Loading...
HomeMy WebLinkAbout2009 Construction Manual Part 2 01 2015.pdfSECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 7/2014 .............................. City of Auburn Engineering Construction Standards.......................... i Ref.: H:\Engineering Standards Manuals\02 Construction Standards\02-2 Revisions Issued\Revision 5 - 07 2014\Section II Table Of Contents (7-14).docx ENGINEERING CONSTRUCTION STANDARDS STANDARD DETAIL NAME STANDARD DETAIL NUMBER GENERAL BANNER DETAIL ................................................................................................................................................ GENERAL-01 TEMPORARY CONSTRUCTION SITE SIGN BOARD (4’ X 4’) ....................................................................... GENERAL-02 TEMPORARY T.I.B. CONSTRUCTION SITE SIGN BOARD (4’ X 4’) ............................................................ GENERAL-02a TEMPORARY H.U.D. CONSTRUCTION SITE SIGN BOARD (4’ X 4’) .......................................................... GENERAL-02b TEMPORARY CONSTRUCTION SITE SIGN BOARD (4’ X 8’) ....................................................................... GENERAL-03 ROCK WALL DETAIL ......................................................................................................................................... GENERAL-04 CITY TELECOMMUNICATIONS SPLICE VAULT DETAIL (Sheet 1 of 2) ..................................................... GENERAL-05 CITY TELECOMMUNICATIONS SPLICE VAULT DETAIL (Sheet 2 of 2) ..................................................... GENERAL-05a CITY TELECOMMUNICATIONS PULL BOX DETAIL (Sheet 1 of 2) ............................................................. GENERAL-06 CITY TELECOMMUNICATIONS PULL BOX DETAIL (Sheet 2 of 2) ............................................................. GENERAL-06a EROSION TEMPORARY CONSTRUCTION ENTRANCE .................................................................................................. EROSION-01 SMALL SITE TEMPORARY CONSTRUCTION ENTRANCE .......................................................................... EROSION-01a TEMPORARY CONSTRUCTION EXIT WITH TIRE WASH PAN ................................................................. EROSION-02 SILT CONTROL FENCE ...................................................................................................................................... EROSION-03 CATCH BASIN PROTECTION ............................................................................................................................ EROSION-04 ALTERNATE CATCH BASIN PROTECTION .................................................................................................... EROSION-04a GRAVEL FILTER BERM ..................................................................................................................................... EROSION-05 STRAW AND HAY BALE BARRIER ................................................................................................................. EROSION-06 SMALL LOT, SITE EROSION CONTROL PLAN ............................................................................................... EROSION-07 TRAFFIC BUMPER CURB DETAIL ..................................................................................................................................... TRAFFIC-01 STREET RIGHT-OF-WAY PIPE TRENCH BACK FILL & PAVEMENT RESTORATION ............................. TRAFFIC-02 TYPICAL PIPE TRENCH DETAIL ...................................................................................................................... TRAFFIC-03 TELECOMMUNICATION CORRIDOR TRENCH DETAIL .............................................................................. TRAFFIC-04 BARRICADES ....................................................................................................................................................... TRAFFIC-05 BOLLARDS ........................................................................................................................................................... TRAFFIC-06 RESIDENTIAL DRIVEWAY ................................................................................................................................ TRAFFIC-07 ALTERNATE RESIDENTIAL DRIVEWAY ........................................................................................................ TRAFFIC-08 COMMERCIAL/INDUSTRIAL DRIVEWAY ...................................................................................................... TRAFFIC-09 ALTERNATE COMMERCIAL/INDUSTRIAL DRIVEWAY RETROFIT .......................................................... TRAFFIC-10 DRIVEWAY WIDTHS AND LOCATION ........................................................................................................... TRAFFIC-11 ADJUSTMENT OF NEW AND EXISTING UTILITY STRUCTURES TO FINISH GRADE ............................ TRAFFIC-12 TYPICAL STREET INTERSECTION DESIGN ELEMENTS ............................................................................. TRAFFIC-13 STREET TREE PLANTING/STAKING ............................................................................................................... TRAFFIC-14 NOT USED ............................................................................................................................................................ TRAFFIC-15 MAILBOX MOUNTING CURB TYPE LOCATION ........................................................................................... TRAFFIC-16 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) INSTALLATION ................ TRAFFIC-17 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) SINGLE UNIT ..................... TRAFFIC-18 NEIGHBORHOOD DELIVERY AND COLLECTION BOX UNIT (N.D.C.B.U.) MULTIPLE UNITS ............. TRAFFIC-19 POURED IN PLACE MONUMENT, TYPE ‘A’ MODIFIED ............................................................................... TRAFFIC-20 POURED IN PLACE MONUMENT, TYPE ‘B’ MODIFIED ............................................................................... TRAFFIC-21 MONUMENT CASE AND COVER ...................................................................................................................... TRAFFIC-22 SIDEWALK WITH LANDSCAPE STRIP ............................................................................................................ TRAFFIC-23 COMMERCIAL/INDUSTRIAL SIDEWALK WITHOUT PLANTER STRIP ..................................................... TRAFFIC-24 WHEELCHAIR RAMP WITH DOMES ................................................................................................................ TRAFFIC-25 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 7/2014 .............................. City of Auburn Engineering Construction Standards......................... ii Ref.: H:\Engineering Standards Manuals\02 Construction Standards\02-2 Revisions Issued\Revision 5 - 07 2014\Section II Table Of Contents (7-14).docx TRAFFIC (continued) STANDARD DETAIL NAME STANDARD DETAIL NUMBER ALTERNATE WHEELCHAIR RAMP WITH DOMES ....................................................................................... TRAFFIC-26 PRINCIPAL ARTERIAL ROADWAY SECTION ................................................................................................ TRAFFIC-27 MINOR ARTERIAL ROADWAY SECTION ....................................................................................................... TRAFFIC-28 RESIDENTIAL COLLECTOR ROADWAY SECTION ....................................................................................... TRAFFIC-29 NONRESIDENTIAL COLLECTOR ROADWAY SECTION ............................................................................. TRAFFIC-30 RURAL COLLECTOR ROADWAY SECTION ................................................................................................... TRAFFIC-31 LOCAL RESIDENTIAL ROADWAY SECTION ................................................................................................. TRAFFIC-32 LOCAL NONRESIDENTIAL ROADWAY SECTION ........................................................................................ TRAFFIC-33 RURAL RESIDENTIAL ROADWAY SECTION ................................................................................................. TRAFFIC-34 LANE-USE PAVEMENT MARKING DETAIL ................................................................................................... TRAFFIC-35 34’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-36 44’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-37 61’ WIDE ROADWAY, CROSSWALK AND STOP BAR DETAIL ................................................................... TRAFFIC-38 2 WAY LEFT TURN LANE TO LEFT TURN LANE .......................................................................................... TRAFFIC-39 PAVEMENT MARKINGS (2-Lane 2-Way Traffic, Left Turn Lane, 2-Way Left Turn Lane, and Standard Lane Markings ................................................................................................ TRAFFIC-40 PAVEMENT MARKINGS (2-Way Left Turn Lane with Left Turn Pocket) ......................................................... TRAFFIC-41 PAVEMENT MARKINGS (Dual Left Turn Lanes and Dual Right Turn Lanes) .................................................. TRAFFIC-42 PAVEMENT MARKINGS (Raised Pavement Marker (RPM), Gore, Center, Skip, and Turn Lane Stripe) .................................................................................................................... TRAFFIC-43 BICYCLE LANE MARKINGS (Right Turn Lane Drop) ...................................................................................... TRAFFIC-44 BICYCLE LANE MARKINGS (Right Turn Pocket) ............................................................................................. TRAFFIC-45 PEDESTRIAN PUSH BUTTON DETAIL............................................................................................................. TRAFFIC-46 PREEMPTION INDICATOR LIGHT ASSEMBLY .............................................................................................. TRAFFIC-47 LUMINAIRE AND CONDUIT LAYOUT ............................................................................................................ TRAFFIC-48 LUMINAIRE POLE ............................................................................................................................................... TRAFFIC-49 UNIFORM LUMINAIRE WIRING DETAIL ........................................................................................................ TRAFFIC-50 POWER SERVICE CABINET DETAIL ............................................................................................................... TRAFFIC-51 POWER SERVICE AND UPS CABINET DETAIL (Sheet 1 of 2) ....................................................................... TRAFFIC-52 POWER SERVICE AND UPS CABINET DETAIL (Sheet 2 of 2) ....................................................................... TRAFFIC-52a TRAFFIC SIGNAL CONTROLLER AND UPS FOUNDATION DETAIL ......................................................... TRAFFIC-53 TELLECOMMUNICATION AND LUMINAIRE ELECTRICAL TRENCH DETAIL ........................................ TRAFFIC-54 TYPICAL SIGN POST INSTALLATION ............................................................................................................. TRAFFIC-55 MAST ARM MOUNTED, STREET NAME SIGN DETAIL ................................................................................ TRAFFIC-56 POST MOUNTED, STREET NAME SIGN DETAIL ........................................................................................... TRAFFIC-57 50’ WIDE ROADWAY CROSSWALK AND STOP BAR DETAIL .................................................................... TRAFFIC-58 STANDARD DETECTOR LOOP SPACING ........................................................................................................ TRAFFIC-59 REPAIR OF EXISTING CEMENT CONCRETE PANELS IN ROADWAY ....................................................... TRAFFIC-60 DOWNTOWN PEDESTRIAN LIGHTING STANDARD .................................................................................... TRAFFIC-61 DOWNTOWN PEDESTRIAN POLE MOUNT LIGHTING STANDARD .......................................................... TRAFFIC-61a LOCAL RESIDENTIAL ORNAMENTAL STREET LIGHTING STANDARD .................................................. TRAFFIC-62 DOWNTOWN STREET LIGHTING STANDARD .............................................................................................. TRAFFIC-63 TYPICAL PLAN FOR TREE GRATE .................................................................................................................. TRAFFIC-64 PRIVATE ACCESS ROAD (SHARED DRIVEWAY) ......................................................................................... TRAFFIC-65 PRECAST CONCRETE DUAL FACED SLOPED MOUNTABLE CURB ......................................................... TRAFFIC-66 SANITARY SEWER SIDE SEWER STUB .............................................................................................................................................. SEWER-01 PRIVATE SANITARY SIDE SEWER CLEANOUT ............................................................................................ SEWER-02 PUBLIC SANITARY OR STORM SEWER CLEANOUT ................................................................................... SEWER-03 24” DIA. MANHOLE FRAME AND COVER ...................................................................................................... SEWER-04 MANHOLE INSIDE DROP DETAIL.................................................................................................................... SEWER-05 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 1/2015 .............................. City of Auburn Engineering Construction Standards........................ iii Ref.: H:\Engineering Standards Manuals\02 Construction Standards\02-2 Revisions Issued\Revision 6 - 1 2015\Section II Table Of Contents (1-15).docx EXTRA SHALLOW MANHOLE DETAIL ........................................................................................................... SEWER-06 STANDARD DETAIL NAME STANDARD DETAIL NUMBER STORM DRAINAGE FLOW RESTRICTOR (TEE) ................................................................................................................................. STORM-01 MULTIPLE ORIFICE CONTROL STRUCTURE ................................................................................................ STORM-02 SMALL SITE, WATER QUALITY CONTROL STRUCTURE ........................................................................... STORM-03 GRADING/EROSION DISCHARGE CONTROL STRUCTURE ........................................................................ STORM-04 RESIDENTIAL INFILTRATION TRENCH SYSTEM FOR DOWN SPOUTS ................................................... STORM-05 RESIDENTIAL INFILTRATION DRY WELL DETAIL ..................................................................................... STORM-06 RESIDENTIAL FOOTING DRAIN DETAIL ....................................................................................................... STORM-07 HEADWALL WITH GRATE ................................................................................................................................ STORM-08 THROUGH-CURB INLET FRAME & GRATE WITH VERTICAL CURB INSTALLATION .......................... STORM-09 THROUGH-CURB INLET FRAME ...................................................................................................................... STORM-10 CURB & GUTTER REINFORCING DETAIL ...................................................................................................... STORM-11 RESIDENTIAL SIDEWALK DRAIN ................................................................................................................... STORM-12 WATER WATER MAIN BLOCKING ................................................................................................................................. WATER-01 TYPICAL AIR & VACUUM RELIEF VALVE DETAIL ..................................................................................... WATER-02 2” PERMANENT BLOW OFF ASSEMBLY DETAIL ......................................................................................... WATER-03 TEMPORARY BLOW OFF DETAIL.................................................................................................................... WATER-04 DOUBLE DETECTOR CHECK VALVE ASSEMBLY AND VAULT (Page 1 of 2) .......................................... WATER-05 DOUBLE DETECTOR CHECK VALVE ASSEMBLY AND VAULT (Page 2 of 2) .......................................... WATER-05a IRRIGATION FROM DOMESTIC SERVICE LINE WITH D.C.V.A. UP TO 2” ................................................ WATER-06 5 ¼” M.V.O. HYDRANT SETTING DETAIL ...................................................................................................... WATER-07 FIRE HYDRANT LOCATION IN CUT OR FILL WITH GUARD POSTS DETAIL .......................................... WATER-08 ¾” TO 3” FIRE SPRINKLER LINES WITH DOMESTIC SERVICE LINE ........................................................ WATER-09 PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 1 of 3) .................................. WATER-10 PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 2 of 3) .................................. WATER-10a PRESSURE REDUCING VALVE STATION FOR 8” DIA. WATERLINE (Sheet 3 of 3) .................................. WATER-10b PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 1 of 3) ................................ WATER-11 PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 2 of 3) ................................ WATER-11a PRESSURE REDUCING VALVE STATION FOR 10” DIA. WATERLINE (Sheet 3 of 3) ................................ WATER-11b PRESSURE REDUCING VALVE STATION FOR 12” DIA WATERLINE (Sheet 1 of 3) ................................. WATER-12 PRESSURE REDUCING VALVE STATION FOR 12” DIA. WATERLINE (Sheet 2 of 3) ................................ WATER-12a PRESSURE REDUCING VALVE STATION FOR 12” DIA. WATERLINE (Sheet 3 of 3) ................................ WATER-12b ¾” & 1” WATER METER AND SERVICE LINE INSTALLATION .................................................................. WATER-13 1 ½” & 2” WATER METER AND SERVICE LINE INSTALLATION ............................................................... WATER-14 NOT USED ............................................................................................................................................................. WATER-15 WATER METER LOCATION AND SERVICE LINE MATERIAL SCHEDULE .............................................. WATER-16 3” OR 4” WATER METER AND SERVICE LINE INSTALLATION (Sheet 1 of 2) .......................................... WATER-17 3” OR 4” WATER METER AND SERVICE LINE INSTALLATION (Sheet 2 of 2) .......................................... WATER-17a VALVE WRENCH EXTENSION BOX ................................................................................................................ WATER-18 C.I. 18” VALVE BOX TOP AND VALVE BOX COVER .................................................................................... WATER-18a 5” C.I. SOIL PIPE VALVE BOX EXTENSION AND C.I. VALVE BOX BOTTOM .......................................... WATER-18b NON-SINGLE FAMILY SERVICE LINES .......................................................................................................... WATER-19 TEMPORARY COMBINATION HYDRANT METER/REDUCED PRESSURE BACKFLOW ASSY ............. WATER-20 REDUCED PRESSURE BACKFLOW ASSEMBLY (OUTSIDE INSTALLATION) ......................................... WATER-21 REDUCED PRESSURE BACKFLOW ASSEMBLY (INSIDE INSTALLATION) ............................................. WATER-22 DOUBLE CHECK VALVE ASSEMBLY (OUTSIDE INSTALLATION) ........................................................... WATER-23 DOUBLE CHECK VALVE ASSEMBLY (INSIDE INSTALLATION) ............................................................... WATER-24 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 7/2014 .............................. City of Auburn Engineering Construction Standards........................ iv Ref.: H:\Engineering Standards Manuals\02 Construction Standards\02-2 Revisions Issued\Revision 5 - 07 2014\Section II Table Of Contents (7-14).docx WSDOT STANDARD PLANS (COMMONLY USED BY CITY OF AUBURN AND NOT INCLUDED HEREIN) STANDARD PLAN NAME STANDARD PLAN NUMBER CEMENT CONCRETE PAVEMENT JOINTS ............................................................................................... A-40.10-00 CATCH BASIN TYPE 1 .................................................................................................................................. B-05.20-00 CATCH BASIN TYPE 1L ............................................................................................................................... B-05.40-00 CATCH BASIN TYPE 1P (For PARKING LOT) ........................................................................................... B-05.60-00 CATCH BASIN TYPE 2 .................................................................................................................................. B-10.20-00 CATCH BASIN TYPE 2 WITH BAFFLE TYPE FLOW RESTRICTOR ....................................................... B-10.60-00 MANHOLE TYPE 1 ........................................................................................................................................ B-15.20-00 MANHOLE TYPE 2 ........................................................................................................................................ B-15.40-00 MANHOLE TYPE 3 ........................................................................................................................................ B-15.60-00 CONCRETE INLET ......................................................................................................................................... B-25.60-00 RECTANGULAR FRAME (REVERSIBLE) ................................................................................................... B-30.50.00 RECTANGULAR SOLID METAL COVER .................................................................................................... B-30.20.01 RECTANGULAR VANED GRATE ................................................................................................................ B-30.30-00 RECTANGULAR HERRINGBONE GRATE ................................................................................................. B-30.50-00 MISCELLANEOUS DETAILS FOR DRAINAGE STRUCTURES ............................................................... B-30.90-01 CONCRETE THRUST BLOCK FOR CONVEX VERTICAL BENDS ......................................................... B-90.50-00 DROP CONNECTIONS FOR SANITARY SEWER USE .............................................................................. B-85.50-01 BEAM GUARDRAIL: TYPES 1 ~ 4 (W-Beam) .......................................................................................................... C-1 REINFORCED CONCRETE RETIANING WALL TYPE 1 AND 1SW ........................................................ D-10.10-01 REINFORCED CONCRETE RETAINING WALL TYPE 2 AND 2SW ........................................................ D-10.15-01 CEMENT CONCRETE CURBS ....................................................................................................................... F-10.12-00 EXTRUDED CURB .......................................................................................................................................... F-10.42-00 PRECAST CONCRETE SLOPED MOUNTABLE CURB .............................................................................. F-10.62-01 PRECAST CONCRETE DUAL FACED SLOPED MOUNTABLE CURB .................................................... F-10.64-02 SIGNAL STANDARD TYPE DESIGNATIONS AND TYPES PPB, PS, I, RM AND FB DETAILS ....................... J-7a TYPE 3 INDUCTION LOOP ....................................................................................................................................... J-8c LOCKING LID STANDARD JUNCTION BOX TYPES 1 & 2 ....................................................................... J-40.10-00 PULL BOX ......................................................................................................................................................... J-90.10-00 CABLE VAULT ................................................................................................................................................. J-90.20-00 ROAD CLOSURE, WITH DIVERSION ......................................................................................................... K-10.20-01 ROAD CLOSURE, WITH OFF-SITE DETOUR ............................................................................................. K-10.40-00 LANE CLOSURE, WITHOUT FLAGGERS ~ LOW VOLUME ROAD ........................................................ K-20.20-01 LANE CLOSURE, WITH FLAGGER CONTROL ......................................................................................... K-20.40-00 LANE CLOSURE, WITH PILOT CAR ........................................................................................................... K-20.60-00 LANE SHIFT, ONTO PASSING LANE .......................................................................................................... K-22.20-01 SINGLE LANE CLOSURE, WITH ENCROACHMENT ............................................................................... K-24.20-00 DOUBLE LANE CLOSURE, ON MULTILANE ROADWAY ...................................................................... K-24.40-01 SINGLE LANE CLOSURE, ON MULTILANE ROADWAY ........................................................................ K-24.60-00 SINGLE LANE CLOSURE, WITH TEMPORARY CONCRETE BARRIER ................................................ K-24.80-01 LANE SHIFT, ONTO TWO-WAY LEFT TURN LANE ................................................................................ K-26.20-00 LEFT AND CENTER LANE CLOSURE ~ TWO-WAY LEFT TURN LANE ............................................... K-26.40-01 INTERSECTION ~ LANE SHIFT ON THREE LANE TWO-WAY LEFT TURN LANE ............................. K-30.20-00 INTERSECTION ~ LANE SHIFT ON FIVE LANE TWO-WAY LEFT TURN LANE .................................. K-30.40.01 INTERSECTION ~ RIGHT LANE CLOSURE, FAR SIDE ............................................................................ K-32.20-00 INTERSECTION ~ LEFT LANE CLOSURE, FAR SIDE .............................................................................. K-32.40-00 INTERSECTION ~ MULTIPLE LANE CLOSURE........................................................................................ K-32.60-00 INTERSECTION ~ HALF ROAD CLOSURE WITH LANE SHIFT ............................................................. K-32.80-00 INTERSECTION ~ PEDESTRIAN DETOUR ................................................................................................ K-34.20-00 INTERSECTION ~ SHOULDER WORK ....................................................................................................... K-36.20-00 SHOULDER CLOSURE ~ HIGH SPEED ROADWAY (45 MPH OR HIGHER) .......................................... K-40.20-00 SHOULDER CLOSURE ~ LOW SPEED ROADWAY (40 MPH OR LESS) ................................................ K-40.40-00 SHOULDER CLOSURE ~ SHORT DURATION ........................................................................................... K-40.60-00 WORK BEYOND THE SHOULDER .............................................................................................................. K-40.80-00 EMERGENCY ~ PASSABLE HAZARD ........................................................................................................ K-55.20-00 SPEED ZONE, SUPPLEMENTAL SIGNING ~ CHIP SEAL PROJECT ....................................................... K-60.20-02 MOTORCYCLE, SUPPLEMENTAL SIGNING ............................................................................................. K-60.40-00 TEMPORARY CHANNELIZATION .............................................................................................................. K-70.20-00 SECTION II: STANDARD DETAILS TABLE OF CONTENTS Revised 7/2014 .............................. City of Auburn Engineering Construction Standards......................... v Ref.: H:\Engineering Standards Manuals\02 Construction Standards\02-2 Revisions Issued\Revision 5 - 07 2014\Section II Table Of Contents (7-14).docx WSDOT STANDARD PLANS (continued) (COMMONLY USED BY CITY OF AUBURN AND NOT INCLUDED HEREIN) STANDARD PLAN NAME STANDARD PLAN NUMBER CLASS A CONSTRUCTION SIGNING INSTALLATION ........................................................................... K-80.10-00 TYPE 3 BARRICADE ..................................................................................................................................... K-80.20-00 ALTERNATE TEMPORARY CONC. BARRIER (F-SHAPE) ....................................................................... K-80.30-00 TEMPORARY CONC. BARRIER ANCHORING .......................................................................................... K-80.35-00 TEMPORARY CONC. BARRIER ANCHORING ~ NARROW ..................................................................... K-80.37.00 CHAIN LINK FENCE, TYPES 3 and 4 ............................................................................................................ L-20.10-00 CHAIN LINK GATE......................................................................................................................................... L-30.10-00