Loading...
HomeMy WebLinkAbout06-29-2015 CITY COUNCIL STUDY SESSION AGENDA,A BURN ' CALL TO ORDER A. Roll Call City Council Study Session June 29, 2015 - 5:30 PM Auburn City Hall AGENDA Watch the meeti ng LIVE! Watch the meeting video M eeti ng vi deos are not avai I abl e unti 172 hours after the meeti na has concl uded. II. ANNOUNCEMENTS, REPORTS, AND PRESENTATIONS III. AGENDA ITEMS FOR COUNCIL DISCUSSION A. Main Street Urban Design Consultant Introduction & Project Status — SvR Design Company (15 Minute Presentation /15 Minute Q &A) (Snyder) Main Street Urban Design Consultant, SvR Design Company, will introduce themselves and their work on the Main Street Urban Design project. B. 2015 Capital Project Status Review (20 Minute Presentation /10 Minute Q &A)* (Snyder) IV. OTHER DISCUSSION ITEMS V. ADJOURNMENT Agendas and minutes are available to the public at the City Clerk's Office, on the City website (htto11www.auburnwa.gov), and via e -mail. Complete agenda packets are available for review at the City Clerk's Office. *Denotes attachments included in the agenda packet. Page 1 of 16 'Alu,BURN VVAS I � I N G "i'(') N1 AGENDA BILL APPROVAL FORM Agenda Subject: Date: Main Street Urban Design Consultant Introduction & Project June 22, 2015 Status — SvR Design Company (15 Minute Presentation /15 Minute Q &A) Department: Attachments: Budget Impact: Community Development & No Attachments Available $0 Public Works Administrative Recommendation: Background Summary: The consultant team on the Main Street Urban Design Project will introduce themselves and their work to City Council. Managing Principal, Peg Staeheli and Project Manager, Brice Maryman, of SvR Design Company and Katie Idziorek, Urban Designer with VIA Architecture & Urban Design, will update the council on meetings held, interviews conducted, research gathered, design ideas being considered, and public feedback received to date. Specific items to discuss will be the Project Advisory Team, the Downtown Dossier, stakeholder interviews, and public outreach efforts at Clean Sweep and the Auburn Farmer's Market. Reviewed by Council Committees: Councilmember: Staff: Snyder Meeting Date: June 29, 2015 Item Number: DI.A DI.A AUBURN * MORE THAN YOU IMAGINED Page 2 of 16 'Alu,BURN VVAS p � I N G "i'( AGENDA BILL APPROVAL FORM Administrative Recommendation: 2015 Capital Project Summary and Status Update Background Summary: The Engineering Division of the Community Development and Publics Works Department is responsible for the design and construction of City roadway, sewer, storm and water utility projects. The Engineering Division also provides support for facilities, parks, environmental mitigation, and non -City projects. This discussion is intended to provide a summary of the projects that the Engineering Division is currently working on and to provide an overview of recently completed projects and planned projects underway. Currently, there are 39 capital projects, with a total value of $78.8 million, that have been initiated and are either being designed or are under construction. Other notable statistics are as follows: Total Value of Completed Projects by Year of Completion - 2012 = $23.7 million - 2013 = $29.9 million - 2014 = $29.6 million 2015 Current Project Status - Complete = $13.5 million - Under Construction = $27.5 million - Currently Bidding = $13.7 million - Under Design to be bid in 2015 = $5.4 million Reviewed by Council Committees: DI.B AUBURN * MORE THAN YOU IMAGINED Page 3 of 16 Councilmember: Meeting Date: June 29, 2015 Staff: Snyder Item Number: DI.B DI.B AUBURN * MORE THAN YOU IMAGINED Page 4 of 16 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DLB Page 5 of 16 Page 1 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •V0 i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 BNSF Utility Crossings Project: 997,358 This project will address utility crossings (Water) ao of the BNSF right -of -way that will be 517,688 M affected by the 3rd rail line that (Sewer) Pacific Civil & 1 2,591,664 2,543,543 100% Sep -14 100% Apr -15 Sweeting Final payment underway. Parametrix u BNSF /Sound Transit plan to building in 656,618 nfrastructure 2015. The project will also replace a (Storm) storm drain pipe adjacent to the railroad 420,000 tracks at 37th Street. (Streets) 37th St & B St NW BNSF Pre - Signal: v This project will complete 2 M improvements to the rail crossing at 76,900 307,550 384,450 383,379 100% Dec -14 90% Jun -15 Barba Work is underway KPG Transportation u (Street) (Federal) systems 37th Street NW and B Street NW to address safety concerns. Sewer Pump Station Improvements (Repair & Replacement Program): This project will repair and modify existing sanitary sewer pump station m facilities located at: F St SE, R St N E, 3 N 22nd St NE, Rainer Ridge, Valley 1,350,953 1,350,953 1,350,953 100% Aug -14 90% Jun -15 Chalmers Work is underway. acobs /Norto RL Alia u (Sewer) n corrosion Meadows, 8th St NE, Area 19, North taps, Peasley Ridge, Riverside, and Terrace View to address access, corrosion resistance, site security and new generators where needed. Well 4 Improvements: N This project will construct a new 1,378,589 4 .� 1,378,589 1,333,496 100% Nov -14 70% Sep -15 Wickstrom Work is underway. RH2 Gary Harper u building to house a standby generator (Water) and disinfection equipment. DLB Page 5 of 16 Page 1 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DI.B Page 6 of 16 Page 2 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •y° i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 M &O Storm Drainage Improvements: 220,000 (Water) 999,400 This project will construct a new C ( Ecolo gY 5 M detention and treatment system for 200,000 Grant) 2,480,770 2,397,306 100% Dec -14 80% Aug -15 Wickstrom Work is underway. Brown & SCI drainage at the M &0 Facility and (Sewer) Caldwell expand and improve the existing decant 791,370 270,000 (Equip Rental) facility. (Storm) A Street NW Extension - Wetland Monitoring. Reporting and Planting: This project will complete the on -going a monitoring and reporting required by 6 N Permits for the Wetland Mitigation site 750,136 750,136 749,349 100% Dec -14 50% Dec -15 Larson Work is underway. Bsa Native Green u related to the A Street NW Extension (Streets) Landscape Project for 10 years. In addition, the project includes the 2nd Phase Planting at the site in Year 3. Well 1 Improvements: This project will rehabilitate Well 1 so 7 c that it can function at full capacity and 3,287,466 3,287,466 3,154,062 100% Jan -15 25% Mar -16 Vondrak Work is underway. Golder McClure & (Water) associates sons complete modifications to the Howard Road Corrosion Control Facility. 30th Street NE Storm Improvements (Phase 1A ): This project will replace the 30 -inch storm drainage line along 30th Street NE a from the north end of the Airport to the a sBrannan Park Storm Pump Station to 2,206,817 (Storm) Storm ) 8 a address localized flooding issues. Phase 2,501,817 2,474,669 100% Feb -15 40% Nov -15 Truong Work is underway. otak RL Alia N 1A will construct the storm drainage line 295,000 (Streets) afrom the Airport to approximately I Street NE. The 1A and 1B budget and anticipated costs are listed here until the costs can be refined and differentiated between the two phases. DI.B Page 6 of 16 Page 2 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DI.B Page 7 of 16 Page 3 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •y° i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 Auburn Way South Pedestrian 770,604 Improvements - Dogwood to Fir Street: (State) This project will construct new sidewalks, street lighting system, a f (Federal) designated mid -block crosswalk and � median at Fir Street, removal of existing 185,459 330,000 (Street) (MIT) 9 utility poles and undergrounding of the 1,832,636 1,740,750 100% Jan -15 15% Dec -15 Sweeting Work is underway. CH21MMII Stan Palmer a v associated facilities, and a u -turn at Fir 134,973 129,841 (Water) (Century Link) Street. This project also includes a public education element for pedestrian 74, (Comca st) safety. This project is planned to be constructed concurrent with project 107,750 (WSDOT) C P1119. Auburn Way South Corridor Improvements - Fir St. SE to Hemlock St. SE: 2,425,402 This project will widen AWS between Fir (TIB) and Hemlock Streets from 3 lanes to 5 848,090 836,600 rn lanes and includes new sidewalks, street (Street) (MIT) lighting system, removal of existing 35,000 160,958 10 4,515,632 4,386,036 100% Jan -15 15% Dec -15 Sweeting Work is underway. CH21MMII Stan Palmer u utility poles and undergrounding of the (Water) (Century Link) associated facilities, bus pull -outs, and 17,428 76,116 improvement of the Hemlock St. (Sewer) (Comcast) intersection to include u -turns and a 116,038 new traffic signal. This project is (WSDOT) planned to be constructed concurrent with project CP1118. DI.B Page 7 of 16 Page 3 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DLB Page 8 of 16 Page 4 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •y° i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 Lakeland Hills Reservoir Improvement: This project will provide various �++ Work is underway. Finish date 11 C improvements at the reservoir, 1,758,109 1,758,109 1,758,109 100% Feb -15 1% Dec -15 Larson extended to allow for procurement of Gray& Paso Robles u (Water) Osborne Tank including painting, seismic upgrades, long lead time items. and facility modifications. Valley AC Watermain Replacement: cn This project will repair or replace 12 asbestos cement water lines along 1,468,574 1,468,574 1,326,892 100% Mar -15 1% Aug -15 Chalmers Work is underway N/A Pacific Coast u (Water) General AWN, 49th and B St NW and at the M &C /Parks Maintenance area. 2011 Storm Pipeline Repair and Replacement. Phase 2: This project will construct storm 513,471 Construction contract is currently c drainage improvements on Hi -Crest (Storm) being advertised for bids. Bid 13 Drive NW. The City is also designing and 944,203 922,329 100% Jun -15 Dec -15 Barba N/A 430,732 opening scheduled for June 25th. U constructing the relocation of a (Lakehaven) Budget and estimated costs updated. Lakehaven Utility District (LUD) Watermain that is in conflict with the storm improvements, at LUD's expense. DLB Page 8 of 16 Page 4 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DLB Page 9 of 16 Page 5 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •y° i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 AWS Flooding Phase 2: This project will construct conveyance 2,156,168 N improvements on 17th Street SE from A (Storm) Construction contract is currently 14 cN Street SE to K Street SE and increase the 900,000 3,823,435 3,884,531 100% Jun -15 Dec -15 Wickstrom being advertised for bids. Bid N/A capacity of the existing detention pond (Water) opening scheduled for June 25th. U located on A Street SE. The project will 767,266 Estimated costs updated. also replace sewer and water facilities (Sewer) adjacent to the storm drain line. N Auburn Community /Youth Center: 6,000,000 Construction contract is currently This project will construct a new (Parks Fund) Dore being advertised for bids. Bid 15 community /youth center at the Les 3,000,000 9,000,000 8,913,941 100% Jun -15 Jun -16 (Sweeting) opening scheduled for July 7th. ARC U Gove Community Campus. (Grant) Estimated costs updated. m M &O Building Roof Retrofit: ,°,� This project will install a roof retrofit 170,000 16 N 170,000 100,000 30% Jun -15 Sep -15 Barba Design work is underway. system for the aging roof at the M &0 (Facilities) Building. DLB Page 9 of 16 Page 5 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DI.B Page 10 of 16 Page 6 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •y° i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 30th Street NE Storm Improvements (Phase 16): This project will replace the 30 -inch storm drainage line along 30th Street NE m from the north end of the Airport to the Brannan Park Storm Pump Station to r address localized flooding issues. Phase 700,000 Pre - design feasibility analysis work is 17 a� 1B will construct the storm drainage line (Storm) 700,000 1,312,000 15% TBD TBD Truong underway. otak from I Street NE to the Brannan Park Storm Pump Station. The 1A and 1B budget and anticipated costs are listed under Phase 1A until the costs can be refined and differentiated between the two phases. � MIT Master Meters: Coordination with the Muckleshoot This project will install master meters on 480,000 18 480,000 480,000 29% TBD TBD Chalmers Indian Tribe (MIT) is underway to N/A a MIT Services in the reservation area on (Water) U Auburn Way South. secure easements. East Ridge Manor Storm 10 m Improvements: 1,120,000 Evaluation of design alternatives is Brown and 19 CL This project will complete (Storm) 1,120,000 1,110,000 20% TBD TBD Chalmers underway. Caldwell improvements to the East Ridge Manor storm system in the Lea Hill area. DI.B Page 10 of 16 Page 6 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DLB Page 11 of 16 Page 7 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •y° i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 West Main Street Traffic Signal c Upgrades: 20 This project will reconstruct the existing 465,000 465,000 465,000 30% Jan -16 Jun -16 Barba Design is underway. N/A u (Street) signals at C Street SW and Main Street and at Main Street and Auburn Ave. Storm Drainage Pipeline Repair and Replacement: 21 a This project will replace and /or repair 333,000 333,000 333,000 30% Mar -16 Jul -16 Wickstrom Design is underway. N/A (Storm) u aging and damaged storm lines throughout the City. West Hill Springs Improvements: This project will add an automatic shutdown /diversion if disinfection 605,000 Consultant contract negotiations 22 605,000 605,000 0% Jun -16 Nov -16 Barba MSA u system fails, add a screen or a Tide -flex (Water) underway. valve to the overflow at the site, and evaluate site stabilization. 277th - Auburn Way North to Green River Bridge: 1,020,700 This project will complete the widening (Federal) rai of S 277th from the intersection of 989,185 2,300,000 Design is underway. Environmental 23 N 8,309,885 8,309,885 60% Jan -16 Mar -17 Vondrak Parametrix Auburn Way North to L Street NE, (Street) (Developer) documents being prepared. including the construction of a 4,000,000 pedestrian trail and relocation of the (TIB) floodway along S 277th. DLB Page 11 of 16 Page 7 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DI.B Page 12 of 16 Page 8 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •V0 i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 Auburn Way South Corridor Safety Improvements (Muckleshoot Plaza to Dogwood Street SE): Design is underway. Value engineering This project will construct corridor 2,333,108 is currently underway to find ways to improvements to AWS between 252,684 (Federal) bring anticipated construction costs N Muckleshoot Plaza and Dogwood Street (Street) 306,674 within budget. Opportunities for 24 SE. Improvements include designated u- 60,000 (WSDOT 2,952,465 3,363,238 37% Mar -16 Mar -17 Larson additional grant funds are also being CH2MHill U turns, access management, driveway (Water) Overlay pursued. Coordinating with the consolidation, addition of a 2nd left turn Agreement) Muckleshoot Indian Tribe on design lane from eastbound AWS into the MIT issues. Casino, bus pull -outs, medians, signal improvements, and sidewalks. West Main St Multi -Modal Corridor and ITS Improvements: This project will repurpose the existing W Main St between W Valley Highway 25 and the Interurban Trail. The project will 676,060 3,774,340 4,450,400 4,450,400 5% Apr -16 Dec -16 Truong Design work is underway. CH2MHill (Streets) (Federal) u also provide Intelligtent Transportation System (ITS) improvements along W. Main St., West Valley Hwy, 15th St. SW, and C St. SW. Fulmer Wellfield Improvements: This project will be done in phases. The first phase 1A will complete investigation of the Fulmer Wellfield c area to determine the required analysis 533,294 26 ­1 and drilling program needed to utilize 1,750,000 1,750,000 (Phase 1) 85% N/A TBD Fenhaus Consultant design work is underway. Golder (Water) 1,030,358 Associates U the full water rights. Phase 1B will (Phase 2) complete a drilling and testing program as well as an alternatives analysis. Phase 2 will complete the physical improvements. DI.B Page 12 of 16 Page 8 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DLB Page 13 of 16 Page 9 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •V0 i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 BNSF /EVH Pedestrian Undercrossing: This project will conduct a feasibility 27 o, N study for a pedestrian crossing of East 313,329 313,329 313,329 95% N/A N/A Truong Feasibility study underway. u Valley Highway (A St SE) and the BNSF (Streets) (Sweeting) rail tracks just north of the White River. Mohawks Plastics Site Mitigation Monitoring: Monitoring work in progress (Year 6 28 c This project is an annual level of effort 25,000 25,000 25,000 N/A N/A N/A N/A Larson of 10 required for wetland =a rcv,e•y. u to complete the required monitoring for (TI F) mitigation) the mitigation site. S 277th St Reconstruction Wetland Mitigation Improvements: Monitoring work in progress. Actively 29 v This project will complete wetland 55,000 55,000 55,000 100% 100% Larson seeking mitigation acceptance from mitigation enhancements at the S 277th Corps to end monitoring period. wetland mitigation sites. F St SE Non - motorized Improvements: This project will reconstruct F St SE from 4th St SE to Auburn Way South, 130,000 m including adding new sidewalks, curb (Streets) and gutter, bike lanes, wayfinding 100,000 520,000 Consultant contract negotiations in 30 774,000 2,727,000 0% Dec -16 Nov -17 Wickstrom Jacobs u signage, street lighting, streetscape (Water) (Federal) process. elements, and safety improvements, 24,000 and will include a bike share program (Sewer) with bike boulevard components. Some ROW acquisition is necessary. DLB Page 13 of 16 Page 9 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 Page 10 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •y° i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 Auburn Way North Grind And Overlay 972,500 Project: (Streets) ,°n This project will rehabilitate and 42,500 967,500 31 2,057,500 2,057,500 2% Apr -16 Oct -16 Chalmers Pre - design work underway. preserve the existing pavement on (Storm) (Federal) U Auburn Way North between 22nd St NE 75,000 and 45th St NE. (Sewer) 37th St and A St SE Traffic Signal: This project will improve the safety at c the intersection by installing a traffic 32 signal, improving ADA ramps, widening 142,240 792,260 934,500 934,500 0% Nov -16 Jun -17 Barba Consultant selection underway. (Streets) (Federal) u the northeast corner of the intersection for a future u -turn, and pavement restoration. Citywide Traffic Signal Safety Improvements: This project will implement low -cost 33 ° traffic signal safety improvements at 32,600 412,575 445,175 445,175 0% Dec -15 Aug -16 Chalmers Design work is underway. (Streets) (Federal) u various intersections by installing flashing yellow arrow signals, auxiliary signal heads, and backplates. M Street SE Storm - 3rd St SE to E. Main St: ,,� This project will replace the existing 12 430,000 Project being initiated. Schedule 34 inch storm line along M St SE from 4th (Storm) 430,000 430,000 Mar -16 0% Sep -16 Larson updated. U St SE to E Main St to alleviate downstream flooding issues. Page 10 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DI.B Page 15 of 16 Page 11 of 12 Project Budget ($) Design Construction A a a Proj. Street, Total Estimated E Adv. Finish Project c 73 •y° i _ No. No. Location /Description Utilities Other Total Budget Costs $ Date $ Date Manager Status c u 0 2015 Sanitary Sewer Repair and N Replacement: Project being initiated. Schedule 35 This project will replace and /or repair 1,300,000 1,300,000 0% Apr -16 Nov -16 TBD Truong a u p dated. u aging and damaged sewer systems through out the City. SOS Program 2014 Citywide Pavement Patching and Overlay Project: This project will 110,000 2,280,629 N complete pavement patching and (Icon) 36 °v overlay treatments on arterial, collector (105 Fund) 12,350 2,672,979 1,720,442 100% Jan -15 99% Aug -15 Carter Punchlist work is underway. N/A ICON Materials u 2 and local roadways for the purpose of (Marchini (SOS) (SOS) pavement preservation through the Meadows) City. 2014 Local Street Reconstruction Project: 1,668,584 This project will complete the (SOS) (SOS) reconstruction of the following local N 449'438 37 roadways: 2,237,323 2,214,183 100% Jun -14 100% Feb -15 Carter Contract Complete Jacobs Rodarte u (Water) K St NE - East Main to 4th St NE 118,801 H St SE & 19th St SE - 21ST St SE to 17th (Sewer) St SE 24th St SE - M St SE toRStSE 2015 Local Street Reconstruction Project: This project will complete the 2,475,000 reconstruction of the following local (SOS) roadways: Contract awardedd to Titan. Pre - 38 3rd St NE between AWN and Auburn 750,000 3,725,000 2,729,751 100% May -15 Oct -15 Carter construction conference scheduled Jacobs Titan (Water) u Ave, and 200ft east of Auburn Way to D for June 16th. 500,000 St NE (Sewer) 7th St SE between A St SE and AWS D St SE between AWS and 12th St SE DI.B Page 15 of 16 Page 11 of 12 COMMUNITY DEVELOPMENT AND PUBLIC WORKS DEPARTMENT - ENGINEERING GENERAL SERVICES DIVISION, CAPITAL PROJECT STATUS REPORT Date: June 22, 2015 DI.B Page 16 of 16 Page 12 of 12 Proj. Street, Total Estimated No. No. Location /Description Utilities Other Total Budget Costs 2015 Pavement Patching and Overlay Project: This project will complete the patching and /or overlay of the following streets: C St SW between SR -18 and 15th St SW, M St SE between 8th St SE and 12th St 400,000 SE, B St NW between 30th St and 37th (SOS) c St NW, 104th Ave SE between Lea Hill 1,700,000 80,000 39 Road and Green River Road, SE 304th St (Streets) (Icon) 2,180,000 2,623,000 U between 124th Ave SE and 132nd Ave 600,000 SE, 113th Ave SE & 114th Ave SE, F St SE (REET) from 29th St SE to 21st St SE, S 300th St from 58th PI S to 64th Ave S, and Mountain View Dr from S 331st ST to West Valley Highway. 2014 SOS Active Project Totals 1,938,584 1,938,584 2014 & 2015 TOTAL ACTIVE SOS PROJECTS 4,813,584 4,813,584 2015 COMPLETED CAPITAL PROJECTS TOTAL 14,058,000 13,518,989 ACTIVE CAPITAL PROJECTS TOTAL 76,484,272 78,770,956 DI.B Page 16 of 16 Page 12 of 12