is no impact to Uie street mairdenance budget.
ActiVity: -
m�a re Zo�s ree� e�d
FunQing Sources Prlor m 2014 E91maM Y015 Butlget 2018 Butlget Project Total
Arteria/ Presarvallon FurM 80,000 887,500 80,000
Grents- Securad Federal 80,000 887,500 80,000
REET _
BwM proceeds
Tofal Funtling Sources: 760,000 1,775,000 160,000
Capipl Expendituras
Design 160,000 180,000
Rtght o( Way
Constrt�ction 1,775.000
Total Expenditures: - - 160,000 1,775.000 160.000
Forecasted ProJect Cost:
Tota I
2017 2016 2019 2020 20152020
Funtling Sources
ARedal PreservetlonFund 967,500
Grents- Secwed Federal gg7 Spp
REET _
BorM p�oceetls
Topl Funtling Sources - 1,935,000
Capital ExpenAiLirex
Design 160,000
Rlght oi Way
Constmction .1.775.000
Total 6cpendf W res 1,935,000
Grants I Other Sources:
89
City ofAuburn Draft Capital Facilities Plan
ARTERIAL STREET PRESERVATION FUND (105) Capital Facilities Plan
Six Year Capifal Faoilities Plan, 2015-2020 Special Revenue Fund
Project Title: 15th Street NE/NW Preservation (SR-167 to 8th Street NE7 TiP # 71
Projec[ No: cplooa
ProjectType: Non-CapacRy, Preservation
Project Manager Jai Carter LOS Corridor ID# 9
Descrlptlon:
The pmject proposes to grind and overiay 15th Street NWME irom the SR167 to Aubum Way�N; and grind and overlay
Harvey Road NE from Aubum Way N to 8th SVeet NE. The project will restore 7.57 lane miles of pavemeM,upgrade 30
cub ramps to meet currerrt ADA stardard,as weil as remove �ised driveway openirgs as an�grade to non ADA
compliant pedestrian facilities. The project fimds the design, coorcJination,permitting,aM ooristruction of the pavemerrt
preservation project.
Progress Summary•
Federal grarR was secured in 2014.
Fuhire Impact on Operating Budget:
There is ro impact to the street maiMenance budget.
Activity:
2014 YE 20t5 Year End
FunEing Sources . -Prior_ro 2014 _Estlmate___ 2015 Budget M18 Butlget Projecl Total
ARenel PreserveHon Fund 67,500
Grants- Securatl fea'eral 67,500
REET
Bond proceeds
Totnl Funtling Sources 735,000 -
Capiial BcDentllWrex
Design 735,000 135,000
Rlght o% Way
Construction
Total Expandilures: - 135,�0 -
FoiecasteA Project Cost:
Totel
2017 7A78 2019 2020 20152020
Funding Sourcea
Arterlal PreserveUonFund 750,000 817,500
Grants- Secured Fede2/ 750,000 817,500
REET - -
Bond proceeds -
Tofal Funding Sourcex 1,500,000 � — - 7;635,000
Capitel ExpendlNres
Design 135,000
Rlght oI Way
Constniction 1.500,000 1,500.000
Totsl ExpendlWres: 1;500,000 1,WS,OOP
Grams I O[her Sourcas:
90
City ofAuburn Draft Capital Facilities Plan
TABLE T-3
SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS
ProlecC 2018 - 2017 - - 2016 2019 2020 2021 Total
1 A Sbeet NW,Pha ae 1 $ 25,830 '$ 25,830 $ 25,830 $ 25,830 $ 25,830 $ 25,830 $ 154,980
2 AWS Petle4rfan Imp:Oogaootl to Flr
3 M SY�wt Untlerpaas 27.827 21.827 27,827 27,827 21.827 21,827 130.962
4 5177M SI Corrltlor Cepeclty 27,250 27250 27,250 27,250 27250 27,250 163.500
5 F Street S�DowMown fo Les Gow 4,'100 4,100 4,100 4,100 76,400
8 M Strwf NE,E Maln to 4th 1,500 'I,500 1,500 4,500
7 M Se SE 6 72tb St SE haHle Signe/ 6,600 6,600 6,600 19,800
8 ffih Straaf NEWitlening _
9 Mervey 6 8fh SMeet NE _
10 8N SYreet NE 8 SE 1MM SY Imp. 6,600 6,600 6,600 6.600 6,600 6,600 39,600
77 AuburnWeySdMStraet5Elmp.
12 A SY SE Non-motor/zotl Acces Imp. 2,500 2,500 2,500 2,500 2,500 2,500 15,000
73 AcaEemy Driw MuIH-Uw irall 5,000 5,000 10,000
14 /6YhPlanSRealfgnment 1,750 1.750
75 BNSF 3rtl Reil b�anlon Rtlxy Imp. _
78 17AfA Aw SECorNdor 6 J20fh Imp.
17 1211b Aw SE Co�deor Imp. Aha a 3
18 R Streot Bype s 2.500 2.500
i 9 SE 3MM St Co.ritlor�mp.
20 AWS Lorrltlor Salery Improvemanb
21 TraHlcManagemertl LaMar Imp.
22 W�allsY Mxy ImP•15t�Sf NW to W
Maln St. _ _
23 LekeTappsPkxylTSEmenslan 5,000 5,000 5,000 5,000 5,000 5,000 30,000
24 AWS 6/2fh Sf SElnteracf/on Imp.
25 KeixyWeyStutly
YB W Maln Sfreef hnprovements
27 EvergreenNeigMaSoleRoutesto
Sehool /mp.
28 AWS Flr St SE to Neml ock St SE 9,300 9,300 9,300 9,300 9.300 9,300 55,800
29 Au6ur n Ave NE 6 3rtl Sf NE
Pedestr fan Improvements
10 �Y St SE Corrttloi eeh Sf SE ro awS 8,000 B,o00 16,000
31 AWS Bype oRi verxa/k Dr ro SR 18 �
33 Y9th SYraet SE 6 R Sfreet SE 25,000 25,000
33 Len H/ll RO Segment t i 8,300 18,300 36,600
34 Lea Nlll Rtl Segment 2
35 �ae Nlll Rtl menf3 24,100 24,100
� 20,300 20,300 40,600
;$ I$!NE 6 37na SY NE ROvntlabout
37 WVHwy Imp.SR-18 to 15th St SW
38 AutiurnWeyCorrltlorlmp
39 AuburnWeyWl4StNESignallmp _
40 Main Sbeef Sfgnal UpAratles
47 A SYreat SE S/aty Imp. SYutly
42 S 7Ath WaNand M!ilgatlon
43 GtyMtlsPatle#rlanWostlng _
4{ CltyWCaAr}eria/Blrye1�65e/ety
Imp
65 Ilth 6 8 Sf NW Ral/�oatl Cro�ng
Sa/etylmp 2,500 2,500 2,500 2,500 2,500 2,500 15,000
46 A SY NE 7e�eSr ien/mp - 500 500 500 1,500
47 Inte�urba n Trailhes tl Imp
48 f00M Ava SE 6 Grean R/wr!2E ffiu0y
4B A St SE 6 6th Sf SE SaNy Imp.
50 RS Dyno ml e M¢�ps Slgns 5,U00 5,000 5,000 15,000
57 AWS Slreafsa pa Impr ovaments 10,000 10,000 20,000
52 Cltywl tla TraMle Slgne I Se/ary Imp.
53 JRh St SE d A St SE TieNl c S/gna I 2,500 2,500 2,500 2,500 2,500 12,500
54 �oca I Straef Improvemenf Progiem
(FunO f07)
54 15th Streat SW Recon4rueHon
58 LakaTeppsGarkxeyPrearvatlon
57 Arter/al5f.Preaervatlon (FunA fOSJ
58 Artw/al Lreek See I Prog.(Funtl f05�
59 Au6ur n Wy N Preawva Uon
60 17th St NEMW Prasrvetlon
7ota1 S 100,807 S to3,3o7 S 7o7,ao7 S tzt,007 E 1e2,8o7 S 235,957 S est,o92
91
City ofAuburn Draft Capital Facilities Plan
� �
CI�I'Y OF �
�
�k MORE THAN YOU IMAGINED
92
City of Auburn Draft Capital Facilities Plan
WATER
Current Facilities
The City of Auburn water utility provides water supply, treatment, transmission, storage,
distribution, ancl service connections to in-City residences and businesses. The City also
provides water to the City of Algona and Water District #111 under wholesale agreements. The
water system consists of wells, springs and interties for souroe; chlorination stations and
corrosion control for treatment; pump stations, pressure reducing stations and pipelines for
transmission; and steel and concrete enclosed reservoirs for storage. Table W-1, "Facilities
Inventory', lists the facilities along with their current capacities and approximate locations.
Level of Service (LOS)
The City's Comprehensive Water Plan summarizes the design criteria and service polices for
the City's water distribution system. i
Capital Facilities Projects and Financing
The City of Auburn's water system anticipates five capacity projects in the amount of
$9,387,170 and twenty-three non-capacity projects totaling $21,444,895 for a 6-year planning
expectation total of $30,832,065. The firiancing plan is shown in Table W-2 followed by
individual worksheets showing the project details.
The capacity projects will increase water supply quantities, storage, and distribution for growth
of retail customers. The non-capacity projects will provide for pipeline improvements and
replacements, delivery pressure improvements, water quality enhancements, comprehensive
and resource management planning, pump station upgrades, telemetry system improvements,
and meter upgrades.
Impact on Future Operating Budgets
As Table W-3 shows, operating budget impacts of $16,200 are forecasted for water supply and
distribution facilities during the six years 2016 —2021
93
Ciry ofAuburn Draft Capital Facilities Plan
TABL-E W-1
Facilities Inventory
Water Facilities
- -•-C�TYOFAUBt1RN.V1IATER'.SXS?EM' _----------,----_--'--
CAPACITY
PACILITY WATER RIGHT (MGD -max rate) LOCATION
. - —
Water Su I :
Coal Geek Springs CeRifipte 857 9.70�2.52>' 3401 Stuck RiverRd
Well 1 Certifiqte 3560-A 3.17 1136 M St SE
Well 2 G1-00277 C 3.46 1109 5th St NE
Well 3A G1-23629 C 4.03 401 37th St SE
Well38 (IndudedAbove) (IncfudedAbove) 40137thStSE
Well 4 G1-20391 C 4.03 950 25th St SE
Well 5 G1-23633 C 1 44 5530 James Ave SE
Well �A (Included Above) (Included Above) 5401 Olive Way SE
Well58 (lncludedAbove) (IndudedAbove) Westendof62ndCtSE
Well 6 (Supplemental to Wells 1,2, 3A, 3B, 4) 5.04 (supplemental) 1109 5th St NE
Well 7 (Suppfemental to Wells 1,2, 3A,38, 4) 5.04 (supplemental) 405 E St NE
West Hill Springs Claim (1973 File Date) 0.9 1900 15th St NW Ezt
upply Total (MGD) 26.73
Available foi Use 24.21
'Denotes deduction of 1,7W gpm(OU2,824 ao-fVyr)to cortpy with the provisions of the tuLckleshoot-Aubum.Stipulated Agreerrent.
cnPaarv
FACILITY (MGD) LOCATION SERVICE AREA
Intertie
Tacoma 8 Street NW 3.2 3240 B St NW Valley Service Area
Tacoma 132nd Ave SE 3.2 29598132nd Ave SE Lea HiII Servrce Are"a
Intertie Tobl (MGD) 6.4
CAPACITY
FACILITY (MG) _LOCATION _ S_ERVICE AREA _
Storaae Facilities: - - - -
Academy Resenroir 8A 1.0 5031 Aubum Way S Academy Service Area
Academy Resenroir 88 1.5 5031 Auburn Way S Academy Seivice Area
Lakeland Hills Resenroir 5 1.0 1326 57th Dr SE Lakeland Hills Svc,Nea
Lakeland Hitls Resenroir 6 1.0 5718 Francis Ct SE Lakeland Hills Svc Area
Lea Hill Resenroir 4A 1.0 30502 132nd Ave SE Lea Hil!Service Area
Lea Hill Reservoir 48 1.5 30502 132nd Ave SE Lea HiII Service Area
Valley i2eservoir 1 5.0 2003 Auburn Way S Valley Service Area
VaUey Resenroir 2 3.6 32115 105th Pface S Valley Servrce Area
Storage Tota/ (MG) 15.6
94
City ofAuburn Draft Capital Facilities Plan
TABLE W-1 (continued)
Facilities Inventory
Water Facilities
CAPACITY
FACILITY (GP_M) LOCATION
Booster Pum Stations:
Academy 1 2 pumps 800 2004 Aub urn.Way S
Ac.ademy 2: 2 pumps 1,500 2004 Auburn Way S
Academy East: 6 pumps 2,820 5031 Auburn WayS
Green River 4 pumps 4,680 29621 Green RiverRd SE
Infertie: 7 pumps 4,830 30502 132nd Ave SE
Lea Hill: 3 pumps 2,100 10406 Lea Hil�Rd SE Lak
eland Hills. 5 pumps 3,200 1118 57th Place SE
Wildemess Game Farm Pk 2 pumps 1,050 2401 Stuck RiverRd
Terrace View. 3 pumps 1,500 6134 Alexander Place SE
CAPACITY
Primary Valve
FACILITY (PSI - InIeUOuUet) LOCATION I
Pressure Reducrna Stations.
Serves Valley Pressure Zone:
Howard Road CCF #1011-10 82/65 Howard Rd
Howard Road CCF By-Pass #?011-20 - Howard Rd(Bypass)
25th Street SE #1110-10 (Oifline) - 25th St SE&K St SE
Rivervielk #1111-20 90/50 27th St SE&27th Place SE
Riverwdlk #1111-10 109/55 Riverwalk Dr SE&Howard Rd
Serves Lea Hill:
Amber View North #711-10 150/65 105th PI SE&320th PI
Amber View South #711-20 142/60 106th PI SE Near Reservoir 2
Carriage Square Lower#611-10 16�65 Lea Hill Rd SE
Carriage Square Middle #611-20 140/65 Lea HiII Rd 8 106 PI
Cairiage Square Upper #611-30 14�60 Lea Hilf Rd& 107 PI
Cobble Creek Lower #411-20 86/40 SE 304th PI&SE 101st Place
Cobble Creek Upper #411-10 94/55 104th Ave SE(Soufh of 303rd Road)
Lea HiII #412-10 90/45 SE 298th Place & 109 Ave SE
Lea Hill #412-30 N/C 300 Block & 108th Ave SE
Lea Hill #511-10 87/45 304th St SE West of 108th Ave
Lea Hi!l #512-10 80/50 304th St. SE West of 112th Ave
Serves Academy:
AubumWaySouth #1011-30 130/80 2003AuburnWayS
Aubum Way South #?114-10 130/80 4500 Auburn Way S
Serves Jannsen Addition:
Jariris.en #1296-10 72/58 6100 Block &35th Way SE
TABLE W-1 (continued)
95
City ofAuburn Draft Capital Facilities Plan
Facilities Inventory
Water Facilities
caaacinr
Primary Valve
FACILITY _ _ _ (PSI.- InIeUOuUet)_ . _ __ __ __ _LOCATION____ _
Serv'es Cake/arid Hills- - - - - - --
Lak elarid HiNs #1309-10 105/55 hfll Pond Or � Oravetz Rd
Lak e/and Hilfs #1310-10 130/55 A�fll Pond Dr & A4ll Pond Loop
Lak eland Hills #1409-10 N/C Oravetr & Lak eland Hifls Way
Lak eland Hills #1409-20 120/56 47th SE & Lak eland Hills Way
Lak eland Hills #1409-30 95l70 Lak eland Hills Way& Lak e/and Hills Lp
Lak e/and Hills #1409-40 84/55 Mfll Pond Dr & Lak eland Hills Way
Lak e/and Hills #1410-10 103/50 4900 Block 8 hfll Pond Or
lek eland Hills #1410-20 N/C 51st SL SE east of Hfll Pond Loop
Lak eland Hills #14>0-30 125/62 Nathan Ave & Highland Dr
Lak eland Hills #1410-40 82/55 Quincy Ave N of 53�d St SE
Lak eland Hilfs #1411-10 80/42 Bennett Ave 6 S6th Ave SE
Lak e/and Hills #1411-20 82/55 5314 Bennett Ave SE
Lek eland Hills #1411-30 155/73 5100 KerseyWay
Lak e/and Hills #1411-40 92/52 54th St SE
Lak eland Hills #1411-50 85/44 WestlyAve SE
Lak eland Hills #1412-10 82/55 5539 Franklin Ave SE
Lak eland Hills #1509-10 174/60 Terrace ViewLoyer(6170)
Lek eland Hills #1509-20 160�73 Terrace ViewMddle (5960)
Lak eland Hills #1509-30 138/47 Terrace View Upper(5B10)
Lak eland Hills #1509-40 230/90 Terrace View& AlexanderPlsce SE
Lak eland Hills #1510-10 N/C Lak eland Hills Way& Evergreen Way
WC - Nor m all Clos e tl
caPAcinr
FACIUTY (GPM) LOCATION
Corrosion Confrol �
oward Road 5,550 2101 Howard Rd SE
Fulmer Field 9,375 1113 Sth St NE
Chl rination Sfations:
Coal Creek Springs Station 5,000 (gravity feed) 3401 Stuck River Rd
West Hill Springs�Station 625 (gravity feed) 1900 15tli St NW
Well 4 2,600 950 25th St SE
Well 56 600 1100 63rd St SE
Wel1 5A 180 5401 Olive Ave SE
- --
-- ---
- BRi4UNW - D ' - ----' - - —_ �
FACILITY - - -- CAPACITY LOCATION
VYater S'u l:
iaunw�od Satellite #1 0.03 MGD 4501 47th St SE
ra Facilities:
raunwDod Satellite 1 0.03 MG 4501 47th St SE
Boosfer Bum Stations:
raunwnod:3 Pumps 2.0 GPM 4501 47tli St SE
96
City ofAuburn Draft Capital Facilities Plan
Tae�e w-z
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
WATER DIVISION
2015 2018 2017 2078 2019 2020 Total
Caoacitv Proiects:
t Wellllmprovements
Capital Cosis 50,000 - 50,000
Funding Sources:
Water Fund 50,000 50,000
-Bond Proceeds
2 Filmer Well Re.ld Improyements
CaD��I Cos is 50,000 - 50,000
Funding Sources:
Water Fund - _ .
Bond Proceeds 50,000 50,000
3 Cascade Water Nllance Water Purchase
Capital Costs 532,560 532,560 532,580 2,164,490 3,762,170
Funding Sources:
Water Fund - 532,560 532,560 532,560 2,184,490 3,762,170
Bond Proceeds
4 AeademyPump SWtion#7 Pump RepalcemeM
Capital Costs - - 925,000 1,200,000 2,725,000
Funding Sources.
Water Fund - _
Bond Proceeds - 925,000 1,200,000 - 2,725,000
5 Coal Qeek Springs Rehabilitatlon
Capital Cos Ls 800,000 2,600,000 3,400,000
Funding Sources:
Water Fund _ _ .
Bond Proceeds 800,000 2,600,000 3,400,000
Subtotal.Caoackv Prdeets:
Capital Costs 100,000 1,457,560 2,532,560 3,132,560 2,764,490 9,387,170
NorvCauacitv Prdscfs•
8 treen Rher PS EmergencyPower
Capi�al Cosis 90,000 800,000 690,000
Funding Sources:
Water Fund - - 90,000 600,000 - 690,000
Bond Proceeds _
7 Wlell 4 Power 8 Chlorination
Capifal Cosis 50,000 - 50,000
Funding Sources:
Water Fund - _
Bond Proceeds 50,000 - 50,000
8 WeU Inspeetion and RetlevelopmerR Program
Capital Cos ts - 150,000 - 150,000 300,000
Funding Sources.
WaOer Fund - 150,000 150,000 300,000
Bond Proceeds -
97
City of Auburn Draft Capital Facilities Plan
TAB�E W-2(continued)
2015 2D76 2077 2018 2079 2020 Total
Nor�Caoaeltv Proiects:
9 Water Repair&ReplaeertierNs
Capifal Costs - - 200,000 1,700,000 260,000 1,900,000 4,060,000
Funding Sources
Water Fund - - 1,700,000 260,000 1,800,000 3,860,000
Borid Proceeds - 200,000 - - - 200,UOD
10 Lakeland Mlls Rese�r S ImprovemeMs
Capifal CosLs 735,000 - - - - 735,000
Funding Sources
Water Fund 735,000 - - - - - 735,000
Bond Proceeds - -
11 CompreFrensive Water Plan
Capifal CosLs 50,000 - - - 425,000 475,000
Funding Sources
Water Fund 50,000 - - - 425,000 475,000
Bond Proceeds - - - -
12 MIT Master Meters
Capital Costs 400,000 - - 400,000
Funding Sources
Water Fund - - - - - -
Bond Proceeds 400,000 - - - 400,000
13 Street Wlky Improvements
Capital CosLs 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000
Furiding Sources
Water Fund 150,000 100,000 500,000 500,000 500,000 500,000 2,250,000
Bond-Proceeds. . 350,000_ 400,000 - - �50,000
14 Laa FGII PRV Station Improvements
Capital Costs 50,000 400,000 - - 450,000
Funding Sources
Water Fund - - - - -
Bond Proceeds 50,000 400,000 - - - 450,000
15 Water Meter 8 Billing System Improvemerks
Capifal Cosis 1,000,000 1,000,000 1.500,000 1,500,000 1,500,000 8,500,000
Funding Sources
Water Fund - - - - - -
Bond Proceeds 1.000.000 1.000,000 1,500.000 1,500,000 1,500,000 - 8,500,000
18 Utlikies Reld Operadoris Center
Capital Costs 300,000 - - - 300,U00
Funding Sources
Water Fund 100,000 - - - - 100,000
Other-SewerFund 100,000 - - - - - 100,000
Olher-Stortn Fund 100.000 - - - 700,000
17 Valley AC Main Replace
Capital Cosfs 50,000 - - - - - SU,OOU
Funding Sources
Water Fund - - - - - -
Bond Proceeds 50,000 - - 50,000
98
City of Auburn Draft Capital Facilities Plan
TABLE W-2(continued)
2015 2018 2U17 2018 2019 2U20 7otal
NorFCaoacitv Proiects:
18 BNSF Utility Crossing
Capital Costs 50,000 - - 50,000
Funding Sources
Water Fund - - - - -
Bond Proceeds 50,000 - - - 50,000
19 SCADA UPgrades
Capifal CosLs 10,000 - - - - - 10,000
Funding Sources
Water Fund 10,000 - - - 10,000
BonH Prooeeds - - - -
20 West F611 Spri�s Improvemerrts
Capihal CosCs 455,000 - - - - 455,000
Funding Sources
Water Fund - - - - - -
Bond Proceeds 455.000 - - _ _455,000_
21 Reservoir Seismic Rehabllltation
Capital CosLs - 100,000 100,000 100,000 100,000 400,000
Funding Sources
Water Fund - - 100,000 100,000 100,000 100,000 400,000
Bond Proceeds - -
22 Lea Ffill 132nd Ave Distribution System Modificatfons
Capital CosLs 400,000 - - 400,000
Funding Sources
Water Fund - - - .
Bond Proceeds 400,000 - - - - 400,000
23 Auburn WaySouth Rooding Improvements Phase 2-77tF�Street SE
Capital Cosis 850,000 - - - 850,000
Funding Sources
Water Fund 161,000 - - - 187,000
Bond Proceeds 669,000 - - - 669,000
24 Auburn Way South-Dogwood to Rr
Capital CosGs 34,895 - - 34,895
Fundin9 Sources
Water Fund 34,895 - - - 34,895
Bond Proceeds - - - - .
25 Auburn W ay South-Rr to Hemloek
Capifal Cosfs 30,000 - - - 30,000
Funding Sources
Water Fund 30,000 - - - 30,000
Bond Proceeds - - _ _
26 Auburn Way South-Muckleshoot Plaza to Dogwood
Capital Cos45 55,000 - - - 55,000
Funding Sources
Water Fund 55,000 - - - - 55,000
Bond Proceeds
99
City ofAuburn Draft CapitaZFacilities Plan
TABLE W-2(continued)
so�s. zo�s_ zott 2078. _ 2019 2020_ _ _ Total
NorfCaoaeHv Proiects: - - - -- - - - - ---- - - -
27 Reservoir PaiMing
Capital Cosfs - - 1250,000 7,250,000
Funding Sources
Water Fund - - - - - 1:250,000 1,250,000
Bond Proaeeds - - - - -
28 24"White Pover Gossing
Capital Costs - 450,000 450,000 - - - 900,000
Funding Sources
Water Fund - - 450,000 - - 450,000
Bond Proceeds - 450.000 - - - 450,000
SuMotal. NorrCaoacitv Proieets:
Capital Costs 5,079,695 2,350,000 2,990,000 4,400,000 2,570,000 4,775,000 21,444,895
SUMMARY:
CAPRAL COSTS
Capaa_ly ProjecLs 100,000 - 1 457,560 2,532,560 3,132,560 2,164,490 9,387,170
Non-Capacity Projects 5,019,895 2,350,000 2,990,000 4,400,000 2,510,000 4,175,000 21 444,895
Total Cos1s 5,719,695 2,350,000 4,447,560 8.932,580 5,842,580 6,339,490 30,832,066
FUI�ING SOURCES:
Water Fund 1,395,895 100,000 1,822,560 3,432,560 1,542,560 6,339,490 14,633,065
Other-Sewer Fund 100,000 - - - - - 100,000
Other-Storm Furid 100,000 - - - - 100,000
Bond Proceeds 3,524,000 2,250,000 2,625,000 3,500,000 4,100,000 - 15,999,000
Total Funding 5,179;895 2,350,000 4,447,560 8,932,560 5,642,560 6,339,490 30,832,065
100
City ofAuburn Draft Capital Facilities Plan
WATERFUND (430) CapifalFaeilitlesPlan
Six Year Capital Facilities Plan,201Y2020 Enferprise Funds
ProjectTitle: Weil 1 ImpfOVemBnts
Project No: Cp0915
ProjectType: CapaCity
ProjectManager SW@@tltlg
Desaip;ion:
Hydro geologic evaluation of epsting v.ell conditiors, construction of transmission main to Howard Road Corrosion Control
Treatrnerrt Facility for aeration, and construction of building impro�.emenls to house chlorine disiMection equpmeM and an
emergency generator.
Progress Summary•
Trarumission maln is complete.
Well impro�emerris will bid in 2014 with construction completed in 2015.
Future Impact on
The arrwal mainGenance cost is estimated to be approzmatey$1,800.
Activity:
2014 YE 2075 Year End
Funding Sources: PHor ro 2014 F�mate 2015 Budget 2U78 Budget _Prqeet Tofal
UnresMcledWeterReYanue 1,g29,g88 1,487,9t3 50,000 �3,367,901
UnresMcted Storm Reeenue
BorM Proceeds
Other(PWTF/oan) 7,799,553 7 799 553
Total Funtling Sourcas 7,829,888 3,287,466 50,000 5,787,d54
GPibl ExpBndiWrex
Design 673,719 67,000 7qp,7�9
R/ght d Way
EnNronmente/ 920 g2p
CanstrucNon t.t55.349 3.170,466 50,000 4.375.Bt5
Total Expendiwres: �.829.988 3.237.466 50.000 5.777.454
Foreoasted P�oject Cost:
Total
2017 2078 2019 2020 207i-Y010
Funtling Sourws: -
Unrestncted Water Revenue r�p ppp
UnresMcted Slwm Revertue _
Bond Proceetls
Other(PWTF loan)
Tofal FunOfng Sourees: 50,000
Capibl Expendlh�res:
Design
Poeht o/ Way
ConSWCf%on SO,000
Total Expenditures 50,000
Grents/Other Sourcm:
IQI
City ofAuliurn Draft Capital Facilities Plarc
WATER FUND (430) Capital Facilitfes Pian
Six Year Capifal Facilities Plan, 2015-2020 Enterprise Funds
Project Tine: Fulmer Well Field Improvements
Project No: ep1107
Project Type: Capacity
Project nnanager Fenhaus /Vondrak
Descriptbn:
Evaluate Wells 2, 6�and 7 and the Fulmer Field Corrosion CorNrol TreatmeM Facilily ro assess the supply and treatment
capacity of the ewsting facilities and infrastructure. The evaluadon will incl�de an assessmeM of iridividuaJ and total well
s�py capacities, alorg with a review of the VeatmeM facility operatirg and control paremeters. The evaluation will aiso
incorporete recommendations for facility improvemerrts.
Prog�ess Summary•
StWy is being conducted.
Future Impact on Operating Budget:
No significarRimpaci
Activity.
2074 YE 2075 Veer End
Funtling Sources Prlor ro 2014 Estlmale 2075 6uE et 2018 Budget ProJeet TWaI
UnrestdctedWeterRe�enue 2,855 4,899 - 7,854
Grents(Fed,Siate.Locel) -
BontlP�oceetls 448,842 1,456,158 50,000 1,955,000
Other
Total Funtling 9ou`ces: 451.897 1.461.757 50.000 1.982.854
Cepiml ExpendlWres:
Design 451.697 1.46'I.'157 50,000 1,982.854
Poght d Way
CO/1SfNCIJO/1
Tobl Fi�pendiWres 451,897 1.461,757 50,000 1.882,854
Foreoasted ProJect Cost:
Tofal
2017 2016 2019 2020__ _ 201i2020
Funding Sourcos: �
UmeS[dLfed WBfB(RBvenuB
GraMs(Fed,Stete,Locap
BwW Procesds `.+�.�
Otfrer
Total Funtling Soutcee: 50,000
Capipl Ex�penCftures:
Deslgn 50,000
R/ght o/ WaY '
CO�SfNGtiOI�
Total Ezpendimro8: 50.00�
Grents/Other Souices� �
1�2
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital Faciiities Pwn
Six Year CapiFal Facilities Plan, 2015-2020 Enterprise Funds
Project Tiue: Cascade Water Alliance Water Purchase
Project No: cpxxxx
Project Type: CapaCity
Project Manager: TBD
Description:
Financirg to purchase water from adjacent purveyors to meet projected demand based on agreements with Cascade Water
Alliance. Courcil approved the agreemeMs for permanerrt and reserve wholesale supply in September 2013.
Progress Summary:
Planned
Future Impact on Operating Budget:
None
Activily.
za�s re so�s vear ena
Funtling Sourcas: Prlor ro 2014 Estlmate. 2015 Budgat 2018 Bud et Projec!To}al
Unrestncfed Water Revenue - _
Grants(FeqStete,Local)
Bond Proceeds
Other
TOWI FunCing Sourcex .
CaOibl ExpandfWres:
Weter Supp/y Charges
RlghfW Wey
CO/IS�NLtIOII
TOUI EYPGIIA14lflS: _
Forecasted Project Cost:
Total
20t7 2018 2019 2020 _20152020
FunAing Sourwa:
UnresMctetlWaterRevenue 532,560 532,560 532,560 2,164,490 3,762,170
Grants (Fed,Stete,LocalJ
Bontl Proceeds
ane.
TOWI Funding Sources: 532,580 532,560 532,560 2,164,480 3,782,170
W piUl F�cpantliWres:
Weter SuDP�Y�ayes 532,560 532,560 532,560 2,764,490 3,762,170
W'ghf d Way
ConStNction
TOtal ExPendlWres: 532.580 532.56U 532.580 2,164.490 3.762.170
Grants/Other Souices:
103
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital Peciiities F�an
Sia Year Capital Facilities Plan, 2015-2020 Enterprise Funds
ProjectTUe: Academy Pump Station #1 Pump Replacement
Project No: CpXXXX
ProjectType: Capacity
Project Manager TBD
Description:
Increase the punp station capacityto meet peak demands and fire fbw requirements.
Progress Summary•
Plarined
Future hnpact on Operating Budget:
No significaMimpact.
Activity:
2014 YE 2075 Veer Entl
FunOing Sources PHor ro 2014 E9imate 2015 Butlge! 2018 Budget Project Total
Unrestncted Water Revenue -
GreMs(Fed,Stafe,Locaq
6wM Proceeds
Otnor
Total Funding 9ources: -
Capidl ErzPen0ltures:
Des/gn -
RigM ol WaY -
CO/ISINGtlO/I
Total ESPgnCiNres: -
Forecasted Projeet Cost:
roml
2017 2018_ 2019 _2020____ 20752020
Funtling Sources:
UniesMcted Water Revenue
GiaMs(Fed,Sfefe,LocaQ -
BondPioceetls 925,000 1,200.000 2,125.000
Oflrer
Totsl Funding Sourcea: 925,000 1.200,000 2.125,000
Caplal ExpendlNres:
Des/gn 325,000 325,000
Rlghf d Way -
ConSt/uction 600,000 1.200.000 1,800,000
Total FxpendiNrex 925,000 1,200.000 2.125,OM
Grants I Other Sources:
104
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital Facilities Plan
Sfi Year CapHal Pacilities Plan, 20152020 Enterprise Funds
Projea Tne: Coal Creek Springs RehabiliWtion
Project No: cpxxxx
Project Type: Capacity
Project Manager TBD
Description:
Rehabilitation of ihe Coal Creek Springs middle collector will improve capacity of the spnngs resulting in greater utilization of the
water right.
Progress Summary:
Planned
FuWre Impad on Operating Budget:
No significantimpact
Activky.
2010 YE 2015 Vear Entl
FunAing Sourcea: Prior fn 20t4 Estlmate 2075 BuOget 2016 Butlget ProJect.Tofal
Unres7ncfedWaterRevenue � -
Grants(Fed,Steta,Loce/)
PWTFL
Bontl Proceeds
Total Fundfng Sources: _
CapNal EuPentli4�res
Design
R/ghf ol Way
Consln�ction
roai Exvana�wras: -
Forecasted Project Cost:
Total
2017 2018 2019 2020 20752020
Funtling Sources ' '
Unrastnctetl Waler Revenue
Grants(Fed,Stete,Local) _
PWTFL
BondPioceeds 800,000 2,600,000 3,400000
7oh1 Funding Sources B00,000 2,800,000 3,400,000
CaPltal F�cpanditurea
Desi9� 500.000 500�000
Poghf d Way _
Constniction 300,000 2,600,000 2,900,000
Tofal ExpenGihrea 800,000 2,600,000 3,400,000
Grants/Other Sources'
��5
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) CaplNal Facllities Plan
Six Year Capital Facllfties Plan, 2015-2020. . Enterprise Funds
Project rtie: Green River Pump Station Emergency Power
Project No: cpxxxx
Project Type: Non-Capacity
Project Arianager TBD
Description:
Construction of facility improvemerds to house an emergency generator and associated electrical equipmeM.
Progress Summary•
Planned
Future Impact on Operating Budget:
The arvural mairrtenance cost is estimated to be approbmatey$600.
Activity•
2014 YE 2075 Year End
FunCing Sources Prfor W 2074 EctlmaLe 2015 BUC et 20t6 BudOet Project Tofal
Unresfdcfed Weter Revenue -
Grants(Fed,Stffie,Locel) -
Bontl P�oceeds
Other
Total FunAing$oureea
Caplfal Erzpenifldirea
Design -
R/ght o/ Wey
Ci0/ISINCfIOII
TMeI Ficpendilures: -
Forecas;ed ProJect Cost:
Tofal
zo�i 2o�e zoye zozo io�s�ozo
FunCing Sources:
UnRShiCtBdWelerRe�erruB 90,000 600,000 690,000
G�antS(Fed,Stete,Locel)
eond Pioceetls
Ofher
7otal Funding$ources 90.000 800,000 89D.000
Capltal Ezpentliwras:
Design 90,000 �.�
FNghf d Way -
Construction 600,000 600,000
Tofal6cpenditures: 90,000 800,000 890,00
Gr&Ms/Other Sonrcesi -
106
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) CapiWl Facilities Plan
Six Year_Capifal Pacili[ies Plan, 20152020 Enterprise Funds
arojea Ttle: Well 4 Power and Chlorination
Project No: C512a0
Project Type: Non-Capacity
Project Manager WCkst�Om
Description:
Construct a new building at the Well 4 site to house a diesel-fueled standby generator and new hypochlorite disinfection
equipmeM.
Progress Summary:
Design will be complete arxJ project will bid in 2014 with consbuction completed in 2015.
Future Impact on Opereting Budget:
The annual mairrtenance cost is estimated to be appropmatey$600.
Activity.
2014 YE 2015 Year EnA
Funding Sourcas Prior b 2014 Estlmate 2015 Butl9et 2016 BuAget ProJeet Total
UnresMcted Water Revenue - 7 738 172,450 179,568
Grents(Fed,Stete,Locel)
Bond Proceeds 204.930 944.070 50.000 �.199,000
OfhBi
Total Funding Sourcec 272,088 1,116,520 50,000 1,378,588
Capital ExpendlWrea
Design 212.068 40.000 252,066
Right o/ wey
CanStNCf/on 7.076�520 50.000 1.126.520
Tofal Expenditurcs: 272.068 1.t18,520 50.000 7.378,588
Pore¢asted Project Cost:
Tofal
2017 2018 2019 Z020. 207S2U20
Funtling Sources: - -
UnresMctetl Water Revenue
Grants(Fed,Sfete,local)
Bond Proceeds 50,000
OfMr
7ofe1 Funtling Sourcas: 50.000
Gapipl EzpendiWres:
Design
Right of Way
r.0/IS�NCl/011 ���
roai�penmwres: w,000
GraMS!Other Sources.
1�7
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital Facilities Plan
Six Year Capkal FacilRies Plan, 20152020 Enterprise Funds
Prbject Title: Well Inspection and RedevelopmenfiProgram
Project No: cpxxx�c
Project Type: Non-Capacity
Project Manager TBD
Description:
Program for inspection and redevelopmeM of suppy wells ard spri_rgs necessary to ersure production at mawmum
capacity for efficierrt utiliration.
Progress Summary:
Planned
Future Impact on Operating Budget:
No significard irripact.
Activity•
zo�a re m�e rear ena
FunAing Sourcea Prirn b 2014 6tlmate 2075 BUEget 2076 Budget Project Total
Unrestdcted Weter Ravenue
GraMs(Fetl,Stete,LocaQ
Bontl Piocaeds
OtMr
Tohl Funding Sourcea -
GPlfal Fspontlib�rea
Design
Poghf d Wey
Constructim
Tofal Fi�pandlNres: -
Forecasted ProJect Cost:
rorai
zon zo�e _ .zo�s_ zoxo :o�szozo
Funtling Sourcea
Un2sMctedWate/Revenue 150.000 7W,000 300,000
Giants(Fed,Stete,LocaQ -
BaM Pioceeds
Other
Total Funding Sourcar 150.000 150,000 300.000
Cepihl ErzDentliwrec
Des/gn -
RigM d Wey
Constructlon 150.000 �50,000 300,000
Total ExOandlWrea 750.000 150.000 300,000
Gran[s/Olher Sources:
1�8
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital Facilities Plan
Six Year Capifal Facilities Plan, 20152020 Enterprise Funds
Projea rtle: Water Repair & Repiacements
Project No: CpXXxx
Projea Type: Non-Capacity (R8R)
Project Manager Va�ious
Description:
Distribution system repair and replacement projects required for meeting peak demands and reducing system losses.
ProjecLs will be coordinated with the Local Street Program and othar uGlity projects.
Progress Summary:
Planned
Future Impact on Operating Budget:
No significantimpact.
Activity: -- --
2014 YE 2015 Vear EnA
Funding Sources Prior ro 20t4 Eqimale 2015 Budget 2016 ButlOet. Pro ect Tofal
UnresMcfedWaterRevanue 70,000 - " 70;000
Grants(Fed,Slete,Lxel)
Bontl Pioceeds
Other
Total Fundln0 Sources: 70,000 70,000
Gpinl Ecpen6turec
Desi9� 70.000 70.000
Rlghf oI Wey
CO/151NCilOn
Toql Fspendituroa: 70,000 70.000
Forecasted�Project Cost: -
Total
2017 2018 20�8 2020 20152020
Funding Sourcas:
UrnesMctetlWaterRevenue 1,700,000 260,000 7,900,000 3,880,000
Granfs(Fed,Stefe,Local)
BorrdProceetls 200,000 200,000
Other
Total Funding Sourcas 200,000 1,700,OU0 260,000 7,900,000 4,060,000
Gpipl ExpentllWrea:
Design 200,000 260,000 460,000
RigM d Wey
Construction 1.700.000 1.900 000 3.600.000
7ofa1 ErzpendiWres: - - 200,000 t,700,000 2W,000 1,900,OOD 4,060,000
Grants/O[her Sources:
109
City ofAuburn Draft Capital Facilities P[an
WATER FUND (430) Capital FacilRies Plan
Six Year Capftal Facilkies Plan, 20152020 Enterprise Funds
Project Title: l:akeland Hills Reservoir 5 Improvements
Project No: cp0765
Project Type: Non-Capacity
Project Manager La�Son
Descrip£wn:
Pairrt tlie interior and eiQerior to Preserve the life of the resenroir add mipng equipmentfor improved water quality and
safety improvemerRs includirg seismic isolation valoe and new ladder
Progress Summary:
Design wili be completed in 2014, with corstruction completed in 2015.
Fuhire Impact on Ope�ating Budget:
No significaM Impact
Activity:
2016 YE 2015 Year End
Funding Sourcen: Prior to.2014 Estlmate_ . 2015 Budget ___2016 BUAget_ Prb�ect Total
UnresMctetlWaterRevenue � � 43,334 735,000 778,334
Grants(Fed,Stete,Local)
Bond Pioceeds 5.664 7A4.336 750.00D
O1�iBf
Tofal Funding Soureea: �.�8 744.338 735.000 7,528,334
CaPltal FspenCltures:
Deslgn 48.998 96.000 144,998
Right d Way -
Cbnstruction 648.936 735,000 1.383,336
Total F�cpandituros 46.998 744.338 735.000 - � _ � 1.528.334
Forewsted Project Cost:
Total
2017 2018 2079 2020 20152020
FunCing Sources:
Unrestncted Wafer Revenue 735,000
Gran�s(Fed,Stefe,Loce/) -
Bond Proceeds
Offrer
Total Funding Sourcex 73S,OU0
Capltal EupendiWraa:
Des/gn -
RfgM d Way -
ConsWction 735,000
Tofal Expentliturex 735,000
Grants/-Other Sowces:
11�
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital Facilities Plan
Six Year.Capital Facilkies Plan, 20152020 Enterprise Funds
aroject TiUe: Comprehensive Water Plan
Projea rro: cp7403
Projact Type: Non-Capacity
Projed Manager• Fenhaus
Description:
Update the Comprehensive Water Plan as required by Washington State Departmerrt of Heatth. Plan is updated every 6
years.
Progress Summary:
Submit draft report to WasFurigton Departmerrt of Health before December 31 2014
Futuie ImpacE on Operating Budget:
No significant impact.
Activity•
2014 YE 2075 Year Entl
Funding Sourcas: Prlor ro 2014 EstlmaOe 20�5 Budget 2018 Budget . _P.ro eet Total
UnrestnctedWeterRevenua 384,643 50,000 43M1;649
G/eMs(Fed,SlBfe,LAca1)
BdM Proceetls
Other
Tofal Funding Sourtes 386,663 50,000 qyti,5q3
CePibl Ezpenditures:
DesiBn 384,643 50,000 434,643
R;gnr d wey _
consrruorron
7ofa1 E�[pend(turea 384,863 50,000 434;g43
Foreaasted Project Cost: - -
7otal
2017 2078. 2079 2020 20152020
Funding Sourus:
UniestActeCWaterRevenue 425,000 475,000
Grenfs(Fetl,State,Lwe/)
Bontl Procaeds
aner
Total Funding Sources: 625,000 475,000
Gpihl Expentlitures:
Design 425.000 475.000
,4;gnr a way
C.0115t2Lf1011
Total FxpendiWres: 425,000 475,000 �
G2nts/Other Samces:
111
City ofAu.burn Draft Capital Facilities Pla.n
WATER FUNU (430) Cap'�I Facilkles Plan
S& Yeai Capital FacilRies Plan, 20152020 Enterprise Funds
Project Title: Muckleshoot Indian Tribe Master Meters
Project No: wabd03
Project Type: Non-Capacity
Project Manager TBD
Description:
Vstall master meters to Muckleshoot hdian Tribe properties to ease accowt administration.
P�og►ess Summary:
Design of master meter stations completed in 2014 with constrvction in 2015.
Future Impact on OperaUng Budget:
No significarrtimpact
/►ctivily: - -
2014 VE 2015 YeOr Entl
Funtling Sources: Prlor b 2074 F9lmale 2015 BUAget 2016 Budget Projeet Tobl
Unreslnctetl Water Re�enue 80,000 80,000
Grents(Fed,Sfete,Locel) -
Bond Proceeds 400,000 400,000
OMar
Tofal FunAing Sources BO,OOD 400.000 �80.000
Gpibl Ezpentlih�ras:
Desi9n 80.000 80,000
FSgM d Way -
ConSfNGf%on 400,000 400,000
Total EzpanAiturea 80,000 400,000 d8U.000
Foiecasted Project Cost:
rom�
2ot7 201a 2019 2020 2otS2020
Furiding Sources:
Unrestncfetl Water Revenue
Giants(Fed,Stete,Local) -
eond Proceetls 4�.�
Other
Tobl Funding 3ources: � 400,000
Capital Fxpenditurea
Deslgn -
�ynr d way
consrN�rron a�.�o
Total Ezpenilidiree: � � " �0.�
GraMs 1 Other Sourcas:
112
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capkal Facilities Plan
Six Year Capital Faellities Plan,2075-2020 Enterprise Funds
Projectree: Street Utility Improvements
Project No: CpxxxX
ProjectType: Non-Capacity
Project Manager. T BD
Description:
Water rtiain improvemer�s in coordination with the Sa�.e oir Streets(SOS)program and general arterial stree[
improvemerrts.
Progress Summary•
P�anned
Future Impact on Operating Budget:
No sfgnificarrtimpact
Aetivity.
2014 YE 2015 Year End
Funding Sources: PAor to 2014 E9imate 2075 BuAget 2076 Builget _Project Total
UnrestnctetlWaterRe.�enue 500,000 150,000 100,000 650,000
G2nts(Fed,State,Local) _
Bond Pioceeds 350,000 400,000 350,000
Other
Tofal Funding Sources 500,000 500.000 500,000 1,000,000
Caplql Expenditures:
Deslgn
RigM W Way _
Consfruction 500,000 500,000 500,000 t,000.000
Tofal Ezpentliturea 500,000 500.000 500,000 7,000,000
Forecasted Project Cost:
Tobl
2017 2018 2019 2020 20152020
Funtling Sources
Un2sMctedWeterRevanue 500,000 500,000 500,000 500,000 2,250,000
Granrs(Fed,srate,Locaq
Bond Proceeds �yp ppp
Ofher
Toial FunEfng Sourpc: 500,000 500,000 500,000 500,000 3,000,000
Gpipl Expenditures
Design _
Right d Way
Constructlon 500,000 500 000 500,000 500,000 3,000,000
Total6cpentlitures: 500,000 500,000 500,000 500,000 3,000,000
Grarrts/Ot�er Sourcas
113
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital Facilities Plan
Six Vear_Capital .FacilRies_Plan,_20152020__ EMerprise Funds
Project TiUe: Lea Hill PRV Statfon Improvements
Project No: cpxxxx
Project Type: Non-Capacity
Project Manager TBD
Description:
Replace pressure 2ducing valve statlors in the Lea Hill area.
Progres"s Summary•
Planrred
Future Impact on Opereting Budget:
No significantimpact.
Activity: - - —
2o�a re zo+s rea.E�a
Funding Sources: Prlor b 2014 Ec6mam 2015 BuABet 2078 Budget ProJeet Total
Unrestnctad Water Revenue -
GiaMs(Fed,§tata,Locaq -
Baitl P�oceetls 50,000 400,000 50,000
Other
Toml FunAing Sources � � 50.000 400,000� 50.000
Capital Expentliturex
Des/gn 50,000 50.000
Rlght d Way
Consfruction 400.000
Total Expantlitums 50.000 400,000 50,000
Fdrecasted ProjeofCost:
Totll
T017 2018 2019 2020 20752020
Funtling Souims:
UnresMctetl Wafer Re�errue -
Grants(Ferl,Stete,Loceq -
Bond Proceea's d50,000
Other
Total FunAfng Sources - - ' '-' - '450.000�
Capltal F�cpandlturex
. . Design �.�
RfgM of Way -
ConSf2Ction 400,000
7ofal E�cpenCltures � -� 450,000
Grants I Other Souices:
114
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) CapRal Facilities Plan
Six Year Capital Facllltles Plan, 2015-2020 Enterprise Funds
Project Tine: Water Meter 8 Billing System Improvements
Project No: ep1317
Project rype: Non-Capacity
Project Manager TBD
Description:
Conduct a study to detertnine which recent improvemeMs in automated metering tecMology,generaly referred to as
Advanced Metering 6ifrastructure(AM�, awuld best benefit the Gity and construct selected improvemerrts. Benefits include
more accurate meter reads, daiy informatlon for quicker detection of leaks, and improved efficiencyof billing operations.
Progress Su:mmary•
Study in progress. hsfallation of ineters and metering infrastnicture to begin in 2015
Future Impabt on Operating Budget:
No significant impact.
Act'rvity.
2014 YE 2015 Vear Entl
Funtling Sourcas Prlor Eo 2074 E�mate 2075 Butlget 2076 BuCget ProJeR TOTaI
Unrestncted Watar Reronue _
GraMs(Fed,Stafe,Lweq _
BondPioceeds 25,753 50,247 1,000,000 1,000,000 1,076,000
Other
Tobl Funding Sources: 25,753 50,247 1,000,000 1,000,000 1;076,000
Capital EaOentliturcs:
Dasign 25.753 50.247 24.000 100.000
Righf d Way _
COIIS(NCNW1 B7B.00O 'I.00O�OOO H%B.00O.
Total F�cpendltures 25.753 50,247 1,000,000 1,000,000 1,076,000
Forecasted Project Cost:
Tofal
2017 2018 2019 2020 2UtS2020
FunOing Sources
Unrestncled Weter Revenue
Giants(Fed,State,Locel)
Bond Proceads 1,500,000 1,500,000 1,500,000 6,500,000
Other
Toml Funding Sources: 7,500,000 1,500,000 1,500,000 8,500,000
Capital ExpentllWres
DeshJ� 24.000
Poght d Wey
ConSlNLtlon 1,500,000 1,SOO,000 7,WO,O00 B,476,000
Tofal ExpenCitures 1,500,000 1,500,000 1,500,000 8,SD0,000
Grants/Other Sou'ces�
115
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capifal Facilkfes Plan
Six Year Capital F.abilkies Plan, 2015-2020 Enterprise Funds
Project Title: Utilities Field Operations Center
Project No: epXX)C�)C
Project 7ype: Non-Capacity
Project Manager TBD
Description:
Coretruct building for utilities field st2ff use and storage of field equipmerrt.
Progress S.ummary•
Fuhrre ImpaM on Operating Budget
No significarrt impact
Activity
2014 YE 2015 Vear,Entl
FunEing Sources PNor to 2014 Estlmats 2075 Bu et Y018 Budgst P set Total
Unrestnctetl Wefer Reyanue 100,000 '100,000
GiaMs(Fed,State,LOCe/)
Otheropereting transferM SeMer 100.000 100,000
Ofher oparatiig erensler in Simn t0�OW 700 000
Total Funding Sourus: 300,000 300.000
Capipl ExpenCiNros
Design
RlgM d Way
Construction 300,000 300,000
Tofal F�cpendiWres 300,000- � 300,000"
Forecasted Project Cost:
Total
2077 2018 2019 2020 20152020
Funding Saurps
Unrestncted Weter Rawnue 100,000
Granfs(Fed,State,Loce!) -
Other operatlrg trensfe�M Seuer 100.000
Other operatisig trarisfer m Stam �00 000
Total Funding Sourcas: 300,000
Gpinl ExpendiWres
Deslgn
PogM d Wey -
ConSWCNon 300.000
Total Expendifurea 300,OOf
Grarrts/Other Sources:
116
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capkal Facflities Plan
Sfx Year Capkal Faoilkles Plan,20'IS2020 Enterprise Funds
arojectree: Valley AC Main Replacement
ProjactNo: CP1219
Projearype: Non-Capaeity
ProJectManager Truong
Desoriptiori:
Distribution system repair ard replacemerrt project requirered for meeting peak demands and reducing system losses.
Projects will replace AC Main in the Valley service area.
Progress Summary•
Designwill be complete antl projectwill bid in 2014 witli construction completed in 20'I5.
Future Impaet on Operating Budget:
No sigrrificarrt impact
Aetiv'rty
201d YE 2015 Vear End
Funding Sourcas P.rlor to 2014 Estlmate 2075 BUOget 2078 Budgat ProJect Total
Unrestdcted Weter Rerenue -'
Grents(Fed,Stata,Loceq
PWTFL _
Bond ProceeOs 74 254 7 345.746 50 000 1.470.000
Total Funding Sources 74,2% 7,345,746 50,000 1,470,000
Capifal Ezpendltures:
Design 74.254 60.000 134,234
R/yht d Way _
COn51NCl/011 1.2$$,%AB SO.00O 1�33S.7AG
Total Expenditurex 74,254 1,345,748 W,000 1,470,000
Foreeasted Project Cost:
rofal
2017 2076 2018 2020 20152020
Funtli�g Soureos:
Unrestncted Wefer Revenue
G2nts(Fed,State,LxaQ
PWTFL
BaM Proceeds Sp Qpp
Tonl Funtling Sourcex 50,000
Capital Expantlituren:
Design _
Right d Way
ConstmCllOn SO,O00
Tofal Expenditures: 5D,000
Granls/Other Sources'
Bontl proceeds from 2013 bond issuanca.
117
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital FacilBies Plan
Six Year Capipt_Facilltles Plan,,2015-2020_ Enterprise Funds
Project TiUe: BNSF Utility Crossing - - - - -
Project No: cp1308
aroject Type: Non-Capacity
Project Manager Sweeting
Description:
Water main inprovemerRs required prior to BNSF rail e�ansion project.
Progre§s$urtmmary:
The design phase will be completed in 2014 and construction to be completed in 2015.
Future Impact on Opereting Budget:
No significarrt impact
Activity.
2014 YE 2015 Vear End
FunCing Sourceu PAor ro 2014 _Eadmate. 2015 BudgeL_ _2016 Butlget _ProjectSofal
Unrestncted Weter Revenue
G�ants(Fed,Stefe,Locep
PWTFL -
Bond Piviceei/s 51.358 6]8,644 50,000 �80,000
Tofal Funding Sourtts: 51,358 678,664 50,000 780.000
CaPital Ecpenditules:
Des(gn 51.356 40,000 9�.356
R/ght d WaY '
Con5f2Ct7on 838,644 50.000_ _ _ 688,644
Total Expendlfuros: 57,358 878,&14 50,000 780,000
ForegasteC ProJect Cost: � �
Total
2017 2078 2018 2020 20752020
Funtling Sources
UnresMctetl Weter Re�enue -
G/ents(FeN,State,Locel) -
PWTFL -
Bond ProceeQt 50,000
TofSl FunAing Source� 50,000
Capital E:penGituroa
Design
RlgM d Way -
Construtt/on 50,000
Total ExpenCiturea 50.OW
Grants/Othar Sources:
eontl proceetls hom 2013 bond issuance.
11g
City of Auburn Draft Capital Facilities Plan
WATER FUND (430) CapiWl Facflities Plan
Six Year Capital Facilities Plan, 20152020 Enterprise Funds
Project Ttle: SCADA Upgrades
Project No: c524a0
Project 7ype: Non-Capacity (Improvements)
Project Manager SWeeting
Description:
Upgrade the epsting Supervisory Control ard Data Acquisition(SCADA)system, also known as the Telemetry system,to
replace obsolete componerrts and allow for improved contrrol of the water utility facilities.
Progress Summary:
Telemetry upgrades are complete. Physical site improvemeMs are in progress and will be completed in 2015.
Fd�re Impaet on Operating Budget:
No significantimpact.
Acfivity.
2074 YE 2015 Year Entl
FunAing Sources: Prior l0 2014 6tlmato 2075 BUA et 2076 BudBet Pro act Total
UnrestnctedWaterRevenue 1,06g,277 553,790 10.000 7,633,067
GreMs(Fed,StBte,Local) �
BwWPmceeds 1,744.778 1.744,778
Other
Total Funding Sourcen: 2,814,055 553,790 70,000 = 3,377,845
Capital E:penAiWres
Design 193.77� 793.711
Right d Way
Constiuction 2.620.34A 553.790 10,000 3.184.134
TOtal Ezpenditures: 2,810.055 553,790 10,000 3.377,845
Forecasted Project Cost:
Total
2017 2018 2019 2020 201&YOYO
Funtling Sourcea -
UrnesMcfed Weter Revenue �p�
Grdnts(Fed,Stffie,Locaq
Bwrd Procaeds
Other
Tofal FunEing Sourcea: �p.ppp
CaPltal Eicpenditures:
Design
Right d Way _
Construction 10,000
Total ExpenCiturea: ' 10,000
GraMS/Other Sources:
Bond proceads fiom 2010 bond issuance ��
119
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital FacilRies Plan
Siic Year Capltal Facilities Plan, 20152020 Enterprise Funds
Project rUe: West Hill Springs Improvements
Project No: wabd04
Project rype: Non-Capacity
Project Manager TBD
Description:
Fstall flow control vaM1re for automatic shutdown and upgrade disirrfection system. TNs projec[ was ider�fied diai_ng the
DepaRmerrt of Heatth Sanitary Swey as a health and safety concem.
Progress Summary•
Design will be complete and project will bid in 2014 with construction completed in 2015.
Fuhire Impaet on Operating Budget:
No significant impact
Activky.
2016 YE 2075 Year EnA
Funticng Sources Prior b 2014 Estimate 2075 Budget 2016 Butl t Pro ect Total
UnresMcfedWaferRevenue 150,OOD - � � - 150,000�
Granfs(Fed,Stete,Loca/) -
PWTFL -
Borrtl PioceeOs 455 000 455.000
Tatal Funtling Sources: 150,000 455,000 603.000
Cap{fal ExpenAfWrea
De57gn 150,000 750,000
PogM d Way
CiOIIS(NLIIOII 4JS.�0 4JS.��
Total ExpenAltures tso,000 � ass.000 eoa.000
Forecasted Project Cost: � � �
roa�
2017 2078 2019 2020 201i2020
Fundfng Saurces:
Unrestnctetl YYater Resxnue -
Granfs lFed.Stete.laceq
PWTFL
BorM Proceeds 455 000
Total Funding Sourcex 4`�+.0�
Ceplql Expendltursa
Design -
RigM d Wey
r.0I15�2CtIW1 455�000
Tofal ErzpendlNroa �455:000-
Grants/Othar Souroes.
I2�
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capipl FacilRies Plan
Six Year Capital Facilkies Plan, 20152020 Enterprlse Funds
Project Tiue: Reservoir Seismic Rehabilitation
Projea No: cpxxxx
Project Type: Non-Capacity
Project Manager TBD
Description:
Install seismic control valves on outlet piping of Reservoirs 1, 2, 4q 4B, Bq and 88.
Progress Suriimary:
FuWre impact on Operating Budget:
No significarrt impact
Activity:
2074 YE 2p75 Year Entl
Fundfng Sourcea Prior ro 2074 Estlmate 20�5 BuABet 2078 Butlget Project Tofal
UnresMctetl Weter Revenue
Caanfs Lnsecuretl Federal
PWTFL
Bond Proceetls
Total Funtlinp Sourees: _
Gapitll�pendlWres:
Des/gn
PogM d Way
Constrvction
Tofal ExpendlWras: _
Forecasted Projed Cost: -
Tolal
2017 2018 20t9 2020 20152020
Funtling Sourcex
UnrestncledWeterRevenue t00,000 100,000 100.000 100,000 400,000
G'enfs-Unsecuiad Federal _
PWTFL
Bond Proceetls
Tofal Fundine Sources: 100,000 100,000 700,000 700,000 400,000
Capital ExpenCiluras:
Dasign
RlgM d Wey
ConSf2GNon 700.000 �00 O00 t00,000 100,000 400,000
Total Expe�Aitures: 100,000 700,000 100,000 700,000 400,000
G2nts/Other Sou�ces:
121
City ofAuburn Draft Capital Facilities Plan
Wi4TEF2 FUND (430) Capltal Facili[les Plan
Su Year Capital_Facilfties Plan,.20152020_ Enterprise Funds
Project Title: Lea Hill - 132nd Ave Distribution System Modifieations
Projea No: cpxxxx
Projea Type: Non-Capacity
Projecl Manager TBD
Description:
Project witl aCd pressure reducing valve,control valves at Lea Hill resenroirs,arW system valves to provide efficient operation of ttie
132nd Ave Tacoma Intertie.
Progress Summary:
Design and construction will be completed in 2015.
Future Impact on Operating Budget:
No significant impact
Activity - -
2074 YE 2075 Yaar End
Funding Sources: Prlor W 2074 Esflmate 2075 Bud et 2078 Bud t Pr 'ect Total
UnresMcfetl Water Ra�anue � - � -
Giams(Fed,Stete,Locaf)
PWTFL
BorM Pmceeds 400,000 400.000
Total Funding Sourcas: 400,000 600,000
Capital Eipentllfurea
Design 40,000 40,000
Idght d lNey - -
Consfrucfion 360,000 _360,000_
rorai�penaimres: eoo,000 aoo.000
Forecasted Project Cost: � �
total
2017 2018 2019 2020 20752020
Funding Sourcec
UnresMcfed Waror Revenue -
Giants(Fed,Sfete.Local) -
PWTFL
eond P�oceeds 400,000
Tofal Funding Sources: 400.000
Capifal Expe�dlWres
Design 40,000
RigM d Wey -
ConslNGlion 360,000
Total 6cpenAlWres: 400,00r
GrantS/Other Sou'ces:
122
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Capital Facilitfes Plan
Six Year Capltal Facilities Plan, 20152020 Enterprise Funds
Project Title: Auburn Way South Flooding Improvements Phase 2 - 17th Street SE
Project No: cp1202
arojea Type: Non-Capacity
Project Manager TBD
Description:
Project will replace water main along 77th Avenue SE in conjunction with flood improvements project
Progress Summary:
Design wlll be completed in 2014 with construction completed in 2015.
Future Impact on Operating Budget:
No signficant impact
Activity.
2014 YE 2015 Vear EnA
FunCing Souros: Prbr ro_2074 E9lmate 2015 BuOget 2016 Butlget Pro ect Total
UnrestActad Weter Revenue 50,000 181,000 23'I,000
Grants(FealStffie,Local)
PWTFL
Bond Proceeds 669 000 689,000
Total FunAing Sources: 50,000 850,000 900,000
Gplbl EzpanOiWres:
Desfgn 50,000 50,000
RigM ol Wey
COnSINCHOn H$O.00O BSO.00O
Tofal Expenditures: 50,000 850,000 900,000
Forecasted ProJect Cost: -
To71
2017 2078 2019 2020 20752020
Funding Sourcec
Unrestncfed Weter Revanue �g� ppp
Grents(Fetl,5lete,LocaQ _
PWTFL _
Bartl Proceeds 669.000
Tofal FunCing Sources: 850,000
Capipl E:penAlWres:
Dasi9n
R1gM o/ Way
Constnicfion 850.000
7obl Expenditures: BW,000
Grents/Other Sources:
123
City of Auburn Draft Capital Facilities Plan
WATER FUIVU (430) Capilal Facili[fes Plan
Si�c Year Capital FacflRies Plan, 2015-2020 Enterprise_Funds_
Project Title: Auburn Way South - Dogwood to Fir
Project No: cp 1118
Project Type: Non-Capaeity
Project Manager. SWeEting
Description:
Water main improvemeMs constructed in conjunction wiN Aubum Way South Cortidor ImprovemeMs.
Progress Summary:
Design wiQ be completed in 2014 wiM constructlon complated in 2015.
Future Impact on Operating Budget:
No sign�caM impact
Activky.
zo�a ve za+e rear E�d
Funtling Sourcas Prior to 2014 ESUmate 2075 Bud et 2076 BuE et ProjeQ Tolal
UnresMctedWaterRewenue 5,144 20,000 34,895 60,039
Grants(Fetl,Stete,LocaQ
PWTFL
Bontl Pioceetls
7oTal Fundine Sourcae 5,746 20.000 36.�5 80.039
Gpibl F�cDenElturee:
Oesign S,t44 10,000 �5,144
RiyM d Way -
Consfructlon 10,000 34.895 44.895
Tofal Expendltures S,1M 20,000 34,895 80.039
Foreeasted-Projeef Cost:
Total
2017 2078 2019 2020 2075�2020
Puntling Sources: --�---�-�- -- � — -
UnresMcted Wa[er Re�nue 34,895
Grents(Fred;State,LocaQ
PWTFL -
Bond Proceeds
Tofal Funding Sourcea: 34.895
Capital ExpendiWres:
Design
Right d Way -
Construction . .34.895
Total ExpentllNres 34•e9`
Grarrts/O[her Souices:
124
Ciry ofAuburn Draft Capital Facilities Plan
W.4TER FUND (430) Capital Facilities Plan
Six Year Capital Facilities Plan, 20t5-2020 Enterprise Funds
Project Title: Auburn Way South - Fir to Hemlock
Project rlo: cp 1119
Project Type: Non-Capacity
Project Manager Sweeting
Description:
Water main improvemeMs constructed in conjunction with Aubum Way South Corridor ImprovemeMs.
Progress Summary•
Design will be completed in 2014 with consWction completed in 2015.
Future Impac[ on Opereting Budget:
No significant impact
Activky.
2016 YE 2015 Yaar End
Funtline Sou�cea: Prlor to 2016_ Estlmate 2015 BUCget 2078 BUAgat Project Tobl
UnrestncfedWeterRevenue 3.907 5,000 30,000 38,907
Grants(Fed,State,Local) _
PWTFL _
Bond Pioceetls
Tofal Funding Sources: 3,9W 5,000 30,OD0 3g,gp7
Capfbl ExpendiWres
Design 3,907 5,000 8,907
RigM ol Way
Cwistn2tion 30,000 30.000
Total E:pandiNrer. 3,907 S,ODO 30,000 38,9W
Forecasted Projed Cost:
Tofal
2017 2078 2019 2020_ _ 20152020
FunCing Sources
Unrestrlc(ed Weter Re�snue 30,000
Granfs(Fed,Stata,Locel)
PWTFL _
Bond Proceeds
Tofal Funtling Sources: 30.000
Gpital ExpendlWres
Design
RigM d Way _
Construchon 30,000
Tofal F�cpenAlWres: 30,000
Grarrts/O[har Sources:
125
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430� Capital Facilkies Plan
Shc Year Capital Faeilkie"s Plan, 20152020 Enterprlse_Funds.
Project Tiue: Auburn Way South - Muckleshoot Plaza to Dogwood
Project No: cp1218
Project rype: Non-Capacity
Project Manager Sweeting
Descriptlon:
Water maln improvemeMs constructed in conjunction with Auburn Way SaM CoRidor Improvemerrts.
Progress Summary•
Design will be completed in 2014 with consWctlon completetl in 2075.
FutWre Impact on Operating Budget:
No significarrt impact
Activity:
2014 YE 2015 Year EnE
Funding Sourcem Prlor b 2014 Estlrtiate 1015 Budget 2078 BUEget Pro ect Topl
UniestrictetlWeterRewnua 5.0�0 55,000 60,000
GraMs(Fed,Stefe,locaq -
PWTFL -
Bond Pioceeds
Total FunAing Sourees: 5,000" "55,000 -- � 80,000
CaplLl Expantlitures
Des/gn 5,000 5,000
Righf d Wey
Construction 55,000 55,000
Total Expenditures: 5,000 55,000 80.000
Forewsted Proje¢t Cost:
Tofal
2017 2078 2018 2020 201&2020
Funding Souras:
Unresfncted VVefer Revenue 55,000
Grerrts(Ferl,State.Local) '
PWTFL -
Bwtl Pioceeds
Total Funding Sources = � -55.000
CaPltal ExpsnAitures:
Deslgn
R7gM ol Wey -
Construct/on 55,000
rwai�oe�amres: _ ss,oa
GraMs/Other Souices:
126
City ofAuburn Draft Capital Facilities Plan
WATER FUND (430) Cepipl Facilities Plan
Six Year Capitai Facilkies Plan, 20152020 Enterprise Funds
Project Title: Reservoir Painting
Project No: CpXXxx
Project 7ype: Non-Capacity
Project Managar• TBD
Descriptlon:
A�intenance of reservoirs requires periodic painting to protect Ne steel and increase the useful Ilfe of the reservoir
Progress Summary•
Planned
FuWre Impact on Operating Budget:
No significarrt impact
Activity.
zo�a rE zo�s rear ena
Funtling Sourcen: Prfor b 2016 Estimafe 2075 BUABat 2016 ButlBet Project Total_
Uniestncfetl Wafer Reuenue
Grants(Fed,Stafe,Loca/) _
PWTFL
BaW Proceeds
Tofal Funding Saurces:
CaPibl E:pandiWrea:
Design _
Rlghf W Wey _
ConSWction
Total EspenAiWrec _
Forecasted Project Cost: -
rom�
2017 2018. 2019 2U20 2075-2020
FunAing Sources
Unrestncted Waler Rewnue 1,250,000 1,250.000
Grants(Fetl,Stffie,Loca/)
PWTFL
BwM Proceeds
ToTal Funtling Sources: 1,250,000 1,250,000
Capifal Fspenditures:
Desi9� t50�000 150�000 �.
R/ghf 0/ Way _ '
ConSWction t.700.000 1.100.000
Tofal F�cPanOiOirec 7.250.000 7,250.000
Grants/Other Sources'
127
City ofAuburn Draft Capital Facilities Pla�z
WATER FUND (430) Capital Facilities Plan
Six Year Capital FacilBies Plan, 2015-2b20 Enterprise Funds
Project Title: 24" White River Crossing
Project No: epxxxx
Project Type: Non-Capacity
Project Manager TBD
Desbription:
The facilities evaluation study conducted in 20'132014 found a suspectetl leak on the 24" steel trensmission main crossing the
White River The approbmate location was tleterminetl, Dul further investigation is required to assess lhe degree arM magnRude of
the leak Thls proJeetwill providefor full replacementol the river crossing.
Progress Summary•
D.esign Is anticipated to be completed in 2016 with coretructlon completed in 2017
Future�Impect on�Opereting Budget:
No significantimpact
Activity:
za�a re zo�e rear�a
Funtling Sources: Prior ro 2014 Estlmafe 2015 Budget 2078 BuCget Projeet Total
Unrasmcletl WeterRevenue -
Giants(Fed,State,Local)
PWTFL -
BwM Proceeds 450 000
Tofal Funtling Sources 450,000 -
Cepital ErzPenditures
pgsign 100,000 -
PogM d Way -
Construction 350.000
Total EiPantllWres �0�-. ..._
Forecasted Project Cost:
Totel
2017 2018 2018 2020 201SZ020
Funding Sources
UnresfnctedWaterRe�snue 450,000 450,000
GraMs(Ferl,State,Loca!) -
PWTFL
BwM Pioceeds 450 000
Tofal Funding Sources 450,000 900,000
Capipl FxpandiMes:
Deslgn 100.000
PogM b Wey
cu,�srn,cnon aso,000 aoo,000
Torai �cPenaiwres: aso,000 eoo.000
crerns�aner sou�cas:
128
City ofAuburn Draft Capital Facilities Plan
TABLE W-3
Impact on Future Operating Budgets
WATER
Pro ect: 2016 2017 2018 2019 2020 2021 Total �
1 Wellllmprovements $ 1,800 $ 1,800 $ 1,800 $ 1,800 $ 1,800 $ 1,800 $ 10,600
2 Fulmer Well Fleltl
Improvamen[s
3 CassadeWaterAlllanceWatu
Purohase ' ' ' '
d AcademyPump Sta[ion#1
Replacement - - -
5 Coal Creek Springs
Rahabllltatlon
6 Green Rlver Pump Statlon _ _ 600 600 600 1,800
Emergeney Power
7 WeIIIPowerandChlorinatlon 600 600 600 600 600 600 3,600
8 Wa�lln�oecNonand
Redaval opment Progra m -
9 Water Repalr 6 Replacemeni _ _ _ _ _
10 LekalandNlllaReservolr5
/mprovemanfs � -
11 Comprehensl ve Water Plan _ _ _ _
12 MITMasferMeters _ _ _ _ _
13 Street Utilitylmprovements - ' ' ' ' '
14 Lea Hlll PRV ffiation
Improvements -
75 �M1'aterMeter68111ingSystem
/mprorements - - - '
16 UttlttlesFleldOperatlons
Center - ' - - - -
17 Va11eyACMainReplacemenl _ _ _
78 BNSFUtiIlryCromnq _ _ _ _ _
79 SCADA Upgrades _ _ _ _ _
20 We4 H!lI Springs Improvement _ _ _ _ _ . _
27 ReservatrSelrnic
Reheb(Iltatlon - - '
22 Lea Nlll-132nd Ave
Dtstrlbuffon SyaYem - - - - _
Modl/Icatlons
23 AuburnWaySoFlooding
Improvements Phase 2 - - - - '
2d Auburn Way South-Dogwood
to Ftr - ' ' '
25 Aubum Way Souffi-Ftr to
Hemlock - - ' '
26 Auburn Way South-
Muek/ed,00t Plaza ta _ _ _ _
Dogxrootl
27 ReservolrPalnting _ _ _ _ _ _
28 21"Wh(te River Crosing ' ' ' ' - '
Total S 2A00 S 2Aoo S 2,40o S 3,OOo S 3,000 f 3,000 E 16,200
129 I
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
�
� MORE THAN YOU IMAGINED
130
City ofAuburn Draft Capital Facilities Plan
SANITARY SEWER
Current Facilities
The Citys sanitary sewer service area encompasses approximately 28-square miles which are
primarily within the City limits, but includes a totai of approximately '/� square mile within
Aubum's Proposed Annexation area (PAA). The City contracts with King County for sewage
treatment and disposal. The City's Sanitary Sewer Utility is responsible for the collection and
transmission of wastewater to the King County trunk lines.
The Citys current inventory of approximately 197 miles of sewer lines serves the City's sewer
service area. Tabie S-1, Facilities Inventory, lists the sewage collection and transmission
facilities along with their capacities and locations.
Level of Service (LOS)
The Comprehensive Sewerage Plan for the Sewerage Collection System summarizes the level
of service (LOS}, or design criteria, for the Citys sewage collection system. These standards
represent the average quantities of sewage that the system is designated to accommodate for
residential, industrial, and commercial development.
Capital Facilities Projects and Financing
Investments in the Citys sewage collection facilities include primarily non-capacity
improvements and replacement projects. Anticipated replacements include replacement of
aging sewer pipes and manholes in conjunction with arterial and local street improvements, and
replaCement of pipe identified through the sewer program's condition assessment process.
Anticipated improvements include upgrades and additions to the utility's maintenance facilities
and the construction of a sewer decant facility The City of Auburn's sewer system anticipates
costs for seven non-capacity projects tofaling $11,345,160. Table S-2 shows the proposed
fnancing plan followed by individual worksheets showing the project detail.
Impact on Future Opereting Budgets
There are no operating budget impacts forecasted for sanitary sewer facilities during the six
years 2026—2021
131
City ofAuburn Draft Capital Facilities Plan
TABLE S-1
Facilities Inventory
Sewage Facilities
CAPACITY -
FACILITY (MGD) LOCATION
um Stations:
ith Street 0.26 900 8th Street NE
2nd Street 0.79 1950 22nd Street NE
rea i9 0.47 800 71st Street SE
ubum 40 0.63 4159 O Place NE
ogwood 0.43 1423 Dogwood Street SE
llingson 2.20 100 41st Street SE
Street 0.86 1700 F Street SE
orth Tapps 0.73 2610 Lake Tapps Pkwy SE
easley Ridge 0.36 5225 South 320th Street
Street 0.14 600 R Street NE
ainier Ridge 0.29 31809 125th Place SE
'verside 0.58 13900 104th A�enue SE
Terrace View 0.94 104 60th Street SE
Valley Meado� 0.18 2022 4th Street SE
Verdana 2.88 11807 SE 296th Place (Kent, WA)
FACILITY Pi e Size_ LOCATION
River Crossinas:
Inverted Syphon 8 & 12 Inch Green Ri�er& 26th Street NE
8th Street Bridge 14 Inch Green Ri�er 8� 8th Street NE
132
City ofAuburn Draft Capital Facilities Plan
TABLE S-2
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
SANITARY SEWER DIVISION
2015 2076 2017 2018 2018 2020 Total
Caoacitv Proleets:
NOf1e
Non-Canaekv Prolects:
7 SanitarySewer Repatr 6 RepWceme�rt
Cepital CoSLs 1,930,000 2,050,000 300,000 7,500,000 300,000 '1,500,000 7,580,000
Funding Sources.
SewerFuntl 1,930,000 2,050,000 300,000 '1,500,000 300,000 1,500,000 758�.000
BonC Proceetls
2 Stree!Utilky ImprowmerKs
Cepital Cosis 200.000 200,000 200,000 200,000 200,000 200,000 7,200,000
Funtling Sources:
Sewer Fund 200,000 200,000 200,000 200,000 200,000 200.000 1,200,000
Bond Proceetls
3 Vactor Decarrt Faciifty
Capital CosS 30,000 240,000 - - - - 270,000
Funtling Sources:
SewerFuntl 30,000 240.000 - - - 270,000
Bond Proceetls
4 Comprehensiva Sewer Plan Update
Capiml Costs 25,000 - - - 350,000 375,000
Funding Sources.
Sewer Funtl 25,000 - - - - 350,000 375,000
Bontl Proceetls
5 Auburn Way South Roodirp hnprowmerK-Phase 2
CapitalCosts 4�5,160 - - - - 415,160
Funtling Sources:
SewerFuntl 415,t60 - - - - 615,160
Bond Proceeds
6 BNSF UtilHy Crossinps
Capital Cos� 5,000 - - - - - SA00
Funding Sources:
Sewer Funtl 5,000 - - - - 5,000
.Bond Proceetls
7 Sewer P�anp Station ReplacemeM/ImprovemeM
Capital Costs - - - - 1,500,000 1,500,D00
Funtling Sources:
SewerFuntl - - - - - 1,500,000 7,500,000
Bond Proceeds
SuMotal.NdtCaoacMv Probeta:
Capifal CosS 2,605,t60 2A80,000 500,000 7,700,000 500,000 3,550,000 71,345,160
SUMMARV:
G1PfTAL COSTS
CapaciryProjects - - - _ _ _ _
Non-CapaciryPro�ecfs 2,605,160 2,490.000 500,000 1,700,000 500,000 3,550,000 1'1,345,160
Total Costs 2,605,760 2,690,000 500,000 1,700,000 500,000 3,550,000 17,345,160
FUNDING SOURCE3:
UtlliryFuntls (Seuer) 2,605,160 2,490,000 500.000 1,700,000 500,000 3,550,000 11,345,760
Bond Proceeds - - _ _ _
Other
Total Funtlin9 2,605,160 2p90,000 500,000 1;700,000 SOOA00 3,SSOA00 11,345,760
133
City ofAuburn Draft Capital Facilities Plan
SEWERFUND (431) CapkalFacilitiesPlan
Suc.YearCapltalFaeilkles_PIan,207S2020_ _ EnterpriseFunds
Project Tine: Sanitary Sewer Repair 8 ReplacemenUSystem Improvements
Project No: Cpxxxx
ProjectType: Non-Capacity (Repair and Replacement)
ProjectManager Eiwell
Descrlptbn:
Repair and replace broken sewer mairs and other facilities. These lines will be idartified through teleNsion inspection and
rouGna clearvng. This particular program indudes proposed projects which do rot ha�e an approved Project Managemerrt
Plan,or are rot associatad with the SOS or other transportation improeemerAs. Ariticipated projecis include bi-armual,
stand-abne, repair and replacemerrt projects for sewer lines wldch are broken,misaligned,"bellied"or oHierwise req�re an
inordlnate amourrt of maiMenance eftort or present a risk of backup or trench failu2,and facflities wMch gene2te ConsisteM
odor complair�.
Additionally,system impro�emeMs wFdch erdiance the abilityto mair�tain service are included Fie2.
Progress�Surrmmary•
Arrtcipated projecLs for 20152020 inclu0e:
1. MaNiole frame and co�er repfacemeNs.
2. Biennlal Repair and Replacemerrt Projects.
Future Impact on Operating Budget:
Ttus shoWd decrease the operating budget by correcting ttie problems Uiat require operaUon stafPs attention.
Activily:
(PreMous 2 Vrs) 2074 YE 2015 Vear End
Funtljng 9ources: Pdor fu 2014 FstlmatB _2015 Butlget. .2018 Budget __ .Projoct Totil
UnresMctedSexerRevenua 1,285,681- 420,502 - 1;930,000 2,050,000 3,636,183
GiarRs(Fed,Stefe,LocaQ
eond Proceeds -
Othe�
Total Funding Sourcec 1.285.681 420.502 1.930.000� - 2.050.000 3.836,783
Capital Ezpendltures:
Desgn 192,852 100,000 290,000 307,500 582.852
RigM d Way -
Cons7rucMrn 'I.092,629 320.502 1.640.000 1.742.500 3.053,331
Total Expsntliturex 7.2B5,6B7 420,502 7.830,000 2,050,000 3,636,183
Foredasted Project Cost:
Total
2017 2018 2079 2020 20152020
FwMing Sources
UnrestrlctedSe�aerRe�nue 300.000 1.500.000 300.000 1.500,000 7.580.000
Grants(Fed,State,Loca/)
Bartl Proceeds
Otlffx
Tofal Funtling Sources 300,000 1.500,000 300,000 1,500,000 7.560.000
Gpital ExpendiWrea:
Desi� 200.000 150.000 200,000 150.000 1,297.500
RigM d Way
Consfruction 100,000 1,350,000 100,000 1,350,000 8.282.500
Total Ei�{ientlitures: 300.000 7,500,000 300.000 1.500.000 7,580,ON
Grants/Other Sourcas:
134
City ofAuburn Draft Capital Facilities Plan
SEWER FUND (431) CapRalFacilkiesPlan
Six Year Capital Faeilities Plan, 20152020 Enterprise Funds
ProjectTiUe: StTeet Utility Imp�Ovements
Project No: cpxxxx
ProjectType: Non Capacity
ProjectManager TBD
Description:
Sewer line replacemeM in coordination with the Save our Streets(SOS) program and Arterial improvemerrts.
Progress Summary: -
Ongoing
Future Impact on Operating Budget:
No significaM Impact
Activity.
(Prallous 2 Vrs) 2oia ve zots vear ena
FunAing Sourcac PAcr to 2014. .Estimate. 2075 Butl et 20�8 Budget Pro act Tofal
UnresMctedSererRevenue 34g,pp0 200,000 200,000- 200,000 998,000
G2nts(Fad,Slete,LocaQ _
Bard Proceeds _
aner
Total Fundin8 Sourcex 348.000 200,000 200,000 200,000 848,000
CaPlfal F�cpen0iturea
Design 34.800 20.000 20.000 20.000 94,800
RigM ol Wey
ConstruCtion 373,200 'I80,000 t80,000 780,000 673,200
Total Erzpanditures: 348,000 200,000 200,000 200,000 7A8,000
�Foreoasted Project Cost:
Total
20t7 2018 2019 20T0_ _2075-2020
FunCing Sources: - --
UnrastnctedSe�aerRevenue 200,000 200,000 200,000 200,000 1,200,000
Grarrts(Fetl,Stete,Local)
Bmd Proceeds
Other
Total Funtling Sources: 200,000 200,000 200,000 200,000 1,2D0,000
Gpifal ExpenAitures:
Design 20,000 20,000 20,000 20,000 120,000
RigM o/ Wey
Conswcfion t80,00p 180,000 180,000 180,000 _ 1,080,000
Total F�cpendlWres: 200,000 200,000 200,000 200,000 7,200.000
Grants/Other Sources
135
City ofAubum Draft Capital Facilities Plan
SEWER FUND (437) CapkalFacllklesPlan
Six Year Capital Facllkfes Plan, 2075-2020 Enterprlse Funds
ProjectTiue: Sewer Vactor Decant Facility
Prbject No: cpxxxx
ProjectType: Non-Capacity (Improvements)
ProjectManager TBD
Deso�iption: "
FiaWs allocated to construct a decarR facility for sewer vactor waste.
Progress Summary•
Staff concluded that the ise of an expanded decarrt building at the M&O facility to decarrt sewage oras impractical,so
attems6ve sites will be e�lored.
Future Impad on Operating Budget:
i}is pmject wo�ld decrease the fuhre operating budget by reducing the e�enses associated with hauling sahuated waste
to tha Gourriy landfill.
Activily.
2074 VE 2014 Vear EnC
Funding Sources: Prior to 2074 6tlmate 2015 Butlget 2078 BUAgat Pro ect Total
UnrestActedSeHerRevanue 30,000 240,000 30,000
GraMs(FeQStete,local)
BwM Proceeds
Other
Total FunAfng Sourcea: 30.000 240,000 30,000
Capibl EupendlNrea
Design 15.000 30,000 15,000
PogM d Wey/PropertyAcquisR/on �5,000 15,000
Conxtluttion 2t0.000
7ota1 Eicpendldires 30,000 240.000 �0,000
Forecasted Project Cost:
roni
2077 2018 2078 2020 2015-2020
Funtling Sourcex
UnresMcted Seuer Rerenue 270,000
GraMs(Ferl,5lete,Local)
Bond Pioceeds
Other
Tofal Funding Sources - Z70,000
Capital F�penditures
Design 45.000
Right W Way/PmpeRy Acquisition 15,000
ConsfNGtlon 21 O 000
Tohl ExpendlWrax - 270,000
Grants/Other Somces —
136
City ofAuburn Draft Capital Facilities Plan
SEWERFUND (431) CapkalFacllkiesPlan
Six Year.Capital Facilities Plan, 20152020 Enterprise Funds
ProjectTitle: Comprehensive Sewer Plan Update
Project No: cpxXXX
ProjectType: Non-Capacity (improveme�ts)
ProjectManager TBD
Descriptlon:
Update the Comprehensive Sewer Plan to be consisterrt with ttie Citys overell Comprehensive Plan update as required by the
Spte of Washington.
Progress Summary:
The Citys consultarrt has completed preliminary work, arid is preparirig a draft document for approval eary in 2015.
Future Impact on Operating Budget:
None
Activity.
2074 YE 2015 Yaer End
Funtling Soureea: PApr to 20'14 Estimate 2015 eudpet 2016 Budgat ProJeet Total
Unrestncted SeNer Revenue 325,000 25,000 350,000
GreMS (Fetl,Stefe.LOCef)
BwW Proceeds
aner
Tobl Funding Sources: 325.000 25,000 350,OOU
Capifal EzPendlWres
Design 325.000 25.000 350.000
IbgM W Way
Construction
7otal Ezpendilures: 325,000 25,000 350,000
Foreeasted Project Cost:
Tota I
2017 20'18 2078 2020 20152020
Funtling Sources:
UnrastncfatlSe�ierRevenue 3W,000 375,000
Grants(Fred,State,Locel)
BorM Proceeds
Other
Tofal Funding Sources: - 350,000 375,000
Gpifal FspenCiWres
�s�9^ 350,000 375,000
R/ght o/ Way
CO/ISfNLf1011 �
Tofal Eupenditures 350,000 375,000
Grdrrts/Other Sources:
137
City ofAubum Draft Capital Facilities Plan
SEWER FUND (431) Capital FaoilkiesPlan
Six Year Capifal FaciUties Plan, 2015-2020 EnterpAse Funds
Project Tiue: Auburn Way South Flooding Improvement - Phase 2
Project No: CP1202
P�oject Type: Non Capaeity
Project Manager TBD
Desoription:
Repl�e the Ciry sewer main and portions of side sewers within fhe rigMof-way in 17th Street SE in conjunction with stortn
drahiage and water improvemeMs.
Progress Summary:
The project is in design and is e�ected to be constructed in the Spring/Summer of 2015.
Future Impact on Operating Budget: �
None
AcHvity
2074 VE 2075 Year Entl
FurMing Sources: Prlor to 20t4 Estimate 2015 BuOget 2018 Budget Project Tapl
UnrestnctBdSeNeiReeenue 65,200 415,t80 480,360
Gients(Fed,State,Lacel)
Bond Proceeds
OLrer
7ofa1 Fundfng Sources 65.200 415,180 480.3fA
CaPifal E:Pendlturcs
Design 65,200 65,200
RigM ol Wey -
Constructirn 415,160 415,160
Tofal F�ipenAlb�res &5.200 475.180 - - --480.380
Forecasted Project Cost:
Topl
2017 2078 2019 2020 201S2M0
FunCing 9ources:
Uniastricted Seuier Revenue 415,160
G�anfs(Fei/,S7ffie,Local)
BwM Pioceetls
Other
Tofal Funtlin9 Sourcea 415,180
Capital FicpenClWres:
Design
R7gM d Wey
Constluction 415J60
Total ExpanAl[urec 475,160
Grants/Other Sources:
138
City ofAuburn Draft Capital Facilities Plan
SEWERFUND (431) Capital FacilkiesPlan
Six Year Capital Facilkfes Plan, 20152020 Enterprise Funds
Projea rue: BNSF Utility Crossings
Project No: CP1308
Project Type: Non Capacky
Project Manager SWeeting
Descriptlon:
Replace one server main which crosses under the BNSF railroaC tracks to ensure that i[complies with pipeline casing
requirements prior to the BNSF consWction of a third Vack within their rightof-way.
Progress Summary:
The project is e�ected to be substantially constructed in 2014 and completed in early 2015.
FuWre Impact on Operating Budget:
No significant impact.
Activity:
2074 YE 2015 Year Entl
Funding Sources P.Aor b 2014 E9lmate 2075 Budget 2076 BUAget Project Tofal
UnresMCtadSe.ierRevarrue 1q,440 356,500 5,000 375.960
Grents(Fed,Stafe,Loca/)
Bond Proceetls _
Other
Totll Funtling Sourcas: 14,440 356,500 5,000 - 373,94U
Capital Fspen0ltures
Des/gn 14,440 15,000 ?g,qqp
Right W Wey
Constluction 341,500 5,000 348,500
7ofa1 Expenditures: 14,440 356.500 5,000 375,940
Foreoested Project Cost:
Tofal
T017 2018 2018 2020 2015Q020
FunCing Sourcea
UniestNcted SeNer Reven�e 5.000
Grants(Fed,State,Lwaq
Bontl Pioceeds
Other
Tofal Funding Sources: 5,000
Capitll Ezpenditures
Design
Right d Way
Constructirn 5,000
Total 6cpenOlNres: - 5,000
GreMs/Other Sowces'
139
City ofAuburn Draft Capital Facilities Plan
SEWER FUND (431) Capital FacilitiesPlan
Six Year Capifal Facilities Plan, 20152020 Enterprise Funds
Project Title: Sewer Pump Station Replacement�lmprovement
Project No: cpxxxx
Project Type: Capacity S Non-Capacity (Repair and Replacement
Projebt Manager
Descriptiori: �
Project(s)to repair, upgrade,and/or replace e�dstirig pwnp stations. Stations aMicipated to need upgrades during ihat time indude:
1. The Valley Meadaws Pump Station.
2. The 22nd Strcet Pump Station.
3. The 81h Street Pump Station.
Progress Summary•
FuWre Impad on Opereting Budget:
The effect on fulure operation budget will be negligible.
Activity:
2014 YE 2015 Vear Entl
Funding Sourrcex Prior to 2074 Estimale 2075 BUAget 2018 Bud t Pro ect Total
Unrestncfed Sewe�Rewnue -
Granfs(FBd,Stffie,Lxal) -
Bond Proceetls
Othe�
Tohl Funtling Sources -
Capifal ExPenClturoa
Des/gn
Right d Way
Construction
Tofal ErzpenAlluros: -
Forecasted Project Cost:
Total
2017 2078 2019 2020 207i2020
Funding Sourcea
Unrestticted Seuer Revenue 1,500,000 1,500,000
Grenfs(Fea',Stffie,Lxal)
BmM PioCeeds -
Other
7oq1 Funtling Sources 1,500,000 1,500,000
Capital ExpendiWres:
Deslgn 300,000 300,000
Right d Way
Corisfruction 1,200,000 1200.000
Total Expendituras: 1,500,000 1,500,00�
GraMs/Other Sou�ces:
140
City ofAuburn Draft Capitkl Facilities Plan
STORM DRAINAGE
Current Facilities
The City's storm drainage service area encompasse"s the municipal boundaries of the City For
management purposes the service area is divided into 60 drainage sub-basins. The City's
drainage system consists of a combination of closed conveyance pipes and open ditch
conveyance facilities, with six pumping stations. Table SD-1 Facilities Inventory lists the facilities
along with their current capacities and location.
Level of Service (LOS)
The City's Comprehensive Drainage Plan summarizes the level of service (LOS), or design
criteria, for the City's storm drainage system. Generally, these standards represent a 25-
year/24hour design storm capacity within the 60 drainage sub-basins.
Capital Facilities Projects and Financing
The City's storm drainage facilities anticipates four capacity projects in the amount of
$1,433,600, 17 non-capacity projects totaling $13,276,442 for a six-year planning
expectation fotal of $14,710,042. Table SD-2 shows the proposed financing plan followed by
individual worksheets showing the project detail.
Impact on Future Operating Budgets
There are no operating budget impacfs forecasted for storrn drainage facilities during the six
years 2016—202-1
141
City ofAubum Draft Capital Facilities Plan
TABLE SD-1
Facilities Inventory
Storm Drainage Facilities
cnPAciTv
Feet of Feet of
FACILITY Acres Pipeline Open Channels LOCATION
Diainage-- - --
easins:
A 562 36,300 1,200 See City of Aubum's
AA 408 17,600 17,100 ComprehensiveDrainage
AAA 296 3,100 5,300 Plan, Dec. 2009
AZ 777 53,400 14,200
B 864 94,400 0
BB 15 1,700 0
BBB 73 0 0
C 836 75,900 5,600
CG 242 1,400 0
CCC 976 56,400 12,900
D 168 18,900 400
DD 231 0 0
DDD 61 4,000 0
E 692 59,400 19,400
EE 600 3,900 0
F S3 9,600 0
FF 411 3,600 900
G 137 18,800 0
GG 190 4,900 3,100
H 559 40,000 4,600
HH 392 0 0
HV 66 5,200 0
I 241 35,300 7 100
II 305 0 0
J 257 5,000 1,100
JJ 1,170 26,600 17,200
K 266 15,100 700
KK 391 0 0
L 87 12,900 600
LL 198 100 1,600
LS 1 138 48,800 0
M 553 32,400 9,900
MM 332 1,900 1,200
N '126 9,800 0
NN 588 11,100 900
NNN 175 400 0
O 176 16,900 3,600
00 1,397 28,500 8,900
P 189 7,800 3,100
PP 110 1,600 0
PPP 161 3,400 4,500
QQ 334 11,400 3,300
142
City ofAuburn Draft Capital Facilities Plan
TABLE SD-1 (continued)
Facilities Inventory
Storm Drainage Facilities
cAaAcirr
Feet of Feet of
FACILITY Acres Pipeline Open Channels LOCATION
R 55 7,200 0
RR 249 11,600 4,700
S 273 13,700 2,200
SS 333 20,900 2,700
T 699 78,300 1,400
TT 135 3,000 0
U 365 9,800 0
UU 453 14,200 700
V 598 19,700 10,100
W 287 30,300 2,400
WC 65 7,900 0
WW 71 1,100 500
X 40 3,600 0
YY 327 23,200 5,600
YYY 105 0 0
2 70 9,700 0
ZZ 949 47 400 17 400
ZZZ 237 0 0
ToWI 22,144 1,079,100 196,100
FACILITY (GPM) LOCATION
Pumn Stations:
White Ri�r Pump Station 17,700 5000 block A Street SE
A Street SE Pump S[ation 1,380 A Street SE near SR-18 and
BNRR oeerpass
Aubum Way S Pump Station #3 1,000 Aubum Way S near SR-18
and BNRR o�rpass
Brannan Park Pump Station #4 20,200 Brannan Paric
Emerald Corp. Park Pump Station 6,500 C Street NE near 42nd Street
West Main Street Pump Station 1,200 1420 West Main Street
143
City ofAuburn Draft Capital Facilities Plan
TABLE SD-2
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
STORM DRAINAGE DIVISION
2015 2076 2017 2018 20�9 202U Total
Cauadb Proietts:
1 Bypass at 2ntl a�G Street SE
Capital Cos Ls - - 50,000 493,800 543,600
Funtling Sources
Slortn Fund - - 50.000 493,800 543,600
Bond Proceeds
2 M Street SE Stwm Improvement
CaO�m� Cosfs a00,000 - 400,000
Funtlmg Sources
Slorm Fund 400,000 - - 400,000
Bontl Prooeeds -
3 Howartl RoaA Improvemetrt
Capital CosS 40,000 250,000 - 280,000
Funtling Sources
Stortn Fund 40,000 250,000 - 290,000
Bond Proceeds
4 S7Sh St NW Storm Improvement
Capital Cos ts 40,000 160,000 - - 200,000
Funtling Sources
Srortn Funtl 40,000 160,000 - - - 200,OOC
BOnd Proceeds
5 M 80 Stam Drainage ImprovemeMs
Capital CosS 840,050 - 640,050
Funding Sources
Srorm Fund 305,080 - - - - 305,080
Granis 9,897 - 9,887
Olher (Wa[er, Sewer, ERR) 525,083 - 525,083
SuMotal.Caoacitv Ptdects:
Capital CosTs 1,320,050 410,000 • • SO,OOD 493,600 2,273,650
Non-Canatttv Proiects:
8 PI{iellne Repa'v &Reptaeeme�rt Program
Capital CosS 1,000,000 100,000 1.000,000 100,000 7,000,000 100,000 3,300,000
Funding Sources
Slorm Fund 1,000,000 100,000 7,000,000 100,000 1,000,000 700,000 3,300,000
__Bond_Proceeds - -
7 /wburn Way SwN flooding,Phase 2
CaPital Costs 1482,392 - - - - 7,482.392
Funding Sources
Stoen Funtl - - - -
. Bond Proceeds 1,482,392 - 1,482,392
8 30th Streat NE Mea AooNng,Phase 1
Capital Cosis 10,000 - - - - - 70,000
Funding Sources
Slortn Fund 10,000 - - - - 10,U0�
Bond Proceeds
144
City ofAuburn Draft Capital Facilities Plan
TABLE SD-2
2075 2076 2017 2018 2019 202U Total
Non-Canackv Proieets:
9 30th Street NE Area Flooding,Phase 2
Capifal CosS - 75,000 600,000 - - - B75,000
Funding Sources:
Storm Fund - 75,000 600,000 675,000
Bond Procaeds -
10 30th Street NE Nea Fooding, Phase 3
Capital CosLs - 200,000 954,000 - 1,154,000
Funding Sources:
Stortn Fund - - 200,000 954,000 - 1,154,000
Bond Proceeds - - - - - _
11 West Main Street Pump Station Upg}ade
Capifal Costs 125,000 985,000 - 7,770,000
Funding Sources:
Stortn Fund 125,000 985,000 - - - - 7,110,000
Bond Proceeds - - -
12 StreetUtilitylmprovements
Capihal CosS 100,000 100,000 100,000 100,000 100,000 100,000 60U,000
Funding Sources:
Stortn Fund 100,000 100,000 100,000 100,000 100,000 100,000 600,000
Bond Proceeds - - - -
13 Compreher�iva Storm Drainage Plan Update
Capital Cos6 10,000 - - - - 250,000 260,000
FunCing Sources:
Stortn Fund 10,000 250,000 280,000
Bond Proceeds - - - _
14 Mill Geek Wetland SK Reach Restoration
Capital Costs 255,000 5,000 55,000 55.000 5,000 - 375,000
Funding Sources:
Stortn Fund 5,000 5,000 55,000 55,000 5,000 - 1Y5,000
CxanLs 250,000 - - - - - 250,000
General Fund - - - _
15 Eastrftlge Manor OuNall Replacement
Capital Costs 810,000 - - 810,000
Funding Sources:
Stortn Fund 810,000 - - - 870,000
Grants - - - - - -
Bond Proceeds - - - -
16 BNSF Utilities Crossing
Capital CosLs 10,000 - - - 10,000
Funding Sources:
Srortn Fund 10,000 - - - - 10,000
Grants - _ _ _
Bond Proceeds - - - - _ _
145
City o.fAuburn Draft Capital Facilities Plan
TABLE SD-2
2075 2018 2017 2018 2019 2020 Tctal
17 Compostlng Facilky
Capital CosLs 750,0�0 - - - 750,OU0
Funding Sources:
Storm Fund - 750,000 - - - 750,000
Bond Proceeds - - - - -
18 MIIsWe Dreinage AssessmerH
Capital Cosk 150,000 750,000 150,000 - - 450,000
Funding Sources:
Slorm Fund �50,000 150,000 150,000 - - - 450,000
Bond Proceeds - - - -
19 North Alrport Area Improvements
Capifal Costs 40,000 135,000 - - - 175,000
Furiding Souroes:
Slortn Fund 40,000 135,000 - - 775,000
Bond Proceeds - - -
20 DStSEStam ImprovemeM
Capital Costs - 75,000 600,000 - - 675,000
Funding Sources:
Storm Fund - 75,000 600,000 - - 675,000
Bond.P.roceeds - - -
2'I Mnexation Area Small Storm Improvement
Capipl CosLs 40,000 260,000 40,000 260,000 - - B00,000
Funding Sources:
Stortn Fund 40,000 260,000 40,000 260,000 - - 800,000
Bond Proceads - - - - - -
Subtotal.NoirCaoackv Prolects:
Capiial Cosfs 4,032,392 1,810,000 2,770,000 1,315,000 2,059,000 450,000 12,436,392
SUMMARI'•
CAPRAL COST5
CapacityProjects 1,320,050 410,000 - - 50,000 493,600 2273,650
Non-Capadty ProJects 4,032,392 1.810,000 2,770,000 1,315,000 2,059,000 450,000 12,436,392
Total Costs 5,352,442 2,220,000 2,770,000 1,315,000 2,109,000 943,600� 14,710;042-
RINDING SOURCES:
Stortn Fund 3,085,080 2220,000 2,770,000 1,315,000 2,109,000 943.600 12,442,680
Grants 259,887 - - - - - 259.887
Otlier 525,083 - - - - - 525,083
Bond Proceeds 1,482,392 - - - - - 1,482,392
Total Funding 5,352,442 2,220,000 2,770,000 1,315,000 2,109,000 943,600 74,710,042
146
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capifal Facilities Plan
Six Year Capipl FacilRfes Pian, 20152020 Enterprise Funds
Project Titie: Bypass at 2nd and G Street SE
Project No: cpxuux
Project Type: CapaCity
Project Manager TBD
Descrfption:
TYtis project will iretall a parallel bypass pipe to cornrey upstream fbws arourid a localized low spot located at 2nd and G
SVeet SE. The existing line will serve to drain the localized low spot.
Progress Surrimary:
Future Impact on Operating Budget:
No significarrt impact.
Activity.
2014 YE 2075 Year EnC
Funding Sources: Prior ro 2014 Eatimafe 2015 Butlget 2076 Budget Project Tolal
UnrestActed Storm Revanue "
Giants-Secured(Fed,State.GoceQ
Bond ProceeUs
Other
Total Funding Sourcew _
Gpital EipenOitures:
Design
Rlghf oI Wey
ConstnicHon
Tofal ExpanCitures: _
Forecasted Project Cost:
Total
2077 2078 2019 2020 2U7&2020
FunAing Sourws:
Unrestnctetl Storm Revanue 50,000 493,600 543,600
Grants-Securetl(Fetl,Stzle,Locel)
8ontl Proceed5
Oflrer
Total Funding Sources: 50,000 493,800 543,800
Capital ExpanAitures:
Design Sp.ppp Sp.ppp
R'ght o/ Way
Consfructlon 493,600 493,600
Total ExpBndiWres: 50,000 493,600 543,600 '
Grants/Other Sources:
147
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capita� Facilities Plan
Six Yea[Capital_Facilihes Plan,_2015r2020 Enterprise Funds
Project Tine: M Street SE Storm Improvement
Project No: CpXxx
Project Type: Capacity
Project Manager TBD
Descriptlon:
This Project will iristall a replacemeirt pipe of greater capactty from 3rd Street SE to A�in Street to alleviate perbdic flooding in th(s
area as a result of upsiream flows.
Progress Summary•
Future Impact on Operating Budget:
None, since this is a rePlacemeM pips.
Activity:
2014 YE 2075 Vear End
Funding Sources: PNor to 2014 Estlmate 2015 Budget 2076 Budgat Pro ae[Total
UnresMcted Srorm Revenue 30,000 400,000 430,000
Grants-Secu�ed(Fed,Stffie,tocal) - -
BpM Proceeds -
Other
TMaI FunGing$ources: 30,000 400,000 430,OD0
Capipl EipanWWret
Deslgn 30,000 60,000 90,000
RlgM W Way
Con57NCf/on 340,000 340,000
Tofal FxpenNWrea 30.000 000,000 430,000
Foreaasted ProJect Cost:
TOTaI
2017 2018 2019_ 2020 20152020
FunEing Sourcem ' �� �
Unrestncfed Stam Reuenue 400,000
Grents-Secured(Fetl,Stete,Locel)
Bond Pioceeds
Other
Total Funding Soureee: 400,000
Capital ExpenCitures:
Deslgn 60.000
Poghf W Wey -
Construttion 340,000
Total Expenditures - �0.��
Granta/Ottiet Soumes:
148
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capital Facilities Plan
Si�c Year Capital Facilkies Plan, 2015-2020 Enterprisa Funds
Project Tiue: Howard Road Improvement
Project No: cpxxx
Project Type: Capacity
Project Manager TBD
Desaription:
Improve tlreinage ditch capaciry alorg the nortli side of Howard Road. Improve inlet capacity antl upsize e�tisting conveyirg line
which flows rroAh through the Coal Creek Sprirgs Pwnp Stafion property. hisiall overflow Iine wifh adjustable gate to the epsting
line flowing westerly in 21st SL SE.
Progress Summary•
Futu�re Impact on Operating Budget:
None
Activity.
2074 YE 2075 Year En0
Funtling Soureen PNor ro Y014 Estlmate 2015 Butlget 2018 Budgat Project Total
UnresMtted Sfam Revenue 40,000 250,000 40,000
Grenfs-Securetl(Fed,State,Local)
Bond Proceeds _
Other
Totnl Funtling Sources: 40,000 250,000 40,000
Capilal Expsnditurea:
. .�5�9� 60.000 40.000
Right W Wey
COIISINCf%O/1 'lSO�OOO
Total F�cpendl0irex 40,000 250,000 40,000
Forewsted Project Cost:
Total
2077 2018 2019 2020 201&2020
Funding Sources:
Unrestncted Sform Re�enue yyp ppp
Giants-Securetl(Fea',Sta[e,LocaQ
Bond Proceeds _
Other
Total Funtlinq Sources 290,000
Capifal Expendilures:
Design qp ppp
rx�nr a way _
C�.OIISfNCIIOII Zr�.O�
rorai �,cpana�ares: zso,000
Grants/Other Sources:
149
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capkal Faciluies Plan
Six Year Capital Pacilitles Plan, 201Y2020 Enterprise Funds.
Project Title: 37th St. NW Storm improvement
Project No: CpXJf7c
Project Type: CapOcity
Project Mareger TBD
Deswiption:
This proJect would increase epsting pipes to provide addkional capaciry to alleviate ounent periodie flooding conditions in vicinity of I
St NW This would also provide relief to the flooding e�erienced on the Irrterurban.Bike Traii.
Progress Summary:
Future Impact on Opereting Budget:
None
Activky:
2014 YE 2075 Vear End
FunEing Sources Prlor to 2074 E.stlmale 2015 Butlgat 2076 Butl et Projaet Tofal
UnresMcted Storm Revenue 40,000 780,000 40,000
Grents-Secmad(Fed,State,tocal) -
Bmd Proceeds
Other
Tohl FunEing Sourcea 40.000 - t60,000 �0.000
Gpltal ExpenOibiros
Design 40,000 40.000
R/ght W WaY '
ConSt2C17on 160,000
Total Ezpentliturea 40.000 160,000 40,000
Forecasteil-P�oject Cost:
Tofal
zon zo�e za�s Zazo zo�s-zozo-
Funding Sourcec
UnresMctetl Sfam Re�nue 200,000
Gianfs-Securad(Fed.State.Locaq '
BwW Proceeds -
Oti�er
Total Funding Sources: 200,000
Capital Fspentlitures:
Des/gn 40,000
RigM d Way -
CansfNcf%on . 160.000
Total EapentliWres 200.00D
Grants/Other Sources:
150
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capiql Facilities Plan
Six Year Capiql Facilities Plan, 20152020 Enterprise Funds
Project Tt1e: M &O Storm Drainage Improvements
Project No: CP1320
Project Type: Capacity
Project Manager Seth �CkStrOm
Desoription:
This project will co�struct storm drainage improvements and a�and the vacror decant facility at the Citys maintenance and
operations facility.
Progress Summary•
The City received a grant from the State Departrr�erK of Ecologytotaling $999,400 in 2013. Preliminary design has been
completed ard final design is in progress. Arrticipated bid award in October2014.
FuWre Impact on Operating Budget:
None
Activity: - - --- --
2o�a ve zot5 vear�d
FunAing Sources: Prlor to 2014 Estlmate 2015 Budget 2016 Butlget Prqect Tobl
Uniestncted S[orm Revenue 164,920 305,080 470,000
Grants-Secu2tl(Fed,State,Loca/) 889,5i3 9,867 999,400
BwW Proceeds
Other(Water, SeHer, ERR) 164,917 525,083 690,000
Total Funtling Sources: 7,319,350 840,050 2,159,400
Gpipl Ezpenditures:
Design 485,300 485,300
R'ght o/ Way _
Consf2cMon 834,050. 840,050 1,6�4,t00
Total Expenditures: 1,319,350 840,050 2,159;400
Foreeasted�Project Cost:
Total
2017 2018 2019 2020 20752020
Funtling Sources
UnresMctetl Storm Revenue 305,080
Grants-Secuied(Fed,State,Local) g,gg7
Bond Proceetis _
Other(Water, Seue� ERR) 525,083
Total Funtling Sources: 840,050
Capital Erzpenditures:
Design
Right o/ Way
ConSINCflon 840,050
Total F�cpenditures: - gqp,p5p
Grants P Othar Souices:
151
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capital FacilF[ies Plan
Siz Year_Capifal_Facilities_Pian,_20152020_ Enterprise_Funds_
- — - -- - - - - -- - - - - - -- - - --- ---- -------- -- -
Projed Tiue: Pipeline Repair & Replacement Program
Project No: c(ixxxx
Project Type: Non-Capacity
Projeot Manager TBD
Description:
Projects iderrtified as those requiring replacement of epsting irttrastructure. These projects support street repairs and other
utilily replacement programs, requiring coordination.
Progress Summary•
Fulure Impact on Opereting Budget:
No significant impact.
Activky:
(PreHous 2 Vrs.� 2014 YE 20t5 Year Entl
Funtling Sources: Prior to 20�4 Estimate 2015 Butlget_ 2018 Butlget___ Project Total_
Unrestr/ctetl Storm Revenue 339,563 200,000 1.000,000 100,000 1,539,563
oisn(s-seculeo�(Fed,Srere,�ocaq - - -
Borrtl Pioceeds
Other
Total Funding Sources: 339,583 200,000 'I,000,000 t00,000 7,539,583
Gpibl Fipentlitures:
Des/gn 100,000 -
R/ght ol Way -
Constructfon 339,563 200,U00 .1,000,000 t,539,563
Tofal Expentliturex 339,583 200,000 1,000,000 100,000 1,538.563
Fo�edasted�P�oject'Costi� -� - � - - �� � � �-- �
rotal
2017 2018 2079 2020 20152020
Funding Sources
UnresMctetl Stbmn Revenue 1,000,000 100,OD0 1,000,000 100,000 3,300,000
G2nrs-secuied(Fetl,srare,Loca/)
Bond Proceeds
Other
Total Funding Sources 1.000,000 100.000 7.000.000 700,000 3,300,000
Gpital ExpentliWres:
Design 100,000 100,000 300,000
Right of Way
ConstrucNon 'I,000,000 1,000,000 3,000,000
Total ExpendlWres 1,000,000 100.000 1.000,000 700,000 3.300,000
Grants/Other Sources:
152
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capital Facilities Plan
Six Year Capital Facilkies Plan, 20152020 Enterprise Funds
Project Tine: Auburn Way South Flooding, Phase 2
Project No: cp1202
Project rype: Non-Capacity
Project Manager TBD
Description:
Construct cbrnreyance improvemerrt to 17th SVeet SE as part of Metro realignmerrt project. Replace ewsting conveyance
line from A Street SE to K Sheet SE aM add an additional 7 ac-ft. of storage witNn the ewsting A Street SE detention
pond.
Progress Suinmary•
Future Impact on Operating Budget:
No significantimpact.
Activity
2014 YE 2075 Year End
Funtling Sourcea: Prlm to 2014 Estlmate 2015 Budgat 2076 BUAget Projaet Total
Un2sMcted Storm Reyenue '
Grants-SecureO(Ferl,State,Loce/) _
Bond Proceeds 82,O6B 75.000 1,482,392 1,839,460
Other
Total FunCing Sourcac: 82,068 75,OD0 1,482,392 �,gg9,q5p
Upihl Enpendilures:
Daslgn 82,068 75,000 157,068
Right ol Way
Canstmchon 1.482.392 t.482.392
Total EzpendiNrea 82,068 75,000 1,482,392 7,839,460
Foreca§ted P�oject Cost:
Tonl
2077 2018 2079 2020 201$-2020_.
Funding Sourcos
UnresMcled Slom�Rewnue
Grenfs-Securetl(Fed,State,Locel)
Bontl Pioceeds 1,482,392
Otlre�
Total Funding Sourcex ��pgy;gy
Capipl ExpendiWres:
Deslgn _
RigM d Wey
Construction 1,482,392
Tofal ExpentliNrea: 1,482.392
GreMs/Other Souices:
153
City of Auburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capkal Faeilkies Plan
Siz Year CapHal Facflitles PW�n,20152020 Enterprise Funds
Projectrne: 30th Street NE Area Flooding, Phase 1
Project tdo: cp1122
Pro�eccTyPe: Non-Capacity
Projectnnanager Kim Truong
Descr�tion:
This projectwoWd irxtall a new stortn drain from ihe NW comer of the airport property(MH N07)to the ezstlng Brannan
Park storm pump station.This pipe would replace the e�dsBrg 30-inch dlameter plpe generally located along @ie 30th St.
NE aligrvnerrt ard ihe rortherfy bo�dary of Brannan Park by improvirg the corneyanoe system's hydraWic capacity,
thareby reducing the potential for stortnwaterflooding into the street.
• 3,820 feet of 42-in.-diameter gravity storm drain from ihe NW comer of airport propertyto the existing Brennan Park stortn
p�arip station
• Removal of floatable capGue baflles upstream of fhe B2rn�an Paric pump sfation(fhese are rot needed to protect the
piunps and reduce ihe system's hyd2Wic capacity)
Progress Summary:
Future Impact on Operating Budget:
No significaM impact.
Activky.
zou ve zo�s rear Ena
Funding Sourees: Priw ro 2014 6tlmate 2015 Budgat 2016 Budget P.ro eet Total
UnresMcted Storm Rerenue 290.702 1,093.653� t0.000-- -- --- ---� � -1.394.355
GraMs-Secuiad(Fed,Stete,LoceQ
Bond Proceeds 2,408,347 2,406,347
Other
ToTal Funding Sourcea 290.702 3,500,000 70.000 3.800.�02
CaPltal Expen0lturea:
Deslgn 290,702 80.000 350,702
RigM ol Way
Consbuct/on 3,440,000 10.000 3.450.000
Total Expendituros: 290.702 3.500,000 10,000 3,600.702
Forecasted Project Cost:
romi
2on 2ote 2oi8 2020 2otS2020_
FunEingSources: ' - '- ' ' -- -
UnresMttetl Storm Revenue 10,000
GrsMs-Secured(Fed,State,Local)
Bond Proceeds -
Other
Tofal FunAing Sourees: - 10,000
Capital F�cpenditures:
Design -
RigM d Wey -
Constructidr 10,000
Total FxpendlWree: 10,000
GraMs/Other Sources�
154
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capi[al FacllRies Plan
Six Year CapMal Pacilkies Plan,2075-2020 Enterprise Funds
ProjeaTitle: 30th Street NE Area Flooding, Phase 2
Project No: GpXXXX
Project rype: Non-Capacity
Project Manager T BD
DesaNption:
Locate a storm drain�ne to capture stormwaterfrom the Mo residentlal developmeMs at tlie west edge of the fortner
CRISTA Mirristrfes property.CurreMly, stormwater flows are discharged orrto a depressed area on llie CRISTA Ministries
propertywhere ifs irfittration is limited by high groundwater lewls Mat ocaa durirg e�Qended periods of high flows on the
Green Rirer This phase would constrtict a new stortn drein within I St. NE soulhward to connect irrto the upgraded 42-inch
diameter(Phase 1) storm drain nearthe iMersection at I St. NE and 30tti St NE. The 42-inch diameterlina would have
sufficierrt available capacity to corney ihe I SL NE flows.Key componerhs of Phase 2 include:
• 1,760feet of 15tinchdiametergravitystortnd2in
• Catch basin and inciderrta�grading to collect stortnwater at ihe upsVeam end of system
ProgressSummary•
Future Impac!on Opereting Budget:
No sigrrificarrtimpact
Acfivlty.
2014 VE 2015 Year End
Funtling Sources Prior to 2014 Estlmate 2075 Butlget 2018 Bud t ProJee[Tofal
Unrestnctetl Stam Re�enue 75,000
Grents-Secured(Fed,State.Locaq
BaM Pmceeds
Other
Total Fun0ing Sources 75,000 -
Gpipl Expentli[urex
Design 75,000 -
Right d Way
CO/19�NC1/OIl
roeai�Pe�ain,�es �s.000
Forecasted ProJect Cost:
Total
2017 2018. 2019 2020 2D15-2G20
Funtling Sources -
Unrestncted Storm Revenue 600,000 675,000
Grents-Secured(Fed,Stafe,Loca/) _
Bontl Proceeds _
Other
Total FunAing Sources: 800,000 875,000
Capital ExpendlWres:
Desi9� 75,000
R'ght o/ Way _
ConStNGfion 600,000 600,000
Tofal ExpenNtures: 600,000 675,000
Gran[s/Olher Soumes
�55
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capkai Facilnies Plan
Six Vear Capital Facilkies PWn,20152020 Enterprise Funds
Projea Ttle: 30th SVeet NE Area Flooding, Phase 3
Pro�a No: cpxxxx
ProJect7ype: Non-Capacity
Project Manager T BD
DescNp;fon:
TiYs projectwoWd reduce flooding in C St NE by 2directing wet weather Ngh flows souThward b� fhe 42-Inch diameter
(Phase 1) storm drain in 30tli St NE. By re.directing the C St NE drairege irrto ttie Brannan Park system,Uiese flows would
rq longer be afiected by Hgh water ievels in Mill Creek.7o awid deepeNrg the Phase 1 gravity lirie (and extensiw retroflLs
to the Brannan Park pump s�tlon),this projectwould include a v.et weatl�er p�anp station and Torce main connection to 30(h
SL NE. The upgraded 42-inch diame[er pipe In 30th SL NE woWd ha�e suflicieM capacityfor t}iese additional flows.Key
componerds of Pfiase 3 include:
•Wet weather purtip sti.tion(estirtiated capaciry of 4.5 to 7 cis).
• 1,730 feet of 15-inch diameRrforce main
• Di�.ersion struchue in C St NE for p�anp station
Progress Summary-
Future Impact on Operating Budget:
No sigrdflcaMimpact.
Activky.
2014 YE 2013 Year End
Funding Sourcas: Prlor to 2014 EstlmaOe 2015 Budget 2018 Budget Pr eet Total
UnresMcfetl Storm ReJenue
Grents-Secured(Fed,Stste,Local) -
Boritl Pioceeds -
Otlrer
Total Funtling Sourus -
Gplql Ezpenditurcs
Design -
R(gflt ol W8y
C.OPSINCIIOl1
Total Espentlitures -
Forecasted-Prujed Cost: �
roea�
2017 2018 2019 .2020- 20158020
Fundfng Sourcex --" ' - " '
UnrasMcred Storm Re�nue 200,000 9;vi,000 1,154,000
Grants-Secured(Fed,Stffie,Loca/)
Bond Proceeds
Other
Total Funtling Sources: 200,000 954,000 1,154,000
Capital Ezpantlitures
Design 200,000 200,000
R'ght d Way -
ConstNGtion 954,000 954,000
Tofal Expend(tures 200,OD0 956;000 - 7,154,000
Grants/Other Sou�ces:
156
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capifai Facilities Plan
Sirz Year Capital Facilkies Plan, 20152020 Enterprise Funds
Project Ttle: West Main Street Pump $tation Upgrade
Project No: cpxx�c
Projea Type: Non-Capacity
Project Manager• TBD
Descriptan:
1Tvs project will update the epsting pump station by providing a redundant pump and telemetry system meeting level of
seroice goals.
Progress Summary:
Fuhrre Impact on Operating Budget: - -
No significarrtimpact.
Activity:
zou re m�s rear�ia
Funding Sources: Prlor ro 2014 Estlmate 2015 Budget 2018 BUCgat Pro act Total
Uniesfnctetl Storm Revenua 125,000 985,000 �125,000
Grants-Securetl(Fed,State,Locel) _
Bond Proceetls
Ofher
Total Funtling Sourees: 125,000 985,000 125,000
Gpital ExpendlNres:
Des/gn 125,000 125,000
Right W Way
Constrvction gg5.ppp
Total EzpendiNres 125,000 985,000 125,000
Forecasted ProJect Cost:
Toal
2077 2018 2079 2020 20152020
Funtling Sources:
Uniesfnctetl Storm Revenue 1,710,000
c.a�rs-sec��ea(Fed,srara,i.ocaq
Borrd Proceeds
Other
Total Funding Sources 1,770,000
Capital ExPenAiWrea
Design 125,000
w�nr a way
COI15f2GI%0I) 9�r��
7om1 Expenditures: 1,170,000 I
Grarrts/Other Sources:
157
City of Auburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capftal Facillties Plan
Six Year Capital Faclikles Flan, 2015-2020 EntPrprise Funds
Pmject Tine: Street Utiiity Improvements
Project No: CpxncX
Project Type: Non Capaeity
Project Manager• TBD
Description:
Stortn drainage corneyance improvemer�is in coordination with Arterial and SOS improvemerrts.
Progress Summary:
Future Impact on Operating Budget:
No.significant Impact.
Activity:
PreNous 2 yeers 2014 YE 2014 Y88r EnG
Funtling Sources: Prlor to 20t4 Eetlmate 2015 Butlget ]O18 Bud et Pro ect Total
UnresMcted Stwm Re�+enue 233,367 100,000 '100,000 333,367
Grarrts-Securetl(Fed,Stffie,Lxel)
BaM Proceeds -
Othar
Tofal Funding Soufces 233.367 100,000 �100,000 333,387
GPital Expenditure8:
Deslgn 15.296 75.296
RigM d Way
Construcfion 2t8.07t 700.000 t00.000 318,071
Total FxpenEiturec 2.73.367 100,000 7D0,000 333,3W
Fo7ecasted Project Cost:
Total
zo�� zo�e zo�s zo"so za�szozo
Funding Sourpa �
UnresMcled Sfam Re�snue 100,000 10D,000 100.000 700,000 600,000
cranrs-secu�ed(r-ed,srare,toceq - -
BaM Proceeds -
Other
Total Funding Sourcos: 700.000 700,000" "" 100,000 100,000 600,000
CaPltal EzpenCiSuras
Des/gn
RigM d Way -
ConSlruGlion '100,000 t00.000 100,000 100,000 600.000
7otll EzpenAiturex 100,000 100,000 � 700.0�0- �700,000 800,000
G2nta I Other Sou�ces:
158
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capifal Facitities Plan
Six Year_Capital FadlRles Plan, 2015-2020 EnterpNse Funds
Project rUe: Comprehensive Storm Drainage Plan Update
Project No: cp1405
Project Type: Non-Capacity
Projec[ Manager Carlaw
Description:
Update fhe Comprehensive Storm Drainage Plan to be consisterrt with Ne Cilys overall Comprehensive Plan update as required
by the State of Washington.
P�ogress Summary•
Future Impact on Operating Budget:
None
Activky.
2014 VE 2015 Year End
Funding Sources: Prior to 2014 Edimate 2015 BudBet 2U78 Budget ProJec!Tobl
Unrestncted Storm Revenue 340,000 10,000 350,000
Giants-Securetl(Fetl,Stafe,Local)
BorM PiotBedS
Ofher
Total Funding Sourws; 340,000 10,000 350,000
Gpital E:penditurea
Design 340.000 10.000 35p.ppp
R79M o/ Way
CbI15INC1%O/l
rmai �penaim.as: aao;000 �o,000 aso,oao
Forecasted ProJebt Cost:
Tobl
2017 2018 2019 2020 20152020
Funtling Sourcec:
UnrestrVctetl Storm Revenue 250,000 260,000
Grants-Securad(Fed,Stale,Lxel)
Bond Proceeds _
Other
Tofal FunAing Sources: 2W,000 260,000
Gpltal EupenAltures:
�5�9� 250,000 260,000
Right d Way _
Construction
Tofal Expend(hres 250,000 260,000
G2Ms/Other Soumes:
159
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capital FabtlHies Plan
S6c Year CapMal Faellkles Plan,20�5-2020 Enterprise Funtls
Projectrne: M ill Creek Wetland SK Reach Restoratfon
Projeet No: CP0748
ProjectType: Non-CapaCity
ProjeetMariager. Mdersen
D6scriptlon:
Mi0 Creek Wetlantl SK reach(W5K)is a stream res[oratlon prvject ro pro�ide improwd corn�eyance and habitat abng an
appro�dmate one mile reach W Mill Creek between West Main Street and SR�67 The project i nclud_es coretruction of a
new larger stream cuWert at 151h Street NW for impro�d hytiraulic cornreyance.and fish passage,removal of irrvasive
�egehation,nati�.e tree and stvub plarrtrigs. The project is being conducted in partnership with tte Artny Corps of
Ergireers�mder ihe Corps'Ecosystem Restoretion Program.The Citys wst share tor construction is 35%,and the
fetleral cost share is 65%.The value M Cily-owned WnCs used for ihe project are c2dited towarcJ the Citys cost share.
Total fede2l firWirg for the proJect(not shown below)is appropmatey$3.9 million basetl on llia most recerrt Corps
estimates of�$8 million for total project costs.
Progress Summary•
Tha City has executed a tlesign agreemerrt with Cie Army Corps of Ergineers,and 35 percerrt of tlesign vras completed in
20�2;firel design is schedWed to complete in eary20�4.Ne#steps inclutle reai estate and rigM of way
acqusitloNcerbfieatlon,with corstructlon schedWed for 2014-20'15.A Project Partriership(corstructlon)ag2emerrt�vill
neetl lo be ezecuted between the City and ttia Corps priorlo real estate acqWsition and consVuctlon.
Future Impact on Operatlng Budget
Moritoring arxl mairrterence d�aing tlie req�rired 5 year mordtoring period is part of ttia o�.erall projectcosis.
AeLivlry:
zou ve �zo�a veer�a
Funtling Sources: Prlor ro 2076 EstlmaOa 2015 BuC t 20t8 Butl at Pro aU Tofal
GeneialFuntl 29,798 29.'198
Urvesfncfetl5tormReranue 23,590 1.10'I.4t0 5,000 5,000 t.t35.000
Grsnts-Securetl(Fetl,State,LocaQ 289,693 282.000 250,000 BOt,693
Gty(Real Es[afe Ownetl) - -
Tofel FunEing Sourcea: 322,481 �.383,410 255,000 S,OOU 1,865,891
CaPffal Erzpendlturas
Desiyn 327,521 48,4'10 389,93t
Righfo/Wey %0 350,000 250.000 600,960
LERRD(]etlrt (900,000)
Construchon 1,885 000 5 000 5,000 1 890 000
TotelF�cpBnClWrea: 322.481 1.389.410 255,000 5,000 1,960,897
Forecasted Projeet Cost:
Total
2077 2018 2078 2020 2013-2U20
Funding Sourees ---' " - -"-'-- - "'- "-' ' --
General Funtl -
Unrestr/cled Stam Revenue 55,000 55,000 5,000 725,000
GreMs-Securetl(Fetl.Sfate.Locel) - - 250.000
Gty(Rea/Estate OxnedJ - -
Total FunGing Sourcea: 55,000 35,000 5,000 - 375,000
Capltal ExpenCifuias
Design -
Po'9�t of W aY 250.000
Construction SS,D00 55.000 S.OW_ 125,000
Totel F�cpanCilurea: 55,000 55,000 5,000 - 375,OOf
160
City ofAuburn Draft Capital Facilities Plan
$TORM DRAINAGE FUND (432) CapiWl Facilkies Plan
Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds
Project T�tie: Eastridge Manor Outfall Replacement
Project No: cp1316
Project Type: Non-Capacity
Project Manager Matt Larson
Description:
Replace the epsting deteriorated ou[fall with new High Dersity PolyeUrylene (HDPE). Two existing outfalis may be
combined into a sirgle outfall. hnprovemerrts to the GoH Course corneyance system may be needed.
Progress Summary:
None
FutuPe Im{iad on Opereting Budget:
None
Activity.
2014 YE ?A15 Year End
Funding Sourcex Prior ro 2014 Estlmate 2015 Budget 2016 Budget Project Total
UnresfnctedSfam Revenue 7100 350,000 810,000 1,787100
Gren[s- Secured(Fed,Stafe,Locaq
BorW PmceeUs _
Other
Total Funding Sources: 7100 350,000 810,000 1,767100
Capifal 6Pendihires
Deslgn 7100 165.000 172.100
RlgM o� Way 185,000 185,000
cw,sm,cuw, a�o.000 e�o.000
Total Erzpendiwres: 7,100 350,000 810,000 1,167100
Forecasted Project Cost: -
roml
2017 2078 2019 2020 207i2020
Funding Sources
UnresMcted Stam Revanue - 810.000
Grants- Secured(Fed,State,local) _
Bond Proceeds _
Other
Total Funding Sourcex -� _ g�p ppp
Capital Erzpendlwres:
Desl9n ' ' '
Right ol Way
Construction 810.000
Topl F�cpendfL�res: - 810,000
G2Ms /Other Sources:
161
City of Auburn Draft Capital Fqcilities Plan
STORM DRAINAGE FUND (432) Capftal Facllities Plan
Six Year Capipl FaoilRies Plan, 20152020 Enterprise Funds_
Project Title: BNSF Utilities Crossing
Project No: cp1308
Pro)ect Type: Non-Capacity
Projed Manager Kim Truong
Description:
Replace or eMerid as needed the epsting crossirg casings to accommodate the 3rd rail improvement.
Progress Summary•
Project design will be complete in 2014 and construction is an6cipated to start in early October
Future Impaot on Ope�ating Budget:
None
Activity:
201a YE 2015 vear Ena
FunAing Soureea . _P.dor_ro 2016 6rimate 2075 ButlBet 2018 Budgat Project Tolal
UnrestAeted Sform Reeenue 41,356 10,000 51,358
Gianfs-Secured(Fed,Stffie,Lacal) -
Bond ProceeUs 97.583 402,417 500,000
Ofher
Total Funding Sourtas: 97,583 443.775 70,000 551,358
Capital ErzpsnOituroB:
Des/gn 97,583 40,131 137,7t4
Rlght oI Way
Constrt�cfion 403.642 _ 10,000_ 413,842
Total ExpandiMes: 97,583 443.77] 70,000 551,358
Foreca§ted Projed Cost:
ToUI
20» zo�e 2ota zuzo zoiszoio
Funding Sourcea
Unrestncte0 Sform Revenue 10,000
Granfs-Secured(Fed,Stete,Loca/) -
Bontl Proceeds -
Otl�er
7ofal FunEing Sourcee: 10,000
Capipl ExpendiNrea
Design -
Wght d Way
r.OIiSINCflOI1 10.�00
rorai�pena�mras: +o.oa
GraMs I Othar Sources:
162
City ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capital Facilities Plan
Six Year Capital Facilities Plan, 20752020 Enterprise Funds
ProjectT�tle: Composting Facility
Projed No: CPxxxx
ProjectType: Non-Capacity
ProjectManager• TBD
Description:
Property acquisition and site improvemerrts to consVuct a composting facility.
Progress Summary:
Future Impact on Opereting Budget: �
Impacts to the operating budget will be analyzed and calculated once the timirg of expenses is determined.
/►ctivity.
2014 YE 2a15 Year Entl
Funding Sources: PAor.b 2074 Estimab 2015 Budget 2018 BUA9et Prqact Tofal
Unrestncfed Stam Rarenue -
Grarrts-Secmad(Fed,State,Loce!) _
Bond Proceeds _
Other
Total FunAing Sources:
Gp1181 ExpenClturox
Desi9n
Righf ol Way -
r.OlISfNCf/0I1
rorai F�Cpeomwrec _
F.orecasted Prbject Cost:
rora�
2017 2018 2079 2020 2015-2020
Funding Sources:
Un2stncted Stam Revenue 750,000 750,000
GreMs-Secured(Fetl,Stete,Local)
BwM Pioceeds _
Ofhe�
Total Funding Sources 750.000 750.000
Capinl F�pentllWres
Des�gn _
RigM ol Wey 750,000 75p,ppp
(�.p/ISt2Cf(011
Tofal EzPentlituras: 750.000 750,000
G2rrts/Othm Sources�
163
City of Auburn Draft Capital Facilities Plan
STORM DRi41NAGE FUND (432) Capital Facilities P1an
Six Yea[Capital Facilkies Plan, 20152020 Enterprise Funds
Project TiUe: Hillside Drainage Assessment
Project No: cpxxx
Project Type: Non-Capacity
Project Manager. TBD
Description:
The existing dreinage system includes pipes ttiat discharge arer hillsides.While a preliminary inventory antl mapping of locations
has been completed,field-locating and detailed inspection is warrarHed lo d�ne deficiencies.
Progress Summary•
Future Impact on Operating Budge;:
None
Activity:
2014 YE 20t5 Vear Entl
Funding Sourqs Prior b 2074 Eatlmate 2075 BUC at 2076 BuA at Pr act.Tohl
UnresMctetl Storm Rewnue �� � = 150,000 150,000 150,OD0
Grants-Secuiatl(Fetl,State,Loca/) -
Bond Proceeds -
Othar
Total Funding Souices '150.00D 750.000 750,000
GpiLl Ezpenditures
Deslgn 150,000 150.000
RigM d Wey 50,000
Carrxtructfon ..tU0.000
Total Expe_ntlituroc 150,000 750.000 t50,000
Forecasted Project Cost: �
Totel
2017 2018 2019 2020 2015-2020
FunCfng Sourcds:
Unrestrtcted Stwm Revenue 150,000 450,000
Grents-Secured(Fed Stefe,Local)
BOM Proceads
Ot/rer
Tobl Ftinding Sources 150,000 450,000
CapkalEnPentliNraa
Design 150,000
PogM d 6Yey 50,000
ConsINCHon 150,000 2W,000
7otal ExpentliWres: 150,000 � � � 450,000-
G2rrts/Other Sources'
164
Citv ofAuburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capitai Pacii'ities Plan
Six Year CapiWl Facilities Plan, 20152020 Enterprise Funds
Project TUe: North Airport Area Improvements
Project Na: Cpxxx
Project 7ype: Non-Capacity
Project Manager TBD
Desbription:
This project would provide atlditional storage depth in Pond I antl replace the existirg inlet pipe at a lower invert to the pond, and
install a bablClow preverrter at the ouUet. The project also includes the installffiion of a second bacMlow preventer at the overFlow to
30th St NE to protect the hangar area.
Progress Summary:
Fudire Impact on Operating Budget:
None
Activity.
2014 YE 2015 Year End
Funding Sources: PAor b 2014 Estlmate 2015 BudBet 2016 BuAget ProJecY Total
Unreslnctetl Storm Revanua 40,000 135,000 40,000
GiaMs-Secured(Fed,State,Loce/)
Bond Proceetls
Other
Tofal FunEing Sourcea: 40,000 735,000 40,000
�O�m��Pentliturec
Desi9� 40.000 40.000
Ri9ht ol Way
Construction 135,000
7otal EcpanCih�res 40,000 135,000 40,OD0
Forecasted Project Cost: -
TOTaI
2017 T018 2019 2020 201SM20
Funding Sourcen:
UnresMcted Storm Revenue 175,000
Grants-Secuietl(Fed,Sfete,LocaQ
Borrd Pioceeds
Other
Total Funtling Sourcas: 775,000
Caplfal Fxpenditurea:
Design 40,000
Righf W Wey
Consfn�cflon 135,000
Total Ficpentlltuma 175,000
G2nts/Other Sources:
165
City of Auburn Draft Capital Facilities Plan
STORM DRAINAGE FUNb (432) Capitai Facilities Plan
Six Year Capital FacilRfes Plan, 2015-2020 Enterprise Funds
Project TiUe: D St. SE Storm Improvement
Project No: cpxxx
Projea Type: Non-Capacity
Project Manager TBD
Desalptbn: - - --
This project would replace the existing line from 21st St SE to 23rd St. SE and Install a new eMension to 25th St. SE.The proJect
will eliminate an e�dstirg dryrvell near 25th & D St. SE
Progress Summa"ry:
Future Impact on Opereting Budget•
Norre
Activity•
2014 YE 2015 Year End
Funding Sources Prlor b 2076 F81ma[a 2075 BuCget T018 Budget Project Total
Unrestncted Storm Revenue -
Gronts-Securerl(Fetl,State,Loca/)
Band ProceaUs -
Other
Tofal Funding Sources: ' - - -- - -
Capibl Expandilures
Desfyn
R/gM ol Wey
COrtSfNCtldl
Total Expenditures -
Forecasted ProJect Cost:
Total
2017 2018 2019 2020 2015-2020 _
Funtling Souims - '- - --'-- ' ' -- ' -- ' ' '
UnresMcfed Sform Revenue 75,000 600,000 675,000
Grents-Secured(Fed,State,Loca!) -
BwM Proceeds -
ori,el
rorai Fu�moe sources: �s.000 soo,000 - e�s.000
CaPltai ExpentllWres
Design 75,000 75,000
RlgM d Way
ConSfNCIIon 600.000 600,000
Total EzOe�ditures 75,000 800,000 - - - �675.000
Grants/Other Sowces�
166
City of Auburn Draft Capital Facilities Plan
STORM DRAINAGE FUND (432) Capital Facilities Plan
Six Year Capifal Facilities Plan, 20152020 Enterprise Funds
aroject r�Ue: Annexation Area Small Storm Improvement
Project No: cpxxx
Project Type: Non-Capacity
Project Manager• TBD
Description:
Improve euisting drainage condkions for the annexation areas.
Progress Summary•
Futuie �mpact on Opereting Budget:
None
Activity:
zou re ¢ois rear ena
Funding Sources Prlor ro 2074 Eerimate 20�5 Budgat 2076 Budget Pro ect Total
Unrestncted Storm Revenue ' — - 40,000 280.000 40,000
Grants-Securetl(Fed,Sfefe,LocaQ
Bond Proceetls
Otlrer
Total Funding Sourcex 40,000 260,000 40,000
Capidl Expanditures
Desiqn 40,000 40,000
R/ght o/ Way 50,000
r.0/ISfNCfI0I1 '1�0��0
Total Bcpentlib�rea 40,000 260,000 40,000
ForeeasteH ProJect Cost:
Tofa I
20'17 20t8 2019 2020 20152020
Funding Sources:
UroesMctetl Sform Ravenue 40.000 260,000 600,000
Grants-Secuietl(Fetl.Stffie.Loca/) _
Bond Proceetls _
Other
Total Funding Sources — - 40,000 260,000 600.000
CaPibl Ezpentliturex
Design 40,000 80,000
R/ght W Way 50,000 100,000
ConsWction 210,000 420,000
Total EzpanAiWres: 40,000 260,OOD 600,000
Grants/Othe�Sources.
167
City ofAuburn Draft Capital Facilities Plan
� �
CITY C�F �
�
�k MORE THAN YOU IMAGINED
168
City ofAuburn Draft Capital Facilities Plan
SOLID WASTE
Current Facilities
The City of Auburn no longer has recycle drop station facilities. The City now provides curbside
service through a vendor who handles the disposal.
169
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
�
�k MORE THAN YOU IMAGINED
��o
City of Auburn Draft Capital Facilities Plan
PARKS, ARTS AND RECREATION
Current Facilities
The City of Aubum's park system consists of a total of 735.53 acres of neighborhood and
community parks, special use areas, open space, and linear parks (trails). The 150-acre
Auburn Municipal Golf Course is identified as a separate public facility in this report, and is not
included in the Parks and Recreation inventory
Table PR— 1 "Facilities Inventory' lists all park and recreation land in the City's park system
along with their current capacity and location.
Level of Service (LOS)
The current LOS provided by the City's park system represents the existing inventory of City-
owned park acres divided by the 2014 City population of 74,630. This equates to 0.86 acres per
1,000 population for neighborhood parks, 3.16 acres per 1,000 population for community parks,
0.44 acres for linear parks, 4.66 acres for open space, and 0.73 acres for special use areas.
The proposed LOS provided by the Citys park system represents the planned 2020 inventory of
City-owned park acres divided by the 2020 projected City population of 85,288. This equates to
0.86 acres per 1,000 population for neighborhood parks, 3.46 acres per 1,000 population for
community parks, 0.38 acres per 1,000 population for linear parks, 4.08 acres per 1,000
population for open space, and 0.64 acres per 1,000 population for special use areas.
Capital Facilities Projects and Financing
Parks and Recreation facilities include seventeen capital projects at a cost of$24,205.000.
Table PR-2 shows the proposed financing plan followed by individual worksheets s.howing the
project detail.
Impact on Future Opereting Budgets
As Table PR— 3 shows, operating budget impacts of$891,000 are forecasted for parks and
recreation facilities during the six years 2096 —2021
171
City of Auburn Draft Capital Facilities Plan
TABLE PR-1
Facilities Inventory
Parks, Arts and Recreation, Land
ca�aaTv - -- -
FACILITY (Acres) LOCATION
Neighborhood Parks:
wstin /nvent
21st Street Playground 0.20 2'Ist Street SE & D Street SE
ubu�ndale Park 10.00 31700 '108th NE
allard Park 0.70 37th 8 R Street SE
Cameron Park 3.90 Lemon Tree Lane 8 Academy Dri�,e
Cedar Lane Parlc 8.30 25th & K Street SE
Dorthy Bothe!l Park 4.00 570� Lakeland Hills WaySE
ykstra Park 1 70 1533 22nd A�renue NE
orest ViUa mini-park 0.20 17th & Fr SVeetSE
Gaines Park � 40 '11th NW& W ValleyHighway
Gree» River Property '10.00 104th SVeet SE
ndian Tom Park 0.40 6th & HenryRoad NE
ornada Park 'I.90 1440 U CourtNW
ersey 3 Park #1 'I.80 Charlotte A�,e SE 8 Eaergreen Way SE
ersey 3 Park #2 2.10 56th Street SE & Udall Arenue SE
akeland Hills Park 5.00 540� Oli�e A�,enue SE
otary Park 4.00 27th � Alpine Street SE
Scootie Brown Pa�k 'I 70 Sth & Henry Road NE
Shaughnessy Park 3.50 21 st& Hem lock SE
Termina! Park 1.20 12th 8 C Street SE
Trai! Run Pa�k 1.21
Vi/lage Square '1.07 310th St SE Qa 120th Aw
Total Neighborhood Parks 64.28
Pro osed Ca acit Pro' s:
ubumdale ll Park 9.34 29700 118th Street SE
Total Proposed Capaclty Projects 9.34
2020 Projected Inventory Total
- Nelghborhood Parks- 73.62
Community Pa�ks
xistin lnvento .
rannan Park 2'I 70 26th 8 M Street NE
enster/Green RiverAccess '13.40 10520 PuburnBlack Diamond Road
ulme�Field 5.00 51h & K SVeet NE
Game Farm Park 63.00 3226 V SVeetSE
Game Farm Wildemess Park 20.00 2401 SE Stuck Ri�r Road
GSA Pa�k 6.60 C Street SW 8 15th SW
saac Evans Park 14.90 29627 Green Ri�er Road NE
ea Hil1 Park 7 00 SE 316th & 124th SUeet SE'
es Gove Park 20.50 11th & Aubum WayS
!!Pond 4.00 600 Ora�etz R6ad
O/son Canyon Fa�mstead 'I5.00 28728 Green Ri�er Road
oegner Park 2� 60 601 Oravetr Road
Sunset Parlc 15.00 1306 69th Street SE
Veteran's Memoria! Rark 8.50 Park A"enue & Aubum Way N
Total Community Parks 236.20
172
City ofAuburn Draft Capital Facilities Plan
TABLE PR-1 (continued)
Provosed Caoacitv Proiects:
Jacobson Tree Farm 29.04 13009 SE 294th Street
LakelandHills 30.00 KerseyWay
Tota/ Proposed Capacity Projects 59.04
2020 Projected Inventory Total
aCommunityParks- 295.24
Linear Parks:
Existina lnventorv:
/nterurban Trail 25.40
Lakeland Hills Trai! 2.30 540'I Olire A�enue SE
White River Trail 4.90
Total Linear Parks 32.60
Proposed Cepacitv Proiects:
None
Tofa/ Proposed Capacity Projects -
2020Projected Inventory Total
- Linear Parks- 32.60
Special Use Areas:
Enistina lnventorv:
Bicentennia! Park 1 40 SR-�88Pubum WayS
Centennia/ VieKpoint Park 0.70 600 Nbuntain View Drive i
City Hall Plaza 0.90 25 W Main
Clark Plaza 0.20 15th &AUburn Way N
8 Street Plaza 0.10 E. Main &B StreetSE
Plaza Park 0.'IS 25 W Main
Mountain View Cemetery 50.00 2020 Nbuntain view Drive
Pioneer Cemetery 0.80 8th &ALbum Way N
Slaughte� Memorial 0.20 3�OOAuburn WayN
Total Special Use Areas 54 45
Proposed Capacitv P�oiects:
None
Tota/Proposed Capacity Projects -
2020 Projected Inventory Total
- Special Use Areas- 54 45
Open Space Areas:
Existino lnventorv.�
Aubum Environmental Park Open Space 120.00 Westem A�.e NW and Maint Street
Cla�k Property 25.00 '16000ra�.e�Road
Gaine Farm Open Space 87 00 2400 SE Stuck Riwr Road
Golf Course Open Space 42.00 29B89 Green Ri"ar Road
Green River Property 10.00 3�5th Street Se & �04th Way SE
Lakeland Native Area '10.00 Oraae�Road
Olson Canyron Open Space 45.00 28728 Green Ri�.er Road
West Au6um Lake PropeRy Open Space 9.00 N ofS 321stand westof W St.NW
Tota! Open Space A�eas 348.00
?ro osed Ca acit P�o"ecis:
None
Total Proposed Capacity Projects -
2020 ProJected Inventory Total
- Open Space Areas- 348.00
173
City ofAuburn Draft Capital Facilities Plan
TABLE PR-2
CAPITAL FACIL-ITIES PLAN PROJECTS AND FINANCING
PARKS, ARTS and REGREATION
(Municipal Parks Construction Fund)
2075 2078 2017 Y016 2019 2U20 Total
CewiM ProfeCts:
1 Park AequlskionsfDevelopment
Capital Costs - 125.000 125,000 125,000 375,000
Funding Sources
Fund Balance - - - - - - -
G2nis (Fed,State,Loql) - - - - - - -
Bond Proceeds - - - - -
KC Prop 2 - - 125,000 125,000 125,000 - 375,000
Subtotal, Capacky Projects:
Capital Costs - - 125,000 725,000 725,000 - 375,OD0
Nort�Caoacitv Profeets:
2 Isaac Evans Pa7k
Capital CosLs 100,000 - - - - 100,000
Funding Sources
Fund Balance - 50,000 - - 50,000
CxanS (Fed,Shate,Local) - - - - - -
Other(Park Impact Fee) - 50,000 - - - - 50,000
3 Jacobsen Tree Farm Site Plan
Capital Costs - 12,000,000 - - - 12,000,000
Funding Sources
Fund Balance - - - - - -
Grants (Fed,State,Local) 2,000,000 - - - 2,000,000
Other(De�eloper) - 4,000,000 - - 4,000,000
Bond Proceeds - - 6,000,000 - - 6,000,000
4 Aubum CommunRy and Youth!('een Center
Capihal CosS 300,000 6,300,000 - - - - B,800,000
Funding Sources
REET 1 300,000 759219 - - - 1,059,279
Oth-er - 4,540,781 4;540,781
Grents (Fed,State,Local) - 3,000,000 - - - 3,000,000
5 Les Guve Park Improvements
Capital Costs 40,000 260,000 - 300,000
Funding Sources
Fund Balance - - - - - -
Grants (Fed,State,Loca.l) - - - - - -
KC Prop 2 40,000 260,000 - - - - 300,000
6 Rotary Park Improvements
Capital Cosls - 30,000 - - - 30,000
Funding Sources
Fund Balance - - 30,000 - - - 30,000
GranLs (Fed,Slate,Local) - - - - - - -
Other - - - -
174
City ofAuburn Draft Capital Facilities Plan
TABLE PR-2(continued)
zo�s zo�s zo» zo�s zo�s zoso raei
NortCaoacitv Proiects: �
7 Mise.Parks ImprovemeMs
Capifal CosS 100,000 100,000 175,000 175,000 175,000 175,000 900,000
Funding Sources
Fund Balance - - 25,000 25,000 25,000 25,000 100,000
Grants (Fed,State,Local) 50,000 50,000 75,000 75,000 75,000 75,000 400,000
Other(Park Impact Fee) 50,000 50,000 75,000 75,000 75,000 75,000_ 400,000
8 Cameron Park
Capital CosCs - - 55,000 55,000
Funding Sources
Fund Balance - - 25,000 25,000
GranS (Fed.Sqte,Local) - - 30,000 30,000
Other - - - -
9 Geme Fartn Park ImprovemeMs
Capital CosS - - 40,000 - - 40,000
Funding Sources
Fund Balance - 40,000 - - - 40,000
GrenLs (Fed,Sfate,Local) - - - - - -
aner - - - - -
10 Gaines Park
Capital Costs - 30,000 - - 30,OOD
Funding Sources
Fund Balance - - 30,000 - - 30,000
Grants (Fed,Slate,Local) - - -
Other - -
11 Roegner Park
CapiYal Costs - 50,000 - 50,000 ��
Funding Sources '
Fund Balance - 50,000 - - - 50,000
Granls (Fed,State,Local) - - - - -
KC Prop 2 - - - -
12 Auburndale Park I
Capital Costs 25,000 - 350,000 - 375,000
Funding Sources
Fund Balance 25,OD0 - - - - - 25,000
KC Prop 2 - 100,000 - - 100,000
Olher(Park Impact Fee) - 250,000 - 250,000
13 Au6urndale Park II �
Capital Cosk 25,000 - - 575.000 600,000
Funding Sources
Fund Balance 25,000 - - - - - 25,000
Granls (Fed.Shate,Local) - - - - -
OUier - - - 575,000 - - 575,000
14 Sunset Park
Capital Costs 15,000 385,000 - 400,000
Funding Sources
Fund 8alanca - - - - -
Otlier(ParklmpactFee) 75,000 185,000 - - 200,000
Otlier,(Contributions) - 200,000 - - 200,000
175
City ofAuburri Draft Capital Facilities Plan
TABLE PR-2(continued)
2015 2076 2077 2078 2019 2020 Total
Non-Caoackv Proiects:
15 BPA Trail on Lea FGII
Capital CosLs - - - 150,000 150,000
Punding Sources
Fund Balance - - -
Qants (Fetl,Sfate,Local) - - - 150,000 150,000
KC ProD 2 - - - - - -
16 Wkeland Parkll4
Capital Cosfs - - 25,000 150.000 - - 175,000
Funding Souroes
Fund Balance - 25,000 - - 25,000
Other - - 150,000 750.000
17 Fenster Levee Setback, Phase 26
Capital Costs 25,000 - - - - - 25,000
Funding Sources
GrenLs (Fed,State,Local) - - - - - - -
Other(Storm) 25,000 - - - - 25,000
Subtotal. Nor►Cauacitv Proiects:
Capital Costs 530,000 9,145,000 12,350,000 1,250,000 230,000 325,000 23,830,000
SUMMARY:
CAPITAL COSTS
Capacily Projecls - 125,000 125,000 125,000 - 375,OOG
Non-Capaaty Projects 530,000 9,145,000 12,350,000 1,250,000 230,000 325,000 23,830,000
Total Costs 530,000 9,145;000� 72;475,000 - -7,375,000 - �355;000 �325,000� 24,205,000
FUNDING SOURCES:
Fund Balance 50,000 50,000 200,000 25,000 50,000 25,000 400,000
Grants (Fed,Sfate,Local) 50,000 3,050,000 2,075,000 75,000 105,000 225,000 5,580,D00
REET 1 300,000 759,219 - - - - 1,059,219
Bond Proceeds - 6,000,000 - 6,000,000
KC Prop 2 40.000 260,000 125,000 225,000 125,000 - 775,000
Other-Parks Impact 65,000 285,000 75,000 325,000 75,000 75,000 900,000
Otlier 25,000 4,740,781 4,000,000 725,000 - - 9,490,78'I
Tohal Funtling 430,000 9,745,000 12,475,000 7,375,000 355,000 325,000 24,205,OOD
176
City of Auburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan
Six Year Capital Facilkies Plan,20752020 Capkal Projeets Fund
Projectr�ue: Park Acquisitions/Development
Project No: CpXXXX
ProjectType: CapaCity
Project Manager Da�yl FabBr
Description:
Land acq�nsitioru to occur based on demand and deficiencies including parks,open space,trails and cortidors.
Progress Summary: -
Future Impaet on Operating Budget:
None
Activity�
(PreHous 2 Vrs.) 2014 YE 2015 Year End
Funtling Sources: Prior to 2014 Estlmate _20t5 Butlget 2018 Budget Broject Tofal
FurM 321 -Unrestncted FurM Ba/ance � - '- - --'--
c�.as-s��.ae�Fed,srare,t oceq
Borrd Proceeds _
Genera/Funtl TranSfar In �,5pp �,gpp
KC Prop2' 127,Q58 23914 251,372
Total Funding Soureos: Y27.658 48.616 273.872
Capital EnpentliNrea:
Des/gn
Ac4u/s/Nan 22�458 46.4t4 273.8�2
CWIS�NCL/OI)
Total ExpendlWrea 227,458 48,474 279,872
Forecasted�Project C ost: -
roai
2017 2078 20t9 202D 20152020
Funding Soureea: - ' -
FuiM 321 -Unrestricted Fund Belence _
GiaMs-Secured(Fed.State,Locel)
Bmd PioceeUs
General FurM Trens/er fn
KC Prop 2' 125,000 125,000 125,000 375,000
Total Funding Sourcos: 125,000 125,000 725,000 375,000
Capital Expentlituren:
Des/gn
Acqu/s/tlon 125,000 125,000 125,000 375,000
QOIISfNL(IOII
7ota1 Expantlitures: 125,000 125,000 725,000 375,000
GraMs/Olher Sources:
177
City of Auburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) CapitalFdcilRiesPWn
Six Year Capital Fa¢ilities Plan, 2015-2020 Capkal ProJects F.und
ProjectTine: Isaac Evans Park
Project No: Cpxxxx
Projea7ype: Non-Capacity
Projed Manager Daryl Faber
Deac�i{ition: -
Repair trail throughout park, improve playground and develop reforestation plan.
Progress Summary:
None
Future Irtipaet on Operatlng Budget:
Increased mowing ard u6lities-$6,000
Activity
2014 YE 2015 Year End
FunCing Souroee: Pr7or ro 2014 f�lmate 2075 BuOget 2078 BUAgot Projaet Total
FuMI 321 -Unrestricted FunU Belence Sp,ppp -
crarvs-secured�Fea,srare,�xeq _ _
BOM Proceeds -
REET -
Other(Park Impacf Fee)' SO.00p
Tota1 Funtlinp Souress: 100.000 -
Capifal Expendlwrea
Desfgn 70,000
Right o/ Way
ConstrucNon 80,000
Topl EzpenAliurec 100,000 -
Forecasted�Project Cost:
Total
2017 2018 2078 2020 207&2020
FunCing Sources:
Fund 321 -UruestncleO Fund Balaxe 50,000
Giems-Securea(Fee,State,t.ocaq -
Bmd Proceeds
REET -
Other(Park /mpact Fee)• 50,000
Tobl FunEing Sourcea: t00,00D
CaPital Expenditures:
Des/gn �0,000
R/gM oi Wey -
Const/utt/on 90.000
Total EcpendlWrea 100,OW
Grorits/Other Sources:
1�g
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS COWSTRUCTION FUND (321) Capital Faeilities Plan
Sbc Year Capital Facilities Plan,20�52020 Capital Prbjects Fund
ProjectTitle: Jacobsen Tree Farm Site Plan
Pro}ect t�lo: cp0609
ProjectType: Non-Capacity
Project Manager• Daryl Faber
Description:
Implemerrt Master Plan for the development of this 31 acre site. Lea Hill area is deficieM in park ac2age.
Progress Summary•
Future Impact on Operating Budget: �- -- - - -
No significant impact due to master plan. Fuhae park devalopmerrt will result in maintenance and uUlity e�enses
undetertninable at tlds time.
Activky.
2014 YE 2075 Year EnA
Funding Sauroea: PAor to 2074 Eatlmate 2015 Butlget 2018 Budget Proiect Total
FUM 327 Lnrestncted FurM Balance 25,321 25,321
Grants-Unsecured(Fetl,Stafe.Loce!) _
Barid Proceeds -
REET
Other(Development)
Total Funding Sources: 25.327 25,921
Capifal ExOantlituros:
Dasign 25,321 25,321
RigM o/ Wey
COlISINC710/I
Totil ExpentliWrcs 25,32t 25,721
Forecasted Project Cost:
Tofal
2017 2018 2019 2020 20152020
Funding Sourcas:
Fund 3Yf -Unrestncted Fund Balance _
GraMs-Unsecured(Fer/,State,Locaq 2,000,000 2,000,000
BmtlProceeds 6,000,000 6,000,000
REET
Other(Deve/opment) 4,000,000 4,Opp,ppp
Total Funding Sources: 12.000.000 72,000.000
Capital F�pantliwros:
De5/gn �.000.000 7,000.000
Po'ght d Way
Constn�ction 71,000,000 11,00O.00D
Tofal Erzpenditurea: 12,000,000 12,000,000
G2M5/Other SourGes:
179
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARK$ CONSTRUCTION FUND (321) Capital Faclities Plan
Six Year Capital Facilities Plan, 20152020 Capifal Projecffi Fund
Projeccrtie: Auburn Community and YouthlTeen Center
Project No: cp0925, cp1412
Proiectry�e: Non-Capacity
Project Manager� Daryl Faber
Deseription:
Construct a new 15,100 sq. ft. Community CerRer facility as well as repurpose the ebstirg Parks, Recrea6on and Arts
Administration building irdo a YoutNTeen Cerrter The project includes site improvemerrts associated v�M the construction
at Les Gove Campus arcl 3,000 sq. ft. of adminisVative space for the Parks Departrnerrt,meetirg,aciivity and fitness
space as well as a dedicated youth/teen center The State has allocated $3 million of the capifal budget W tl�e City to fund
the project.
Progress Summary•
Design in 2014 &2015, bid and begin construction in 2015 with constr�tion completed in 2016.
Future Impact on Operating Budget:
The annual operating budgetfiscal impact is estimated to be $150,000
Activity.
2074 YE 2015 Vear End
FunNng Sources Priw m?A14 Etimate 2015 Bud9et 2078 Budget ProJed Total
Fwd 321 Lmestncted Furnd Balance
GrdMs- Secared State - 3,000,000
REE71 92,046 400,000 300,000 759,219 792,046
Other (Sdid waste Fees) 7,000,000 - 1,000,000
O[her 4,540.781
Total Funding Sources: 1,092,046 40D,000 300,000 8,300,000 1,792,046
Cepipl ErzpendiWres:
PropertyAcquisttlon
Des/gn 900,857 400,000 300,000 1,600,857
DemWltlon 191.189 791,189
ConstrucNon 8,300.000
Total Espendlturex 1,092,048 400,000 300,000 8,300,000 1,792,048
Forecasted Projeqt Cost:
Tomi
�17 2018 2019 2020 20152020
Funding Source�
Fund 321 -Umeshicfed FurM Balance - -
GreMs- Secuied State 3,000,000
REET 1 1.Q59.219
Other (Sol�d Waste Fees) -
Ofher 4.540 781
Total Funding Sources: - - 8,600,000
Capital F�cpendiWres:
PmpertyAcqulsltlon
Des/gn 300,000
Pro/essional SeMces
ConstrucNon 8,300,000
Total Expenditures - - - 8,600,00!
Grarrts I Other Sources: Washing[on State capital bWget appropriation thiough the Department of Commarce
ig�
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilkles Plan
Six Year_Capital Facilities Plan,20�52020 Capital PrbJects Fund
Projectrne: Les Gove Park Improvements
Project No: cpxxxx
ProJectType: Non-Capacity
Projec[Manager Fabe�
Description:
Based on "to be completed' Les Goee Masier Plan,design and implemerrt recommendations tlet will Increase user safety,
exourage public ise and commimiry connectivity.
Progress Summary•
Future Impact on Operating Budget:
$5,000 Utilities
AcUvlty
2014 YE 2075 Vear End
FunAing Sourcen: PNor ro 2014 Fstlmale 2015 Budget 2016 Budget Pro ect Total
FUM 32f -Unrestncfed Fund Ba/ance
GraMs-Securetl(Fed,Stefe,Local)
Bond Proceeds
REET
KC Prop 2 40.000 260,000 40.000
Total Funding Sources: 40,000 260,000 40,000
Capibl Ezpantli4ires
Dasign 40,000 10,000 40.000
RigM d Wey
ConStNGflon 250,000
Total Expenditurea: 40,OOD 260,000 40,000
Forecaste0 Project Cost:
Tofal
2017 20t8 2019 2020 201b2020
Funding$ourees:
Furni 321 -Unrestncted Fmrd Balance _
GrerKs-Secured(Fetl,Stete,Loce/)
6ond Proceeds
REET
KC Prop 2 gp0.ppp
Tofal FunEing Sourcas: 300,000
CaPibl EzpsntliWroa
Design Sp�ppp
R(gM d Wey
ConslNLtlon 250.000
Total F�tpentliturea: 300,000
Grants/Other Soumes�
I81
City of Auburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilkies Plan
Six Year CapMal Facilttles Plan,2015-2020 Capital Projects.Fund
Proiect r�ne: Rotary Park Improvements
Project No: cpxxxx
ProjectType: Non-Capacity
Project Manager Faber
Descrlptlon:
Coordinate improoemer�s with neighborhood and Rotary Club of A�um to add walking path.
Progress Summary:
Future Impa¢t ori Opeiating Budget:
None
Activiry• - - -
2014 YE 2015 Vear End
FundingSourees: PAor.W2014 6tlmate 2015Butl9et_._.20188udget. __P.roJeotTctal _
FurM 321 -UnrosMcted Funtl Belance - '
Grerrts-Secured(Fed,State,Cqcel)
8ond Proceeds
REET
Other
Tofal Funtling$ou�ces: -
Capipl ExpendiNrec
Pesign
RlgM d Way
Const/uctfon
Total F�cpenClWres -
Foreaasted Projeet Costi
Tofel
2077 20t8 2019 2020 2075-2020
Funding SOureeB: -- " ' ' � - -- —
Fund 321 -Unrestncted Fund Belence 30,000 30,000
�ra.rcs-sec�ied�Fee,sraee,�xeq
Bmd Proceetls
REET
Other
TOTaI Funding Source8: 30.000 30.000
Capifal ExpendiWraa
Design 5,000 5,000
RlgM d Way
Constructim 25,000 25,000
7ofal ExpendiNna 30,000 30.Ob
GraMs/Other Sources:
1g2
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (327) Capital PaeilRies Plan
SIx Year Capital Facilkies Plan,20152020 Capital Projects Fund
Projectrue: M iscellaneous Parks Improvements
Projea r�o: cpxxxx
Project7ype: Non-Capacity
Project Manager Faber
Description:
Miror park improeemer�s including shetters, roofs,play�roinds, irtigation and restrooms.
Progress Summary• - -
Future Impact on Operating Budget:
None
AeUvity
(PreHous 2 Vrs) 2014 VE 2015 Year EnC
PunGing Sources Pdor ro 2014 Esflmats 2075 Butlget 2018 Bud et .P.iqect Total
FurM 327 -Uniastticted FuiW Balance - -- -� _ -
GraMs-Urnsecured State 50,000 50,000 50.000
Bwrtl Pioceeds
REET
Other(Perk lmpect Fee)' 10.922 Sp.00p 5p.00p �p.g22
Tofal FunOing Sources: 70,922 t00,000 t00,000 770,922
Caplpl EzpenElWres:
Design
R1gM ol Way
Const2ction 70,922 100,000 100,000 110,922
Total ExpanGlturos: �0,922 �00,000 100,000 110,822
forewsted ProJect Cost:
Tobl
2077 2018 2019 2020 207S2U2U
Funtling Sources: - ' - -
FurM327 -UnrastrlctedFUMBalance 25,000 25,000 25,000 25,000 100,000
Grants-Unsecuretl State 75,000 75,000 75.000 75,000 400,000
Bmtl Proceetls
REET
OtYrer (Perk Impect Fee)` 75,000 75,000 75,000 75,000 400 000
Tofal Funtling Sources: 775,000 175,000 775,000 175,000 900,000
Capftal ExpendiWres:
Design
Rfght d Way _
Construc[ion 175.000 175,000 175,000 175,OOD 900,000
Total Expendlturex 175.000 775,000 775,000 775,000 900,000
G2rrts/O[her Sources:
183
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS GONSTRUCTION FUND (321) Capital Faeilkies PWn
Six Year Capltal FacllRies Plan,2075-2020 Capkal ProJects Fund
ProjeotTne: Cameron Park
Project No: CpXXXX
ProjectType: Non-Capaeity
Project Mareger Faber
Description:
This project will impro�e the pedestrian trail and add landscape arxl fencing W serve as buffer to ihe nefghborhood arid
play strucMe. l7ds project is iderrtifietl in ihe Partcs trnpro�merrt Plan.
Prog�ess Summary•
Future Impact on Opereting Butlget:
None
AetWky: - - -
2014 YE 2075 Year Entl
Funtling Sources: PriorW 2014 Estlmafe .2075 Butlget. . 2018 Bud t __Prcject Topl
FurM 327 -UnresWcted FuM Belanca '
Grants-Unsecured(Fed,Sfafe,Local) -
Bmd Proceeds -
REET - -
O[her
Tonl FunAing Sourcea
Capltal EzpenCiturer.
Deslgn
wgnr w way -
Consrrticrion
Total Expentlltures: -
Foreeasted Project Cost:
Tobl
2077 2018 _2079_._._ 2020._ 2075-2020
Funtling Sourees:
Funtl32f -UniasfnctedFuntlBalance 25,000 25,000
Grams-Unsecurad(Fed,Sfate.Locaq 30,000 30,000
8ond Pioceeds -
REET
Other
Totll FunAing Sources: 55,000 SS,000
Caplfal F�cpantllturea
Design 5,000 5,000
R/9ht d WaY _
Consbuctton 50.00U 5�.000
Total Enpenditurex 55.000 55,000
Grerrts/Other Sourcas:
184
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capitai Facilkies Plan
Siu Year Capital Faeilities PWn,20152020 Capital Projects_Fund
ProjectTine: Game Farm Park Improvements
Project No: CpXXXX
Projearype: Non-Capacity
Project Manager Faber
Deseription:
trnpro�e interior lighting ard patlmays ard provide access from the newly acq�red property on soWrwest comer of the
park.
Progress Summary�
Future Impact on Operating Budget: -
None
Activity.
2014 YE 2015 Year End
Funding Sources: Prior to 2014 F�imate 2075 Butlget Y018 Butlget Projec!Total
Fund 311 -UnresMctad FurM Be/ence -
Grants-Securetl(Fed,Stete,loca!)
BaM Proceeds
REET
Of/rer
Tolal Funding Sources: c
Gpibl Expentlilures:
Design
R/gM o/ Way _
Construction
Total EupenOitures _
Forecasted Project Cost:
7otal
2017 20t8 2078 2020 201Y2020
FunCing Sources: - �
Funtl321 -Unrnstnctad Fund Balence 40,000 40,000
Grants-Secured(Fed,Stale,Lwal)
8aM Ploceeds
REET
Othef
Tobl Fundfng Sources: 40,000 40,000
Capipl EaPentlitures
Design
R/gM d Way
Construction 40,000 40.000
7otal EzpendlNres 40,000 40,000
Grarrts/Other Sources.
185
City of Auburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities PIa4
Snc Year CapiFal Fadlities_Plan,20152020 Capital Projects Fund
Projea rtle: Gaines Park
Project No: CpX7(X7C
aro]ectrype: Non-Capacity
Project Manager Fdbe�
Descriptlon•
De�elop HorticWhae Plan for ihe Park as indicatetl�n tlie Parks trnpro�.emeM Plan and repair boardwalk.
Progress Summary:
Future Impact on Operating Budget:
None
Activity.
2014 YE 2015 Vear EriC
Funtling Sources: Prior b 2014 6tlmate 2015 Budget 2078 Butlget .Pro act Total _
Fund 32f -UnresMctetl Fund Ba/anca - - --�� - - ---
Granfs-Secured(Fed.Slete,Loca�
Bmd Proceeds -
REET -
Other
Total Funding Sources: -
Capifal Expendttures
Design
R/gM d Way -
Cqnslnittion
Total ExpenCiW�as -
Forecasted Prgect Cost:
Tofal
2011 20'IB 2079 2020 20152020
FunCing Sources:
Fuid 321 d/nrestrtctetl Fund Balance 30,000 30,000
GrerRs-Securetl(Fad,Sfefe,Local) -
Bmtl Proceeds - -
REET
Other
Total Funtling Sources: 30,000 30,000'
Capital ExpanCitures:
Daslgn 70,000 10,000
RlgM d Way -
ConsfNCllon 20,000 20.000
Tobl ExpentliWres: 30,000 ' 30,000
GraMs/Other Sources
186
Ciry of Auburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) CapRal Facilities Plan
Six Year Capi[al Faciikies Plan,20152020 Capital Projects Fund
ProjectTitle: Roegne� Park
Project No: cpxxxx
Projectrype: Non-Capacity
ProjectManager Fabef
Description:
This project will proNde tor trail system mairrtenance,play structure replacemerrt and ri�.erbank stabiliation.
Progress Summary•
Future Impact on OpereSing Budget:
None
Activity:
2014 YE 2015 Year End
Funtling Sources: PAor ro 2074 Fstlmafe 2075 Budget 2018 Budge[ Pro�eet Tofal
FurM 321 -UnreStActeo'Fund Belance
GraMs-Securetl(Fed,State,Loca/)
Bmd Proceeds
REET
OfhBr(PRp Levy 2)
Tofal FunAing Sources: -
Gpifal Expendituras
Deslgn
Right d Way -
�'.OlISfNGfi0I1
Total Expantlilurec
Forewstetl Project Cost:
Totel
2017 2018 2079 2020 2015-2020
FunAing Sources:
Furrd 327 -UnasMcted FurM Ba/ance 50,000 50,000
Giants-Securetl(FeO,Stete,Loca/) _
Bond Proceeds _
REET _
Other(P�op Levy 2)
Total FunAing Sources: 50,000 50,000
Gpital Expentliluros:
Des/gn 5,000 5,000
R/gM ol Way
Construct/on 45,000 45.000
Total ExpendlWrea 50,000 50,000
GrdMs/Other Sou¢es:
187
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUGTION FUND (321) Capkal Faeilkles Plar
Sirz Year Capital Factlities Plan,20152020 Capital Projects Fund
aro�ect rne: Auburndale Park
Project No: CpxxXX
ProjectType: Non-Capacity
Project Manager. Faber
Description:
De�elop a Master Plan for ihe Park,Iretall an IrtigaBon system, new play stnichae arid improve sigriage.
Progress Summary•
Fu;ure Impaet on Operating Budget:
UGlities would increase by $5,000
Activity
2074 YE 2015 Vear End
FunAing Sources: PFlor_to-2014 EsUmate 2075 BuA et . 2078 Budgat Pro eet Tofal
FurM321 -UmeatActadFundBelence � - - - ----"25,OU0� - 25,000
GrerRs-Secured(Fed,Sfate,Local)
Bwrcl Pioceeds
Ofher(Park Impacf Fee)
Other(KC Prt�y 2)
Total FunCing Sources 25,000 25,000
GPital ExpendiWies:
Des7gn 25.000 - 25.000
R/gM d Wey ' '
COIIS�NC�IOl1
Totel ExpendiWres: 25,000 25,000
Foredasted�Piojeot Cost: --
Total
2077 2018 2079 2020 20'I&2020
Funding Sourcea: - --
Funtl3Y1 -UnrasfActetlFulMBalence 25,000
Gisms-securec(Fee,srere,t.ocaq _ _
BaM ProceeUs -
Other(Pak ImP�Fee) 250.000 250,000
Ofher(KC Prop 2) 100.000 100 000
Total Funding Souresn: 350.000 375,000
Caplfal FspenElturea
Des/gn 25,000
RigM ol Wey -
ConStrucNon 350,OD0 350,000
Total Expenditures: 350,000 375,000
GraMs/Other Somces: '
igg
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capftal Faeilkles Plan
Six Year Capital Facilkies Plan,20152020 Capkal ProJeets Fund
Projea rne: Auburndale Park II
Project w: cpxxxx
arojectType: Non-Capacity
Project Manager. Faber
Description:
De�.elop a Master Plan in 2015; impro�.e the ebsting trail system arxl install signage and play str�ture.
Progress Summary•
Future Impact on Operating Budget:
Increased utilitycosts of $2,000
Actiyity
201d YE 2015 Vear EnA
Funtling Sourcec: Prlor ro 2014 E9imate 2015 Bud et 2016 Butlget ProjectSotal
Fuirtl321 -UnresMcfed Fund Be/ence 25,000 - 25,000
Grants-Secured(Fetl,Stete,Locaq
Bwrd Proceetls
REET
Other TBD
Total FunEing Sources: 25,000
Gpifal ExpentllWres:
Design 25.000 25.000
R1gM d Way
Construction
Total EzpenEitures: 25,000 25,000
Forecasted Project Cost:
Toql
2017 2078 2019 2020 2015-2020
Funtling Sources:
Funr1327 -UnresHictetl Fund Balance ps,ppp
G2rRs-Secured(Fed,Stete,Locaq _
Borrd Proceeds _
REET
Other TBD 575,000 575,000
Total Funding Sources: 575,000 gpp,ppp
CaPltal EzpenCiwres:
Design 75,000 100,000
Rlght ol Wey
Construcfion 500.000 W0,000
TOW I ExpanAltures: 575,000 600,000
Grarrts/Other Sou�ces:
189
City of Auburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capkal Facilkles Plan
Siz Yea�Capital Facilkies Plan,20152020 Capital ProJects Fund
Projec�rne: SunsetPark
Project n�o: Cpxxxx
ProjectType: NOn-Cdpacity
Project Marvger Fabe�
DesCrlption:
E�iand playground area to Inolude sp2y,park and additiorel play activities. Cobrclinate improvemerrts will� service club
and Lakeland Hills Homeowners Association.
ProgFess Surtimary•
Future Impact on Opereting Budget:
Increase in Utilities of $10,000 per year
ActNity�
201d YE 2015 Year Entl
Funtling Sourcaa: Prlor b 2014 E9lmafe 2015 Budeet 207B Budget ProJect Total
FurM 321 -Unrostncfed Fund Belence
GreMs-Securetl(Fetl,Stete,Loceq
Bontl Proceatls
Perk Impecf Fees 'IS,ODO 785,000 15,000
OtherConMbuNons 8 �oneNons 200,000
Totai Funtling Sources: 75,000 385,000
Gpinl EzpenEi4�res
Design 15,000 15.000
Poght d Wey -
Cor�3fNCt/an 385.000
To}al Expandituros: 15,000 385,000
Forecasted Projeet Cost:
Total
2017 2078 2019 2020 2075-2020
FunOing Sources:
Fund 321 -Unrestnctetl Furrtl Balance -
Grar#s-Secured(Fed,State,Loca/) -
� Bond Procaeds
Pailr Impect Fees 200,000
O[her-Cw�tnbut(ons 6 Donffilwu 200.000
Tofal Funtlin9 Sour�es - 4C0,000
Gpinl Expenditures:
Design 15,000
Rlght d Wey
CorrstrucNon 38S,OOD
7ofa1 Fspentlltures 400;0!
Grarrts/Other Sources:
190
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capkal Facilities Plan
Sfx Year Capi[al FacilRies Plan,20�5-2020 Capital ProjeetsFund
Projeccrne: BPA Trail on Lea Hill
Projea No: cpxxxx
Projeccrype: Non-Capacity
ProjectManager Faber
Description:
Develop a feasibility study related to constructability of a pedestrian trail Ilnking the Jacobsen Tree Fartn site M tlie west
end of Lea Hill. This trail wo�d follow the alignmeM of tlie Borvie�ille Power Administration(BPA)traremission lines from
132nd to 1081h Aeerve SE. Constrvctlon woWd be in phases based on constructability.
Progress Summary�
Future Irtipact on Opereting Budget:
None
Activiry:
2074 VE 2075 Year Entl
Funding Sources: Prior to 20�4 Estlmate 2015 Budget 2018 BudBet _Project Total
FurM 321 LrnesMcted Furrtl Balance _
GreMs-Unsecuretl(State RCOJ -
BwM Proceeds -
REET _
OfhBr(KC Prtrp. 2)'
Total FunAing Sources: -
Capipl Expen0lWres:
Poedesrc�n _
Deslgn
r.WISINC�IpII
7ota1�penAitures -
Forecasted Project Cost:
Tota I
2017 2078 2019 2020 2075-2020
Funding Sourcas:
FurM 32/ -Un2stnctetl Furm'Belance _
Grarrts-Unsecured(State RCO) 750,000 t50.000
BaW ProCBBdS _
REET _
Other(KC Prop. 2)'
Total FunCfng Sources: 75U,000 150,000
Capital Expenditures:
Predes/gn 25,000 25,000
Deslgn '125,000 125,000
CO�SINCf/On
Tofal Ezpentlltures: 150,000 1$0,000
Grarrts/Other Sowces'
191
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND ($Y'I� Capkal Pacilkies Plan
Siu Year_Capital Facillties PWn,20152020 Capkal Projects,Fund
Projec�rne: Lakeland Park #4
Project No: cpXXXX
aro�ectType: Non-Capacity
ProjeccManager. Faber
Desc(iption:
Complete Master Plan ro include the deeelopmerrt ard construction of an erMrormerrtal commiauty park. Trails,fercing,
parkirg and visitor amerutles are included in the proJect.
Progress Summary•
Future Impact on Operating Budget:
tricreased maiMenance wsts of$5,000
Aetivky.
2074 VE 2075 Vear End
Funtling Sourcss: PAor b 2014 E�ImaLa 20t5 BuC et 2018 BUCBet Pro eC TOTaI
Fund 321 -Unrestncted FurM Balence _
GiaMs-Securad(Fed,Stffie,Local) -
Bmtl Pioceetls
REET
Other
TOTdI FunEing Sourcea:
CaPltal ExpendiNres
Dasign
mynr d way
ConsINCI(on
rorai�pe�aiarea
Foreeasted Projeet Cost:
Total
2017 2018 2079 2020 2075.2020
Funtling Sourcex
Furni 327 -Unrestdcted FurM Belence 25,000 25,000
GrarRs-Secured(Fetl,State,Loca!)
Bontl Proceeds
REET
Other 150 000 150 000
Tobl Funding Sources: 25,000 140,000 775,000
Gpinl ExpenAiturex
Deslgn 25,000 25,000
RIgM o( Wey
ConslNCflon 1SO,O00 150.000
Tofal EapendiWres 25.000 150.000 17S.00f
Grants/Other Sou�ces:
192
City ofAuburn Draft Capital Facilities Plan
MUNICIPAL PARKS CONSTRUCTION FUND (321) Capital Facilities Plan
Six Year Capital Faeili[Ies Plan,20'15-2020
ProjectTne: Fenster Levee Setback, Phase 2B
ProjectNo: CP1016
Project7ype: Non-Capacity
ProjectManager Ande�sen
Deseription:
The pmject will design and construct approbmately 800 feet of levee setback along fhe left baMc of the Green RivEr at tlie
Citys Fenster Nature Park property.The projeot is interided to irciprove fish habifat and pro�ide refvge for salmonids as
well as create additional flood storage capacity during periods of tugher ri�rflow durirg/after storm eveMs and/or when
additional wliunes of water a2 released from-Howa�rd Harison Dam.This project will complete floodplain resMration and
habitat improvemer�s along an appro�matey riw mile reach of the Green Riv�er tliat begins at Aubum Narrows in
unincorporated King Courriy and ends at Fenster Nature Park in Aubum.The City is partnering witti King County arxl the
Veteran's Corsenration Corp lo coruWct the project,which is scheduled to be completed in 2015.
Progress Summary:
Project design has been wmpleted and construction of the project is in progress.
Future Impact on Operating Budget:
After corutrur,tion,the projectwill need to be moritored and maintained for a minimian of fi� years to ensure tlat the
setback le�ee is operating property arid tlia restoration plarfings becbme successiully eshablisheC. Post construction
morutoring and maiMenance of the site is accomplished under a separate ebsting program for restoration site monitoring
ttet is fimded in the Planning and DevelopmeM Departrnent operations budget.
Activity
2014 YE 2015 Vear End
Funtling Sources: Prior W 20t4 Estfmate 2015 Butlget 2076 BUCBet Pro ect TOTaI
Other(Stam) B00 9,200 25,000 35,000
Othcv(Perks Cap/taf) 160,269 160,269
GraMs-Secured(Fed,Sfafe,Locaq 743,947 826,9'14 970,855
BwM Proceeds
Genere/Fund
Total Funding Sources: 144,741 996,383 25,000 7,166,724
Capibl Ezpenditures:
Design 744,747 638 145,379
Right o/ Way
Constmchon 995,745 25,000 t,020,745
Total Expenditures 744,741 998,383 25,000 7,188,124
Forecast�tl Project Cost:
Total
2077 2078 2019 2020 2015-2020
Funtling Sources:
Other(Storm) 25,000
Ofher(Perks CapitaQ
GraMs-Securad(Fed,Stafe,Loce/)
BwW Proceads
Genera/Fund
Total Funding Sources: 25,000
GPital ExpenOitures:
Design
Right ol Way
Construction 25,000
Total 6[penClWres: 25,000
GraMs/Other Sources' SRFB$304,703: PSAR$100,000; KCD$200,000; WRIA 9/KCFD$300,OOP. SRFB $327,000
193
City of Auburn Draft Capital Facilities Plan
TABLE PR-3
Impact on Future Operating Budgets
PARKS, ARTS & RECREATION - MUNICIPAL PARKS CONSTRUCTION
P�o ect: 2076 2017 2018 2019 2020 2027 Total
1 PaikAcquiskioris $ - $ $ - $ $ - $ - $ -
2 Issac Evarrs Park - 6,000 6,000 6,000 6,000 6,000 30,000
3 Jaco6sen Tiee Farm - - _ _ _
4 AubumCanmunityand - 150,000 150,000 150,000 �50,000 150,000 750,000
YoufhTeen CeMer
5 Les Gove Park lmp. - 5,000 5,000 5,000 5,000 5,000 25,000
8 RotaryParklrriprov. - - - -
7 M(sc Park/mproveiiiants - - - -
S CameronPark - - - - -
9 Game Farm Park - - - -
10 Gaines Park - - - _
77 RoegrrerPark - - - - -
72 Aubyrnda/e Park - 5,000 5,000 5,000 15,000
73 AuburMaM Park ll - 2,000 2,000 2,000 6,00
14 SunsetPark 10,000 10,000 10,000 10,000 10,000 50,000
7 5 BPA Trail Lea Hill - - - - -
76 LakefarMPark#4 - - - 5,000 5,000 5,000 15,000
77 FensffirLeveeSefback - - - -
TOtal $ • $ 171,000 $ 171,000 $ 783,000 $ 783,000 $ 183,000 $ 891,000
194
City ofAuburn Draft Capital Facilities Plan
COMMUNITY AND YOUTHITEEN CENTER
Current Facilities
The City of Auburn currently does not have a Community and Youth/Teen Center
Level of Service (LOS)
The City does not have a current LOS for a Community Center The proposed LOS of 257.94
square feet per 1,000 population is based on the projected inventory divided by the 2020
projected citywide population of 85,288.
Capital Facilities Projects and Financing
The proposed Community and Youth/Teen Center facility construction project will cost
approximately$9,000,000 and the project detail worksheet is presented on page 180.
Impact on Future Operating Budgets
As Table PR—3 shows, estimated operating budget impact of$750,000 is forecasted for the
Community and Youth/Teen Center Facility during the six years 2016-2021
TABLE PR-4
Facilities Inventory
Community and YouthlTeen Center
c,a�+aaTv
FACILITY Square Feet LOCATION
Ewsting Mventory.•
None -
Total Existing Inventory -
Proposed Capacity Projects:
New Youth/Teen Center(Remodel) 7,000
New Communiry Center 15.000
Total Proposed Capacity Projects 22,000
2020 Pro ected Invento Total 22,000
195
City ofAuburn Draft Capital Facilities Plan
SENIOR CENTER
Current Facilities
The City of Auburn currently has one Senior Center Table PR-5 Facilities Inventory lists the
facility along with its current capacity and location.
Level of Service (LOS)
The current LOS of 168.83 square feet per 1,000 population is based on the existing inventory
divided by the 2014 citywide population of 74,630. The proposed LOS of 147 73 square feet
per 1,000 population is based on the projected inventory divided by the 2020 projected citywide
population of 85,288.
Capital Facilities Projects and Financing
The CFP does not include any senior center capital facilities projects during 2015-2020.
Impact on Future Operating Budgets
There are no operating budget impacts forecasted for the senior center facility during the six
years 2016—2021
TABLE PR-5
Facilities Inventory
Senior Center
- -- caPacirr
FACILITY S uare_Feet . LOCATION__. __
Epsting Irnentay:
Senior CeMer 12 600- 808 9th Street SE
Total Existirrg Inventay 12,600
Proposed Capaoity Projects:
None
Tota!Propased Capacity Projects -
2020 Pro ected_Invento Total 72,600
196
City ofAuburn Draft Capital Facilities Plan
GENERAL MUNICIPAL BUILDINGS
Current Facilities
The current inventory of City government administration and operations facilities include
167,896 square feet for general govemment operations, 61,888 square feet for police services,
and 31,653 square feet for fire protection, for a total of 261,434 square feet. Tabie GM — 1
`Facilities Inventory" lists the facilities along with their current capacity and location.
Level of Service (LOS)
The current LOS of 3,503.07 square feet per 1,000 population is based on the existing inventory
divided by the 2014 citywide population of 74,630. The proposed LOS of 3,130.98 square feet
per 1,000 population is based on the projected inventory divided by the 2020 projected citywide
population of 85,288.
Capital Facilities Projects and Financing
The City's General Municipal Building facilities include five capital projects at a cost of
$1,570,000 and debt service at a cost of $3,967,223 for a total of $5,537,223. The projects
include (1) $200,000 for M&O Vehicle Storage Bay Improvements, (2) $500,000 for Equipment
Rental Vehicle Maintenance Bay (3) $320,000 for M&O Fuel Tank Replacement (4) $400,000
for M80 Small Equipment and Tool Storage Building, (5) $150,000 for M&O Lunchroom
expansion and $3,967,223 for City Hall Annex debt service costs. Table GM — 2 shows the
proposed financing plan foliowed by individual worksheets showing the project detail.
Impact on Future Operating Budgets
Operating budget impacts annually are not yet forecast for general municipal buildings during
the six years 2016—2021
197
City of Auburn Draft Capital Facilities Plan
TABLE GM-1
Facilities Inventory
General Municipal Buildings
cavacirv
FACILITY (Square Feet) LOCATION
xisting fn�ntory:
Gene2l.Go�mment:
CityHall 61,721 25 W Main Street
City Hal1 Annex 45,034 1 W Main Street
City Maintenance& Operations Facility 17,940 1305 C Street SW
nicipal Court(Justice CertfervLeased to King County) 12,200 340 E Main Street
ctivity Center 10,074 910 9th Street SE
arks & Recreation Admin. Facility 7,804 910 9th Street SE
ubum Valley Humane Society-(Leased to AVHS) 5,900 4910 A Street
SA Buifding 4,47b 2905 C Street#815
treet Waste Handling Facility 2.750 1305 C Street SW
Total 167,893
olice:
Gun range 32,880 1800 Block 15th St MN
aiiquarters (Justice Center) 24,800 340 E Main Street
eized vehicle parkingstalls 3,000 1101 Supermall Way
upermall Substation 1.208 C Street SW (GSA)
Total 61,888
Fire:
Stations:
North S[ation#31 12,220 1101 D Street NE
GSA Station if35 9,533 2815 C Street SW
South Station#32 5,200 1951 R Street SE
O[her Facrlities:
Nath Station Maint Faciliry 4.700 1101 D Street NE
Total 31,653
Total Existing Inventory 261,434
Proposed Capacity Projects:
Community 15 D00
Total Propased Capacity Projects 15,000
2020 Projected Inventory Total 276,434
198
City ofAuburn Draft Capital Facilities Plan
TABLE GM-2
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
GENERAL MUNICIPAL BUILDINGS
2015 2076 2017 2018 2019 2020 Total
Caoaekv Proieets:
None
Non-Caoacitv Proiects:
1 M 8 O Vehicle Storage Bay Improvements
Capital Cos 5 100,000 100,000 - - - 200,000
Funding Sources.
Equip.Rental Fund '100.000 100,000 - - - 200,000
2 Equipment ReMaI Vehicle Maintenance Bay
Capital Cos 1s 250,000 250,000 - - - 500,000
Funding Sources.
Equip.Rental Fund 250,000 250,000 - - 500,000
3 M&O Fuel Tank Replacement
Capital Cos ls 70,000 250.000 - 320,000
Funding Sources:
Equip. Rental Fund 70,000 250.000 - 320,000
4 M80 Small Equipment and Tool Storage Building
Capital Cos Ls 400,000 - - 400,000
Funding Sources:
Operating Transfer-Water �00,000 - - - - 100,000
Opereting Transier-Sewer 100,000 - - 100,000
Operating Trensfer-Storm �00,000 - - - - 700,000
Equip.Renml Funtl 100,000 - - - 100,000
5 M80 Lunchroom Expansion
Capital Cos ts 'I50,000 - - - �50,000
Funding Sources:
Equip. Rental Fund 150,000 - - - - 150,000
6 City Hall Mnex
Long-Tertn Debt 659,426 658,527 661,780 662,680 662,680 662,130 3,967,223
Funding Sources.
Capital Im prov. Fund - - - _
REET1 659,426 658,527 661,780 662,680 662,680 662,130 3,967;223
Subt�al. Non-Caoacitv Proiects:
�Capkal Costs 970,000 600,000 • - • 7,570,000
SUMMARY•
CA?IT%1L COSTS
Non-CapacityProjects 970,000 600,000 - - - 1,570,000
Long-Term Debt 659,426 658,527 661,760 662,680 662,680 662,130 3,967,223
Total Costs 7,B29,42B 7,258,527 B61,760 862,680 882,880 662,130 5,537,223
RINDING SOURCES:
Equip.Rental Fund 670,000 600,000 - - 1,270,000
Operating Transfer -Water 100,000 - - 100,000
Operating Trensfer -Sewer �00,000 - - - �00,000
Operating Transter -SWrtn 100,000 - - - - 100,000
REET1 659,426 658,5_2_7 661,780 662,680 662,680 662,130 3,967,223
Total Funtling 7,629,426 1,258,527 661;780 662,880 662,680 -662,130 5,537,223
199
City ofAuburn Draft Capital Facilities Plan
EQUIPMENT RENTAL FUND (550) CapMal Faciltties Plan
Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds
ProjectTitle: M80 Vehicle Storage Bay Improvements
Project No: Cp0711
Project Type: Non-Capacity
Project Manager. Randy Balley
Desariptiori:
Enclase the 8 e�dsting bays to provide necessary weather protection for street sweepers, vactors, sandirig, and srww pbuv
equipmeM. Construct storage shed M facilitate removal of portable corrtainers, improving space util¢ation and traffic flow
throughout M&0.
Progress Summary•
Future Impact on Operadng Budget:
None
Activity – – - —
2U74 YE 2075 Year End
Funtling Sourees Prfor Lo 2074 Estlmate 2015 ButlBet 7A78 Budget Projeet Total
UnresMcted Equip. Rental Re�enue 5,451 100,000 100,000 105,451
Grants- S9tured(Fed,Stete.Local)
Other _
Total Fundfng Sourcea: 5,457 100,000 700,000 105;451
CapHel ExpendfWrex
Design
RlgM of Wey
ConSfNCtion 5.451 700.000 '100,000 105.457
Total ExpendlWres 5,451 - 100,000 100,000 105,651
Forecasted ProJeot Cost:
roal
2017 2018 2019 2020 207620E0
Funding Sources:
UnresWctedEqulp. Rental Revenue 2U0,000
GiaMs- Secured(Fed,Sfete,Loca/)
Other
TOfal Funding Souraes: Z00,000
Capital EzpandlWres
Design - -
Right ol Way - -
CWIStNCtbl1 200.000
Toql F�cpenditures: 200,000
G2rrts/Olher Sourcas:
20�
City ofAuburn Draft Capital Facilities Plan
EQUIPMENT RENTAL FUND (550) Capital Facilities Plan
Six Year Capital Facilities Plan, 20152020 Enterprise Funds
Project Ttle: Equipment Rental Vehicle Maintenance Bay
Project No: cp1223
Project Type: Non-Capacity
Project Manager Randy Bailey
Desaription:
Build additional vehicle bay at EquipmeM Renfal sMp for heavy equipment and large vehicles to improve etficiency and remove
chbke points. Adding a large vehicle liay with a larga vehicle lift will enable us to perfortn inspections and maintenance on more
than one large vehicle at a time, this becomes eMremely important during emergency operetions such as snow and ice events.
The City curreMy has 2.5 mairrtenance bays, this project will add one more maintenance bay for a total of 3.5 bays.
Progress Summary: -
Future Impact on Operating Budget:
None
Activ'ity
2014 YE 2075 Year End 2016 Year End
Funding Sourcex Prlor Lo 2014 FSGmafe Project Tofal ProJect Tofal
UruestnctedEquip. Rerrfal Revenue 29,278 250,000 250,000 279,276
Grants- Securetl(Fetl,Sfafe,LocaQ _
Other
Total Funding Sources: 29,276 250,000 250,000 279,278
Capiql F�cpentliturex
Design _
Right o/ Way
Const�ucfion 29,276 250,000 250,000 _ _279,27fi
Tofal Expand(Wres: 29,276 - 250,000 250,000 279,278
Forecasted ProJect Cost:
Total
2077 2078 2019 2020 20752020
Funding Sources:
UnrasMctedEqurp. Rerrtal Revenue _ Spp,ppp
Grants- Secmed(Fed,Sfafe,LocaQ
Other
Tofal Fundtng Sources: 500,000
CaPital F�cpenditures:
Design
Poght of Way
Construct/on 500,000
Toql EzpendlWres: 500,000
G2nts /Other Sources:
2�1
City ofAuburn Draft Capital Facilities Plan
NAME OF FUND/DEPT Capital Facilities Plan
Six Year Capital Facilitfes Plan, 20152020 Enterprise Funds
Project Ttle: M&O Fuel Tank Replacement
Project No: cpxXXX
Project Type: Non-Capacity
Projea Mana9er Randy Bailey
Description: - -
Replace our three 10,000 gallon underground tanks with new above ground tanks. Our exisUng fanks were installed in 1989 and
they are single wall fiberglass hanks. The Cilys cwrent insurence 6artier will not insure these tanks once they become 25 years old
which will occur in 2014. The cily is looldng at other insurance options that may remove this age restricUon. tt will be a benefit to the
Ciry ro have tha tanks above ground in the firture due to tlie reduced maintenance and inspectlon cost.
Propress Summary:
Future Ifnpact on Op`erating Buiiget: � �
None
Activity•
2074 YE 2015 Year Entl
Fdnding Sources Ptlor b 2014 E9imate 2015 BuEget 2016 8utlget Pro ect Total
UnrestrlctedEquip. Rental Revenue 70,000 250,000 70,000
GraMs- Secured(Fad,State,Local) -
OMer
Tofnl Funtling Sources: 70,000 IW,000 70,000
Capitel Expendltures:
Des/gn 70,000 70,000
Right o/ WaY '
ConStNtt(on 250.000
Tofal ExpendlWres: - 70,000 250,000 70,000
Foreoasted Project Cost: � �
Total
7077 2018 2019 2020 20752020
Funding Sources
UnresMcfedEquip. RerRal Revenue - - 320,000
Grants- Secured(Fed,State,Locaq - -
Other
Topl Funding Sources - - 320,000
Capitel ExpendlNrex
Deslgn 70,000
RigM o( Way
ConsWct/on 250,000
Total Ezpenditures: - 320,000
GraMs /Other Sources:
2�2
City ofAuburn Draft Capital Facilities Plan
NAME OF FUND/DEPT Capital Facllkles Plan
Six Year Capital Facilkies Plan, 20152020 Enterprise Funds
Project Title: M&O Small Equipment and Tool Storage Building
ProjCCt No: CpXxXx
Project Type: Non-Capacity
Project Manager Randy Balley
Description:
Construction of a pertnanent building to replace the 7 aging cargo coniainers.The cargo corMainers were a temporary,ine�ensive
storage solution but the space layout is very in�ciert and they are difficult to maintain.The new sVucture would be complete with
electrical,plumbing and insulation. W ater, Sewer, Storm and Equipment Rerdal will use this building for storage of small tools anC
equipment.
Progress Surrimary:
This projed will be designed and built in 2015.
Future impact on Operating Budget: -
None
Activity.
2074 YE 20'IS Vear End
Funtling Sources: Prior ro 2014 Fstimate 2075 Budget 2076 Butlget ProjectSofal
Unresficted Eqmp. Renta/Revenue 100,000 - -� 700,000
Operatirg Transfer-Water 100,000 700,000
Opeiating T2nsfen Sener 100,000 700,000
Operatmg Transferv Stwm t00,000 700,000
Total Funding Sources: 400,000 400,000
Capltal Expenditures:
Design _
171ghf W Way _
r.OlIS12Cr%M }�p,QQ� QQD.QQD
7otal Ezpenditures: 400,000 400,000
Forecasted Project Cost:
Tofal
2017 2018 2079 2020 207i2020
Funtling Sourcea
Unrestdcted Equip. Renfal Revenue 700,000
Oparating Transfer-Water 100,000
Operating Trans/eo-Sev.er 100,000
Operating Transfer-Stam 700,000
Tofal Funding Sources 400,000
Capital F�cpendiWres:
Design
R'ght o/ Wey
Construction 400,000
Tofal Expentlitures: 400,OOD
GraMs/Other Souices'
203
City ofAuburn Draft Capital Facilities Plgn
WAME OF FUND/DEPT CaPital FacilRles Plan
Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds
Project Title: M80 Lunchrbom Expansion
Project No: cpxx�c
Project Type: Non-Capacity
Project Manager Randy Bailejr
— --- -- - - -
Description:
E�ansion of the currerrt lunchroom by redesignirig the area to accommodate PJI-Staff meetings, provide for a lraining facility, lunch
room and also senre as the DepartrneM Operations Center (DOC) during an emergency event. In addkion,the design would
include siiding doors which would allow the area to serve Mro purposes at once, for e�mple,one half of the room being used as a
DOC and the otlier hatf open to employees to use as a lunch/break room.
Prog�ess Summary•
This project will be designed and buiR in 2015
Future Impact on Opereting Budget:
None
Activky
2014 YE 2015 Year End
FunCing Sourcex Prior to 2014 E4imate 2015 Butlget 2076 8udget Prqect Total
Unrestncted Equlp. Rental Revenue 150,000 150,000
GraMs- Secuied(Fed,State,Local)
Other
Total Funiling Sources: 150.000 150,000
Capital Expendilurex
Design 45,000 45,000
Right o/ Way -
Consfnictlon 105.000 105,000
Toml EzpendiWres: 150,000 750,000
Forecasted-Project Cost:
rotal
2017 2018 2019 2020 201SY020
Funding Sources
UnrestnctedEquip. Rental Revenue 150,000
Grar�fs- Secured(Fed,Stete,Local) -
Other
Tofal Funding Sources: 150,000
CapHal Fspenditures
Design 45,000
Riqht ol Way
ConstNUion 105 000
Toml Expendiwres: " 750,000
Grarrts /Other Sources:
204
City ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Capita� Faci�ities Plan
Six Year Capitai Facilities Plan, 2015-2020 Capital Projecfs Fund
Project Title: City Hall Annex
Projact No:
Frojed Type:
Project Manager.
Descriptlon:
To pay scheduled deM service costs on 2010 General Obligation bbnds issued for the Ciry Hall Mnex.
Progress Surrimary•
Future Impact on Operating Budget:
Activity:
(PreHous 2 rrs) 2076 YE 2015 Year End
Funding Sources Prior to 2074 Estlmate 2015 Budget 2076 BuOget Project ToTal
UnresMcted Cap lmprow �
Grants Secured(Fed,Sfate,Local)
REET 1 1,289,400 645,200 659.426 fi58.527 2,594,026
Toml Funtling Sources: 7,289,400 845,Y00 859,428 656,527 2,594,026
Capifel Erzpenditures:
Des�gn _
Constniction
Long-Term Debf SeMce 1,289.400 645,200 659.426 658,527 2,594,026
Tolal Expenditures: 1,289,400 845,200 659,428 658,527 2,594,026
Foreca_sted Projed Cost:
Topl
2017 2018 2019 2020 20152020
FunEing Sources
UnresMcted Cap lmprrne _
G2nfs Securod(Fed,Stafe,Local) _
REET 1 667,780 fi62,680 662,680 662,130 3,967,223
Total Funtling Sources 667,780 662,680 662,fi80 662,130 3,967,223
Capiql Eapentli4�res
Deslgn
COIIS�NC(IOII _
Long-Temr Debt Sarvice ,661,780 662.680 662,680 662,730 3,967,223
Total ExpendiWres: 661,780 682,680 662,680 662,130 3,967,223
G2M5 /Other Sources:
205
City ofAuburn Draft Capital Facilities Plan
� �
CIT� OF �
� - -
�k MORE THAN YOU IMAGINED
206
City ofAuburn Draft Capital Facilities Plan
COMMUNITY IMPROVEMENTS
Current Facilities
Community Improvements include sidewalk and traffic signal improvements, public art and
phase 2 of the Auburn Environmental Park Boardwalk project.
Level of Service (LOS)
No Level of Service for community improvement projects have been identified at this time.
Capital Facilities Projects and Financing
The City's proposed Community Improvements include thirteen capital projects at a cost of
$3,961,188 and debt service at a cost of 1,361,973 for a total of$5,323,161 Table CI-2 shows
the proposed financing plan followed by individual work sheets showing the project detail. '
Impact on Future Operating Budgets
As Table CI-3 shows, operating budget impacts of $43,000 are forecasted for community
improvement facilities during the six years 2016-2021
207
City ofAuliurn Draft Capital Facilities Plan
TABLBCI-2
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
COMMUNITY IMPROVEMENTS
2015 2016 2017 2018 2019 2020 Total
Caoaeib PrWects:
1 8C�Street NE&C Street NW ITS�Improvements
Capital Costs 5,000 - 5,000
Funding Sources
Capital Im pro�,em ent Fund - - - -
REET 2 5,000 5,000
SubWrtal. CaoaciN Proieets:
Capital Cosfs 5,000 - 5,000
Noi�-CatiaciN ProieeSs:
2 plywide Sidewalk Repalrs &Improvemerrts
Capihal Cosfs 325,000 325,000 125,000 125,000 125,000 125,000 1,750,000
Funding Sources
Capifal Im proe2m ent Fund 25,000 25,000 25,000 25,000 25,000 25,000 150,000
REET2 200,000 200,000 - - - 400,000
Grents (Fed, Siate, Local) 100,000 100,000 100,000 100,000 �00,000 100,000 600,000
3 Annual Traffe Signa_I Improve_merMs
Capital Costs 175,000 175,000 175,000 175,000 '175,000 175,000 1,050,000
Funiiing Sources
Capital Im provem ent Fund - - - - -
REET 2 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000
4 Mohawks Plastics SNe Mitlgatlon Project
Capitel Cos4s 25,000 20,000 20,000 65,000 20,000 - 150,000
Funiiing Sources
Capital Improvem ent Fund -
Other(Fund 124 Trafic Imp.) 25,000 20,000 20,000 65,000 20,000 150,000
REET 2 - -
5 Pu61ic Art
Capital Costs 30,000 30,000 30,000 30,000, 30,000 30,000 780,000
Funtling Sources
Capital Impro�m ent Fund - -
Grants - - - - -
REET 2 30,000 30,000 30,000 30,000 30,000 30,000 780,000
6 dty Wetland Mitlgation Projeets
Capital CosLs 20,790 7,694 7,694 7,694 7,696 51,568
Funding Souroes
Capital Improvem ent Fund - - - - -
REET t - - - -
Other (Fund 124-Wetland Mit.) - 20,790 7,694 7,694 7,694 7,696 51,568
7 Auburn F1Mronmerrtal Park Boardwalk-Phase 2
Capi�al Costs 75,000 800,000 - - 875,000
Funding Sources
Capital Impro�nem ent Fund - - - -
REET 2 75,000 - - - 75,000
Grants 550,000 - SSO,U00
Other-To Be Determ ined - - 250,000 - - - 250,OOU
8 Downtown WayfinAing Progrem .. . . - - - - - � - - -
CapiFal Costs 90,000 30,000 - - - �20,000
Funding Sources
Capital Im promem ent Fund - - - - -
REET 2 90,000 30,000 - 120,0G
2�8
City ofAuburn Draft Capital Facilities Plan
TABLE CI-2 (continued)
2015 2016 2077 2018 2019 2020 Tofal
Non-Caoackv Proiects:
9 Qeen River Park Design
Capihal Costs 75,000 - - - 75,000
Funding Sources:
CapihallmprovementFund - - - - -
REET 2 75,000 - - - - 75,000
10 LesGove Campus Master Plan
Capital Costs 75,000 - - - 75,000
Funding Sources:
CapitallmprovementFund - - - - - -
REET 2 75,000 - - - - 75,000
11 Main Street Streetscape Urban Design
Capital Costs 70,000 - - - - - 70,000
Funding Sources:
Loral ReHtalization Fund 70,000 - - - - - 70,000
Granis - - _ _ _ _
12 City Downtown Public Parking Lot Reco�guration
Capifal Costs 159,620 - - - - 159,620
Funding Sources:
Local Revitalim4on Fund 159,620 - - - - 159,620
Grants - - - _ _ _ .
13 LocalRevkalaatlon
Long Term Debt 222,942 223,091 225,210 224,810 228,610 237,310 1,361,973
Funding Sources:
REET2 222,942 223,091 225210 224,810 228,610 237,310 1,361,973
SuMotal,Non-Caoacttv Proiects:
Capifal Costs 1,099,620 600,�90 1,157,694 402,694 357,694 337,696 3,956,188
SUMMARY•
CAPITAL COSTS
CapaciryProjects 5,000 - - - - 5,000
Non-CapaclryProjects 1,099,620 600,790 1157,694 402,694 357,694 337,696 3,956,�88
Long-TeYm Debt 222,942 223,091 225210 224,810 226,610 237,310 1,361,973
Total Costs 1,327,562 623,881 1,362,904 627,504 586,304 575,006 5,323,161-
FUNDING SOURCES:
CapitallmprovementFund328 25,000 25,000 25,000 25,000 25,000 25,000 150,000
Local Revitalization Fund 330 229,620 - - - - 229,620
Grants 100,000 100,000 650,000 100,000 100,000 100,000 t 150,000
REET2 947,942 658,091 430,210 429,810 433,610 442,310 3,341,973
Other-ToBeDetermined - 250,000 - - 250,000
Other(Fund 124-Traffic Imp.) 25,000 20,000 20,000 65,000 20,000 150,000
Ofher(Fund 124-Wetland Mit.) 20,790 7,694 7,694 7,694 7,696 51,568
Total Funding 1,327,562 823,881 1,382,904 627,504 566,304 575,006 5,323,161
209
City of Auburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Capital Facilkies Plan
Six Year Capital Facllities Plan, 20152020 Capital Projects Fund
` ._ .. ..- - -� - ' -
Project Title: 8th Street NE and C Street NW RS Improvements TiP # 52
Pioject No: cp1226
ProjectType: CapaCity
Pmject Manager� Matt Larson LOS Corrldor ID# 18, 19
Description:
This project will expand tfie Citys fTS networic to improve trevel reliability,maintenan6e response,and emergency
manag"emerrt capabilities.The project includes tlie design, coorclination,pertnitting,and constr�tion of the ITS e�ansion
on the 8th SVeet NE/Lea Hill Road corridor ard at the C Street NWNV Main Street, C Street NW%3rcJ Street NW ard A
Street NW/3rd Street NW intersections.
Prog�ess Su'mmary:
Project is planned to be completed in 2014.
Future Impact on Opereting Budget:
The amual mairrtenance cost for this project is estimated to be $500.
Activity:
2074 YE 2015 Year EnA
Funding So�ries Prlor W 2014 E�imaOe 2015 Butlget 2016 Budgat Project To18i
FurM Balence
Grants Securetl(FeU,Sfate.LocaQ
REET2 50.000 5,000 55,000
Trafflc Impact Fees
anB�
roai F�oa�n9 so����: w.000 s,000 - ss,000
CaPital Fspentli4�rec
Dasign 10,000 - 10.000
Right of way -
Constructlon 40.000 5,000 d5,000
Total F�cpendfWres: 50,000 5,000 55,000
Forecasted Project Cost:
To�l
2017 2018 1019 1020_ 2015-2020
Funding Soureas
Furxl Balance -
Grants Secured(Fed,State,Local)
REET2 5,000
Trafflc Impact Fees
Other
Total Fundin9 Sourees: - 5.000
Capital 6cpenditures
Deslgn
Right of Way -
COIISiNCl/0/1 5,��
Totel Ezpenditurea: 5,000
Grants /Other Sources:
21�
City ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan
Six Year Capital Facilities Plan,20152020 Capihal Projects Fund
ProjectTitle: Citywide Sidewalk Repairs 8 Improvements TIP#32
Project No: cp1301
ProjectType: Non-Capacity(Annual)
Project Manager. Jai Carter LOS Corridor ID#N/A
Description:
Projectfundssidewalkimprovemerrtsatmultiplelocatior�sthroughouttheCity. Asidewalkirrventorywascompletedin
2004 Annual projects are selected based upon criteria such as:gap closure,safe walking routes to schools,completion o
dowmown pedestrian cortidor or"linkage",connectivity to transit seMce,ADA requiremerrts, and "Save our SVeets"(SOS
project locations.
Progress Summary:
Puture Impact on Operating Budget.
This project will have no impact on the operating budget for street main[enance.
Activ'rty:
2014 YE 2015 Year End
Funding Sources: Prloi W 2014 Estlrriate 2015 Budget 2016 Butlget ProJed Toql
FurMBalance 25,000 25,000 25,000
Grants-Unsecured State 100,000 100,000 100,000
REET 2 200,000 200,000 200,000
Other
Total Funding Sources: 325,D00 325,000 325,000
Capital Expenditures
Design 15,000 15,000 15,000
Right o/ Way -
Consbuction 310,000 310,000 820,000
Total ExpendiWrex • 325,000 325,000 325,000
Forecasted ProJect Cost:
Total
2077 2018 2079 2020 20152020
Funding Sourcez
FurMBalance 25,000 25,000 25,000 25,000 150,000
Grams-Unsecured State 100,000 100,000 100,000 100,000 600,000
REET 2 - 400,000
O[her
Tofal Funtling Sources 125,000 125,000 125,000 125,000 1,150,000
Caplpl Expenditures:
Design 15,000 15,000 15,000 15,000 90,000
RigM oi Way
Construction 110,000 170,000__ 110,000 110,000 1,060,000
Total ErzpendlWres: 125,000 125,000 125,000 125,000 1,150,000
Granls/Other Sources: Grent funds are na secure - �-
211
City ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Capital Paeilitles Plan
Six Year Capital Facilifies Plan, 20752020 C.apital ProJects Fund
Project Title: Mnual Traffic Signal Replacement 8 Improvements T1P #34
Project No: Various
Project Type: Non-Capacity (Annual)
Project Manager. TBD LOS Corridor ID# N/A
DescripUon:
This project includes replacing traffic signal cabinets and equipmeM, video detection cameras and pedestrian pushbuttons.
This project will also make safety improvements to our signals including awdliary heads and flashirg yellow arrows, or
capacity improvemer�ts such as righ[-tum owdap signals. The City uses current trafiic courds and collision data to
detertnine the iMersections to improve.
Progress Summary•
The project is ongoing and corAiriues to successtully corriplete annual traffic sigrel irtiprovement projects cityuvide.
Future Impact on OperaNng Budget:
This project will have ra impact on the operating budget for street maiMeronce.
ACtIVI�/•
2014 YE 2075 Year Entl
Funding Sources Prlor to 2014 Estlmate 2D15 Budget 2078 Budget ProJee!Totel
Fund Balance - -
GraMs Unsecured(Fed,State,Lacaq - -
REET 2 175,000 175,000 175,000 350,000
Other
Total Funding Sources 775,000 - - --175,000 175,000- 350,000
Capital ExpendfWres
Deslgn - 25,000 25,000 25,000 50,000
RigM o/ Way -
Construction - 150.000 150.000 150,000 300,000
Total ExpendiWres - 175,000 775,0� 775,000 350,000
Forewsted Projed Cost:
Totai
2077 2018 Z079 2020 20152020
Funding Sources
Fund Ba/axe - - -
G/ents-Unsecu2d(Fed,State,Local) - -
REET 2 175,000 175,000 175,000 175,000 1,050,000
Other
Total FurMing Sourcex 175,000 175,000 175,000 175,000 1,050,000
Capltel EicpentliWres:
Design 25,000 25,000 25,000 25,000 150,000
Right oi Way
Conshuction 150,000 150,000 150,000 150,000 900,000
Total Eic{iendiWrex 175,000 175,000 175,000 175,000 7;050;OD0
GraMs/Olher Sw�ces:
212
City ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Capltal Facilities Plan
Six Year Capifal Facflitles Plan,2015-2020 Capital ProJeeffi Fund
ProjectTiUe: Mohawks Plastics Site Mklgation Project TIP #13
Project No: cp0767
ProjectType: Non-Capacky
Project Manager JefF D&on/Matt Larson LOS Corridor IDII N/A
Description:
The project consists of the design,corstruction,mairrtenance antl morritoring of appro�dmately 22ac2s of wetland
c2adon and appro�dmatey 0.4acres of wetland enhancemerK witFrin the Goedecke South Property owned by the Sewer
Utility in orcJerto compensate for approbmately�.6ac2 weBand loss on the Mohawk PlasUcs prbperty(Parcel#
'132'1049056). The project wds appro�ed �er an ebsting ag2emerrt approsed by Resolution No. 4196,June 2007
Progress Summary:
Ttie Ciry recei�d the DOE WQ Certification, WDFW HPA,and on May 7 2009,the Arrny Corps of Engineers(Corps)404
wetland pertnit(NWS-2007-1913). Subsequently, bid speciflcatiorts arcl construction plans were prepared and
corutrucGon began in October 2009. Coretruction�ras completed in January 20�0 and the project is currentlywithin the 10-
year monitoring period,which irnolres amual mairrtenance,moritoring ard reporting.
Future Impact on Ope�ating Budget:
tt is ar�ticipated Mat armual mairrtenance,morutoring and reporting on tlie performance of the weflarul mitigation project will
be requred tor a period of 10 years,in corRortnance with pertnit req�oremeMs. Afterthe successfid conclusion of 1N5 10-
year monitoring period,which is arrticipated to be in December 20'19,ongoing operetion e�enses shoWd be mirdmal.
Activity.
2014 YE 2015 Vear EnA
FunAing Sources Prior b 2014 Estlmate 2015 Budget 2076 Budget Project Total
Furrd Ba/ence _
Grants Sacuretl(Fetl,Stete,LocaQ
Bontl Proceeds
Tref/ic Impact Fees 469,855 25,000 25,000 20,000 519,855
REET 2 76.368 76 368
Toql FunAing Soureea 546,223 25,000 25,000 20,000 596,223
Capipl ErzPenOib�res
Des�gn 770.706 170,706
Rlght d Wey
Consfructiw 375,517 25.000 25.OD0 20,000 425,5'17
Tobl Expentlitures: 548,223 25.000 25,000 20,000 598,223
Forecas;ed Project Cost:
Tofal
2017 2078 2019 2020 2015•2020
Funding Sources:
Fund Be/ance
Grants Sec�red(FeU,State,Loce!)
Bond Proceeds
Treflic Impecf Fees 20,000 65,000 20.000 150,OOp
REET2
Tolal Funding Sources: 20,000 65,000 20,000 150,000
GpiGl Expenditures
Design
Rlght o/ Way
Construction 20,000 65,000 20,000 150,000
Topl ExpendiNres: 20,000 85,000 20.000 750,000
G2Mb/Other Somces: I
213
City ofAuburn Draft Capital Facilities Plgn
CAPITAL IMPROVEMENT FUND (328) Capipl Faciuties Plan
Six Year Cap'rtal Facilkies Plan, 2015-2020 Capifal Projects Fund
Project Title: Public /Ut
Project No: gCbd02
Project Type:
Projed Manager• Krueger
Description: - -
The City desigretes$30,000 armuallytovrard the purcha�se of p�lic art, for placemeM at designated locatiore throughou[
the City.
Progress Summary:
Arts Commission will meet to assess futwe needs and seek approval from City Coimcil on placemerrt.
Pulure Impact on Operating"Budgeti
None
Activily - - - - - - -
2074 YE 2015 Vear End
Funtling Sources: Prlor_to20t4 Fstlmate 2015 Butlget-_2018 Butlget Bro�ectSodl_
Fund Belence � - � 22,000 - - - - �- - 22,000
GraMs Secuied(Fed,Sfete,Locel) -
REET 2 30,000 30,000 30,000 30,000 90,000
ONrer
Total Funtling Sourcas 30,000 52,000 30,000 30,000 112.000
CaplLl ExpandiNres
Design -
RiryM d Wey -
ConstrucNon 30,000 52,OOD 30.000 30.000 742.000
ToTal E:pantliWrec 70.000 52,000" 30,000 - 30,000 " 112.000"
Forecasted ProJeot Cost:
Tofal
2017 2018 2018 2020 201b2020
FunEing Sources:
Funtl Belence -
Grarrts Secured(Fed,Stete,Local) -
REET 2 30,000 30,000 30,000 30,000 180,000
Other
Total Funding Sourcex �0,000 30,000 30,000 30,000 180.000
Capltal Expandituros
Design
Rlghf ol Way
Constn�ction 30,000 30,000 30,000 30,000 180,000
Total F�cpenillturas: 30,000 30,000 50,000 30,000 180,000
Grants/Other Sources:
214
City ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Capital Faeilkies Plan
Six Year Capital Facilities Plan,20'IS-2020 Capkal Projeets Funtl
Projectrne: City Wetland Mitigation Projects
ProjectNo: cp1315
ProjectTN,e: Non-Capacity
ProjectManager Afld@f5@fl
Description:
This project desigre and constructs off-site wetland mitigation in the Aubum Ern�ironmental Park for participating
de�elopment projects as approved ihrough the Citys developmerR review process. Design,construction, monitorirg, and
mairRenanoe of the mitigation is funded ttirough wetland mitigation fees collected by tlie City.
Progress Summary�
Construction and monitoring are on9oing.
Future Impact on Operating Budget:
After construction, each wetland mitigation site is monitored and mairrtained for a period of ttiree to ten years,depending
on the specific requiremerris for the project.Fintling for Tulure.year monitoring and maintenance is included in ihe
dewlopmerrt fees collected by ihe City,and is budgeted as part of tlie Capital Facilities Pian.
Activity.
2074 YE 2015 Year Entl
Puntling Sources: Prior ro 2014 EstlmaOe 2015 Budget _2016 Butlget ProJect7otal
Funtl Ba/ance - - —
Grants Securetl(Fed,State,Local) _
FurM 124 WeNand AAltigaGon Accounf 4,355 20,790 25.145
REET
Total FunAing Sources: 4,355 20,790 25,145
Capitll Expenditures:
Desi9� 4,000 4.000
Righf ol WaY 72,090 12.090
CorrstmcLon 4,355 4,700 4,700
TOUI E�cpendilures 4,355 20,790 20,790
Forecasted Project Cost:
Tobl
2017 2078__ 2019 2020 20152020
Funtling Sources: - - -
Fu�Balance
Gran7s Secured(FeU,Stete,Local)
Funtl tt4 Wet/and fvA'tigation Accounf 7,694 7,694 7,694 7,696 5'1,568
REET
Tobl Funding Sources: 7,894 7,694 7,694 7,696 51,568
Capibl Expendltures:
Design 4.000
Right W WaY 72.090
Construction 7,694 7,694 7,694 7,696 30,778
Tobl Expenditures: 7.694 7.694 7.684 7.696 57,568
Grants/Other Sources
215
City ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) CapiNal Facillties Plan
Six Year Capihal FacilRies Plan, 20752020 Capiql Projects_Fund
Project Title: Auburn Environmental Park Boardwalk - Phase 2
Project No: cpxxxx
Project Type: Non-Capaaity
Project Manager Mdersen
Description:
The Aubum Ernironmental Park (PEP) provides vegetated naturel open space within an urban¢ed area. The AEP provides
opportuntties for local economic development,water quality improvemeM,stortn water detention,flood control, fish and wildlife
enhancemeM,visual resources, public education,and passive recreation, including waliting Vails and bird viewing amenities. In
2012, the Ciry completeH ihe coristruction of approximately 1,200 lineal feet of tlia first phase (Phase 1)of an elevated tioardwalk
trail in the Fwbum Environmental Park (AEP). This Vail eMended from W est A�6in Street through e�dsting wetlands in the AEP
tertninating at the base of the Bird vewing Tower coristructed in 2009. As pert of the cohsVuation of the elevated boardwalk,the
City also instatied iMerpretative signage,b�ch seating,limited new vehicle parking on Western Avenue and over lwo acres of
wetland species of traes, plarrts and sHrubs. Phase 2 of the elevated boartltivzlk trail would construct a combinatibn of
appropmately 2,000 lineal feet of surtace trall and elevated boardwalk trail from the current tertninus at the Bird �liewing Tower to a
connection wiN the Interurban Trail. The Phase 2 project will TuMer previous and current Councils'visions of the AEP providing
assive recreation and environmental educatlon unkies for all Fwbum citizens.
Progress Summary•
This is a new capital improvement proposal.
Future Impaot on Operating Builget:
ConsVuction of the Phasa 2 project is anticipated to incur approbmately$�0,000 in annual operating�wsts to the Citys operating
budget. This operating cost is covered in ewsting program improvemerrt fundirg for the Environmental Services portion of the
Commun' Develo mertand Public Works De rtmentbud et.
Activity.
Y014 YE 2015 Year End
Funtling Sources Prior tn 2014 Esbmate 2015 ButlBet T016 Butlget Project 7otnl
Fund Ba/arice
Granfs Unsecurod State
REET 2 75,000 - 75,000
Other -TBD
Total Funding Sources: 75;000 - 75,000
Capitsl Ex{iendittires:
Oes/gn 75,000 75,000
Right W Way -
COIISfNC110O
Total Eupenditures 75,000 � _ " - -" 75,000
Forecasted Project Cost:
Total
2017 2018 2079 2020 2015-2020
Funding Sources:
Fund Balance -
Grents Unsecuiad State 550,000 550,000
REET 2 75,000
Other -TBD 2W,000 _ 250,000
Total Funtling Sources: 800,000 875,000
Capifal F�cpentlitures:
Deslgn 75,000
Right W Way -
Construction 800,000 800.000
Total Erzpenditurex 800,000 - 875,000
G2Ms /Othar Souroas:
216
City ofAuburn Draft Capital Facilities Plan
CAPffAL IMPROVEMEM' FUND (328) Capital Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Capital Projects Pund
Project Title: Downtown Wayflnding Program
Project No: Gpxxxx
Projact Type: Non-Capacity
Project Manager Elizabeth Chamberlain
Description:
Phase 1: The dowrrta.vn PedesVian Kiosks were developed in 2012 as a result of additional funding being available ihrough Local
Revitalization Financing. Nlne locations were selected within Downtown Aubum for a pedesVian Iti�k M be constructed. Witli the
budget available,three luosks were consVucted in 2013 at the Interurban Trail, Sound Trensit Plaza, antl at 1st StreeUSouth
Division Street Phase 1 proposes consWction W three atldiGonai Idosks m 2015.
Phase 2: Develop an updated wayfinding program,both pedestrian ar�d vehicular that would initially begm within DavMown Aubu
that could then be e�anded Citywide. The current vehicular wayfind'mg program is lacking in aesthetic appeal, dces not coordinat
with the vision tor powrrtown Alibum, and needs refreshing. A design and color scheme have been established with the pedesVia
kiosk design that an updated wa�nding progrem can build upon.
Progress Summary•
Future Impact on Operating Budget:
Activity•
2074 YE 2015 Yeer End
Funding Sour�es: Prlor ro 2014 Estimate 2075 Butlget 2076 Bud et Pro ect Total
Fund Ba/ance
REET 2 90,000 30,000 90,000
Ofher
Total Funding Sourcea: - 90,000 30,000 30,000
CaPiml Expendlwres
Design 8,000 15,000 8,000
Right of Way
Constructlon 82.000 15.000 82.000
Toml ExpenAiwres: - " 90,000 30,OU0 90,000
Forecasted Project Cost:
Total
2017 2018 2019 2020 20152020
Funding Sourcex �
Fund Balance
REET 2 �2p,ppp
Other
7otal Punding Sources: 120,000
Capifal F�cpenditurex
Desl9� 23.000
Rlght ol Way -
Constructlon 97,000
Total ExpendiWres: 120,000
Grsrns /Other Souroes:
21�
City ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan
Six Year Capital Faeflitles Plan, 2015-2020 Capital Projects Fund
Project rne: Green River Park Design
Project No: CpxxicX
Project Type: Non-Capacity
Project rvtanager. Daryl Faber
Description:
This project provides funding ro complete of a Green River Park Master Plan. The Ciry has receMy received, via a property transfer
from King Courrty and the State of W ashington, the riverfrorrt property located alorig a bend in the Green River tietween 102nd and
104th Ave SE. These two parcels comprise an approximate 14 acre sde, intended to be developed for public use. This future park
coMinues more than 1,000 feet of water access. Much of the property is subject to shoreline regulatiorrs as well as other
restrictions. Community input is vital to the long-term vision and success of the property.
Piogress Summary•
Future Impact on Operating Budget:
No impact on the Parks Departmerrt Operating Budget. The Citys funding of a Park Master Plan for this sRe is critical in an effort to
receive graM funding and can be a reimbursable expense should funding be allocffied for construction for the proposed park site.
Activity•
(Prallous 2 Yrs) 2074 YE 2075 Yee�End
Funding Sources: Prior to 2074 Estimafe 2075 Budget 2018 Butlget Pra ed Tofal
UnresMcted Cap Impro�s - - -
GraMs-Secured(Fed,Stafe,Local) - -
REET 2 75,000 75 000
Tofal Funding Sourees: - 75,000 - 75,000
Capital FxpendlWres:
Design - 75,000 - 75,000
CO/IS�NCGM - - - -
LO/1¢T8/II/Q96�$BlVICB -
Tofal Expendltures: - - 75,000 - 75,000
Forecasted Projed Cost:
Tofel
2077 2018 2079 20�1 20752020
Funding Sourees
Unrestnctetl Cap Improve - -
Grants - -
REET2 75000
Totai Punding Sourcex - - - 75,000
Capital ExpendiWrex
Design 75,000
Constn,ction - -
Long-Term Debt Servlce
Total ExpendiWres: - - 75,000
GraMs/Other Sou�ces: " - -
218
Ciry ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Capital Facilities Plan
Six Year Capital Facilities Plan, 2015-2020 Capital_Projects Fund
Project Title: Les Gove Campus Master Plan
Projed No: CpxXxX
Projea Type: Non-Capacity
Project Mareger. Daryl Faber
Description:
This project provides the funding to complete a Les Gove Campus Master Plan made necessary by the recent acquisRion of the
Herr Properties and the proposed construction of the Community and Youth/Teen Center This plan will consider recreational
opportundies; potential community uses;h�c pattems aFFectirg the Les Gove neighborhood; park user pedesfian, antl vehicular
safety. The plan will also e�mine poterdial Ciry uses and opGons such as demolition or repurposing of property.
Progress Summary:
Future Impact on Opereting Budget:
This project will have rro impact on the opereting builget for Parks and Recreation, but will make the City eligible for graM funding.
Activity
(PreHous 2 Yrs) 2016 YE 2015 Year Entl
Funding Sources: Prlor b 4014 Fsdmate 2015 Budget 2076 Builget .ProJact Tofal
UnresMcted Cap Improve
Grants Secured(Fed,Stete,Locaf)
REET 2 75,000 75,000
Tofal Funding Sources 75,000 75,000
Capliel F�cpenditures
Deslgn 75,000 75,000
Construction
Laig-7ertn Debt SeMce
Toml ExpenClturoa: 75,000 75,000
Forecasted Projed Cost:
roa�
2017 2018 2019 2020 20752020
Funding Sourcas: -
Unrc+stdcted Cap Impiove _
G2nts _
REET 2 75,ppp
7otal Funding Sources: - - 75,000
Capital Expenditures
Des/8� 75.000
�'.OIISINL(hM _
Lorg-Term Debf Service
Total Expendiwres: 75,000
G2nts /Olher Sources:
219
City of Auburn Draft Capital Facilities Plan
LOCAL REVITALIZATION FUND (330) Capital Facilitfes Plan
Six Year Capifal Facilkies Plan, 20152020 Capital Projecffi Fund
Project Tue: Main Street Streetscape Urban Design
Project No: cpxxxx
aroject Type: Non-Capacity
Project Manager Elizabeth Chamberlain
DescMption:
Develop an iuban design conceptto( Main Street fmm C SVeet NW/SW to F Street NE/SE. The design woWd primarily
lobk at the sVeet ernironmerrt of Main SVeet and Faw the ebsting buildings will irrterface with the street. The project will
also bok at geotechrrical analysis of the soil conditions within ihe Main Street rigM-of-way as weli as preliminary design of
idilities in order to develop a cost estimate for a fuhae construc6on project. Construction is rot part of this pmject. a is
armcipated ihat fuhae budget or grard tunding will be sougM for the detailed design and construction phases.
Progress Summary•
ConsultaM selection is underway. AMicipate beginrrirg the urban design work in 2014 arid cortipleting tfris pFiase in 2015.
Future Impact on Opereting Budget:
None aMicipated.
/�CYIVIf)/.
2014 YE 2075 Year End
Fundfng Sourcea: Prior ro 201d Estlmate 2075 Butlget 2016 Budget Proect Total
Lxal ReNtal/zation Fund 330 170,000 10,000 180,000
Granfs- Secured(Fed,State,Locel)
Ofher /GO Ba�d)
Totel FunCing Sourcas 110,000 70.000 - 780,000
Capltal Expentlltirea
Deslgn 110,000 70,000 180,000
Righf W Wey -
COIIS�NC�IOl1
Totel �pendiWres: 110,000 � 70,000-�- - "" - _ - - 180,000"
Forecasted ProJect Cost:
rom�
2017 2078 2019 2020 2075-2020.
Funding Sourees
Loca/ Revttadzallon Fund 330 - 70,000
Grants- Secured(Fed Stete,Locaf) - -
Other (GO Bond) - -
Total Funding Sour�es: 7�.a�
Capltal EzpendlWres:
Deslgn 70,000
Right ol Way
CO�S�NCtlpl '
Topl Expendlturea - - � � - � � —�70.000
Grants /Olhw Sources:
22�
City ofAuburn Draft Capital Facilities Plan
LOCAL REVITALIZATION FUND (330) Capital Facilltles Plan
Six Year Capifal Facilfties Plan, 20152020 Capifal Projects Fund
Project rtie: City Downtown Public Parking Lot Reconfiguration
Projea No: cpxxxx
Project Type: Non-Capacity
Project Manager Elizabeth Chamberlain
Description:
Reconfigure the City owned public parkirg bt between Safeway and Main SVeet to address pedestri.an ard vehicular
circulation;remove epstirg landscaping to allow more flepbility in the parking lot redesign;e�lore whether more paricing
sta�ls can be added to the lot to aid in providing additlonal customer parking within Downtown Aubum;and resurface the
parking lot.
Progress Summary:
Begin design in 2014 with construcfion potentially startirg towards the end of 2014 and completion in 2015.
FuWre�Impaat dn Opereting Budget:
None anticipated as the Cily already mairrtains the parking lot.
Activity.
2074 YE 2p15 Year EnC
FunCing Sourms: Prlor to 2074 Estimate 2075 Budeet 2016 Butlget Project Total _
Loca/RaNtellzet/on Fund 330 220,000 759,620 379,620
Grants-Secured(Fred,Sfete,Loce!)
REET
Othe�(GO Bontls)
Total Funding Sources 220,000 159,620 379,620
CaPitel ExpendiWres:
Design 725.867 t25.867
R79M d Way 94,133 759,620 253,753
r.0I15INC�lOI1
Total Expendltures 220.000 159,620 379,620
Foreoasted Project Cost:
rotal
2017 ZO78 2019 2020 20152020
FunEing Sourcas:
Loca/Rev/tellzat/on Funtl330 159,620
c�a.ns-securea(Fee,srere,cocap
REET _
O�har(GO Bartls)
Total Funding Sources 159.620
Gpital EzpenEliurec
Design
RigM o/ Way 159,620
C.OlISfNC�IOII
Tobl ExpentliWres: 159.620
Grants/Other Soutces:
221
City ofAuburn Draft Capital Facilities Plan
CAPITAL IMPROVEMENT FUND (328) Ca{iital FaeilitiesPlan
Six Year Capital Facilitles Plan, 2015-2020 Capital ProJects Fund
Project Title: Local Revitalization
Project No:
Project Type:
Project Manager
Desc�Iption:
To pay debt service costs on 2010 General Obligadon bonds issued for Cie Dowrrtown P�enade trnpro�merrts. Loaal
Revitalizatlon financfng is a oredit on the State's poNon M sales ta�c that the City will receive through 2035.
Progress Summary•
Future Impact on Operating Budget:
Activity - --
(PreNous 2 Vrs) 2076 YE 2015 Year End
Funding Sourcea Prlor to 2014 FSimate 2075_BuE et_ 2016.Bud8aL — BroJacl 7otal
Urnestdcted CeP /mProw - -__-__ - _ _.__ _-__ - _ _ _
G2M5 Secuied(Fed,State,Local)
REET 2 299.132 217.100 222,942 223,091 739.174
Total Funding Sourees 299,1ffi 217,100 rt2.942 723,091 739.174
Capllal ExPandiWres
Design
Constructiar
LonB'Term Debt Service 299.132 217.100 222,942 223.091 739.174
Total F�cpendiNros: 289,132 277,100 u3,942 223.091 739.174
Forecasted ProJect Cost: �
Tofe I
2077 2018 2019 2020 20152020
Funding Sour�es:
Uruestr/cted Cap Improva - -
Grarrts -
REET 2 225.210 224.810 228,610 237,310 1,361,973
Total Funding Sourcax 225,210 71A,670 t28,670 237,310 1,361.973
Capital ExpendlWies
Design
Construction - - -
Lorg-Term Debt SeMce 225,210 224,810 228,810 237,310 1,361,973
Total ExpendlWies: Y25,210 224,870 218.810 237,710 1,361.973�
Grams I Other Sources:-
222
City ofAuburn Draft Capital Facilities Plan
TABLE CI-3
Impact on Future Operating Budgets
COMMUNITY IMPROVEMENTS
Pro'ect: 2016 2077 2078 2019 2020 2021 Total
1 Sth Sf NE 8 C Si NW!TS
Improvements $ 500 $ 500 $ 500 $ 500 $ 500 $ 500 $ 3,000
2 Citywide Sidewalk Repair 8
ImprovemeM _ _ _ _ _ _ _
3 Tra�c Signallmprovements _ _ _ _ _ _ _
4 Mohawks Plastics Site
Mitigation - - - - - - -
5 PuWic Art
6 CityWetlandMitigation
Projects - - - - - - -
7 AEPBoardwalk-Phase2 _ - 10,000 10,000 10,000 10,000 40,000
8 DowntownWa�nding _ _ _ _ _ _ _
9 G�een Rive�Paik Design _ _ _ _ _ _ _
10 Les Gove Campus Master
Plan - - - - - - -
11 Main SL Streetscape Urban
Design - - - - - - -
12 CityDowntownPubNc
ParkingLoiReconfiguration - - - - - - -
13 Local Revkalization - - _ _ _ _ _ '
Total $ 500 $ 500 $ 10,500 $ 10,500 $ 10,500 $ 10,500 $ 43,000
223
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
*
�k MORE THAN YOU IMAGINED
224
City ofAuburn Draft Capital Facilities Plan
AIRPORT
Current Facilities
The City of Aubum operates the Auburn Municipal Airport, providing hangar and tie-down
facilities/leasing space for aircraft-related businesses. As of 2010, there were approximately
141,000 take-offs and landings (aircraft operations) at the airport annually Table A-1 "Facilities
Inventory' lists the facilities with current capacity and location. Currently the Airport is in the
process of updating the Master Plan which will be completed in 2014.
Level of Service (LOS)
The Auburn Municipal Airport Master Plan Update 2001-2020 provides a maximum runway
capacity (LOS standard) of 231,000 aircraft operations annuaily; one take-off or landing equals
one aircraft operation. This LOS is recognized by the Federal Aviation Administration (FAA).
The FAA requires the airport to have the capital facilities capacity (i.e., runways, taxiways,
holding areas, terminal, hangars, water/sewer system, etc.) necessary to accommodate 100%
of aircraft operations during any one year By 2020 the Airport Master Plan foreqsts the
number of operations to be 193,189 —well below the capacity of the airport runway
Capital Facilities Projects and Financing
The Citys Airport facilities include thirteen non-capacity capital projects at a cost of $ 3,893,170.
These projects include the South T-Hangar Row 3 enclosure, runway extension project and land
acquisition for future approaches. Table A-2 shows the proposed financing plan followed by
individual worksheets showing the project detail.
Impact on Future Operating Budgets
There are no operating expense budget impacts forecast for the airport during the six years
2016 — 2021 The South T-Hangar Row 3 enclosure project is anticipated to increase the
hangar rental revenue by approximately$60,000 per year beginning in 2016.
TABLE A-7
Facilities Inventory
Airport
cnancirr
FACIL�7Y #ofAiroreft #ofFeet LOCATION
Existing Inwntory:
Hangars 145 400 23M Street NE
Tiedov.ns 214 400 23rd Street NE
irStrfp 3400 40023rdStreetNE
Total Existing Inventay 359 3,400
Propased Capacity Projects:
2020 Land Aoquisitiar 30 400 23rd Street NE
2017RunHeyExtension 718 40023rdStreeWE
Total Proposed Capacity Projects 30 718
2020ProjectedlnventoryToWl 389 4,118
225
City ofAuburn Draft Capital Fgcilities Plan
TABLE A-2
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
AIRPORT
2015 2016 2017 2018 2019 2020 Total
Caoacitv Praects: - - - - -- - - --- -
Nare -
Non-Caoaciri Profects:
1 Airport Security Camera &Gate Access Upgrades
Capital Cos ts - - - - - 70,000 70,000
Funding Sources
Airport Fund - - - - - 3,500 3,500
Grant - - - - _66,500 . - _ 66,500_
2 Sou[h T- Hangar Row 3 Enclosure
Capital Costs 347,000 - - - - - 347,000
Funding Sources
Airport Fund 347,000 - - - - - 347,000
Grant - - - - - -
3 Obstruction Survey for NezGen/f.�S Approach
Capital Cos ts 210,000 - - - - - 210,OOU
Funding Sources
Pirport Fund 10,500 - - - - - 10,500
Grant 199,500 - - - - - 198,500
4 Land AcqufsitlonforFuture Approaches
Capital Cos fs - - 420,000 - - - 420,000
Funding Sources
flirport Fund - - 21,000 - - - 21,000
Grants - - 399,000 - - - 399.000
5 Wildlife Hazard Assessment
Gapital Costs 16,125 - - - - - 16,125
Funding Sources
Airport Fund 806 - - - - 806
Grants 15,319 - 15,319
6 Rurnvay Eictension
Capital CosS 161,000 140,000 1,064,000 - - - 1,365,000
Funding Sources
Airport Fund 8,050 7,000 53200 - - - 68,25b
Grants 152,950 133,000 1,010,800 - - - 1,296,750
7 Automated Weather Observation System
Capital Cos ts - - - - 268,800 - 268,800
Funding Sources
Airport Fund - - - - 13,440 - 13,440
Grants - - - 255,360 _ _ - 255,360_
B Fuel Farm
Capital Costs - - 140,000 - - - 140,000
Funding Sources
Airport Fund - - 140,000 - - - 140,000
Grants - - - - - - -
226
City of Auburn Draft Capital Facilities Plan
2015 2016 2077 2018 2019 2020 Total
Non-Capacitv Proiects:
9 Land Acquisition
Capital Costs - - - - - 735,205 735,205
Funding Sources:
Airport Fund - - - - - 36,760 38,760
Grants - - - - - 698,445 698,445
10 Precision Approach Path Indicatw (PAPI)for Runway
Capital Costs - - - - - 168,000 168,000
Funding Sources:
AirpoR Fund - - - - - 8,400 8,400 I
Grants - - - - - 159,600 159,600
11 West Side Fencing
Capital Costs - - - - 52,920 - 52,920
Funding Sources:
Airport Fund - - - - 2,646 - 2,648
Grants - - - - 50,274 - 50,274
12 General Repair&Maintenance
Capital Costs 50,000 - - - - - 50,000
Funding Sources:
Airport Fund 50,000 - - - - - 50,000
Grants - - - - - - -
13 Taxiway Seal Coat 8 Restripe
Capital Costs - - - - - 50,120 50,720
Funding Sources.
Airport Fund - - - - - 2,506 2,506
Grants - - - - - 47,614 47,814
SUMMARY�
CAPITAL COSTS
Capacity Projects - - - - _ _ _
Non-Capacity Projects 784,125 140,000 1,624,000. - 321,720 1,023,325 3,893,170
Total Costs 784,125 140,000 1,624,000 - 321,720 1,023,325 3,893,170
RJNDING SOURCES:
Airport Fund 416,356 7,000 214,200 - 16,086 51 166 704,808
Grants (Fed,State,Local) 367,769 133,000 1,409,800 - 305,634 972,159 3,188;362
Total Funding 784,125 140,000 1,824,000 - 327,720 1,023,325 3,893,770
227
City of Auburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capipl Facllkles PWn
5ix Year Capital Facilities Plan, 2015-2020 Enterprise Funds
Project rue: Airport Security Camera 8� Gate Access Upgrades
Project No: cp"'''
Projecc Type: Non-Capacity
Project Manager� Shelley Coleman
Description:
6icreased seau�ity iderrtified by the Federal Aviation Administration and the Transportation Security Admirilstration fur
Airport control access gates (both vehiGe and personnel). This projec[ will iretall seauitycameresand rep�ace the
obsoletegffie operatoraccess contrrol urvis. The proposed system will include cards and keypad operationwith both
inbound arxl outbound lracking of tha authorized tenant/guest. Personnel gates will also tiave the same system.
Progress Surtimary:
Future Impact on Operating Budget:
None
Activity - - - - ----
2014 YE 2015 Year End
Funding Sourcec PAor Lo 2014 E9lmate T015 Butlget 2018 Budget ProJeet Total
UnrasMcted Ai�pwt Revenue - -
Federa/ Grant Secured - -
State Grant Secured
Tofal FunHing Sources: - -
CePHeI Ezpenditurex
Deslgn -
R/ght ol Way - -
C.O/iSllUC�lO/1
Total ExpendlWres - - -
Foredasted ProJeot Cost:
Tota I
2077 2018 2019 2020 2015-2020
Funding Souresa
UnresMctedAirypt Revenue 3.500 3,500
Federal Grarrt -Secu�ed 63,000 83,000
State Granf Secured 3.500. - 3 500
Total Funding Sources - 70,000 70,000 ,
Capital ExpanAiWrox
Deslqn
Right ol Way
ConStNCIlon 70.000 70.000
Total ExpendlWrea 70,000 70,000
GrarR /Other Sources: Fede21 ANatlon Adminis[ratian
22g
City ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capiql Facilkies Plan
Six Year Capital Facilities Plan, 20152020 Enterprise Punds
Projea Titie: South T- Hangar Row 3 Enclosure
Project No: cp1408
Project rype: Non-Capacity
Project Manager TBD
Description:
The airport currently has vacant open T-Haiigars,but the airport has 100% occupancy on closed T-Hangars inclutling a wait list for
closed T-Hangars. This projeci proposes seventeen open T-hangars be upgreded to closed T-hangars.
Progress Summary•
Design and engineering was completed in 2014 and constructionwill begin in 2015.
Futu�re Im{iact on Operating Budget:
This project is anticipated to increase hangar rental revenue by approximataly$60,000 per year beginning in 2016.
Activity -
2074 YE 2015 Year End
Funding Sources: Prfor b 2014 ESNmate 2015 Butlget 2016 Budget Prqecl Tofal
UnrestnctedAirporf Revenue 10,000 347.000 - - -- "357,000
Grents (Fatl,State,Local)
Other
Tofal Funding Sources: 10,000 347,000 357,000
Capipl Fxpenditures:
Design 10.000 10,000
Poght of Way
Constructlwr 347,000 34T,000
Toql Expenditures: 10,000 347,000 357,000
Forecasted Project Cost:
7ota1
2017 ZO18 2079 2020 2015-2020_ .
Fundin9 Sources:
UnrestncfedAirpwt Revenue 347,000
Giants (Fred,State,LocaQ
Other
Toml Funding Sources 347,000
Capiql Erzpenditures:
Design
Right ol Way
Construction 347,000
Total Expenditures: 367,000
G2rris /Other Sources:
229
City ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capifal Facilities Plan
Six Year Capital Facilkies Plan, 2015-2020 Enterprise Funds
Project rtie: ObsVuction Survey for NexGen/GPS Approach
Project No: Cp'"'*
Project Type: Non-Capacity
Project Manager Shelley Coleman
Description:
Digital ObsVuction Survey to lower landirg minimums,provide more efficient approach procetlu�e and remove riighNcircle
restriotion on ebstirig approach.
Progress Summary•
Fulure Impact on Operating Budget:
Activity.
2014 YE 2015 Year End
Funding Sources: Pdor to 2014 .FstimaM_ .._2015_Budget_ _ 2018 Budget Projecl Total
Un�estActed Airppt Revenue 10,500 10,500
Federel Grant -Securod 189,000 189.OU0
State Grent -Secured 10 500 10 500
Total FunAing Sourees 210,000 210,000
Capiml ExpendiNres:
Design 210,000 210.000
Po'gAt o/ WaY '
CORSINC�IOO
romi ExPendiwres: z�o,000 z�o,000
Fore.casteil Project Cost:
Total
2017 2078 2018 2020 20152020
Funding Sources:
UniasMctedAlrpdt Revenue - 10,500
Fede21 GraM Securad - 189.000
State Grant Securad 10,500
Tofal Funding Sources: - - 210,000
Capifal Expenditures:
Design 210,000
Right ol Way -
COl�SfNC[i0/I
Total ExpendiWres: 210,000
Grarrt /Other Sources' �
230
City ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capital Facilkies Plan
Six Year Capital Facilities Plan, 2015•2020 Enterprise Funds
Project Title: Land Acquisition for Future Approaches
Project No: Cp""""`
Project Type: Non-Capacity
Project Manager Shelley Coleman
Description:
Acquire lard at the ciareM Park and Ride for future approaches.
Progress Summary:
Future Impact on Operating Budget:
None
Activity:
2014 YE 2015 Year End
Funding Sources Prior to 2014 Estimate 2075 Budget 2U76 Budget Projeet Total
UnrestnctedAirport Revenue
Fede21 G2nt -Unsecured
Stafe Grdnt -Unsecured
Total Funding Sources -
CaPitel Expenditures:
Design -
Acquisition -
Constmction
Tobi 6cpendiwres:
Forecasted Project Cost:
rotal
Y017 2078 2019 2020 2015-2020
FunAing Sources
Unres[ActedAirport Revenue 21,000 - - 21,000
Fede21 Grant -Unsecumd 378,000 378,000
State Grant -Unsecured 21,000 21,000
7otal Funding Sourcex � 420,000 420,000
Capifal Erzpenditures
Design
Acquisttion 420,000 420,000
ConsWction
To�al ExpendiWres: 420,000 420,000
GraM /Other Sources:
231
City ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capifal Facilkies Plan
Six Year Capital Facilkies Plan, 2015-2020 Enterprise Funds
Project Tue: Wildlife Hazaril Assessment
Project No: cp1321
Projea Type: Non-Capacity
Project Manager Shelley Coleman
Description: - " ""
Federel Aviation Administration mandated wildfre haard assessmerrtfor high wlume airports.
Progress Summary•
Mead & Hurrt began the Wildlife Assessmentsurvey on December2013. Surveys are conducted mordhlyuntil December
2014; and a report will tie issued diaing 1st quarter 2015.
Future Impact on Operating Budget:
Activity: � - � - �- -
2014 YE 2015 Year End
Funding Sources: Prfor to 2014 Estimate 2015 Budget 2018 Budget ProJect Total
UnresthctedAirywt Revenue 476 2,218 806 3,500
Federal Grant -Secured 8,562 39,925 14,513 - 63,000
Sfate Grdnt -Secured 476 2,278 806 3,500
Totei Pu�Ming Soure¢s: 9,514 4t,367 ' 16,125 -" � - - "70,000
Capltal Expenditures
Des/gn 9,514 44,361 16,125 70,000
R�ght o/ Way
COIISINCtIOIi
Toml Ezpenditures: 9,514 "-44,367- � --" 18,125 - - - - 70,000
Forecasted Project Cost:
Totnl
2017 2018 2019 2020 201&2020
Funtling Sources:
UnresMcied Airyort Revenue - - 806
Fetleral Grant -Secured - 74,513
Stafe Grem Secured 806
Total Ftinding Sources: - 16,725
Capiql Expenditures
Deslgn 76,725
Righf of Way -
CO(ISINC�lO(1
Total Expentlitures: 16,125
Grarrts /O[her Sources: Federal AHffiion Administration and Washington State DeDartment of Transportation
232
Ciry ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capital Facilities Plan
Six Year Capital Facilkies Plan, 2015-2U20 Enterprise Funds
Project Ttle: Runway Extension
Project No: Cp'"""
Project 7ype: Non-Capacity
Project Manager Shelley Coleman
Description:
Extend Runway 16/34 per Airport layout Plan & A�4ster Plan Update for increased safery and utilization.
Progress Summary•
Ernironmerrtal Assessment is planned for 2015.
Future Impact on Operating Budget:
Activity.
2014 YE 2015 Veai End
Funding Sources Prior tu 201d Estimate _ 2015 Budget 2016 8ud et Pro ec[ Total
UniesMcfedAirpat Revenua 8,050 7,000-" BA50
Federal Grdnt -Unsecured 144,900 126,000 144,900
State Grant -Unsecu2d 8,050 7,000. 8,050
Total Funtling Sources 161,000 140,000 181,000
Capifal ExpentliWres:
Des79� 140,000
Enviionmenfal Assessment 161,000 161,000
Construct/on
Tofal Expenditures: - 761,000 140,000 161,000
Forecasted Project Cost:
Tofal
2017 2018 2079 2020 20752020
Funding Sources
UnrestncfedAirport Revenue 53,200 5g,psp
Federal Grant -Unsecured 957,600 1,228,500
Sfafe Grent Lnsecured 53,200 68 250
Tofal Funding Sources: 1,084,000 - 1,365,000
Capital Ecpenditures:
Design 140,OOD
EnviionmeMal Assessment 161,000
ConstNCtlon 1,064.000 1,064,000
7otal ErzpendiNres: 1,064,000 - 1,365,000
Grarns /Other Sources:
233
City ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) CapiTal Facilities Plan
Six Year Capital Facilkies Plan, 2015-2020 Enterprise Funds
Project Title: Automated Weather Observatlon System
Project No: Cp""""
Project 7ype: Non-Capacity
Project Manager Shelley Coleman
Description:
Install weaMer reporting equipment for insVument approach.
Progress Summary•
Future Impact on Operating Budget:
/►ctivlty.
201d YE 2015 Year End
FunAing Sourcas Prior ro 207d Effimate 2015 Budget 2016 Budget Project Tofal
UnresMcted Airpwt Revenue -
Federal Grent -Unsecured
State G2nt -Unsecured
Tofal Fundlnp Sources:
Caplial ExpentllWres:
Des/gn
RigM ol Way
COIISINCIW/1
7oml Expentliares: - -
Forecasted P�oject Cost:
rcrai
2017 2078 2019 2020 20152020
Funding Sources
UnrestrlctedAlrparf Revenue 13,440 73,440
Fede21 G2nt -Unsecured 241,920 247,920
Stete Grent -Unsecured 13 400 13 440
Toal Funding Sources 288,800 268,800
Capial FxpendlWres
Oeslgn -
RIgM ol Way - - -
ConStNLt/on 268.800 268.800
Total F�cpendiWres - 768.800 � 268.800
G2rrts /Other Sowces:
234
City ofAuburn Draft Capital Facilities Plan I
AIRPORT FUND (435) Capitat FacilRies Plan
Six Year Capifal Facilities Plan, 20152020 Enterprise Funds
Project Title: Fuel Farm
Project Mo: cp""'
Project Type: Non-Capacity
Project Manager Shelley Coleman
Descriptfon:
Construct a Fuel Farm for Jet A service at Airport
Progress Summary:
Future Impact on Operating Budget:
Activity:
2074 YE Y015 Year Entl
Funding Sourcex Prior to 2014 Estlmate 2015 Budget 2016_Budget .P.ro ect Total
UnrestncfedAnport Revenue
Federal Grant -Unsecured _
State Grant -Unsecuretl
7ofa1 Funding Saurces:
Capital Expenditures:
Des/gn
Right o/ Way -
COIISINLf(OII
Tofal 6cpendi W res:
Forecasted Projeot Cost:
rotal
20�7 2018 2018 2020 20152020
Funtling$ouroes:
UniestnctedA/rport Revenue 740,000 140,000
Federal Grant -Unsecuied
Sfate Granf -Unsecured
Total Funding Sourcex 140,000 - 740,000
Capipl ErzpenAiNres
Design 25,000 25,000
RigM o/ Way -
Consfrucfion 115,000 115,000
Total Erzpenditures: 140,000 - 160.000
G2rns /O[her Sources:
235
City ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) CapiW FacilRies Plan
Six Year Capital Facilities Plan, 2015-2020 Enterprlse Funds
Project TiUe: Land Acquisition
Project No: cp*""`"
Project Type: Non-Capacity
Project Mana9er Shelley Coleman
Description:
Land Acquisition-Artnstrong
Progie§s Summa_ry"�
Future Impact on Operating Budget:
None
Activity
2014 VE 2015 Yea7 End
Funding Saurees: Prior to 2014 ERtimate 2015 Bud �et 2016-Budget Pro ect 7otal
UnresMcted Alrport Revenue " - - - - " " -�-"- ---� -" " - - -"--"- - -
Federal Grant -Unsecured
State Giant -Unsecured
Total Funtling Sources - - -
CapiTal E�cpendltures �
Destgn
Ac4uislfbn -
r.0I1SfNC�IM
TOtal ExpendiWRE:
Forecasted Project Cost:
Toml
2017 2018 _ 2019_. _ _. 1020. _ 20152020_ _
Funding Sources:
UnrastnctedAiiport Revenue 36,760 36,760
Federel Grant -Unsecured 661,685 661,685
Stafe Grant -Unsecuretl 36,780 38 760 �.
Total Funding Sourees - - � 735,205 735,205 ,.
Capital ExpendiL�res:
D¢Sign
Acquisltlon - - 735,7A5 735.205 �
Consttiction
Total Expendituras: - - 735,205 735,205
G2rn /Other Souices� Federal Awatlon Atlministration
236
City ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capital Facilities Plan
Six Year Capital Faclikies Plan, 2015-2020 Enterprise_Funds
Project Title: Precision Approach Path Indicator (PAPI) for Runway
Project No: Cp«•••
Project Type: Non-Capacity
Project Manager Shelley Coleman
DescripUon:
Install Precision Approach Path Indicator(PAPI) for Rurnvay to replace aging VASI system.
Progress Summary:
Future Impact on Operating Budget:
Acfivky.
Z01b YE 2015 Year EnA
Funding Sourcex Prior b 2014 Estimate 2015 Butlget Y016 Budget Project Total
UniestnctedAirpwt Revenue -
Federal Grant -Unsecurerl
State Granf -Unsecured
Tofai Funding Sources:
CaPifal ExpentliWres
Design _
Righf W Way
Constnictron
Tofal Expenditures:
Forecasted Project Cost:
Tofal
2017 2018 2079 2020 201i2020
Funding Sources:
Un2slnctedAilpoR Revenue 8,400 8,400
Federel Grent -Unsecured 151,200 151,200
State Grant -Unsecured 8,400 8,400
Total Funding Sources: 166,000 768,000
Capifal EzpenGiWres:
Desrgn 20,000 20.000
Right ol Way _
ConStNCNon 148,000 148,000
Total Fxpendilures: 168,000 168,000
Grants /Other Sowces:
237
City ofAuburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capital Facilities Plari
S& Year Capital Facilities Pian, 20152020 Enterprise Funds
Project TiUe: West Side Fencing
Project No: Cp""""
Project Type: Non-Capacity
Project Manager• Shelley COleman
Description:
Install Fence on West side of property
Progress Summary•
Future Impact on Operating Budget:
Activlty: - -
2074 YE 2015 Year End
Funding Sources PNor Eo 201< Estimate 2015 Budget 2016 Butlget ProJect Tofal
UnrestrVcted Alrport Revenue
Federal Grant -Unsecured
Sfate Giant Lnsecured
Tofal Funding Sources - -
Capilal ExpendlWres
Design
R/ght o/ Way
C.OlIS�NCt1011
7oql Expendimres: - - - --�--- - �- - -
Forecasted Projed Cost:
Topl
2017 2018 2019 2020 201&2020
Funtling Sources:
UnresMcted A/ywf Revenue 2,648 2,86G
Federel Grant 1/nsecu�ad 47.828 47,628
State Grent Lnsecuiatl 2,646 2,848
Total Funding Sources: 52,920 52,920
CaPlpl EtcPendiNres
Deslgn -
Rlght oi Way -
ConstrucNon 52,920 52,920
Total Ezpentliwres - -52.920 - 52,920
c�ms i aner sa,�c�:
238
Ciry ofAuburn Draft Capital Facilities Plan
AIRPOItT FUND (435) Capifal Facilities Plan
Six Year Capital Facilities Plan, 20152020 Enterprise Funds
Project Tit1e: General Repair � Maintenance
Projed No: CpxxXx
Projea Type: Non-Capacity
Project Manager� Shelley Coleman
Descrlption:
Various airport repairs and mairKenance projects to be identiFied and prioritized as needed.
Progress Summary:
Future Impact on Opereting Budget:
Activity.
2014 YE 2015 Year End
Funding Sources: Prlor ro 2014 E4imate 2015 Butlget 2076 Budget Project Total
Unrest�7ctedAiryort Revenue 50,000
Federal GraIR Securad
State G2nf Secured
Tofal Funding Sources: 50,000 -
Capital ExpendiWres:
Design
RigM W Way
Construction 50,000 50,000
Tofal FxpendlWres: 50,000 50,000
Forecasted Project Cost:
TMaI
2017 2018 2019 2@0 20152020
Funding Sources
UnresMctedAiryort Revenue 50,000
Fede2/ Grant Secuiad
Stafe Grent -Secured
Total Funding Sources - 50,000
Capifal Ezpenditurex
Design _
Right W Way
Construction 50,000
Total ExPendiWres: ' S0.000
Grarrts /Other Sources.
239
City of Auburn Draft Capital Facilities Plan
AIRPORT FUND (435) Capifal Facili[ies Plan
Six Year Capital_ Facilities,Plan, 2015-2�20 Enterprise Funds
Projea Ttie: Taxiway Seal Coat & Restripe
Project No: CpXXxx
Projea 7ype: Non-Capacity
Project Manager Shelley Coleman
Desc�iptioni - -
This project will provide funding for seal coating and restriping of the tapway ihat was replaced in 2009.
Progress Summary:
Futuie Impact ori Operating Budget:
Activ'rty:
2014 YE 2075 Vear End
Funding Sources: Prlor to 2014 Estimate 2015 Budget 2016 Budget Prqect Total
Unrestr/cted AirpwY Revenue
Federal Grant Secured
State Grant Secured
Tofal Funding Sources:
Capiql F�cpondiWres
Desgn
Right W Way
COIISINCflWI — - -
Total Expenditures: -
Forecasted Project Cost:
Tofal
2017 2018 2079 2020 20152020
Funding Sourcas:
Unrestticted AirpuK Revenue 2,506 2,506
Faderal G2nf Secured 45,108 45,106
State Grant -Securetl 2,506 2.506
Total Funding Sources: � " ' - 50,120 50,120
Capi}al Expentlitures:
Desfgn
RlgM o/ Way
Construction 50,120 50,120
Total Expenditures: - 50,720 50,120
G2nts /Olher Sources:
240
City of Auburn Draft Capital Faci7ities Plan
CEMETERY
Current Facilities
The City owns two cemeteries. The Mountain View Cemetery is a fully developed facility (50
acres and five buildings) that provides burial services and related merchandise for the
community The Pioneer Cemetery is a historic cemetery which is no longer used for burial
purposes. Table C-1 "Facilities Inventory' lists the facilities along with their current capacity and
location.
Level of Service (LOS)
The current LOS of 30.03 burial plots/niches per 1,000 population is based on the existing
inventory divided by the 2014 citywide population of 74,630. The proposed LOS of 40.80 burial
plots/niches per 1,000 population is based on the projected inventory divided by the 2020
projected citywide population of 85,288. In addition, the cemetery will be able to offer a natural
cremation garden.
Capital Facilities Projects and Financing
The CFP does not include any Cemetery capital facilities projects during 2015-2020.
Impact on Future Operating Budgets
There are no operating budget impacts forecast for the cemetery during the six years
20.16 —2021
TABLE C-1
Facilities Inventory
Cemetery
CAPACITY
FACILITY #of Burial PlofslNiches LOCATION
Existing lnventory.• - �
Mountain ViewCemetery 2,241 2020 Mountain View Dr
Pioneer Cemetery 8th&Aubum W ay No.
Total Existing Inventory 2,241
Proposed Capacity Projects:
New Development-Bunal P/ots 475 Memory Heights
IVew Development-Burial Plots 764 10th Addition
TotalProposed CapacityProjects 1,239
2U20 Projected Inventory Total 3,480
241
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
� -
� MORE THAN YOU IMAGINED
242
City ofAuburn Draft Capital Facilities Plan
GOLF COURSE
Current Facilities
The City of Auburn owns and operates the 18-hole Auburn Municipal Golf Course. A PGA
Class A professional is contracted to collect g�eens fees, operate the pro shop and snack bar,
provide golf carts for rent, and offer a lesson program. Table GC-1 Facilities Inventory lists the
facilities along with their current capacity and location.
Level of Service (LOS)
The current LOS of 0.24 holes per 1,000 population is based on the existing inventory divided
by the 2014 citywide population of 74,630. The proposed LOS of 0.21 holes per 1,000
population is based on the projected inventory divided by the 2020 projected citywide population
of 85,288.
Capital Facilities Projects and Financing
The CFP does not include ariy Golf Course capital facilities projects during 2015-2020.
Impact on Future Operating Budgets
There are no operating budget impacts forecast for new goff course facilities during the six
years 2016 —2021
TABLE GC-1
Facilities Inventory
Golf Course
caancirr
FACILITY # of holes LOCATION
Existing Inventory.•
Aubum Municipal C,olf Course 18 29639 Green Rioer Road
Total Existing Inventay 18
Proposed Capacity Projects:
None
Total Proposed Capacity Projects -
2019 Pro'eoted Invento Total 18
243
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
� - -
� MORE THAN YOU IMAGINED
z�
City ofAuburn Draft Capital Facilities Plan �ii
POLICE
Current Facilities
The City of Auburn Police Department provides a full range of law enforcement services to the
citizens of Auburn. All Divisions of the Auburn Police Department are housed at 340 East Main
Street, Suite 201 The Divisions include Patrol, Investigations, Administrative Services,
Inspectional Services, and Records.
Level of Service (LOS)
The City of Auburn Police Department contracts with SCORE, an outside entity, for housing of
all misdemeanant inmates.
CapiWl Facilities Projects and Financing
The CFP does not include any Police capital facilities projects during 2015- 2020.
Impact on Future Opereting Budgets
Thejail services expenses are dependent on the City's contract agreement with SCORE.
245
City ofAuburn Draft Capital Facilities Plan
� �
CITY OF �
�
�k MORE THAN YOU IMAGINED
246
City ofAuburn Draft Capital Facilities Plan
FIRE PROTECTION
Current Facilities
The Valley Regional Fire Authority provides fire protection and rescue services to a 25-square
mile area which includes the City of Auburn, the City of Algona, the City of Pacific and King
County Fire Protection District 31 The Valley Regional Fire Authority operates out of fve
stations, which are manned 24 hours per day The North Station #31 also serves as the
department headquarters and includes a hose and training tower Each station is assigned fire
apparatus (Engines and Aid Vehicles). Table F-1 "Facilities Inventory' lists the facilities along
with their current capacity and location.
Level of Service (LOS)
The current LOS of 0.21 fire apparatus per 1,000 population is based on the existing inventory
(16 fire apparatus) divided by the 2014 citywide population of 74,630. The proposed LOS of
0.20 fire apparatus per 1,000 is based on the 2020 planned inventory(17 fire apparatus) divided
by the 2020 projected citywide population of 85,288.
Capital Facilities Projects and Financing
l`he Valley Regional Fire Authority includes one capital project at a cost of $510,000 for fire
apparatus enhancements and improvements. Table F-2 shows the proposed financing plan
followed by an individual worksheet showing the project detail.
Impact on Future Operating Budgets
There are no operating budget impacts forecasted for fire protection during the six years
2016—2021
247
Ciry ofAuburn Draft Capital Facilities Plan
TABLE F-1
Facilities Inventory
Valley Regional Fire Authority
cnPncirr
FACILITY Fire araWs Aid VehiGes LOCATION
Ezisting lriventoryi- - - -
Stations:
North Station#31 1101 'D'Street NE, Aubum
First Line 1 1
Reserve 1 1
South Statlon#32 1951 'R'Street SE, Aubum
First Vhe 1 1
Reserve 1 1
Lakeland Station 1133 500 182nd A�,e E, Aubum
First Une 1 -
Reserve 1 -
Lea Hill Station#34 31290 124th A�e SE, Aubum
First line 1 -
Reserve 1 -
GSA Station�i35 2815 C St SW,Aubum
Reserve 1 1
Pacific Station�R38 133 3rd A�e SE, Pacific
First Line 1 -
Resenre 1
Total Existing lnveMay 11 5
Proposed Inveniay Additions:
None 1
Tota/Propased Capacity Projects 1 -
2020 Projected Inveritory Total 12 5
248
City ofAuburn Draft Capital Facilities Plan
TABLE F-2
CAPITAL FACILITIES PLAN PROJECTS AND FINANCING
VALLEY REGIONAL FIRE AUTHORITY
2015 2b16 2017 2018 2079 2020 Total
Nor�Cauacitv Proiects:
1 Fre Station Facility Relxation, Enhancements& Improvements
Capital Costs 460,000 50,000 - - - - 510,000
Funding Sources.
Grants - - - - - - .
Bond Proceeds - - - - - - -
ImpacUNitigation Fees 460,000 50,000 - - - - 510,000
SUMMARY•
CAPITAL COSTS
CapacityProjects - - - - - - _
Non-Capacity Projects 460,000 50,000 - - - - 510,000
Total Costs 460;000 50,000 - - - - 510,000
FUNDING SOURCES:
CemeteryFund - - - - - - -
Grants(Fed,State,local) - - - - - - _
Bond Proceeds 460,000 50,000 - - - - 510,000
Total Funding 460,000 50,000 - - - - 510,000
249
City ofAuburn Draft Capita!Facilities Plan
Valley Regional Fire Authority Capital Facilkies Plan
Six Year Capilal Faciittles Plan, 2015-2020
Project Ttie: Fire Station Facility Relocation, Enhancements 8 Improvements
Projact No: cpxxxx
Project Type:
Pmject Manager Mark Horaski
Description:
Facility Improvemerrt projects are iderrtified and prioritized annualy and are subject to delay to accommodate emergency
repairs. The Valley Regior�l Fire Authority includes one project in 2015 for apparetus enhancemeMs ard improvemerrts.
Progress Summary•
Fire mitigation and impacl fees will be traruferred to the Valley Regional Fire Authority to pay for apparatus enhancemerrts
ard improvemerAs in 2015.
Future Impact on Operating Budget:
Biennial Budget: sota 2ots 2018 2o�szois
Notes: Budget Butlget BuEget Budget
Atlopfetl Butlgef =
Butlgef Amentlmenfs
Atl%usred Budge( -
Activity•
(PreNous 2 Vrs ) 2014 VE 2074 Yeer End
Funding Sources: Prlor ro 2074 Estlmate_ _1015.Budget_ 2016 Budget P.ro�ect Totai
Grants -
Bond Pioceeds - -
Impact/Mtigation Fees 100,000 50,000 460,000 50.000 610,000
7oTel Funding Sources: 700,000 30,000 460,000 50,ODD 610,000
CaPifal F�cpenEltures
Design '
Righf o/ Way
ConStNCI(on 100.000 50.000 460,OOD 50.000 6�0.000
Tofel ExpendiWres: 100,000 50,000 460,000 50,000 610,000
Foreoasted Projeat Cost:
rwai
2017 2018 2019 2020 20752020
Funding Sources
GraMs - -
Bond Proceeds -
Impect/IvYti9atlon Fees 510 000
Total Funding Sourees: 570,000
Capital Fxpanditures -
Des/gn -
RigM oi Way
Constiuction 510.000
Totel ExpendlWres: 570,000
25�
Exhibit "B"
Staff report dated November 6, 2014, which included the Findings
and Conclusions adopted by the P/anning Commission
-----------------------
Ordinance No. 6541
November 12, 2014
Page 6
,
�
�CIlYOF �
" ��"' 1 " ' AGENDA BILL APPROVAL FORM
WASHINGTON
Agenda Subject Date:
CPA14-0001, 2014 Comprehensive Plan Amendments — City November 6, 2014
Initiated Plan Polic /Text Amendments
DepaRment: Community Aftachments: See separate Budget Impact: N/A
Development & Public Works summary matrix and the
policy/text amendment sections of
the binder
Administrative Recommendation: Planning and Cominunity Development Committee to reView
planning commission recommendation on 2014 City-Initiated Comprehensive Plan
Amendments.
Background Summary•
The City of Auburn adopted amendments to its Comprehensive Plan in 1995 in response to the
Washington State Growth Management Act(GMA) requirements, as amended. Since then the Auburn
Comprehensive Plan has been amended annually
Comprehensive plan amendments can be initiated by the City of Auburn (city-initiated) and by private
citizens (privately-initiated). This year the city is initiating:
• Five policy/text amendments.
• (No map amendments are proposed with this year's amendment process)
In addition, this year the city received two privately-initiated plan map amendments by the submittal
deadline. However, since the two aPplications for adjacent sites by the same Applicant were submitted
w'ithout the necessary environmental checklist application (required pursuant to the State Environmental
Policy Act(SEPA)), the Applicant has agreed to defer the city's consideration of the applications until
consideration of the larger overall Comprehensive Pian Update effort in 2015.
This staff report and recommendation addresses Comprehensive PolicylText(P/T)Amendments P1T# 1
through# 5. This is the oniy staff report associated with the annual comprehensive plan amendment
process.
In terms of process, the Comprehensive plan amendments are initially reviewed during a public hearing
process before the City of Auburn Planning Commission, who then provides a recommendation to the City
Council for final action. City Council consideration and action on the amendments generally occurs but is
not required prior to the end of the year
Reviewed 6y Council 8 Committees: Reviewed by Departments&Divisions:
❑Arts Commission COUNCIL COMMITiEES: ❑ Building ❑ M&O
❑ Auport ❑ Finance ❑ Cemetery ❑ Mayor
❑ Hearing Examiner ❑ Municipal Services ❑ Finance ❑ Parks
❑ Human Services ❑ Planning&Dev ❑ Fire � Planning
� Park Board ❑ Public Works ❑ Legal ❑ Police
� Planning Comm ❑ Other � Public Works ❑ Human Resources
Action:
Committee Approval: ❑Yes ❑No
Council Approval: ❑Yes �No Call for Public Hearing _/_/_
Referred to - Until / /
Taliled Until %%
Councilmemlier: Holman � - Staff:Tate
Meetiri Date: November 10, 2014 Item Number;
Page 1 of 8
AUBURN * MORE THAN YOU IMAGWED
Agenda Subject: CPA14-0001, 2014 Comprehensive Plan Date: November 6, 2014
Amendments—City Initiated Plan Map Amendments and PolicylText
Amendments
At its November 5, 2014 public hearing, the Planning Commission reviewed the following annual
comprehensive plan amendments:
P/T#1 — Incorporate Aubum School District Capital Facilities Plan
P/T#2— Incorporate Dieringer School District Capital Facilities Plan
P/T#3 — Incorporate Federal Way School District Capital Facilities Plan
P/T#4 — Incorporate Kent School District Capital Facilities Plan
P/T#5— Incorporate City of Auburn Capital Facilities Plan
The Planning Commission has forward its recommendation for approval to the City council on
all comprehensive plan amendments.
The 2014 Comprehensive Plan Amendments were previously reviewed by the Planning ancJ
Community Development Committee of the city cbuncil at the June 23, 2014 regular meeting.
A. Findings
1 RCW 36.70A.130 (Washington State Growth Management Act (GMA)) provides for
amendments to locally adopted GMA comprehensive plans. Except in limited circumstances
provided for in State law, compreherisive plan amendments shail be considered by the city
or county legislative body no more frequently than once per year
2. The City of Auburn established a June 6, 2014 deadline for the submittal of privately-
initiated comprehensive plan applications (map or policy/te�). Notice to the public of the
filing deadline was provided on the City's website, the Seattle Times Newspaper, and sent
to a compiled notification list in May 2014 The City received two privately-initiated plan map
amendments by the submittai deadline. The Applicant agreed to defer the city's
consideration of the applications until consideration of the larger overall Comprehensive
Plan Update effort in 2015 The postponement was accepted by the Planning and
Corrimunity Development Committee at their June 23, 2014 meeting.
3. The City of Auburn received annual updates to the four school district Capital Facilities
Plans whose districts occur within the City of Auburn. These Capital Facilities Plans, as well
as the City's Capital Facilities Plan are referenced in Chapter 5, Capital Facilities, of the
Auburn Comprehensive Plan and are processed as Policy/Text (P/T) amendments.
4 The environmental review under the State Environmental Policy Act (SEPA) for the school
district capital facilities plans were prepared seParately by each school district acting as their
own lead agency, as allowed by state law.
5. The environmental review under the State Environmental Policy Act (SEPA) for the
remaining amendment resulted in a Determination of Non-Significance (DNS) issued for the
City-initiated Comprehensive Plan Amendments on September 16, 2014 (City File# SEP14-
0011). The comment period ended September 30, 2014 and the appeal period ended
October 14, 2014
6. The City did not receive any comments in response to the issuance of the Determination of
Non-Significance (DNS).
Page 2 of 8
AUBURI�T * MORE THAN YOU IMAGWED
Agenda Subject: CPA14-0001, 2014 Gomprehensive Plan Date: November6, 2014
Amendments-Gity Initiated PIan�Map Amendments.and Policy/Text
Amendments
7 Each of the school districYs acting as their own lead agency as allowed under SEPA
conducted their own environmental review and issued separate Determinations of Non-
Significance (DNS).
8. Auburn City Code Chapter 14.22 outlines the process for submittal of privately-initiated
amendments and the general processing of comprehensive plan amendments as follows:
"Section 14.22.100
A. The planning commission shall hold at least one public hearing on all proposed
amendments to the comprehensive plan. Notice of such public hearing shall be
given pursuant to Chapter 1.27 ACC and, at a minimum, include the following:
1 For site-specific plan map amendments:
a. Notice shall be published once in the official newspaper of the city not
less than 10 calendar days prior to the date of public hearing;
b. Notice shall be mailed by first class mail to all property owners of
record within a radius of 300 feet of the proposed map amendment
request, not less than 10 calendar days prior to the public hearing;
2. For area-wide plan map amendments:
a. Notice shall be published once in the ofFicial newspaper of the city not
less than 10 calendar days prior to the date of public hearing;
b. Notice sfiall be mailed by first class mail to all property owners of
record within the area subject to the proposed amendment;
c. Notice shall be posted in at least two conspicuous locations in the
area subject to the proposed amendment not less than 10 calendar
days prior to the date of the public hearing.
B. Notwithstanding the above, the directo� may expand the minimum noticing
provisions noted above as deemed necessary
C Planning Commission Recommendation. The planning commission shali conduct
a public hearing on ail potential comprehensive plan amendments and shall
make and forward a recommendation on each to the city council. The planning
commission shall adopt written findings and make a recommendation consistent
with those findings to ttie city council.
D The city council, if it elects to amend the comprehensive plan, shall adopt written
findings and adopt said amendments by ordinance.
E. State Review All comprehensive plan amendments considered by the planning
commission shall be forwarded for state agency review consistent with RCW
36.70A.106.
F Any appeal of an amendment to the comprehensive plan shall be made in
accordance with Chapter 36.70A RCW (Ord. 6172 § 1, 2008.)"
9. As prbvided in the code, the Comprehensive Plan amendments are initially reviewed during
a public hearing process before the Gity of Auburn Planning Commission, who then provides
a recommendation to the City Council for final action. City Council consideration and action
on the amendments generally occurs, but•is not required, prior to the end of the year
10. Pursuant to RCW 36.70A.106, the proposed comprehensive plan amendments outlined in
this agenda bill were sent to the Washington State Office of Commerce and other state
agencies as required for the stafe review on October 9, 2014 The Washington State Office
of Commerce acknowledged receipt by letter dated October 13, 2014. No comments have
Page 3 of 8
AUBURN � MORE THAN YOU IMAGINED
Agenda Subject: CPA14-0001, 2014 Comprehensive Plan Date: November 6, 2014
Amendments—City Initiated Plan Map Amendments and Policy/Text
Amendments
been received from the Washington State Department of Commerce or other state
agencies as of the writing of this report.
11 Due to the nature and limited number of policy/text changes, and the lack of private initiated
map amendments, the optional process for a public open house was not conducted as
provided for in the city code.
12. The notice of public hearing was published on October 14, 2014 in the Seattle Times which
is at least 10-days prior to the Planning Commission public hearing scheduled for
November 5, 2014
13. The 2014 Comprehensive Plan Amendments were previously reviewed tiy the Planning
and Community Development Committee of the city council at the June 23, 2014 regular
meeting.
14 On November 5, 2014 the Planning Commission conducted a public hearing on the
proposed annual amendments as part of the process required by code.
15. On November 10, 2014 the Planning and Community Development Committee of the city
council will review the planning commissibn's �ecommendation.
16. The following report identifies the Comprehensive Plan Map Policy/Text (Pff) amendments
that were scheduied for the Planning Commission's November 5, 2014 public hearing with a
staff recommendation and the subsequent Planning Commission recommendation.
-=-----=-----November 5, 2014 Planning Commission Public Hearing --------------------------
Comprehensive Plan Map Afnendments (File No. CPA14-00071
(No map amendments are proposed with thrs year's amendment process)
Comprehensive Plan Policv/TextAmendments (File No. CPA74-00071
PIT#1
Incorporate Auburn School District Capital Facilities Plan 2014 through 2020 into the City of
Aubu[n Comprehensive Plan.
Discussion
The Auburn School District has provided the City with its annually updated Capital Facilities
Plan (CFP) covering from 2014-2020. The CFP was adopted by the Auburn School District
School Board of Direetors on June 9, 2014 and has been subject to separate SEPA review and
a Defermination of Non Significance (DNS). Information contained in the School District CFP
serves as the basis for the City's collection of school impact fees on behalf of the school district.
The Planning Commission action is incorporation of the Aubum School District Capital Facilities
Plan into the City's Comprehensive Plari.
The CFP includes the following:
• six—year enroilment projections
• Auburn school district level of service standards
• The districYs overall capacity of the 6-year period
Page 4 of 8
AUBURN * MORE THAN YOU IMAGINED
Agenda Subject: CPA14-0001, 2014 Comprehensive Plan Date: November 6, 2014
Amendments—City Initiated Plan Map Amendments and Policy/Text
Amendments
• An inventory of existing facilities
• Impact fee calculations
• District capital construction Plan
A review of the Auburn School DistricYs updated Gapital Facilities Plan indicates the District
is requesting a change in the fee obligations. The net fee obligation for single-family
dwellings is proposed to be $4,137.21, a decrease of$1,261 72 and the requested fee for
multiple-family dwellings is $3,518.17, an increase of$130.33. The actual impact fee to be
assessed is set by ordinance by the Auburn City Council.
Staff Recommendation
Planning Commission to recommend approval of the Auburn School District Capital Facilities
Plan 2014 through 2020 to the City Council
Planninp Commission Recommendation
Planning Commission to recommend approval of the Aubum School District Capital Facilities
Plan 2014 through 2020 to the City Couricil
P/T#2
Incorporate the Dieringer School District Capital Facilities Plan 2015-2020 into the City of
Auburn Comprehensive Plan.
Discussion
The Dieringer School District has provided the City with its annually updated Capital Facilities
Plan 2015 -2020. The CFP was adopted by the Dieringer School District Board of Directors on
June 17, 2014 The CFP has been subject to separate SEPA review and a DNS. Information
contained in the School District CFP serves as the basis for the City's collection of school
impact fees on behalf of the school district. The Planning Commission action is incorporation of
the School District Capital Facilities Plan into the City's Comprehensive Plan.
The CFP includes the following:
• Overview
• An inventory of existing facilities
• six—year enrollment projections
• standard of service
• Capacity projects
• Finance plan
. Impact fee calculations
A review of the Dieringer School DistricYs updated Capital Facilities Plan indicates the
District is requesting a change in the fee obligations. The net fee obligation for single-family
dwellings is proposed to be $5,231 00, an increase of$2,016.00 and the requested fee for
multiple family dwellings is $1,839; an increase of$144 00. The actual impact fee to be
assessed is set by ordinance by the Aubum City Council.
Siaff Recommendation
Planning Cbmmission to recommend approval of the Dieringer School District Capital Facilities
Plan 2015-2020 to the City Council.
Page 5 of 8
AUBURN * MORE THAN YOU IMAGINED
Agenda Subject: CPA14-0001, 2014 Comprehensive Plan Date: November 6, 2014
Amendments—City Initiated Plan Map Amehdments and Policy/Text
Amendments
Planninq Commission Recommendation
Planning Commission to recommend approval of the Dieringer School District Capital Facilities
Plan 2015-2020 to the City Council.
During the course to the deliberation, the Planning Commission asked that the calculations
contained in the Dieringer School District Capital Facilities Flan 2015-2020 be carefully
reviewed.
P/T#3
Incorporate Federai Way School DistricYs 2015 Capital Facilities Plan into the City of Auburn
Comprehensive Plan.
Discussion
The Federal Way School District has provided the City with its annually updated Capital
Facilities Plan (2015). The CFP was adopted by the Federal Way School District School Board
June 24, 2014 The CFP has been subject to separate SEPA review and a DNS. Information
contained in the School District CFP serves as the basis for the City's collection of school
impact fees on behalf of the school district. The Planning Commission action is incorporation of
the School District Capital Facilities Plan into the City's Comprehensive Plan.
The CFP includes the foilowing:
• Intrbduction
• Inventory of educational facilities & non-instructional facilities
• Needs forecast, existing & new facilities
• Siic—year finance plan
• Maps of district boundaries
• Building capacities & portabie locations
• Studentforecast
• Capacity summaries
• Impactfeecalculations
• Summary of changes from the 2014 plan
A review of the Federal Way School DistricYs updated Capital Facilities Plan indicates the
District is requesting a change in the fee obligations. The net fee obligation for single-family
dwellings is proposed to be $5,171 00, representing a decrease of$192.00 and the
requested fee for multi-family dwellings is $1,834.00, a decrease of$90.00. The actual
impact fee to be assessed is set by ordinance by the Auburn City Council.
Staff Recommendation
Planning Commission to recommend approval of the Federal Way School DistricYs 2015
Capital Facilities Plan to the City Council
Planttinv Commission Recommendation
Plaririing Commission to recommend approval of the Federal Way School District's 2015
Capital Facilities Plan to the City Council
P/T#4
Incorporate Kent School District Capital Facilities Plan 2014-2015 to 2019-2020 into the City of
Auburn Comprehensive Plan.
Page 6,of 8
AUBURN * MORE THAN YOU IMAGINED
Agenda Subject: CPA14-0001, 2014 Comprehensive Plan Date: November 6, 2014
Amendments—City Initiated PIan.Map Amendments and Policy/Text
Amendments
Discussion
The Kent School District has provided its annually updated 2014-2015 to 2019-2020 Capital
Facilities Plan. The CFP was adopted by the Kent School District School Board on June 25,
2014 and has been subject to separate SEPA review and a DNS. Information contained in the
School District CFP serves as the basis for the City's collection of school impact fees on behalf
of the school district. The Planning Commission action is incorporation of the School District
Capital Facilities Plan into the City's Comprehensive Plan.
The CFP includes the following:
• Executive Summary
• Six-year enroliment projection & history
• District standard of service
• Inventory, capacity & maps of existing schools
• Six-year planning & construction plan
• Portable classrooms
• Projected classroom capacity
• Finance Plan, cost basis and impact fee schedules
. Summary of changes to previous plan
A review of the Kent School District's updated Capital Facilities Plan indicates the District is
not requesting a change in the fees. The Plan indicates the continuing net fee obligation for
single-family dwellings of$5,486.00, representing no change, and for multi-family dwellings
a fee of$3,378.00, also rePresenting no change. The actual impact fee to be assessed is
set by ordinance by the Auburn City Council.
Staff Recommendation
Planning Commission to recommend approval of the Kent School District Capital Facilities Plan
2014-2015 to 2019-2020 to the City Council
P/ann/nq Commission Recommendation
Planriing Commissiori to recominend approval of the Kent School District Capital Facilities Plan
2014-2015 to 2019-2020 to the City Council
CPM #5
Incorporate the City of Auburn's 6-year Capitai Facilities Plan 2015-2020, into the City's
Comprehensive Plan.
Discussion
A Capital Facilities Plan is one of the comprehensive plan elements required by the Washington
State Growth Management Act (GMA) (RCW 36.70A). The GMA requires that a capital facilities
plan include an inventory of existing capital facilities (showing locations and capacities), a
forecast of future neeiis for such capital facilities, proposed locations and capacities of new or
expanded capital facilities, and a minimum of a six,year plan to finance capital facilities with
identified sources of funding. The proposed City of Auburn 6-year Capital Facilities Plan 2015-
2020 satisfies the GMA requiremenfs for a capital facilities element as part of the
Comprehensive Plan.
Page 7 of S
AUBURN * MORE THAN YOU IMAGWED
Agenda Subject: CPA14-0001, 2014 Comprehensive Plan Date: November 6, 2014
Amendments-City Initiated Plan Map Amendments and PolicylText
Amendments
Each comprehensive pian prepared under the GMA must include a capital facilities plan
element. More specifically, RCW 36.70A.070(3) of fhe GMA requires the following:
"A capital facilities plan element consisting of:
(a) An inventory of existing capital faciiities owned by public entities, showing the
locations and capacities of the capital facilities;
(b) a forecast of the future needs of such capital facilities;
(c) the proposed locations and capacities of expanded or new capital facilities;
(d) at least a six-year plan that will finance such capital facilities within projected
funding capacities and clearly identifies sources of public money for such
purposes; and
(e) a requirement to reassess the land use element if probable funding falls short
of ineeting existing needs and to ensure that the land use element, capital
facilities plan element, and financing plan within the capital facilities plan element
are coordinated and consistent. Park and recreation facilities shall be included in
the capifal facilities plan element."
A capital facility is defined as a structure, street or utility system improvement, or other long-
lasting major asset, including land. Capital facilities are provided for public purposes. Capitai
facilities include, but are not limited to, the following: streets, roads, highways, sidewalks, street
and road lighting systems, traffic signals, domestic water systems, storm and sanitary sewer
systems, parks and recreation facilities, and police and fire protection facilities. These capital
facilities include necessary anciliary and support facilities.
The memo dated October 2, 2014 from the City's Finance Department contained in the three
ring binder highlights the major changes in the CFP from last year The proposed City of
Auburn 6-year Capital Facilities Plan 2015-2020 is incorporated by �eference in the
Comprehensive Plan, Chapter 5, Capital Facilities.
Sfaff Recommendafion
Planning Commission to recommend approval of the City of Auburn's 6-year Capital Facilities
Pian 2015-2020 to the City Council.
Planninp Commission Reaommendation
Planning Commission to recommend approval of the City of Auburn's 6-year Capital Facilities
Plan 2015-2020 to the City Council with the amendment that the Planning Commission
recommends that the City study the extension of sidewalks along Auburn Way South, south of
Hemlock Street SE for pedestrian safety reasons.
Page 8 of 8