Loading...
HomeMy WebLinkAbout07-06-2015 CITY COUNCIL AGENDA MODIFICATION (2)C 1 TY O F * __�1 TO: WASHINGTON Members of the City Council Mayor Backus Department Directors FROM: Danielle Daskam, City Clerk SUBJECT: Agenda Modification DATE: July 6, 2015 The July 6, 2015, City Council agenda is modified as follows: VII. Consent Agenda The attached Public Works Project CP1506 substitutes the documents transmitted with the agenda packet. F. Public Works Project No. 1506 (Snyder) City Council award Contract No. 15 -13, to ICON Materials on their low bid of $1,894,842.20 for Project No. Project No. CP1506, 2015 Pavement Parching and Overlay Project Title: Public Works Contract No. 15 -13 Agenda Category: _Consent •Resolution Date:7 /2/15 ■ Ordinance ■ Discussion Department: CD & PW Budget Impact: $0 Administrative Recommendation: City Council award Contract No. 15 -13, to ICON Materials on their low bid of $1,894,842.20 for Project No. Project No. CP1506, 2015 Pavement Parching and Overlay Project. Background Summary: This project includes funding from the Save Our Streets Program, the Arterial Street Preservation Program and an additional $600,000 of Real Estate Excise Tax revenue. The purpose of this project is to preserve and enhance City streets by grinding and overlaying 1.07 miles of arterial and collector streets, patching pavement on 2.00 miles of arterial and collector streets, and applying a thin overlay to 0.83 miles of local residential streets as part of the Save Our Streets Program (streets shown on the attached map). The project will also replace 28 curb ramps at the various project sites so they are compliant with the Americans with Disabilities Act (ADA). The 2015 Pavement Patching and Overlay Project is expected to be completed by October 2015, however the work is weather dependent. Because the bid opening was held on July 2, 2015 staff was unable to compile the bid tabulations to include in the agenda packet and has prepared this revised agenda bill with information from the bid opening. The City received 4 responsive bids and the low bid was approximately 18% below the engineer's estimate. Staff has performed reference checks and other verifications to determine that ICON Materials meets the responsible bidding criteria and recommends award. Construction of this project is anticipated to begin in July 2015. An authorized contract contingency amount of $550,000.00 is being requested to allow for the potential of additional street patching to be completed at the favorable bid prices received by ICON. An evaluation will be completed to determine what streets can be repaired within this authorized contingency amount and within the construction period. A project budget contingency of $97,775.00 remains in the 103 (Local Street Pavement Preservation) Fund. A project budget contingency of $206,488.00 remains in the 105 (Arterial and Collector Pavement Preservation) Fund. List Attachments: Budget Status Sheet, Bid Tab Summary, Map Reviewed by Council Ad Hoc Committees or Commissions: Other: Meeting Date: July 6, 2015 Staff: Jai Carter Updated 12/30/2014 Project Name: Prepared by: Bid Date: BID TABULATION BID TOTALS SUMMARY CP1506, 2015 Citywide Pavement Patching & Overlay, Contract 15 -13 City of Auburn 7/2/15 ENGINEERS ESTIMATE: $ 2,323,120.64 AVERAGE BASIC BID AMOUNT $ 2,084,951.02 BASIC BID SPREAD AMOUNT: $ 271,169.85 Basic BID Amount Spread $ Spread % LOW BIDDER: Icon Materials $ 1,894,842.20 - $428,278.44 - 18.44% Second Bidder: Lakeside Industries $ 2,115,973.98 - $207,146.66 - 8.92% TOTAL BID (Tax not applicable) Icon Materials $ 1,894,842.20 Lakeside Industries $ 2,115,973.98 Puget Paving & Construction, $ 2,162,975.85 Miles Resources, LLC $ 2,166,012.05 NOTE: An evaluation of whether a bidder is responsible or non - responsible was only made for the low bidder. This does not indicate, one way or the other, how other bidders would be considered if they were the low bidder. 7/2/2015 (4:16 PM) h:lprojlbidtabs \CP1506 wnxls BUDGET STATUS SHEET Project No: 15 -13 Project Title: 2015 Pavement Patching, and Overlay Project Project Manager: Jai Carter Initiation Date: October 6, 2014 Advertisement Date: June 18, 2015 Award Date: July 6, 2015 Q Final Design O Project Intiation • Contract Award O Change Order Approval O Contract Final Acceptance Date: July 6, 2015 The "Future Years" column indicates the projected amount to be requested in future budgets. Funds Budgeted (Funds Available) Funding Prior Years 2014 2015 Future Years Total 103 Fund - Local Street Preservation 0 0 430,000 0 430,000 105 Fund - Arterial /Collector Preservation 0 0 1,700,000 0 1,700,000 ICON Materials - Mining Permit #MIN07 -0001* 0 0 80,000 0 80,000 Real Estate Excise Tax# 0 0 600,000 0 600,000 Total 0 0 2,810,000 0 2,810,000 *Funds to be contributed as traffic mitigation fee associated with Mining Permit. Shown below combined with 105 fund budget. #Funds shown below combined with 105 fund budget. Estimated Cost (Funds Needed) Activity Prior Years 2014 2015 Future Years Total Design Engineering - Actual City Costs** 0 0 20,895 0 20,895 Construction Contract Bid 0 0 1,894,842 0 1,894,842 Authorized Contingency 0 0 550,000 0 550,000 Construction Engineering - City Costs** 0 0 40,000 0 40,000 Total 0 0 2,505,737 0 2,505,737 **City staff costs for Local Street Preservation (103 fund) are not charged against the project budget, amount shown is for City staff design and construction costs of the Arterial and Collector Streets (105 fund). 103 Local Street Budget Status 105 Arterial /Collector Budget Status Prior Years 2014 2015 Future Years Total ***103 Funds Budgeted () 0 0 (430,000) 0 (430,000) 103 Funds Needed 0 0 332,225 0 332,225 ** *103 Fund Project Contingency () 0 0 (97,775) 0 (97,775) 103 Funds Required 0 0 0 0 0 105 Arterial /Collector Budget Status "' ( #) in the Budget Status Sections indicates Money the City has available. 1 of 1 Prior Years 2014 2015 Future Years Total "'105 Funds Budgeted () 0 0 (2,380,000) 0 (2,380,000) 105 Funds Needed 0 0 2,173,512 0 2,173,512 ** *105 Fund Project Contingency () 0 0 (206,488) 0 (206,488) 105 Funds Required 0 0 0 0 0 "' ( #) in the Budget Status Sections indicates Money the City has available. 1 of 1 TA ____ "` `EE 1- 27 SE 236 275. P 5 STAR s 23, 31 �k S 230th s BST NWW 30TH ST NW TO 37TH ST NW Work: GRIND & OVERLAY = $173K F s 3E d. PL _ *" M de �^-- 82nd ST 3E 83d BT r Zak ST — 2301 SE 304TH ST M N > POND 33 S 300TH STREET 58TH PL S TO 64TH AVE S \\ m� ` 819 NT 124TH AVE SE TO 232 ' .2 132ND AVE SE o,J Work: PATCH AND OVERLAY = $310K S 287th 3T , I 3E l� 284th f d ST NE 104TH AVE SE LEA HILL RD TO GREEN RIVER WORK: GRIND & OVERLAY = $361K m E 236th ST Work: a 3 "h > SE 236th PL W 10tF s' "tl 37th 9T NF m 36th ST ���E PATCH = $233K % 37th 2"th sT SE za lu sT� E 290. PL �A 93rd ET SE 294th ST o'I e we Je z9sth ST °"'"'""` •''xE $ f N mreewrxwE� ®g ox € _ SE e 29g1, BT ry ° S 298. ST S 300. ST 2' 300th'' _ 3ti0� `// 9 9T °1 Lh ST m w "' °•^ e a S 318th ST ST A �T'i ,mrv. w; $ S co zsAn AT NW 2Ntry ST S 305 tt ST NW r m S '. TNN y F / \ oq h 3 m .0th ST NW AUBURN MUNICIPAL I AIRPORT 6. ST E u smw r. m xe 30th ST NE < s2athm ET sawn crux 'z ST NE 28th AL °s N E „,,. ,,' sans we m x 90. 'tn in S m 6 €+ o N n 22nd ST u21st ,g ST NW a T z . •m� - s 31zuy`' ]fit ` n o K q 24th ST NE rdNE T 22nd 5 v E �- O 17thx 1' STS "1 N N E ° ge _ x AAA '... z S'1' tiE s :�gto hTST NE 1e. s son. s OE • w 3T _ - �� e mwae xsoe me " m Isms s =om. o� _. x nnw a m'01 S 310th i — " ¢p _I / SE 312th 'TI S = - �r - — — y „n F ,.r,t„ • F, ,,... = 3 - 316th S ,� n 14t h ' x 9T NW z z � 2 T. APPROX. WEST Work: PATCH VIEW DRIVE 350 FEET FROM VALLEY HIGHWAY _ $75K STZ ifith 9T °' 8th ST NE 16th NE ST 14 NE e12th 1 E 16th 3 z ,T- �m s 313m s `. 0th 3T NE ° 10th m e ath r �zwNE 6 3T� E ss J� =_ SE h a - a,.•,e'16t sT 6 m S 3 ST ' SE HE to sT rvrv�e �Yfi \¢lit 316TH, 315TH, a ss...n :. m w�aarnm•wmrc m gg o i n 6 0, 5 320th ST Y Al F y S STn ST NWN3d aT 0 v, plat S v,,. r. AV o0rd S'A 19 }t x nne T VETERANS e 9th ST 3rd , ST EE AUBURN E, ST NE _ RICH SCHOOL st MAIN s ° EAaT to s z6 NET z z ME® w z a E A vTI d NEws st NEF�e<x.e @ tla4spa,.5 R PL rc MAIN A ST @ e,. s x =' BE 3 T /7 _ 113TH & 114TH Work: THIN ur OVERLAY = $350K 5 1. MT VIED, 4 CEMETERY O ,>r«o r. ids 9 331st .322 1 Eh St SA ZA m �� �, = zna m m ® m Ei em „m °' na SvesE Brd ST SE 2,SST s q q?039 4 •. -, BE x \ \ x ET ewi+w•� w�s.emw Ad- se 4th ' SE ` .. m > S 338th ST5 S 338th AB ANYOry STATE 000 • r B. S SW h Sr:;;A® , S rn 8th ST SE Blh xx a 6D. E M ST SE SE V, SE x LAKE RD - SEE C. ST SW SR 18 EAST RAMP TO 15TH ST SW Work: PATCH = $391K l` 9th SE zes 8TH ST SE TO 12TH ST SE S 338th S ST cti = r a a S” 340th ST 342ND ST 0 N 44. a S 396. m .a I 3 �1 I cs sw PAR thy' COVE 10th SE PARK s I1100 2tA� -- ST sE SEE d �� G,? ; Work: GRIND & OVERLAY = $278K le n s m 119* N ST T ST 18Th ST ,.n hr Wy .7 ,o 177h SE 19Y vi 1 ItT�SR 000 T 1g�p '� —I aqy� P>, 5 340te i- ,M�Jr"' a + 34atp elh AVE N S 349th C, Z 81h a AvE N a Q S 350u> ,T nd ST S 352nd ST m 352nd m T AVE BROADWAY m.e s, 0th AVE /G m ° mwP 21st d 23rd ST SE v ° rd x 2Eth ST SE N aw. ST P1°r`Wx ST SE E CEDARPeta aLANES T - " PARK' " ° 3E T ST z 3E sBlh 9 L/ 1.y se 1' s. >aL F MUCKLESH00T o h ST S E -. ° m SOUTy 5 1 Ez�• x �m '`"•X` " "''`'" INS 80EIN USTRIeL 22nd ST SE CASINO F22na U 3rd ST SE oiA DRIVE `S l VALLEY 24. 9E S SE E_ 20`tha 7th 9th zsm ST SE o "A er ®te 24th ST SE d 4 %+' a x ror.Are ROAD 22 I ry 0Amm N S 354th S6 5th AVE N th STc� >n 356. ¢ 4t1gAVE N .0 30. AVE S 358th ST a S 358th ST " 2nd AVE " 30. E 360. H 260th 360. st Ave QI Ir ST SE n: Ee N ^, r m e.• e Ac9D ' $U;o oxY �9EE ° rz apoa Fare .,. € ® ° F STREET SE x €BE sTE3E R,VER DIANE 3053 \ oa °H T A u.eA�s� ` R xa Ave s in „ S 302. ST s 362na sr ,,f,' 3rd 3rd 49 E h ST 84th ST °u Ah E < w o S 338 5 4 T s ,88th 5T 3RD s I n PLb s 370 T AVE S S 332 rvd 9T nd ,,, m HOMER A e $ ..e ,, nn sw s, tre S D m AvE ' -1 AVE S pS 376th ST 3RD s AvE m a a, 4TH F ii ` 9T1 AVE 9 380th S g 5TH m AVE SW V 3319T Nn ,. Sr g 5 5 2ND ST OTN ASE a9W 84th ST COUNTY LINE RD E ` z 1ST 9TH 411. m ryry a ,•.w m s I M 37th ST SE P, SE E 21ST ST SE TO 29TH ST SE Work: PATCH = $215K 1 ELLI ON ry AVE ^ p wuc sE a A ^• r., a AVE s rvE eo we rvs w E ,4 }� 91 L , 6r, j,¢ A4+(+ h� -- s 44th ST SE 4 , pL ety t4Y*;t, ' ' & c 4 Fpry DR s 47th ST SE aawm. uru .9 _ & q is M gFQ °' WKELAND " m 4 e m a a fyp a° 4 gsssn T fi3r3 x 9T SE vy �q ww £ S uxeurvn k y pP� C2 N 66th ST z M 09 s s+ ° '°'H °' �r"4Nu ^T E ewes z W :i nas°rx&A A ,, y0e, °¢iC qko mkt C 'w.ry %$ erg §•�fr �gs � ' a imne Ory <P g1 ST E 9T E 41". CO(') 6 oo O 0 1 3'' Dc I SCALE: 1 INCH = 3,300 FEET 2D " s TH 2ND ST E 2N0 ST E 4T i _< EDWARpE H sT esf so ,. RD E 9 � �• g� >,3m a 1 S eom sev 12TH S HIM re era I 10TH ST E 1v ® ss % e2z 11 W. vm surmerz -rwe n ° 4M 9�P '5xE TAPPS 4xWY X00 0300R a 20TH ST E 20TH ST 210T ST E E 5 1 - AXE TAPES LfN / .. \ -2. 1'0\ \ \ n 1 \ `Ca � ® \��\ /� LAKE APPS MAP 1• 2015 PAVEMENT PATCHING AND OVERLAY PROJECT STREET S ADDED PATCH /OVERLAY STREETS .(REAL ESTATE EXCISE TAX) PATCH .(105 FUND) GRIND & OVERLAY (105 FUND) THIN OVERLAY (103 FUND)