HomeMy WebLinkAbout05-11-2015 CITY COUNCIL STUDY SESSION AGENDACity Council Study Session
May 11, 2015 - 5:30 PM
C. TY 01 Auburn City Hall
u
AGENDA
Watch the meeting LIVE!
,A Watch the meeting video
M eeti ng vi deos are not avai I abl e unti 172
hours after the meeti na has cond uded.
CALL TO ORDER
A. Roll Call
II. ANNOUNCEMENTS, REPORTS, AND PRESENTATIONS
A. Green River College's Capital Project, Aviation Trades Building - 15 Minute
Presentation / 5 Minute Q &A
Dr. Eileen Ely, President of Green River College
Sam Ball, Director of Capital Projects for Green River College
III. AGENDA ITEMS FOR COUNCIL DISCUSSION
A. Urban Design Presentation - 15 Minute Presentation /15 Min Q &A
(Flemister)
B. 2016 -2021 Transportation Improvement Plan Update - 10 Min
Presentation /10 Min Q &A* (Para)
C. 10 -Year Economic Development Strategic Plan RFP - 15 Minute
Presentation /15 Min Q &A* (Lein /Tate)
Overview briefing of the DRAFT 10 -Year Economic Development Strategic Plan
Request for Proposals.
IV. OTHER DISCUSSION ITEMS
V. ADJOURNMENT
Agendas and minutes are available to the public at the City Clerk's Office, on the City
website (http: / /www.auburnwa.gov), and via e -mail. Complete agenda packets are
available for review at the City Clerk's Office.
*Denotes attachments included in the agenda packet.
Page 1 of 130
'Alu,BURN
VVAS p � I N G "i'(
AGENDA BILL APPROVAL FORM
Agenda Subject: Date:
Urban Design Presentation - 15 Minute Presentation /15 March 23, 2015
Min Q &A
Department: Attachments: Budget Impact:
Community Development No Attachments Available $0
and Public Works
Administrative Recommendation:
Background Summary:
Urban Design is the study and practice of creating urban space. As we move through
cities and towns, we experience buildings, streets, and open space that come together
to form the familiar places we visit or call home. Architects, landscape architects, and
engineers are typically responsible for designing the individual components that
populate our spatial reality; but the truth is, much more goes into urban design than
structures and intersections. Culture, politics, and economy vastly affect the
realization, the "feel', and the success of urban design initiatives.
What makes a functional and engaging city, ultimately, are the people who live within
its boundaries. Communities that share values and work toward goals that resonate
within the built environment live in the type of cities we aspire to become.
The presentation will focus on defining urban design, discussing the roles of parties
who contribute to urban design projects, describe the process of urban design, and
most importantly, will show and explain the ways that Auburn can use urban design
principles and elements to improve downtown and other areas.
Reviewed by Council Committees:
Councilmember: Staff: Flemister
Meeting Date: May 11, 2015 Item Number: DI.A
DI.A AUBURN * MORE THAN YOU IMAGINED Page 2 of 130
DI.A AUBURN * MORE THAN YOU IMAGINED Page 3 of 130
'Alu,BURN
VVAS I � I N G "i'(') N1
AGENDA BILL APPROVAL FORM
Administrative Recommendation:
For discussion only.
Background Summary:
The Six -Year Transportation Improvement Program (TIP) is required to be amended
annually as required by RCW 35.77.010. The primary importance of the TIP is that, in
most instances, projects must be included on the TIP to be eligible for state and
federal grant programs. The TIP identifies secured or reasonably expected revenues
and expenditures for each of the projects included in the TIP. Typically, projects listed
in the first three years of the document are shown as having secured funding while
projects in years 4, 5, and 6 can be partially or completely un- funded.
The TIP is a multiyear planning tool and document for the development of
transportation facilities within the City and does not represent a financial commitment
by the City. Once the TIP is approved, projects are budgeted and funded through the
City's biennial budget. The TIP sets priorities for the acquisition of project funding and
is a prerequisite of most grant programs. Staff also uses the TIP to coordinate future
transportation projects with needed utility improvements.
SUMMARY OF PROPOSED AMENDMENTS TO THE 2016 -2021 TIP
Deletions: The following projects were removed from the 2014 -2019 TIP:
TIP 9: D ST NE (Keep in Comp Plan)
TIP 18: 8th & 104 Intersection Improvements
TIP 20:AWS &MStSE
TIP 23: BNSF / A St SE Pedestrian Underpass Feasibility Study
TIP 33: BNSF 3rd Rail Expansion Roadway Improvements
TIP 38: 37th & B St NW Railroad Crossing Safety Improvements
DI.B AUBURN * MORE THAN YOU IMAGINED Page 4 of 130
TIP 44: A St NE Pedestrian Improvements
TIP 45: Interurban Trailhead Improvements
TIP 52: 8th St NE & C ST NW ITS Improvements
Additions: The following project is proposed to be added to the 2015 -2020 TIP:
TIP 9: Auburn Way South Corridor Improvements (Hemlock to Academy)
TIP 18: M St and 29th St SE Safety project (Signal)
TIP 20: R St SE & 21st St SE Project (Roundabout or Signal)
TIP 23: Riverwalk Drive Build out (R St to AWS)
TIP 33: Neighborhood Traffic Calming Program
TIP 38: C St SW & 15th St SW Intersection Improvements
TIP 44: Downtown Transit Access Improvements: SW Corner 3rd SW & S Division
St, NE Corner 2nd ST SW
TIP 45: 124th Ave SE & SE 284th St Intersection Safety Improvements
TIP 52: A St SE & Lakeland Hills Way Intersection Safety & Capacity Improvements
TIP 73: Stewart Road Project
NEXT STEPS:
Staff will incorporate council and administration comments into the final draft. Final
draft is anticipated to be presented at the June 1 st City Council meeting for first
reading and to set public hearing. The second reading, public hearing, and final
adoption are anticipated at the June 15th Council meeting. This schedule meets the
requirement to submit the Plan to the State by the end of June 2015.
Reviewed by Council Committees:
Councilmember: Staff: Para
Meeting Date: May 11, 2015 Item Number: DI.B
DI.B AUBURN * MORE THAN YOU IMAGINED Page 5 of 130
0tv ofAuburn Transportation Improvement Program
X_ m
w,
,.
1111p, '1111 11111, 11�
Adopted by Auburn City Council
June 15, 2015
City of Auburn
25 West Main Street
Auburn, WA 98001
(253)- 931 -3010
www.auburnwa.gov
DI.B Page 6 of 130
0tv ofAuburn Transportation lmproyementProgram
Id
. .:... .W
ov't N,
Cover Photos: Left: XXXX, Right: XXXXX
ii
DI.B Page 7 of 130
0tv ofAuhurn Transportation Improvement Program
RESOLUTION NO. 5146
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
AUBURN, WASHINGTON, APPROVING THE 2016 -2021
TRANSPORTATION IMPROVEMENT PROGRAM OF THE CITY OF
AUBURN PURSUANT TO R.C.W. CHAPTER 35.77 OF THE LAWS
OF THE STATE OF WASHINGTON
WHEREAS, RCW 35.77.010 requires that the legislative body of each City
prepare and adopt a comprehensive Transportation Improvement Program (TIP)
for the ensuing six years, but only after conducting a public hearing; and
WHEREAS, a public hearing to review the 2016 -2021 Transportation
Improvement Program for the City of Auburn was held on June 15, 2015 at the
hour of 7:00 p.m. in the Council Chambers of the Auburn City Hall, pursuant to
notice published in the legal newspaper of the City of Auburn on June 03, 2015.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF AUBURN,
WASHINGTON, HEREBY RESOLVES as follows:
Section 1. There is attached hereto and denominated as Exhibit "A," the
terms of which are incorporated herewith by reference as though fully set forth, a
designation of the streets within the corporate limits of the City of Auburn to be
improved in the manner therein set forth during the year set for the improvement
of such street or streets.
Section 2. That the City Engineer of the City of Auburn is hereby directed
to forward a certified copy of this Resolution to the Washington State Department
of Transportation for filing not more than thirty (30) days after the adoption of this
Section 3. That the Mayor is hereby authorized to implement such
administrative procedures as may be necessary to carry out the directions of this
legislation.
Section 4. That this Resolution shall take effect and be in full force upon
passage and signatures hereon.
DI.B Page 8 of 131
0tv ofAuburn Transportation Improvement Program
DATED this day of June, 2015
CITY OF AUBURN
NANCY BACKUS
MAYOR
ATTEST:
Danielle E. Daskam,
City Clerk
APPROVED AS TO FORM:
Daniel B. Heid,
City Attorney
lv DI.B Page 9 of 130
0tv ofAuhurn Transportation Improvement Program
Table of Contents
ExecutiveSummary ............................................................................................... ............................... 1
Introduction.............................................................................................................. ............................... 1
Projects & Financing Plan Summary ................................................................. ............................... 3
Financial Constraint & Fund Balance Summary ............................................ ............................... 13
Roadway Improvement Projects ....................................................................... ............................... 15
Auburn Way S Ped Improvements (TIP# 2) ................................................... ...............................
15
Auburn Way Corridor (TIP# 3) .......................................................................... ...............................
16
1 Street NE Corridor (TIP# 4) ............................................................................. ...............................
17
MStreet Underpass (TIP# 5) ............................................................................ ...............................
18
S 272nd/277th Street (TIP# 6) .......................................................................... ...............................
19
A Street NW, Phase 2 (TIP# 8) ......................................................................... ...............................
20
Auburn Way S, Hemlock to Academy (TIP# 9) .............................................. ...............................
21
FStreet SE (TIP# 10) ......................................................................................... ...............................
22
MStreet NE (TIP# 11) ........................................................................................ ...............................
23
Grade - Separated Crossing of BNSF Yard (TIP# 12) .................................... ...............................
24
8th Street NE Widening (TIP# 15) .................................................................... ...............................
25
49th Street NE (TIP# 16) .................................................................................... ...............................
26
46th Place S Realignment (TIP# 25) ............................................................... ...............................
27
Neighborhood Traffic Calming Program (TIP# 33) ........................................ ...............................
28
124th Avenue SE Corridor Improvements, Phase 2 (TIP# 40) .................... ...............................
29
RStreet Bypass (TIP# 41) ................................................................................. ...............................
30
SE 320th Street Corridor Improvements (TIP# 42) ....................................... ...............................
31
Auburn Way S (SR -164) Corridor Safety Improvements (TIP# 43) ............ ...............................
32
W Valley Highway Improvements (15th NW to W Main St) (TIP# 49) ........ ...............................
33
W Main St Corridor Improvements (TIP# 55) ................................................. ...............................
34
Auburn Way S Corridor Improvements (Fir to Hemlock) (TIP# 58) ............ ...............................
35
M Street SE Corridor (TIP# 60) ......................................................................... ...............................
36
Auburn Way S Bypass (TIP# 61) ...................................................................... ...............................
37
Auburn Way S Streetscape Improvements (TIP# 62) ................................... ...............................
38
Lea Hill Road Segment 1 (TIP# 64) ................................................................. ...............................
39
Lea Hill Road Segment 2 (TIP# 65) ................................................................. ...............................
40
Lea Hill Road Segment 3 (TIP# 66) ................................................................. ...............................
41
W Valley Highway Improvements (SR -18 to 15th SW) ( TIP# 72) ............... ...............................
42
Stewart Road (Lake Tapps Parkway) (TIP# 73) ............................................ ...............................
43
Intersection Signal & ITS Improvements ........................................................ ...............................
45
M Street SE & 12th Street SE Traffic Signal (TIP# 14) ................................. ............................... 45
Harvey Rd NE & 8th Street NE Intersection Improvements (TIP# 17) ....... ............................... 46
M Street SE & 29th Street SE Intersection Safety Improvements (TIP# 18) ............................ 47
Auburn Way N & 1st Street NE Signal Improvements (TIP# 19) ................ ............................... 48
R Street SE & 21st Street SE Intersection Safety Improvements (TIP# 20) ............................ 49
Main Street Signal Upgrades (TIP# 21) ........................................................... ............................... 50
Traffic Signal Improvements (TIP# 34) ............................................................ ............................... 51
DI.B Page 10 of 130
0tv ofAuhurn Transportation Improvement Program
C Street SW & 15th Street SW Intersection Improvements (TIP# 38) ....... ...............................
52
124th Avenue SE & SE 320th Street Intersection Improvements (TIP# 39) ............................
53
Traffic Management Center Improvements (TIP# 47) ................................... ...............................
54
A Street SE & 6th Street SE Safety & Access Improvements (TIP# 48) ... ...............................
55
124th Avenue SE & SE 284th Street Intersection Safety (TIP# 45) ........... ...............................
56
ITS Dynamic Message Signs (TIP# 50) .......................................................... ...............................
57
Lake Tapps Parkway ITS Expansion (TIP# 51) ............................................. ...............................
58
A Street SE & Lakeland Hills Way Intersection (TIP# 52) ............................ ...............................
59
Auburn Way S & 12th Street SE Intersection Improvements (TIP# 53) ..... ...............................
60
Auburn Avenue NE & 3rd Street NE Pedestrian & Access Improvements (TIP# 59) .............
61
29th Street SE & R Street SE Intersection Improvements (TIP# 63) ......... ...............................
62
Traffic Signal Safety Improvements (TIP# 67) ............................................... ...............................
63
37th Street & A Street SE Traffic Signal Safety Improvement (TIP# 68) ... ...............................
64
1 Street NE & 22nd Street NE Roundabout Safety Improvement (TIP# 69 ) .............................
65
Non - Motorized & Transit Improvements ......................................................... ...............................
67
Riverwalk Drive SE Non - Motorized Improvements (TIP# 23) ...................... ...............................
67
Academy Drive Multi -Use Trail (TIP# 24) ........................................................ ...............................
68
MetroShuttle (TIP# 26) ...................................................................................... ...............................
69
Citywide Pedestrian Accessibility Program (TIP# 30) ................................... ...............................
70
Citywide Arterial Bicycle and Safety Improvements (TIP# 31) .................... ...............................
71
Citywide Sidewalk Repair and Improvements (TIP# 32) .............................. ...............................
72
Downtown Transit Access Improvements (TIP# 44) ..................................... ...............................
73
Evergreen Heights Safe Routes to School Improvements (TIP# 56) ......... ...............................
74
Preliminary Engineering & Miscellaneous Projects .................................... ...............................
76
A Street NW, Phase 1 (TIP# 1) ......................................................................... ............................... 76
Mohawk Plastics Site Mitigation (TIP# 13) ...................................................... ............................... 77
A Street SE Safety Improvements Study (TIP# 27) ....................................... ............................... 78
S 277th Street - Wetland Mitigation (TIP# 29) ................................................ ............................... 79
104th Avenue SE & Green River Road Study (TIP# 46) .............................. ............................... 80
Kersey Way SE Corridor Study (TIP# 54) ....................................................... ............................... 81
Pavement Preservation Projects ...................................................................... ............................... 83
15th Street SW Reconstruction (TIP# 7) ..................
Lake Tapps Parkway Preservation (TIP #22) ...........
Annual Bridge Structure Preservation (TIP# 28) .....
Arterial Preservation Program (TIP# 35) ..................
Arterial Crack Seal Program (TIP# 36) .....................
Local Street Improvement Program (TIP# 37) ........
Arterial Bridge Deck Rehabilitation (TIP# 57) ..........
Auburn Way N Preservation (TIP# 70) .....................
15th Street NW /NE Preservation (TIP# 71) .............
.................................... ............................... 83
.................................... ............................... 84
.................................... ............................... 85
.................................... ............................... 86
.................................... ............................... 87
.................................... ............................... 88
.................................... ............................... 89
.................................... ............................... 90
.................................... ............................... 91
Project Summary Sheet .................. ............................... .......................Appendix A
2016 -2021 TIP Project Map ................ ............................... .......................Appendix B
vl DI.B Page 11 of 130
0tv ofAuhurn Transportation Improvement Program
EXECUTIVE SUMMARY
The Transportation Improvement Program (TIP) is a 6 -year plan for transportation
improvements that support the City of Auburns current and future growth. The TIP along with
the Comprehensive Transportation Plan (CTP) serve as source documents for the City of
Auburn Capital Facilities Plan which is a Comprehensive Plan element required by
Washington's Growth Management Act. The program may be revised at any time by a majority
of the City Council after a public hearing.
INTRODUCTION
Purpose
The purpose of the TIP is to identify priority transportation projects and assure that the city has
advanced plans as a guide in carrying out a coordinated transportation program. There are
always more projects than available revenues. Therefore, a primary objective of the TIP is to
integrate the two to produce a comprehensive, realistic program for the orderly development
and maintenance of our street system. Projects are required to be included in the TIP in order
to be eligible for state and federal grants. Grant funding for projects listed may not yet be
secured.
Statutory Requirements
Six Year Transportation Improvement Program - RCW 35.77.010 requires that each city
prepare and adopt a comprehensive transportation improvement program for the ensuing six
calendar years consistent with its CTP. This six -year TIP shall be filed with the Secretary of the
Washington State Department of Transportation (WSDOT) each year within 30 days of
adoption.
Projects of Regional Significance - RCW 35.77.010 also requires each city to specifically set
forth those projects and programs of regional significance for inclusion in the transportation
improvement program for that region. The 2016 -2021 TIP includes five projects of regional
significance:
TIP Project Number
Project Title
TIP# 6
S 272nd/277th Street Corridor
TIP# 49
West Valley Highway (15th NW to W Main St)
TIP# 58
AWS Corridor Improvements (Fir to Hemlock)
TIP# 61
Auburn Way South Bypass
TIP# 71
West Valley Highway (W Main St to 15th St SW)
D I . B Executive Si in & Introduction Page 12 of 130
0tv ofAuhurn Transportation Improvement Program
Methodology
Annual updates of the TIP begins with developing a revenue forecast to provide a reasonable
estimate of funding available to accomplish the transportation improvement needs. Since the
desire to construct transportation improvements typically exceeds the available forecast
revenue, it is necessary to establish some method of prioritizing the needs.
Transportation needs are identified by examining the latest information concerning level of
service, safety and accident history, growth trends, traffic studies and the City's adopted CTP.
The likelihood of receiving federal or state grants for various improvements, community
interests and values are also considered. All of these factors yield a prioritized list of
transportation improvements.
Projects are placed into one of the following categories;
• Roadway Improvements,
• Intersection, Signal & Intelligent Transportation System Improvements,
• Non - Motorized & Transit Improvements,
• Preliminary Engineering & Miscellaneous Projects, and
• Roadway Preservation Projects.
Each project is identified as a Capacity or Non - capacity improvement and those that lay within
the limits of a defined Arterial LOS Corridor per with Table 2 -2 of the City's CTP are identified
accordingly. Capacity projects from the 6 -year plan are incorporated into the CTP as Group A
projects. Longer term capacity projects are listed in the CPT as Group B Projects.
Detailed project costs and funding sources are identified and provided for each project listed in
the proposed TIP. The prioritized list is then financially constrained in the first three years to
reflect the financial projections to yield the six -year Transportation Improvement Program. After
completing all reviews and compiling the document, staff makes final recommendations to the
Planning and Community Development Committee and City Council for approval.
2 Executive Summary & Introduction
DI.B Page 13 of 130
0tv ofAuburn Transportation Improvement Program
Projects & Financing Plan Summary
TIP# Roadway Projects 2016 2017 2018 2019 2020 2021 Total
2 Auburn Way S Pedestrian Improvements (Dogwood St SE to Fir St SE)
Capital Costs 5,000 5,000
Funding Sources:
Unrestricted Street Revenue 5,000 5,000
Secured Fed & State Grants
Traffic Impact Fees
Other (MuckleShoot Tribe)
Auburn Way Corridor (4th St NE to 4th St SE)
Capital Costs 818,700 3,000,000 3,818,700
Funding Sources:
Unrestricted Street Revenue 110,000 600,000 710,000
Projects & Financing Plan Sznnmaly 3
DI.B Page 14 of 130
Unsecured Grant
708,700
2,400,000
3,108,700
Traffic Impact Fees
-
-
-
4
I Street NE Corridor (45th St NE to S 277th St)
Capital Costs
6,760,000
6,760,000
Funding Sources:
Unrestricted Street Revenue
-
-
Unsecured Grant
Traffic Impact Fees
-
-
Other (Development)
-
6,760,000
-
- 6,760,000
5
M Street Underpass (3rd St SE to 8th St SE)
Capital Costs
130,654
130,080 129,500 128,920
128,350
128,000 775,504
Funding Sources:
Unrestricted Street Revenue
-
- - -
-
- -
Secured State Grant
-
- - -
-
- -
TrafFic Impact Fees
130,654
130,080 129,500 128,920
128,350
128,000 775,504
Traffic Mitigation Fees
-
- - -
-
- -
PWTFL
Other (Agencies)
-
-
6
S 272nd /277th St Corridor
Capital Costs
6,881,800
6,881,800
Funding Sources:
Unrestricted Street Revenue
-
-
Secured Fed & State Grants
4,000,000
4,000,000
Traffic Impact Fees
581,800
581,800
Other (Development)
2,300,000
-
2,300,000
8
A Street NW, Phase 2
Capital Costs:
-
3,000,000
3,000,000
Funding Sources:
Unrestricted Street Revenue
-
-
Unsecured Grant
Traffic Impact Fees
-
-
Other (Development)
3,000,000
3,000,000
Projects & Financing Plan Sznnmaly 3
DI.B Page 14 of 130
0tv ofAuburn Transportation Improvement Program
TIP# Roadway Projects 2016
2017
2018
2019
2020
2021
Total
9
Auburn Way S (Hemlock to Academy)
Capital Costs: 200,000
200,000
Funding Sources:
Unrestricted Street Revenue -
-
Unsecured Grant -
-
TrafFic Impact Fees 100,000
100,000
Other (MIT) 100,000
-
100,000
10
F Street SE Non - Motorized Improvements
Capital Costs 250,000
1,800,000
2,050,000
Funding Sources:
Unrestricted Street Revenue -
160,000
160,000
Unsecured Grant 200,000
1,440,000
1,640,000
Traffic Impact Fees 50,000
200,000
-
-
-
250,000
11
M Street NE (E Main St to 4th St NE)
Capital Costs -
-
100,000
275,000
1,150,000
1,525,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Unsecured Grant
-
220,000
920,000
1,140,000
Traffic Impact Fees
100,000
55,000
230,000
-
385,000
12
Grade - Separated Crossing of BNSF Railyard
Capital Costs
-
-
-
1,125,000
1,125,000
Funding Sources:
Unrestricted Street Revenue
-
-
Unsecured Grant
-
Traffic Impact Fees
-
Other (Development)
-
-
1,125,000
1,125,000
15
8th Street NE Widening (Pike St to R St NE)
Capital Costs
450,000
1,000,000
-
1,450,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Unsecured Grant
360,000
800,000
1,160,000
Traffic Impact Fees
90,000
200,000
-
290,000
16
49th Street NE (Auburn Way N to I St NE)
Capital Costs
-
850,000
2,500,000
3,350,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Unsecured Grant
Traffic Impact Fees
-
-
-
Other (Development)
850,000
2,500,000
3,350,000
25
46th Place S Realignment
Capital Costs
-
825,000
825,000
Funding Sources:
Unrestricted Street Revenue
-
-
Unsecured Grant
575,000
575,000
Traffic Impact Fees
250,000
250,000
Other
-
-
-
-
-
-
33
Neighborhood Traffic Calming Improvements
Capital Costs 100,000
100,000
100,000
100,000
100,000
100,000
600,000
Funding Sources:
Cap. Imp. Fund Balance -
-
-
-
-
-
-
Unsecured Grant -
-
-
-
-
-
-
REET 2 100,000
100,000
100,000
100,000
100,000
100,000
600,000
Other -
-
-
-
-
-
-
4 Projects & Financing Plan Sitinma7T
DI.B Page 15 of 130
0tv ofAuburn Transportation Improvement Program
TIP# Roadway Projects
2016 2017
2018
2019
2020 2021
Total
40
124th Ave SE Corridor Improvements (SE 312th to SE 318th)
Capital Costs
400,000
1,100,000
2,500,000
4,000,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Unsecured Grant
300,000
880,000
2,000,000
3,180,000
Traffic Impact Fees
100,000
220,000
500,000 -
820,000
41
R Street Bypass
Capital Costs
-
-
- 500,000
500,000
Funding Sources:
Unrestricted Street Revenue
-
-
Unsecured Grant
Traffic Impact Fees
-
-
Other (Development)
-
-
- 500,000
500,000
42
SE 320th Street Corridor Improvements (116th Ave SE to 122nd Ave SE)
Capital Costs
100,000
600,000
662,500
3,281,600 -
4,644,100
Funding Sources:
Unrestricted Street Revenue
100,000
-
-
-
100,000
Unsecured Grant
-
480,000
530,000
2,953,440
3,963,440
Traffic Impact Fees
120,000
132,500
328,160
580,660
43
Auburn Way S (SR -164) Corridor Safety
Improvements (Muckleshoot Plaza to Dogwood)
Capital Costs
2,347,665
-
2,347,665
Funding Sources:
Unrestricted Street Revenue
-
-
Secured Federal Grant
1,951,313
1,951,313
Traffic Impact Fees
89,678
89,678
Other (WSDOT)
306,674
-
-
-
306,674
49
West Valley Highway Improvements (15th Street NW to W Main Street)
Capital Costs
100,000
600,000
3,000,000
3,700,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
Unsecured Grant
-
480,000
2,400,000
2,880,000
Traffic Impact Fees
100,000
120,000
600,000
820,000
55
W Main St Multimodal Corridor and ITS Improvements (WVH to Interurban Trail)
Capital Costs
3,494,400
-
-
3,494,400
Funding Sources:
Unrestricted Street Revenue
-
-
Secured Grant
2,970,240
2,970,240
Traffic Impact Fees
209,650
209,650
Other (Arterial Preserv. Fund)
314,510
314,510
58
Auburn Way S Corridor Improvements (Fir to Hemlock)
Capital Costs
5,000
5,000
Funding Sources:
Unrestricted Street Revenue
5,000
5,000
Secured State Grant
-
-
Traffic Impact Fees
Other (MIT)
-
-
-
60
M Street SE Corridor (8th St SE to AWS)
Capital Costs
1,925,000
4,750,000
6,675,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Unsecured Grant
925,000
3,750,000
4,675,000
Traffic Impact Fees
750,000
750,000
1,500,000
Other (Development)
250.000
250.000
500.000
Projects & Financing Plan m
Sitina7T
DI.B Page 16 of 1�0
0tv ofAuburn Transportation Improvement Program
TIP# Roadway Projects 2016 2017
2018 2019
2020
2021
Total
61 Auburn Way S Bypass
-
Capital Costs 100,000
Grants
2,450,000
Capital Costs
12,550,000
10,243,700
6,000,000
6,000,000
Funding Sources:
Traffic Impact Fees
1,261,782
430,080
Unrestricted Street Revenue -
Unrestricted Street Revenue
-
-
-
-
Unsecured Grant
34,000
1,950,000
4,800,000
4,800,000
Traffic Impact Fees
Traffic Impact Fees 100,000
REET 2
-
-
Other (Development)
-
-
1,200,000
1,200,000
62 Auburn Way S Streetscape Improvements (SR -18 to M St SE)
306,674
-
Capital Costs
-
Capital Costs
1,950,000
2,800,000
-
4,750,000
Funding Sources:
7,860,000
5,750,000
2,825,000
Unrestricted Street Revenue
200,000
200,000
-
400,000
Unsecured Grant
1,750,000
2,600,000
100,000
4,350,000
Traffic Impact Fees
-
-
-
-
Other
1,400,000 2,000,000
66
Lea Hill Road Segment 3 (112th Ave SE to 124th Ave SE)
2,230,080
64
Lea Hill Road Segment 1 (R St NE to 105th PI SE)
226,000
-
310,000
800,000
-
Capital Costs 100,000
Grants
2,450,000
10,000,000
12,550,000
10,243,700
Funding Sources:
11,900,000
65,743,693
Traffic Impact Fees
1,261,782
430,080
Unrestricted Street Revenue -
3,606,420
-
-
-
Traffic Mitigation Fees
Unsecured Grant -
34,000
1,950,000
8,000,000
9,950,000
-
Traffic Impact Fees 100,000
REET 2
500,000
2,000,000
- 2,600,000
65
Lea Hill Road Segment 2 (105th PI SE to 112th Ave SE)
100,000
600,000
Other (WSDOT)
306,674
-
Capital Costs
-
-
3,500,000
8,500,000 12,000,000
Other (Development)
Funding Sources:
7,860,000
5,750,000
2,825,000
Unrestricted Street Revenue
Other (Muckleshoot Tribe)
100,000
-
- -
-
Unsecured Grant
-
100,000
2,900,000
7,100,000 10,000,000
Traffic Impact Fees
-
-
600,000
1,400,000 2,000,000
66
Lea Hill Road Segment 3 (112th Ave SE to 124th Ave SE)
2,230,080
2,379,500
22,120,120
43,534,950
Capital Costs
100,232,169
1,000,000
3,000,000
- 4,000,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Unsecured Grant
-
3,000,000
3,000,000
Traffic Impact Fees
1,000,000
-
1,000,000
72
W Valley Highway Improvements (SR -18 to 15th Street SW)
Capital Costs
100,000
500,000 2,500,000
3,100,000
Funding Sources:
Unrestricted Street Revenue
-
- -
-
Unsecured Grant
-
400,000 2,000,000
2,400,000
Traffic Impact Fees
100,000
100,000 500,000
700,000
73
Stewart Road, Lake Tapps Parkway Corridor
Capital Costs
100,000
- -
100,000
Funding Sources:
Unrestricted Street Revenue
66,000
66,000
Unsecured Grant
-
-
TrafFic Impact Fees
-
-
TrafFic Mitigation Fees
34,000
34,000
Subtotal, Roadway Projects:
Capital Costs 13,614,519 2,230,080 2,379,500 22,120,120 43,534,950 16,353,000 100,232,169
Funding Sources
Unrestricted Street Revenue
110,000
226,000
-
310,000
800,000
-
1,446,000
Grants
9,121,553
1,440,000
1,540,000
10,243,700
31,498,440
11,900,000
65,743,693
Traffic Impact Fees
1,261,782
430,080
739,500
3,606,420
5,386,510
1,528,000
12,952,292
Traffic Mitigation Fees
-
34,000
-
-
-
-
34,000
REET 2
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Other (WSDOT)
306,674
-
-
-
-
-
306,674
Other (Development)
2,300,000
7,860,000
5,750,000
2,825,000
18,735,000
Other (Muckleshoot Tribe)
100,000
-
-
-
100,000
Other (Arterial Preserv. Fund)
314,510
-
-
-
314,510
Total Funding
13,614,519
2,230,080
2,379,500
22,120,120
43,534,950
16,353,000
100,232,169
6 Projects & Financing Plan Sitinma7T
DI.B Page 17 of 130
0tv ofAuburn Transportation Improvement Program
TIP# Intersection, Signal & ITS Projects
2016
2017
2018
2019
2020 2021
Total
14
M St SE & 12th St SE Traffic Signal
Capital Costs
625,000
625,000
Funding Sources:
Unrestricted Street Revenue
-
-
Unsecured Grant
500,000
500,000
Traffic Impact Fees
-
-
Other (Development)
-
-
125,000
- -
125,000
17
Harvey Road & 8th St NE Intersection Improvements
Capital Costs
85,383
85,200
84,800
84,400
84,400 84,200
508,383
Funding Sources:
Unrestricted Street Revenue
-
-
-
-
- -
-
Unsecured Grant
-
-
-
-
- -
-
Traffic Impact Fees
85,383
85,200
84,800
84,400
84,400 84,200
508,383
18
M St SE & 29th St SE Intersection Improvements
Capital Costs
50,000
-
-
400,000
- -
450,000
Funding Sources:
Unrestricted Street Revenue
50,000
100,000
150,000
Unsecured Grant
-
300,000
300,000
Traffic Impact Fees
-
-
Other
-
-
19
Auburn Way N & 1st Street NE Signal Improvements
Capital Costs
50,000
550,000
600,000
Funding Sources:
Unrestricted Street Revenue
50,000
125,000
175,000
Unsecured Grant
-
425,000
425,000
Traffic Impact Fees
-
-
-
20
R St SE & 21st St SE Intersection Improvements
Capital Costs
75,000
800,000
875,000
Funding Sources:
Unrestricted Street Revenue
75,000
100,000
175,000
Secured State Grant
-
700,000
700,000
Traffic Impact Fees
-
-
Traffic Mitigation Fees
-
-
21
Main Street Signal Upgrades
Capital Costs
5,000
5,000
Funding Sources:
Unrestricted Street Revenue
5,000
5,000
Unsecured Grant
-
-
Traffic Impact Fees
Traffic Mitigation Fees
-
-
-
-
- -
-
34
Traffic Signal Improvements
Capital Costs
175,000
175,000
175,000
175,000
175,000 175,000
1,050,000
Funding Sources:
Cap. Imp. Fund Balance
-
-
-
-
- -
-
Unsecured Grant
-
-
-
-
- -
-
REET2
175,000
175,000
175,000
175,000
175,000 175,000
1,050,000
38
C St SW & 15th St SW Intersection Improvments
Capital Costs
150,000
-
875,000
- -
1,025,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Unsecured Grant
-
750,000
750,000
Traffic Impact Fees
150,000
125,000
275,000
Projects & Financing Plan Sitinma7T
DI.B Page 18 of 130
0tv ofAuburn Transportation Improvement Program
TIP# Intersection, Signal & ITS Projects 2016
2017
2018 2019
2020 2021
Total
39
124th Ave SE & SE 320th St Intersection Improvements
Capital Costs 350,000
1,500,000
1,850,000
Funding Sources:
Unrestricted Street Revenue 175,000
150,000
325,000
Unsecured Grant -
1,200,000
1,200,000
Traffic Impact Fees -
-
-
Other (GRC) 175,000
150,000
325,000
45
124th Ave SE & SE 284th St Intersection Safety Improvements
Capital Costs
100,000
600,000 -
700,000
Funding Sources:
Unrestricted Street Revenue
-
-
-
Unsecured Grant
-
450,000
450,000
Traffic Impact Fees -
100,000
150,000
250,000
47
Traffic Management Center Improvements
Capital Costs 25,000
-
-
25,000
Funding Sources:
Unrestricted Street Revenue -
-
Unsecured Grant -
-
TrafFic Impact Fees 25,000
25,000
48
A St SE & 6th St SE Safety & Access Improvements
Capital Costs 50,000
50,000
Funding Sources:
Unrestricted Street Revenue -
-
Unsecured Grant
Traffic Impact Fees -
-
Other (BNSF) 50,000
-
- -
-
50,000
50
ITS Dynamic Message Signs
Capital Costs 150,000
150,000
150,000 150,000
150,000
750,000
Funding Sources:
Cap. Imp. Fund Balance -
-
- -
-
-
Unsecured Grant -
120,000
120,000 120,000
120,000
480,000
REET 2 100,000
30,000
30,000 30,000
30,000
220,000
Other (WRA) 50,000
-
- -
-
50,000
51
East Valley Highway ITS Expansion
Capital Costs 105,000
900,000
1,005,000
Funding Sources:
Unrestricted Street Revenue -
-
-
Unsecured Grant 82,950
711,000
793,950
Traffic Impact Fees 22,050
189,000
211,050
52
A St SE & Lakeland Hills Way SE Intersection Safety
& Capacity
Improvements
Capital Costs 75,000
75,000
Funding Sources:
Unrestricted Street Revenue -
-
Unsecured Grant -
-
TrafFic Impact Fees 75,000
-
75,000
53
Auburn Way S & 12th Street Intersection Improvements
Capital Costs 100,000
750,000
850,000
Funding Sources:
Unrestricted Street Revenue 100,000
-
100,000
Unsecured Grant -
750,000
750,000
Traffic Impact Fees
-
-
8 Projects & Financing Plan Sitinma7T
DI.B Page 19 of 130
0tv ofAuburn Transportation Improvement Program
TIP# Intersection, Signal & ITS Projects 2016 2017
2018
2019 2020 2021
Total
59 Auburn Ave & 3rd St NE Pedestrian & Access Improvements
722,600
Funding Sources:
Capital Costs
Capital Costs 50,000
300,000
3,034,800
350,000
Funding Sources:
259,200
635,360
Traffic Impact Fees -
Unrestricted Street Revenue -
-
Arterial Preserv. Fund (105) 87,240
-
Unsecured Grant -
250,000
Improvement
250,000
Traffic Impact Fees 50,000
50,000
-
100,000
63 29th Street SE & R Street SE Intersection Improvements
-
Unrestricted Street Revenue -
- -
Capital Costs -
-
1,800,000
1,800,000
Funding Sources:
50,000 235,000
335,000
Traffic Impact Fees
Unrestricted Street Revenue
624,200
-
-
Unsecured Grant
84,200
1,300,000
1,300,000
Traffic Impact Fees -
-
500,000
500,000
67 Citywide Traffic Signal Safety Improvement
-
-
REET 2
Capital Costs 412,575
205,000
-
412,575
Funding Sources:
175,000
1,270,000
Arterial Preserv. Fund (105)
Unrestricted Street Revenue -
-
-
-
Secured Federal Grant 412,575
-
87,240
412,575
Traffic Impact Fees -
-
REET2
125,000
Other (Green River College)
68 37th Street SE &A Street SE Traffic Signal Safety
Improvement
Capital Costs 722,600
722,600
Funding Sources:
Capital Costs
2,480,558
Unrestricted Street Revenue -
3,034,800
-
Secured Federal Grant 635,360
259,200
635,360
Traffic Impact Fees -
-
Arterial Preserv. Fund (105) 87,240
-
87,240
69 1 Street NE & 22nd Street NE Roundabout Safety
Improvement
Unrestricted Street Revenue
Capital Costs 50,000
150,000 1,175,000
1,375,000
Funding Sources:
-
-
Unrestricted Street Revenue -
- -
-
Unsecured Grant -
100,000 940,000
1,040,000
Traffic Impact Fees 50,000
50,000 235,000
335,000
Subtotal, Intersection, Signal & ITS Protects:
Capital Costs
2,480,558
2,510,200
3,034,800
6,409,400
409,400
259,200
15,103,558
Funding Sources:
Unrestricted Street Revenue
455,000
-
125,000
350,000
-
-
930,000
Grants
1,130,885
1,681,000
2,185,000
4,870,000
120,000
-
9,986,885
Traffic Impact Fees
257,433
624,200
519,800
709,400
84,400
84,200
2,279,433
Traffic Mitigation Fees
-
-
-
-
-
-
-
REET 2
275,000
205,000
205,000
205,000
205,000
175,000
1,270,000
Arterial Preserv. Fund (105)
87,240
-
-
-
-
-
87,240
Other (Development)
-
125,000
125,000
Other (Green River College)
175,000
150,000
325,000
Other (White River Amp.)
50,000
-
50,000
Other (BNSF)
50,000
-
-
-
-
-
50,000
Total Funding
2,480,558
2,510,200
3,034,800
6,409,400
409,400
259,200
15,103,558
Projects & Financing Plan Sitinma7T
DI.B Page 20 of 130
0tv ofAuburn Transportation Improvement Program
TIP: Non - Motorized & Transit Projects
2016
2017
2018
2019
2020
2021
Total
23
Riverwalk Dr SE Non - Motorized Improvements
300,000
600,000
1,154,000
961,000
4,027,000
7,142,000
Traffic Impact Fees
Capital Costs
-
100,000
600,000
-
-
-
700,000
25,000
Funding Sources:
25,000
25,000
25,000
25,000
150,000
REET 2
200,000
-
Unrestricted Street Revenue
-
100,000
100,000
200,000
Total Funding
765,000
200,000
1,170,000
Unsecured Grant
1,563,000
-
500,000
500,000
Traffic Impact Fees
-
-
-
-
24
Academy Drive Multi -Use Trail
Capital Costs
425,000
425,000
850,000
Funding Sources:
Unrestricted Street Revenue
42,500
42,500
85,000
Unsecured Grant
382,500
382,500
765,000
Traffic Impact Fees
-
-
-
-
-
-
-
26
METRO Shuttle: Lakeland Hills Shuttle
Capital Costs
240,000
245,000
245,000
250,000
250,000
250,000
1,480,000
Funding Sources:
Unrestricted Street Revenue
240,000
245,000
245,000
250,000
250,000
250,000
1,480,000
Unsecured Grant
-
-
-
-
-
-
-
TrafFic Impact Fees
-
-
-
-
-
-
30
Citywide Pedestrian Accessibility
and Safety Program
Capital Costs
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Funding Sources:
Unrestricted Street Revenue
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Unsecured Grant
-
-
-
-
-
-
-
Traffic Impact Fees
-
-
-
31
Citywide Arterial Bicycle and Safety
Improvements
Capital Costs
100,000
100,000
100,000
300,000
Funding Sources:
Unrestricted Street Revenue
100,000
100,000
100,000
300,000
Unsecured Grant
-
-
-
-
TrafFic Impact Fees
-
-
-
-
-
-
32
Citywide Sidewalk Repairs and Improvements
Capital Costs
325,000
125,000
125,000
125,000
125,000
125,000
950,000
Funding Sources:
Cap. Imp. Fund Balance
25,000
25,000
25,000
25,000
25,000
25,000
150,000
Unsecured Grant
100,000
100,000
100,000
100,000
100,000
100,000
600,000
REET2
200,000
-
-
-
-
-
200,000
44
Downtown Transit Center Access Improvements
Capital Costs
250,000
250,000
Funding Sources:
Unrestricted Street Revenue
50,000
50,000
Unsecured Grant
200,000
200,000
Traffic Impact Fees
-
-
-
-
-
56
Evergreen Heights Safe Routes to School Improvements
Capital Costs
790,000
563,000
4,620,000
5,973,000
Funding Sources:
Unrestricted Street Revenue
118,500
84,500
693,000
896,000
Unsecured Grant
671,500
478,500
3,927,000
5,077,000
Traffic Impact Fees
-
-
-
-
Subtotal, Non - Motorized & Transit Projects:
Capital Costs 765,000 820,000 1,170,000 1,690,000 1,563,000 5,095,000 11,103,000
Funding Sources
Unrestricted Street Revenue
440,000
495,000
545,000
511,000
577,000
1,043,000
3,611,000
Grants
100,000
300,000
600,000
1,154,000
961,000
4,027,000
7,142,000
Traffic Impact Fees
-
-
-
-
-
-
-
Cap. Imp. Fund Balance
25,000
25,000
25,000
25,000
25,000
25,000
150,000
REET 2
200,000
-
-
-
-
-
200,000
Total Funding
765,000
820,000
1,170,000
1,690,000
1,563,000
5,095,000
11,103,000
10 Projects & Financing Plan Sitinma7T
DI.B Page 21 of 130
0tv ofAuburn Transportation Improvement Program
TIP# Pre. Eng. and Misc. Projects
2016
2017
2018
2019 2020 2021
Total
1
A Street NW, Phase 1
Unrestricted Street Revenue
15,000 - - - -
- 15,000
Grants
- - - - -
Capital Costs
25,000
25,000
25,000
25,000 25,000 25,000
150,000
- 50,000
Funding Sources:
110,000 45,000 90,000 45,000 25,000
25,000 340,000
Unrestricted Street Revenue
-
-
-
- - -
-
Secured Fed & State Grants
-
-
-
- - -
-
Traffic Impact Fees
25,000
25,000
25,000
25,000 25,000 25,000
150,000
13
Mohawks Plastics Site Mitigation Project
Capital Costs
20,000
20,000
65,000
20,000 - -
125,000
Funding Sources:
Unrestricted Cap. Imp. Funds
-
-
-
-
-
Unsecured Grant
-
-
-
-
-
TrafFic Impact Fees
20,000
20,000
65,000
20,000
125,000
27
A Street SE Safety Improvements Study
Capital Costs
5,000
-
-
-
5,000
Funding Sources:
Unrestricted Street Revenue
5,000
5,000
Unsecured Grant
-
-
Traffic Impact Fees
-
-
29
S 277th Street, Wetland Mitigation
Capital Costs
5,000
5,000
Funding Sources:
Unrestricted Street Revenue
5,000
5,000
Unsecured Grant
-
-
TrafFic Impact Fees
-
46
104th Ave SE & Green River Road Study
Capital Costs
5,000
5,000
Funding Sources:
Unrestricted Street Revenue
5,000
5,000
Unsecured Grant
-
-
Traffic Impact Fees
-
-
54
Kersey Way SE Corridor Study
Capital Costs
50,000
50,000
Funding Sources:
Unrestricted Street Revenue
-
-
Unsecured Grant
-
-
TrafFic Mitigation Fees
50,000
50,000
Subtotal, Pre. Eng. and Misc. Projects:
Capital Costs
110,000 45,000 90,000 45,000 25,000
25,000 340,000
Funding Sources
Unrestricted Street Revenue
15,000 - - - -
- 15,000
Grants
- - - - -
- -
Traffic Impact Fees
45,000 45,000 90,000 45,000 25,000
25,000 275,000
Traffic Mitigation Fees
50,000 - - - -
- 50,000
Total Funding
110,000 45,000 90,000 45,000 25,000
25,000 340,000
Projects & Financing Plan Sznnma7T 11
DI.B Page 22 of 130
0tv ofAuburn Transportation ImprovementPrograzn
TIP# Roadway Preservation Projects
2016
2017 2018
2019 2020 2021
Total
7 15th St SW Reconstruction
Capital Costs
50,000
Capital Costs
50,000
375,000
3,000,000
3,375,000
Funding Sources:
Funding Sources:
9,600,000
Funding Sources:
Arterial Preservation Fund
75,000
500,000
575,000
Unsecured Grant
50,000
300,000
2,500,000
2,800,000
Other
300,000
-
-
-
22 Lake Tapps Parkway Preservation (City Limit to Lakeland Hills Way)
-
-
Capital Costs
124,380
828,470
-
952,850
Funding Sources:
-
-
-
-
Arterial Preservation Fund
26,480
176,370
-
202,850
Unsecured Grant
97,900
652,100
Capital Costs
750,000
Other
-
-
1,800,000
-
28 Annual Bridge Structure Preservation
Local Streets Improvement Program
Capital Costs
50,000
50,000
50,000
50,000
50,000
50,000
300,000
Funding Sources:
9,600,000
Funding Sources:
Arterial Preservation Fund
50,000
50,000
50,000
50,000
50,000
50,000
300,000
Unsecured Grant
-
-
-
-
-
-
-
Other
-
-
-
-
-
-
-
35 Annual Arterial Preservation Program
-
-
-
-
-
57
Arterial Bridge Deck Rehabilitation
Capital Costs
600,000
700,000
1,700,000
1,800,000
1,800,000
1,800,000
8,400,000
Funding Sources:
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Arterial Preservation Fund
600,000
700,000
1,700,000
1,800,000
1,800,000
1,800,000
8,400,000
Unsecured Grant
-
-
-
-
-
-
-
Other
-
-
-
-
-
-
-
36 Annual Arterial Crack Seal Program
-
-
Other
Capital Costs
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Funding Sources:
Capital Costs
1,775,000
Arterial Preservation Fund
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Unsecured Grant
-
-
-
-
-
-
-
Other
887,500
Secured Grant
37
Local Streets Improvement Program
Capital Costs
4,484,380
Capital Costs
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
9,600,000
Funding Sources:
Arterial Preservation Fund
1,831,480
1,876,370
2,025,000
Local St Preservation Fund
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
9,600,000
2,500,000
Unsecured Grant
-
-
-
-
-
-
-
1,600,000
Other
-
-
-
-
-
-
-
57
Arterial Bridge Deck Rehabilitation
Capital Costs
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Funding Sources:
Arterial Preservation Fund
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Unsecured Grant
-
-
-
-
-
-
-
Other
-
70
Auburn Way N Preservation (22nd Street NE to 45th Street NE)
Capital Costs
1,775,000
1,775,000
Funding Sources:
Arterial Preservation Fund
887,500
887,500
Secured Grant
887,500
887,500
Other
-
-
-
71
15th Street NE /NW Preservation (SR -167 to NE 8th
Street)
Capital Costs
135,000
1,500,000
1,635,000
Funding Sources:
Arterial Preservation Fund
67,500
750,000
817,500
Secured Grant
67,500
750,000
817,500
Other
-
-
-
Subtotal, Preservation Projects:
Capital Costs
4,484,380
4,878,470
3,925,000
6,650,000
3,650,000
3,650,000
27,237,850
Funding Sources
Arterial Preservation Fund
1,831,480
1,876,370
2,025,000
2,550,000
2,050,000
2,050,000
12,382,850
Grants
1,052,900
1,402,100
300,000
2,500,000
-
-
5,255,000
Local St Preservation Fund
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
9,600,000
Total Funding
4,484,380
4,878,470
3,925,000
6,650,000
3,650,000
3,650,000
27,237,850
12 Projects & Financing Plan Sznnmaly
DI.B Page 23 of 130
0tv ofAuburn Transportation Improvement Program
Financial Constraint & Fund Balance Summary
PROJECT FINANCING SUMMARY:
2016
2017
2018
2019
2020
2021
Total
CAPITAL COSTS
2021
Unrestricted Street Revenue 102
Roadway Projects
13,614,519
2,230,080
2,379,500
22,120,120
43,534,950
16,353,000
100,232,169
Int., Signal & ITS Projects
2,480,558
2,510,200
3,034,800
6,409,400
409,400
259,200
15,103,558
Non - Motorized Projects
765,000
820,000
1,170,000
1,690,000
1,563,000
5,095,000
11,103,000
Prel. Eng. and Misc. Projects
110,000
45,000
90,000
45,000
25,000
25,000
340,000
Preservation Projects
4,484,380
4,878,470
3,925,000
6,650,000
3,650,000
3,650,000
27,237,850
Total Costs
21,454,457
10,483,750
10,599,300
36,914,520
49,182,350
25,382,200
154,016,577
FUNDING SOURCES:
1,000,000
Project Expenses
1,564,215
1,099,280
1,349,300
4,360,820
5,495,910
Unrestricted Street Revenue
1,020,000
721,000
670,000
1,171,000
1,377,000
1,043,000
6,002,000
Grants
11,405,338
4,823,100
4,625,000
18,767,700
32,579,440
15,927,000
88,127,578
Traffic Impact Fees
1,564,215
1,099,280
1,349,300
4,360,820
5,495,910
1,637,200
15,506,725
Traffic Mitigation Fees
50,000
34,000
-
-
-
-
84,000
Local Street Pres. Fund 103
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
9,600,000
Arterial Preservation Fund 105
2,233,230
1,876,370
2,025,000
2,550,000
2,050,000
2,050,000
12,784,600
Cap. Imp. Fund Balance
25,000
25,000
25,000
25,000
25,000
25,000
150,000
REET2
575,000
305,000
305,000
305,000
305,000
275,000
2,070,000
Other (WSDOT)
306,674
-
-
-
-
-
306,674
Other (Development)
2,300,000
425,000
425,000
7,985,000
5,750,000
2,825,000
18,860,000
Other (Muckleshoot Tribe)
100,000
-
-
-
100,000
Other (Green River College)
175,000
(439,600)
(439,600)
150,000
1,900,000
1,900,000
325,000
Other (White River Amp.)
50,000
2,050,000
Project Expenses
-
1,876,370
2,025,000
50,000
Other (BNSF)
50,000
End of Year Fund Balance
111,770
-
-
-
50,000
Total Funding
21,454,457
10,483,750
10,599,300
36,914,520
49,182,350
25,382,200
154,016,577
Projects & Financing Plan Swnma7T 13
DI.B Page 24 of 130
Financial Constraint & Fund Balance Summary
2016
2017
2018
2019
2020
2021
Unrestricted Street Revenue 102
Beginning Fund Balance
949,756
464,756
278,756
143,756
(492,244)
(1,334,244)
Forecast Annual Revenue
535,000
535,000
535,000
535,000
535,000
535,000
Project Expenses
1,020,000
721,000
670,000
1,171,000
1,377,000
1,043,000
End of Year Fund Balance
464,756
278,756
143,756
(492,244)
(1,334,244)
(1,842,244)
Traffic Impact Fees
Beginning Fund Balance
1,720,000
1,055,785
856,505
457,205
(2,953,615)
(7,449,525)
Forecast Annual Revenue
900,000
900,000
950,000
950,000
1,000,000
1,000,000
Project Expenses
1,564,215
1,099,280
1,349,300
4,360,820
5,495,910
1,637,200
End of Year Fund Balance
1,055,785
856,505
457,205
(2,953,615)
(7,449,525)
(8,086,725)
Traffic Mitigation Fees
Beginning Fund Balance
84,000
34,000
-
Forecast Annual Revenue
-
-
Project Expenses
50,000
34,000
End of Year Fund Balance
34,000
-
-
-
-
-
Local Street Preservation Fund 103
Beginning Fund Balance
425,000
425,000
425,000
425,000
425,000
425,000
Forecast Annual Revenue
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
Project Expenses
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
End of Year Fund Balance
425,000
425,000
425,000
425,000
425,000
425,000
Arterial Preservation Fund 105
Beginning Fund Balance
445,000
111,770
135,400
110,400
(439,600)
(439,600)
Forecast Annual Revenue
1,900,000
1,900,000
2,000,000
2,000,000
2,050,000
2,050,000
Project Expenses
2,233,230
1,876,370
2,025,000
2,550,000
2,050,000
2,050,000
End of Year Fund Balance
111,770
135,400
110,400
(439,600)
(439,600)
(439,600)
Grants
Secured Grants
11,222,388
1,402,100
-
-
-
-
Unsecured Grants
182,950
3,421,000
4,625,000
18,767,700
32,579,440
15,927,000
Projects & Financing Plan Swnma7T 13
DI.B Page 24 of 130
City ofAuburn Transportation Improvement Program
,, .
.,
14 Projects & Financing Plan Sirnnma7T
DI.B Page 25 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 2
ARTERIAL STREET FUND (102)
Project Title:
Auburn Way S Pedestrian Improvements (Dogwood St SE to Fir St SE)
Project No:
cp1118
Project Type:
Non - Motorized
Project Manager:
Jacob Sweeting
STIP# AUB -N /A
LOS Corridor ID# 4
Description:
This project will construct pedestrian improvements along Auburn Way S between Dogwood Street SE and Fir Street SE that are consistent with WSDOT's SR -164 Route
Development Plan. The project includes sidewalk improvements, access management, a mid -block pedestrian crossing, construction of a U -turn wedge for eastbound
vehicles at Fir Street SE and street lighting.
Progress Summary:
The City was awarded $100,000 in federal funding and $740,830 in state funding in May 2011.
Other funding source is Muckleshoot Indian Tribe contribution. Project
design began in 2012. Design was completed in 2014 and construction started in early 2015.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 37,816 63,428
5,000 - -
- - - -
106,244
Secured Grants (Fed, State) 235,389 604,237
-
839,626
Traffic Impact Fees - 115,000
115,000
Other (WSDOT) - 107,750
107,750
Other (Comcast, CLink) 19,368 179,275
198,643
Other Sources (MIT) 41,900 330,000
-
371,900
5,000
1,739,163
Total Funding Sources: 334,473 1,399,690
Capital Expenditures:
Design 334,473 6,500
-
340,973
Right of Way - -
-
-
Construction - 1,393,190
5,000
1,398,190
1 5,000
1,739,163
Total Expenditures: 334,473 1,399,690
Rocrchvay Improvemefrt Projects 15
D1.13 Page 26 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 3
ARTERIAL STREET FUND (102)
Project Title: Auburn Way Corridor (4th St NE to 4th St SE)
Project No: c409aO
Project Type: Non - Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 2, 3
Description:
This project is based on a pre- design study to improve pedestrian accessibility, appearance, and link the downtown area along Auburn Way S between 4th Street NE and
4th Street SE. The project may include some pavement repairs. However, an overlay was completed as part of the City's Arterial Pavement Preservation Program in
2007. Although this was considered a temporary fix, the scope has been modified to account for the pavement work. The project is approximately 0.5 miles long.
Progress Summary:
The pavement portion has been minimized due to the work completed in 2007 under the Arterial Pavement Preservation Program.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue 78,251
- - -
110,000 600,000 - -
788,251
Unsecured Grant -
708,700 2,400,000
3,108,700
REET
- -
-
Traffic Impact Fees
OtherSources -
- -
-
Total Funding Sources: 78,251
818,700 3,000,000
3,896,951
Capital Expenditures:
Design 78,251
618,700 -
696,951
Right of Way -
200,000 -
200,000
Construction -
- 3,000,000
3,000,000
818,700 3,000,000
3,896,951
Total Expenditures: 78,251
Rocrchvay Improvemefrt Projects 16
D1.13 Page 27 of 130
City of Arrbuni Tratisportatioft Intproventeftt Progrant
Six Year Transportation Improvement Plan TIP# 4
ARTERIAL STREET FUND (102)
Project Title:
I Street NE Corridor (45th St NE to S 277th St)
Project No:
c415a0
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 21
Description:
The final alignment of the I Street Corridor is being analyzed as part of the Northeast Auburn Special Area Plan Environmental Impact Study.
A portion of the ROW and
construction will be developer funded. The cross section will likely be a 5 -lane arterial per the city's Comprehensive Plan.
Progress Summary:
This project is development driven. Prior expenditures were for design and construction of culvert crossing.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,200.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021
Beyond 2021
Total Project Cost
- - -
- -
-
Unrestricted Street Revenue -
Unsecured Grant -
-
Traffic Impact Fees 3,892
-
3,892
Other Sources (Development) -
6,760,000
6,760,000
Other (Pon of Seattle) -
-
-
6,760,000
6,763,892
Total Funding Sources: 3,892
Capital Expenditures:
Design 3,892
460,000
463,892
Right of Way -
1,020,000
1,020,000
Construction -
5,280,000
5,280,000
6,760,000
6,763,892
Total Expenditures: 3,892
Roachvay Improvemefrt Projects 17
D1.13 Page 28 of 130
City of Arfbrrf°rr Tratisportcrtiorr Improvement Program
Six Year Transportation Improvement Plan
TIP# 5
ARTERIAL STREET FUND (102)
Project Title: M Street Underpass (3rd St SE to 8th St SE)
Project No: c201 a0
Project Type: Capacity
Project Manager: Ryan Vondrak
STIP# AUB -N /A
LOS Corridor ID# 6
Description:
Construction of a grade separated railroad crossing of M Street SE at the BNSF Stampede Pass tracks.
Progress Summary:
100% Design Drawings and right of way acquisition were completed in 2011.
Construction started in early 2012 and was completed in 2014.
Project is now in PWTFL debt
repayment. Other Agencies are King County Metro Sewer, Port of Seattle, Port of Tacoma, and BNSF Railway
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $21,827.
Activity: 2015 YE
Budget
Forecast Project Cost
2016
2017 2018
2019
2020
2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
-
- -
-
-
-
-
-
Unrestricted Street Revenue -
Secured Grants (Fed, State) 9,731,904
9,731,904
REET2 1,140,000
1,140,000
Traffic Impact Fees (Construction) 4,309,782 -
-
- -
-
-
-
-
4,309,782
Traffic Impact Fees (Debt Service) 148,190 131,233
130,654
130,080 129,500
128,920
128,350
128,000
2,372,000
3,426,927
Traffic Mitigation Fees 660,000 -
-
- -
-
-
-
-
660,000
PWTFL (30 years) 3,284,857
3,284,857
Other (Agencies) 3,090,514 -
-
- -
-
-
-
-
3,090,514
130,654
130,080 129,500
128,920
128,350
128,000
2,372,000
22,359,127
22,217,057 131,233
Capital Expenditures:
Design 2,688,924 -
-
- -
-
-
-
-
2,688,924
Right of Way 3,358,443
-
3,358,443
Construction 16,169,690 -
-
- -
-
-
-
16,169,690
PWTF Debt Service 148,190 131,233
130,654
130,080 129,500
128,920
128,350
128,000
2,372,000
3,426,927
130,654
130,080 129,500
128,920
128,350
128,000
2,372,000
22,359,127
22,217,057 131,2331
Rocrchvay Improvement Projects 18
D1.13 Page 29 of 130
City of Ailbuni Tf°cursportcrtiorr Improvement Program
Six Year Transportation Improvement Plan
TIP# 6
ARTERIAL STREET FUND (102)
Project Title: S 272nd/277th St Corridor Capacity & Non - Motorized Trail Improvements
Project No: c222a0
Project Type: Capacity
Project Manager: Ryan Vondrak
STIP# AUB -42
LOS Corridor ID# 15
Description:
This project includes preliminary engineering, design, right of way acquisition and construction
of major widening on S 277th Street, including the addition of three lanes, one
westbound and two eastbound, a Class 1 trail, and storm improvements. The project extends from Auburn Way North to L Street NE, approximately 0.9 miles.
Progress Summary:
Federal design and ROW grant was secured in 2012 through PSRC and state construction grant
was secured in 2013 through TIB. Design consultant was selected in 2013.
Envirionmental permitting and design are in process. Staff is coordinating with the City of Kent and King County to complete annexation of the roadway into the City of Auburn.
Auburn and Robertson Properties Group executed a project participating agreement in 2013.
RPG is contributing funds and dedicating all necessary roadway frontage to the
City.
Future Impact on Operating Budget:
The annual maintenance costs for this project is estimated to be $27,250.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017
2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 82,539 308,062
- -
-
- -
390,601
Secured Grants (Fed, State) 407,849 612,851
4,000,000
5,020,700
Traffic Impact Fees - -
581,800
581,800
Other (RPG)
2,300,000
2,300,000
Other - -
-
-
Total Funding Sources: 490,388 920,913
6,881,800
8,293,101
Capital Expenditures:
Pre - Design 10,448 -
-
10,448
Design 479,940 900,913
-
1,380,853
Right of Way - 20,000
1,300,000
1,320,000
Construction - -
5,581,800
5,581,800
6,881,800
8,293,101
Total Expenditures: 490,388 920,913
Rocrchvay Improvement Projects 19
D1.13 Page 30 of 130
City of Ailbilm Tratisportcrtiorr Improvement Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
Project Title: A Street NW, Phase 2 (W Main St to 3rd St NW)
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
TIP# 8
STIP# AUB -N /A
LOS Corridor ID# 18
Description:
Construct a multi -lane arterial from W Main St to 3rd St NW. This project will connect A St NW, Phase 1 to the
Sound Transit Station and the Central Business District.
This
project could be partially or fully funded by development. The project is approximately 0.2 miles long.
Progress Summary:
The parking garage constructed by the Auburn Regional Medical Center completed a portion of this project in 2009.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
-
- - -
Unsecured Grant
Traffic Impact Fees -
-
-
Other (Developer) 150,000
3,000,000
3,150,000
3,000,000
3,150,000
Total Funding Sources: 150,000
Capital Expenditures:
Design -
250,000
250,000
Right of Way -
-
-
Construction 150,000
2,750,000
2,900,000
Total Expenditures: 150,000
3,000,000
3,150,000
Rocrchvay Improvement Projects 20
D1.13 Page 31 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 9
ARTERIAL STREET FUND (102)
Project Title: Auburn Way S Improvements (Hemlock St SE to Academy Dr SE) STIP# AUB -N /A
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD LOS Corridor ID# 4
Description:
Widen Auburn Way S between Hemlock St SE and Academy Dr SE to accomodate two general purpose lanes in each direction, center turn lanes, access management
medians, U- turns, curb, gutter, sidewalk, illumination, transit stop improvements, new traffic signals, Intelligent Transportation Systems, streetscape and storm
improvements. The project length is approximately two miles.
Progress Summary:
Conceptual corridor plan will be coordinated with the MIT and WSDOT in 2015. This project is planned as a partnership between the City of Auburn and the MIT. Pre -
design effort will produce a project construction cost estimate. Major grant funding is expected to come from future federal competitions. This project will extend corridor
improvements along Auburn Way S completed under previous projects.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,000.
Activity: 2016 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2016 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue -
- - -
- - - -
Unsecured Grant
-
-
Traffic Impact Fees
100,000
100,000
Other (MIT)
100,000
100,000
200,000
200,000
Total Funding Sources:
Capital Expenditures:
Pre - Design
200,000
200,000
Design
-
-
Right of Way
Construction
-
Total Expenditures:
200,000
200,000
Rocrchvay Improvemefrt Projects 21
D1.13 Page 32 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 10
ARTERIAL STREET FUND (102)
Project Title: F Street SE Non - Motorized Improvements (Downtown to Les Gove)
Project No: cp0911
Project Type: Capacity, Non - Motorized
Project Manager: TBD
STIP# AUB -49
LOS Corridor ID# N/A
Description:
The F St SE project includes pavement rehabilitation, installation of curbs, gutters, bike lanes, sidewalks, ADA improvements, utility undergrounding, LED street lighting,
new two way center left turn -lane, crash attenuation at the supports for the BNSF railroad bridge, initiation of Auburn Staff Bikeshare pilot program, wayfinding signage
and a "Bicycle Boulevard" designation of roadway connections between Auburn City Hall and the Les Gove Park Campus. This project improves mobility and safety
along the corridor and will complete a gap in the non - motorized network between Auburn's Downtown and the Les Gove Community Campus. The major infrastructure
improvements are approximately 0.3 miles long and the "Bicycle Boulevard" improvements are just over a mile long.
Progress Summary:
Preliminary design and survey work was completed in 2009. Federal Grant was secured in 2014 for design and ROW phases. Design phase was initiated in 2015.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $4,100.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
- 160,000 -
- - -
160,000
Unrestricted Street Revenue - -
Secured Grant - 320,000
200,000 1,440,000
1,960,000
Traffic Impact Fees 7,620 80,000
50,000 200,000
337,620
Other - -
- -
-
Total Funding Sources: 7,620 400,000
250,000 1,800,000
2,457,620
Capital Expenditures:
Design 7,620 400,000
200,000 -
607,620
Right of Way - -
50,000 -
50,000
Construction - -
- 1,800,000
1,800,000
250,000 1,800,000
2,457,620
Total Expenditures: 7,620 400,000
Rocrchvay Improvemefrt Projects 22
D1.13 Page 33 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 11
ARTERIAL STREET FUND (102)
Project Title:
M Street NE (E Main St to 4th St NE)
Project No:
asbd12
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 5
Description:
This project will construct a complete four -lane street section on M St NE between south of E Main St and 4th
St NE.
Progress Summary:
Pre - design is planned to be completed during 2015 to refine project scope, alignment, and cost.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,500.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
- - -
-
-
-
-
Unrestricted Street Revenue -
Unsecured Grant
-
220,000
920,000
1,140,000
Traffic Impact Fees
100,000
55,000
230,000
385,000
Other
-
-
-
-
Total Funding Sources:
100,000
275,000
1,150,000
1,525,000
Capital Expenditures:
Design
100,000
75,000
-
175,000
Right of Way
-
200,000
-
200,000
Construction
-
-
1,150,000
1 1,150,000
100,000
275,000
1,150,000
1,525,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 23
D1.13 Page 34 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 12
ARTERIAL STREET FUND (102)
Project Title:
Grade - Separated Crossing of BNSF Railyard
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will grade- separate the crossing of the BNSF Railyard, either from SR -18 to 6th Street SE or from 15th Street SW to A Street SE. The first alternative would
realign the SR -18 eastbound ramp, grade separate the main north /south line and the Stampede Pass line, and connect to 6th Street SE.
The second alternative would
provide a new corridor from 15th Street SW to A Street SE in the vicinity of 12th Street SE and 17th Street SE, either via an overpass or underpass of the BNSF Railyard.
This new east/west connection will improve access and circulation associated with the potential redevelopment of the BNSF yard as an intermodal freight facility.
Progress Summary:
Future Impact on Operating Budget:
TBD
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021
Beyond 2021
Total Project Cost
Unrestricted Street Revenue -
- - -
- -
-
Unsecured Grant
Traffic Impact Fees
-
-
-
Other
1,125,000
31,000,000
32,125,000
1,125,000
31,000,000
32,125,000
Total Funding Sources:
Capital Expenditures:
Design
1,125,000
2,500,000
3,625,000
Right of Way
-
4,000,000
4,000,000
Construction
-
24,500,000
1 24,500,000
1,125,000
31,000,000
1 32,125,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 24
D1.13 Page 35 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 15
ARTERIAL STREET FUND (102)
Project Title:
8th Street NE Widening (Pike St NE to R St NE)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 19
Description:
Widen 8th Street NE to extend the five -lane cross - section which currently exists to the west of Pike St NE to R St NE by providing an additional travel lane along the
south side of the roadway. This is a planning level cost estimate.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $600.
Activity: 2016 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2016 Estimate
2016 2017
2018
2019
2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue -
- -
-
-
- -
-
Unsecured Grant
360,000
800,000
1,160,000
Traffic Impact Fees
90,000
200,000
290,000
Other
-
-
-
Total Funding Sources:
460,000
1,000,000
1,460,000
Capital Expenditures:
Design
200,000
-
200,000
Right of Way
250,000
-
250,000
Construction
1,000,000
1,000,000
460,000
1,000,000
1,460,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 25
D1.13 Page 36 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 16
ARTERIAL STREET FUND (102)
Project Title:
49th Street NE (Auburn Way N to I St NE)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 29
Description:
Construct a new east/west corridor from Auburn Way N to I St NE. The existing 49th Street corridor extends B St NW to the west. This project also includes a traffic
signal at the intersection of Auburn Way North and 49th Street. This roadway was evaluated and recommended
in the NE Special Planning Area.
It is anticipated that
this will be constructed by future development. It is approximately 0.75 miles long.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $27,050.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- -
-
-
-
-
Unsecured Grant
Traffic Impact Fees
-
-
-
Other (Development)
850,000
2,500,000
3,350,000
850,000
2,500,000
3,350,000
Total Funding Sources:
Capital Expenditures:
Design
250,000
-
250,000
Right of Way
600,000
-
600,000
Construction
2,500,000
2,500,000
850,000
2,500,000
3,350,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 26
D1.13 Page 37 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 25
ARTERIAL STREET FUND (102)
Project Title:
46th Place S Realignment
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
The project will realign 46th Place S to the south of S 321 st Street. The realignment will move the 46th Place S intersection with S 321 st Street approximately 350 feet to
the east of the current location. This will create two T- intersections (44th Avenue S and 46th Place S) in place of the existing four -leg intersection.
The existing 46th Place
S will be dead -ended to the south of S 321 st Street. The project will improve safety and traffic operations at the intersections.
Progress Summary:
Right -of -way for the realigned roadway will be dedicated as part of an adjacent development project.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,750.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
-
-
-
-
Unsecured Grant
575,000
575,000
Traffic Impact Fees
250,000
250,000
Other
-
-
Total Funding Sources:
826,000
826,000
Capital Expenditures:
Design
125,000
125,000
Right of Way
25,000
25,000
Construction
675,000
675,000
Total Expenditures:
826,000
826,000
Rocrchvay Improvemefrt Projects 27
D1.13 Page 38 of 130
City of Ailbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 33
CAPITAL IMPROVEMENT FUND (328)
Project Title: Neighborhood Traffic Calming Program
Project No: cpxxxx
Project Type: Non - Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will implement neighborhood traffic calming strategies including street lighting, speed cushions, signage, speed radar signs, chicanes, traffic
circles, and other
approved traffic calming devices. Projects will be selected annually based on neighborhood
meetings, public surveys, and engineering studies.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Fund Balance -
- -
-
- - -
Unsecured Grant -
- -
-
- - -
-
REET 2 100,000
100,000 100,000
100,000
100,000 100,000 100,000
700,000
Other -
- -
-
- - -
-
Total Funding Sources: 100,000
100,000 100,000
100,000
100,000 100,000 100,000
700,000
Capital Expenditures:
Design -
- -
-
- - -
-
Right of Way -
- -
-
- - -
-
Construction 100,000
1 100,000 100,000
100,000
1 100,000 100,000 100,000
700,000
1 100,000 100,000
100,000
1 100,000 100,000 100,000
700,000
Total Expenditures: 100,000
Rocrchvay Improvemefrt Projects 28
D1.13 Page 39 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 40
ARTERIAL STREET FUND (102)
Project Title:
124th Ave SE Corridor Improvements (SE 312th to SE 318th)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 23
Description:
This project will fund the design, right -of -way acquisition, and construction of a four -lane section with bicycle and pedestrian facilities on 124th Ave SE between SE 318th
St and SE 312th St, and improvements to the signalized intersection of SE 312th St and 124th Ave SE (including adding bike lanes, dual
westbound left -turn lanes, dual
southbound through - lanes, a northbound right -turn pocket, ITS improvements, and pedestrian safety improvements).
Progress Summary:
Phase 1 improvements between SE 318th and SE 316th were completed by Green River College in 2012.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $3,500.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
- - -
- -
-
-
Unrestricted Street Revenue -
Unsecured Grant
300,000
880,000 2,000,000
3,180,000
Traffic Impact Fees
100,000
220,000 500,000
820,000
Other
-
- -
-
Total Funding Sources:
400,000
1,100,000 2,500,000
4,000,000
Capital Expenditures:
Pre - Design
-
- -
-
Design
400,000
-
400,000
Right of Way
-
1,100,000 -
1,100,000
Construction
-
- 2,500,000
2,500,000
Total Expenditures:
400,000
1,100,000 2,500,000
4,000,000
Rocrchvay Improvemefrt Projects 29
D1.13 Page 40 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 41
ARTERIAL STREET FUND (102)
Project Title:
R Street Bypass (M Street SE to SR -18)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will complete the design and construction of the Bypass Rd, an arterial connection between M Street and Auburn Black Diamond Road, paralleling the rail
line. The project will provide an arterial connection from the newly constructed M Street Underpass to the Auburn Black Diamond Road interchange with SR -18 to keep
both vehicular and freight traffic out of residential neighborhoods along R Street SE north of the Stampede Pass line. The arterial connection may also provide
opportunities for partnering with the Muckleshoot Indian Tribe as they redevelop the Miles Pit area and as more definitive plans are developed for a potential new
WSDOT interchange on SR -18 in the vicinity of the project.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $2,500.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
- - -
Unsecured Grant
Traffic Impact Fees
- -
-
Other (Development)
500,000 5,700,000
6,200,000
500,000 5,700,000
6,200,000
Total Funding Sources:
Capital Expenditures:
Design
500,000 -
500,000
Right of Way
- 1,800,000
1,800,000
Construction
- 3,900,000
3,900,000
500,000 5,700,000
6,200,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 30
D1.13 Page 41 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 42
ARTERIAL STREET FUND (102)
Project Title: SE 320th Street Corridor Improvements (116th Ave SE to 122nd Ave SE)
Project No: cpxxxx
Project Type: Capacity, Safety
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 25
Description:
SE 320th St is a primary route serving Green River College and adjacent neighborhoods. There are very high volumes of pedestrians, bicyclists, and transit utilizing the
corridor. This project will fund the design, right -of -way acquisition, and construction of non - motorized roadway and safety improvements including a roundabout at 116th
Ave SE, adding bicycle lanes, sidewalks, and streetlighting between 122nd Ave SE and 116th Ave SE. Project length is approximately .45 miles.
Progress Summary:
GRCC completed the design and construction for the segment between 124th Ave SE and 122nd Ave SE in 2013. Corridor pre- design is scheduled to start in 2016.
Construction schedule is pending securing full funding.
Future Impact on Operating Budget:
This project is not expected to have a significant impact on operating budgets.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue -
100,000 - -
- - -
100,000
Unsecured Grant
- 480,000
530,000 2,953,440
3,963,440
Traffic Impact Fees
120,000
132,500 328,160
580,660
Other
- -
- -
-
Total Funding Sources:
100,000 600,000
662,500 3,281,600
4,644,100
Capital Expenditures:
Pre - Design
100,000 -
- -
100,000
Design
- 600,000
250,000
850,000
Right of Way
-
412,500 -
412,500
Construction
- -
- 3,281,600
3,281,600
Total Expenditures:
100,000 600,000
662,500 3,281,600
4,644,100
Rocrchvay Improvemefrt Projects 31
D1.13 Page 42 of 130
City of Ailbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 43
ARTERIAL STREET FUND (102)
Project Title: Auburn Way S (SR -164) Corridor Safety Improvements (Muckleshoot Plaza to Dogwood) STIP# AUB -44
Project No: cp1218
Project Type: Capacity
Project Manager: Matt Larson LOS Corridor ID# 4
Description:
This project will improve access management, including u- turns, upgrade transit stops and street lighting, widen to accomodate turn -lanes and pedestrian and bicycle
facilities, upgrade pavement markings, install pedestrian signals and audible pedestrian push buttons, and upgrade traffic signals to change the phasing and to improve
the visibility of the signal heads.
Progress Summary:
Grant funding was awarded in 2012. Design began in 2012 and construction is scheduled for 2016.
Future Impact on Operating Budget:
This project is expected to have a neglible impact on operating budgets.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue 2,768 -
- - -
-
- -
2,768
Grants (Fed, State, Local) 98,470 283,325
1,951,313
2,333,108
Traffic Impact Fees - 160,322
89,678
250,000
Other (WSDOT) - -
306,674
306,674
2,347,666
2,892,660
Total Funding Sources: 101,238 443,647
Capital Expenditures:
Design 101,238 374,062
-
475,300
Right of Way - 69,585
-
69,585
Construction - -
2,347,665
2,347,665
2,347,666
2,892,660
Total Expenditures: 101,238 443,647
Rocrchvay Improvemefrt Projects 32
D1.13 Page 43 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 49
ARTERIAL STREET FUND (102)
Project Title: W Valley Highway Improvements (15th Street NW to W Main Street)
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 35
Description:
This project scope includes pavement rehabilitation and re- channelization, roadway widening, bicycle lanes, pedestrian facilities, roadway lighting, required storm system
improvements, and Intelligent Transportation System Improvements.
Progress Summary:
Survey, base mapping and pre- design are planned to be completed in 2018 to complete preliminary plans and refine project cost - estimate.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019
2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
- -
-
-
- -
-
-
Unrestricted Street Revenue -
Unsecured Grant
-
480,000
2,400,000
2,880,000
Traffic Impact Fees
100,000
120,000
600,000
820,000
Other
-
-
-
-
Total Funding Sources:
100,000
600,000
3,000,000
3,700,000
Capital Expenditures:
Design
100,000
600,000
-
700,000
Right of Way
-
-
-
-
Construction
-
-
3,000,000
3,000,000
100,000
600,000
3,000,000
3,700,000
Total Expenditures:
Rocrchvay Improvemeftt Projects 33
D1.13 Page 44 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 55
ARTERIAL STREET FUND (102), ARTERIAL PRESERVATION FUND (105)
Project Title: W Main Street Multimodal Corridor and ITS Improvements (WVH to Interurban Trail) STIP# AUB -50
Project No: CP1415
Project Type: Capacity
Project Manager: Kim Truong LOS Corridor ID# 11
Description:
This project will repurpose the existing W Main St corridor within Auburn's designated Regional Growth Center and will construct Intelligent Transportation System (ITS)
improvements serving local and regional transportation networks and a major commercial retail center. Improvements include converting the existing four -lane roadway
section to a three -lane section including center two -way left turn lane with new bike lanes, new sidewalks, new LED street lighting, and streetscape improvements
between West Valley Highway and the Interurban Trail. ITS Improvements include interconnecting and coordinating traffic signals From C St NW along W Main St to W
Valley Highway south to 15th St SW including two interchanges with SR -18 and one with SR -167.
Progress Summary:
Project was awarded federal grant in 2014. Design started in 2015 and construction is scheduled to begin in 2016.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
- - -
- - -
56,490
Unrestricted Street Revenue - 56,490
Unsecured Grant - 804,100
2,970,240
3,774,340
Traffic Impact Fees 4,538 -
209,650
214,188
Other (Arterial Pres. Fund) - 85,410
314,510
399,920
3,494,400
4,444,938
Total Funding Sources: 4,538 946,000
Capital Expenditures:
Pre - Design 4,538 -
-
4,538
Design - 946,000
946,000
Right of Way -
-
-
Construction - -
3,494,400
3,494,400
3,494,400
4,444,938
Total Expenditures: 4,538 946,000
Rocrchvay Improvemeftt Projects 34
D1.13 Page 45 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 58
ARTERIAL STREET FUND (102)
Project Title: Auburn Way S Corridor Improvements (Fir St SE to Hemlock St SE)
Project No: cp1119
Project Type: Capacity
Project Manager: Jacob Sweeting
STIP# AUB -N /A
LOS Corridor ID# 4
Description:
This project will widen Auburn Way South between Fir St SE and Hemlock St SE to five lanes with curb, gutter, sidewalk, illumination and
storm improvements. A new
traffic signal will be constructed at Hemlock Street SE and connect to Auburn's Intelligent Transportation System.
Progress Summary:
Washington State Transportation Improvement Board (TI B) awarded the City grant funds in the amount of $2,426,400 on November 19, 2010. The Muckleshoot Indian
Tribe is a project partner and is contributing ROW dedications and project funding in the amount $836,601.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $9,300.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue 195,060 -
5,000 - -
- -
-
200,060
Secured State Grant 508,176 2,061,951
-
2,570,127
Traffic Impact Fees 200,000 450,000
650,000
Other (Comcast, Clink) 94,107 142,967
Other (WSDOT) 116,038
Other (MIT) 101,006 735,594
-
836,600
6,000
4,266,787
Total Funding Sources: 1,098,349 3,606,660
Capital Expenditures:
Design 666,617 39,816
-
706,433
Right of Way 431,732 -
-
431,732
Construction - 3,466,734
5,000
3,471,734
1 6,000
4,609,899
Total Expenditures: 1,098,349 3,606,660
Rocrchvay Improvemefrt Projects 35
D1.13 Page 46 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 60
ARTERIAL STREET FUND (102)
Project Title:
M Street SE Corridor (8th St SE to AWS)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 6
Description:
Widen M Street SE into a multi -lane arterial between 8th St SE and AWS. This project will improve
mobility and is tied to corridor development. It is consistent
with the
Comprehensive Plan and contributes to the completion of a north /south arterial corridor.
Progress Summary:
Future Impact on Operating Budget:
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
- - -
-
- -
-
Unrestricted Street Revenue -
Unsecured Grant
925,000
3,750,000
4,675,000
Traffic Impact Fees
750,000
750,000
1,500,000
Other (Development)
250,000
250,000
500,000
1,926,000
4,760,000
6,676,000
Total Funding Sources:
Capital Expenditures:
Design
650,000
-
650,000
Right of Way
1,275,000
-
1,275,000
Construction
-
4,750,000
4,750,000
1,926,000
4,760,000
6,676,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 36
D1.13 Page 47 of 130
City of Arrbuni Tratisportcrtioft Intproventeftt Progrant
Six Year Transportation Improvement Plan TIP# 61
ARTERIAL STREET FUND (102)
Project Title: Auburn Way S Bypass (Riverwalk Dr to SR -18 at R St SE)
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will construct a new roadway corridor to bypass Auburn Way South.
The new roadway will extend from Riverwalk Drive to R Street SE to the
north of SR -18. A
new connection to a new interchange with SR -18.
Progress Summary:
Future Impact on Operating Budget:
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue -
- -
-
- - -
-
-
Unsecured Grant
4,800,000
43,560,000
48,360,000
Traffic Impact Fees
-
-
-
Other (Development)
1,200,000
10,890,000
12,090,000
6,000,000
64,460,000
60,460,000
Total Funding Sources:
Capital Expenditures:
Design
6,000,000
-
6,000,000
Right of Way
-
6,000,000
6,000,000
Construction
-
48,450,000
1 48,450,000
Total Expenditures:
6,000,000
64,460,000
1 60,460,000
Rocrchvay Improvemefrt Projects 37
D1.13 Page 48 of 130
City of Arfbuni Tf°cursportcrtiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 62
ARTERIAL STREET FUND (102)
Project Title: Auburn Way S Streetscape Improvements (SR -18 to M St SE)
Project No: cpxxxx
Project Type: Miscellaneous
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 3
Description:
This project will revitalize and beautify Auburn Way S from the SR -18 interchange to the
intersection with M Street SE. Proposed improvements include: enhancement of
crosswalks and pedestrian linkages; new and repaired sidewalks; curb and gutter; pedestrian ramps; new landscaped
medians; street trees; new lighting; pedestrian
benches; trash receptacles; recycling containers and other appropriate amenities.
Progress Summary:
Future Impact on Operating Budget:
Activity: 2015 YE
Budget
Forecast Project Cost
2,016 2,017
2,018
2,019
2,020 2,021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
- -
-
200,000
200,000 - -
400,000
Unrestricted Street Revenue -
Unsecured Grant
1,750,000
2,600,000
4,350,000
Traffic Impact Fees
-
-
-
Other
-
-
-
Total Funding Sources:
1,950,000
2,800,000
4,750,000
Capital Expenditures:
Design
500,000
-
500,000
Right of Way
1,450,000
-
1,450,000
Construction
-
2,800,000
2,800,000
1,950,000
2,800,000
4,750,000
Total Expenditures:
Rocrchvay Improvement Projects 38
D1.13 Page 49 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 64
ARTERIAL STREET FUND (102)
Project Title:
Lea Hill Rd Segment 1 (R St NE to 105th PI SE)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 19
Description:
Widen the existing roadway to provide a four -lane cross section with pedestrian and bicycle facilities. The project includes widening the Green River Bridge.
Progress Summary:
Three parcels along the future roadway alignment were procured in 2014.
Corridor pre- design effort is planned
to begin in mid 2015 following adoption of the
Comprehensive Transportation Plan major update.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $18,300.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016
2017 2018
2019
2020 2021 Beyond 2021
Total
Project Cost
Unrestricted Street Revenue -
-
-
-
- -
-
Unsecured Grant - -
-
-
1,950,000
8,000,000
9,950,000
Traffic Impact Fees 430,000 50,000
100,000
500,000
2,000,000
3,080,000
Other - -
-
-
-
-
Total Funding Sources: 430,000 50,000
100,000
2,450,000
10,000,000
13,030,000
Capital Expenditures:
Design - 50,000
100,000
1,950,000
-
2,100,000
Right of Way 430,000 -
-
500,000
-
930,000
Construction - -
-
-
10,000,000
10,000,000
100,000
2,450,000
10,000,000
13,030,000
Total Expenditures: 430,000 50,000
Rocrchvay Improvemefrt Projects 39
D1.13 Page 50 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 65
ARTERIAL STREET FUND (102)
Project Title:
Lea Hill Rd Segment 2 (105th PI SE to 112th Ave SE)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 19
Description:
Project includes widening the existing roadway to provide a four -lane cross - section including pedestrian and bicycle facilities.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $24,100.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020
2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
- -
-
- -
-
-
-
Unrestricted Street Revenue -
Unsecured Grant
2,900,000
7,100,000
10,000,000
Traffic Impact Fees
600,000
1,400,000
2,000,000
Other
-
-
-
Total Funding Sources:
3,500,000
8,500,000
12,000,000
Capital Expenditures:
Design
2,000,000
-
2,000,000
Right of Way
1,500,000
-
1,500,000
Construction
-
8,500,000
8,500,000
3,500,000
8,500,000
12,000,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 40
D1.13 Page 51 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 66
ARTERIAL STREET FUND (102)
Project Title:
Lea Hill Rd Segment 3 (112th Ave SE to 124th Ave SE)
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 19
Description:
Project includes widening the existing roadway to provide a four -lane cross - section including pedestrian and bicycle
facilities.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $20,300.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017
2018
2019
2020 2021
Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue -
- -
-
-
-
-
-
Unsecured Grant
-
3,000,000
3,000,000
Traffic Impact Fees
1,000,000
-
1,000,000
Other
-
-
-
Total Funding Sources:
1,000,000
3,000,000
4,000,000
Capital Expenditures:
Design
500,000
-
500,000
Right of Way
500,000
-
500,000
Construction
-
3,000,000
3,000,000
1,000,000
3,000,000
4,000,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 41
D1.13 Page 52 of 130
City of Arrbuni Tratisportcrtiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 72
ARTERIAL STREET FUND (102)
Project Title: W Valley Highway Improvements (SR -18 to 15th St SW)
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 35
Description:
This project scope includes pavement rehabilitation and re- channelization, pedestrian and bicycle facility improvements, improved roadway
lighting, required storm system
improvements, intersection signal replacement at 15th St SW, and Intelligent Transportation System Improvements.
Progress Summary:
Survey, base mapping and pre- design are planned to be completed in 2016 to complete preliminary plans and refine project cost - estimate.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
- - -
-
-
Unsecured Grant
- 400,000
2,000,000
2,400,000
Traffic Impact Fees
100,000 100,000
500,000
700,000
Other
- -
-
-
Total Funding Sources:
100,000 500,000
2,500,000
3,100,000
Capital Expenditures:
Design
100,000 500,000
-
600,000
Right of Way
- -
-
-
Construction
-
2,500,000
2,500,000
100,000 500,000
2,500,000
3,100,000
Total Expenditures:
Rocrchvay Improvemefrt Projects 42
D1.13 Page 53 of 130
City of Arrbuni Tratisportcrtioft Intproventeftt Progrant
Six Year Transportation Improvement Plan TIP # 73
ARTERIAL STREET FUND (102)
Project Title: Stewart Road (Lake Tapps Parkway Corridor)
Project No: N/A
Project Type: Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is a City of Pacific project to widen the Stewart Road (Lake Tapps Parkway) Corridor. This is the final segment of widening in the City of Pacific which will tie in with
the city of Sumner's planned final widening segment and new bridge over the White river. Completion of this corridor widening is expected to significantly relieve traffic
congestion in Auburn along the A St SE and C St SE corridors.
Progress Summary:
City of Pacific has initiated preliminary road design and is applying for grant funding to complete the project. City of Auburn contribution is for construction phase only.
Future Impact on Operating Budget:
There is no future impact to Auburn's operating budgets.
Activity: 2016 YE
Budget
Forecast Project Cost
Total Project
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Cost
Unrestricted Street Revenue -
- 66,000 -
- - - -
66,000
Unsecured Grant
-
-
Traffic Impact Fees
-
-
Traffic Mitigation Fees
34,000
34,000
100,000
100,000
Total Funding Sources:
Capital Expenditures:
Design
-
-
Right of Way
-
Construction
100,000
100,000
100,000
100,000
Total Expenditures:
Rocrchvay Intproventeftt Projects 43
D1.13 Page 54 of 130
City of Arrbilm Transportation Improvement Program
OYS ' !' '- I N-
Roachvay Improvement Projects 44
DI.B Page 55 of 130
City of Ailbilni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 14
ARTERIAL STREET FUND (102)
Project Title: M Street SE & 12th Street SE Traffic Signal STIP# AUB -N /A
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD LOS Corridor ID# 6
Description:
This project includes the design, right of way acquisistion and construction of a new traffic signal.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $6,600.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
-
- - -
-
Unsecured Grant
500,000
500,000
Traffic Impact Fees
-
-
Other (Development)
125,000
125,000
626,000
626,000
Total Funding Sources:
Capital Expenditures:
Design
75,000
75,000
Right of Way
50,000
50,000
Construction
500,000
500,000
626,000
626,000
Total Expenditures:
DI B hitersectlofl, Traffic Sig7ial, & hitelllgetit Tratisportatlofl Systems knipe lg"it r Jects 45
City of Ailbrn°n Tratisportcrtiorr Improvement Program
Six Year Transportation Improvement Plan
TIP# 17
ARTERIAL STREET FUND (102)
Project Title:
Harvey Rd NE & 8th St NE Intersection Improvements
Project No:
cp0611
Project Type:
Capacity
Project Manager:
None
STIP# AUB -N /A
LOS Corridor ID# 5,19
Description:
Add one eastbound through /right turn -lane on 8th St NE to the west of Harvey Rd. Modify traffic signals and traffic channelization to accommodate the new lane. The
additional lane will reduce traffic delays and queuing at the intersection of Harvey Rd and
8th St NE in all directions.
This project will reconstruct M St NE from 4th St NE to 8th
St NE, a segment of roadway approximately 0.3 miles long with a four -lane cross - section.
The reconstruction will address the existing poor pavement condition and fill in any
gaps in the sidewalk network.
Progress Summary:
Project was completed in 2010. Ongoing budget is for PWTFL debt payments.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- -
-
-
- - -
Unsecured Grant - -
- -
-
-
- - -
-
Traffic Impact Fees (Debt Service) 435,500 86,010
85,383 85,200
84,800
84,400
84,400 84,200 573,400
1,603,293
Traffic Impact Fees 204,500 -
- -
-
-
- - -
204,500
PWTF 1,527,300 -
- -
-
-
- - -
1,527,300
85,383 85,200
84,800
84,400
84,400 84,200 573,400
1,807,793
Total Funding Sources: 1,731,800 86,010
Capital Expenditures:
Design 327,500 -
- -
-
-
- - -
327,500
Right of Way 200,400
-
-
200,400
Construction 1,203,900 -
- -
-
- -
1,203,900
Long Term Debt: PWTF 435,500 86,010
85,383 85,200
84,800
1 84,400
84,400 84,200 573,400
1 1,603,293
1 85,383 85,200
84,800
1 84,400
84,400 84,200 573,400
1 1,807,793
Total Expenditures: 1,731,800 86,010
DI B Intersectfoti, Traffic Sipial, & Intelligetit Tratisportatfoti Systems knipe i j' ? efit�r Jects 46
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 18
ARTERIAL STREET FUND (102), CAPITAL IMPROVEMENT FUND (328)
Project Title: M Street SE & 29th Street SE Intersection Safety Improvements
Project No: CPXXXX
Project Type: Non - Capacity, Safety
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 27
Description:
This project includes the design and construction of a new traffic signal.
Progress Summary:
M St SE & 29th St SE is currently an all -way stop controlled intersection, experiences
significant congestion in the peak traffic hours, and
has a documented high collision
history. Design is scheduled to be completed in 2016. Construction will be completed when project is fully funded.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
50,000 -
-
100,000 -
-
150,000
Unsecured Grant
-
300,000
300,000
Traffic Impact Fees
-
-
Other
-
-
-
Total Funding Sources:
50,000
400,000
450,000
Capital Expenditures:
Design
50,000
-
50,000
Right of Way
-
-
-
Construction
-
400,000
400,000
50,000
400,000
450,000
Total Expenditures:
DI B hitersectlofl, Traffic Sig7ial, & hitelllgetit Tratisportatlofl Systems knipe igi fit r Jects
47
City of Ailbilni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 19
ARTERIAL STREET FUND (102)
Project Title: Auburn Way N & 1st Street NE Signal Improvements
Project No: cpxxxx
Project Type: Non - Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 2
Description:
This project will construct a new traffic signal with controller cabinet and battery backup along with necessary intersection improvements.
Progress Summary:
Design is scheduled to be completed in 2015.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
50,000 -
125,000
- -
-
175,000
Unrestricted Street Revenue -
Grants (Fed, State, Local)
-
425,000
425,000
Traffic Impact Fees
-
-
Other
-
-
-
Total Funding Sources:
50,000
550,000
600,000
Capital Expenditures:
Design
50,000
-
50,000
Right of Way
-
100,000
100,000
Construction
-
450,000
450,000
50,000
550,000
600,000
Total Expenditures:
DI B hitersectlofl, Traffic Sig7ial, & hitelllgetit Tratisportatlofl Systems knipe lg�ofit r Jects
F0.
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 20
ARTERIAL STREET FUND (102)
Project Title: R Street SE & 21st Street SE Intersection Safety Improvements
Project No: CPXXXX
Project Type: Non - Capacity, Safety
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 16
Description:
This project includes the design and construction of a intersection safety improvements.
Progress Summary:
R St SE & 21 st St SE is currently an two -way stop controlled intersection, experiences significant
congestion in the peak traffic hours, and has a documented high
collision history. Analysis to determine appropriate intersection control and design is scheduled
to be completed in 2016. Construction will be completed when project
is
fully funded.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue -
75,000 - -
100,000 - -
175,000
Unsecured Grant
-
700,000
700,000
Traffic Impact Fees
-
-
Traffic Mitigation Funds
Other
-
-
-
Total Funding Sources:
76,000
800,000
876,000
Capital Expenditures:
Design
75,000
-
75,000
Right of Way
-
-
-
Construction
-
800,000
800,000
76,000
800,000
876,000
Total Expenditures:
D1. B hitersectlofl, Traffic SIg7ial, & hitelllgetit Tratisportatlofl Systems knip e ve efit �0 Jects
•
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 21
ARTERIAL STREET FUND (102)
Project Title: Main Street Signal Upgrades STIP# AUB -N /A
Project No: cp1406
Project Type: Non - Capacity
Project Manager: Seth Wickstrom LOS Corridor ID# 11
Description:
Reconstruct the existing traffic signals at C St NW and W Main St and at E Main St and
Auburn Ave /A St SE. The new C St NW signal would provide protected left -turn
phasing for C St, and would provide additional safety related to the railroad pre - emption.
The Auburn Ave /A St signal would replace one of the City's oldest signals which
has exceeded its design life.
Progress Summary:
Design started in 2014 and construction is expected to start in 2015.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
5,000
-
- - -
320,000
Unrestricted Street Revenue - 315,000
Grants (Fed, State, Local) -
-
-
Traffic Impact Fees - -
-
-
Traffic Mitigation Fees 11,232 138,768
150,000
Other - -
-
-
Total Funding Sources: 11,232 463,768
6,000
470,000
Capital Expenditures:
Design 11,232 38,768
-
50,000
Right of Way - -
-
-
Construction - 415,000
5,000
420,000
6,000
470,000
Total Expenditures: 11,232 463,768
DI B hitersectlofl, Traffic Sig7ial, & hitelllgetit Tratisportatlofl Systems knipe ve efit�r Jects 50
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 34
CAPITAL IMPROVEMENT FUND (328)
Project Title: Traffic Signal Improvements STIP# AUB -N /A
Project No: Various
Project Type: Non- Capacity (Annual)
Project Manager: Scott Nutter LOS Corridor ID# N/A
Description:
This project includes procuring capital equipment needed to replace cabinets, video detection cameras, conflict monitors and upgrade pedestrian pushbuttons to APS. This
project is also used to make safety improvements to our signals like auxiliary heads and flashing yellow arrows, or capacity improvements like
right turn overlap signals.
The City uses current traffic counts and accident data to determine intersections for these improvements.
Progress Summary:
Project continues to complete various intersection improvements.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021
Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Cap. Imp. Fund Balance -
- - -
-
-
-
Unsecured Grant -
- - -
-
- -
-
REET 2 175,000
175,000 175,000 175,000
175,000
175,000 175,000
1,225,000
Other -
- - -
-
- -
-
Total Funding Sources: 176,000
176,000 176,000 176,000
176,000
176,000 176,000
1,226,000
Capital Expenditures:
Design 25,000
25,000 25,000 25,000
25,000
25,000 25,000
175,000
Right of Way -
- - -
-
- -
-
Construction 150,000
1 150,000 150,000 150,000
1 150,000
150,000 150,000
1,050,000
1 176,000 176,000 176,000
1 176,000
176,000 176,000
1,226,000
Total Expenditures: 176,000
D1. B hitersectlofl, Traffic Sipial, & hitelllgetit Tratisportatlofl Systems knip @ ve efit �r Jects 51
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP # 38
ARTERIAL STREET FUND (102)
Project Title: C Street SW & 15th Street SW Intersection Improvements
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 12,13
Description:
This project will install a southbound right -turn pocket, re- channelize the
intersection to provide two southbound through lanes, and replace the existing spanwire
traffic
signal with a new traffic signal.
Progress Summary:
Design is planned to begin in 2017. Construction will be sheduled once full funding is secured.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $2,500.
Activity: 2015 YE
Budget
Forecast Project Cost
Total Project
2016
2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Cost
Unrestricted Street Revenue -
-
- -
- - - -
-
Unsecured Grant
-
750,000
750,000
Traffic Impact Fees
150,000
125,000
275,000
Other
-
-
-
Total Funding Sources:
150,000
875,000
1,025,000
Capital Expenditures:
Design
150,000
-
150,000
Right of Way
-
-
-
Construction
-
875,000
875,000
150,000
875,000
1,025,000
Total Expenditures:
DI B hitersectlofl, Traffic SIg7ial, & hitelllgetit Tratisportatlofl Systems knipe 6giiefit�r Jects
52
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 39
ARTERIAL STREET FUND (102)
Project Title:
124th Avenue SE & SE 320th Street Intersection Improvements
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 23, 25
Description:
This project will fund the design, right -of -way acquisition, and construction of improvements to the intersection of SE 320th St and 124th Ave SE. The intersection is
located at the main entrance to Green River College and will require additional on -site
improvements to be constructed.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $2,500.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
175,000 -
-
150,000 -
-
325,000
Unrestricted Street Revenue -
Unsecured Grant
-
1,200,000
1,200,000
Traffic Impact Fees
-
-
-
Other (GRC)
175,000
150,000
325,000
350,000
1,500,000
1,850,000
Total Funding Sources:
Capital Expenditures:
Design
350,000
-
350,000
Right of Way
-
-
-
Construction
1,500,000
1,500,000
350,000
1,500,000
1,850,000
Total Expenditures:
D1. B hitersectlofl, Traffic SIg7ial, & hitelllgetit Tratisportatlofl Systems knip e ve oft 130 sects
53
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
TIP# 47
Project Title: Traffic Management Center Improvements STIP# AUB -N /A
Project No: epxxxx
Project Type: Capacity, ITS
Project Manager: Pablo Para LOS Corridor ID# N/A
Description:
The rapid growth of the City traffic signal and Intelligent Transportation Systems infrastructure has severely strained the capacity and reliability of the existing network
processing capabilities. This project will implement network communications, software, video, and physical improvements to the Traffic Management Center which will
improve the network data processing speed, reliability, and redundancy improving the City's ability to manage the transportation system and respond to emergencies.
Additionally, these improvement will allow Information & Technology staff to isolate the Traffic Management data processing demands from the City's general facility
security data processing demands resulting in improvements to both processes.
Progress Summary:
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue -
- - -
- - - -
Unsecured Grant -
-
-
Traffic Impact Fees 125,000
25,000
150,000
Other -
-
-
Total Funding Sources: 125,000
25,000
150,000
Capital Expenditures:
Design 5,000
-
5,000
Right of Way -
-
-
Construction 120,000
25,000
145,000
25,000
150,000
Total Expenditures: 125,000
DI B hitersectlofl, Traffic Sipial, & hitelllgetit Tratisportatlofl Systems knipe 6g0fit�r Jects 54
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 48
ARTERIAL STREET FUND (102)
Project Title: A Street SE & 6th Street SE Safety and Access Improvements
Project No: cpxxxx
Project Type: Non - Capacity
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 10
Description:
This project is a partnership between Auburn and Burlington Northern Santa Fe Railway to improve the intersection of A St SE and 6th St SE. The scope of the project
includes adding a phase to the traffic signal for traffic entering and exiting the BNSF railyard.
Progress Summary:
Design and construction is planned to be completed in 2016 pending agreement with BNSF.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
- - - -
Unsecured Grant
Traffic Impact Fees
-
-
Other (BNSF)
50,000
50,000
60,000
60,000
Total Funding Sources:
Capital Expenditures:
Design
10,000
10,000
Right of Way
-
-
Construction
40,000
40,000
60,000
60,000
Total Expenditures:
DI B hitersectlofl, Traffic SIg7ial, & hitelllgetit Tratisportatlofl Systems knipe 6 iiefit�r Jects
55
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 45
ARTERIAL STREET FUND (102)
Project Title: 124th Avenue SE & SE 284th Street Intersection Safety Improvements
Project No: cpxxxx
Project Type: Capacity, Safety
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 23, 40, 41
Description:
This project will complete the design phase for intersection safety and capacity improvements.
Progress Summary:
Future Impact on Operating Budget:
TBD
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
- -
-
- - -
-
Unrestricted Street Revenue -
Unsecured Grant
-
450,000
450,000
Traffic Impact Fees
100,000
150,000
250,000
Other
-
-
-
Total Funding Sources:
100,000
600,000
700,000
Capital Expenditures:
Design
100,000
-
100,000
Right of Way
-
50,000
50,000
Construction
-
550,000
550,000
100,000
600,000
700,000
Total Expenditures:
DI B hitersectlofl, Traffic SIg7ial, & hitelllgetit Tratisportatlofl Systems knipe 6y0fit�r Jects
56
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
CAPITAL IMPROVEMENT FUND (328)
Project Title:
Project No:
Project Type:
Project Manager:
ITS Dynamic Message Signs
cpxxxx
Non - Capacity (ITS)
TBD
TIP# 50
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project funds the design and construction of Dynamic Message Signs at various locations throughout the City. Dynamic message signs
are an important ITS tool for
providing information to roadway users. Priority locations for sign placement are based on the Comprehensive Transportation Plans ITS map and include Auburn Way N,
Auburn Way S, W Valley Highway, E Valley Highway, Lake Tapps Parkway, and Lea Hill Rd.
Progress Summary:
The first phase of this project is scheduled to begin in 2016 or sooner if grant funding becomes available.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Cap. Imp. Fund Balance -
- - -
-
-
-
-
Unsecured Grant
- 120,000 120,000
120,000
120,000
480,000
REET 2
100,000 30,000 30,000
30,000
30,000
220,000
Other (WRA)
50,000 - -
-
-
50,000
150,000 150,000 150,000
150,000
150,000
750,000
Total Funding Sources:
Capital Expenditures:
Design
15,000 15,000 15,000
15,000
15,000
75,000
Right of Way
- - -
-
-
-
Construction
135,000 135,000 135,000
1 135,000
135,000
675,000
150,000 150,000 150,000
1 150,000
150,000
750,000
Total Expenditures:
DI B hitersectlofl, Traffic SIg7ial, & hitelllgetit Tratisportatlofl Systems knipe vegiefit�0 Jects 57
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 51
ARTERIAL STREET FUND (102)
Project Title: Lake Tapps Parkway ITS Expansion STIP# AUB -N /A
Project No: cpxxxx
Project Type: Capacity
Project Manager: TBD LOS Corridor ID# 17
Description:
The project funds the design, coordination, permitting, and construction of new ITS infrastructure along Lake Tapps Parkway from Lakeland Hills Way to East Valley
Highway, and along East Valley Highway to Lakeland Hills Way. The proposed ITS infrastructure includes conduit, fiber, VMS signage, cameras, network communication
upgrades, and weather stations along the route.
Progress Summary:
Federal Grant application was submitted to PSRC in May 2014. Project is currently on the contingency list.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
-
- -
-
Unsecured Grant
82,950 711,000
793,950
Traffic Impact Fees
22,050 189,000
211,050
Other
- -
-
Total Funding Sources:
105,000 900,000
1,005,000
Capital Expenditures:
Design
105,000 -
105,000
Right of Way
- -
-
Construction
- 900,000
900,000
105,000 900,000
1,005,000
Total Expenditures:
DI B hitersectlofl, Traffic SIg7ial, & hitelligetit Tratisportatlofl Systems knipe 6�0fit�r Jects 58
ansP °rtatio n
rPrQV ement Yrng'"a"
city o f An�z�rn Tr
t plan Capa�;ty Improvements
lmpr °ve'men ga {ety &
Transp° at1oo21 iits Way gE Intersection
eat rjlX ER AI- STREET FDND lA Street SE &Lakeland H
ART A -CXX t Irnp,O\Iements
TIP# 52
gT1P# P`UB NIA
og Corridor I't)# 10, 34
L
CP ity, gafe y ct�on
prOjectTitle: Capac terse available.
project N° e. TgD are a prellminax, I design 1n med as funding be
Pr all � Manager erat�ons, safety, and 'Prep re phases�dl be program
gescr;ption study traffic op 2p16 Futu
-This prOleQtwill lets° in
on cost estimate will be °omp
Gt1 Cost �sevov"'�
ress somm a y design and 000stru �rct ast
pto9 sis, prelims d et for street ma
2019
Operating Buo gne Operating bug s -
gudg
uture Impact on ve 00,1M921 Will h 2015 YE 2016
This prOJect Estimate
sources'. prior to 2015
i
tiv tY � riding -
Fu Revenue
restricted street Grant
Un
Unsecured Fees
Traffic lrnpa Other
Total Funding Sources:
Capital EXpend�pes 9n
RlIght Of V
'
Oonstru_..e�:
m
75,p00
75 p00
_ 75,OC
201 -
����t���o�ects
�n 10
s ortat,0n systeM P �9e
gal & Intelligent Tran p
I
nterseetion, Tra�.�e Sid
21 Total pro,ect Cost
_ 75,Qp0
75,ap0
75,OC
59
City of Arfbrn°n Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 53
ARTERIAL STREET FUND (102)
Project Title: Auburn Way S & 12th Street SE Intersection Improvements STIP# AUB -N /A
Project No: cp1114
Project Type: Capacity, Safety
Project Manager: TBD LOS Corridor ID# 3
Description:
The project will design multi -modal intersection improvements at the AWS /12th Street SE intersection. The improvements will include pedestrian access improvements,
channelization improvements to add bicycle lanes, new traffic signal, and ITS upgrades.
Progress Summary:
Design is scheduled to be completed in 2016. Construction phase is contingent on future funding or the award of a grant.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
100,000 - -
- - -
-
100,000
Unrestricted Street Revenue -
Unsecured Grant -
- 750,000
750,000
Traffic Impact Fees 50,000
-
50,000
Other -
- -
-
Total Funding Sources: 50,000
100,000 750,000
900,000
Capital Expenditures:
Design 50,000
100,000 -
150,000
Right of Way -
- -
-
Construction -
- 750,000
750,000
1 100,000 750,000
900,000
Total Expenditures: 50,000
D1. B Intersectfoti, Traffic Sipial, & Intelligetit Tratisportatfoti Systems knip e y� ief it �r Jects 60
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 59
ARTERIAL STREET FUND (102)
Project Title:
Auburn Avenue NE & 3rd Street NE Pedestrian & Access Improvements
Project No:
cp1023
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 2
Description:
This project will improve access, safety and operations for pedestrian, bicyclists and motorized vehicles at the intersections of 3rd St NE /Auburn Ave, 4th
St NE /Auburn
Ave, and 4th St NE /Auburn Way North. Improvements include a new traffic signal and geometric improvements at 3rd St NE to add a missing pedestrian
crossing and
accomodate the northbound left -turn movement; improving pedestrian facilities to meet ADA requirements, restricting uncontrolled accesses near the intersection, and
modifying the traffic signal at Auburn Way North and 4th St NE to eliminate the east/west split phase operation.
Progress Summary:
Survey and pre- design were started in 2010 -2011. Pre - design will be completed in 2017, with construction scheduled for 2018, pending grant funding.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2016 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2016 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
- - -
- - -
8,778
Unrestricted Street Revenue 8,778
Unsecured Grant -
- 250,000
250,000
Traffic Impact Fees
50,000 50,000
100,000
REET2
- -
-
Other -
- -
-
Total Funding Sources: 8,778
60,000 300,000
368,778
Capital Expenditures:
Design 8,778
50,000 -
58,778
Right of Way -
- -
-
Construction -
- 300,000
300,000
60,000 300,000
368,778
Total Expenditures: 8,778
D1. B hitersectlofl, Traffic Sig7ial, & hitelllgetit Tratisportatlofl Systems knip e y� ief it �o y.ects 61
City of Arfbrn°n Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 63
ARTERIAL STREET FUND (102)
Project Title:
29th Street SE & R Street SE Intersection Improvements
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 16, 27
Description:
This project funds the design, right -of -way acquisition and construction of intersection capacity and safety improvements at the 29th St SE /R St SE intersection.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- -
-
- - - -
-
Unsecured Grant
1,300,000
1,300,000
Traffic Impact Fees
500,000
500,000
Other
-
-
Total Funding Sources:
1,800,000
1,800,000
Capital Expenditures:
Design
350,000
350,000
Right of Way
450,000
450,000
Construction
1,000,000
1,000,000
1,800,000
1,800,000
Total Expenditures:
DI B Intersectfoti, Traffic Sipial, & Intelligetit Tratisportatfoti Systems knipe ySiefit�r Jects
62
City of Ailbilni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan
TIP# 67
ARTERIAL STREET FUND (102)
Project Title: Traffic Signal Safety Improvements
Project No: CP1501
Project Type: Non - Capacity, Safety
Project Manager: Ryan Vondrak
STIP# AUB -52
LOS Corridor ID# N/A
Description:
Improve traffic signal phasing and timing, and improve visibility of traffic signal heads.
Progress Summary:
Federal Grant was awarded in 2014. Design phase began in 2015 and construction is scheduled for completion in 2016.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue - 5,000
- - -
- -
-
5,000
Secured Federal Grant -
412,575
412,575
Traffic Impact Fees -
-
-
REET2 27,600
27,600
Other -
-
-
Total Funding Sources: 32,600
412,575
445,175
Capital Expenditures:
Design 32,600
-
32,600
Right of Way -
-
-
Construction -
412,575
412,575
412,575
445,175
Total Expenditures: 32,600
DI B hitersectlofl, Traffic SIg7ial, & hitelllgetit Tratisportatlofl Systems knipe (4 0fit�r Jects 63
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 68
ARTERIAL STREET FUND (102), ARTERIAL PRESERVATION FUND (105)
Project Title: A Street SE & 37th Street SE Intersection Improvements STIP# AUB -53
Project No: CP1502
Project Type: Non - Capacity, Safety
Project Manager: Ryan Vondrak LOS Corridor ID# 10
Description:
Widen the intersection for a u -turn, install an interconnected
traffic signal, overlay the intersection, and upgrade curb ramps.
Progress Summary:
Federal Grant was awarded in 2014.
Future Impact on Operating Budget:
The annual maintenance cost for this project
is estimated to be $2,500.
Activity:
2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015
Estimate
2016 2017 2018
2019 2020 2021
Beyond 2021
Total Project Cost
Unrestricted Street Revenue -
55,000
- - -
- -
-
55,000
Secured Federal Grant
156,900
635,360
792,260
Traffic Impact Fees
-
-
-
Arterial Preserv. Funds (105)
-
87,240
87,240
7229600
9349500
Total Funding Sources: 211,900
Capital Expenditures:
Pre - Design
10,500
-
10,500
Design
135,000
135,000
Right of Way
66,400
-
66,400
Construction
-
722,600
722,600
7229600
9349500
Total Expenditures: 2119900
D1. B hitersectlofl, Traffic Sipial, & hitelllgetit Tratisportatlofl Systems knip e ye it �o Jects 64
City of Arrbrn°n Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 69
ARTERIAL STREET FUND (102)
Project Title: I Street NE & 22nd Street NE Roundabout Safety Improvement STIP# AUB -N /A
Project No: cpxxxx
Project Type: Capacity (Safety)
Project Manager: TBD LOS Corridor ID# 21
Description:
This project includes the design and construction of a roundabout
at the 22nd Street
NE intersection with I Street NE.
This is currently a all -way stop controlled intersection.
Progress Summary:
Preliminary Design was initiated in 2015. Final design and construction are dependant on securing full funding.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017
2018
2019
2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue -
- -
-
-
- - -
-
Unsecured Grant -
- 100,000
940,000
1,040,000
Traffic Impact Fees 50,000
50,000 50,000
235,000
385,000
Other -
- -
-
-
Total Funding Sources: 50,000
50,000 150,000
1,175,000
1,425,000
Capital Expenditures:
Design 50,000
50,000 150,000
-
250,000
Right of Way -
- -
-
-
Construction -
- -
1,175,000
1,175,000
50,000 150,000
1,175,000
1 ,425,000
Total Expenditures: 50,000
DI B hitersectlofl, Traffic SIg7ial, & hitelligetit Tratisportatlofl Systems knipe yeiefit�r Jects 65
City of Ailbilm Transportation Improvement Program
D I. B Intersection, Traffic Signal, & Intelligent Transportation Systems �� e / / 0it 3r y.ects 66
City of Arrbuni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP # 23
ARTERIAL STREET FUND (102)
Project Title: Riverwalk Drive SE Non - Motorized Improvements
Project No: cpxxxx
Project Type: Non- Motorized
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# 27
Description:
This project will construct sidewalks, street lighting, and storm improvements on Riverwalk Drive SE between Auburn Way S and Howard Road SE.
Progress Summary:
Design is anticipated to begin in 2016. Construction will be completed when funds are available.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $1,000.
Activity: 2016 YE
Budget
Forecast Project Cost
Total Project
2016
2017
2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Cost
Unrestricted Street Revenue -
-
100,000
100,000
- - - -
200,000
Unsecured Grant
-
500,000
500,000
Traffic Impact Fees
-
-
Other
-
-
-
Total Funding Sources:
100,000
600,000
700,000
Capital Expenditures:
Design
100,000
-
100,000
Right of Way
-
-
-
Construction
-
600,000
600,000
100,000
600,000
700,000
Total Expenditures:
D1.13 p Nofr Motorized & Transit Improvemeftt ProjeVs
age 78 of 130
67
City of Arfbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 24
ARTERIAL STREET FUND (102)
Project Title: Academy Drive Multi -Use Trail
Project No: cpxxxx
Project Type: Class 1 Trail (Capacity)
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will use existing Acadamy Dr right -of -way to create a multi -use trail between
the Green River Rd and Auburn Way S.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $5,000.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019
2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- -
-
42,500
42,500 -
-
85,000
Unsecured Grant
382,500
382,500
765,000
Traffic Impact Fees
-
-
-
Other
-
-
-
Total Funding Sources:
425,000
425,000
850,000
Capital Expenditures:
Design
100,000
-
100,000
Right of Way
-
-
-
Construction
325,000
425,000
750,000
425,000
425,000
850,000
Total Expenditures:
D1.13 p Norr Motorized & Transit Improvement ProjeVs
age 79 of 130
.:
City of Arfbuni Tratisportatiort Intproventertt Progrant
Six Year Transportation Improvement Plan TIP# 26
ARTERIAL STREET FUND (102)
Project Title: METRO Shuttle: Lakeland Hills Shuttle
Project No: NA
Project Type: Other
Project Manager: Joe Welsh
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
Operating costs associated with the Commuter Shuttle from the Lakeland Hills neighborhood to Auburn Station and King County Metro Transit's Route 910.
Progress Summary:
The Lakeland Hills route began in 2009, the community shuttle in 2010. Lakeland Hills Sounder Shuttle is a partnership route with KC Metro and Pierce transit currently
authorized through March 2016. Route 910 is a KC Metro Transit Now Partnership Program funded through October 2015. Funding shown below assumes partnerships
are extended into future years.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue - 240,000
240,000 245,000 245,000
250,000 250,000 250,000 -
1,720,000
Unsecured Grant -
- - -
- - -
-
REET
Other (Agencies) -
- - -
- - -
-
240,000 245,000 245,000
250,000 250,000 250,000
1,720,000
Total Funding Sources: 240,000
Capital Expenditures:
Design -
- - -
- - -
-
Right of Way -
- - -
- - -
-
Transit Service 240,000
240,000 245,000 245,000
250,000 250,000 250,000
1,720,000
240,000 245,000 245,000
250,000 250,000 250,000
1,720,000
Total Expenditures: 240,000
D1.13 p Norr Motorized & Transit Intproventertt ProjeVs
age 80 of 130
.•
City of Arfbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 30
ARTERIAL STREET FUND (102)
Project Title: Citywide Pedestrian Accessibility and Safety Program
Project No: cpxxxx
Project Type: Non- Capacity (Annual)
Project Manager: Pablo Para
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is an annual program to fund small pedestrian improvement projects at locations
throughout
the City. Projects
are prioritized
annually based on pedestrian
demands, existing deficiencies, and citizen requests.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016
2017
2018
2019
2020
2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
100,000
100,000
100,000
100,000
100,000
100,000 -
600,000
Unsecured Grant
-
-
-
-
-
-
-
REET
Traffic Impact Fees
Other
-
-
-
-
-
-
-
Total Funding Sources:
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Capital Expenditures:
Design
15,000
15,000
15,000
15,000
15,000
15,000
90,000
Right of Way
-
-
-
-
-
-
-
Construction
85,000
85,000
85,000
1 85,000
85,000
85,000
510,000
Total Expenditures:
100,000
100,000
100,000
1 100,000
100,000
100,000
6001000
D1.13 p Norr Motorized & Transit Improvement ProjeVs
age 81 of 130
70
City of Arfbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 31
ARTERIAL STREET FUND (102)
Project Title: Citywide Arterial Bicycle & Safety Improvements
Project No: cpxxxx
Project Type: Non - Capacity (Safety)
Project Manager: Various
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is a bi- annual program to fund bicycle and safety improvements on classified roadways.
Projects are prioritized annually based upon field studies. Project was
previously called "Citywide Roadway Safety Infrastructure Improvements ".
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
100,000 -
100,000
- 100,000 - -
300,000
Unsecured Grant
-
-
-
-
Traffic Impact Fees
Other
-
-
-
Total Funding Sources:
100,000
100,000
100,000
300,000
Capital Expenditures:
Design
10,000
10,000
10,000
30,000
Right of Way
-
-
-
-
Construction
90,000
90,000
90,000
270,000
100,000
100,000
100,000
300,000
Total Expenditures:
D1.13 p Norr Motorized & Transit Improvement ProjeVs
age 82 of 130
71
City of Ailbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 32
CAPITAL IMPROVEMENT FUND (328)
Project Title: Citywide Sidewalk Repairs & Improvements
Project No: cp1301
Project Type: Non - Capacity (Annual)
Project Manager: Jai Carter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
Project funds sidewalk improvements at multiple locations throughout the City. A sidewalk inventory was completed
in 2004.
Annual projects
are selected based upon
criteria such as: gap closure, safe walking routes to schools, completion of downtown pedestrian
corridor or "linkage
", connectivity to transit service, ADA requirements,
and "Save our Streets" (SOS) project locations.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017
2018
2019
2020
2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Cap. Imp. Fund Balance - 147,500
25,000 25,000
25,000
25,000
25,000
25,000
-
297,500
Unsecured Grant -
100,000 100,000
100,000
100,000
100,000
100,000
600,000
REET 2 200,000
200,000 -
-
-
-
-
400,000
Other -
- -
-
-
-
-
-
Total Funding Sources: 347,500
325,000 125,000
125,000
125,000
125,000
125,000
1,297,500
Capital Expenditures:
Design -
- -
-
-
-
-
-
Right of Way -
- -
-
-
-
-
-
Construction 347,500
325,000 125,000
125,000
125,000
125,000
125,000
1,297,500
1 325,000 125,000
125,000
1 125,000
125,000
125,000
1,297,500
Total Expenditures: 347,500
D1.13 p Norr Motorized & Transit Improvement ProjeVs
age 83 of 130
72
City of Arrbuni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 44
ARTERIAL STREET FUND (102)
Project Title: Downtown Transit Center Access Improvements
Project No: cpxxxx
Project Type: Non - Capacity, Transit
Project Manager: TBD
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This project will modify channelization and curb radii to improve turning radii for transit vehicles at the southwest corner of S Division St & 3rd St SW, and the southeast
corner of A St SW & 2nd St SW.
Progress Summary:
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to minimal.
Activity: 2016 YE
Budget
Forecast Project Cost
2016
2017
2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue -
-
50,000
-
- - -
50,000
Unsecured Grant
200,000
200,000
Traffic Impact Fees
-
-
Other
-
-
Total Funding Sources:
260,000
260,000
Capital Expenditures:
Design
30,000
30,000
Right of Way
-
-
Construction
220,000
220,000
260,000
260,000
Total Expenditures:
D1.13 p Nofr Motorized & Transit Improvemeftt ProjeVs
age 84 of 130
73
City of Arfbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 56
ARTERIAL STREET FUND (102)
Project Title: Evergreen Heights Safe Routes to School Improvements STIP# AUB -N /A
Project No: cpxxxx
Project Type: Capacity, Non - Motorized
Project Manager: TBD LOS Corridor ID# 37
Description:
The project will widen S 316th Street from 51st Avenue S to the west of the Evergreen Elementary School frontage, and 56th Avenue S between S 316th Street and S
318th Street. The proposed widening will allow the addition of bike lanes and sidewalks on both sides of the street to match the existing roadway cross - section to the east
of the school. A roundabout will be constructed at the S 316th Street /56th Avenue S intersection replacing the existing all -way stop - control and the school driveway will be
relocated to the west to align with the roundabout. The reconstruction of S 316th Street includes the vertical alignment of the existing roadway along the school frontage
which creates sight- distance problems associated with the school driveways, and at the intersection with 56th Avenue S. Other project elements include undergrounding
of aerial utilities, street lighting, and upgrades to the storm water system.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
118,500 84,500 693,000 -
896,000
Unsecured Grant
671,500 478,500 3,927,000
5,077,000
Traffic Impact Fees
- - -
-
Other
- - -
-
Total Funding Sources: - -
- - -
790,000 663,000 4,620,000 -
6,973,000
Capital Expenditures:
Design
790,000 - -
790,000
Right of Way
- 563,000 -
563,000
Construction
- - 4,620,000
4,620,000
- - -
790,000 663,000 4,620,000 -
6,973,000
Total Expenditures: - -
D1.13 Norr Motorized & Transit Improvement ProjeVtage 85 of 130 74
City of Arrbilm Transportation Improvement Program
D I . B Non -Motorized & Transit Improvement ProjeVtage 86 of 130 75
City of Arrbuni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 1
ARTERIAL STREET FUND (102)
Project Title:
A Street NW - Phase 1 (3rd St NW to 14th St NW)
Project No:
c207aO
Project Type:
Capacity
Project Manager:
Matt Larson
STIP# AUB -N /A
LOS Corridor ID# 18
Description:
Constructed a new multi -lane arterial from 3rd Street NW to 14th Street NW. This project improves mobility and
was tied to corridor development. It is consistent with the
Comprehensive Plan and completes a missing link of a north /south arterial corridor. The project length is approximately three - quarters of a mile. The City purchased
ROW from the northern property owner. If the property develops, some or a portion of those funds may be reimbursed
to the City (total cost was $251,000).
Progress Summary:
Pre - design was completed prior to 2007. Final design and environmental permitting were completed in 2011.
Construction was completed in 2012. The project is now in
the wetland maintenance monitoring period required until 2023.
Future Impact on Operating Budget:
The annual maintenance cost for this project is estimated to be $25,830.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019
2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 123,276
- - -
-
- - -
123,276
Secured Grants (Fed, State) 6,562,702 -
- - -
-
- - -
6,562,702
Traffic Impact Fees 999,953 407,900
25,000 25,000 25,000
25,000
25,000 25,000 150,000
1,707,853
Other (Developer) 383,381 -
- - -
-
- - -
383,381
25,000 25,000 25,000
25,000
25,000 25,000 150,000
8,777,212
Total Funding Sources: 8,069,312 407,900
Capital Expenditures:
Design 2,247,331 -
10,000 10,000 10,000
10,000
10,000 10,000 40,000
2,347,331
Right of Way 821,341
- - -
-
- - -
821,341
Construction 5,000,640 -
- - -
-
- -
5,000,640
Monitoring - 407,900
15,000 15,000 15,000
15,000
15,000 15,000 110,000
607,900
25,000 25,000 25,000
25,000
25,000 25,000 150,000
8,777,212
Total Expenditures: 8,069,312 407,900
Prelinfitiary Etigitieeritig and Mlscellatieoils Pro efts
D1.13 Page 87 of 130
76
City of Arrbuni Tratisportatioft Intproventeftt Progrant
Six Year Transportation Improvement Plan TIP# 13
ARTERIAL STREET FUND (102), CAPITAL IMPROVEMENT FUND (328)
Project Title: Mohawks Plastics Site Mitigation Project
Project No: cp0767
Project Type: Non - Capacity
Project Manager: Jeff Dixon
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
The project consists of the design, construction, maintenance and monitoring of approximately 2.2 -acres of wetland creation and approximately 0.4 -acres of wetland
enhancement within the Goedecke South Property owned by the Sewer Utility in order to compensate for approximately 1.6 -acre wetland loss on the Mohawk Plastics
property (Parcel # 1321049056). The project was approved under an existing agreement approved by Resolution No. 4196, June 2007.
Progress Summary:
The City received the DOE WQ Certification, WDFW HPA, and on May 7, 2009, the Army Corps of Engineers (Corps) 404 wetland permit (NWS- 2007 - 1913).
Subsequently, bid specifications and construction plans were prepared and construction began in October 2009. Construction was completed in January 2010 and the
project is currently within the 10 -year monitoring period, which involves annual maintenance, monitoring and reporting.
Future Impact on Operating Budget:
It is anticipated that annual maintenance, monitoring and reporting on the performance of the wetland mitigation project will be required for a period of 10 years, in
conformance with permit requirements. After the successful conclusion of this 10 -year monitoring period, which is anticipated to be in December 2019, ongoing
operation expenses should be minimal.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
- - -
- - - -
Fund Balance -
Unsecured Grant - -
- - -
-
-
Traffic Impact Fees 480,906 25,000
20,000 20,000 65,000
20,000
630,906
REET 2 (328) 78,283 -
- - -
-
78,283
20,000 20,000 66,000
20,000
709,189
Total Funding Sources: 669,189 26,000
Capital Expenditures:
Design - -
- - -
-
-
Right of Way - -
- - -
-
Construction 559,189 25,000
1 20,000 20,000 65,000
20,000
709,189
20,000 20,000 66,000
20,000
709,189
Total Expenditures: 669,189 26,000
Prellnfitiary Etigitieeritig and Mlscellatieoils Pro efts
D1.13 Page 88 of 130
77
City of Arfbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 27
ARTERIAL STREET FUND (102)
Project Title: A Street SE Safety Improvements Study
Project No: cp1110
Project Type: Safety (Non- Capacity)
Project Manager: James Webb
STIP# AUB -N /A
LOS Corridor ID# 10, 33
Description:
Study the A Street SE corridor between 6th Street SE and Lakeland Hills Way SE including 41st St SE from D St SE to C St SE. The study will reviewthe safety and
access needs of the traveling public and the adjacent properties.
Progress Summary:
In -house pre- design was completed to refine project scope, alignment, and identify design issues. 2015 design will complete conceptual corridor plan for future
improvements.
Future Impact on Operating Budget:
This study will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue 1,230 50,000
5,000 - -
- - - -
56,230
Unsecured Grant - -
-
-
Traffic Impact Fees
Other - -
-
-
5,000
56,230
Total Funding Sources: 1,230 50,000
Capital Expenditures:
Design 1,230 50,000
5,000
56,230
Right of Way - -
-
-
Construction - -
-
-
Total Expenditures: 1,230 50,000
5,000
56,230
Prelinfiti ry Etigitieeritig and Mlscellatieoils Pro efts
D1.13 Page 89 of 130
W.
City of Arfbuni Tratisportatiort Intproventertt Progrant
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
Project Title:
S 277th Street - Wetland Mitigation
Project No:
c41 0a0
Project Type:
Non - Capacity
Project Manager:
Matt Larson
TIP# 29
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
Wetland mitigation for the S 277th St grade separation project.
Progress Summary:
This is a 10 -year obligation, which began in 2004.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2016 YE
Budget
Forecast Project Cost
2016 2017
2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
5,000 -
-
- - - -
345,091
Unrestricted Street Revenue 290,091 50,000
Unsecured Grant - -
-
-
Traffic Impact Fees -
-
Other 3,804 -
-
3,804
6,000 -
-
- - - -
348,896
Total Funding Sources: 293,896 60,000
Capital Expenditures:
Design 37,673 -
-
37,673
Right of Way -
-
Construction 160,390 -
-
160,390
Monitoring 95,832 50,000
5,000
150,832
6,000 -
-
- - - -
348,896
Total Expenditures: 293,896 60,000
Prellnfitia "y Etigitieeritig Cn1Ll MlscellCnleoils Pro efts
D1.13 Page 90 of 130
79
City of Arfbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 46
ARTERIAL STREET FUND (102)
Project Title: 104th Avenue SE & Green River Road Study STIP# AUB -N /A
Project No: cpxxxx
Project Type: Non - Capacity, Safety
Project Manager: James Webb LOS Corridor ID# 24
Description:
This project funds a pre- design study to determine the right -of -way, environmental and construction requirements for intersection safety improvements. The project is
anticipated to include sight- distance improvements, constructing turn - lanes, channelization, environmental mitigation, signage and clear zone improvements.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Unrestricted Street Revenue -
5,000 - -
- - - -
5,000
Unsecured Grant
-
-
Traffic Impact Fees
Other
-
-
Total Funding Sources:
5,000
5,000
Capital Expenditures:
Design
5,000
5,000
Right of Way
-
-
Construction
-
Total Expenditures:
5,000
5,000
D1.13 Prelinfiti ry Etigitieeritig and Mlscellatieoils Proyectts 80
91 Of 130
City of Ailbuni Tratisportatiort Intproventertt Progrant
Six Year Transportation Improvement Plan
ARTERIAL STREET FUND (102)
Project Title:
Kersey Way SE Corridor Study
Project No:
cpxxxx
Project Type:
Capacity
Project Manager:
TBD
TIP# 54
STIP# AUB -N /A
LOS Corridor ID# 36
Description:
This project will study improvements to the Kersey Way SE corridor from the White River Bridge to the southern city limits. The study will develop the scope and costs for
horizontal /vertical geometric roadway improvements, roadside hazard mitigation, street lighting and non - motorized trail construction. The project length is approximately
two miles.
Progress Summary:
Design study will begin in 2016 following the completion of the update to the Comprehensive Transportation Plan.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Unrestricted Street Revenue -
- - -
- - - -
Grants (Fed, State, Local)
-
-
Traffic Mitigation Fees
50,000
50,000
Other
-
-
Total Funding Sources:
50,000
50,000
Capital Expenditures:
Design
50,000
50,000
Right of Way
-
-
Construction
-
-
Total Expenditures:
50,000
50,000
Prelinfitiary Etigitieeritig Cn1Ll MlscellCnleoils Pro efts
D1.13 Page 92 of 130
RE
City of Arrbilm Transportation Improvement Program
D I. B Preliminary Engineering card Miscellaneous Pro�age 82
93 of 130
City of Ailbuni Tratisportatiort Intproventertt Progrant
Six Year Transportation Improvement Plan
TIP# 7
ARTERIAL PRESERVATION FUND (105)
Project Title:
15th Street SW Reconstruction
Project No:
cpxxxx
Project Type:
Preservation
Project Manager:
TBD
STIP# AUB -N /A
LOS Corridor ID# 12
Description:
This project will evaluate improvements to the Union Pacific at grade rail crossings as well as the vertical sight distance to the Interurban Trail crossing to the west of the
tracks. This project was originally scoped to include pavement preservation. The pavement preservation component
could still be combined with this project, but is also
eligible for the Arterial Pavement Preservation Program. A planning level cost estimate is provided.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Cost
2016 2017 2018
2019
2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Arterial Preservation Fund -
- - 75,000
500,000
- - -
575,000
Unsecured Grant
300,000
2,500,000
2,800,000
Other
-
-
-
Total Funding Sources:
375,000
3,000,000
3,375,000
Capital Expenditures:
Design
375,000
-
375,000
Right of Way
-
-
-
Construction
-
3,000,000
3,000,000
375,000
3,000,000
3,375,000
Total Expenditures:
Preservation Projects 83
D1.13 Page 94 of 130
City of Ailbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan
TIP# 22
ARTERIAL PRESERVATION FUND (105)
Project Title:
Lake Tapps Parkway Preservation (City Limit to Lakeland Hills Way)
Project No:
Cpxxxx
Project Type:
Preservation
Project Manager:
Jai Carter
STIP# AUB -51
LOS Corridor ID# 17
Description: The Lake Tapps Parkway Preservation project will complete a patch and overlay of pavement between the Auburn /Sumner City limit and Lakeland Hills Way
including all required ADA improvements to curb ramps, sidewalks, and
pedestrian signals.
Progress Summary:
Federal grant was awarded in 2014.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Costs
Funding Sources: Prior to 2015 Estimate
2016
2017 2018
2019 2020 2021 Beyond 2021
Total Project Cost
Fund Balance -
26,480
176,370 -
- - - -
202,850
Secured Grant
97,900
652,100
750,000
Other
-
-
-
Total Funding Sources:
124,380
828,470
952,850
Capital Expenditures:
Design
124,380
-
124,380
Right of Way
-
-
-
Construction
-
828,470
828,470
124,380
828,470
952,850
Total Expenditures:
Preservation Projects 84
D1.13 Page 95 of 130
City of Ailbuni Tratisportatiort Intproventertt Progrant
Six Year Transportation Improvement Plan
TIP# 28
ARTERIAL PRESERVATION FUND (105)
Project Title: Annual Bridge Structure Preservation
Project No: Various
Project Type: Non - Capacity, Preservation
Project Manager: Scott Nutter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is an annual program to fund improvements to bridge structues identified by the
city's annual bridge inspection program.
Progress Summary:
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity:
2016 YE
Budget
Forecast Project Cost
2016
2017
2018
2019
2020
2021
Beyond 2021
Funding Sources: Prior to 2016 Estimate
Total Project Cost
Arterial Preservation Fund -
50,000
50,000
50,000
50,000
50,000
50,000
50,000
-
350,000
Grants (Fed, State, Local)
-
-
-
-
-
-
-
-
Other
-
-
-
-
-
-
-
-
Total Funding Sources: -
60,000
60,000
60,000
60,000
60,000
60,000
60,000
-
360,000
Capital Expenditures:
Design
5,000
5,000
5,000
5,000
5,000
5,000
5,000
35,000
Right of Way
-
-
-
-
-
-
-
-
Construction
45,000
1 45,000
45,000
45,000
45,000
45,000
45,000
315,000
60,000
60,000
60,000
60,000
60,000
60,000
-
360,000
Total Expenditures: - 60,000
Preservation Projects 85
D1.13 Page 96 of 130
City of Arrbuni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 35
ARTERIAL PRESERVATION FUND (105)
Project Title: Arterial Street Preservation Program
Project No: varies annually
Project Type: Non - Capacity, Preservation
Project Manager: Jai Carter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description: Implement regular pavement maintenance and /or rehabilitation of various classified streets citywide. These projects may include a combination of overlays,
rebuilds, and spot repairs. This program is funded through a 1 % utility tax that was adopted by City Council during 2008.
Progress Summary:
The 2015 construction cycle included the completion of
the 2014 preservation project and participation in two utility projects in addition to the annual 2015 project.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Costs
2016 2017 2018
2019 2020 2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Arterial Preservation Fund - 4,575,293
600,000 700,000 1,700,000
1,800,000 1,800,000 1,800,000
-
12,975,293
Secured Federal Grant -
- - -
- - -
-
Other (ICON) 190,000
- - -
- - -
190,000
600,000 700,000 1,700,000
1,800,000 1,800,000 1,800,000
13,165,293
Total Funding Sources: 4,765,293
Capital Expenditures:
Design 100,000
50,000 50,000 50,000
50,000 50,000 20,000
370,000
Right of Way -
- -
-
Construction 4,665,293
550,000 650,000 1,650,000
1,750,000 1,750,000 1,780,000
12,795,293
600,000 700,000 1,700,000
1,800,000 1,800,000 1,800,000
13,165,293
Total Expenditures: 4,765,293
Preservatiofr Projects 86
D1.13 Page 97 of 130
City of Ailbuni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 36
ARTERIAL PRESERVATION FUND FUND (105)
Project Title: Annual Arterial Crackseal Program
Project No: cpxxxx
Project Type: Non - Capacity, Preservation
Project Manager: Jai Carter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
Implement regular maintenance of various classified streets
by sealing
newly formed
cracks. Sealing the cracks will prolong the life of the
pavement by stopping water
from draining into the sub -base of the road.
Progress Summary:
Future Impact on Operating Budget:
There is no impact to the street maintenance
budget.
Activity:
2015 YE
Budget
Forecast Project Costs
2016
2017
2018
2019
2020
2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Arterial Preservation Fund -
100,000
100,000
100,000
100,000
100,000
100,000
100,000
-
700,000
Unsecured Grant
-
-
-
-
-
-
-
-
Other
-
-
-
-
-
-
-
-
Total Funding Sources:
100,000
100,000
100,000
100,000
100,000
100,000
100,000
700,000
Capital Expenditures:
Design
10,000
10,000
10,000
10,000
10,000
10,000
10,000
70,000
Right of Way
-
-
-
-
-
-
-
-
Construction
90,000
90,000
90,000
90,000
90,000
90,000
90,000
630,000
100,000
100,000
100,000
100,000
100,000
100,000
700,000
Total Expenditures: 100,000
Preservatiofr Projects 87
D1.13 Page 98 of 130
City of Arrbuni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 37
LOCAL STREET PRESERVATION FUND (103)
Project Title: Local Street Improvement Program
Project No: Various
Project Type: Non - Capacity, Preservation
Project Manager: Jai Carter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
The program preserves local (unclassified) streets. The work includes crack sealing, asphalt patching,
pre - leveling, asphalt overlays and roadway reconstruction.
Beginning in 2013 sales tax on construction was dedicated by council to fund this program.
Progress Summary:
This program has successfully completed overlays, chip seals and complete reconstructions since
2005. The program will focus on completing reconstruction needs in
addition to regular maintenance treatments.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Cost
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019
2020 2021 Beyond 2021
Total Project
Cost
Local Street Preserv. Fund - 3,218,665
1,600,000 1,600,000 1,600,000
1,600,000
1,600,000 1,600,000 -
12,818,665
Unsecured Grant -
- - -
-
- -
-
Other -
- - -
-
- -
-
Total Funding Sources: 3,218,665
1,600,000 1,600,000 1,600,000
1,600,000
1,600,000 1,600,000
12,818,665
Capital Expenditures:
Design 400,000
300,000 300,000 300,000
300,000
300,000 300,000
2,200,000
Right of Way -
- - -
-
- -
-
Construction 2,818,665
1,300,000 1,300,000 1,300,000
1 1,300,000
1,300,000 1,300,000
10,618,665
1,600,000 1,600,000 1,600,000
1,600,000
1,600,000 1,600,000
12,818,665
Total Expenditures: 3,218,665
Preservatiofr Projects gg
D1.13 Page 99 of 130
City of Ailbuni Tratisportatiofr Improvemefrt Program
Six Year Transportation Improvement Plan TIP# 57
ARTERIAL PRESERVATION FUND (105)
Project Title: Bridge Deck Preservation
Project No: cpxxxx
Project Type: Non - Capacity, Preservation
Project Manager: Scott Nutter
STIP# AUB -N /A
LOS Corridor ID# N/A
Description:
This is an annual program to fund the rehabilitation of bridge decks as
identified by the City's annual bridge inspection program.
Progress Summary:
R St SE Stuck River Bridge deck repairs were completed in 2014.
Future Impact on Operating Budget:
This project will have no impact on the operating budget for street maintenance.
Activity: 2015 YE
Budget
Forecast Project Costs
2016
2017
2018
2019
2020
2021
Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Arterial Preservation Fund -
100,000
100,000
100,000
100,000
100,000
100,000
-
600,000
Utility Tax
-
-
-
-
-
-
-
Bond proceeds
-
-
-
-
-
-
-
100,000
100,000
100,000
100,000
100,000
100,000
600,000
Total Funding Sources:
Capital Expenditures:
Design
-
-
-
-
-
-
-
Right of Way
-
-
-
-
-
-
-
Construction
100,000
100,000
100,0001
100,000
100,000
100,000
600,000
100,000
100,000
100,000
1 100,000
100,000
100,000
600,000
Total Expenditures:
Preservatiofr Projects gg
D1.13 Page 100 of 130
City of Ailbuni Tratisportatiorr Improvement Program
Six Year Transportation Improvement Plan TIP# 70
ARTERIAL PRESERVATION FUND (105)
Project Title: Auburn Way N Preservation (22nd St NE to 45th St NE) STIP# AUB -48
Project No: cpxxxx
Project Type: Non - Capacity, Preservation
Project Manager: Joel Chalmers LOS Corridor ID# 1
Description: The project proposes to grind and overlay Auburn Way N from the 22nd Street NE to 45th Street NE.
The project will restore 7.3 lane miles of pavement,
upgrade 26 curb ramps to meet current ADA standard, as we as remove unused driveway openings as an upgrade
to non ADA compliant pedestrian facilities. The project
funds the design, coordination, permitting, and construction of the pavement preservation project.
Progress Summary:
Federal Grant funding was secured in 2014.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Costs
Funding Sources: Prior to 2015 Estimate
2016 2017 2018
2019
2020 2021 Beyond 2021
Total Project Cost
Arterial Preservation Fund - 80,000
887,500 - -
-
- - -
967,500
Secured Federal Grant 80,000
887,500
967,500
Other -
-
-
Total Funding Sources: 160,000
1,775,000
1,935,000
Capital Expenditures:
Design 160,000
-
160,000
Right of Way -
-
-
Construction -
1,775,000
1,775,000
1,775,000
1,935,000
Total Expenditures: 160,000
Preservation Projects 90
D1.13 Page 101 of 130
City of Ailbuni Tratisportatiort Intproventertt Progrant
Six Year Transportation Improvement Plan TIP# 71
ARTERIAL PRESERVATION FUND (105)
Project Title: 15th Street NE /NW Preservation (SR -167 to 8th St NE)
Project No: cpxxxx
Project Type: Non - Capacity, Preservation
Project Manager: Jai Carter
STIP# AUB -47
LOS Corridor ID# 9
Description: The project proposes to grind and overlay 15th Street NW /NE from the SR167 to Auburn Way N; and grind and overlay Harvey Road NE from Auburn Way N
to 8th Street NE. The project will restore 7.57 lane miles
of pavement, upgrade 30 curb ramps to meet current ADA standard, as well as remove unused driveway openings
as an upgrade to non ADA compliant pedestrian facilities.
The project funds the design, coordination, permitting, and construction of the pavement preservation project.
Progress Summary:
Federal Grant Funding was securred in 2014.
Future Impact on Operating Budget:
There is no impact to the street maintenance budget.
Activity: 2015 YE
Budget
Forecast Project Costs
2016 2017 2018
2019 2020 2021 Beyond 2021
Funding Sources: Prior to 2015 Estimate
Total Project Cost
Arterial Preservation Fund -
67,500 750,000 -
- - - -
817,500
Secured Federal Grant
67,500 750,000
817,500
Other
- -
-
Total Funding Sources:
135,000 1,500,000
1,635,000
Capital Expenditures:
Design
135,000 -
135,000
Right of Way
- -
-
Construction
- 1,500,000
1,500,000
135,000 1,500,000
1,635,000
Total Expenditures:
Preservation Projects 91
D1.13 Page 102 of 130
City of Arrbilm Transportation Improvement Program
Preservation Projects 92
DI.B Page 103 of 130
City of Auburn
2016-2021
Transportation Improvement Program Summary
r. -
�zo�.o �� i�s�Hw.i>n,s�, �,�s��w�o,.m s��w s.a�e a an ziz zs ooa zs oaa zs.oao zs oao n o0o zs o00 +so 00o a m z�z w.n.�e xo�uo,i�
co1118 p ^°eur�wnysvice�sin,nenp�ovemema�UOgwaoast 5•cuna 1.134,t63 5.000 - - - - � � 1,139.183 Roeeway
S'C lo f I�$I SC
capga0 J Fu�urnWayCOrnJOr�C1051NE�oQ�319E) UnucunE 18251 - - - 618.]0� 3,000,000 - - 3.88895/ RoWway
N15a0 a I S�rtet Me Corriaa <St�31 NE m 529)1�91 UnxcunC 3992 fi]fi0 000 6]63892 Foatlwa
c301A 5 M Sh�et UnO� au )ro St SE to M�St 9E Secuntl Ii 348 280 190 854 130 080 R9 500 12B,920 128,350 12B 000 2]l2 000 22 359 12] lioeaw�
c14]a0 6 53Tri�Sime1�PWN1oLSlreetNE) Secuntl 14H.301 6,B81.B00 - - - - � � B,Y93,ip1 RoaEwey
cpma ] 15N9�SWPecanavucllon UnxcuroE � - - 3]5,000 3.000.000 - � - J,375.000 Pnurvnion
cpxaax 8 ASlmeINW.P�am2�WMalnS�toJr04lNN) UnwcureE 150.00D - - - � 3000000 - � 3,150.000 Ro�Cwey
�O� g AubumWaySCOrtitlorlmprw�m�Ma�H�mlocMro UnpcuraU - 200,000 - - - � - - 200,000 RaaEwry
Adtlemy)
LPln6 ID F Sveet SE�dtn Si SE m AWS� UnucureJ a0].620 150,000 1.800,000 - - - - - 2A5].820 Rwawey
cpaux 11 MSVea1NE�EMaIn511oLL�SINE) Unucwe0 - � - 100.000 2]5.000 1.150.000 - - 1.525.W0 NoeEwry
cpvax 12 GraJe-SeOnra�etl Cmssing of BNSF H�IIyrtE UneecuroJ � � - - ' - 1,125,000 91,000,000 J2.125.000 RoaJwry
CPol6] i] MonawMPmcnccSimMingaianvrolKl NIA 58<.189 20,000 20.000 65.000 20.000 - - � 109.189 WeMaMMOnllonnp
cpzuz 1< M Svea�SbtYl�S�net SE inMlc Slgnai UnucunE � - - - 625.000 - - � 825.000 Inmiwcvm,SIqm18
ITS
cpuan 15 MhStmIHEWldnlnp�PIMe31NElaNStNE� UnwcureC - � - J50,000 1.000.0�0 - - - 1p50,000 RoaEwry
cpmx 16 49N5[metNE�AUpumW�yNO�nm19lNE) Onwcuretl 850.000 2.500.000 3.350,000 RwOway
CP0611 1) HarveyPtlNHe�hNElmenecUOnlmprmammis W� i,BtI.810 85.389 85200 84.800 84.400 84400 84.200 5]3AW 1.801,)93 �nuivclim,Slpnald
ITS
cpvua 1fi MSISE8lH�5t5E1Mersecllonlm0��em�Ma Onwcun0 - 50.000 - - <00.000 - . , q�000 InbrwcYlm.Slqnel8
RS
cpwvr. ie AuOUmWayNlirtSlmtNE5lgnallmprawmems Onxcurs0 - 50,000 - 550.000 - - - - fi00.000 �°�°°°�O°'s�e°V8
ITS
cpuu 34 RSLSE821n9t9E1MenectlmlmprmamenU Unwwntl - ]5.000 - - 800.0�0 - - - 815.W� Inlenenlan,Signal8
ITS
CV1COfi 3i MalnSVeat$ignelVpBnEea 9�cun0 <65,000 5,000 - - - - � � a�0.000 Imm�eaiw.5lgnalb
i1S
p� �, LBFBTeppaPa/kwayP�eune�lon�CllyLlmttlo UnwamE � 12a.980 B28J]0 - - � - - 952950 Preserva�lon
LaMebnJ NIIIC Wa
C na 3J alvBrxalkOmBNOrvMmanmElm rw meMi UnMCW�O tU0000 fi00000 100000 NomMIXOnaa
cpwaan 3d acaeemy�nve Mwn Use Tnll Unucurotl - - - - <25.000 C25.000 - - 850.000 Non-MaonnC
epxx�� 45 69t�Vlace 5 Feallgnment tLA � - - - � 825,000 - - 825,000 Roetlwq
NA ]6 METftOSM1UryIe:LahemntlHIII55nunle Nlp 240,000 240.000 245.000 245.000 250000 250.000 250,000 - 1.R0.00� Tunel[
CP1110 P ♦ShcelSE Salety Improvemente Slutly NIA 51,230 5,000 56,430 9WEy
cp1008 3B Annual Bn09e Simcture Prmervtllon NI4 so.aaa 50,000 50,000 50.000 50.000 50,000 50,000 - 350.000 Preservnlon
catoa0 �s 9 anm Sirem�wetlena Mingenon Nln 743,895 5,000 � - - - 9<8.895 w�uane Monuonnp
Vd/IOUS l0 CllywitlePOtlesVlenA[[enslblll�yenCSeb�yP/Ogrem NIA - 100,000 100.000 iao,aoo 100,000 100.000 100,000 � 60�000 NomMalonzetl
Vatlaus ]1 LIrywIEe Atlarlel Blrycle 65ebty Im0 NIA - 140,000 � 100,000 - 100,000 - - 900,000 Non-MMOrIaE
Vatloua ]R Cllywltle Sltlewelk Fapaln antl Improv�menb NIA 941,500 925.000 125.000 125,000 125.000 125,000 125,000 - 1,29Z500 NomMato�ImC
cpvnw lJ Ne18h�orM1OOtlTmXICCeImingProprem NIR 100,00� 100,000 100,000 100,000 100.000 100.000 100,000 - ]00,000 Roatlway
Vanous aa TreMICSIgnollmOravammn Nln i]5,000 115.000 115.000 195p00 1]5p00 1]5.000 1)5,000 � 1.225.ODD mtenecuon,Slgnal8
li9
Varlauc JS ArtrtleStroetPmwnet�onProgrom NIA 4,]85,299 600.000 'l00.000 1,]00,000 1,800,000 1,800.000 1,800,000 - 13,iB5293 Pmnerva�lon
Varlous )6 AM1erlal Slreet CracM Senl NIA 100,000 1UO,OOU 10U.OD0 100.000 100.000 100.000 100,000 - ]Oq000 Preservallon
Vatlous J> LaalSVeablmprwamemFragnm NIR 7218,885 1,800,000 1,G00,000 1,600,000 1,600,000 1,600,000 1,800,000 - 12,818,Bfi5 Pnserv�lmn
CPOB30 ]8 C St SW 6151M1 St SW Intersac�lon Improvemonb Unqc�retl � - 150000 - 8]5,000 - - - 1,015,000 �^�°�tllon.SlpmlB
IT$
cpounr 39 13CtM1 Ave SE 8 SE]101M1 5l Inlerseclion Imp. Uneecuretl - 350,000 - - 1.500,000 - � - 1,850,000 ^ ne[ on. pn+
cpxxxx a0 1241M1AVaSECOr.itlOrlinprovemen[s�Pnaaex Unwcuretl - - - 900,000 1.100,000 2,500,000 � - 4,000.000 Roetlwey
cpvux 01 R Street 9ypess Ilnwc�ntl � � - - � � 500,000 5,]00,000 B.I�0,000 RoeEwey
cpuu at SE]3%�51 CoMGOr Impmvemen�� Unmcuretl � 100.000 - 600,OOfl 662,500 3.81.600 � � J,60A,100 Roetlwey
LPtY18 <J RubumWny3�SP�1W�COrtlGarSVNtylmprwamcnta 9�[oretl SJ0,885 2.JJ9,685 - - - - - � 2.892.550 Roetlwoy
cpw. aa Do.vmowniran�l�C�mn�cue�lmprwemenb Unwcuro0 - - 250,000 - - - - - 150.00� inna�t
cpuuz d5 ���N nm 9E e SE 36�tn St brteneeiw S�My Unwcun! � � 100.000 800,00� - - - � f00,000 �^���°ttlun,Slpml E
Im rovammMS Ii9
CPt02t O6 10dt�qve3E8CrwnFivarFOBtlS1u0y NIA - 5,000 - - - - - ' $,000 SLUEy
cpvax 4] TraNlcMamgamemCemerlmpronmamc Wn 125,000 25,000 - - - - - - 150.000 �"1O00aO"'glprul8
ITS
�p� � A St SE an0 61�St SE Sekry an0 Accena H�q . 50.000 - - � - - - 50,000 �^�'�'°cnan.9pntl 6
Im mv ments �i5
�Oxxxn d8 WealVelleyHwylmprwemeMaI�5N31NWbW Unucuv0 - � - 100,000 600.000 7.000,000 - - 3,I00.000 RwUway
Maln 51
cpvua 50 RSOynamlcMessapeSlB^s u�..���ea - isa.000 150.000 150.000 154�00 1W,000 . . ��QQp �meroectlon.Slgmld
IT9
cpuu St LaMeTappsPeMweylT3EapenWOn Unwcura0 - 105.000 900,000 - - - � - 1.0p5,000 �Man�plm,91B�6
ITS
cP� � •S�SE 6 LnblonC HIIIa WaY SE Irrterucllon Sah1Y 6 UnWCwetl - P5.000 - - - - - - T5.000 Inbneplm.SIB�b
c. im ro m.ms iTs
LP1H6 5] PWSeM1EhSVUt9E�nUn�ctbnimpmvemeMa Unwcurotl 50,000 1pp.000 ]W.000 - � . . _ y�d� Imeneaion.5�gnei8
IT9
cpxxxz Ss Narsey Way SE Cwrma Swtly 1lln - 50.000 - - - - - - 50.000 SwOy
CP1N5 55 W Maln Strtet Improvem�Ma UnacveE 950,538 7A9i.400 - - - - � - 0 444,938 RaaOwey
cpxua 56 Erergmen Heignu Sale Routes to ScM1aol UnwcmeE � � � � 190.000 Sfi3.000 0,fi20.000 - 5,9]3,000 NomMdorlmtl
imo�ornmems
cpuxa 5) anatlai BtlEge Decx Reb�bmutlon IllR - 100.000 100.000 100.000 100.000 100.000 10�.000 - 800,000 Pm»rvtllon
cpttt9 SB AY/SCarnOwlmp�Flr5�5EtoXemlocF5�5E� 9acareE 3466]3d 5.000 - - - � - � 3.411.174 FoMway
p�Q�� � Aubu/nAVeNE83�CSlNEGedezttlanBP[[nns UnMCUnE 8,1�8 - 50,000 300.000 � � - - 358,778 ��ry�������t
im ro m.mc i*9
c0*�+a 60 MStree�SELOrtlew�Bt�S[SEtoAWS) Ilnucuntl � � - - 1,925,000 4,]50,000 - - 6.6]5.000 Foetlwry
cpurx 61 nw90ypass Unx[urotl - - - - - � 6,000,000 Sa,650,000 BO,dW,000 Nowwry
cpuax 63 AWSSVeetecapelmprwaments�5ft48toMSlSE) Uneecuma - - - - 195�.000 LB00.000 - � 6,150.000 XoaOway
cpvua fi] ]9iM1 5t SEIR St SE Inbnetllon Imprwem�Ma Unu[umU - - � - 1.900,000 - - � 1,800,000 LIbMNM.SIQMI S
ITS
cpaexx 6J LeeHIIIRCSegmamllftStNEroW51nP19E) 1lnucureE 480.�00 100.000 � - 2.45�.040 100D0.000 - � 13.030.000 Roaeway
Wxtez 65 LeaHIIIRJ$egmeM2�105��P19EmNhM1Rr�9E) Unucund � - - - - 3.500.000 8.500.000 - 12,000,000 NwCwry
cpwx fifi Lee HIII RU Sagment]pill�Ave SE la 1341�Ava SE) Onvecuratl - - � - 1.000.040 3,000.0�� - - 4.000.000 RoeCway
CPtWt 9] TroMIC5lgnal5ebrylmprov�menls S�curetl 32,800 412,95 - - � - - - 5d5.1]5 Imrtwcllon,91pntl8
IT9
CP150] 68 Im'r5[�iSEanORSirontSETraMICSIB�alSably Unsacure0 211,900 12I,800 - - - - - - 9J4.500 Inlere�c0an.91pneIB
ITS
�p���y gg InirealNEantl32nUSIreetNEROUntlebaitSehty pnueurW W,000 50,000 150,000 1,1�5,000 - - - - ip25,000 �^�°°eellon.9lgndA
Im rovBmen� IT9
CP150] p0 A�bum Way N Prcurvellon(4YnC 9VGG�NE�o 05�� pnucure0 180.000 1,>15,000 - - - - - � 1,935.000 Pneervallon
SUee1NE
�P� �� t5m5[me1NEINWPreservmlon�5Rn6]loNEe[M1 Un00CUretl - 135,000 1,`A0,000 - - - - - 1,83$,000 Prawrvallon
9Vee1
p^rr^ �2 WvalleyHwylmprovemonu�SR-t91o151M13tmet pnzecure0 � - 100,000 500,000 2,500.000 - - - 3,140.000 RoeEwey
9] 9uwertRaetl L�FeTe sGerkw� NIR 100004 100000 Rmtlwe
Total 349C9]O6 1145d45] 10183]50 10099300 344'IOSYO 49182350 35I83200 94Y05400 R93]BJE56
Appendix A
DI.B Page 104 of 130
City ofAuburn 2016 - 2021 Transportation Improvement Program (TIP) AU�BURN
\V1011�GTON
��� �
� , �
��
_�.,�
,��
_ ,�,, �
; ,,.
o �:
!'TH\I�W ' Il'lll.\fN�
' i �II
� f _
�� �
G
3 p
I¢ � 1
z p ^
r � qq!! � �.
J a �`a� �� ,, f�'1vAi ST w
i (i�) /''�
� F �O V c
s =
� �� � �l�i
J I�IwW'r�h' I .. W ��yRw�9uurlf;r
i
� u:li��vwR+l:� . . hty+� �/1 w
W4WitlY� � � �' 1�r_ � ff
/ L� � � �i ���
_ ,�� "� '�y ! �` �� ��.�,,,,,�.M.�,t��w.�,� 39 _ --
�iu , ' xn�'�✓ �
�')1 . � i = .. ��r �/�
j k �t) IR
s. � '�—_ � '�j
iJ �1 I S
.,�� o p �,�,�,�
�A �
1a��3 I11 al s
��.,,s�_Er��H.�,� ` .� q, .
a�'�. � ,18 � 1 �
ix �
�'7�ti ' � �� q��lU
�] j �` � �� �l�
,iu si.x� �� 1,�
��.,i.an,ier�r,n,n�.>v ��{
� ���) �3
1}�
�.�
z F �'�" '-�
. ,.��,,,�,� �� �,�� �
� �s �,�
�s,.
�,s ,t°
,��� ��4,.�, r
���� .�
_ 4�
� �w�,;
II ,� ;, �
��,,
<
9�J
v
� ' 1�) �l).�(�, � � . , . .
.. � � .V41V1/:.1N:1'tllh{�FI
Z I
i- llil)\'1' W tµU�.til� ��
y U �
tn
b
I��
sAl.�l 1' � O F�I�IN' � .i. .. � I
�� 3
O <
� I
_ ,��w � 1.
� � s...,t ���..,,�
a� �
In[ersection and ITS Improvements Prescrvation � City ofAuburn � . . .
��/
Non-Mororized/Transit Improvements Roadway Iinprovemen[s Parks ��� � �f�
� ,i��... �. „� �.��_� . ��. , ,,.
Prelim Eng and Misc Improvements Water Fextures ; '"'; , �;.,,;' �.'.'� �
DI.B Page 105 of 130
Appendix B
I
'Alu,BURN
VVA,S p � I N G "i'(
AGENDA BILL APPROVAL FORM
Background Summary:
Overview briefing of the DRAFT 10 -Year Economic Development Strategic Plan
Request for Proposals. Funding was approved as part of the City's 2015/2016 budget
years.
Reviewed by Council Committees:
Councilmember: Staff: Lein/Tate
Meeting Date: May 11, 2015 Item Number: DI.0
DI.0 AUBURN * MORE THAN YOU IMAGINED Page 106 of 130
C111TY, 00F
JWBURN
WASHINGTON
REQUEST FOR PROPOSAL (RFP 2015 -1001)
Ten (10) Year
Economic Development Strategic Plan
City of Auburn
Departments of Administration - Economic Development Division
9
Community Development & Public Works
25 West Main St
Auburn, WA 98001
253.804.3101
www.auburnwa.gov
Issue Date: May 20th, 2015
Deadline for Submission: June 22nd, 5:00 PM
DI.0 Page 107 of 130
TABLE OF CONTENTS
TABLEOF CONTENTS ............................................................................................. ............................... 2
SUMMARY OF REQUEST FOR PROPOSAL (RFP) 2015 -1001
GENERAL DESCRIPTION OF PROJECT ............................................................... ..............................4
BACKGROUND............................................................................................................ ..............................4
CONTACTPERSON .................................................................................................. .............................11
PROPOSED PROJECT SCHEDULE ...................................................................... .............................11
DEADLINE AND DELIVERY ..................................................................................... .............................11
CONTRACTAMOUNT ............................................................................................... .............................12
MINIMUM REQUIREMENTS .................................................................................... .............................12
SCOPEOF SERVICES .............................................................................................. .............................13
REVIEWPROCESS ................................................................................................... .............................19
WORKSCHEDULE .................................................................................................... .............................19
RFP PROPOSAL SUBMITTAL REQUIREMENTS ................................................ .............................19
RESPONSIBILITIES, DEFENSE, INDEMNIFICATION, HOLD HARMLESS AND INSURANCE
REQUIREMENTS....................................................................................................... .............................21
EQUAL OPPORTUNITY COMPLIANCE ................................................................. .............................24
Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Strategic Plan e
DI.0 Page 108 of 130
SUMMARY OF REQUEST FOR PROPOSAL (RFP) 2015 -1001
The City of Auburn, Washington is soliciting proposals in order to identify qualified
individuals, firms or teams of firms to act as a consult to the City for the preparation of a
Ten (10) year Economic Development Strategic Plan for the City of Auburn. The
qualified individual, firm or team of firms will have demonstrated experience, knowledge
and qualifications in the preparation of a comprehensive and long -term economic
development strategic plan for the entire City of Auburn. The selected consultant will be
one that has demonstrated experience in preparation of city -wide economic
development strategic plans. The purpose of this Request for Proposal (RFP) is to
solicit responses from individuals, firms, or teams of firms that desire to be considered
for this project.
Sealed Proposals will be received at the City of Auburn City Hall, 25 West Main Street,
Auburn, WA 98001 until 22nd, June, 2015, 5:00 PM PST. Proposals shall be delivered
and addressed to, City of Auburn, Washington, Attn: City's Clerk's Office, 25 West Main
Street, Auburn, WA 98001 and shall be labeled "SEALED PROPOSAL FOR CITY OF
AUBURN TEN (10) YEAR ECONOMIC DEVELOPMENT STRATEGIC PLAN - RFP #
2015 - 1001 ". No information submitted by facsimile or electronic mail will be accepted
unless otherwise requested by the City during the proposal review process. Proposals
received after 5:00 PM on June 22nd, 2015 will not be accepted with no exceptions.
Any Proposer who wishes his /her proposal to be considered is responsible for making
certain that his proposal is received in the City by the proper time. No oral, telegraphic,
electronic, facsimile, or telephonic Proposals or modifications will be considered unless
specified. Proposals received after the scheduled Proposal Submittal Deadline will be
returned unopened. It is the responsibility of the Proposer to see that any proposal
submitted shall have sufficient time to be received by the City before the Proposal
Submittal Deadline. Late Proposals will be returned to the Proposer unopened.
Please note that any and all costs borne by the Proposer for the preparation of
any and all materials to be submitted in response to this Request for Proposal are
the sole responsibility of the Proposer. The City of Auburn shall not be
responsible for nor compensate in any manner for these costs.
Proposers must submit one (1) identified original copy, ten (10) copies of the proposal
and one (1) electronic copy of the proposal including any attachments. The proposal
shall be accompanied by a cover letter signed by a representative who is authorized to
contractually bind the Proposer.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWan,
ic Ph of 130
[ ] MANDATORY PRE - PROPOSAL CONFERENCE
A mandatory pre - proposal conference is scheduled for May 26th at 1:00 PM, at City of
Auburn City Hall 25 West Main St, Auburn, WA 98001.. All Proposers planning to
submit a proposal are required to attend this meeting. Proposers should allow sufficient
time to insure arrival prior to the indicated time. Proposals from those who have failed to
attend the mandatory pre -bid conference will not be opened
[ ] VOLUNTARY PRE - PROPOSAL CONFERENCE
A voluntary pre - proposal conference is scheduled for June 17th at 1:00 PM, at the City
of Auburn City Hall 25 West Main St, Auburn, WA 98001. Attendance at the pre -
proposal conference is encouraged. This information session presents an opportunity
for the Proposers to clarify any concerns regarding the proposal requirements and visit
the site location. Although the pre - proposal conference is optional, no modification or
any changes will be allowed because of the failure of the Proposer to have visited the
site or attend the conference or carefully review all available information.
For additional information, contact Douglas Lein, Manager, Economic Development
Division, 253 804 -3101, dlein @auburnwa.gov. Please note that any inquiries for
additional information or clarification will be provided to all other interested parties via
posting on the City's web site page for Requests for Proposals.
GENERAL DESCRIPTION OF PROJECT
The City of Auburn, Washington is issuing this Request for Proposals (RFP) to identify
qualified individuals, firms or team of firms for the preparation of a Ten (10) Year
Economic Development Strategic Plan for the City. The City seeks an individual, firm or
team of firms that has specific and demonstrated experience in the preparation and
implementation of comprehensive Economic Development Strategic Plans. It is
expected that the selected consultant will prepare a City- specific Strategic Plan that
contains community analyses, community strengths, weaknesses, opportunities and
threats, community feedback and information gained through substantive public
outreach and education, specific economic development goals and objectives, specific
economic development strategies, and specific economic development implementation
measures. The City requires the Strategic Plan to also contain an Implementation Plan,
outlining the timing, anticipated cost and funding source of each Implementation Action.
The City of Auburn, Washington is located in King and Pierce Counties in Western
Washington. It is an area often referred to as the Green River Valley. Auburn was
incorporated in 1891 and is one of the older communities in the State of Washington.
The City has a total land area of 29.8 square miles. As of April 2015, the City's
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Phan. of 130
population was approximately 75,000 with approximately 9,000 residents in the Pierce
County portion of the City.
Ideally, the plan will outline a key set of strategies, with action items, that build upon the
City's current economic asset base, and would identify how to overcome its challenges,
facilitate the growth and expansion of existing industry and business sectors, and
promote key redevelopment corridors as integral to the City's economic future. These
activities will increase employment and position the City as a great place to live, learn,
work, and play. The strategies developed should address both the needs and
impediments for existing business, while defining methods for attracting and growing
new business areas of opportunity. Identifying and maintaining a balance between the
two is necessary in a "built -out" community like the City of Auburn.
The following table is from the United States Census Bureau and provides an overview
of key information regarding Auburn pertaining to its people, businesses and
geography:
People QuickFacts
Auburn
Washington
Population, 2013 estimate
74,860
6,971,406
Population, 2010 (April 1) estimates base
70,189
6,724,543
Population, percent change, April 1, 2010 to July 1, 2013
6.7%
3.7%
Population, 2010
70,180
6,724,540
Persons under 5 years, percent, 2010
7.4%
6.5%
Persons under 18 years, percent, 2010
25.9%
23.5%
Persons 65 years and over, percent, 2010
10.2%
12.3%
Female persons, percent, 2010
50.6%
50.2%
White alone, percent, 2010 (a)
70.5%
77.3%
Black or African American alone, percent, 2010 (a)
4.9%
3.6%
American Indian and Alaska Native alone, percent, 2010 (a)
2.3%
1.5%
Asian alone, percent, 2010 (a)
8.9%
7.2%
Native Hawaiian and Other Pacific Islander alone, percent, 2010 (a)
1.6%
0.6%
Two or More Races, percent, 2010
5.4%
4.7%
Hispanic or Latino, percent, 2010 (b)
12.9%
11.2%
White alone, not Hispanic or Latino, percent, 2010
65.5%
72.5%
Living in same house 1 year & over, percent, 2009 -2013
81.9%
82.7%
Foreign born persons, percent, 2009 -2013
18.5%
13.2%
Language other than English spoken at home, pct age 5 +, 2009 -2013
25.5%
18.5%
High school graduate or higher, percent of persons age 25 +, 2009 -2013
87.5%
90.0%
Bachelor's degree or higher, percent of persons age 25 +, 2009 -2013
22.1%
31.9%
Veterans, 2009 -2013
6,184
582,265
Mean travel time to work (minutes), workers age 16 +, 2009 -2013
29.1
25.7
Housing units, 2010
27,834
2,885,677
Homeownership rate, 2009 -2013
59.8%
63.2%
Housing units in multi -unit structures, percent, 2009 -2013
34.0%
25.6%
Median value of owner - occupied housing units, 2009 -2013
$238,500
$262,100
Households, 2009 -2013
27,427
2,629,126
Persons per household, 2009 -2013
2.6
2.54
Per capita money income in past 12 months (2013 dollars), 2009 -2013
$26,807
$30,742
DI.0 Request for Proposal - City of Auburn, WA Ten (10) Year Economic Development StratWic Phan. of 130
Median household income, 2009 -2013
$55,483
$59,478
Persons below poverty level, percent, 2009 -2013
16.0%
13.4%
Business QuickFacts
Auburn
Washington
Total number of firms, 2007
5,068
551,340
Black -owned firms, percent, 2007
1.9%
S
American Indian- and Alaska Native -owned firms, percent, 2007
1.5%
1.2%
Asian -owned firms, percent, 2007
11.4%
6.8%
Native Hawaiian and Other Pacific Islander -owned firms, percent, 2007
S
0.2%
Hispanic -owned firms, percent, 2007
3.1%
3.2%
Women -owned firms, percent, 2007
26.7%
28.7%
Manufacturers shipments, 2007 ($1000)
1,767,399
112,053,283
Merchant wholesaler sales, 2007 ($1000)
3,732,621
76,790,966
Retail sales, 2007 ($1000)
1,417,184
92,968,519
Retail sales per capita, 2007
$22,883
$14,380
Accommodation and food services sales, 2007 ($1000)
103,844
12,389,422
Geography QuickFacts
Auburn
Washington
Land area in square miles, 2010
29.62
66,455.52
Persons per square mile, 2010
2,369.3
101.2
FIPS Code
3180
53
Auburn is at the hub of the regional transportation network. Bisected by two regional
highways and freight and commuter railways, thousands of goods and people travel
through Auburn every day. From Auburn, it is an easy connection to Interstates 5, 405
and 90. For businesses, Auburn is literally steps away from access to the Pacific Rim
trade. Auburn is only 15 miles from Sea -Tac International Airport, 15 miles from the Port
of Tacoma and just 20 miles from the Port of Seattle. Auburn Municipal Airport is the
third busiest commuter airport in the State of Washington. Located in downtown Auburn,
the Auburn Sounder Station supported by an existing 633 stall parking garage provides
access to Sounder Commuter Rail, Sound Transit Express Bus service and King
County Metro Transit service. Auburn is served by two major rail services, Burlington
Northern Santa Fe (BNSF) and Union Pacific.
Historically, a variety of factors have shaped Auburn's economy. At the turn of the 20th
century, the City offered services to support agriculture and the railroads. Downtown
offered a full range of services and retail opportunities. In later years, automotive sales
became a significant factor. As urbanization of the region expanded to include Auburn,
the vitality of Downtown Auburn was impacted by new shopping malls located outside
the community and by changing retail trends. At the same time, Auburn's importance as
the home of large industrial and warehousing operations increased. This same period
saw the growth of retail along commercial "strips" such as Auburn Way and 15th Street
NW. Large retailers such as Fred Meyer and many major supermarket chains located in
the community.
The development of the Super Mall (now known as the Outlet Collection) in the 1990's
led to Auburn becoming a major player in the regional retail market. Auburn shoppers
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Phan. of 130
no longer needed to leave the City to visit retail malls for many of their purchases.
During that same decade, Emerald Downs Race Course and the Muckleshoot Casino
also contributed to commercial recreation facilities in Auburn and associated
employment growth.
Today, Auburn provides over 38,000 jobs for residents throughout the region. Auburn
has a strong industrial sector that includes Boeing, the General Service Administration
(GSA) and numerous warehouse and distribution facilities. MultiCare Auburn anchors a
growing medical office community that also provide a significant number of jobs. The
retail and service sectors are expanding as small businesses are created. Educational
uses such as the Auburn School District and Green River Community College also add
to the area's employment base.
While development has continued throughout the City, Downtown Auburn remains the
heart and soul of the community. With its historical character and pedestrian oriented
development pattern, Downtown Auburn reflects many of the qualities being sought by
other communities. Downtown Auburn has been designated an Urban Center for transit
oriented /higher density development by the Puget Sound Regional Council. Downtown
Auburn has a Commuter Rail Station supported by a 560 stall multi -story parking
garage with a second future garage planned. In 2001, the City completed a
comprehensive Environmental Impact Statement for its downtown that addressees
compliance to the State Environmental Policy Act (SEPA) and reduces time and cost for
environmental review by developers. The City has also offered incentives for
development including the waiving of traffic impact fees for certain downtown parcels. In
2014, over $60 million of new residential mixed use development in Downtown Auburn
was under construction or announced.
From 1995 to 2000, the number of jobs located in Auburn increased 34 percent
compared to an overall increase of 22 percent throughout the rest of King County.
Manufacturing jobs remain the largest category in Auburn, despite the loss of nearly
2,000 manufacturing jobs since 1990. The remaining job categories all experienced job
growth. Retail jobs increased substantially along with jobs in warehousing,
transportation, and communication industries.
The State of Washington previously adopted streamlined sales tax (SST) legislation.
Prior to SST, sales tax collection in Washington State was based on the site of origin,
rather than on the site of delivery. Under the SST tax structure, sales tax is collected at
the site of delivery rather than from those areas from which they were shipped. This
change in tax structure will put Auburn at a disadvantage and negatively impact its tax
revenue. Specifically, Auburn and similar cities have historically invested in
infrastructure to support businesses engaged in warehouse and distribution activities
that ship goods to other destinations. Another concern for Auburn and similar cities that
have invested in infrastructure include how the debt that has already been extended for
such infrastructure will be paid and how the loss of a significant source of revenue will
affect bond ratings.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Phan. of 130
Based on the potential passage of SST, the Auburn City Council approved Resolution
No. 3782 in November 2004. Resolution No. 3782 outlines an approach and actions the
City will take related to land use planning, zoning and other matters in the event a
streamlined sales tax proposal or other similar proposals that change the tax structure
are adopted.
Because of the State of Washington's implementation of sales tax mitigation payments
to cities such as Auburn, the impact resulting from streamlined sales tax has been
somewhat lessened. However, the continued availability of these payments is not
certain due in part to the State's current and anticipated fiscal challenges. In addition,
the amount of payments does not equal the total loss in revenue to the City. The City's
economic development strategies are dependent upon the City being able to continue a
strong public investment program in infrastructure and services. The City's ability to
continue this public investment is contingent upon maintaining solvent public revenue
streams, particularly sales tax. Sales tax comprises the largest source of monies to the
City's General Fund, approximately 30 percent in 2010. The City anticipates that current
and long -term fiscal challenges facing the State of Washington will likely results in the
dissolution of the current sales tax revenue mitigation program. The eventual loss of the
aforementioned sales tax revenue will directly and adversely affect the City's ability to
adequately fund the capital infrastructure and services necessary to support the
realization of the City's economic development strategies. This is especially applicable
to industrial areas supporting warehouse and distribution centers that are origin based
in nature.
In 2005 the City of Auburn brought together a focus group of diverse business and
community interests that identified several economic development areas within the City.
The focus group's effort is reflected in an Economic Development Strategies document
that includes strategies and actions needed to affect necessary change for specific
strategy areas within the City. These Economic Development Strategy Areas (EDSAs)
are targeted in the City's 20 -Year Comprehensive Plan to help the City meet its long-
term population and employment growth needs. The City is intent on working with
property owners, businesses and interested parties on focused planning efforts to
develop long -term subarea plans to guide future growth and development including
public investment strategies and possible incentives for all properties within these
specified EDSAs. Since the initial development of the Economic Development
Strategies document, additional economic development strategy areas have been
identified to include the SE 312th Street/124th Avenue SE corridor within the recently
annexed portion of Lea Hill and M Street SE between Auburn Way North and Auburn
Way South.
In 2011, the City of Auburn received a State of Washington designated Innovation
Partnership Zone (IPZ) for the City. Auburn's IPZ is one of only 15 statewide IPZs.
Further, the City is one of only four cities in the State to receive the designation. The
primary goal of the City's IPZ is to create a sustainable model through public and private
partnerships for business and product development that will create living wage jobs for
City residents and others in the region. The City's IPZ provides a unique marketing tool
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Phan. of 130
and focal point for economic development. IPZs are eligible for targeted State funding
that can include infrastructure improvements and new product development. In addition,
businesses in the City's IPZ can utilize partner relationships to assist in product
development and raising of financial capital.
In 2011, the City approved voluntary and incentive based master planning regulations
that could be applied to future new development redevelopment projects. These
regulations provide a procedural vehicle for large- scale, multi - phased developments
through receipt of conceptual approval of one or more development projects at the
same time that allows for the timely and efficient coordination of future public
infrastructure. The master plan process provides the applicant with certainty for land
use approvals and development standards for large and multi - phased project. The
process also provide opportunities for adjacent property owners, homeowner
associations, and businesses to participate early in the process and evaluate the
cumulative impacts associated with the full build -out of large -scale developments to
minimize impacts to adjacent properties and protect the character of the surrounding
areas. Development related incentives are offered for certain actions in the preparation
and execution of the master plan.
Similar to other communities throughout the region, state and nation, Auburn
experienced the effects of the Great Recession that began in 2008. Beginning in 2010,
however, Auburn began to emerge from the recession more quickly than surrounding
communities. Table 1 on the next page summarizes this re- emergence. The key factors
that contributed to this re- emergence included but were not limited to the lower cost of
developable land in the City, the City's reputation for being business friendly, the market
awareness of Auburn's ability to process development applications for time and cost
efficiency and various incentive programs enacted by the City to spur economic
development.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Phan. of 130
Table 1. Summary Table of Residential /Non - Residential Permit Activity in Auburn (2007 -2014)
DI.0 Request for Proposal — City of Auburn, WA Teit(a) Y71r6Ecc? kic Development Strategic Plan
2014
2013
2012
2011
2010
2009
2008
2007
Single - Family
Residential -
Permits Issued
TBD
429
419
216
183
85
88
252
Annual
Valuation of
Single - Family
Residential -
Development
TBD
$94,467,746
$97,081,843
$44,240,971
$34,970,062
$15,739,907
$16,970,213
$51,661,367
Annual
Valuation of
Non - Residential
Development
TBD
$138,222,951
$69,084,661
$41,448,902
$23,992,932
$70,421,322
$34,091,032
$43,844,323
Total Permits
TBD
3,907
3,568
2,729
2,543
2,750
2,504
3,307
Total Value
$239,592,144
$175,195,908
$122,485,688
$74,261,856
$99,253,454
$80,726,001
$132,059,529
DI.0 Request for Proposal — City of Auburn, WA Teit(a) Y71r6Ecc? kic Development Strategic Plan
Between 2010 and 2012, the City initiated a number of incentive based programs to
spur economic development in the City. A complete list of current incentives are avilable
on the City of Aburn Website for review, www.auburnwa.gov
More recently, the City has engaged in an update of the City's Comprehensive Plan.
The Auburn Comprehensive Plan is an expression of Auburn citizens' vision of their
community over a twenty (20) year planning horizon and is intended to comply with
requirements of the State of Washington's Growth Management Act (GMA). The Plan
will guide the Planning Commission and City Council in making policy decisions. It will
also provide guidance and communicate the community's vision and values to citizens,
developers, businesses, property owners, and visitors. The adoption of this significant
update to the City's Comprehensive Plan is scheduled to be completed by June 2015.
CONTACT PERSON
Questions regarding this Request for Proposal may be directed to the following person:
City of Auburn
Doug las Lein
Manager, Economic Development Division
25 West Main St
Auburn, WA 98001
253 804 -3101
dlein @auburnwa.gov
www.auburnwa.gov
PROPOSED PROJECT SCHEDULE
RFP Issued: May 201h 2015
Deadline for Proposed Submission: June 22nd 2015
Consultants Selected for Interviews: July 3rd 2015
Interviews Conducted by RFP Review Committee: July 16th 2015
Consultant Agreement Approved by Council: Augest 3rd 2015
Notice of Agreement Award: August 5th 2015
Project Completion Date: December 1St, 2016
NOTE: All dates /times are subject to change at the City's discretion.
DEADLINE AND DELIVERY
Proposers must submit one (1) identified original copy, ten (10) copies of the proposal
and one (1) electronic copy of the proposal including any attachments.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Pll��17 of 130
Sealed Proposals will be received at the City of Auburn City Hall, 25 West Main Street,
Auburn WA 98001, until 22nd, June, 2015, 5PM local time. Proposals shall be delivered
and addressed to, City of Auburn, Attn: City's Clerk's Office, 25 West Main Street,
Auburn, WA 98001 and shall be labeled "SEALED PROPOSAL FOR CITY OF
AUBURN TEN (10) YEAR ECONOMIC DEVELOPMENT STRATEGIC PLAN - RFP #
2015- 1001 ".
No information submitted by facsimile or electronic mail will be accepted unless
otherwise requested by the City during the proposal review process. Proposals received
after 5 PM on June 22nd, 2015 will not be accepted.
CONTRACT AMOUNT
The contract amount shall be a not to exceed amount of $250,000.00 as authorized by
the Auburn City Council through its adoption of the 2015/2016 biennial budget. Funding
is for this biennial budget period only and all contracted work must be completed in this
timeframe unless future action is taken by the Auburn City Council to provide additional
funding in the 2017/2018 biennial budget. Please be advised that responders to this
RFP should not in any way assume that there will be any future funding available in
preparing their submittals.
MINIMUM REQUIREMENTS
Minimum requirements for submittal of a proposal in response to this RFP include the
following:
1. Demonstrated understanding of local economic development theory and practice,
research methods, group consensus building, implementation methods, and
monitoring and updating processes.
2. Demonstrated familiarity with development and implementation of economic
development policies.
3. Demonstrated experience in community engagement, information gathering and
information sharing.
4. Demonstrated experience, competence, and qualifications of the consultant and the
participating staff successfully providing similar services to public entities.
5. Understanding of the requested services and appropriateness of the proposed work
program.
6. Ability to perform the work in a timely manner, availability of staff and contingency
plans.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Plan. n . 8 of 130
Proposals must state the proposer's federal and state taxpayer identification numbers.
Please note that any and all costs borne by the Proposer for the preparation of
any and all materials to be submitted in response to this Request for Proposal are
the sole responsibility of the Proposer. The City of Auburn shall not be
responsible for nor compensate in any manner for these costs.
SCOPE OF SERVICES
The overall responsibility and scope of work for the Consultant is to prepare a Ten (10)
Year Economic Development Strategic Plan for the City of Auburn containing goals,
objectives, strategies and performance based implementation measures. The
Consultant will also provide meeting facilitation services during the public outreach and
stakeholder interview process as necessary.
The Consultant shall provide professional services to support the following tasks:
Task 1 — Kick -Off Meeting
Prepare for and facilitate a comprehensive kick -off meeting with City staff to review work
tasks and responsibilities, discuss key questions or concerns, review and plan for any
logistical requirements and refine any project timeline elements.
Task 2 - Existing Conditions Analysis
a. Review and analysis of existing demographic and socioeconomic data, labor force
characteristics, sales tax revenue, lodging tax revenue, and other key economic
data.
b. Review of Auburn's economic base including business types and characteristics,
employment characteristics and labor force characteristic.
c. Review and analysis of local ordinances, policies, Comprehensive Plan /zoning and
rules, providing recommendations on making adjustments to favor economic growth.
Task 3 - Market Capacity Study
Conduct a market study of the City's retail /commercial sectors. The study shall assess
current and future retail trends affecting the City at the local, regional, national level,
current vacancy rates and factors influencing these vacancies, competitive advantages
and disadvantages, the current retail inventory and the ability of the market to bear this
inventory and future additions to it and needed strategies by the City and the private
sector to maintain and enhance the City's retail sector. The following subtasks shall be
conducted-
Request Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Pllap of 130
a. Review of Current National and Global Retail Trends — Analyze trends in the
national and global retail landscape and their current and future applicability to
Auburn and the region.
b. Demand Factor Analysis - Define trade area; determine population and income
levels for trade area; calculate expenditure potential by retail store type, estimate
Auburn's capture rates based on survey research; estimate inflow sales
opportunities based on survey research; and calculate additional supportable retail
and service space.
c. Supply Factors Analysis - Determine existing retail and service space in Auburn by
type, including vacant space, determine planned and potential competition; calculate
existing sales performance levels and service levels; and compare with typical
industry averages to determine if there is current oversupply /undersupply.
d. Inventory of Current and Proposed Competition — Complete a full inventory of all
retail and services space in the City of Auburn and identify all known potential future
developments, including proposed commercial projects, expansion potential on
existing sites, and designated un -built commercial lands.
e. Commercial Space Demand Projections — Determine the amount of retail and
service space that could be supported in Auburn to 2025 by analyzing information
including but not limited to trade area population projections, per capita income
levels of trade area residents, estimates of the Auburn capture rates.
f. Supply /Demand Reconciliation — Conduct a detailed comparison of potential supply
and future demand to assess the need for additional commercial designated land.
g. License Plate Survey — Collect an appropriate level of license plate numbers at
multiple retail locations at a pre- determined time to determine the extent of the City's
retail draw and the extent of inflow from outside Auburn.
h. On- Street Intercept Surveys — Conduct an appropriate number of in- person
customer interviews in Uptown Auburn, West Auburn and the Gallery District during
a pre- determined time to determine the retail draw of these areas, customer
shopping patterns and perceptions of these areas.
i. Telephone Consumer Survey — Conduct a telephone survey of an appropriate
number of residents from the City of Auburn and the surrounding defined Trade Area
to determine their retail expenditure patterns and the Auburn capture rate. From this
survey, determine the market shares attracted by individual retail clusters in the City.
j. Rental Rate Survey — Interview commercial realtors in the City of Auburn to establish
local commercial real estate trends. In addition to obtaining detailed rental rate
information, the survey should also include questions regarding market trends,
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic Pll�'p20 of 130
impediments to future commercial development, and the strengths and weaknesses
of the various commercial clusters in the City.
Task 4 - Strengths, Weaknesses, Opportunities and Threats (SWOT) Analysis
Conduct a Strengths, Weaknesses, Opportunities and Threats (SWOT) analysis of
Auburn's assets, strengths, weaknesses, opportunities, threats and barriers to
development and business growth shall be documented from stakeholder interviews,
focus groups, on -line and random surveys and website research
The Consultant shall identify the community's assets and competitive advantages and
proposed activities and programs to incorporate these assets and advantages into an
overall economic development strategy.
Task 5 - Reverse Site Selection
Conduct the following subtasks:
a. Inventory available buildings and land;
b. Rate quality of commercial /office stock versus needs of relocating businesses in
target industries;
c. Review business costs compared to benchmark communities;
d. Assess quality /availability of incentives;
e. Assess infrastructure /utilities including:
a. Transportation networks (road, rail, air)
b. Water, wastewater, electricity, telecommunications
c. Utility rates
f. Review entitlement process and permitting;
g. Review labor quality and availability;
h. Review marketing, promotional, and public relations efforts to target corporate site
selectors, executives in target business sectors, and other targeted audiences; and,
i. Review of website, collateral, electronic newsletters, advertising campaigns and
other vehicles employed to reach the target audience.
Task 6 - Perception Survey (Site Selectors)
Conduct telephone interviews national and international site location consultants and
other key influencers to gather insights on their perspective on: (a) Auburn's assets and
barriers for business attraction and expansion; (b) industries they see are having the
most growth and investment activity in the United States and State of Washington; and
(c) suggestions for target industries based on their perception of Auburn and the region.
Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwga g el 1a 1 of 130
�
DI.0 FP
Task 7 - Best Practice Case Studies and Performance Metrics
Perform a case study analysis of three (3) comparable communities that have
successfully implemented economic development strategic plans. The case study
analysis should provide a detailed background on each selected community, the
economic development strategic planning process for each community, key findings,
actions, strategies and implementation measures identifying from the respective
planning processes and key performance metrics adopted and implemented by each
community to measure progress and success.
Task 8 - Target Industry Validation & Selection
Perform the following subtasks:
a. Conduct an analysis to identify the Auburn community's best fit with primary
industries — those industries that would most benefit from the community's assets
and be willing to expand and /or relocate to the area — and industries that bring value
to the community in the form of investment, jobs, payroll and local purchasing.
b. Identify a list of potential industry clusters to "target" and allocate resources to
enhance and diversify the economic base.
c.. Analyze Industry trends and growth in the region and in select geographic locations;
Support industries to existing basic targets; and Geo- economic assets of the
community.
d. Evaluate industry trends in King County, Pierce County, the Green River Valley, the
South Sound area and the Puget Sound region to identify patterns of growth,
employment, payroll, and number of establishments.
e. Identify industries that are currently represented in the local regional economy and
how they have performed over the past several years.
f. Develop specific guidelines to identify the types of industries that can be targeted for
Auburn.
g. Conduct research on those industries rising to the top to uncover opportunities at the
industry sub - sector level and to enhance industry understanding.
Task 9 — Public Engagement
Perform the following subtasks:
a. Prepare for and facilitate three (3) community workshops with business community
leaders, the business community in general, the Auburn Chamber of Commerce,
Auburn Downtown Association and other groups and citizens in the Auburn
community.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic Pll p_ of 130
b. Prepare for and facilitate three (3) meetings with Town staff and key community
members to identify and prioritize economic development goals and objectives and
proposed activities and programs.
c. Conduct stakeholder interviews with the following-
1 . Mayor of Auburn
2. Seven (7) Individual Auburn City Council Members
3. Director of Administration
4. Finance Director
5. Community Development and Public Works Director
6. City Engineer
7. Assistant Director of Community Development Services
8. Economic Development Manager
9. Police Chief
10. President/CEO of Auburn Area Chamber of Commerce
11. Executive Director of Auburn Downtown Association
12. Superintendent of Auburn School District
13. President of Green River College
14. King County Executive
15. Pierce County Executive
16. President/CEO of Economic Development Council of Seattle and King County
17. Ten (10) Additional Organization /Community Representatives to be determined
through consultation with City Administration
d. Develop and implement with City support and assistance a social media campaign
to illicit community input and sentiment on topical areas pertaining to the
development of the Ten (10) Year Economic Development Strategic Plan.
e. Develop and host for the duration of the project a project specific web page
containing project related information. The project specific web page shall be
developed early and shall contain methods for the public to review information and
documents and provide comments.
Task 10 — Ten (10) Year Comprehensive Economic Development Strategic Plan
Based on the work conducted for Tasks 1 -8, the consultant shall prepare draft and final
versions of a locally based and comprehensive Ten (10) Year Economic Development
Strategic Plan setting forth goals and objectives for taking advantage of the
opportunities for the City of Auburn and solving key economic development problems of
the City. The Plan shall address economic development issues including but not limited
to labor and occupational skills development, market capacity issues and opportunities,
site selector and public perceptions including real and perceived barriers to entry, target
industry focuses and strategies, SWOT issues and opportunities, best practices
applicable to Auburn, business recruitment and marketing, City web and branding
services. The Plan shall contain: a) detailed recommendations on economic
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic PI�21723 of 130
development strategies that the City should pursue over the course of ten (10) years; b)
actions including projects, programs, policy additions and changes that the City should
strive to implement over the course of ten (10) years to implement the economic
development strategies; and c) performance measures with timelines that will be used
to evaluate whether and to what extent plan strategic goals and objectives have been or
are being met.
Task 11 — Economic Development Strategic Plan Review, Refinement & Adoption
a. The Consultant and any needed subcontractors shall prepare for and facilitate one
(1) meeting with City staff to review and discuss the draft Ten (10) Year Economic
Development Strategic Plan provided to City staff for initial review. The Plan shall be
revised as needed based on staff input.
b. The Consultant and any needed subcontractors shall prepare for and facilitate up to
two (2) public presentations with interested citizens, businesses and organizations to
review and discuss the draft Ten (10) Year Economic Development Strategic Plan.
The Consultant shall prepare a summary of key comments and concerns and shall
identify potential changes to the Plan based on this input for transmittal to the
Planning and Zoning Commission and City Council.
c. The Consultant and any needed subcontractors shall prepare for and attend up to
two (2) meetings or workshops with the Planning Commission to review and discuss
the draft Ten (10) Year Economic Development Strategic Plan. The Consultant shall
prepare a summary of key comments and concerns from the Commission and shall
identify potential changes to the Plan based on this input for transmittal to the City
Council.
d. The Consultant and any needed subcontractors shall prepare for and attend up to
two (2) meetings or workshops with the City Council to review and discuss the draft
Ten (10) Year Economic Development Strategic Plan.
e. The Consultant and any needed subcontractors shall revise the draft Plan based on
City Council direction and input.
f. The Consultant and any needed subcontractors shall prepare for and attend one (1)
meeting of the City Council to assist the City Council and City staff in the adoption of
the final Ten (10) Year Economic Development Strategic Plan.
Task 12 — Project Management
Conduct project management activities including but not limited to regular
correspondence with the City's designated project manager,
preparation /review /submittal of monthly invoices, preparation and submittal of monthly
strategic management reports addressing current project status and issues, outstanding
issues or concern and future work tasks.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic Pll�p_ of 130
REVIEW PROCESS
Consultant selection will be based upon a qualitative review of the Proposals submitted.
City staff may request additional clarifying information from any or all consultants that
submit a Proposal during the review process. City staff will conduct an initial evaluation
of the responses to this RFP to identify those firms that will be selected to proceed to an
interview with the RFP Review Committee that will make a recommendation to the City
Council on the selection of the consultant determined to be the most qualified for the
project. It is anticipated that the City of Auburn and the selected firm will enter into a
professional services contract for the time period beginning August 2015 through project
completion.
WORK SCHEDULE
The Consultant's work schedule will begin immediately upon contract award and is
expected to continue until the City Council approves the acceptance of a complete plan.
A proposed work schedule for the Strategic Plan process should be submitted as part of
the proposal. All work must be completed within the City's biennial budget for
2015/2016unless otherwise extended by the City.
RFP PROPOSAL SUBMITTAL REQUIREMENTS
Consultants interested in providing these services must prepare and submit a Proposal
that includes the following minimum information:
a. Cover Letter:
The Cover letter is to be signed by an officer of the firm authorized to execute a contract
with the City of Auburn.
b. Approach to Services
Provide a narrative statement demonstrating an understanding of the overall intent of
this RFP, as well as the methods used to complete assigned tasks. Identify any issues
or concerns of significance that may be appropriate. Please include any suggested
changes that may streamline the process resulting in a cost savings.
c. Consultant Qualifications:
This section shall describe the areas of expertise of current permanent staff and the
scope of services that can be provided by the firm without the services of an outside
consultant under the consultant's direction.
d. Key Personnel:
Include a proposed project management structure. Identify the key contact for the
project and all personnel who will be assigned to work on this project, including a
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic Pll p_ 5 of 130
description of their abilities, qualifications, and experience. A meeting facilitator shall be
included as part of the project team. Include resumes for all key individuals.
There can be no change of key personnel once the proposal is submitted without the
prior approval of the City of Auburn.
e. Subcontractors:
Identify any portion of the scope of work that will be subcontracted. Include firm
qualifications and key personnel, telephone number and contact person for all
subcontractors. The City of Auburn reserves the right to approve or reject all consultants
or internal staff performing consulting services, proposed by the consultant during or
after the consultant review and selection process.
f. Project Organizational Chart:
Provide a detailed project organizational chart demonstrating the roles and
responsibilities of all involved parties including the City of Auburn.
g. Project Work Plan:
Provide a description of project understanding, detailed work approach and
methodology. The work plan shall list specific tasks and any specific considerations,
options, or alternatives.
h. Project Schedule:
Propose a detailed timeline for completion for the Strategic Plan including start date,
tasks, milestones, and target date of completion. Any assumptions regarding turnaround
time for City Council or City staff review should be clearly noted.
i. Fee Information:
Provide a detailed fee proposal by task for the services identified in the scope of
services section of this proposal. Identify sub -tasks and the respective cost in your fee
proposal as necessary. This section of your proposal shall include a professional fee
schedule (hourly fee chart) for the consultant's personnel and the subcontractor's key
personnel identified above who would be working on this project. Hourly fees for
additional or optional services that may be required shall also be included. Unless
specified in the submittals, the professional fee schedule shall include any costs
associated with complying with the City's insurance requirements. The fee proposal
shall specify all estimated expenses.
j. References-
Request Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic Pllap_ of 130
A list of projects completed by the proposer under which services similar to those
required by this RFP were preformed shall be listed in your proposal. An emphasis
should be placed on projects undertaken within the last 5 years and those projects
undertaken for public agencies located in similar sized communities in Arizona and /or
the Southwestern United States. Include a brief description of the services, dates the
services were provided, and name and telephone number or references familiar with the
services provided.
k. Work Samples:
Provide brief descriptions of a minimum of five (5) similar projects dealing with
economic development, strategic planning, community engagement and involvement, or
similar topics prepared by or under the direction of your firm. Include in your description
the techniques utilized in using the strategic planning process and the outcome of the
planning process.
I. Interview Availability:
Provide a written statement agreeing that proposers may be requested to be available
for an interview in the City of Auburn as part of the City's final selection process and
agreeing that the lead members of the consulting team will attend any interviews
scheduled with the City of Auburn.
RESPONSIBILITIES, DEFENSE, INDEMNIFICATION, HOLD HARMLESS
AND INSURANCE REQUIREMENTS
Indemnification /Hold Harmless. The selected Consultant shall defend, indemnify and
hold the CITY, its officers, officials, employees and volunteers harmless from any and
all claims, injuries, damages, losses or suits including attorney fees, arising out of or
resulting from the negligent acts, errors or omissions of the selected Consultant in
performance of work, except for injuries and damages caused by the sole negligence of
the City. The City shall defend, indemnify and hold the selected Consultant, its officers,
officials, employees and volunteers harmless from any and all claims, injuries,
damages, losses or suits including attorney fees, arising out of or resulting from the
negligent acts, errors or omissions of the City in performance of work, except for injuries
and damages caused by the sole negligence of the selected Consultant. In the event of
liability for damages arising out of bodily injury to persons or damages to property
caused by or resulting from the concurrent negligence of the selected Consultant and
the City, its officers, officials, employees, and volunteers, (collectively the "Parties ") the
Parties' liability shall be only to the extent of each Party's negligence. It is further
specifically and expressly understood that the indemnification provided will constitute
the Parties waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the
purposes of this indemnification. The waiver will be mutually negotiated by the Parties
and the provisions of agreed to indemnification and hold harmless provisions shall
survive the expiration or termination of any executed Agreement.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic Pllap_ of 130
Indemnification. The selected Consultant shall agree to indemnify and hold harmless
the City, its officials and its employees from and against all liability claims, demands and
expenses, including court costs and reasonable attorney's fees, in an amount not to
exceed the total compensation under contract, on account of any injury, loss or damage
that arise out of, or are in any manner connected with, the work negligently performed
under contract, or on account of any injury, loss or damage that arise out of, or are in
any manner connected with, any omission or professional error of the consultant, or any
officer, employee or agent of the Consultant. For other than its professional services,
the consultant shall agree to indemnify and hold harmless the City, its officials and its
employees from and against all liability claims, demands and expenses, including court
costs and reasonable attorney's fees, in an amount not to exceed the total
compensation under contract, on account of any injury, loss or damage that arise out of,
or are in any manner connected with, the work negligently performed under this
contract, or on account of any injury, loss or damage that arise out of, or are in any
manner connected with, any other fault or negligence of the Consultant, or any officer,
employee or agent of the Consultant.
Ownership of Documents. All documents, including, but not limited to, correspondence,
estimates, notes, recommendations, analyses, reports and studies that are prepared in
the performance of a contract between the Consultant and the City based on a qualified
response to this Request for Proposal shall be and remain the property of the City.
Professional Responsibility. The Consultant shall warrant that it is qualified to assume
the responsibilities and render the services specified in the Request for Proposal and
has all requisite corporate authority and professional licenses in good standing, required
by law.
Compliance with the Law. It is contemplated that the work and services to be performed
by the Consultant shall be done in compliance with applicable laws, ordinances, rules
and regulations that are in effect on the date of execution of the contract between the
Consultant and the City based on a qualified response to this Request for Proposal.
Insurance. The Consultant shall procure and maintain, for the duration of any executed
Agreement, insurance as specified by the City Attorney's Office and the City's Risk
Manager against claims for injuries to persons or damages to property which may arise
from or in connection with the performance of the work hereunder by the Consultant,
his /her agents, representatives, employees, or subcontractors. The cost of such
insurance shall be paid by the Consultant. Insurance shall meet or exceed the following
unless otherwise approved by the City Attorney and the City's Risk Manager:
1. Automobile Liability insurance covering all non -owned and hired vehicles. Coverage
shall be written on Insurance Services Office (ISO) form CA 00 01 or a substitute
form providing equivalent liability coverage. If necessary, the policy shall be
endorsed to provide contractual liability coverage.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic Pllap_ of 130
2. Commercial General Liability insurance shall be written on ISO occurrence form CG
00 01 and shall cover liability arising from premises, operations, independent
contractors and personal injury and advertising injury. The City shall be named as
an additional insured under the Consultant's Commercial General Liability
insurance policy with respect to the work performed for the CITY under this
Agreement.
3. Workers' Compensation coverage as required by the Industrial Insurance laws of
the State of Washington, unless the Consultant has no employees while the
Agreement is in effect.
4. Professional Liability insurance appropriate to the Consultant's profession.
5. Minimum Amounts of Insurance: The Consultant shall maintain the following
insurance limits:
a. Automobile Liability insurance with a minimum combined single limit for bodily
injury and property damage of $1,000,000 per accident.
b. Commercial General Liability insurance shall be written with limits no less
than $1,000,000 each occurrence, $2,000,000 general aggregate.
c. Professional Liability insurance shall be written with limits no less than
$1,000,000 per claim and $1,000,000 policy aggregate limit.
6. Other Insurance Provisions: The insurance policies are to contain, or be
endorsed to contain, the following provisions for Automobile Liability and
Commercial General Liability insurance:
a. The Consultant's insurance coverage shall be primary insurance as respect to
the City. Any insurance, self- insurance, or insurance pool coverage
maintained by the City shall be in excess of the Consultant's insurance and
shall not contribute with it.
b. The Consultant's insurance shall be endorsed to state that coverage shall not
be cancelled by either party, except after thirty (30) days prior written notice
by certified mail, return receipt requested, has been given to the CITY.
7. Acceptability of Insurers: Insurance is to be placed with insurers with a current
A.M. Best rating of not less than A: VII.
8. Verification of Coverage: The Consultant shall furnish the City with original
certificates and a copy of the amendatory endorsements, including but not
necessarily limited to the additional insured endorsement, evidencing the
insurance requirements of the Consultant before commencement of the work.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development Stratwic Pll2'p29 of 130
The Consultant shall procure and maintain the minimum insurance coverages listed
herein. Such coverages shall be procured and maintained with forms and insurers
acceptable to the City, acceptable of which shall not be unreasonably withheld. All
coverages shall be continuously maintained to cover all liability, claims, demands and
other obligations assumed by the Consultant pursuant to an executed contract. In the
case of any claims made policy, the necessary retroactive dates and extended reporting
periods shall be procured to maintain such continuous coverage.
A Certificate of Insurance shall be completed by the Consultant's insurance agent(s) as
evidence that policies providing the required coverages, conditions and minimum limits
are in full force and effect, and shall be subject to review and approval by the City. The
Certificate shall identify this contract and shall provide that the coverages afforded
under the policies shall not be canceled, terminated or limits reduced until at least thirty
(30) calendar days prior written notice has been given to CITY. The City shall be named
as an additional insured. The completed Certificate of Insurance shall be sent to the
City of Auburn, Attn: City Clerk, 25 West Main Street, Auburn, WA 98001.
Failure on the part of the Consultant to procure or maintain policies providing the
required coverages, conditions and minimum limits shall constitute a Material Breach of
Contract upon which the City may immediately terminate this contract or, at its
discretion, the City may procure or renew any such policy or any extended reporting
period thereto and may pay any and all premiums in connection therewith, and all
monies so paid by the City shall be repaid by the Consultant to the City upon demand,
or the City may offset the cost of the premiums against any monies due to the
Consultant from the City.
The City reserves the right to request and receive a certified copy of any policy and any
pertinent endorsement thereto. The Consultant shall agree to execute any and all
documents necessary to allow Auburn access to any and all insurance policies and
endorsements pertaining to this particular job.
EQUAL OPPORTUNITY COMPLIANCE
The City is an equal opportunity employer and requires all Proposers to comply with
policies and regulations concerning equal opportunity. The Proposer, in the
performance of a contract for services, shall agree not to discriminate in its employment
because of the employee's or applicant's race, religion, national origin, ancestry, sex,
sexual preference, age, or physical handicap.
DI.0 Request for Proposal — City of Auburn, WA Ten (10) Year Economic Development StratWic Pll2'i30 of 130