HomeMy WebLinkAbout2016-2021 Capital Facilities Plan.pdfCity of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN (2016 – 2021) Adopted by Ordinance No. 6580, January 19, 2016 as part of the City of Auburn Comprehensive Plan City of Auburn 25 West Main Auburn, WA 98001 (253) 931-3000 www.auburnwa.gov Cover Design: ARC Architects Inc. Auburn Community and Youth/Teen Center City of Auburn Capital Facilities Plan City of Auburn Capital Facilities Plan CAPITAL FACILITIES PLAN 2016 – 2021 TABLE OF CONTENTS Executive Summary ................................................................................................................... 1 1. Introduction Purpose .................................................................................................................................. 7 Statutory Requirement for Capital Facilities Elements ............................................................ 7 Concurrency and Level of Service .......................................................................................... 8 Implementation ....................................................................................................................... 8 2. Goals and Policies 1. Capital Facilities Response to Growth .............................................................................. 11 2. Financial Feasibility .......................................................................................................... 11 3. Public Health and Environment ......................................................................................... 13 4. Consistency With Regional Planning ................................................................................ 13 3. Capital Improvements Introduction ............................................................................................................................ 15 Transportation ........................................................................................................................ 17 Arterial Street (102) Capital Projects ................................................................................. 22 Local Street (103) Capital Projects ................................................................................... 83 Street Preservation Fund (105) Capital Projects ............................................................... 85 Water...................................................................................................................................... 93 Sanitary Sewer ....................................................................................................................... 127 Storm Drainage ...................................................................................................................... 145 Parks, Arts and Recreation ..................................................................................................... 169 General Municipal Buildings ................................................................................................... 195 Community Improvements ...................................................................................................... 205 Airport..................................................................................................................................... 221 Cemetery ................................................................................................................................ 235 Police Department .................................................................................................................. 237 Valley Regional Fire Authority ................................................................................................ 239 City of Auburn Capital Facilities Plan City of Auburn Capital Facilities Plan EXECUTIVE SUMMARY A capital facilities element is one of the comprehensive plan elements required by Washington’s Growth Management Act (GMA). Capital facilities generally have long useful lives, significant costs and tend to not be mobile. The GMA requires that capital facilities elements include an inventory of existing capital facilities showing locations and capacities, a forecast of future needs for such capital facilities, proposed locations and capacities of new or expanded capital facilities and at least a six-year plan to finance capital facilities with identified sources of funding. The GMA also requires that the land use element be reassessed if probable funding falls short of existing needs. This document is the City’s six-year Capital Facilities Plan (CFP). The CFP, in conjunction with other City adopted documents, satisfies the GMA requirement for a Capital Facilities Element. It addresses one of the GMA’s basic tenets: to provide adequate facilities to support development in accordance with locally adopted level of service standards. This CFP will enable the City to: (1) make informed decisions about its investment of public dollars, and (2) make timely decisions about maintaining level of service in accordance with this CFP and other adopted plans. CAPITAL FACILITIES PLAN CONTENT This CFP consists of the following: Chapter 1. Introduction Purpose of CFP, statutory requirements, methodology. Chapter 2. Goals and Policies Goals and policies related to the provision of capital facilities. Chapter 3. Capital Improvements Proposed capital projects, which include the financing plan and reconciliation of project capacity to level of service (LOS) standards. This CFP is a companion document to the Capital Facilities Element of the Auburn Comprehensive Plan. The Capital Facilities Element of the Auburn Comprehensive Plan identifies the City’s planning approach and policy framework for the provision of capital facilities. This CFP provides the background inventory, identifies proposed projects and establishes the six-year capital facilities plan for financing capital facilities. The comprehensive plan contains timeframes which are the intended framework for future funding decisions and within which future actions and decisions are intended to occur. However, these timeframes are estimates; depending on factors involved in the processing City of Auburn Capital Facilities Plan 2 of applications and project work, and the availability of funding, the timing may change from the included timeframes. The framework does not represent actual commitments by the City of Auburn that may depend on funding resources available. GROWTH ASSUMPTIONS In planning for capital facilities, contemplation of future growth needs to be considered. The CFP is based on the following City population forecast: Year Population 2014 74,630 2015 75,545 2021 85,912 The population forecasts are based on information from the State of Washington Office of Financial Management (OFM) as well as estimates developed by the City of Auburn Planning and Community Development Department. CAPITAL COSTS OF FACILITIES Based on the analysis of capital improvements contained in this document, the cost of City- owned and managed capital improvements for 2016-2021 is summarized as follows: Type of Facility 2016 - 2021 Transportation - Arterial (102)123,088,541$ Transportation - Local (103)9,600,000 Transportation - Street (105)15,762,850 Water 35,758,154 Sanitary Sewer 12,751,000 Storm Drainage 17,685,618 Parks, Arts & Recreation 20,710,000 General Municipal Buildings 5,140,850 Community Improvements 5,724,670 Airport 8,078,650 Total 254,300,333$ City of Auburn Capital Facilities Plan 3 FINANCING FOR CAPITAL FACILITIES The financing plan for the citywide capital improvements includes: Funding Source 2016 - 2021 Capital Facility Grants 79,143,903 Transportation 4,605,000 Parks, Arts & Recreation 1,150,000 Community Improvements 7,541,717 Airport User Fees / Fund Balance 21,338,154 Water 13,151,000 Sewer 17,832,776 Storm Drainage 150,000 Community Improvements 1,075,000 Equipment Rental 536,933 Airport Arterial Street Fund 4,657,000 Transportation Arterial Street Preservation Fund 401,750 Transportation Bond Proceeds 14,520,000 Water 252,842 Storm Drainage 6,000,000 Parks, Arts & Recreation Municipal Parks Fund 435,000 Parks, Arts & Recreation Property Tax 735,000 Parks, Arts & Recreation Sales Tax 8,700,000 Transportation Utility Tax 13,307,850 Transportation Mitigation/Impact Fees 15,809,214 Transportation 910,000 Parks, Arts & Recreation 176,570 Community Improvements REET 1 759,219 Parks, Arts & Recreation 425,000 Community Improvements 4,065,850 General Municipal Buildings REET 2 3,573,100 Community Improvements 300,000 Transportation Other Sources 25,231,674 Transportation 250,000 Community Improvements 7,265,781 Parks, Arts & Recreation Total 254,300,333$ (Includes grant funding that has not been secured) City of Auburn Capital Facilities Plan 4 SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS The forecasted impacts of new capital facilities on the City’s future operating budgets (2017-2022) are as follows: Budget Year:2017 2018 2019 2020 2021 2022 Total 1 Transportation 86,707$ 95,807$ 105,807$ 188,807$ 258,857$ 258,857$ 994,842$ 2 Water - - 600 600 600 600 2,400 3 Sanitary Sewer - - - - - - - 4 Storm Drainage - - - - - - - 5 Solid Waste - - - - - - - 6 Parks, Arts and Recreation 171,000 171,000 183,000 183,000 183,000 183,000 1,074,000 7 General Municipal Buildings - - - - - - - 8 Community Improvements - - 10,000 10,000 10,000 10,000 40,000 9 Airport - - - - - - - 10 Cemetery - - - - - - - 11 Golf Course - - - - - - - 12 Senior Center - - - - - - - 13 Police Department - - - - - - - 14 Fire Protection - - - - - - - Total 257,707$ 266,807$ 299,407$ 382,407$ 452,457$ 452,457$ 2,111,242$ Project summary details are located on the following pages: Transportation page 92 Water page 126 Parks & Recreation page 191 Community Improvements page 219 City of Auburn Capital Facilities Plan 5 LEVEL OF SERVICE (LOS) CONSEQUENCES OF THE CFP Based on the proposed six-year capital projects and the projected population increase of 10,658 (13.7%) between 2015 and 2021, the LOS for the following City-owned public facilities will change as follows: The LOS for the following facilities will be increased as a result of the CFP, comparing the 2015 LOS to the projected 2021 LOS. CAPITAL FACILITY LOS UNITS 2015 LOS 2021 LOS (Projected) Cemetery Burial Plots per 1,000 Pop.27.13 40.44 Community Parks Acres per 1,000 Pop.2.96 3.12 Linear Parks Acres per 1,000 Pop.0.23 0.24 Neighborhood Parks Acres per 1,000 Pop.0.77 0.79 The LOS for the following facilities will be maintained as a result of the CFP. CAPITAL FACILITY LOS UNITS 2015 LOS 2021 LOS (Projected) Roads Volume/Capacity Ratio "D""D" Airport % Air Operations Support 100%100% Sanitary Sewer Residential GPCPD (Note 1)171.00 171.00 Storm Drainage N/A Water Residential GPCPD (Note 1)230.00 230.00 Note 1: GPCPD = Gallons per Customer per Day The LOS for the following facilities will be decreased as a result of the CFP, comparing the 2015 LOS to the projected 2021 LOS. CAPITAL FACILITY LOS UNITS 2015 LOS 2021 LOS (Projected) Fire Protection Apparatus per 1,000 Pop.0.23 0.21 General Municipal Buildings Sq. Ft. per 1,000 Pop.3,895.98 3,585.62 Open Space Acres per 1,000 Pop.5.12 4.50 Senior Center Sq. Ft. per 1,000 Pop.154.43 135.80 Special Use Areas Acres per 1,000 Pop.3.37 2.96 Level of Service (LOS) is a common measure used to determine the efficiency or effectiveness of services. For the City of Auburn, LOS targets serves as a means to assess the adequacy of public facilities in meeting the needs of the population for which it serves. City of Auburn Capital Facilities Plan 6 For example, in the case of park space, when there is an increase in population without a corresponding increase in park acreage, the LOS unit of measure (acres per 1,000 population) will decline, indicating a potential need to increase the total amount of park acreage to keep pace with population growth. On the other hand, a slight increase in population, coupled with a large increase in facilities, will result in an increased LOS. For example, facilities such as buildings or burial plots may be constructed or expanded to keep pace with anticipated population growth. While this will have the effect of increasing LOS in the short-term, in the longer-term, the LOS will gradually decline to the targeted level based on forecasted population. The impact of population growth to the LOS for facilities will vary depending on the type of facility and long range planning by the City. CFP ELEMENT SOURCE DOCUMENTS Documents used in preparing this Capital Facilities Plan (CFP) are principally the comprehensive plans for the various public facilities included in this CFP. These individual comprehensive plans provide detailed identification of projects and identify their (projects) proposed funding sources. City documents include: • City-wide Comprehensive Land Use Plan Element (2014); • City Municipal Airport Master Plan Update (2012-2032); • City Comprehensive Water Plan (2015); • City Comprehensive Transportation Plan (2012) and Six Year Transportation Improvement Program (2016-2021); • City Comprehensive Drainage Plan (2015); • City Comprehensive Sewer Plan (2015);  City 2015-16 Biennial Budget and 2014 Annual Financial Report; and, • Master plan update for parks, as well as numerous other planning and financial documents. All documents are available for public inspection at the City of Auburn. City of Auburn Capital Facilities Plan 7 CHAPTER 1 INTRODUCTION PURPOSE The Capital Facilities Plan (CFP) is a 6-year plan (2016-2021) for capital improvements that support the City of Auburn’s current and future growth. In this plan, funding for general government projects is identified. To maintain consistency with individual master and utility comprehensive plans, applicable projects in the 6-year window of those master/utility plans are included in this CFP. The CFP also identifies LOS standards, where applicable, for each public facility. STATUTORY REQUIREMENTS FOR CAPITAL FACILITIES ELEMENTS RCW 36.70A.070(3)(d) requires that the comprehensive plan capital facilities element include “a six-year plan that will finance such capital facilities within projected funding capacities and clearly identifies sources of public money for such purposes.” RCW 36.70A.070(3)(e) requires that all capital facilities have “probable funding” to pay for capital facility needs, or else the City must “reassess the land use element.” In addition, the capital facilities element must include the location and capacity of existing facilities, a forecast of future needs, and their proposed locations and capacities. The State Growth Management Act (GMA) guidelines suggest that this analysis be accomplished for water systems, sanitary sewer systems, storm water facilities, schools, parks and recreation facilities, police and fire protection facilities. The GMA also seeks the selection of level of service standards for capital facilities. As a result, public facilities in the CFP should be based on quantifiable, objective measures of capacity such as traffic volume, capacity per mile of road and acres of park per capita. In some instances, though, level of service may best be expressed in terms of qualitative statements of satisfaction with a particular public facility. Factors that influence local level of service standards include, but are not limited to, community goals, national and local standards, and Federal and State mandates. To be effective, the CFP must be updated on a regular basis. State GMA guidelines suggest that the CFP be updated at least every two years. In 2007, the City transitioned to a biennial budget. With this in mind, the City will follow these guidelines and update the CFP at least every two years, incorporating the capital facilities improvements in the City’s biennial budget process. City of Auburn Capital Facilities Plan 8 CONCURRENCY AND LEVEL OF SERVICE Concurrency The GMA requires that jurisdictions have certain capital facilities in place or available within a specified time frame when development occurs. This concept is called concurrency. Under the GMA, concurrency is required for transportation facilities and is recommended by the State for certain other public facilities, namely potable water and sanitary sewer. Concurrency has a direct relationship to level of service. The importance of concurrency to capital facilities planning is that development may be denied if it reduces the level of service for a capital facility below the locally adopted minimum. The level of service is unique for each type of facility and is presented in the subsequent sections. Explanation of Level of Service As indicated earlier, the GMA requires that level of service be established for certain transportation facilities for the purposes of applying concurrency to development proposals. The State GMA guidelines recommend the adoption of level of service standards for other capital facilities to measure the provision of adequate public facilities. Typically, measures of level of service are expressed as ratios of facility capacity to demand (i.e., actual or potential users). Table 1-1 lists generic examples of level of service measures for some capital facilities: TABLE 1-1 Sample Level of Service Measurements The need for capital facilities is largely determined by a community’s adopted LOS standards and whether or not the community has formally designated capital facilities, other than transportation, as necessary for development to meet the concurrency test. The CFP itself is therefore largely influenced by the selection of the level of service standards. Level of service standards are measures of the quality of life in the City. The standards should be based on the City’s vision of its future and its values. IMPLEMENTATION Implementation of the CFP requires constant monitoring and evaluation. The CFP is sensitive to funding and revenue availability and therefore needs to be constantly monitored against variations in available resources. To facilitate its implementation, the CFP should be kept current. Type of Facility Sample Level of Service Measure General Municipal Buildings Square feet per 1,000 population Parks Acres per 1,000 population Roads and Streets Ratio of actual volume to design capacity Sewer / Water Gallons per customer per day City of Auburn Capital Facilities Plan 9 Update of Capital Facilities Plan Perhaps the most desirable way to keep the CFP current is to update it regularly so the six- year plan is a rolling CFP. Again, the State recommends that the CFP be updated at least biennially. The City of Auburn will seek to update the CFP at least biennially in conjunction with the budget process. Future updates will consider: A. Revision of population projections, including annexations; B. Update of inventory of public facilities; C. Update of costs of public facilities; D. Update of public facilities requirements analysis (actual level of service compared to adopted standards); E. Update of revenue forecasts; F. Revise and develop capital improvement projects for the next six fiscal years; and, G. Update analysis of financial capacity. Amendments to the CFP, including amendments to level of service standards, capital projects, and/or the financing plan sources of revenue are all actions that can keep the CFP current and relevant to City decision-making. City of Auburn Capital Facilities Plan 10 City of Auburn Capital Facilities Plan 11 CHAPTER 2 GOALS AND POLICIES This chapter identifies goals and policies specific to the City’s provision of capital facilities. Goal 1 Provide a variety of responses to the demands of growth on public facilities. Policy 1.1 Establish land use patterns that optimize the use of public facilities. Policy 1.2 Provide additional public facility capacity when existing facilities are used to their maximum level of efficiency (consistent with adopted standards for level of service). Policy 1.3 Encourage development where new public facilities can be provided in an efficient manner. Policy 1.4 Exempt the following from the concurrency management program: 1.4.1 Development vested by RCW 19.27.095, 58.17.033 or 58.17.170. 1.4.2 Development that creates no added impact on public facilities. 1.4.3 Expansions of existing development that were disclosed and tested for concurrency as part of the original application. Goal 2 Provide needed public facilities that are within the ability of the City to fund or within the City’s authority to require others to provide. Policy 2.1 Establish level of service standards that are achievable with the financing plan of this Capital Facilities Plan. Policy 2.2 Base the financing plan for public facilities on realistic estimates of current local revenues and external revenues that are reasonably anticipated to be received by the City. Policy 2.3 Match revenue sources to capital projects on the basis of sound fiscal policies. 2.3.1 The City shall continue to fund utility costs through utility enterprise funds, based on user fees and grants. Public facilities included in utilities are sewer, solid waste, storm drainage, and water. 2.3.2 Where feasible pursue joint venture facility construction, construction timing, and other facility coordination measures for City provided facilities, as well as with school districts and other potential partners in developing public facilities. 2.3.3 The City shall continue to assist through direct participation, LIDs and payback agreements, where appropriate and financially feasible. Where funding is available, the City may participate in developer initiated facility extensions or improvements, but only to the extent that the improvements benefit the broader public interest, and are consistent with the policies of this Capital Facilities Plan. City of Auburn Capital Facilities Plan 12 Policy 2.4 If the projected funding is inadequate to finance needed public facilities and utilities based on adopted level of service standards and forecasted growth, the City will do one or more of the following to achieve a balance between available revenue and needed public facilities: 2.4.1 Lower the level of service standards; 2.4.2 Increase the amount of revenue from existing sources; 2.4.3 Adopt new sources of revenue; 2.4.4 Require developers to provide such facilities at their own expense; and/or 2.4.5 Amend the Land Use Element to reduce the need for additional public facilities. Policy 2.5 Both existing and future development will pay for the costs of needed capital improvements. 2.5.1 Ensure that existing development pays for capital improvements that reduce or eliminate existing deficiencies, and pays for some or all of the cost to replace obsolete or worn out facilities. Existing development may also pay a portion of the cost of capital improvements needed by future development. Existing development’s payments may take the form of user fees, charges for services, special assessments and taxes. 2.5.2 Ensure that future development pays a proportionate share of the cost of new facilities which it requires. Future development may also pay a portion of the cost to replace obsolete or worn-out facilities. Future development’s payments may take the form of voluntary contributions for the benefit of any public facility, impact fees, mitigation payments, capacity fees, dedications of land, provision of public facilities, and future payments of user’s fees, charges for services, special assessments and taxes. Policy 2.6 The City will determine the priority of public facility capital improvements using the following criteria as general guidelines. Any revenue source that cannot be used for the highest priority will be used beginning with the highest priority for which the revenue can legally be expended. 2.6.1 Projects that eliminate hazardous conditions. 2.6.2 Refurbishment of existing facilities that contribute to achieving or maintaining standards for adopted level of service. 2.6.3 New or expanded facilities that reduce or eliminate deficiencies in level of service for existing demand. 2.6.4 New or expanded facilities that provide the adopted level of service for new development and redevelopment during the next six fiscal years. 2.6.5 Capital improvements that significantly reduce the operating cost of providing a service or facility, or otherwise mitigate impacts of public facilities on future operating budgets. City of Auburn Capital Facilities Plan 13 2.6.6 Capital improvements that contribute to stabilizing and developing the economy of the City. 2.6.7 Project priorities may also involve additional criteria that are unique to each type of public facility, as described in other elements of this Comprehensive Plan. Policy 2.7 Ensure that the ongoing operating and maintenance costs of a capital facility are financially feasible prior to constructing the facility. Goal 3 Protect public health, environmental quality, and neighborhood stability and viability through the appropriate design and installation of public facilities. Policy 3.1 Promote conservation of energy, water and other natural resources in the location and design of public facilities. Policy 3.2 Require the separation of sanitary and storm sewer facilities wherever combined sewers may be discovered. Policy 3.3 Practice efficient and environmentally responsible maintenance and operating procedures. Policy 3.4 The siting, design, construction and improvement of all public buildings shall be done in full compliance with the Americans with Disabilities Act (ADA). Policy 3.5 Promote economic and community stability and growth through strategic investments in public facilities and public private/partnerships. Goal 4 Make the Capital Facilities Plan consistent with other elements of the comprehensive plan, and - to the extent feasible - with other city, county, regional and state adopted plans. Policy 4.1 Ensure that the growth and development assumptions used in the Capital Facilities Plan are consistent with similar assumptions in other elements of the comprehensive plan. Policy 4.2 Coordinate with non-city providers of public facilities on a joint program for maintaining applicable level of service standards, concurrency requirements, funding and construction of public facilities. Goal 5 Provide public facilities that provide a sense of community that is inclusive of diverse populations. Policy 5.1 Contribute to community pride and foster a sense of community through provision of public facilities that create a community gathering place for neighbors, family and friends. Policy 5.2 Through provision of public facilities offer a broad range of activities promoting social interactions especially with new residents. Policy 5.3 Provide maximum flexibility and multiple uses through design of public facilities that are adaptable to changing interests. Policy 5.4 Provide a community center facility that is financially feasible, affordable for participants, and can generate revenue to offset a portion of the operating costs. City of Auburn Capital Facilities Plan 14 City of Auburn Capital Facilities Plan 15 CHAPTER 3 CAPITAL IMPROVEMENTS 1. INTRODUCTION This CFP includes City capital improvement projects and the financing plan to pay for those projects. It also contains the inventory of existing City facilities, and identifies level of service standards, where applicable. Each type of City public facility is presented in a separate subsection that follows a standard format. Throughout this section, tables of data are identified with abbreviations that correspond to the type of facility. For example, Table W-1 refers to Table 1 for Water (Supply and Distribution). Each abbreviation corresponds to the name of the type of facility. 1. Narrative Summary This is an overview of the data, with sections devoted to Current Facilities, Level of Service, Capital Facilities Projects and Financing, and Impact on Future Operating Budgets. 2. Inventory of Facilities (Table X-1) This is a list of existing capital facilities, including the name, capacity (for reference to level of service), and location. This table also includes any proposed capital projects and the planned inventory total through December 31, 2021. 3. Capital Projects and Financing Plan (Table X-2, X-2A and X-2B) This is a list of capital improvements that identifies existing deficiencies, identifies facilities needed for future growth, and identifies the need to repair or replace obsolete or worn out facilities through December 31, 2021. Each list shows the proposed financing plan followed by individual worksheets showing the project detail. 4. Impact on Future Operating Budgets (Table X-3) This is a list of new capital projects and the forecasted impacts on the City’s future operating budgets (2017 – 2022). City of Auburn Capital Facilities Plan 16 City of Auburn Capital Facilities Plan 17 TRANSPORTATION Current Facilities Roadways: The City’s street system consists of a network of 216 miles of arterials, collectors, local streets and alleys. Existing non-motorized facilities include a mix of trails, sidewalks, bicycle lanes and sharrows. Transit: King County Metro Transit, Sound Transit and Pierce Transit serve the Auburn area. Auburn is currently served by eight Metro bus routes, two Sound Transit bus routes, and one Pierce Transit bus route. In addition, twenty Sound Transit “Sounder” commuter rail trains stop at the Auburn Station. The Sounder also provides special event service to selected sporting events. Bus and rail service is supported by park and ride facilities and the Auburn Station. Level of Service (LOS) Washington's Growth Management Act (GMA) requires Level of Service (LOS) standards for both arterials and transit routes. The GMA requires that each jurisdiction's LOS standards be coordinated within the region and be supported by local ordinance, but the actual standards and the methods used are determined by each local jurisdiction. Under GMA, the focus is on the performance of the whole road system, not on individual intersections or roadways. LOS standards are a tool to help keep the transportation system in balance with the needs of forecast population growth and development. Table T-1a summarizes the LOS definitions. City of Auburn Capital Facilities Plan 18 Table T-1a Definition of Urban Street Level of Service (LOS) LOS A - describes primarily free flow operations at average travel speeds, usually about 90 percent of the free flow speed for the given street class. Vehicles are completely unimpeded in their ability to maneuver within the traffic stream. Control delay at signalized intersections is minimal. LOS B - describes reasonably unimpeded operations at average travel speeds, usually about 70 percent of the free flow speed for the street class. The ability to maneuver within the traffic stream is only slightly restricted, and stopped delays are not bothersome. LOS C - describes stable conditions; however, ability to maneuver and change lanes in midblock locations may be more restricted than in LOS B, and longer queues, adverse signal coordination, or both may contribute to lower average travel speeds of about 50 percent of the free flow speed for the street class. LOS D - borders on a range in which small increases in flow may cause substantial increases in delay and decreases in travel speed. LOS D may be due to adverse signal progression, inappropriate signal timing, high volumes, or some combination of these factors. Average travel speeds are about 40 percent of free flow speed. LOS E - is characterized by significant delays and average travel speeds of 33 percent or less of the free flow speed. Such operations are caused by a combination of adverse progression, high signal density, high volumes, extensive delays at critical intersections, and inappropriate signal timing. LOS F - is characterized by urban street flow at extremely low speeds, typically one-third to one-fourth of the free flow speed. Intersection congestion is likely at critical signalized locations, with high delays, high volumes and extensive queuing. Source: 2010 Highway Capacity Manual, Special Report 209, Transportation Research Board, Washington, D.C. 2010, page 10-5 A methodology and set of standards have been drafted for the City of Auburn Comprehensive Plan. The standards help determine concurrency (i.e., balance) between transportation and land use elements of the City’s Comprehensive Plan, as required by the GMA. The City has four choices if it finds the standards cannot be met.  Modify the land use plan, placing tighter controls on the amount and type of development to reduce traffic.  Construct additional transportation facilities to support increased travel demand from new development.  Implement Transportation Demand Management (TDM) measures to increase use of non single occupant vehicle travel modes.  Relax the LOS standards; the City can accept lower level of service standards to encourage further growth and minimize the need for additional transportation facilities. The transportation land-use balance will be monitored through the City's Concurrency Management System as part of the State Environmental Policy Act (SEPA). Transportation concurrency will be evaluated for key facilities and on a system-wide basis. By having system- wide and facility-based roadway LOS standards, the City of Auburn can define preliminary capacity needs. The City can then identify locations where standards are not anticipated to be met in the future and identify appropriate improvements. At the project level, the State Environmental Policy Act (SEPA) process will continue to guide the more specific planning and analysis efforts. City of Auburn Capital Facilities Plan 19 Level of Service Standards LOS standards can help identify where and when transportation improvements are needed, and when development or growth will impact system operations. LOS provides a standard below which a transportation facility or system is not considered adequate. LOS standards can also be used to evaluate the impact of proposed developments to the surrounding street system. They can assure that all developments are served by a safe, efficient and cost-effective street system. They can also be used to disclose impacts, identify remedial actions, and apportion costs between public and private sources. The LOS standards shown in Table T-1b apply to the facility’s location and its functional classification. A more detailed description of the level of service methodology is provided in the City of Auburn Comprehensive Transportation Plan (2012), page 5-4. Table T- 1b Draft Roadway Capacity/Congestion LOS Standards Roadway/Intersection Maximum V/C Ratio/LOS Arterial Corridor D* Signalized Intersection D Unsignalized Intersection D *Unless otherwise specified in Chapter 2 of the City of Auburn Comprehensive Transportation Plan, 2012 LOS standards are also the basis of an equitable traffic impact fee system, which require developments to pay a portion of the costs for capacity improvements to the transportation infrastructure. In 2001, the City implemented a traffic impact fee program. The purpose of the fee is to mitigate traffic impacts more equitably while making the costs of development more predictable to developers. In 2007, the City implemented an additional transportation impact fee to address the impacts of heavy truck usage on the City’s transportation system. Both fees are updated annually so that the fees are consistent with current project costs. Measuring Transportation System Performance The level of service for street segments or links is analyzed with two primary purposes in mind. First, this site-specific LOS can be used, with the help of a travel demand model, to evaluate areas of congestion within a transportation network, leading to the development of a long-range transportation facilities plan. Second, arterial corridor LOS analysis can be used to assess concurrency or if facilities are meeting the LOS standards. The City of Auburn currently uses Highway Capacity Manual methodologies to calculate levels of service. For arterials LOS are based on average travel speeds along a defined corridor. Table T-1c shows the 42 defined street corridors, LOS standards and most recent calculated LOS. City of Auburn Capital Facilities Plan 20 TABLE T- 1c Auburn Corridor Level of Service ID Corridor From To LOS Standard LOS 2009 1 Auburn Way North 15th St NE Northern City Limits D C/D 2 Auburn Way North East Main St. 15th St NE E D 3 Auburn Way South East Main St.M St SE D F/E 4 Auburn Way South M St SE Eastern City Limits D C 5 M St./Harvey Auburn Way North East Main St.E C 6 M St./Harvey East Main St Auburn Way South D D/C 7 Evergreen Way Lakeland Hills Way Kersey Way D Future 8 37th St NE/NW West Valley Hwy I St. NE D B/C 9 15th St NE/NW West Valley Hwy Auburn Way North F**D 10 Auburn Ave / "A" St SR 18 Southern City Limits D B 11 Main St West Valley Hwy R St D C 12 15th St SW West Valley Hwy C St SW D D 13 C St SW Ellingson SR 18 D C/E 14 West Valley Hwy Northern City Limits 15th Street NW E B/C 15 S 277th St Frontage Rd.108th Ave SE E E/B 16 R St./Kersey Way Auburn Way S.Oravetz Road D A/B 17 Lake Tapps Parkway East Valley Hwy.182nd Ave E D B 18 "A" St SW/NW/ "B" St NW 4th St NW S 277th St D Future 19 8th St NE/Lea Hill Rd.Auburn Way North 132nd Ave SE E C/B 20 D St NW/Emerald Downs Dr S 277th St 15th St. NW D A/B 21 I St NE S 277th St Harvey Rd D A/B 22 132nd Ave SE SE 282nd St SE 312th St D B 23 124th Ave SE SE 282nd St SE 320th. St D C 24 104th Ave SE/SE 304th St 8th St NE 132nd Ave SE D B/A 25 105th Pl SE/SE 320th St Lea Hill Road 124th Ave SE D B 26 Lakeland Hills Way SE Lake Tapps Parkway Oravetz Rd D C/D 27 29th St SE/Riverwalk Dr.A Street SE Auburn Way South D C 28 108th Ave SE/112th Ave. SE S 277th St SE 304th St D A 29 49th St NW B St NW S 277th St D Future 30 R Street SE 8th St NE 4th Street SE D B/C 31 3rd St SW/Cross St C Street Auburn Way South E E 32 17th St SE A St SE Auburn Way South D B/A 33 41st St SE/Ellingson Rd A St SE Western City Limits E F 34 Lakeland Hills Way/Oravetz East Valley Hwy Kersey Way E A/B 35 West Valley Hwy 15th Street NW Southern City Limits E C/B 36 Kersey Way Oravetz Road Southern City Limits D A 37 S. 316th Street/Terrace Drive West Valley Highway Western City Limits D B 38 S. 296th Street/65th Ave West Valley Highway Western City Limits D B 39 51st Ave S.S. 288th Street Peasley Canyon Rd D B 40 S. 284th Street 112th Ave SE 124th Ave SE D B/A 41 S. 284th Street 124th Ave SE 132nd Ave SE D Future 42 R St. Bypass/Black Diamond M Street SE SR 18 D Future * **Total travel time in the eastbound direction cannot exceed 1000 seconds for this corridor to meet the LOS Standard. Split LOS indicates directional LOS in either the East-West or North-South direction. Otherwise, the LOS is the same in both directions. City of Auburn Capital Facilities Plan 21 Concurrency (Adequate Public Facilities) Concurrency involves matching public facilities and new development. The GMA extends concurrency to transportation facilities by requiring that new development be served by adequate roads and public transportation service, and that development is not permitted to cause these transportation facilities to operate below level of service standards that are adopted by local governments in their comprehensive plans. In compliance with the GMA, adequate transportation system facilities must be available within six years of the time of occupancy and use of new development. Capital Facilities Projects and Financing The City’s transportation facilities include projects totaling $148,451,391. Tables T-2, T-2A and T-2B show the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table T-3 shows, operating budget impacts of $994,842 are forecasted for transportation facilities during the six years 2017 – 2022. City of Auburn Capital Facilities Plan 22 TABLE T- 2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION – ARTERIAL STREET 2016 2017 2018 2019 2020 2021 Total TIP#Capacity Projects: 1 A Street NW, Phase 1 Capital Costs 25,000 25,000 25,000 25,000 25,000 25,000 150,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 25,000 25,000 25,000 25,000 25,000 25,000 150,000 Other - - - - - - - 2 AWS Pedestrian Imp. -Dogwood St SE to Fir St SE Capital Costs - - - - - - - Funding Sources: Unrestricted Street Revenue - - - - - - - Traffic Impact Fees - - - - - - - Other - - - - - - - 5 M Street Underpass Capital Costs - - - - - - - Long-Term Debt 132,202 131,617 131,032 130,447 129,862 129,277 784,437 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 132,202 131,617 131,032 130,447 129,862 129,277 784,437 PWTF Loan - - - - - - - Other (Other Agencies)- - - - - - - 6 S 272nd/277th St Corridor Capacity & Non-Motorized Trail Improvements Capital Costs 5,581,800 - - - - - 5,581,800 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 4,000,000 - - - - - 4,000,000 Traffic Impact Fees 581,800 - - - - - 581,800 Other (Development Funds)1,000,000 - - - - - 1,000,000 9 Auburn Way S Improvements (Hemlock St SE to Academy Dr SE) Capital Costs 200,000 - - - - - 200,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 100,000 - - - - - 100,000 Other (MIT)100,000 - - - - - 100,000 10 F Street SE, 4th to AWS Capital Costs 250,000 1,800,000 - - - - 2,050,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 200,000 1,440,000 - - - - 1,640,000 Traffic Impact Fees 50,000 360,000 - - - - 410,000 11 M Street NE, E. Main to 4th Capital Costs - - 100,000 275,000 1,150,000 - 1,525,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 220,000 920,000 - 1,140,000 Traffic Impact Fees - - 100,000 55,000 230,000 - 385,000 14 M St SE and 12th St SE Traffic Signal Capital Costs - - - 625,000 - - 625,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 500,000 - - 500,000 Traffic Impact Fees - - - - - - - Other - - - 125,000 - - 125,000 City of Auburn Capital Facilities Plan 23 TABLE T- 2 (continued) 2016 2017 2018 2019 2020 2021 Total TIP#Capacity Projects: 15 8th Street NE Widening (Pike Street to R Street NE) Capital Costs - - 450,000 1,000,000 - - 1,450,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 360,000 800,000 - - 1,160,000 REET 2 - - - - - - - Traffic Impact Fees - - 90,000 200,000 - - 290,000 17 Harvey Road & 8th Street NE Intersection Improvements Long-Term Debt 85,608 85,206 84,803 84,402 84,000 83,598 507,617 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - PWTF - - - - - - - Traffic Impact Fees 85,608 85,206 84,803 84,402 84,000 83,598 507,617 24 Academy Drive Multi-Use Trail Capital Costs - - - 425,000 425,000 - 850,000 Funding Sources: Unrestricted Street Revenue - - - 42,500 42,500 - 85,000 Grants - - - 382,500 382,500 - 765,000 Other - - - - - - - 25 46th Place S Realignment Capital Costs - - - - 825,000 - 825,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - 575,000 - 575,000 Traffic Impact Fees - - - - 250,000 - 250,000 38 C Street SW & 15th Street SW Intersection Improvements Capital Costs - 150,000 - 875,000 - - 1,025,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 750,000 - - 750,000 Traffic Impact Fees - 150,000 - 125,000 - - 275,000 39 124th Ave SE Corridor & 320th Intersection Improvements Capital Costs 350,000 - - 1,500,000 - - 1,850,000 Funding Sources: Unrestricted Street Revenue 65,000 - - 150,000 - - 215,000 REET 2 110,000 - - - - - 110,000 Grants - - - 1,200,000 - - 1,200,000 Other (GRC)175,000 - - 150,000 - - 325,000 40 124th Ave SE Corridor Improvements Phase 2 Capital Costs - - 400,000 1,100,000 2,500,000 - 4,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 300,000 880,000 2,000,000 - 3,180,000 Traffic Impact Fees - - 100,000 220,000 500,000 - 820,000 41 R Street Bypass Capital Costs - - - - - 500,000 500,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Other - - - - - 500,000 500,000 City of Auburn Capital Facilities Plan 24 TABLE T- 2 (continued) 2016 2017 2018 2019 2020 2021 Total TIP#Capacity Projects: 42 SE 320th Street Corridor Improvements Phase 1 Capital Costs 100,000 - 600,000 662,500 3,281,600 - 4,644,100 Funding Sources: Unrestricted Street Revenue 100,000 - - - - - 100,000 Grants - - 480,000 530,000 2,953,440 - 3,963,440 Traffic Impact Fees - - 120,000 132,500 328,160 - 580,660 43 Auburn Way South Corridor Safety Improvements Capital Costs 2,329,312 - - - - - 2,329,312 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 1,772,638 - - - - - 1,772,638 Other (WSDOT)306,674 - - - - - 306,674 Traffic Impact Fees 250,000 - - - - - 250,000 45 124th Avenue SE & SE 284th Street Intersection Safety Improvements Capital Costs - 100,000 600,000 - - - 700,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 450,000 - - - 450,000 Traffic Impact Fees - 100,000 150,000 - - - 250,000 47 Traffic Management Center Improvements Capital Costs 25,000 - - - - - 25,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 25,000 - - - - - 25,000 49 West Valley Highway Improvements (15th St NW to W Main St) Capital Costs - - 100,000 600,000 3,000,000 - 3,700,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 480,000 2,400,000 - 2,880,000 Traffic Impact Fees - - 100,000 120,000 600,000 - 820,000 51 Lake Tapps Parkway ITS Expansion Capital Costs 105,000 900,000 - - - - 1,005,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 82,950 711,000 - - - - 793,950 Traffic Impact Fees 22,050 189,000 - - - - 211,050 52 A Street SE & Lakeland Hills Way SE Intersection Safety & Capacity Imp. Capital Costs 75,000 - - - - - 75,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees 75,000 - - - - - 75,000 53 AWS and 12th Street SE Intersection Improvements Capital Costs 100,000 750,000 - - - - 850,000 Funding Sources: Unrestricted Street Revenue 100,000 - - - - - 100,000 Grants - 750,000 - - - - 750,000 Traffic Impact Fees - - - - - - - City of Auburn Capital Facilities Plan 25 TABLE T- 2 (continued) 2016 2017 2018 2019 2020 2021 Total TIP#Capacity Projects: 54 Kersey Way Study Capital Costs 50,000 - - - - - 50,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Traffic Mitigation Fees 50,000 - - - - - 50,000 55 W Main Street Multimodal Corridor and ITS Improvements Capital Costs 3,494,400 - - - - - 3,494,400 Funding Sources: Unrestricted Street Revenue - - - - - - - Other- Fund 105 314,510 - - - - - 314,510 Traffic Impact Fees 209,650 - - - - - 209,650 Grants 2,970,240 - - - - - 2,970,240 56 Evergreen Heights Safe Routes to School Improvements Capital Costs - - - 790,000 563,000 4,620,000 5,973,000 Funding Sources: Unrestricted Street Revenue - - - 118,500 84,500 693,000 896,000 Grants - - - 671,500 478,500 3,927,000 5,077,000 Other - - - - - - - 58 Auburn Way South Corridor Improvements, Fir ST SE to Hemlock ST SE Capital Costs - - - - - - - Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Traffic Impact Fees - - - - - - - Other (MIT)- - - - - - - 59 Auburn Ave NE & 3rd St NE Pedestrian & Access Improvements Capital Costs - 50,000 300,000 - - - 350,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 250,000 - - - 250,000 Traffic Impact Fees - 50,000 50,000 - - - 100,000 60 M Street SE Corridor (8th St SE to AWS) Capital Costs - - - 1,925,000 4,750,000 - 6,675,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 925,000 3,750,000 - 4,675,000 Traffic Impact Fees - - - 750,000 750,000 - 1,500,000 Other - - - 250,000 250,000 - 500,000 61 SR-18 to Auburn Way South (SR-164) Bypass Capital Costs - 1,000,000 3,500,000 17,500,000 - - 22,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Other (WSDOT)- 1,000,000 1,500,000 12,500,000 - - 15,000,000 Other ( MIT)- - 2,000,000 5,000,000 - - 7,000,000 63 29th Street SE & R Street SE Intersection Improvements Capital Costs - - - 1,800,000 - - 1,800,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - 1,300,000 - - 1,300,000 REET2 - - - - - - - Traffic Impact Fees - - - 500,000 - - 500,000 64 Lea Hill Segment 1 (R St NE to 105th Pl SE) Capital Costs 100,000 - 2,450,000 10,000,000 - - 12,550,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - 1,950,000 8,000,000 - - 9,950,000 Traffic Impact Fees 100,000 - 500,000 2,000,000 - - 2,600,000 Other - - - - - - - City of Auburn Capital Facilities Plan 26 TABLE T- 2 (continued) 2016 2017 2018 2019 2020 2021 Total TIP#Capacity Projects: 65 Lea Hill Rd Segment 2 (105th Ave SE to 112th Ave SE) Capital Costs - - - - 3,500,000 8,500,000 12,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - 2,900,000 7,100,000 10,000,000 Traffic Impact Fees - - - - 600,000 1,400,000 2,000,000 Other - - - - - - - 66 Lea Hill Rd Segment 3 (112th Ave SE to 124th Ave SE) Capital Costs - - - 1,000,000 3,000,000 - 4,000,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - 3,000,000 - 3,000,000 Traffic Impact Fees - - - 1,000,000 - - 1,000,000 Other - - - - - - - 69 22nd Street NE & I St NE Intersection Capital Costs 55,000 1,175,000 - - - - 1,230,000 Funding Sources: Grants 40,000 940,000 - - - - 980,000 Traffic Impact Fees 15,000 235,000 - - - - 250,000 Other - - - - - - - 72 West Valley Highway Improvements (SR-18 to 15th St SW) Capital Costs - 100,000 500,000 2,500,000 - - 3,100,000 Funding Sources: Grants - - 400,000 2,000,000 - - 2,400,000 Traffic Impact Fees - 100,000 100,000 500,000 - - 700,000 Other - - - - - - - 73 Stewart Road (Lake Tapps Parkway Corridor) Capital Costs - 100,000 - - - - 100,000 Funding Sources: Unrestricted Street Revenue - 66,000 - - - - 66,000 Traffic Impact Fees - - - - - - - Traffic Mitigation Fees - 34,000 - - - - 34,000 Subtotal, Capacity Projects: Capital Costs 13,058,322 6,366,823 9,240,835 42,817,349 23,233,462 13,857,875 108,574,666 TIP#Non-Capacity Projects: 3 Auburn Way Corridor Improvements Capital Costs - - - 818,700 3,000,000 - 3,818,700 Funding Sources: Unrestricted Street Revenue - - - 110,000 600,000 - 710,000 Grants - - - 708,700 2,400,000 - 3,108,700 Other - - - - - - - 18 M Street SE & 29th Street SE Intersection Safety Improvements Capital Costs 50,000 - - 400,000 - - 450,000 Funding Sources: Unrestricted Street Revenue 50,000 - - 100,000 - - 150,000 Grants - - - 300,000 - - 300,000 Other - - - - - - - 19 Auburn Way North/1st Street NE Signal Improvements Capital Costs 50,000 - 475,000 - - - 525,000 Funding Sources: Unrestricted Street Revenue 50,000 - 200,000 - - - 250,000 Grants - - - - - - - Other - - 275,000 - - - 275,000 City of Auburn Capital Facilities Plan 27 TABLE T- 2 (continued) 2016 2017 2018 2019 2020 2021 Total TIP#Non-Capacity Projects: 20 R Street SE & 21st Street SE Intersection Safety Improvements Capital Costs 75,000 - - 800,000 - - 875,000 Funding Sources: Unrestricted Street Revenue 75,000 - - 100,000 - - 175,000 Grants - - - 700,000 - - 700,000 Other - - - - - - - 21 Main Street Signal Upgrades Capital Costs 420,000 - - - - - 420,000 Funding Sources: Unrestricted Street Revenue 320,000 - - - - - 320,000 Grants - - - - - - - Traffic Mitigation Fees 100,000 - - - - - 100,000 23 Riverwalk Drive SE Non-Motorized Improvements Capital Costs - 100,000 600,000 - - - 700,000 Funding Sources: Unrestricted Street Revenue - 100,000 100,000 - - - 200,000 Grants - - 500,000 - - - 500,000 Other - - - - - - - 27 A Street SE Safety Improvements Study Capital Costs 35,000 - - - - - 35,000 Funding Sources: Unrestricted Street Revenue 35,000 - - - - - 35,000 Grants - - - - - - - Other - - - - - - - 30 Citywide Pedestrian Accessibility & Safety Program Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Unrestricted Street Revenue 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Grants - - - - - - - Other - - - - - - - 31 Citywide Arterial Bicycle & Safety Improvements Capital Costs 100,000 - 100,000 - 100,000 - 300,000 Funding Sources: Unrestricted Street Revenue 100,000 - 100,000 - 100,000 - 300,000 Grants - - - - - - - Other - - - - - - - 44 Downtown Transit Center Access Improvements Capital Costs - 250,000 - - - - 250,000 Funding Sources: Unrestricted Street Revenue - 50,000 - - - - 50,000 Grants - 200,000 - - - - 200,000 Other - - - - - - - 46 104th Ave SE & Green River Road Study Capital Costs 5,000 - - - - - 5,000 Funding Sources: Unrestricted Street Revenue 5,000 - - - - - 5,000 Grants - - - - - - - City of Auburn Capital Facilities Plan 28 TABLE T- 2 (continued) 2016 2017 2018 2019 2020 2021 Total TIP#Non-Capacity Projects: 48 A St SE & 6th St SE Safety and Access Improvements Capital Costs 50,000 - - - - - 50,000 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants - - - - - - - Other 50,000 - - - - - 50,000 50 ITS Dynamic Message Signs Capital Costs 150,000 150,000 150,000 150,000 - - 600,000 Funding Sources: Unrestricted Street Revenue - - - - - - - REET 100,000 30,000 30,000 30,000 - - 190,000 Other (WRA)50,000 - - - - - 50,000 Grants - 120,000 120,000 120,000 - - 360,000 62 AWS Streetscape Improvements (SR 18 to M St SE) Capital Costs - - - 1,950,000 2,800,000 - 4,750,000 Funding Sources: Unrestricted Street Revenue - - - 200,000 200,000 - 400,000 Grants - - - 1,750,000 2,600,000 - 4,350,000 REET 2 - - - - - - - 67 Citywide Traffic Signals Safety Improvements Capital Costs 412,575 - - - - - 412,575 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 412,575 - - - - - 412,575 68 37th St SE & A St SE Traffic Signal Safety Improvement Capital Costs 722,600 - - - - - 722,600 Funding Sources: Unrestricted Street Revenue - - - - - - - Grants 635,360 - - - - - 635,360 Other- Fund 105 87,240 - - - - - 87,240 Subtotal, Non-Capacity Projects: Capital Costs 2,170,175 600,000 1,425,000 4,218,700 6,000,000 100,000 14,513,875 2016 2017 2018 2019 2020 2021 Total SUMMARY: CAPITAL COSTS Capacity Projects 12,840,512 6,150,000 9,025,000 42,602,500 23,019,600 13,645,000 107,282,612 Non-Capacity Projects 2,170,175 600,000 1,425,000 4,218,700 6,000,000 100,000 14,513,875 Long-Term Debt 217,810 216,823 215,835 214,849 213,862 212,875 1,292,054 Total Costs 15,228,497 6,966,823 10,665,835 47,036,049 29,233,462 13,957,875 123,088,541 FUNDING SOURCES: Unrestricted Street Revenue 1,000,000 316,000 500,000 921,000 1,127,000 793,000 4,657,000 Grants 10,113,763 4,161,000 4,810,000 22,217,700 24,359,440 11,027,000 76,688,903 Traffic Impact Fees 1,671,310 1,425,823 1,550,835 5,842,349 3,497,022 1,637,875 15,625,214 Traffic Mitigation Fees 150,000 34,000 - - - - 184,000 REET2 210,000 30,000 30,000 30,000 - - 300,000 PWTF Loan - - - - - - - Fund 105 -Arterial St. Preserv.401,750 - - - - - 401,750 Other (Other Agencies)1,681,674 1,000,000 3,775,000 18,025,000 250,000 500,000 25,231,674 Total Funding 15,228,497 6,966,823 10,665,835 47,036,049 29,233,462 13,957,875 123,088,541 * Mitigation agreements, impact fees, contributions, other agencies, other funds City of Auburn Capital Facilities Plan 29 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: A Street NW - Phase 1 (3rd St NW to 14th St NW) TIP # 1 Project No:c207a0 Project Type:Capacity Project Manager:Matt Larson LOS Corridor ID# 18 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 64,999 64,999 Grants- Secured (Fed,State,Local)6,562,702 6,562,702 Traffic Impact Fees 999,953 300,000 25,000 25,000 1,324,953 Other Sources -Multicare Contribution 383,381 383,381 8,011,035 300,000 25,000 25,000 8,336,035 Capital Expenditures: Design 1,591,160 50,000 10,000 10,000 1,651,160 Right of Way 821,341 821,341 Environmental 701,708 200,000 901,708 Construction 4,896,826 50,000 15,000 15,000 4,961,826 8,011,035 300,000 25,000 25,000 8,336,035 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - Grants- Secured (Fed,State,Local)- Traffic Impact Fees 25,000 25,000 25,000 25,000 150,000 Other Sources -Multicare Contribution - 25,000 25,000 25,000 25,000 150,000 Capital Expenditures: Design 10,000 10,000 10,000 10,000 60,000 Right of Way - Environmental Construction 15,000 15,000 15,000 15,000 90,000 25,000 25,000 25,000 25,000 150,000 Description: Construct a new multi-lane arterial from 3rd Street NW to 14th Street NW. This project will improve mobility and is tied to corridor development. It is consistent with the Comprehensive Plan and completes a missing link of a north/south arterial corridor. The project length is approximately three-quarters of a mile. The City purchased right-of-way from the northern property owner. If the property develops, some or a portion of those funds may be reimbursed to the City (total cost was $251,000). Progress Summary: Pre-design was completed prior to 2007. Final design and environmental permitting were completed in 2011 and construction was completed in 2013. Major plantings are scheduled in 2015 as part of the wetland monitoring that is required to continue until 2023. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $25,830. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 30 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Auburn Way South Pedestrian Imp. (Dogwood St SE to Fir St SE)TIP # 2 Project No:cp1118 Project Type:Capacity, Non-Motorized Project Manager:Jacob Sweeting LOS Corridor ID# 4 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 37,816 63,428 - - 101,244 Grants- Secured (Fed & State)235,389 604,237 - - 839,626 Traffic Impact Fees - 115,000 - - 115,000 WSDOT (Federal)107,750 - - 107,750 Other Sources(Private Utilities)19,368 184,450 - - 203,818 Other Sources(Muckleshoot)41,900 288,100 - - 330,000 334,473 1,362,965 - - 1,697,438 Capital Expenditures: Design 334,473 9,010 - - 343,483 Right of Way - - - - - Construction - 1,353,955 - - 1,353,955 334,473 1,362,965 - - 1,697,438 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed & State)- - - - - Traffic Impact Fees - - - - - Other Sources(Muckleshoot)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Description: This project will construct pedestrian improvements along Auburn Way South between Dogwood Street SE and Fir Street SE that are consistent with WSDOT's SR-164 Route Development Plan. The project includes sidewalk improvements, access management, a mid-block pedestrian crossing, construction of a U-turn wedge for eastbound vehicles at Fir Street SE and street lighting. Progress Summary: The City was awarded $100,000 in federal funding and $740,830 in state funding in May 2011. Other funding sources are Muckleshoot Indian Tribe contribution, WSDOT contribution for paving, and Private utility contributions for undergrounding. Project design began in 2012. Design was completed in 2015 and constructionis scheduled to be completed in 2015. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 31 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: M Street Underpass (3rd St SE to 8th St SE) TIP # 5 Project No:c201a0 Project Type:Capacity Project Manager:Ryan Vondrak LOS Corridor ID# 6 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)9,731,904 - - 9,731,904 REET2 1,140,000 - - 1,140,000 Traffic Impact Fees (Construction)4,309,782 - - 4,309,782 Traffic Impact Fees (Debt Service)148,190 132,751 132,202 131,617 413,143 Traffic Mitigation Fees 660,000 - - 660,000 PWTFL (30 years)3,284,857 - - 3,284,857 Other Sources (Other Agencies)*3,090,514 - - 3,090,514 22,365,247 132,751 132,202 131,617 22,630,200 Capital Expenditures: Design 2,688,924 - - 2,688,924 Right of Way 3,358,443 - - 3,358,443 Construction 16,169,690 - - 16,169,690 PWTFL Debt Service 148,190 132,751 132,202 131,617 413,143 22,365,247 132,751 132,202 131,617 22,630,200 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET2 - - - - - Traffic Impact Fees (Construction)- - - - - Traffic Impact Fees (Debt Service)131,032 130,447 129,862 129,277 784,437 Traffic Mitigation Fees - - - - - PWTFL (30 years)- - - - - Other Sources (Other Agencies)*- - - - - 131,032 130,447 129,862 129,277 784,437 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - PWTFL Debt Service 131,032 130,447 129,862 129,277 784,437 131,032 130,447 129,862 129,277 784,437 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Grants / Other Sources: Other Agencies are King County Metro Sewer, Port of Seattle, Port of Tacoma, and BNSF Railway Description: Construction of a grade separated railroad crossing of M Street SE at the BNSF Stampede Pass tracks. Progress Summary: 100% Design Drawings and right of way acquisition were completed in 2011. Construction started in early 2012 and will be complete during 2014. Debt Service is scheduled each year through 2041. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $21,827. City of Auburn Capital Facilities Plan 32 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: S 272nd/277th St Corridor Capacity & Non-Motorized Trail Improvements TIP # 6 Project No:c222a0 STIP# AUB-42 Project Type:Capacity Project Manager:Ryan Vondrak LOS Corridor ID# 15 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 82,539 308,062 - - 390,601 Grants- Secured Federal 407,849 612,851 - - 1,020,700 Grants- Secured State - - 4,000,000 - 4,000,000 Traffic Impact Fees - - 581,800 - 581,800 Other (Development Funds)*- - 1,000,000 - 1,000,000 Other - - - - - 490,388 920,913 5,581,800 - 6,993,101 Capital Expenditures: Design 490,388 900,913 - - 1,391,301 Right of Way - 20,000 - - 20,000 Construction - - 5,581,800 - 5,581,800 490,388 920,913 5,581,800 - 6,993,101 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured State - - - - 4,000,000 Traffic Impact Fees - - - - 581,800 Other (Development Funds)*- - - - 1,000,000 Other - - - - - - - - - 5,581,800 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,581,800 - - - - 5,581,800 Total Funding Sources: Description: This project includes preliminary engineering, design, right-of-way acquisition and construction of major widening on S 277th Street, including the addition of three lanes, one westbound and two eastbound, a Class 1 trail, and storm improvements. The project is approximately 0.9 miles long. Progress Summary: Staff is coordinating with the City of Kent and King County to complete annexation of the roadway into the City of Auburn. Robertson Properties Group is participating in this project and is dedicating all necessary roadway frontage to the City. Future Impact on Operating Budget: The annual maintenance costs for this project is estimated to be $27,250. Total Funding Sources: Total Expenditures: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 33 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Auburn Way S Improvements (Hemlock St SE to Academy Dr SE)TIP # 9 Project No:asbd02 Project Type:Capacity Project Manager:TBD LOS Corridor ID# xx Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - 100,000 - 100,000 REET2 - - - - - Other (MIT)- - 100,000 - 100,000 - - 200,000 - 200,000 Capital Expenditures: Design - - 200,000 - 200,000 Right of Way - - - - - Construction - - - - - - - 200,000 - 200,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - 100,000 REET2 - - - - - Other (MIT)- - - - 100,000 - - - - 200,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - - Construction - - - - - - - - - 200,000 Total Expenditures: Description: Widen Auburn Way S between Hemlock St SE and Academy Dr SE to accommodate two general purpose lanes in each direction, center turn lanes, access management medians, U-turns, curb, gutter, sidewalk, illumination, transit stop improvements, new traffic signals, Intelligent Transportation Systems, streetscape and storm improvements. The project length is approximately two miles. Progress Summary: Conceptual corridor plan will be coordinated with the MIT and WSDOT in 2015. This project is planned as a partnership between the City of Auburn and the MIT. Pre-design effort will produce a project construction cost estimate. Major grant funding is expected to come from future federal competitions. This project will extend corridor improvements along Auburn Way S completed under previous projects. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 34 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: F Street SE Non-Motorized Improvements (Downtown to Les Gove) TIP # 10 Project No:cp1416 Project Type:Capacity, Non-Motorized Project Manager:Seth Wickstrom LOS Corridor ID# N/A Activity: 2015 YE 2015 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 141 - - - 141 Grants- Secured Federal - 320,000 200,000 - 520,000 Grants-Unsecured Federal - - - 1,440,000 - Traffic Impact Fees 7,700 80,000 50,000 360,000 137,700 Other - - - - - 7,841 400,000 250,000 1,800,000 657,841 Capital Expenditures: Design 7,841 400,000 200,000 - 607,841 Right of Way - - 50,000 - 50,000 Construction - - - 1,800,000 - 7,841 400,000 250,000 1,800,000 657,841 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed)- - - - 200,000 Grants-Unsecured Federal - - - - 1,440,000 Traffic Impact Fees - - - - 410,000 Other - - - - - - - - 2,050,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - 50,000 Construction - - - - 1,800,000 - - - - 2,050,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Description: The F St SE project includes pavement rehabilitation, installation of curbs, gutters, bike lanes, sidewalks, ADA improvements, utility undergrounding, LED street lighting, new two way center left turn-lane, crash attenuation at the supports for the BNSF railroad bridge, initiation of Auburn Staff Bike share pilot program, wayfinding signage and a "Bicycle Boulevard" designation of roadway connections between Auburn City Hall and the Les Gove Park Campus. This project improves mobility and safety along the corridor and will complete a gap in the non-motorized network between Auburn's Downtown and the Les Gove Community Campus. The major infrastructure improvements are approximately 0.3 miles long and the "Bicycle Boulevard" improvements are just over a mile long. Progress Summary: Preliminary design and survey work was completed in 2009. Federal grant was secured in 2014 for Design and ROW phases. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $4,100. City of Auburn Capital Facilities Plan 35 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: M Street NE (E Main St to 4th St NE) TIP # 11 Project No:asbd12 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 5 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 220,000 920,000 - 1,140,000 REET - - - - - Traffic Impact Fees 100,000 55,000 230,000 - 385,000 Other - - - - - 100,000 275,000 1,150,000 - 1,525,000 Capital Expenditures: Design 100,000 75,000 - - 175,000 Right of Way - 200,000 - - 200,000 Construction - - 1,150,000 - 1,150,000 100,000 275,000 1,150,000 - 1,525,000 Description: This project will construct a four-lane street section that includes sidewalks, gutters, landscaping and streetlights on M St NE between south of E Main St and 4th St NE. Progress Summary: Pre-design will be completed during 2018 to refine project scope, alignment, and cost. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,500. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 36 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: M Street SE/12th Street SE Traffic Signal TIP # 14 Project No:cpxxxx Project Type:Intersection Improvement, Capacity Project Manager:TBD LOS Corridor ID# 11 Activity: 2015 YE 2015 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET 2 - - - - - Traffic Impact Fees - - - - - Other- Developer - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 500,000 - - 500,000 REET 2 - - - - - Traffic Impact Fees - - - - - Other- Developer - 125,000 - - 125,000 - 625,000 - - 625,000 Capital Expenditures: Design - 75,000 - - 75,000 Right of Way - 50,000 - - 50,000 Construction - 500,000 - - 500,000 - 625,000 - - 625,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This project includes the design, right-of-way acquisition and construction of a new traffic signal. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $6,600. City of Auburn Capital Facilities Plan 37 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 8th Street NE Widening (Pike St NE to R St NE)TIP # 15 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 19 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)360,000 800,000 - - 1,160,000 REET - - - - - Traffic Impact Fees 90,000 200,000 - - 290,000 Other - - - - - 450,000 1,000,000 - - 1,450,000 Capital Expenditures: Design 200,000 - - - 200,000 Right of Way 250,000 - - - 250,000 Construction - 1,000,000 - - 1,000,000 450,000 1,000,000 - - 1,450,000 Description: Widen 8th Street NE to extend the five-lane cross-section which currently exists to the west of Pike St NE to R St NE by providing an additional travel lane along the south side of the roadway. This is a planning level cost estimate. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $600. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 38 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Harvey Rd NE/8th St NE Intersection Improvements TIP # 17 Project No:cp0611 Project Type:Capacity Project Manager:None LOS Corridor ID# 5,19 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees (Debt Service)435,500 86,010 85,608 85,206 607,118 Traffic Impact Fees 204,500 - - - 204,500 PWTF 1,527,300 - - - 1,527,300 2,167,300 86,010 85,608 85,206 2,338,918 Capital Expenditures: Design 327,500 - - - 327,500 Right of Way 200,400 - - - 200,400 Construction 1,203,900 - - - 1,203,900 Long Term Debt - PWTF 435,500 86,010 85,608 85,206 607,118 2,167,300 86,010 85,608 85,206 2,338,918 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees (Debt Service)84,803 84,402 84,000 83,598 507,617 Traffic Impact Fees - - - - - PWTF - - - - - 84,803 84,402 84,000 83,598 507,617 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - Long Term Debt - PWTF 84,803 84,402 84,000 83,598 507,617 84,803 84,402 84,000 83,598 507,617 Total Funding Sources: Total Funding Sources: Total Expenditures: Total Expenditures: Forecasted Project Cost: Description: Add one eastbound through/right turn-lane on 8th St NE to the west of Harvey Rd. Modify traffic signals and traffic channelization to accommodate the new lane. The additional lane will reduce traffic delays and queuing at the intersection of Harvey Rd and 8th St NE in all directions. This project will reconstruct M St NE from 4th St NE to 8th St NE, a segment of roadway approximately 0.3 miles long with a four-lane cross-section. The reconstruction will address the existing poor pavement condition and fill in any gaps in the sidewalk network. Progress Summary: Project was completed in 2010. Ongoing budget is for Public Works Trust Fund Loan debt payments scheduled through 2028. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 39 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Academy Drive Multi-Use Trail TIP # 24 Project No:cpxxxx Project Type:Class 1 Trail (Capacity) Project Manager:TBD LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - 42,500 42,500 - 85,000 Grants- Unsecured (Fed,State,Local)- 382,500 382,500 - 765,000 REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - 425,000 425,000 - 850,000 Capital Expenditures: Design - 100,000 - - 100,000 Right of Way - - - - - Construction - 325,000 425,000 - 750,000 - 425,000 425,000 - 850,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project will use existing Academy Drive right-of-way to create a multi-use trail between the Green River Road and Auburn Way South. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $25,000. City of Auburn Capital Facilities Plan 40 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 46th Place S Realignment TIP # 25 Project No:cpxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - 575,000 - 575,000 REET - - - - - Traffic Impact Fees - - 250,000 - 250,000 Other Sources - - - - - - - 825,000 - 825,000 Capital Expenditures: Design - - 125,000 - 125,000 Right of Way - - 25,000 - 25,000 Construction - - 675,000 - 675,000 - - 825,000 - 825,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: The project will realign 46th Place S to the south of S 321st Street. The realignment will move the 46th Place S intersection with S 321st Street approximately 350 feet to the east of the current location. This will create two T-intersections (44th Avenue S and 46th Place S) in place of the existing four-leg intersection. The existing 46th Place S will be dead-ended to the south of S 321st Street. The project will improve safety and traffic operations at the intersections. Progress Summary: Right-of-way for the realigned roadway will be dedicated as part of an adjacent development project. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $1,750. City of Auburn Capital Facilities Plan 41 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: C Street SW & 15th Street SW Intersection Improvements TIP # 38 Project No:cpxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 12,13 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - 150,000 - REET2 - - - - - Other - - - - - - - - 150,000 - Capital Expenditures: Design - - - 150,000 - Right of Way - - - - - Construction - - - - - - - - 150,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 750,000 - - 750,000 Traffic Impact Fees - 125,000 - - 275,000 REET2 - - - - - Other - - - - - - 875,000 - - 1,025,000 Capital Expenditures: Design - - - - 150,000 Right of Way - - - - - Construction - 875,000 - - 875,000 - 875,000 - - 1,025,000 Total Expenditures: Description: This project will install a southbound right-turn pocket, re-channelize the intersection to provide two southbound through lanes, and replace the existing spanwire traffic signal with a new traffic signal. Progress Summary: Design is planned to begin in 2017. Construction will be scheduled once full funding is secured. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 42 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 124th Ave SE Corridor & 320th Intersection Improvements TIP # 39 Project No:asbd04 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 23, 25 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - 65,000 - 65,000 Grants- Unsecured (Fed,State,Local)- - - - - REET 2 - - 110,000 - 110,000 Other (GRC)- - 175,000 - 175,000 - - 350,000 - 350,000 Capital Expenditures: Design - - 350,000 - 350,000 Right of Way - - - - - Construction - - - - - - - 350,000 - 350,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - 150,000 - 215,000 Grants- Unsecured (Fed,State,Local)- 1,200,000 - - 1,200,000 REET 2 - - - - 110,000 Other (GRC)- 150,000 - 325,000 - 1,500,000 - - 1,850,000 Capital Expenditures: Design - - - - 350,000 Right of Way - - - - - Construction - 1,500,000 - - 1,500,000 - 1,500,000 - - 1,850,000 Description: This project will fund the design, right-of-way acquisition, and construction of improvements to the intersection of SE 320th St and 124th Ave SE. The intersection is located at the main entrance to Green River College and will require additional on- site improvements to be constructed. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 43 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 124th Ave SE Corridor Improvements (SE 312th to SE 318th)TIP # 40 Project No:asbd01 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 23 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal 300,000 880,000 2,000,000 - 3,180,000 Traffic Impact Fees 100,000 220,000 500,000 - 820,000 Other - - - - - 400,000 1,100,000 2,500,000 - 4,000,000 Capital Expenditures: Design 400,000 - - - 400,000 Right of Way - 1,100,000 - - 1,100,000 Construction - - 2,500,000 - 2,500,000 400,000 1,100,000 2,500,000 - 4,000,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project will fund the design, right-of-way acquisition, and construction of a four-lane section with bicycle and pedestrian facilities on 124th Ave SE between SE 318th St and SE 312th Street. The project will also fund improvements to the signalized intersection of SE 312th St and 124th Ave SE (including adding bike lanes, dual westbound left-turn lanes, dual southbound through-lanes, a northbound right-turn pocket, ITS improvements, and pedestrian safety improvements). Progress Summary: Phase 1 improvements between SE 318th and SE 316th were completed by GRCC in 2012. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $3,500. City of Auburn Capital Facilities Plan 44 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: R Street Bypass (M Street SE to SR-18)TIP # 41 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources (Development)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources (Development)- - - 500,000 500,000 - - - 500,000 500,000 Capital Expenditures: Design - - - 500,000 500,000 Right of Way - - - - - Construction - - - - - - - - 500,000 500,000 Description: This project will complete the design and construction of the Bypass Rd, an arterial connection between M Street and Auburn Black Diamond Road, paralleling the rail line. The project will provide an arterial connection from the newly constructed M Street Underpass to the Auburn Black Diamond Road interchange with SR-18 to keep both vehicular and freight traffic out of residential neighborhoods along R Street SE north of the Stampede Pass line. The arterial connection may also provide opportunities for partnering with the Muckleshoot Indian Tribe as they redevelop the Miles Pit area and as more definitive plans are developed for a potential new WSDOT interchange on SR-18 in the vicinity of the project. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 45 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: SE 320th Street Corridor Improvements (116th Ave SE to 122nd Ave SE)TIP # 42 Project No:asbd19 Project Type:Capacity, Safety Project Manager:TBD LOS Corridor ID# 25 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - 100,000 - 100,000 Grants- Unsecured Federal - - - - - Traffic Impact Fees - - - - - PWTFL - - - - - Other - - - - - - - 100,000 - 100,000 Capital Expenditures: Design - - 100,000 - 100,000 Right of Way - - - - - Construction - - - - - - - 100,000 - 100,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - 100,000 Grants- Unsecured Federal 480,000 530,000 2,953,440 - 3,963,440 Traffic Impact Fees 120,000 132,500 328,160 - 580,660 PWTFL - - - - - Other - - - - - 600,000 662,500 3,281,600 - 4,644,100 Capital Expenditures: Design 600,000 250,000 - - 950,000 Right of Way - 412,500 - - 412,500 Construction - - 3,281,600 - 3,281,600 600,000 662,500 3,281,600 - 4,644,100 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: SE 320th St is a primary route serving Green River Community College and adjacent neighborhoods. There are very high volumes of pedestrians, bicyclists, and transit utilizing the corridor. This project will fund the design, right-of-way acquisition, and construction of non-motorized roadway and safety improvements including a roundabout at 116th Ave SE, adding bicycle lanes, sidewalks, and street lighting between 122nd Ave SE and 116th Ave SE. Project length is approximately .45 miles. Progress Summary: GRCC completed the design and construction for the segment between 124th Ave SE and 122nd Ave SE in 2013. Corridor design is scheduled to start in 2016. Construction is planned for 2020. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 46 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Auburn Way South (SR-164) Corridor Safety Improvements TIP # 43 Project No:cp1218 STIP# AUB-44 Project Type:Capacity, Safety Project Manager:Matt Larson LOS Corridor ID# 4 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 2,768 - - - 2,768 Grants- Secured (Federal)98,470 462,000 1,772,638 - 2,333,108 Traffic Impact Fees - - 250,000 - 250,000 WSDOT (Federal)- - 306,674 - 306,674 Other - - - - - 101,238 462,000 2,329,312 - 2,892,550 Capital Expenditures: Design 101,238 374,000 - - 475,238 Right of Way - 88,000 - - 88,000 Construction - - 2,329,312 - 2,329,312 101,238 462,000 2,329,312 - 2,892,550 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Federal)- - - - 1,772,638 Traffic Impact Fees - - - - 250,000 WSDOT (Federal)- - - - 306,674 Other - - - - - - - - - 2,329,312 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 2,329,312 - - - - 2,329,312 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project will improve access management, including U-turns, upgrade transit stops and street lighting, widen to accommodate turn-lanes and pedestrian and bicycle facilities, upgrade pavement markings, install pedestrian signals and audible pedestrian push buttons, and upgrade traffic signals to change the phasing and to improve the visibility of the signal heads. Progress Summary: Grant funding was awarded in 2012. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 47 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 124th Avenue SE & SE 284th Street Intersection Safety Improvements TIP # 45 Project No:CPXXXX Project Type:Capacity, Safety Project Manager:TBD LOS Corridor ID# xx Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - 100,000 - REET2 - - - - - Other - - - - - - - - 100,000 - Capital Expenditures: Design - - - 100,000 - Right of Way - - - - - Construction - - - - - - - - 100,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)450,000 - - - 450,000 Traffic Impact Fees 150,000 - - - 250,000 REET2 - - - - - Other - - - - - 600,000 - - - 700,000 Capital Expenditures: Design - - - - 100,000 Right of Way 50,000 - - - 50,000 Construction 550,000 - - - 550,000 600,000 - - - 700,000 Total Expenditures: Description: This project will complete the design phase for intersection safety and capacity improvements. Progress Summary: Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 48 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Traffic Management Center Improvements TIP # 47 Project No:asbd10 Project Type:Capacity, ITS Project Manager:Scott Nutter LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - 125,000 25,000 - 150,000 PWTFL - - - - - Other - - - - - Total Funding Sources:- 125,000 25,000 - 150,000 Capital Expenditures: Design - 25,000 - - 25,000 Right of Way - - - - - Construction - 100,000 25,000 - 125,000 Total Expenditures:- 125,000 25,000 - 150,000 Forecasted Project Cost: Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - 25,000 PWTFL - - - - - Other - - - - - Total Funding Sources:- - - - 25,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 25,000 Total Expenditures:- - - - 25,000 Description: The rapid growth of the City traffic signal and Intelligent Transportation Systems infrastructure has severely strained the capacity and reliability of the existing network processing capabilities. This project will implement network communications, software, video, and physical improvements to the Traffic Management Center which will improve the network data processing speed, reliability, and redundancy improving the City's ability to manage the transportation system and respond to emergencies. Additionally, these improvement will allow Information & Technology staff to isolate the Traffic Management data processing demands from the City's general facility security data processing demands resulting in improvements to both processes. Progress Summary: Future Impact on Operating Budget: There is no impact to the street maintenance budget. City of Auburn Capital Facilities Plan 49 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: West Valley Highway Improvements (15th Street NW to W Main Street)TIP # 49 Project No:asbd13 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 35 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 480,000 2,400,000 - 2,880,000 Traffic Impact Fees 100,000 120,000 600,000 - 820,000 100,000 600,000 3,000,000 - 3,700,000 Capital Expenditures: Design 100,000 600,000 - - 700,000 Right of Way - - - - - Construction - - 3,000,000 - 3,000,000 100,000 600,000 3,000,000 - 3,700,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: This project scope includes pavement rehabilitation and re-channelization, roadway widening, bicycle lanes, pedestrian facilities, roadway lighting, required storm system improvements, and Intelligent Transportation System Improvements. Progress Summary: Survey, base mapping and pre-design are planned to be completed in 2018 to complete preliminary plans and refine project cost-estimate. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 50 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Lake Tapps Parkway ITS Expansion TIP # 51 Project No:asbd17 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 10 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - 82,950 711,000 82,950 REET - - - - - Traffic Impact Fees - - 22,050 189,000 22,050 Other - - - - - - - 105,000 900,000 105,000 Capital Expenditures: Design - - 105,000 - 105,000 Right of Way - - - - - Construction - - - 900,000 - - - 105,000 900,000 105,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - 793,950 REET - - - - - Traffic Impact Fees - - - - 211,050 Other - - - - - - - - - 1,005,000 Capital Expenditures: Design - - - - 105,000 Right of Way - - - - - Construction - - - - 900,000 - - - - 1,005,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: The project funds the design, coordination, permitting, and construction of new Intelligent Transportation System (ITS) infrastructure along Lake Tapps Parkway from Lakeland Hills Way to East Valley Highway, and along East Valley Highway to Lakeland Hills Way. The proposed ITS infrastructure includes conduit, fiber, VMS signage, cameras, network communication upgrades, and weather stations along the route. Progress Summary: Federal Grant application was submitted to PSRC in May 2014. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5,000. City of Auburn Capital Facilities Plan 51 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: A Street SE & Lakeland Hills Way SE Intersection Safety & Capacity Imp.TIP # 52 Project No:asbd15 Project Type:Capacity, Safety Project Manager:TBD LOS Corridor ID# xx Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - 75,000 - 75,000 REET2 - - - - - Other - - - - - - - 75,000 - 75,000 Capital Expenditures: Design - - 75,000 - 75,000 Right of Way - - - - - Construction - - - - - - - 75,000 - 75,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - 75,000 REET2 - - - - - Other - - - - - - - - - 75,000 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - - Construction - - - - - - - - - 75,000 Total Expenditures: Description: This project will study traffic operations, safety, and prepare a preliminary design intersection improvements. Progress Summary: Analysis, preliminary design, and construction cost estimate will be completed in 2016. Future phases will be programmed as funding becomes available. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 52 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Auburn Way South and 12th Street SE Intersection Improvements TIP # 53 Project No:cp1114 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 3 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - 100,000 - 100,000 Grants- Unsecured Federal - - - 750,000 - REET2 - - - - - Traffic Impact Fees - 50,000 - - 50,000 Other - - - - - - 50,000 100,000 750,000 150,000 Capital Expenditures: Design - 50,000 100,000 - 150,000 Right of Way - - - - - Construction - - - 750,000 - - 50,000 100,000 750,000 150,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - 100,000 Grants- Unsecured Federal - - - - 750,000 REET2 - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - 850,000 Capital Expenditures: Design - - - - 100,000 Right of Way - - - - - Construction - - - - 750,000 - - - - 850,000 Description: The project will design and construct multi-modal intersection improvements at the AWS/12th Street SE intersection. The improvements will include pedestrian access, bicycle lanes, signal phasing and timing, and ITS upgrades. Progress Summary: Design is scheduled to be completed in 2016. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 53 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Kersey Way SE Corridor Study TIP # 54 Project No:asbd11 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 4 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Mitigation Fees - - 50,000 - 50,000 Other - - - - - - - 50,000 - 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - - - - - 50,000 - 50,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - - - - - - Traffic Mitigation Fees - - - - 50,000 Other (Developer)*- - - - - - - - - 50,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - - - - - - - - - 50,000 Description: This project will study improvements to the Kersey Way SE corridor from the White River Bridge to the southern city limits. The study will develop the scope and costs for horizontal /vertical geometric roadway improvements, provide roadside hazard mitigation, street lighting and non-motorized trail construction. The project length is approximately two miles. Progress Summary: Design will begin in 2015 following the completion of the update to the Comprehensive Plan. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 54 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: W Main Street Multimodal Corridor and ITS Improvements TIP # 55 Project No:cp1415 Project Type:Capacity Project Manager:Kim Truong LOS Corridor ID# 11 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - 56,490 - - 56,490 Grants- Secured Federal - 804,100 2,970,240 - 3,774,340 REET - - - - - Traffic Impact Fees - - 209,650 - 209,650 Other (Arterial Preservation Fund 105)- 85,410 314,510 - 399,920 - 946,000 3,494,400 - 4,440,400 Capital Expenditures: Design - 946,000 - - 946,000 Right of Way - - - - - Construction - - 3,494,400 - 3,494,400 - 946,000 3,494,400 - 4,440,400 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured Federal - - - - 2,970,240 REET - - - - - Traffic Impact Fees - - - - 209,650 Other (Arterial Preservation Fund 105)- - - - 314,510 - - - - 3,494,400 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 3,494,400 - - - - 3,494,400 Description: This project will repurpose the existing W Main St corridor within Auburn’s designated Regional Growth Center and will construct Intelligent Transportation System (ITS) improvements serving local and regional transportation networks and a major commercial retail center. Improvements include converting the existing four-lane roadway section to a three-lane section including center two-way left turn lane with new bike lanes, new sidewalks, new LED street lighting, and streetscape improvements between West Valley Highway and the Interurban Trail. ITS Improvements include interconnecting and coordinating traffic signals From C St NW along W Main St to W Valley Highway south to 15th St SW including two interchanges with SR-18 and one with SR-167. Progress Summary: Federal grant was secured in 2014. Arterial Preservation Fund 105 is participating in the pavement rehabilitation portion of this project. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 55 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Evergreen Heights Safe Routes to School Improvements TIP # 56 Project No:asbd14 STIP# AUB-39 Project Type:Capacity, Non-Motorized Project Manager:TBD LOS Corridor ID# 19 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - 118,500 84,500 693,000 896,000 Grants- Unsecured Federal - 671,500 478,500 3,927,000 5,077,000 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - 790,000 563,000 4,620,000 5,973,000 Capital Expenditures: Design - 790,000 - - 790,000 Right of Way - - 563,000 - 563,000 Construction - - - 4,620,000 4,620,000 - 790,000 563,000 4,620,000 5,973,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: The project will widen S 316th Street from 51st Avenue S to the west of the Evergreen Elementary School frontage, and 56th Avenue S between S 316th Street and S 318th Street. The proposed widening will allow the addition of bike lanes and sidewalks on both sides of the street to match the existing roadway cross-section to the east of the school. A roundabout will be constructed at the S 316th Street/56th Avenue S intersection replacing the existing all-way stop-control and the school driveway will be relocated to the west to align with the roundabout. The reconstruction of S 316th Street includes the vertical alignment of the existing roadway along the school frontage which creates sight-distance problems associated with the school driveways, and at the intersection with 56th Avenue S. Other project elements include undergrounding of aerial utilities, street lighting, and upgrades to the storm water system. Progress Summary: Design phase Grant funding application was submitted in May 2014. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 56 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Auburn Way S Corridor Improvements (Fir St SE to Hemlock St SE)TIP # 58 Project No:cp1119 STIP# AUB-38 Project Type:Capacity Project Manager:Jacob Sweeting LOS Corridor ID# 4 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 195,060 - - - 195,060 Grants- Secured State 508,176 1,917,226 - - 2,425,402 Traffic Impact Fees 200,000 450,000 - - 650,000 Other (Comcast,Century Link) 21,731 215,362 - - 237,093 Other Sources (WSDOT) - 116,038 - - 116,038 Other (MIT)173,382 663,219 - - 836,601 1,098,349 3,361,845 - - 4,460,194 Capital Expenditures: Design 666,617 106,365 - - 772,982 Right of Way 431,732 - - - 431,732 Construction - 3,255,480 - - 3,255,480 1,098,349 3,361,845 - - 4,460,194 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured State - - - - - Traffic Impact Fees - - - - - Other (MIT)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Description: This project will widen Auburn Way South between Fir St SE and Hemlock St SE to five lanes with curb, gutter, sidewalks, illumination and storm improvements. A new traffic signal will be constructed at Hemlock Street SE and connect to Auburn's Intelligent Transportation System. Progress Summary: Washington State Transportation Improvement Board (TIB) awarded the City grant funds in the amount of $2,426,400 on November 19, 2010. The Muckleshoot Indian Tribe is a project partner and is contributing ROW dedications and project funding in the amount $836,601. Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $9,300. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 57 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Auburn Ave NE & 3rd St NE Pedestrian & Access Improvements TIP # 59 Project No:cp1023 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 2 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 8,778 - - - 8,778 Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - 50,000 - REET2 - - - - - Other - - - - - 8,778 - - 50,000 8,778 Capital Expenditures: Design 8,778 - - 50,000 8,778 Right of Way - - - - - Construction - - - - - 8,778 - - 50,000 8,778 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)250,000 - - - 250,000 Traffic Impact Fees 50,000 - - - 100,000 REET2 - - - - - Other - - - - - 300,000 - - - 350,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction 300,000 - - - 300,000 300,000 - - - 350,000 Description: This project will improve access, safety and operations for pedestrian, bicyclists and motorized vehicles at the intersections of 3rd St NE/Auburn Ave, 4th St NE/Auburn Ave, and 4th St NE/Auburn Way North. Improvements include a new traffic signal at 3rd St NE to add a missing pedestrian crossing and accommodate the northbound left-turn movement; improving pedestrian facilities to meet ADA requirements, restricting uncontrolled accesses near the intersection, and modifying the traffic signal at Auburn Way North and 4th St NE to eliminate the east/west split phase operation. Progress Summary: Survey and pre-design were started in 2010-2011. Pre-design will be completed in 2017, with construction scheduled for 2018, pending grant funding. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 58 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: M Street SE Corridor (8th St SE to AWS)TIP # 60 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 6 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other(Development)- - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 925,000 3,750,000 - 4,675,000 Traffic Impact Fees - 750,000 750,000 - 1,500,000 REET2 - - - - Other(Development)- 250,000 250,000 - 500,000 - 1,925,000 4,750,000 - 6,675,000 Capital Expenditures: Design - 650,000 - - 650,000 Right of Way - 1,275,000 - - 1,275,000 Construction - - 4,750,000 - 4,750,000 - 1,925,000 4,750,000 - 6,675,000 Description: Widen M Street SE into a multi-lane arterial between 8th St SE and AWS. This project will improve mobility and is tied to corridor development. It is consistent with the Comprehensive Plan and contributes to the completion of a north/south arterial corridor. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $8,000. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 59 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: SR-18 to Auburn Way South (SR-164) Bypass TIP # 61 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other (WSDOT)- - - 1,000,000 - Other (MIT)- - - - - - - - 1,000,000 - Capital Expenditures: Design - - - 1,000,000 - Right of Way - - - - - Construction - - - - - - - - 1,000,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other (WSDOT)1,500,000 12,500,000 - - 15,000,000 Other (MIT)2,000,000 5,000,000 - - 7,000,000 - 17,500,000 - - 22,000,000 Capital Expenditures: Design 1,500,000 - - - 2,500,000 Right of Way 2,000,000 - - - 2,000,000 Construction - 17,500,000 - - 17,500,000 3,500,000 17,500,000 - - 22,000,000 Description: This project will permit and construct a new interchange at SR-18 and over a mile of new classified roadway connecting the new interchange to Auburn Way South (SR-164). This project will create a new road connecting SR-18 and SR-164 to bypass Auburns urban center serving the Muckleshoot Reservation and regional traffic to the Enumclaw area. Progress Summary: This project was originally analyzed by WSDOT's Auburn Way South (SR-164) Route Development Plan. The State Legislature allocated $15 Million for the new eastbound SR-18 off-ramp serving this bypass road in 2017-2019. The Muckleshoot Indian Tribe is anticipated to donate the property necessary to accommodate the off-ramp and connecting road to Auburn Way South. The route of the new roadway will be determined after completion of a feasibility study. Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $37,500. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 60 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 29th St SE/R St SE Intersection Improvements TIP # 63 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 16, 27 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- 1,300,000 - - 1,300,000 Traffic Impact Fees - 500,000 - - 500,000 REET - - - - - Other - - - - - - 1,800,000 - - 1,800,000 Capital Expenditures: Design - 350,000 - - 350,000 Right of Way - 450,000 - - 450,000 Construction - 1,000,000 - - 1,000,000 - 1,800,000 - - 1,800,000 Description: This project funds the design, right-of-way acquisition and construction of intersection capacity and safety improvements at the 29th St SE/R St SE intersection. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 61 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Lea Hill Rd Segment 1 (R St NE to 105th Pl SE) TIP # 64 Project No:asbd18 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 19 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees 409,025 50,000 100,000 - 559,025 Other - - - - - 409,025 50,000 100,000 - 559,025 Capital Expenditures: Design - 50,000 100,000 - 150,000 Right of Way 409,025 - - - 409,025 Construction - - - - - 409,025 50,000 100,000 - 559,025 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - Grants- Unsecured (Fed,State,Local)1,950,000 8,000,000 - - 9,950,000 Traffic Impact Fees 500,000 2,000,000 - - 2,600,000 Other - - - - - 2,450,000 10,000,000 - - 12,550,000 Capital Expenditures: Design 1,950,000 - - - 2,050,000 Right of Way 500,000 - - - 500,000 Construction - 10,000,000 - - 10,000,000 2,450,000 10,000,000 - - 12,550,000 Description: Widen the existing roadway to provide a four-lane cross section pedestrian and bicycle facilities. The project includes widening the Green River Bridge. Progress Summary: Two parcels along the future roadway alignment were procured in 2014. Corridor pre-design effort is planned to begin in late 2015 following adoption of the Comprehensive Transportation Plan major update. Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $18,300 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 62 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Lea Hill Rd Segment 2 (105th Pl SE to 112th Ave SE) TIP # 65 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 19 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - 2,900,000 7,100,000 10,000,000 Traffic Impact Fees - - 600,000 1,400,000 2,000,000 Other - - - - - - - 3,500,000 8,500,000 12,000,000 Capital Expenditures: Design - - 2,000,000 - 2,000,000 Right of Way - - 1,500,000 - 1,500,000 Construction - - - 8,500,000 8,500,000 - - 3,500,000 8,500,000 12,000,000 Description: Project includes widening the existing roadway to provide a four-lane cross-section including pedestrian and bicycle facilities. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $24,100. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 63 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Lea Hill Rd Segment 3 (112th Ave SE to 124th Ave SE ) TIP # 66 Project No:cpxxxx Project Type:Capacity Project Manager:TBD LOS Corridor ID# 19 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - 3,000,000 - 3,000,000 Traffic Impact Fees - 1,000,000 - - 1,000,000 Other - - - - - 1,000,000 3,000,000 - 4,000,000 Capital Expenditures: Design - 500,000 - - 500,000 Right of Way - 500,000 - - 500,000 Construction - - 3,000,000 - 3,000,000 - 1,000,000 3,000,000 - 4,000,000 Description: Project includes widening the existing roadway to provide a four-lane cross-section including pedestrian and bicycle facilities. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $20,300. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 64 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 22nd Street NE & I St NE Intersection TIP # 69 Project No:cp1513 Project Type:Capacity (Safety) Project Manager:TBD LOS Corridor ID# 21 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured State - 160,000 40,000 - 200,000 Grants- Unsecured Federal 940,000 Traffic Impact Fees - 40,000 15,000 235,000 55,000 REET2 - - - - - Other - - - - - - 200,000 55,000 1,175,000 255,000 Capital Expenditures: Pre-Design - 5,000 - - 5,000 Design - 195,000 55,000 - 250,000 Construction - - - 1,175,000 - - 200,000 55,000 1,175,000 255,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured State - - - - 40,000 Grants- Unsecured Federal - - - - 940,000 Traffic Impact Fees - - - - 250,000 REET2 - - - - - Other - - - - - - - - - 1,230,000 Capital Expenditures: Pre-Design - - - - - Design - - - - 55,000 Construction - - - - 1,175,000 - - - - 1,230,000 Total Expenditures: Description: This project includes the design and construction of a modern roundabout at the 22nd Street NE and I Street NE intersection. This is currently a 4-way stop controlled intersection. Progress Summary: State grant was awarded for design in 2015. Construction phase is dependent on securing future grants or other local funding. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 65 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: West Valley Highway Improvements (SR-18 to 15th Street SW)TIP # 72 Project No:asbd20 Project Type:Capacity Project Manager:TBD LOS Corridor ID# 35 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - 100,000 - REET2 - - - - - Other - - - - - - - - 100,000 - Capital Expenditures: Design - - - 100,000 - Right of Way - - - - - Construction - - - - - - - - 100,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)400,000 2,000,000 - - 2,400,000 Traffic Impact Fees 100,000 500,000 - - 700,000 REET2 - - - - - Other - - - - - 500,000 2,500,000 - - 3,100,000 Capital Expenditures: Design - - - - 100,000 Right of Way - - - - - Construction 500,000 2,500,000 - - 3,000,000 500,000 2,500,000 - - 3,100,000 Total Expenditures: Description: This project scope includes pavement rehabilitation and re-channelization, pedestrian and bicycle facility improvements, improved roadway lighting, required storm system improvements, intersection signal replacement at 15th St SW, and Intelligent Transportation System Improvements. Progress Summary: Survey, base mapping and pre-design are planned to be completed in 2017 to complete preliminary plans and refine project cost-estimate. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 66 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Stewart Road (Lake Tapps Parkway Corridor)TIP # 73 Project No:CPXXXX Project Type:Capacity Project Manager:City of Pacific LOS Corridor ID# xx Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - 66,000 - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Traffic Mitigation Fees - - - 34,000 - - - - 100,000 - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 100,000 - - - - 100,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - 66,000 Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Traffic Mitigation Fees - - - - 34,000 - - - - 100,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 100,000 - - - - 100,000 Total Expenditures: Description: This is a City of Pacific project to widen the Stewart Road (Lake Tapps Parkway) Corridor. This is the final segment of widening in the City of Pacific which will tie in with the city of Sumner's planned final widening segment and new bridge over the White river. Completion of this corridor widening is expected to significantly relieve traffic congestion in Auburn along the A St SE and C St SE corridors. Progress Summary: City of Pacific has initiated preliminary road design and is applying for grant funding to complete the project. City of Auburn contribution is for construction phase only. Future Impact on Operating Budget: There is no future impact to Auburn's operating budgets. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 67 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Auburn Way Corridor (4th St NE to 4th St SE) TIP # 3 Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD LOS Corridor ID# 2, 3 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - 110,000 600,000 - 710,000 Grants- Unsecured (Fed,State,Local)- 708,700 2,400,000 - 3,108,700 REET - - - - - Traffic Impact Fees - - - - - Other Sources - - - - - - 818,700 3,000,000 - 3,818,700 Capital Expenditures: Design - 618,700 - - 618,700 Right of Way - 200,000 - - 200,000 Construction - - 3,000,000 - 3,000,000 - 818,700 3,000,000 - 3,818,700 Description: This project is based on a pre-design study to improve pedestrian accessibility, appearance, and link the downtown area along Auburn Way South between 4th Street NE and 4th Street SE. The project may include some pavement repairs. However, an overlay was completed as part of the City's Arterial Pavement Preservation Program in 2007. Although this was considered a temporary fix, the scope has been modified to account for the pavement work. The project is approximately 0.5 miles long. Progress Summary: The pavement portion has been minimized due to the work completed in 2007 under the Arterial Pavement Preservation Program. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 68 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: M Street SE & 29th Street SE Intersection Safety Improvements TIP # 18 Project No:asbd21 Project Type:Non-Capacity, Safety Project Manager:TBD LOS Corridor ID# xx Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - 50,000 - 50,000 Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - 50,000 - 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - - - - - 50,000 - 50,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - 100,000 - - 150,000 Grants- Unsecured (Fed,State,Local)- 300,000 - - 300,000 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - 400,000 - - 450,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction - 400,000 - - 400,000 - 400,000 - - 450,000 Total Expenditures: Description: This project includes the design and construction of a new traffic signal. Progress Summary: M St SE & 29th St SE is currently an all-way stop controlled intersection, experiences significant congestion in the peak traffic hours, and has a documented high collision history. Design is scheduled to be completed in 2016. Construction will be completed when project is fully funded. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5,000. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 69 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Auburn Way North/1st Street NE Signal Improvements TIP # 19 Project No:asbd05 Project Type:Non-Capacity Project Manager:TBD LOS Corridor ID# 2 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - 50,000 - 50,000 Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - Other - - - - - - - 50,000 - 50,000 Capital Expenditures: Design - - 50,000 - 50,000 Right of Way - - - - - Construction - - - - - - - 50,000 - 50,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue 200,000 - - - 250,000 Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET 275,000 - - - 275,000 475,000 - - - 525,000 Capital Expenditures: Design - - - - 50,000 Right of Way 25,000 - - - 25,000 Construction 450,000 - - - 450,000 475,000 - - - 525,000 Description: This project will construct a new traffic signal with controller cabinet and battery backup along with necessary intersection improvements. Progress Summary: Design will be completed in 2016. Construction will be completed when funding is secured. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 70 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: R Street SE & 21st Street SE Intersection Safety Improvements TIP # 20 Project No:CPXXXX Project Type:Non-Capacity, Safety Project Manager:TBD LOS Corridor ID# xx Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - 75,000 - 75,000 Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - 75,000 - 75,000 Capital Expenditures: Design - - 75,000 - 75,000 Right of Way - - - - - Construction - - - - - - - 75,000 - 75,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - 100,000 - - 175,000 Grants- Secured (Fed,State,Local)- 700,000 - - 700,000 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - 800,000 - - 875,000 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - - Construction - 800,000 - - 800,000 - 800,000 - - 875,000 Total Expenditures: Description: This project includes the design and construction of intersection safety improvements. Progress Summary: R St SE & 21st St SE is currently a two-way stop controlled intersection, experiences significant congestion in the peak traffic hours, and has a documented high collision history. Analysis to determine appropriate intersection control and design is scheduled to be completed in 2016. Construction will be completed when project is fully funded. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5,000. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 71 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Main Street Signal Upgrades TIP # 21 Project No:cp1406 Project Type:Non-Capacity Project Manager:Luis Barba LOS Corridor ID# 11 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - 320,000 - 320,000 Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Mitigation Fees 11,232 38,768 100,000 - 150,000 Other - - - - - 11,232 38,768 420,000 - 470,000 Capital Expenditures: Design 11,232 38,768 - - 50,000 Right of Way - - - - - Construction - - 420,000 - 420,000 11,232 38,768 420,000 - 470,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - 320,000 Grants- Unsecured (Fed,State,Local)- - - - - REET - - - - - Traffic Mitigation Fees - - - - 100,000 Other - - - - - - - - - 420,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 420,000 - - - - 420,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: Reconstruct the existing traffic signals at C St NW and W Main St and at E Main St and Auburn Ave/A St SE. The new C St NW signal would provide protected left-turn phasing for C St, and would provide additional safety related to the railroad pre- emption. The Auburn Ave/A St signal would replace one of the City's oldest signals which has exceeded its design life. Progress Summary: Design started in 2014 and construction is expected to start in 2015. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 72 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Riverwalk Drive SE Non-Motorized Improvements TIP # 23 Project No:cpxxxx Project Type:Non-Motorized Project Manager:TBD LOS Corridor ID# 27 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - 100,000 - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - 100,000 - Capital Expenditures: Design - - - 100,000 - Right of Way - - - - - Construction - - - - - - - - 100,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue 100,000 - - - 200,000 Grants- Unsecured (Fed,State,Local)500,000 - - - 500,000 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - 600,000 - - - 700,000 Capital Expenditures: Design - - - - 100,000 Right of Way - - - - - Construction 600,000 - - - 600,000 600,000 - - - 700,000 Total Expenditures: Description: This project will construct sidewalks, street lighting, and storm improvements on Riverwalk Drive SE between Auburn Way S and Howard Road SE. Progress Summary: Design is anticipated to begin in 2017. Construction will be completed when funds are available. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $10,000. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 73 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: A Street SE Safety Improvements Study TIP # 27 Project No:cp1110 Project Type:Safety (Non-Capacity) Project Manager:James Webb LOS Corridor ID# 10,33 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 1,230 20,000 35,000 - 56,230 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Mitigation Fees - - - - - Other - - - - - 1,230 20,000 35,000 - 56,230 Capital Expenditures: Design 1,230 20,000 35,000 - 56,230 Right of Way - - - - - Construction - - - - - 1,230 20,000 35,000 - 56,230 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - 35,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - - - 35,000 Capital Expenditures: Design - - - - 35,000 Right of Way - - - - - Construction - - - - - - - - - 35,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: Study the A Street SE corridor between 6th Street SE and Lakeland Hills Way SE including 41st St SE from D St SE to C St SE. The study will review the safety and access needs of the traveling public and the adjacent properties. Progress Summary: In-house pre-design was completed to refine project scope, alignment, and identify design issues. 2015 design will complete conceptual corridor plan for future improvements. Future Impact on Operating Budget: This study will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 74 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Citywide Pedestrian Accessibility and Safety Program TIP # 30 Project No:asbd08 Project Type:Non-Capacity (Annual) Project Manager:Pablo Para LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - 100,000 100,000 100,000 200,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - 100,000 100,000 100,000 200,000 Capital Expenditures: Design - 15,000 15,000 15,000 30,000 Right of Way - - - - - Construction - 85,000 85,000 85,000 170,000 - 100,000 100,000 100,000 200,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue 100,000 100,000 100,000 100,000 600,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Design 15,000 15,000 15,000 15,000 90,000 Right of Way - - - - - Construction 85,000 85,000 85,000 85,000 510,000 100,000 100,000 100,000 100,000 600,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This is an annual program to fund pedestrian access and safety improvement projects at locations throughout the City. Projects are prioritized annually based on pedestrian demands, existing deficiencies, and citizen requests. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 75 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Citywide Arterial Bicycle & Safety Improvements TIP # 31 Project No:asbd07 Project Type:Non-Capacity (Safety) Project Manager:Various LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - 100,000 - 100,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - - - 100,000 - 100,000 Capital Expenditures: Design - - 10,000 - 10,000 Right of Way - - - - - Construction - - 90,000 - 90,000 - - 100,000 - 100,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue 100,000 - 100,000 - 300,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - Traffic Impact Fees - - - - - Other - - - - - 100,000 - 100,000 - 300,000 Capital Expenditures: Design 10,000 - 10,000 - 30,000 Right of Way - - - - - Construction 90,000 - 90,000 - 270,000 100,000 - 100,000 - 300,000 Total Funding Sources: Description: This is a bi-annual program to fund bicycle and safety improvements on classified roadways. Projects are prioritized annually based upon field studies. Project was previously called "Citywide Roadway Safety Infrastructure Improvements". Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 76 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Downtown Transit Center Access Improvements TIP # 44 Project No:cpxxxx Project Type:Non-Capacity, Transit Project Manager:TBD LOS Corridor ID# xx Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - 50,000 - Grants- Secured (Fed,State,Local)- - - 200,000 - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - 250,000 - Capital Expenditures: Design - - - 30,000 - Right of Way - - - - - Construction - - - 220,000 - - - - 250,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - 50,000 Grants- Secured (Fed,State,Local)- - - - 200,000 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - - 250,000 Capital Expenditures: Design - - - - 30,000 Right of Way - - - - - Construction - - - - 220,000 - - - - 250,000 Total Expenditures: Description: This project will modify channelization and curb radii to improve turning radii for transit vehicles at the southwest corner of S Division St & 3rd St SW, and the southeast corner of A St SW & 2nd St SW. Progress Summary: Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to minimal. Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 77 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 104th Ave SE & Green River Road Study TIP # 46 Project No:cp1021 Project Type:Non-Capacity (Intersection Safety) Project Manager:James Webb LOS Corridor ID# 24 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue 3,228 - 5,000 - 8,228 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - PWTFL - - - - - Other - - - - - 3,228 - 5,000 - 8,228 Capital Expenditures: Design 3,228 - 5,000 - 8,228 Right of Way - - - - - Construction - - - - - 3,228 - 5,000 - 8,228 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - 5,000 Grants- Secured (Fed,State,Local)- - - - - REET - - - - - PWTFL - - - - - Other - - - - - - - - - 5,000 Capital Expenditures: Design - - - - 5,000 Right of Way - - - - - Construction - - - - - - - - - 5,000 Description: This project funds a pre-design study to determine the right-of-way, environmental and construction requirements for intersection safety improvements. The project is anticipated to include sight-distance improvements, constructing turn- lanes, channelization, environmental mitigation, signage and clear zone improvements. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 78 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: A St SE & 6th St SE Safety and Access Improvements TIP # 48 Project No:asbd09 Project Type:Non-Capacity Project Manager:James Webb LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - PWTFL - - - - - Other(BNSF)- - 50,000 - 50,000 - - 50,000 - 50,000 Capital Expenditures: Design - - 10,000 - 10,000 Right of Way - - - - - Construction - - 40,000 - 40,000 - - 50,000 - 50,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - PWTFL - - - - - Other(BNSF)- - - - 50,000 - - - - 50,000 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 40,000 - - - - 50,000 Description: This project is a partnership between Auburn and Burlington Northern Santa Fe Railway to improve the intersection of A St SE and 6th St SE. The scope of the project includes adding a phase to the traffic signal for traffic entering and exiting the BNSF rail yard. Progress Summary: Design and construction is planned to be completed in 2016 pending agreement with BNSF. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 79 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: ITS Dynamic Message Signs TIP # 50 Project No:asbd16 Project Type:Non-Capacity (ITS) Project Manager:TBD LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - 120,000 - REET - - 100,000 30,000 100,000 PWTFL - - - - - Other (WRA)- - 50,000 - 50,000 - - 150,000 150,000 150,000 Capital Expenditures: Design - - 20,000 20,000 20,000 Right of Way - - - - - Construction - - 130,000 130,000 130,000 - - 150,000 150,000 150,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal 120,000 120,000 - - 360,000 REET 30,000 30,000 - - 190,000 PWTFL - - - - - Other (WRA)- - - - 50,000 150,000 150,000 - - 600,000 Capital Expenditures: Design 20,000 20,000 - - 80,000 Right of Way - - - - - Construction 130,000 130,000 - - 520,000 150,000 150,000 - - 600,000 Description: This project funds the design and construction of Dynamic Message Signs at various locations throughout the City. Dynamic message signs are an important Intelligent Transportation System (ITS) tool for providing information to roadway users. Priority locations for sign placement are based on the Comprehensive Transportation Plans ITS map and include Auburn Way N, Auburn Way S, W Valley Highway, E Valley Highway and Lea Hill Road. Progress Summary: The first phase of this project is scheduled to begin in 2016 or sooner if grant funding becomes available. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $5,000. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 80 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: AWS Streetscape Improvements (SR-18 to M St SE)TIP # 62 Project No:cpxxxx Project Type:Miscellaneous Project Manager:TBD LOS Corridor ID# 3 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - 200,000 200,000 - 400,000 Grants- Unsecured (Fed,State,Local)- 1,750,000 2,600,000 - 4,350,000 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - 1,950,000 2,800,000 - 4,750,000 Capital Expenditures: Design - 500,000 - - 500,000 Right of Way - 1,450,000 - - 1,450,000 Construction - - 2,800,000 - 2,800,000 - 1,950,000 2,800,000 - 4,750,000 Description: This project will revitalize and beautify AWS from the SR-18 interchange to the intersection with M Street SE. Proposed improvements include: enhancement of crosswalks and pedestrian linkages; new and repaired sidewalks; curb and gutter; pedestrian ramps; new landscaped medians; street trees; new lighting; pedestrian benches; trash receptacles; recycling containers and other appropriate amenities. A significant portion of project costs are associated with right-of-way acquisition. Progress Summary: Future Impact on Operating Budget: This annual maintenance cost for this project is estimated to be $10,000. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 81 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Traffic Signals Safety Improvements TIP# 67 Project No:cp1501 STIP# AUB-45 Project Type:Non-Capacity Project Manager:Joel Chalmers LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - 5,000 - - 5,000 Grants- Secured Federal - - 412,575 - 412,575 Traffic Impact Fees - - - - - REET2 - 27,600 - - 27,600 Other - - - - - - 32,600 412,575 - 445,175 Capital Expenditures: Design - 32,600 - - 32,600 Right of Way - - - - - Construction - - 412,575 - 412,575 - 32,600 412,575 - 445,175 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Secured Federal - - - - 412,575 Traffic Impact Fees - - - - - REET2 - - - - - Other - - - - - - - - - 412,575 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 412,575 - - - - 412,575 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: Improve traffic signal phasing and timing, and improve visibility of traffic signal heads. Progress Summary: Federal Grant was awarded in 2014. Design phase began in 2015 and construction is scheduled for completion in 2016. Future Impact on Operating Budget: There is no impact to the street maintenance budget. City of Auburn Capital Facilities Plan 82 ARTERIAL STREET FUND (102)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: A Street SE & 37th Street SE Intersection Improvements TIP # 68 Project No:cp1502 Project Type:Intersection Improvement, Non-capacity Project Manager:Luis Barba LOS Corridor ID# 10 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Street Revenue - 55,000 - - 55,000 Grants- Unsecured Federal - 156,900 635,360 - 792,260 Traffic Impact Fees - - - - - Other (Arterial Preserv. Fund 105)- - 87,240 - 87,240 - 211,900 722,600 - 934,500 Capital Expenditures: Design - 145,500 - - 145,500 Right of Way - 66,400 - - 66,400 Construction - - 722,600 - 722,600 - 211,900 722,600 - 934,500 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Street Revenue - - - - - Grants- Unsecured Federal - - - - 635,360 Traffic Impact Fees - - - - - Other (Arterial Preserv. Fund 105)- - - - 87,240 - - - - 722,600 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 722,600 - - - - 722,600 Grants / Other Sources:Other Funds are Fund 105 Arterial Preservation Funds Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: Widen the intersection for a U-turn, install an interconnected traffic signal, overlay the intersection, and upgrade curb ramps. Progress Summary: Federal Grant was awarded in 2014. Arterial Preservation Fund 105 will participate in this project to overlay portions of A St SE. Budget for 2016 includes 10% local match; there is a potential of receiving 100% grant funding for the construction phase if project is advertised by September 30,2017. Future Impact on Operating Budget: The annual maintenance cost for this project is estimated to be $2,500. City of Auburn Capital Facilities Plan 83 TABLE T- 2A CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION – LOCAL STREET 2016 2017 2018 2019 2020 2021 Total Capacity Projects: None - Non-Capacity Projects: 1 Local Street Improvement Program Capital Costs 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000 Funding Sources: Fund Balance - - - - - - - Transfer In (W/S/SWM Utility)150,000 150,000 150,000 150,000 150,000 150,000 900,000 Sales Tax on Construction 1,450,000 1,450,000 1,450,000 1,450,000 1,450,000 1,450,000 8,700,000 Bond Proceeds - - - - - - - Utility Mitigation - - - - - - - SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000 Total Costs 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000 FUNDING SOURCES: Fund Balance - - - - - - - Transfer In (W/S/SWM Utility)150,000 150,000 150,000 150,000 150,000 150,000 900,000 Sales Tax on Construction 1,450,000 1,450,000 1,450,000 1,450,000 1,450,000 1,450,000 8,700,000 Bond Proceeds - - - - - - - Utility Mitigation - - - - - - - Total Funding 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000 City of Auburn Capital Facilities Plan 84 LOCAL STREET FUND (103)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Local Street Improvement Program TIP# 37 Project No:Various Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# N/A Activity: (Previous 2Yrs.)2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Local Street Fund 589,374 1,368,665 - - 1,958,039 Transfer In 300,000 150,000 150,000 150,000 600,000 Property Tax - - - - - Sales Tax on Construction 2,648,495 1,700,000 1,450,000 1,450,000 5,798,495 Bond Proceeds - - - - - Other - - - - - 3,537,869 3,218,665 1,600,000 1,600,000 8,356,534 Capital Expenditures: Design 425,000 400,000 300,000 300,000 1,125,000 Right of Way - - - - - Construction 3,112,869 2,818,665 1,300,000 1,300,000 8,531,534 3,537,869 3,218,665 1,600,000 1,600,000 8,356,534 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Local Street Fund - - - - - Transfer In 150,000 150,000 150,000 150,000 900,000 Property Tax - - - - - Sales Tax on Construction 1,450,000 1,450,000 1,450,000 1,450,000 8,700,000 Bond Proceeds - - - - - Other - - - - - 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000 Capital Expenditures: Design 300,000 300,000 300,000 300,000 1,800,000 Right of Way - - - - - Construction 1,300,000 1,300,000 1,300,000 1,300,000 7,800,000 1,600,000 1,600,000 1,600,000 1,600,000 9,600,000 Description: The program preserves local (unclassified) streets. The work includes crack sealing, asphalt patching, pre-leveling, asphalt overlays and roadway reconstruction. Beginning in 2013 funding sources include annual sales tax on construction. Progress Summary: This program has successfully completed overlays, chip seals and complete reconstructions since 2005. The program will focus on reconstruction in 2015 and 2016. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 85 TABLE T- 2B CAPITAL FACILITIES PLAN PROJECTS AND FINANCING TRANSPORTATION – STREET PRESERVATION 2016 2017 2018 2019 2020 2021 Total Capacity Projects: None - Non-Capacity Projects: 1 15th Street SW Reconstruction Capital Costs - - 300,000 2,000,000 - - 2,300,000 Fund Balance - - - - - - - Utility Tax - - 300,000 2,000,000 - - 2,300,000 Grants - - - - - - - Bond Proceeds - - - - - - - 2 Lake Tapps Parkway Preservation Capital Costs 124,380 828,470 - - - - 952,850 Funding Sources: Fund Balance - - - - - - - Grants 97,900 652,100 - - - - 750,000 Utility Tax 26,480 176,370 - - - - 202,850 3 Annual Arterial Street Preservation Program Capital Costs 600,000 700,000 1,800,000 1,800,000 1,800,000 1,800,000 8,500,000 Funding Sources: Fund Balance - - - - - - - Utility Tax 600,000 700,000 1,800,000 1,800,000 1,800,000 1,800,000 8,500,000 Bond Proceeds - - - - - - - 4 Annual Arterial Crack Seal Program Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Fund Balance - - - - - - - Utility Tax 100,000 100,000 100,000 100,000 100,000 100,000 600,000 5 Auburn Way N Preservation (22nd Street NE to 45th Street NE) Capital Costs 1,775,000 - - - - - 1,775,000 Funding Sources: Fund Balance - - - - - - - Utility Tax 887,500 - - - - - 887,500 Grants 887,500 - - - - - 887,500 6 15th Street NE/NW Preservation (SR-167 to 8th Street NE) Capital Costs 135,000 1,500,000 - - - - 1,635,000 Funding Sources: Fund Balance - - - - - - - Utility Tax 67,500 750,000 - - - - 817,500 Grants 67,500 750,000 - - - - 817,500 Note: Financial plan utilizes the following order for use of funds to finance projects: grant revenues (if available), utility tax revenues and fund balance. SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 2,734,380 3,128,470 2,200,000 3,900,000 1,900,000 1,900,000 15,762,850 Total Costs 2,734,380 3,128,470 2,200,000 3,900,000 1,900,000 1,900,000 15,762,850 FUNDING SOURCES: Fund Balance - - - - - - - Utility Tax 1,681,480 1,726,370 2,200,000 3,900,000 1,900,000 1,900,000 13,307,850 Grants 1,052,900 1,402,100 - - - - 2,455,000 Bond Proceeds - - - - - - - Total Funding 2,734,380 3,128,470 2,200,000 3,900,000 1,900,000 1,900,000 15,762,850 City of Auburn Capital Facilities Plan 86 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 15th Street SW Reconstruction TIP # 7 Project No:cpxxxx Project Type:Preservation Project Manager:TBD LOS Corridor ID# 12 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Arterial Preservation Fund Balance - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Utility Tax - - - - - Traffic Mitigation Funds - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Arterial Preservation Fund Balance - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Utility Tax 300,000 2,000,000 - - 2,300,000 Traffic Mitigation Funds - - - - - Bond Proceeds - - - - - 300,000 2,000,000 - - 2,300,000 Capital Expenditures: Design 300,000 - - - 300,000 Right of Way - - - - - Construction - 2,000,000 - - 2,000,000 300,000 2,000,000 - - 2,300,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Description: This project will evaluate improvements to the Union Pacific at-grade rail-crossings as well as the vertical sight distance to the Interurban Trail crossing to the west of the tracks. This project could include pavement preservation and may be accomplished through the Pavement Preservation Program. A cost estimate for planning purposes is provided below. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 87 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Funds Project Title: Lake Tapps Parkway Preservation TIP #22 Project No:spbd02 STIP# AUB-51 Project Type:Non-Capacity, Preservation Project Manager:Jai Carter Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Arterial Preservation Fund Balance - - - - - Grants- Secured Federal - - 97,900 652,100 97,900 Utility Tax - - 26,480 176,370 26,480 REET2 - - - - - Bond Proceeds - - - - - - - 124,380 828,470 124,380 Capital Expenditures: Design - - - - - Right of Way - - 124,380 - 124,380 Construction - - - 828,470 - - - 124,380 828,470 124,380 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Arterial Preservation Fund Balance - - - - - Grants- Secured Federal - - - - 750,000 Utility Tax - - - - 202,850 REET2 - - - - - Bond Proceeds - - - - - - - - - 952,850 Capital Expenditures: Design - - - - - Right of Way - - - - 124,380 Construction - - - - 828,470 - - - - 952,850 Description: The Lake Tapps Parkway Preservation project will complete a patch and overlay of pavement between the Auburn/Sumner City limit and Lakeland Hills Way including all required ADA improvements to curb ramps, sidewalks, and pedestrian signals. Progress Summary: Federal Grant was secured in 2014. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 88 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Funds Project Title: Annual Arterial Street Preservation Program TIP #35 Project No:Varies Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# N/A Activity: (Previous 2 Years)2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Arterial Preservation Fund 80,750 2,875,293 - - 2,956,043 Property Tax - - - - - Utility Tax 1,192,164 1,700,000 600,000 700,000 3,492,164 REET2 - - - - - Other (ICON)- 190,000 - - 190,000 1,272,914 4,765,293 600,000 700,000 6,638,207 Capital Expenditures: Design 39,167 100,000 50,000 50,000 239,167 Right of Way - - - - - Construction 1,233,747 4,665,293 550,000 650,000 7,099,040 1,272,914 4,765,293 600,000 700,000 6,638,207 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Arterial Preservation Fund - - - - - Property Tax - - - - - Utility Tax 1,800,000 1,800,000 1,800,000 1,800,000 8,500,000 REET2 - - - - - Other (ICON)- - - - - 1,800,000 1,800,000 1,800,000 1,800,000 8,500,000 Capital Expenditures: Design 50,000 50,000 50,000 50,000 300,000 Right of Way - - - - - Construction 1,750,000 1,750,000 1,750,000 1,750,000 8,200,000 1,800,000 1,800,000 1,800,000 1,800,000 8,500,000 Description: Implement regular pavement maintenance and/or rehabilitation of various classified streets citywide. These projects may include a combination of overlays, rebuilds, and spot repairs. This program is funded through a 1% utility tax that was adopted by City Council during 2008. Progress Summary: Program continues to successfully complete annual patching and overlay projects citywide. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 89 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Funds Project Title: Annual Arterial Crack Seal Program TIP #36 Project No:spbd03 Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Arterial Preservation Fund - - - - - Utility Tax - - 100,000 100,000 100,000 REET - - - - - Bond proceeds - - - - - - - 100,000 100,000 100,000 Capital Expenditures: Design - - 10,000 10,000 10,000 Right of Way - - - - - Construction - - 90,000 90,000 90,000 - - 100,000 100,000 100,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Arterial Preservation Fund - - - - - Utility Tax 100,000 100,000 100,000 100,000 600,000 REET - - - - - Bond proceeds - - - - - 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Design 10,000 10,000 10,000 10,000 60,000 Right of Way - - - - - Construction 90,000 90,000 90,000 90,000 540,000 100,000 100,000 100,000 100,000 600,000 Description: Implement regular maintenance of various classified streets by sealing newly formed cracks. Sealing the cracks will prolong the life of the pavement by stopping water from draining into the sub-base of the road. Progress Summary: Program continues to successfully extend pavement life pavement citywide. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 90 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: Auburn Way N Preservation (22nd Street NE to 45th Street NE)TIP # 70 Project No:cp1507 Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# 21 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Arterial Preservation Fund - 80,000 - - 80,000 Grants- Secured Federal - 80,000 887,500 - 967,500 Utility Tax - - 887,500 - 887,500 Bond proceeds - - - - - - 160,000 1,775,000 - 1,935,000 Capital Expenditures: Design - 160,000 - - 160,000 Right of Way - - - - - Construction - - 1,775,000 - 1,775,000 - 160,000 1,775,000 - 1,935,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Arterial Preservation Fund - - - - - Grants- Secured Federal - - - - 887,500 Utility Tax - - - - 887,500 Bond proceeds - - - - - - - - - 1,775,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 1,775,000 - - - - 1,775,000 Description: The project proposes to grind and overlay Auburn Way N from the 22nd Street NE to 45th Street NE. The project will restore 7.3 lane miles of pavement, upgrade 26 curb ramps to meet current ADA standard, as we as remove unused driveway openings as an upgrade to non ADA compliant pedestrian facilities. The project funds the design, coordination, permitting, and construction of the pavement preservation project. Progress Summary: Federal grant was secured in 2015. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 91 ARTERIAL STREET PRESERVATION FUND (105)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Special Revenue Fund Project Title: 15th Street NE/NW Preservation (SR-167 to 8th Street NE)TIP # 71 Project No:spbd05 Project Type:Non-Capacity, Preservation Project Manager:Jai Carter LOS Corridor ID# 9 Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Arterial Preservation Fund - - - - - Grants- Secured Federal - - 67,500 750,000 67,500 Utility Tax - - 67,500 750,000 67,500 Bond proceeds - - - - - - - 135,000 1,500,000 135,000 Capital Expenditures: Design - - 135,000 - 135,000 Right of Way - - - - - Construction - - - 1,500,000 - - - 135,000 1,500,000 135,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Arterial Preservation Fund - - - - - Grants- Secured Federal - - - - 817,500 Utility Tax - - - - 817,500 Bond proceeds - - - - - - - - - 1,635,000 Capital Expenditures: Design - - - - 135,000 Right of Way - - - - - Construction - - - - 1,500,000 - - - - 1,635,000 Description: The project proposes to grind and overlay 15th Street NW/NE from the SR167 to Auburn Way N; and grind and overlay Harvey Road NE from Auburn Way N to 8th Street NE. The project will restore 7.57 lane miles of pavement, upgrade 30 curb ramps to meet current ADA standard, as well as remove unused driveway openings as an upgrade to non ADA compliant pedestrian facilities. The project funds the design, coordination, permitting, and construction of the pavement preservation project. Progress Summary: Federal grant was secured in 2014. Future Impact on Operating Budget: There is no impact to the street maintenance budget. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 92 TABLE T-3 SUMMARY OF IMPACTS ON FUTURE OPERATING BUDGETS Project:2017 2018 2019 2020 2021 2022 Total 1 A Street NW, Phase 1 25,830$ 25,830$ 25,830$ 25,830$ 25,830$ 25,830$ 154,980$ 2 AWS Pedestrian Imp.-Dogwood to Fir - - - - - - - 3 M Street Underpass 21,827 21,827 21,827 21,827 21,827 21,827 130,962 4 S 277th St Corridor Capacity 27,250 27,250 27,250 27,250 27,250 27,250 163,500 5 AWS Imp.(Hemlock to Academy Dr.)- - - - - - - 6 F Street SE, Downtown to Les Gove - 4,100 4,100 4,100 4,100 4,100 20,500 7 M Street NE, E. Main to 4th - - - - 1,500 1,500 3,000 8 M St SE & 12th St SE Traffic Signal - - - 6,600 6,600 6,600 19,800 9 8th Street NE Widening - - - 600 600 600 1,800 10 Harvey & 8th Street NE - - - - - - - 11 Academy Drive Multi-Use Trail - - - - 25,000 25,000 50,000 12 46th Place S Realignment - - - - 1,750 1,750 3,500 13 C St SW & 15th St SW Int. Imp.- - - 2,500 2,500 2,500 7,500 14 124th Ave SE Corridor & 320th Imp.- - - 2,500 2,500 2,500 7,500 15 124th Ave SE Corridor Imp. -Phase 2 - - - - 3,500 3,500 7,000 16 R Street Bypass - - - - - - - 17 SE 320th St Corridor Imp.- - - - - - - 18 AWS Corridor Safety Improvements - - - - - - - 19 124th Ave SE & SE 248th St Int. Imp.- - - - - - - 20 Traffic Management Center Imp.- - - - - - - 21 W Valley Hwy Imp.-15th St NW to W Main St.- - - - - - - 22 Lake Tapps Pkwy ITS Expansion - 5,000 5,000 5,000 5,000 5,000 25,000 23 A St SE & Lakeland Hills Way SE - - - - - - - 24 AWS & 12th St SE Intersection Imp.- - - - - - - 25 Kersey Way Study - - - - - - - 26 W Main St Multimodal Corridor & ITS Imp.- - - - - - - 27 Evergreen Heights Safe Routes to School Imp.- - - - - - - 28 AWS Fir St SE to Hemlock St SE 9,300 9,300 9,300 9,300 9,300 9,300 55,800 29 Auburn Ave NE & 3rd St NE Pedestrian Improvements - 30 M St SE Corridor, 8th St SE to AWS - - - - 8,000 8,000 16,000 31 AWS Bypass-Riverwalk Dr. to SR 18 - - - 37,500 37,500 37,500 112,500 32 29th Street SE & R Street SE - - - - - - - 33 Lea Hill RD Segment 1 - - - 18,300 18,300 18,300 54,900 34 Lea Hill Rd Segment 2 - - - - - - - 35 Lea Hill Rd Segment 3 - - - - 20,300 20,300 40,600 36 22nd St NE & I St NE Intersection - - - - - - - 37 WVHwy Imp.SR-18 to 15th St SW - - - - - - - 38 Steward Rd (Lake Tapps Pkwy Corr.)- - - - - - - 39 Auburn Way Corridor Imp - - - - - - - 40 M St SE & 29th St SE Int. Safety Imp.- - - 5,000 5,000 5,000 15,000 41 Auburn Way N/1st St NE Signal Imp - - - - - - - 42 R St SE & 21st St SE Int. Safety Imp.- - - 5,000 5,000 5,000 15,000 43 Main Street Signal Upgrades - - - - - - - 44 Riverwalk Dr SE Non-Motorized Imp.- - 10,000 10,000 10,000 10,000 40,000 45 A Street SE Safety Imp. Study - - - - - - - 46 S. 277th Wetland Mitigation - - - - - - - 47 Citywide Pedestrian Crossing - - - - - - - 48 Citywide Arterial Bicycle & Safety Imp - - - - - - - 49 Downtown Transit Cntr Access Imp.- - - - - - - 50 104th Ave SE & Green River Rd Study - - - - - - - 51 Interurban Trailhead Imp - - - - - - - 52 A St SE & 6th St SE Safety Imp.- - - - - - - 53 ITS Dynamic Message Signs - - - 5,000 5,000 5,000 15,000 54 AWS Streetscape Improvements - - - - 10,000 10,000 20,000 55 Traffic Signals Safety Improvements - - - - - - - 56 A St SE & 37 St SE Int. Improvements 2,500 2,500 2,500 2,500 2,500 2,500 15,000 57 Local Street Improvement Program (Fund 103)- - - - - - - 58 15th Street SW Reconstruction - - - - - - - 59 Lake Tapps Parkway Preservation - - - - - - - 60 Arterial St. Preservation (Fund 105)- - - - - - - 61 Arterial Crack Seal Prog. (Fund 105)- - - - - - - 62 Auburn Wy N Preservation - - - - - - - 63 15th St NE/NW Preservation - - - - - - - Total 86,707$ 95,807$ 105,807$ 188,807$ 258,857$ 258,857$ 994,842$ City of Auburn Capital Facilities Plan 93 WATER Current Facilities The City of Auburn water utility provides water supply, treatment, transmission, storage, distribution, and service connections to in-City residences and businesses. The City also provides water to the City of Algona and Water District #111 under wholesale agreements. The water system consists of wells, springs and interties for source; chlorination stations and corrosion control for treatment; pump stations, pressure reducing stations and pipelines for transmission; and steel and concrete enclosed reservoirs for storage. Table W-1, “Facilities Inventory”, lists the facilities along with their current capacities and approximate locations. Level of Service (LOS) The City’s Comprehensive Water Plan summarizes the design criteria and service polices for the City’s water distribution system. Capital Facilities Projects and Financing The City of Auburn’s water system anticipates seven capacity projects in the amount of $16,593,665 and eighteen non-capacity projects totaling $19,164,489 for a 6-year planning expectation total of $35,758,154. The financing plan is shown in Table W-2 followed by individual worksheets showing the project details. The capacity projects will increase water supply quantities, storage, and distribution for growth of retail customers. The non-capacity projects will provide for pipeline improvements and replacements, delivery pressure improvements, water quality enhancements, comprehensive and resource management planning, pump station upgrades, telemetry system improvements, and meter upgrades. Impact on Future Operating Budgets As Table W-3 shows, operating budget impacts of $2,400 are forecasted for water supply and distribution facilities during the six years 2017 – 2022. City of Auburn Capital Facilities Plan 94 TABLE W-1 Facilities Inventory Water Facilities CAPACITY FACILITY WATER RIGHT (MGD - max rate)LOCATION Water Supply: Coal Creek Springs Certificate 857 9.70<2.52>*3401 Stuck River Rd Well 1 Certificate 3560-A 3.17 1136 M St SE Well 2 G1-00277 C 3.46 1109 5th St NE Well 3A G1-23629 C 4.03 401 37th St SE Well 3B (Included Above)(Included Above)401 37th St SE Well 4 G1-20391 C 4.03 950 25th St SE Well 5 G1-23633 C 1.44 5530 James Ave SE Well 5A (Included Above)(Included Above)5401 Olive Way SE Well 5B (Included Above)(Included Above)West end of 62nd Ct SE Well 6 (Supplemental to Wells 1, 2, 3A, 3B, 4)5.04 (supplemental)1109 5th St NE Well 7 (Supplemental to Wells 1, 2, 3A, 3B, 4)5.04 (supplemental)405 E St NE West Hill Springs Claim (1973 File Date)0.9 1900 15th St NW Ext Supply Total (MGD)26.73 Available for Use 24.21 * Denotes deduction of 1,750 gpm (Qi/2,824 ac-ft/yr) to comply with the provisions of the Muckleshoot-Auburn Stipulated Agreement. CAPACITY FACILITY (MGD)LOCATION SERVICE AREA Intertie Tacoma B Street NW 3.2 3240 B St NW Valley Service Area Tacoma 132nd Ave SE 3.2 29598 132nd Ave SE Lea Hill Service Area Intertie Total (MGD)6.4 CAPACITY FACILITY (MG)LOCATION SERVICE AREA Storage Facilities: Academy Reservoir 8A 1.0 5031 Auburn Way S Academy Service Area Academy Reservoir 8B 1.5 5031 Auburn Way S Academy Service Area Lakeland Hills Reservoir 5 1.0 1326 57th Dr SE Lakeland Hills Svc Area Lakeland Hills Reservoir 6 1.0 5718 Francis Ct SE Lakeland Hills Svc Area Lea Hill Reservoir 4A 1.0 30502 132nd Ave SE Lea Hill Service Area Lea Hill Reservoir 4B 1.5 30502 132nd Ave SE Lea Hill Service Area Valley Reservoir 1 5.0 2003 Auburn Way S Valley Service Area Valley Reservoir 2 3.6 32115 105th Place S Valley Service Area Storage Total (MG)15.6 CITY OF AUBURN WATER SYSTEM City of Auburn Capital Facilities Plan 95 TABLE W-1 (continued) Facilities Inventory Water Facilities CAPACITY FACILITY (GPM)LOCATION Booster Pump Stations: Academy 1: 2 pumps 800 2004 Auburn Way S Academy 2: 2 pumps 1,500 2004 Auburn Way S Academy East: 6 pumps 2,820 5031 Auburn Way S Green River: 4 pumps 4,680 29621 Green River Rd SE Intertie: 7 pumps 4,830 30502 132nd Ave SE Lea Hill: 3 pumps 2,100 10406 Lea Hill Rd SE Lakeland Hills: 5 pumps 3,200 1118 57th Place SE Wilderness Game Farm Pk: 2 pumps 1,050 2401 Stuck River Rd Terrace View: 3 pumps 1,500 6134 Alexander Place SE CAPACITY Primary Valve FACILITY (PSI - Inlet/Outlet)LOCATION Pressure Reducing Stations: Serves Valley Pressure Zone: Howard Road CCF #1011-10 82/65 Howard Rd Howard Road CCF By-Pass #1011-20 -Howard Rd (Bypass) 25th Street SE #1110-10 (Offline)-25th St SE & K St SE Riverwalk #1111-20 90/50 27th St. SE & 27th Place SE Riverwalk #1111-10 109/55 Riverwalk Dr SE & Howard Rd Serves Lea Hill: Amber View North #711-10 150/65 105th Pl SE & 320th Pl Amber View South #711-20 142/60 106th Pl SE Near Reservoir 2 Carriage Square Lower #611-10 165/65 Lea Hill Rd SE Carriage Square Middle #611-20 140/65 Lea Hill Rd & 106 Pl Carriage Square Upper #611-30 145/60 Lea Hill Rd & 107 Pl Cobble Creek Lower #411-20 86/40 SE 304th Pl & SE 101st Place Cobble Creek Upper #411-10 94/55 104th Ave SE (South of 303rd Road) Lea Hill #412-10 90/45 SE 298th Place & 109 Ave SE Lea Hill #412-30 N/C 300 Block & 108th Ave SE Lea Hill #511-10 87/45 304th St. SE West of 108th Ave Lea Hill #512-10 80/50 304th St. SE West of 112th Ave Serves Academy: Auburn Way South #1011-30 130/80 2003 Auburn Way S Auburn Way South #1114-10 130/80 4500 Auburn Way S Serves Jannsen Addition: Jannsen #1216-10 72/58 6100 Block & 35th Way SE City of Auburn Capital Facilities Plan 96 TABLE W-1 (continued) Facilities Inventory Water Facilities CAPACITY Primary Valve FACILITY (PSI - Inlet/Outlet)LOCATION Serves Lakeland Hills: Lakeland Hills #1309-10 105/55 Mill Pond Dr @ Oravetz Rd Lakeland Hills #1310-10 130/55 Mill Pond Dr & Mill Pond Loop Lakeland Hills #1409-10 N/C Oravetz & Lakeland Hills Way Lakeland Hills #1409-20 120/56 47th SE & Lakeland Hills Way Lakeland Hills #1409-30 95/70 Lakeland Hills Way & Lakeland Hills Lp Lakeland Hills #1409-40 84/55 Mill Pond Dr & Lakeland Hills Way Lakeland Hills #1410-10 103/50 4900 Block & Mill Pond Dr Lakeland Hills #1410-20 N/C 51st St. SE east of Mill Pond Loop Lakeland Hills #1410-30 125/62 Nathan Ave & Highland Dr Lakeland Hills #1410-40 82/55 Quincy Ave N of 53rd St SE Lakeland Hills #1411-10 80/42 Bennett Ave & 56th Ave SE Lakeland Hills #1411-20 82/55 5314 Bennett Ave SE Lakeland Hills #1411-30 155/73 5100 Kersey Way Lakeland Hills #1411-40 92/52 54th St SE Lakeland Hills #1411-50 85/44 Westly Ave SE Lakeland Hills #1412-10 82/55 5539 Franklin Ave SE Lakeland Hills #1509-10 174/60 Terrace View Lower (6170) Lakeland Hills #1509-20 160/73 Terrace View Middle (5960) Lakeland Hills #1509-30 138/47 Terrace View Upper (5810) Lakeland Hills #1509-40 230/90 Terrace View & Alexander Place SE Lakeland Hills #1510-10 N/C Lakeland Hills Way & Evergreen Way N/C - Normally Closed CAPACITY FACILITY (GPM)LOCATION Corrosion Control Howard Road 5,550 2101 Howard Rd SE Fulmer Field 9,375 1113 5th St NE Chlorination Stations: Coal Creek Springs Station 5,000 (gravity feed)3401 Stuck River Rd West Hill Springs Station 625 (gravity feed)1900 15th St NW Well 4 2,600 950 25th St SE Well 5B 600 1100 63rd St SE Well 5A 180 5401 Olive Ave SE FACILITY CAPACITY LOCATION Water Supply: Braunwood Satellite #1 0.03 MGD 4501 47th St SE Storage Facilities: Braunwood Satellite 1 0.03 MG 4501 47th St SE Booster Pump Stations: Braunwood: 3 Pumps 2.0 GPM 4501 47th St SE BRAUNWOOD SATELLITE WATER SYSTEM City of Auburn Capital Facilities Plan 97 TABLE W-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING WATER DIVISION 2016 2017 2018 2019 2020 2021 Total Capacity Projects: 1 Fulmer Well Field Improvements Capital Costs 100,000 800,000 - - - - 900,000 Funding Sources: Water Fund 100,000 800,000 - - - - 900,000 Bond Proceeds - - - - - - - 2 Cascade Water Alliance Water Purchase Capital Costs - 532,561 532,561 532,561 2,164,491 2,164,491 5,926,665 Funding Sources: Water Fund - 532,561 532,561 532,561 2,164,491 2,164,491 5,926,665 Bond Proceeds - - - - - - - 3 Academy Pump Station #1 Pump Replacement Capital Costs - 925,000 1,200,000 - - - 2,125,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds - 925,000 1,200,000 - - - 2,125,000 4 Coal Creek Springs Rehabilitation Capital Costs - - 800,000 2,600,000 - - 3,400,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds - - 800,000 2,600,000 - - 3,400,000 5 Intertie Booster Pump Station Improvements Capital Costs - - - - - 1,303,000 1,303,000 Funding Sources: Water Fund - - - - - 1,303,000 1,303,000 Bond Proceeds - - - - - - - 6 Algona Well 1 Decommissioning Capital Costs - 39,000 - - - - 39,000 Funding Sources: Water Fund - 39,000 - - - - 39,000 Bond Proceeds - - - - - - - 7 Annual Distribution System Improvements Program Capital Costs - 300,000 1,000,000 300,000 1,000,000 300,000 2,900,000 Funding Sources: Water Fund - 300,000 1,000,000 300,000 1,000,000 300,000 2,900,000 Bond Proceeds - - - - - - - Subtotal, Capacity Projects: Capital Costs 100,000 2,596,561 3,532,561 3,432,561 3,164,491 3,767,491 16,593,665 Non-Capacity Projects: 8 Green River PS Emergency Power Capital Costs - 90,000 600,000 - - - 690,000 Funding Sources: Water Fund - 90,000 600,000 - - - 690,000 Bond Proceeds - - - - - - - City of Auburn Capital Facilities Plan 98 TABLE W-2 (continued) 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 9 Well Inspection and Redevelopment Program Capital Costs - 150,000 - 150,000 - - 300,000 Funding Sources: Water Fund - 150,000 - 150,000 - - 300,000 Bond Proceeds - - - - - - - 10 Water Repair & Replacements Capital Costs - - 300,000 1,000,000 300,000 1,000,000 2,600,000 Funding Sources: Water Fund - - 300,000 1,000,000 300,000 1,000,000 2,600,000 Bond Proceeds - - - - - - - 11 MIT Master Meters Capital Costs 430,000 - - - - - 430,000 Funding Sources: Water Fund 30,000 - - - - - 30,000 Bond Proceeds 400,000 - - - - - 400,000 12 Street Utility Improvements Capital Costs 500,000 500,000 500,000 500,000 500,000 500,000 3,000,000 Funding Sources: Water Fund 150,000 100,000 500,000 500,000 500,000 500,000 2,250,000 Bond Proceeds 350,000 400,000 - - - - 750,000 13 Lea Hill PRV Station Improvements Capital Costs 75,000 625,000 - - - - 700,000 Funding Sources: Water Fund - 250,000 - - - - 250,000 Bond Proceeds 75,000 375,000 - - - - 450,000 14 Water Meter & Billing System Improvements Capital Costs 2,045,000 3,195,000 - - - - 5,240,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 2,045,000 3,195,000 - - - - 5,240,000 15 Utilities Field Operations Center Capital Costs - 300,000 - - - - 300,000 Funding Sources: Water Fund - 100,000 - - - - 100,000 Other -Sewer Fund - 100,000 - - - - 100,000 Other -Storm Fund - 100,000 - - - - 100,000 16 West Hill Springs Improvements Capital Costs 554,489 - - - - - 554,489 Funding Sources: Water Fund 99,489 - - - - - 99,489 Bond Proceeds 455,000 - - - - - 455,000 17 Reservoir Seismic Rehabilitation Capital Costs - - 357,500 357,500 - - 715,000 Funding Sources: Water Fund - - 357,500 357,500 - - 715,000 Bond Proceeds - - - - - - - City of Auburn Capital Facilities Plan 99 TABLE W-2 (continued) 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 18 Lea Hill - 132nd Ave Distribution System Modifications Capital Costs 75,000 325,000 - - - - 400,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds 75,000 325,000 - - - - 400,000 19 Auburn Way South - Muckleshoot Plaza to Dogwood Capital Costs 885,000 - - - - - 885,000 Funding Sources: Water Fund 885,000 - - - - - 885,000 Bond Proceeds - - - - - - - 20 Reservoir Painting Capital Costs - - - - 1,250,000 - 1,250,000 Funding Sources: Water Fund - - - - 1,250,000 - 1,250,000 Bond Proceeds - - - - - - - 21 24" White River Crossing Capital Costs - 450,000 850,000 - - - 1,300,000 Funding Sources: Water Fund - - - - - - - Bond Proceeds - 450,000 850,000 - - - 1,300,000 22 F Street SE Non-Motorized Improvements Capital Costs - 250,000 - - - - 250,000 Funding Sources: Water Fund - 250,000 - - - - 250,000 Bond Proceeds - - - - - - - 23 M Street SE Storm Improvements Capital Costs 250,000 - - - - - 250,000 Funding Sources: Water Fund 250,000 - - - - - 250,000 Bond Proceeds - - - - - - - 24 Reservoir Repair and Replacements Capital Costs - 50,000 50,000 50,000 50,000 50,000 250,000 Funding Sources: Water Fund - 50,000 50,000 50,000 50,000 50,000 250,000 Bond Proceeds - - - - - - - 25 Pipeline Asset Management Study Capital Costs - - 50,000 - - - 50,000 Funding Sources: Water Fund - - 50,000 - - - 50,000 Bond Proceeds - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 4,814,489 5,935,000 2,707,500 2,057,500 2,100,000 1,550,000 19,164,489 City of Auburn Capital Facilities Plan 100 TABLE W-2 (continued) SUMMARY: 2016 2017 2018 2019 2020 2021 Total CAPITAL COSTS Capacity Projects 100,000 2,596,561 3,532,561 3,432,561 3,164,491 3,767,491 16,593,665 Non-Capacity Projects 4,814,489 5,935,000 2,707,500 2,057,500 2,100,000 1,550,000 19,164,489 Total Costs 4,914,489 8,531,561 6,240,061 5,490,061 5,264,491 5,317,491 35,758,154 FUNDING SOURCES: Water Fund 1,514,489 2,661,561 3,390,061 2,890,061 5,264,491 5,317,491 21,038,154 Other- Sewer Fund - 100,000 - - - - 100,000 Other- Storm Fund - 100,000 - - - - 100,000 Bond Proceeds 3,400,000 5,670,000 2,850,000 2,600,000 - - 14,520,000 Total Funding 4,914,489 8,531,561 6,240,061 5,490,061 5,264,491 5,317,491 35,758,154 City of Auburn Capital Facilities Plan 101 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Fulmer Well Field Improvements Project No:cp1107 Project Type:Capacity Project Manager:Fenhaus / Vondrak Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue 2,855 - 100,000 800,000 102,855 Grants (Fed,State,Local)- - - - - Bond Proceeds 833,247 200,000 - - 1,033,247 Other - - - - - 836,102 200,000 100,000 800,000 1,136,102 Capital Expenditures: Design 836,102 60,000 100,000 - 996,102 Right of Way - - - - - Construction - 140,000 - 800,000 140,000 836,102 200,000 100,000 800,000 1,136,102 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - 900,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 900,000 Capital Expenditures: Design - - - - 100,000 Right of Way - - - - - Construction - - - - 800,000 - - - - 900,000 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Evaluate Wells 2, 6 and 7 and the Fulmer Field Corrosion Control Treatment Facility to assess the supply and treatment capacity of the existing facilities and infrastructure. The evaluation will include an assessment of individual and total well supply capacities, along with a review of the treatment facility operating and control parameters. The evaluation will also incorporate recommendations for facility improvements. 2015 Comprehensive Water Plan CIP ID S-19 Progress Summary: The first phase of the study is complete. Recommended equipment will be designed and installed in 2016 and 2017. Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 102 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Cascade Water Alliance Water Purchase Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - 532,561 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 532,561 - Capital Expenditures: Water Supply Charges - - - 532,561 - Right of Way - - - - - Construction - - - - - - - - 532,561 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue 532,561 532,561 2,164,491 2,164,491 5,926,665 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 532,561 532,561 2,164,491 2,164,491 5,926,665 Capital Expenditures: Water Supply Charges 532,561 532,561 2,164,491 2,164,491 5,926,665 Right of Way - - - - - Construction - - - - - 532,561 532,561 2,164,491 2,164,491 5,926,665 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Financing to purchase water from adjacent purveyors to meet projected demand based on agreements with Cascade Water Alliance. Council approved the agreements for permanent and reserve wholesale supply in September 2013. A new agreement with Tacoma was executed in 2014. 2015 Comprehensive Water Plan CIP ID S-04 Progress Summary: Planned Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 103 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Academy Pump Station #1 Pump Replacement Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - 925,000 - Other - - - - - - - - 925,000 - Capital Expenditures: Design - - - 325,000 - Right of Way - - - - - Construction - - - 600,000 - - - - 925,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds 1,200,000 - - - 2,125,000 Other - - - - - 1,200,000 - - - 2,125,000 Capital Expenditures: Design - - - - 325,000 Right of Way - - - - - Construction 1,200,000 - - - 1,800,000 1,200,000 - - - 2,125,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The pump station is reaching the end of its useful life. The project will also increase the pump station capacity to meet peak demands and fire flow requirements, and provide backup power generation. 2015 Comprehensive Plan CIP ID PS-07 Progress Summary: Planned Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 104 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Coal Creek Springs Rehabilitation Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds 800,000 2,600,000 - - 3,400,000 800,000 2,600,000 - - 3,400,000 Capital Expenditures: Design 500,000 - - - 500,000 Right of Way - - - - - Construction 300,000 2,600,000 - - 2,900,000 800,000 2,600,000 - - 3,400,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Rehabilitation of the Coal Creek Springs middle collector will improve capacity of the springs resulting in greater utilization of the water right. 2015 Comprehensive Plan CIP ID S-09 Progress Summary: Planned Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 105 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Intertie Booster Pump Station Improvements Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - 1,303,000 1,303,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 1,303,000 1,303,000 Capital Expenditures: Design - - - 153,000 153,000 Right of Way - - - - - Construction - - - 1,150,000 1,150,000 - - - 1,303,000 1,303,000 Increase the pump station capacity to meet peak demands and fire flow requirements. 2015 Comprehensive Plan CIP ID PS-04 Progress Summary: Planned Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 106 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Algona Well 1 Decommissioning Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - 39,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 39,000 - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 39,000 - - - - 39,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - 39,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 39,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 39,000 - - - - 39,000 Algona well has been temporarily abandoned and all related facilities removed. This project will have the well properly decommissioned by a State of Washington-licensed well driller. 2015 Comprehensive Plan CIP ID S-14 Progress Summary: Planned Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 107 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Annual Distribution System Improvements Program Project No:cpxxxx Project Type:Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - 300,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 300,000 - Capital Expenditures: Design - - - 300,000 - Right of Way - - - - - Construction - - - - - - - - 300,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue 1,000,000 300,000 1,000,000 300,000 2,900,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,000,000 300,000 1,000,000 300,000 2,900,000 Capital Expenditures: Design - 300,000 - 300,000 900,000 Right of Way - - - - - Construction 1,000,000 - 1,000,000 - 2,000,000 1,000,000 300,000 1,000,000 300,000 2,900,000 Capacity-related improvements to the water distribution system to address low pressures during peak hour demand and fire flows. 2015 Comprehensive Plan CIP ID D-02 Progress Summary: Planned Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 108 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Green River Pump Station Emergency Power Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - 90,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 90,000 - Capital Expenditures: Design - - - 90,000 - Right of Way - - - - - Construction - - - - - - - 90,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue 600,000 - - - 690,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 600,000 - - - 690,000 Capital Expenditures: Design - - - - 90,000 Right of Way - - - - - Construction 600,000 - - - 600,000 600,000 - - - 690,000 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Construction of facility improvements to house an emergency generator and associated electrical equipment. 2015 Comprehensive Plan CIP ID PS-03 Progress Summary: Planned Future Impact on Operating Budget: The annual maintenance cost is estimated to be approximately $600. City of Auburn Capital Facilities Plan 109 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Well Inspection and Redevelopment Program Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - 150,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 150,000 - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 150,000 150,000 - - - 150,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - 150,000 - - 300,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 150,000 - - 300,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 150,000 - - 300,000 - 150,000 - - 300,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: No significant impact. Program for inspection and redevelopment of supply wells and springs necessary to ensure production at maximum capacity for efficient utilization. 2015 Comprehensive Plan CIP ID S-07 Progress Summary: Planned Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 110 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Water Repair & Replacements Project No:cpxxxx Project Type:Non-Capacity (R&R) Project Manager:Various Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue 300,000 1,000,000 300,000 1,000,000 2,600,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 300,000 1,000,000 300,000 1,000,000 2,600,000 Capital Expenditures: Design 300,000 - 300,000 - 600,000 Right of Way - - - - - Construction - 1,000,000 - 1,000,000 2,000,000 300,000 1,000,000 300,000 1,000,000 2,600,000 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Distribution system repair and replacement projects required for meeting peak demands and reducing system losses. Projects will be coordinated with the Local Street Program and other utility projects. 2015 Comprehensive Plan CIP ID D-09 Progress Summary: Planned Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 111 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Muckleshoot Indian Tribe Master Meters Project No:cp1411 Project Type:Non-Capacity Project Manager:Chalmers Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue 4,419 45,581 30,000 - 80,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - 400,000 - 400,000 Other - - - - - 4,419 45,581 430,000 - 480,000 Capital Expenditures: Design 4,419 45,581 30,000 - 80,000 Right of Way - - - - - Construction - - 400,000 - 400,000 4,419 45,581 430,000 - 480,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - 30,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 400,000 Other - - - - - - - - - 430,000 Capital Expenditures: Design - - - - 30,000 Right of Way - - - - - Construction - - - 400,000 - - - - 430,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Install master meters to Muckleshoot Indian Tribe properties to ease account administration. 2015 Comprehensive Plan CIP ID G-06 Progress Summary: Design and construction of master meter stations are anticipated to be completed in 2016. Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 112 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Street Utility Improvements Project No:wabd01 Project Type:Non-Capacity Project Manager:TBD Description: Progress Summary: Planned No significant impact Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - 500,000 150,000 100,000 650,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - 350,000 400,000 350,000 Other - - - - - Total Funding Sources:- 500,000 500,000 500,000 1,000,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 500,000 500,000 500,000 1,000,000 Total Expenditures:- 500,000 500,000 500,000 1,000,000 Forecasted Project Cost: Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue 500,000 500,000 500,000 500,000 2,250,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 750,000 Other - - - - - Total Funding Sources:500,000 500,000 500,000 500,000 3,000,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 500,000 500,000 500,000 500,000 3,000,000 Total Expenditures:500,000 500,000 500,000 500,000 3,000,000 Water main improvements in coordination with the Save our Streets (SOS) program and general arterial street improvements. 2015 Comprehensive Plan CIP ID D-06 Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 113 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Lea Hill PRV Station Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - 250,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - 75,000 375,000 75,000 Other - - - - - - - 75,000 625,000 75,000 Capital Expenditures: Design - - 75,000 - 75,000 Right of Way - - - - - Construction - - 625,000 - - - 75,000 625,000 75,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - 250,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 450,000 Other - - - - - - - - - 700,000 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - - Construction - - - 625,000 - - - - 700,000 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Replace pressure reducing valve stations in the Lea Hill area. Existing stations are old, difficult to access and are typically flooded. They do not have sump pumps or proper drainage to remove water that enters the stations. Maintaining the stations is difficult. This is a safety issue and a health issue. 2015 Comprehensive Plan CIP ID D-13 Progress Summary: Planned Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 114 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Water Meter & Billing System Improvements Project No:cp1317 Project Type:Non-Capacity Project Manager:Snyder/Fenhaus Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - 276,000 - 276,000 Grants (Fed,State,Local)- - - - - Bond Proceeds 25,753 468,297 2,045,000 3,195,000 2,539,050 Other - - - - - 25,753 744,297 2,045,000 3,195,000 2,815,050 Capital Expenditures: Design 25,753 44,297 - 70,050 Right of Way - - - - - Construction - 700,000 2,045,000 3,195,000 2,745,000 25,753 744,297 2,045,000 3,195,000 2,815,050 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - 5,240,000 Other - - - - - - - - - 5,240,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,240,000 - - - - 5,240,000 Grants / Other Sources: Bond proceeds from 2013 issuance. Anticipate bond issuance in 2016. Based on a completed study, implement and construct selected improvements in automated metering technology, generally referred to as Advanced Metering Infrastructure (AMI). Benefits include more accurate meter reads, daily information for quicker detection of leaks, and improved efficiency of billing operations. 2015 Comprehensive Plan CIP ID G-09 Progress Summary: Study is complete. Installation of meters and metering infrastructure to begin in 2015. Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 115 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Utilities Field Operations Center Project No:wabd04 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - 100,000 - Grants (Fed,State,Local)- - - - - Other operating - transfer in Sewer - - - 100,000 - Other operating - transfer in Storm - - - 100,000 - - - - 300,000 - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 300,000 - - - - 300,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - 100,000 Grants (Fed,State,Local)- - - - - Other operating - transfer in Sewer - - - - 100,000 Other operating - transfer in Storm - - - - 100,000 - - - - 300,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 300,000 - - - - 300,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Construct building for utilities field staff use and storage of field equipment. 2015 Comprehensive Plan CIP ID G-05 Progress Summary: Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 116 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: West Hill Springs Improvements Project No:cp1417 Project Type:Non-Capacity Project Manager:Luis Barba Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue 511 50,000 99,489 - 150,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - 455,000 455,000 511 50,000 554,489 - 605,000 Capital Expenditures: Design 511 50,000 99,489 - 150,000 Right of Way - - - - - Construction - - 455,000 455,000 511 50,000 554,489 - 605,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - 99,489 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - 455,000 - - - - 554,489 Capital Expenditures: Design - - - - 99,489 Right of Way - - - - - Construction - - - - 455,000 - - - - 554,489 Install flow control valve for automatic shutdown, replace meter, and upgrade reservoir hatches. This project was identified during the Department of Health Sanitary Survey as a health and safety concern. 2015 Comprehensive Plan CIP ID S-17 Progress Summary: Design will begin in late 2015 with construction completed in 2016. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 117 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Reservoir Seismic Rehabilitation Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - - Grants -Unsecured Federal - - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue 357,500 357,500 - - 715,000 Grants -Unsecured Federal - - - - - PWTFL - - - - - Bond Proceeds - - - - - 357,500 357,500 - - 715,000 Capital Expenditures: Design 150,000 - - - 150,000 Right of Way - - - - - Construction 207,500 357,500 - - 565,000 357,500 357,500 - - 715,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Install seismic control valves on outlet piping of Reservoirs 1, 2, 4A, 4B, 8A, and 8B. 2015 Comprehensive Plan CIP ID R-06 Progress Summary: Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 118 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Lea Hill - 132nd Ave Distribution System Modifications Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - 75,000 325,000 75,000 - - 75,000 325,000 75,000 Capital Expenditures: Design - - 75,000 - 75,000 Right of Way - - - - - Construction - - - 325,000 - - - 75,000 325,000 75,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - 400,000 - - - - 400,000 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - - Construction - - - - 325,000 - - - - 400,000 Project will add pressure reducing valves and control valves at Lea Hill reservoirs and pump stations, and system valves to provide efficient operation of the 132nd Ave Tacoma Intertie. 2015 Comprehensive Water Plan CIP ID D-06 Progress Summary: Design and construction will be completed in 2016. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 119 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Auburn Way South - Muckleshoot Plaza to Dogwood Project No:cp1218 Project Type:Non-Capacity Project Manager:Larson Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - 55,000 885,000 - 940,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - 55,000 885,000 - 940,000 Capital Expenditures: Design - 55,000 - - 55,000 Right of Way - - - - - Construction - - 885,000 - 885,000 - 55,000 885,000 - 940,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - 885,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - 885,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 885,000 - - - - 885,000 Water main improvements constructed in conjunction with Auburn Way South Corridor Improvements. 2015 Comprehensive Water Plan CIP ID D-06 Progress Summary: Design will be completed in 2015 with construction completed in 2016. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 120 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Reservoir Painting Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - 1,250,000 - 1,250,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - 1,250,000 - 1,250,000 Capital Expenditures: Design - - 150,000 - 150,000 Right of Way - - - - - Construction - - 1,100,000 - 1,100,000 - - 1,250,000 - 1,250,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Maintenance of reservoirs requires periodic painting to protect the steel and increase the useful life of the reservoir. 2015 Comprehensive Plan CIP ID R-05 Progress Summary: Planned Future Impact on Operating Budget: No significant impact City of Auburn Capital Facilities Plan 121 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: 24" White River Crossing Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - DWSRF - - - Bond Proceeds - - 450,000 - - - - 450,000 - Capital Expenditures: Design - - 100,000 - Right of Way - - - - - Construction - - 350,000 - - - - 450,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - Grants (Fed,State,Local)- - - - - DWSRF - - - - - Bond Proceeds 850,000 - - - 1,300,000 850,000 - - - 1,300,000 Capital Expenditures: Design - - - - 100,000 Right of Way - - - - - Construction 850,000 - - - 1,200,000 850,000 - - - 1,300,000 The facilities evaluation study conducted in 2013-2014 found a suspected leak on the 24" steel transmission main crossing the White River. The approximate location was determined, but further investigation is required to assess the degree and magnitude of the leak. This project will provide for full replacement of the river crossing. 2015 Comprehensive Plan CIP ID D-11 Progress Summary: Design is anticipated to be completed in 2016 with construction completed in 2017. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 122 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: F Street SE Non-Motorized Improvements Project No:cp1416 Project Type:Non-Capacity Project Manager:Wickstrom Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - 100,000 250,000 100,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - 100,000 - 250,000 100,000 Capital Expenditures: Design - 100,000 - - 100,000 Right of Way - - - - - Construction - - 250,000 - - 100,000 - 250,000 100,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - 250,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - 250,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 250,000 - - - - 250,000 Water main improvements constructed in conjunction with F Street SE street improvements. 2015 Comprehensive Water Plan CIP ID D-06 Progress Summary: Design will be completed in 2015 with construction completed in 2017. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 123 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: M Street SE Storm Improvements Project No:cp1511 Project Type:Non-Capacity Project Manager:Larson Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - 50,000 250,000 - 300,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - 50,000 250,000 - 300,000 Capital Expenditures: Design - 50,000 - - 50,000 Right of Way - - - - - Construction - - 250,000 - 250,000 - 50,000 250,000 - 300,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue - - - - 250,000 Grants (Fed,State,Local)- - - - - PWTFL - - - - - Bond Proceeds - - - - - - - - - 250,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 250,000 - - - - 250,000 Water main improvements constructed in conjunction with M St SE storm and street improvements. 2015 Comprehensive Water Plan CIP ID D-06 Progress Summary: Design will be completed in 2015 with construction completed in 2016. Future Impact on Operating Budget: No significant impact Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 124 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Reservoir Repair and Replacements Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - 50,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 50,000 - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 50,000 - - - - 50,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue 50,000 50,000 50,000 50,000 250,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 50,000 50,000 50,000 50,000 250,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 50,000 50,000 50,000 50,000 250,000 50,000 50,000 50,000 50,000 250,000 General reservoir maintenance and minor improvements. 2015 Comprehensive Plan CIP ID R-03 Progress Summary: Planned Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 125 WATER FUND (430)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Pipeline Asset Management Study Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Water Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Water Revenue 50,000 - - - 50,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 50,000 - - - 50,000 Capital Expenditures: Design 50,000 - - - 50,000 Right of Way - - - - - Construction - - - - - 50,000 - - - 50,000 Pipeline asset management study will identify the remaining useful life of water mains in the system, prioritize pipe replacements, and develop replacement costs to phase in the replacements. 2015 Comprehensive Plan CIP ID D-10 Progress Summary: Planned Future Impact on Operating Budget: No significant impact. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 126 TABLE W-3 Impact on Future Operating Budgets WATER Project:2017 2018 2019 2020 2021 2022 Total 1 Fulmer Well Field Improvements -$ -$ -$ -$ -$ -$ -$ 2 Cascade Water Alliance Water Purchase - - - - - - - 3 Academy Pump Station #1 Replacement - - - - - - - 4 Coal Creek Springs Rehabilitation - - - - - - - 5 Intertie Booster Pump Station Improvements - - - - - - - 6 Algona Well 1 Decommissioning - - - - - - - 7 Annual Distribution System Improvements Program - - - - - - - 8 Green River Pump Station Emergency Power - - 600 600 600 600 2,400 9 Well Inspection and Redevelopment Program - - - - - - - 10 Water Repair & Replacement - - - - - - - 11 MIT Master Meters - - - - - - - 12 Street Utility Improvements - - - - - - - 13 Lea Hill PRV Station Improvements - - - - - - - 14 Water Meter & Billing System Improvements - - - - - - - 15 Utilities Field Operations Center - - - - - - - 16 West Hill Springs Improvement - - - - - - - 17 Reservoir Seismic Rehabilitation - - - - - - - 18 Lea Hill -132nd Ave Distribution System Modifications - - - - - - - 19 Auburn Way South- Dogwood to Fir - - - - - - - 20 Reservoir Painting - - - - - - - 21 24" White River Crossing - - - - - - - 22 F St SE Non-Motorized Improvements - - - - - - - 23 M St SE Storm Imrprovements - - - - - - - 24 Reservoir Repair and Replacements - - - - - - - 25 Pipeline Asset Manaagement Study - - - - - - - Total -$ -$ 600$ 600$ 600$ 600$ 2,400$ City of Auburn Capital Facilities Plan 127 SANITARY SEWER Current Facilities The City’s sanitary sewer service area encompasses approximately 28-square miles which are primarily within the City limits, but includes a total of approximately ½ square mile within Auburn’s Proposed Annexation area (PAA). The City contracts with King County for sewage treatment and disposal. The City’s Sanitary Sewer Utility is responsible for the collection and transmission of wastewater to the King County trunk lines. The City’s current inventory of approximately 197 miles of sewer lines serves the City’s sewer service area. Table S-1, Facilities Inventory, lists the sewage collection and transmission facilities along with their capacities and locations. Level of Service (LOS) The Comprehensive Sewerage Plan for the Sewerage Collection System summarizes the level of service (LOS), or design criteria, for the City’s sewage collection system. These standards represent the average quantities of sewage that the system is designated to accommodate for residential, industrial, and commercial development. Capital Facilities Projects and Financing Investments in the City’s sewage collection facilities include primarily non-capacity improvements and replacement projects. Anticipated replacements include replacement of aging sewer pipes and manholes in conjunction with arterial and local street improvements, and replacement of pipe identified through the sewer program’s condition assessment process. The City will also undertake significant system assessment efforts including inspections and evaluations of siphons, pump stations, large diameter pipe, and specific areas of the City that shows high levels of inflow and infiltration. The City of Auburn’s sewer system anticipates costs for thirteen non-capacity projects totaling $12,751,000. Table S-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for sanitary sewer facilities during the six years 2017 – 2022. City of Auburn Capital Facilities Plan 128 TABLE S-1 Facilities Inventory Sewage Facilities CAPACITY FACILITY (MGD)LOCATION Pump Stations: 8th Street 0.26 900 8th Street NE 22nd Street 0.79 1950 22nd Street NE Area 19 0.47 800 71st Street SE Auburn 40 0.63 4159 O Place NE Dogwood 0.43 1423 Dogwood Street SE Ellingson 2.20 100 41st Street SE F Street 0.86 1700 F Street SE North Tapps 0.73 2610 Lake Tapps Pkwy SE Peasley Ridge 0.36 5225 South 320th Street R Street 0.14 600 R Street NE Rainier Ridge 0.29 31809 125th Place SE Riverside 0.58 13900 104th Avenue SE Terrace View 0.94 104 60th Street SE Valley Meadows 0.18 2022 4th Street SE Verdana 2.88 11807 SE 296th Place (Kent, WA) FACILITY Pipe Size LOCATION River Crossings: Inverted Syphon 8 & 12 Inch Green River & 26th Street NE 8th Street Bridge 14 Inch Green River & 8th Street NE City of Auburn Capital Facilities Plan 129 TABLE S-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING SANITARY SEWER DIVISION 2016 2017 2018 2019 2020 2021 Total Capacity Projects: None Non-Capacity Projects: 1 Sanitary Sewer Repair & Replacement Program Capital Costs 1,540,000 300,000 1,500,000 300,000 1,500,000 300,000 5,440,000 Funding Sources: Sewer Fund 1,540,000 300,000 1,500,000 300,000 1,500,000 300,000 5,440,000 Bond Proceeds - - - - - - - 2 Street Utility Improvements Capital Costs 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Funding Sources: Sewer Fund 200,000 200,000 200,000 200,000 200,000 200,000 1,200,000 Bond Proceeds - - - - - - - 3 Vactor Decant Facility Capital Costs 150,000 - - - - - 150,000 Funding Sources: Sewer Fund 150,000 - - - - - 150,000 Bond Proceeds - - - - - - - 4 2015 Sewer Repair and Replacement Capital Costs 1,150,000 - - - - - 1,150,000 Funding Sources: Sewer Fund 1,150,000 - - - - - 1,150,000 Bond Proceeds - - - - - - - 5 Manhole Ring and Cover Replacement Capital Costs 80,000 80,000 80,000 80,000 80,000 80,000 480,000 Funding Sources: Sewer Fund 80,000 80,000 80,000 80,000 80,000 80,000 480,000 Bond Proceeds - - - - - - - 6 Sewer Pump Station Replacement/Improvement Capital Costs - 141,000 500,000 168,000 900,000 141,000 1,850,000 Funding Sources: Sewer Fund - 141,000 500,000 168,000 900,000 141,000 1,850,000 Bond Proceeds - - - - - - - 7 Siphon Assessment Capital Costs - 524,000 - - - - 524,000 Funding Sources: Sewer Fund - 524,000 - - - - 524,000 Bond Proceeds - - - - - - - 8 Pump Station Condition Assessment Capital Costs 187,000 - - - - - 187,000 Funding Sources: Sewer Fund 187,000 - - - - - 187,000 Bond Proceeds - - - - - - - 9 Large Diameter Pipe Assessment Capital Costs - 400,000 - - - - 400,000 Funding Sources: Sewer Fund - 400,000 - - - - 400,000 Bond Proceeds - - - - - - - City of Auburn Capital Facilities Plan 130 TABLE S-2 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 10 Inflow and Infiltration Study Capital Costs - 135,000 135,000 135,000 135,000 135,000 675,000 Funding Sources: Sewer Fund - 135,000 135,000 135,000 135,000 135,000 675,000 Bond Proceeds - - - - - - - 11 Comprehensive Sewer Plan Update Capital Costs - - - - 350,000 - 350,000 Funding Sources: Sewer Fund - - - - 350,000 - 350,000 Bond Proceeds - - - - - - - 12 F Street SE Non-Motorized Improvements Capital Costs 12,000 88,000 - - - - 100,000 Funding Sources: Sewer Fund 12,000 88,000 - - - - 100,000 Bond Proceeds - - - - - - - 13 M Street SE Storm Improvements Capital Costs 245,000 - - - - - 245,000 Funding Sources: Sewer Fund 245,000 - - - - - 245,000 Bond Proceeds - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 3,564,000 1,868,000 2,415,000 883,000 3,165,000 856,000 12,751,000 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 3,564,000 1,868,000 2,415,000 883,000 3,165,000 856,000 12,751,000 Total Costs 3,564,000 1,868,000 2,415,000 883,000 3,165,000 856,000 12,751,000 FUNDING SOURCES: Utility Funds (Sewer)3,564,000 1,868,000 2,415,000 883,000 3,165,000 856,000 12,751,000 Bond Proceeds - - - - - - - Other - - - - - - - Total Funding 3,564,000 1,868,000 2,415,000 883,000 3,165,000 856,000 12,751,000 City of Auburn Capital Facilities Plan 131 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Sanitary Sewer Repair & Replacement/System Improvements Program Project No:sebd01 Project Type: Project Manager:Elwell Description: Activity: (Previous 2 Yrs.)2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue 1,665,000 255,000 1,540,000 300,000 3,460,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,665,000 255,000 1,540,000 300,000 3,460,000 Capital Expenditures: Design 249,750 38,250 231,000 45,000 519,000 Right of Way - - - - - Construction 1,415,250 216,750 1,309,000 255,000 2,941,000 1,665,000 255,000 1,540,000 300,000 3,460,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue 1,500,000 300,000 1,500,000 300,000 5,440,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,500,000 300,000 1,500,000 300,000 5,440,000 Capital Expenditures: Design 225,000 45,000 225,000 45,000 816,000 Right of Way - - - - - Construction 1,275,000 255,000 1,275,000 255,000 4,624,000 1,500,000 300,000 1,500,000 300,000 5,440,000 Non-Capacity (Repair and Replacement) Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This should decrease the operating budget by correcting the problems that require operation staff's attention. Repair and replace broken sewer mains and other facilities. These lines will be identified through television inspection and routine cleaning. This particular program includes proposed projects which do not have an approved Project Management Plan, or are not associated with the SOS or other transportation improvements. Anticipated projects include bi-annual, stand-alone, repair and replacement projects for sewer lines which are broken, misaligned, "bellied" or otherwise require an inordinate amount of maintenance effort or present a risk of backup or trench failure, and facilities which generate consistent odor complaints. Additionally, system improvements which enhance the ability to maintain service are included here. Comp Plan ID #1. Progress Summary: Anticipated projects for 2016-2021 include biennial repair and replacement projects. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 132 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Street Utility Improvements Project No:sebd02 Project Type: Project Manager:TBD Description: Activity: (Previous 2 Yrs.)2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue 400,000 200,000 200,000 200,000 1,000,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 400,000 200,000 200,000 200,000 1,000,000 Capital Expenditures: Design 60,000 30,000 20,000 20,000 130,000 Right of Way - - - - - Construction 340,000 170,000 180,000 180,000 690,000 400,000 200,000 200,000 200,000 800,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue 200,000 200,000 200,000 200,000 1,200,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 200,000 200,000 200,000 200,000 1,200,000 Capital Expenditures: Design 20,000 20,000 20,000 20,000 120,000 Right of Way - - - - - Construction 180,000 180,000 180,000 180,000 1,080,000 200,000 200,000 200,000 200,000 1,200,000 Non Capacity (Repair and Replacement) Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: No significant Impact Sewer line replacement in coordination with the Save our Streets (SOS) program and Arterial improvements. Comp Plan ID #2. Progress Summary: Ongoing Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 133 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2015-2020 Enterprise Funds Project Title: Sewer Vactor Decant Facility Project No:sebd03 Project Type: Project Manager:TBD Description: Activity: 2015 YE 2015 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - - 150,000 - 150,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 150,000 - 150,000 Capital Expenditures: Design - - 150,000 - 150,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - 150,000 - 150,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue - - - - 150,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 150,000 Capital Expenditures: Design - - - - 150,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - - - 150,000 Non-Capacity (Improvements) Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project could decrease the future operating budget by reducing the expenses associated with hauling saturated waste to the County landfill. Currently the City hauls vactored sewage waste to the County landfill on a biweekly basis. The sewage sludge is considerably wet, thus City funds are paying for the disposal of water. This project consists of a study/analysis to assess the City’s vactor disposal method and identify a cost-effective alternative to the status quo. Possible recommendations may include maintaining current operations, constructing a gravity decant facility, incorporating special equipment into the vactor truck to increase decanting ability, or purchasing specialized dewatering machinery. Comp Plan ID #3 Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 134 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: 2015 Sewer Repair and Replacement Project No:cp1512 Project Type: Project Manager:Kim Truong Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - 150,000 1,150,000 - 1,300,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 150,000 1,150,000 - 1,300,000 Capital Expenditures: Design - 150,000 - - 150,000 Right of Way/Property Acquisition - - - - - Construction - - 1,150,000 - 1,150,000 - 150,000 1,150,000 - 1,300,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue - - - - 1,150,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 1,150,000 Capital Expenditures: Design - - - - - Right of Way/Property Acquisition - - - - - Construction - - - - 1,150,000 - - - - 1,150,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project could decrease the future operating budget by reducing the number of sewer lines that require frequent maintenance staff attention. Non-Capacity (Repair and Replacement) This project consists of the replacement of aging or problematic sewer lines at nine different sites throughout the City. Progress Summary: The project is currently in the preliminary design phase and is scheduled to be constructed in 2016. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 135 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Manhole Ring and Cover Replacement Project No:sebd04 Project Type: Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - - 80,000 80,000 80,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 80,000 80,000 80,000 Capital Expenditures: Design - - 5,000 5,000 5,000 Right of Way/Property Acquisition - - - - - Construction - - 75,000 75,000 75,000 - - 80,000 80,000 80,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue 80,000 80,000 80,000 80,000 480,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 80,000 80,000 80,000 80,000 480,000 Capital Expenditures: Design 5,000 5,000 5,000 5,000 30,000 Right of Way/Property Acquisition - - - - - Construction 75,000 75,000 75,000 75,000 450,000 80,000 80,000 80,000 80,000 480,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project could decrease the future operating budget by reducing the need for staff to respond to loose manholes or lids. Non-Capacity (Repair and Replacement) As manholes and roads age and their condition deteriorates, access covers and the rings in which they sit can become loose and/or misoriented, and can become a road hazard requiring maintenance staff attention and increasing the City's liability. This annual project will replace approximately 50 sewer manhole rings and covers to maintain access to the sewer system and to decrease the likelihood of the manholes becoming road hazards. Some of these replacements may be in conjunction with other City capital projects. Comp Plan ID #7. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 136 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Sewer Pump Station Replacement/Improvement Project No:cpxxxx Project Type: Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - - - 141,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 141,000 - Capital Expenditures: Design - - - 141,000 - Right of Way/Property Acquisition - - - - - Construction - - - - - - - - 141,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue 500,000 168,000 900,000 141,000 1,850,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 500,000 168,000 900,000 141,000 1,850,000 Capital Expenditures: Design 20,000 168,000 50,000 141,000 520,000 Right of Way/Property Acquisition - - - - - Construction 480,000 - 850,000 - 1,330,000 500,000 168,000 900,000 141,000 1,850,000 Total Funding Sources: Total Expenditures: Non-Capacity (Repair and Replacement/Improvements) Total Funding Sources: Total Expenditures: Forecasted Project Cost: Three sewer pump stations, the 8th Street Pump Station, Valley Meadows Pump Station, and 22nd Street Pump Station have been identified as needing renovation, replacement, and/or relocation based on condition, safety concerns, and to accommodate growth. The scope of these improvements has not yet been developed, but will be based on the Pump Station Condition Assessment project scheduled for 2016. Rehabilitation costs for the 3 pump stations have been estimated over a 6-year period (design one year, construct following year). Comp Plan ID #4. Progress Summary: Following the results of the systematic pump station evaluation study scheduled for 2016, the sequence or identification of pump stations requiring R&R, and detailed scope of improvements (one pump station rehabilitated every other year) for each of these stations will be developed. Future Impact on Operating Budget: This project will not have a significant effect on operating budget. City of Auburn Capital Facilities Plan 137 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Siphon Assessment Project No:cpxxxx Project Type: Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - - - 524,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 524,000 - Capital Expenditures: Design - - - 50,000 - Right of Way/Property Acquisition - - - - - Construction - - - 474,000 - - - - 524,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue - - - - 524,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 524,000 Capital Expenditures: Design - - - - 50,000 Right of Way/Property Acquisition - - - - - Construction - - - - 474,000 - - - - 524,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project will not have a significant effect on operating budget. Non-Capacity (Improvement) Currently, the City does not have the required equipment to complete inspections of the three sewer siphons (2 across the Green River, 1 under the railroad tracks at H and 6th NW) located within its collection system. Their condition is unknown. This project would inspect each siphon to determine its condition and help set future inspection/cleaning protocols. The siphons would be inspected prior to cleaning to determine what their in situ condition is, then if required the lines would be cleaned and re-inspected. Based on the debris level and condition of the pipes, future activities can be planned. Comp Plan ID #5. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 138 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Pump Station Condition Assessment Project No:sebd05 Project Type: Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - - 187,000 - 187,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 187,000 - 187,000 Capital Expenditures: Design - - 187,000 - 187,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - 187,000 - 187,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue - - - - 187,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 187,000 Capital Expenditures: Design - - - - 187,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - - - 187,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project will not have a significant effect on operating budget. Non-Capacity (Improvement) The assessment will evaluate the physical condition of existing sewage pump stations and equipment. The purpose of the assessment is to predict future serviceability and anticipated longevity for development of future CIPs and the City's asset management program. This assessment will also be used to further define the scope of the Pump Station Replacement/Improvement project. Comp Plan ID #6. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 139 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Large Diameter Pipe Assessment Project No:cpxxxx Project Type: Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - - - 400,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 400,000 - Capital Expenditures: Design - - - 10,000 - Right of Way/Property Acquisition - - - - - Construction - - - 390,000 - - - - 400,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue - - - - 400,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 400,000 Capital Expenditures: Design - - - - 10,000 Right of Way/Property Acquisition - - - - - Construction - - - - 390,000 - - - - 400,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project will not have a significant effect on operating budget. Non-Capacity (Improvement) City staff is not equipped to efficiently clean and inspect sewer pipes with a diameter larger than 18 inches. This project would clean and internally inspect all pipe owned by the City that is larger than 18 inches in diameter. This is approximately 39,300 feet, ranging in diameter from 20 inches up to 36 inches. Comp Plan ID #8. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 140 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Inflow and Infiltration Study Project No:cpxxxx Project Type: Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - - - 135,000 - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 135,000 - Capital Expenditures: Design - - - 40,000 - Right of Way/Property Acquisition - - - - - Construction - - - 95,000 - - - - 135,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue 135,000 135,000 135,000 135,000 675,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 135,000 135,000 135,000 135,000 675,000 Capital Expenditures: Design 40,000 40,000 40,000 40,000 200,000 Right of Way/Property Acquisition - - - - - Construction 95,000 95,000 95,000 95,000 475,000 135,000 135,000 135,000 135,000 675,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project will not have a significant effect on operating budget. Non-Capacity (Improvement) This project would assess portions of the City Sewer Service Area assess infiltration/inflow (I/I) values, since excessive localized I/I can also be an indicator of poor sewer main and side sewer condition and could contribute to capacity issues in the future. This project would monitor flow in the collection system over 5 years. These data will then be used to help identify repair and replacement needs and for modeling purposes and I/I assessment in future updates to the Comprehensive Sewer Plan. Comp Plan ID #9. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 141 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Comprehensive Sewer Plan Update Project No:cpxxxx Project Type: Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Sewer Revenue - - - - - Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way/Property Acquisition - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue - - 350,000 - 350,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 350,000 - 350,000 Capital Expenditures: Design - - 350,000 - 350,000 Right of Way/Property Acquisition - - - - - Construction - - - - - - - 350,000 - 350,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Non-Capacity (Repair and Replacement/Improvement) This project will not have a significant effect on operating budget. Prepare an update the City's Sewer Comprehensive Plan to include an update to the hydraulic model and an update to the Capital Improvement Plan. Comp Plan ID #10. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 142 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: F Street SE Non-Motorized Improvements Project No:cp1416 Project Type: Project Manager:Seth Wickstrom Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Project Total Unrestricted Sewer Revenue - 12,000 12,000 88,000 24,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 12,000 12,000 88,000 24,000 Capital Expenditures: Design - 12,000 12,000 - 24,000 Right of Way/Property Acquisition - - - - - Construction - - - 88,000 - - 12,000 12,000 88,000 24,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue - - - - 100,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 100,000 Capital Expenditures: Design - - - - 12,000 Right of Way/Property Acquisition - - - - - Construction - - - - 88,000 - - - - 100,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project will not have a significant effect on operating budget. Non-Capacity (Repair and Replacement) Replace approximately 420 LF of 15"-18" diameter clay pipe as part of the F Street SE Non-Motorized Improvements project. Constructing this project in association with a road improvement project saves money and avoids damage to the new roadway that could occur if the pipe was not replaced and experienced a failure or blockage. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 143 SEWER FUND (431)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: M Street SE Storm Improvements Project No:cp1511 Project Type: Project Manager:Matt Larson Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Project Total Unrestricted Sewer Revenue - 35,000 245,000 - 280,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 35,000 245,000 - 280,000 Capital Expenditures: Design - 35,000 7,000 - 42,000 Right of Way/Property Acquisition - - - - - Construction - - 238,000 - 238,000 - 35,000 245,000 - 280,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Sewer Revenue - - - - 245,000 Grants (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 245,000 Capital Expenditures: Design - - - - 7,000 Right of Way/Property Acquisition - - - - - Construction - - - - 238,000 - - - - 245,000 Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: This project will not have a significant effect on operating budget. Non-Capacity (Repair and Replacement/Improvement) Replace approximately 800 LF of aging sewer pipe with root intrusion issues with new 8" PVC in conjunction with storm and road improvements. Constructing this project in association with a road improvement project saves money and avoids damage to the new roadway that could occur if the pipe was not replaced and experienced a failure or blockage. Progress Summary: The road and storm project is currently in a preliminary design phase. Design is anticipated in 2015 with project construction in 2016. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 144 City of Auburn Capital Facilities Plan 145 STORM DRAINAGE Current Facilities The City’s storm drainage service area encompasses the municipal boundaries of the City. For management purposes the service area is divided into 60 drainage sub-basins. The City’s drainage system consists of a combination of closed conveyance pipes and open ditch conveyance facilities, with six pumping stations. Table SD-1 Facilities Inventory lists the facilities along with their current capacities and location. Level of Service (LOS) The City’s Comprehensive Drainage Plan summarizes the level of service (LOS), or design criteria, for the City’s storm drainage system. Generally, these standards represent a 25- year/24-hour design storm capacity within the 60 drainage sub-basins. Capital Facilities Projects and Financing The City’s storm drainage facilities anticipates two capacity projects in the amount of $631,000 and 16 non-capacity projects totaling $17,054,618 for a six-year planning expectation total of $17,685,618. Table SD-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for storm drainage facilities during the six years 2017 – 2022. City of Auburn Capital Facilities Plan 146 TABLE SD-1 Facilities Inventory Storm Drainage Facilities Feet of Feet of FACILITY Acres Pipeline Open Channels LOCATION Drainage Basins: A 562 54,135 1,643 See City of Auburn's AA 408 33,726 18,063 Comprehensive Drainage AAA 296 1,843 8,697 Plan, Dec. 2015 AZ 777 76,451 28,779 B 864 116,476 2,735 BB 15 1,658 0 BBB 73 0 0 C 836 92,545 5,366 CC 242 1,456 0 CCC 981 71,127 27,523 D 168 21,057 177 DD 231 1,819 0 DDD 61 3,981 0 E 692 71,787 23,674 EE 600 4,294 0 F 83 10,124 0 FF 411 3,589 896 G 137 20,036 0 GG 190 4,745 3,138 H 559 58,645 5,468 HH 392 0 0 HV 66 12,172 0 I 241 39,379 7,152 II 305 0 0 J 257 20,967 2,101 JJ 1,170 32,742 17,192 K 266 25,800 2,574 KK 391 0 0 L 87 19,642 4,164 LL 198 35 1,567 LS 1,139 100,817 0 M 553 45,070 12,186 MM 332 1,779 1,204 N 126 9,815 0 NN 588 42,857 913 NNN 175 5,028 1,165 O 176 25,674 3,639 OO 1,397 37,359 27,978 P 189 28,363 5,312 PP 110 1,321 0 PPP 161 2,869 5,637 QQ 334 13,415 4,845 CAPACITY City of Auburn Capital Facilities Plan 147 TABLE SD-1 (continued) Facilities Inventory Storm Drainage Facilities Feet of Feet of FACILITY Acres Pipeline Open Channels LOCATION R 55 7,166 0 RR 249 11,679 4,944 S 273 13,730 2,236 SS 333 20,279 6,065 T 698 131,734 4,089 TT 135 12,041 131 U 365 26,439 557 UU 453 14,680 3,711 V 598 35,715 10,059 W 287 33,935 3,153 WC 65 7,895 0 WW 71 968 548 X 40 3,616 0 YY 327 19,088 7,284 YYY 105 15 0 Z 70 9,678 0 ZZ 945 54,048 39,862 ZZZ 237 0 0 Total 22,145 1,517,304 306,427 FACILITY (GPM)LOCATION Pump Stations: White River Pump Station 17,700 5000 block A Street SE A Street SE Pump Station 1,380 A Street SE near SR-18 and BNRR overpass Auburn Way S Pump Station #3 1,000 Auburn Way S near SR-18 and BNRR overpass Brannan Park Pump Station #4 20,200 Brannan Park Emerald Corp. Park Pump Station 6,500 C Street NE near 42nd Street West Main Street Pump Station 1,200 1420 West Main Street CAPACITY City of Auburn Capital Facilities Plan 148 TABLE SD-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING STORM DRAINAGE DIVISION 2016 2017 2018 2019 2020 2021 Total Capacity Projects: 1 M Street SE Storm Improvement Capital Costs 340,000 - - - - - 340,000 Funding Sources: Storm Fund 340,000 - - - - - 340,000 Bond Proceeds - - - - - - - 2 37th St. NW Storm Improvement Capital Costs 40,000 251,000 - - - - 291,000 Funding Sources: Storm Fund 40,000 251,000 - - - - 291,000 Bond Proceeds - - - - - - - Subtotal, Capacity Projects: Capital Costs 380,000 251,000 - - - - 631,000 Non-Capacity Projects: 3 Pipeline Repair & Replacement Program Capital Costs 100,000 1,000,000 100,000 1,000,000 100,000 1,000,000 3,300,000 Funding Sources: Storm Fund 100,000 1,000,000 100,000 1,000,000 100,000 1,000,000 3,300,000 Bond Proceeds - - - - - - - 4 30th Street NE Area Flooding, Phase 2 Capital Costs - 896,000 - - - - 896,000 Funding Sources: Storm Fund - 896,000 - - - - 896,000 Bond Proceeds - - - - - - - 5 30th Street NE Area Flooding, Phase 3 Capital Costs - - 200,000 1,924,000 - - 2,124,000 Funding Sources: Storm Fund - - 200,000 1,924,000 - - 2,124,000 Bond Proceeds - - - - - - - 6 West Main Street Pump Station Upgrade Capital Costs - - - - 300,000 2,668,000 2,968,000 Funding Sources: Storm Fund - - - - 300,000 2,668,000 2,968,000 Bond Proceeds - - - - - - - 7 Street Utility Improvements Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Storm Fund 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Bond Proceeds - - - - - - - 8 Comprehensive Storm Drainage Plan Update Capital Costs - - - - 300,000 - 300,000 Funding Sources: Storm Fund - - - - 300,000 - 300,000 Bond Proceeds - - - - - - - TABLE SD-2 City of Auburn Capital Facilities Plan 149 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 9 Mill Creek Wetland 5K Reach Restoration Capital Costs 5,000 - - - - - 5,000 Funding Sources: Storm Fund 5,000 - - - - - 5,000 Grants - - - - - - - General Fund - - - - - - - 10 Eastridge Manor Outfall Replacement Capital Costs 810,000 - - - - - 810,000 Funding Sources: Storm Fund 810,000 - - - - - 810,000 Grants - - - - - - - Bond Proceeds - - - - - - - 11 Vegetation Sorting Facility Capital Costs - 750,000 - - - - 750,000 Funding Sources: Storm Fund - 750,000 - - - - 750,000 Bond Proceeds - - - - - - - 12 Hillside Drainage Assessment Capital Costs 139,000 150,000 - - - - 289,000 Funding Sources: Storm Fund 139,000 150,000 - - - - 289,000 Bond Proceeds - - - - - - - 13 North Airport Area Improvements Capital Costs - 218,000 - - - - 218,000 Funding Sources: Storm Fund - 218,000 - - - - 218,000 Bond Proceeds - - - - - - - 14 D St. SE Storm Improvement Capital Costs - 200,000 1,627,000 - - - 1,827,000 Funding Sources: Storm Fund - 200,000 1,627,000 - - - 1,827,000 Bond Proceeds - - - - - - - 15 West Hill Annexation Area Drainage Improvements Capital Costs - 317,000 408,000 - 304,000 - 1,029,000 Funding Sources: Storm Fund - 317,000 408,000 - 304,000 - 1,029,000 Bond Proceeds - - - - - - - 16 30th Street NE Area Flooding, Phase 1B Capital Costs 1,060,000 - - - - - 1,060,000 Funding Sources: Storm Fund 807,158 - - - - - 807,158 Bond Proceeds 252,842 - - - - - 252,842 City of Auburn Capital Facilities Plan 150 TABLE SD-2 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 17 Annual Citywide Storm Pipeline and Replacement Project Capital Costs 245,618 - - - - - 245,618 Funding Sources: Storm Fund 245,618 - - - - - 245,618 Bond Proceeds - - - - - - - 18 23rd Street SE Storm Improvement Capital Costs - - 316,500 - - 316,500 633,000 Funding Sources: Storm Fund - - 316,500 - - 316,500 633,000 Bond Proceeds - - - - - - - Subtotal, Non-Capacity Projects: Capital Costs 2,459,618 3,631,000 2,751,500 3,024,000 1,104,000 4,084,500 17,054,618 SUMMARY: CAPITAL COSTS Capacity Projects 380,000 251,000 - - - - 631,000 Non-Capacity Projects 2,459,618 3,631,000 2,751,500 3,024,000 1,104,000 4,084,500 17,054,618 Total Costs 2,839,618 3,882,000 2,751,500 3,024,000 1,104,000 4,084,500 17,685,618 FUNDING SOURCES: Storm Fund 2,586,776 3,882,000 2,751,500 3,024,000 1,104,000 4,084,500 17,432,776 Grants - - - - - - - Other - - - - - - - Bond Proceeds 252,842 - - - - - 252,842 Total Funding 2,839,618 3,882,000 2,751,500 3,024,000 1,104,000 4,084,500 17,685,618 City of Auburn Capital Facilities Plan 151 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title:M Street SE Storm Improvement Project No:cp1511 Project Type:Capacity Project Manager:Matt Larson Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - 60,000 340,000 - 400,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 60,000 340,000 - 400,000 Capital Expenditures: Design - 60,000 - - 60,000 Right of Way - - - - Construction - 340,000 - 340,000 - 60,000 340,000 - 400,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 340,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 340,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 340,000 - - - - 340,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will install a replacement pipe of greater capacity from 3rd Street SE to Main Street to alleviate periodic flooding in this area as a result of upstream flows conveying within replaced lines associated with earlier projects. Progress Summary: In design. Future Impact on Operating Budget: None, since this is a replacement pipe. City of Auburn Capital Facilities Plan 152 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title:37th St. NW Storm Improvement Project No:sdbd05 Project Type:Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - 40,000 251,000 40,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 40,000 251,000 40,000 Capital Expenditures: Design - - 40,000 - 40,000 Right of Way - - - - - Construction - - - 251,000 - - - 40,000 251,000 40,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 291,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 291,000 Capital Expenditures: Design - - - - 40,000 Right of Way - - - - - Construction - - - - 251,000 - - - - 291,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project would increase existing pipes to provide additional capacity to alleviate current periodic flooding conditions in vicinity of I St. NW. This would also provide relief to the flooding experienced on the Interurban Bike Trail. 2015 Comprehensive Storm Drainage Plan Project No. 2 Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 153 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Pipeline Repair & Replacement Program Project No:sdbd03 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - 1,000,000 100,000 1,000,000 1,100,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - 1,000,000 100,000 1,000,000 1,100,000 Capital Expenditures: Design - - 100,000 - 100,000 Right of Way - - - - Construction - 1,000,000 - 1,000,000 1,000,000 - 1,000,000 100,000 1,000,000 1,100,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue 100,000 1,000,000 100,000 1,000,000 3,300,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 100,000 1,000,000 100,000 1,000,000 3,300,000 Capital Expenditures: Design - - - - 100,000 Right of Way - - - - - Construction 100,000 1,000,000 100,000 1,000,000 3,200,000 100,000 1,000,000 100,000 1,000,000 3,300,000 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Projects identified as those requiring replacement of existing infrastructure. These projects support street repairs and other utility replacement programs, requiring coordination. Two projects have received funding transfers from this overall Program. Those transfers out of this Program and into projects are identified below as Expenditures. 2015 Comprehensive Storm Drainage Plan Project No. 1 Progress Summary: During 2015 funding was transferred for the following projects: The 2011 Storm Repair & Replacement project ($830,000) and the Mill Creek Wetland 5K Restoration project ($75,000) No significant impact. City of Auburn Capital Facilities Plan 154 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: 30th Street NE Area Flooding, Phase 2 Project No:sdbd01 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - 896,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 896,000 - Capital Expenditures: Design - - - 75,000 - Right of Way - - - - - Construction - - 821,000 - - - - 896,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 896,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 896,000 Capital Expenditures: Design - - - - 75,000 Right of Way - - - - - Construction - - - - 821,000 - - - - 896,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Construct a new storm system to drain stormwater from two multi-family developments at the west edge of the former CRISTA Ministries property. Currently, stormwater is discharged onto a depressed area on the CRISTA Ministries property where its infiltration is limited by high groundwater levels that occur during extended periods of high flows on the Green River. This phase would construct a new storm drain within I St. NE southward to connect into the upgraded 42-inch diameter (Phase 1) storm drain near the intersection at I St. NE and 30th St. NE. The 42-inch diameter line would have sufficient available capacity to convey the I St. NE flows. Key components of Phase 2 include: 1,760 feet of 15-inch diameter gravity storm drain, Catch basin and incidental grading to collect stormwater at the upstream end of system 2015 Comprehensive Storm Drainage Plan Project No. 4A Progress Summary: Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 155 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: 30th Street NE Area Flooding, Phase 3 Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue 200,000 1,924,000 - - 2,124,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 200,000 1,924,000 - - 2,124,000 Capital Expenditures: Design 200,000 - - - 200,000 Right of Way - - - - - Construction - 1,924,000 - - 1,924,000 200,000 1,924,000 - - 2,124,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project would reduce flooding in C St. NE by redirecting wet weather high flows southward to the 42-inch diameter (Phase 1) storm drain in 30th St. NE. By redirecting the C St. NE drainage into the Brannan Park system, these flows would no longer be affected by high water levels in Mill Creek. To avoid deepening the Phase 1 gravity line (and extensive retrofits to the Brannan Park pump station), this project would include a wet weather pump station and force main connection to 30th St. NE. The upgraded 42-inch diameter pipe in 30th St. NE would have sufficient capacity for these additional flows. Key components of Phase 3 include: Wet weather pump station (estimated capacity of 4.5 to 7 cfs), 1,730 feet of 15-inch diameter force main; Diversion structure in C St. NE for pump station 2015 Comprehensive Storm Drainage Plan Project No. 4B Progress Summary: Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 156 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: West Main Street Pump Station Upgrade Project No:sdbd11 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - 300,000 2,668,000 2,968,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 300,000 2,668,000 2,968,000 Capital Expenditures: Design - 300,000 2,668,000 2,968,000 Right of Way - - - - Construction - - - - - - - 300,000 2,668,000 2,968,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: No significant impact. This project will update the existing pump station by providing a redundant pump and telemetry system meeting level of service goals, install new force main and outlet. 2015 Comprehensive Storm Drainage Plan Project No. 1 Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 157 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Street Utility Improvements Project No:sdbd04 Project Type:Non Capacity Project Manager:TBD Description: Activity: Previous 2 years 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue 233,367 100,000 100,000 100,000 433,367 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 233,367 100,000 100,000 100,000 433,367 Capital Expenditures: Design 15,296 - - - 15,296 Right of Way - - - - - Construction 218,071 100,000 100,000 100,000 418,071 233,367 100,000 100,000 100,000 433,367 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue 100,000 100,000 100,000 100,000 600,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 100,000 100,000 100,000 100,000 600,000 100,000 100,000 100,000 100,000 600,000 Storm drainage conveyance improvements in coordination with Arterial and SOS improvements. 2015 Comprehensive Storm Drainage Plan Project No. 12 Progress Summary: Future Impact on Operating Budget: No significant Impact. Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 158 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Comprehensive Storm Drainage Plan Update Project No:cpxxxx Project Type:Non-Capacity Project Manager:Tim Carlaw Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - 300,000 - 300,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 300,000 - 300,000 Capital Expenditures: Design - - 300,000 - 300,000 Right of Way - - - - - Construction - - - - - - - 300,000 - 300,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: None Update the Comprehensive Storm Drainage Plan to be consistent with the City's overall Comprehensive Plan update as required by the State of Washington. 2015 Comprehensive Storm Drainage Plan Project No. 9 Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 159 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Mill Creek Wetland 5K Reach Restoration Project No:CP0746 Project Type:Non-Capacity Project Manager:Chris Andersen Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total General Fund 32,555 - - - 32,555 Unrestricted Storm Revenue 1,186,833 185,207 5,000 - 1,377,040 Grants- Secured (Fed,State,Local)531,672 270,021 - - 801,693 City (Water, Sewer)472 - - - 472 1,751,532 455,228 5,000 - 2,211,760 Capital Expenditures: Design 454,191 - - - 454,191 Right of Way 350,449 250,000 - - 600,449 LERRD Credit (900,000) - - - (900,000) Construction 1,846,892 205,228 5,000 - 2,057,120 1,751,532 455,228 5,000 - 2,211,760 Total 2018 2019 2020 2021 2016-2021 Funding Sources: General Fund - - - - - Unrestricted Storm Revenue - - - - 5,000 Grants- Secured (Fed,State,Local)- - - - - City (Water, Sewer)- - - - - - - - - 5,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 5,000 - - - - 5,000 Mill Creek Wetland 5K reach (W5K) is a stream restoration project to provide improved conveyance and habitat along an approximate one mile reach of Mill Creek between West Main Street and SR 167. The project includes construction of a new larger stream culvert at 15th Street NW for improved hydraulic conveyance and fish passage, removal of invasive vegetation, native tree and shrub plantings. The project is being conducted in partnership with the Army Corps of Engineers under the Corps' Ecosystem Restoration Program. The City's cost share for construction is 35%, and the federal cost share is 65%. The value of City-owned lands used for the project are credited toward the City's cost share. Total federal funding for the project (not shown below) is approximately $3.9 million based on the most recent Corps estimates of $6 million for total project costs. Progress Summary: In construction. Project construction is scheduled to be complete in 2015. Future Impact on Operating Budget: Monitoring of the project is part of the overall project cost. Upon completion of construction, the Army Corps will monitor for five (5) years. Monitoring costs are subject to City cost share (35%); City share of estimated monitoring costs previously paid to Army Corps in 2014. Maintenance for the project is budgeted as part of the Environmental Services AEP and restoration site maintenance program. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 160 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Eastridge Manor Outfall Replacement Project No:cp1316 Project Type:Non-Capacity Project Manager:Joel Chalmers Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue 33,464 276,536 810,000 - 1,120,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 33,464 276,536 810,000 - 1,120,000 Capital Expenditures: Design 33,464 91,536 - - 125,000 Right of Way - 185,000 - - 185,000 Construction - - 810,000 - 810,000 33,464 276,536 810,000 - 1,120,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 810,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 810,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 810,000 - - - - 810,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Replace the existing deteriorated outfall with new High Density Polyethylene (HDPE). Two existing outfalls may be combined into a single outfall. Improvements to the Golf Course conveyance system may be needed. Progress Summary: None Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 161 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title:Vegetation Sorting Facility Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - 750,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 750,000 - Capital Expenditures: Design - - - - - Right of Way - - - 750,000 - Construction - - - - - - - - 750,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 750,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 750,000 Capital Expenditures: Design - - - - Right of Way - - - - 750,000 Construction - - - - - - - - 750,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Evaluation to determine benefits and costs of acquiring property to use as a vegetation sorting facility prior to disposal or reuse of materials from storm drainage maintenance activities (e.g., pond and ditch cleaning). In addition, evaluate potential for use by other City Departments and by neighboring jurisdictions as a regional facility. If evaluation shows a reasonable benefit/cost ratio, budget is for property acquisition and site improvements to construct the vegetation sorting facility. 2015 Comprehensive Storm Drainage Plan Project No. 10 Progress Summary: Future Impact on Operating Budget: Impacts to the operating budget are included in subsequent years after acquisition of the right-of-way. City of Auburn Capital Facilities Plan 162 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title:Hillside Drainage Assessment Project No:sdbd07 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - 139,000 150,000 139,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - 139,000 150,000 139,000 Capital Expenditures: Design - - 139,000 - 139,000 Right of Way - - - 50,000 - Construction - - - 100,000 - - - 139,000 150,000 139,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 289,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 289,000 Capital Expenditures: Design - - - - 139,000 Right of Way - - - - 50,000 Construction - - - - 100,000 - - - - 289,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: The existing drainage system includes pipes that discharge over hillsides. While a preliminary inventory and mapping of locations has been completed, field-locating and detailed inspection is warranted to define deficiencies. 2015 Comprehensive Storm Drainage Plan Project No. 3 Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 163 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title:North Airport Area Improvements Project No:sdbd10 Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - 218,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 218,000 - Capital Expenditures: Design - - - 40,000 - Right of Way - - - - - Construction - - - 178,000 - - - - 218,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 218,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 218,000 Capital Expenditures: Design - - - - 40,000 Right of Way - - - - - Construction - - - - 178,000 - - - - 218,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project would provide additional storage depth in Pond I and replace the existing inlet pipe at a lower invert to the pond, and install a backflow preventer at the outlet. The project also includes the installation of a second backflow preventer at the overflow to 30th St. NE to protect the hangar area. 2015 Comprehensive Storm Drainage Plan Project No. 6 Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 164 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title:D St. SE Storm Improvement Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - 200,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 200,000 - Capital Expenditures: Design - - - 200,000 - Right of Way - - - - - Construction - - - - - - - - 200,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue 1,627,000 - - - 1,827,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 1,627,000 - - - 1,827,000 Capital Expenditures: Design - - - - 200,000 Right of Way - - - - - Construction 1,627,000 - - - 1,627,000 1,627,000 - - - 1,827,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project would replace the existing line along D St. SE from 21st St. SE to 27th St. SE and install a new line along F St. SE from 26th St. SE to 27th St. SE. The project will eliminate an existing injection well near 25th & D St. SE. 2015 Comprehensive Storm Drainage Plan Project No. 7 Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 165 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title:West Hill Annexation Area Drainage Improvements Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - 317,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - 317,000 - Capital Expenditures: Design - - - 35,000 - Right of Way - - - - - Construction - - - 282,000 - - - - 317,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue 408,000 - 304,000 - 1,029,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 408,000 - 304,000 - 1,029,000 Capital Expenditures: Design 60,000 - 30,000 - 125,000 Right of Way - - 50,000 - 50,000 Construction 348,000 - 224,000 - 854,000 408,000 - 304,000 - 1,029,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Improve existing drainage conditions for the West Hill annexation areas. The 2017 project includes improvements near 330th St. and 46th Pl. S. to improve drainage conditions along 330th St. and eliminate roadside discharge onto private property. The 2018 project includes improvements near S 314th St. and 54th Ave S to eliminate a discharge onto private property. 2015 Comprehensive Storm Drainage Plan Project No. 5A and 5B Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 166 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: 30th Street NE Area Flooding, Phase 1B Project No:cpxxx Project Type:Non-Capacity Project Manager:Kim Truong Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - 807,158 - 807,158 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - 154,000 252,842 - 406,842 Other - - - - - - 154,000 1,060,000 - 1,214,000 Capital Expenditures: Design - 154,000 - - 154,000 Right of Way - - - - - Construction - - 1,060,000 - 1,060,000 - 154,000 1,060,000 - 1,214,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 807,158 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - 252,842 Other - - - - - - - - - 1,060,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 1,060,000 - - - - 1,060,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will complete the Phase 1 project by completing the downstream system not completed in Phase 1A. Phase 1A replaced the existing 30-inch diameter pipe generally located along the 30th St. NE alignment toward I St. NE to improve drainage conditions in and around the north end of the Auburn Municipal Airport. Phase 1B will complete the remainder of the project by constructing the downstream system to the existing Brannan Park pump station. Progress Summary: Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 167 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Annual Citywide Storm Pipeline and Replacement Project Project No:cp1312 Project Type:Non-Capacity Project Manager:Seth Wickstrom Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue 47,382 40,000 245,618 - 333,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 47,382 40,000 245,618 - 333,000 Capital Expenditures: Design 47,382 40,000 1,000 - 88,382 Right of Way - - - - - Construction - - 244,618 - 244,618 47,382 40,000 245,618 - 333,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue - - - - 245,618 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - 245,618 Capital Expenditures: Design - - - - 1,000 Right of Way - - - - - Construction - - - - 244,618 - - - - 245,618 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Project replaces existing storm system infrastructure. This is originally budgeted in the 2011 R&R Program. Funding is from the 2015-2016 Pipeline Repair and Replacement Program. Progress Summary: Project deferred to 2016. Future Impact on Operating Budget: No significant impact. City of Auburn Capital Facilities Plan 168 STORM DRAINAGE FUND (432)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title:23rd Street SE Storm Improvement Project No:cpxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Storm Revenue - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Storm Revenue 316,500 - - 316,500 633,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other - - - - - 316,500 - - 316,500 633,000 Capital Expenditures: Design 30,000 - - 30,000 60,000 Right of Way - - - - - Construction 286,500 - - 286,500 573,000 316,500 - - 316,500 633,000 This project will improve existing drainage conditions in vicinity of 23rd St. SE & K St. SE. The 2018 project includes installation of a new 12-inch line along K St. SE from 23rd St. SE to 21st St. SE to alleviate flooding associated with the pedestrian entrance to Terminal Park Elementary School. The 2018 project includes replacement of the existing undersized line with a 15-inch line along 23rd St. SE from F St. SE to H St. SE. 2015 Comprehensive Storm Drainage Plan Project No. 8 Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 169 PARKS, ARTS AND RECREATION Current Facilities The City of Auburn’s park system consists of a total of 940.54 acres of neighborhood and community parks, special use areas, open space and linear parks (trails). Table PR – 1 “Facilities Inventory” lists all park and recreation land in the City’s park system along with their current capacity and location. Level of Service (LOS) The current LOS provided by the City’s park system represents the existing inventory of City- owned park acres divided by the 2015 City population of 75,545. This equates to 0.77 acres per 1,000 population for neighborhood parks, 2.96 acres per 1,000 population for community parks, 0.23 acres for linear parks, 5.12 acres for open space, and 3.37 acres for special use areas. The proposed LOS provided by the City’s park system represents the planned 2021 inventory of City-owned park acres divided by the 2021 projected City population of 85,912. This equates to 0.79 acres per 1,000 population for neighborhood parks, 3.12 acres per 1,000 population for community parks, 0.24 acres per 1,000 population for linear parks, 4.50 acres per 1,000 population for open space, and 1.33 acres per 1,000 population for special use areas. Capital Facilities Projects and Financing Parks and Recreation facilities include sixteen capital projects at a cost of $20,710.000. Table PR – 2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets As Table PR – 3 shows, operating budget impacts of $1,074,000 are forecasted for parks and recreation facilities during the six years 2017 – 2022. City of Auburn Capital Facilities Plan 170 TABLE PR-1 Facilities Inventory Parks, Arts and Recreation, Land CAPACITY FACILITY (Acres)LOCATION Neighborhood Parks: Existing Inventory: 21st Street Playground 0.17 405 21st St. SE Auburndale Park 9.74 31802 108th Ave. SE Ballard Park 0.68 1612 37th Way SE Cameron Park 3.85 3727 Lemon Tree Lane Cedar Lane Park 8.36 1002 25th St. SE Dorthy Bothell Park 4.35 1087 Evergreen Way SE Dykstra Park 1.67 1487 22nd St. NE Forest Villa mini-park 0.21 1647 Fir St. SE Gaines Park 1.33 1008 Pike St. NW Indian Tom Park 0.42 1316 6th St. NE Jornada Park 1.89 1433 U Ct. NW Kersey 3 Park A 2.73 5480 Charlotte Ave. SE Kersey 3 Park B 0.79 5530 Udall Ave. SE Lakeland Hills Park 5.06 1401 Evergreen Way SE Lea Hill Courts 1.18 32121 105th Pl. SE Riverpoint Park 2.95 1450 32nd St. NE Riversands Park 1.76 5014 Pike St NE Rotary Park 3.89 2635 Alpine St. NE Scootie Brown Park 1.68 1403 Henry Rd. NE Shaughnessy Park 3.46 3302 21st St. SE Terminal Park 1.22 1292 C St. SE Village Square 1.10 12111 SE 310th St. Total Neighborhood Parks 58.49 Proposed Capacity Projects: Auburndale II Park 9.35 29700 118th Street SE Total Proposed Capacity Projects 9.35 2021 Projected Inventory Total - Neighborhood Parks -67.84 Community Parks: Existing Inventory: Brannan Park 21.68 1019 28th St. NE Fulmer Field 5.04 1101 5th St. NE Game Farm Park 57.20 3030 R St. SE Game Farm Wilderness Park 48.50 2407 Stuck River Dr. SE GSA Park 5.31 413 15th St. SW Isaac Evans Park 19.87 29627 Green River Road NE Lea Hill Park 5.26 31693 124th Ave. SE Les Gove Park 14.68 910 9th St. SE Mill Pond 4.20 4582 Mill Pond Dr, SE Roegner Park 19.22 601 Oravetz Road Sunset Park 15.15 1420 69th St SE Veteran's Memorial Park 7.67 405 E St. NE Total Community Parks 223.78 City of Auburn Capital Facilities Plan 171 TABLE PR-1 (continued) Proposed Capacity Projects: 104th Avenue SE 14.73 31495 104th Ave. SE Jacobson Tree Farm 29.30 29387 132nd Ave SE Total Proposed Capacity Projects 44.03 2021 Projected Inventory Total - Community Parks -267.81 Linear Parks: Existing Inventory: Interurban Trail 9.80 804 West Main St. Lake Tapps Parkway Trail 2.36 1420 69th St SE Lakeland Hills Trail 1.66 1087 Evergreen Way SE Reddington Levee Trail 2.25 1019 28th St NE White River Trail 0.93 601 Oravetz St. NE Total Linear Parks 17.00 Proposed Capacity Projects: Green River Trail 0.83 277th to Reddington Levee Trail Jacobsen Tree Farm to Green River Trail 2.75 White River Trail Extension 0.05 Total Proposed Capacity Projects 3.63 2021 Projected Inventory Total - Linear Parks -20.63 Special Use Areas: Existing Inventory: Auburn Environmental Park 16.84 413 Western Ave NW B Street Plaza 0.10 148 East Main St. Bicentennial Park 1.07 502 Auburn Way S. Centennial Viewpoint Park 0.70 402 Mountain View Dr. City Hall Plaza 1.10 25 West Main St. Clark Plaza 0.25 1420 Auburn Way N. Community Garden A 1.04 1030 8th St. NE Fenster/Green River Access 12.58 10502 Auburn Black Diamond Road Fly-in Lion Park 0.02 101 15th St. NE Golf Course 139.71 29630 Green River Road SE Mountain View Cemetery 60.00 2020 Mountain View Dr. Olson Canyon Farmstead 20.00 28728 Green River Road Pioneer Cemetery 0.76 802 Auburn Way N, Plaza Park 0.19 2 West Main St. Slaughter Memorial 0.02 2988 Auburn Way N. Total Special Use Areas 254.38 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2021 Projected Inventory Total - Special Use Areas -254.38 Open Space Areas: Existing Inventory: Auburn Environmental Park Open Space 190.91 413 Western Ave. NW Clark Property 26.68 TBD Game Farm Open Space 26.00 3030 R St. SE Golf Course Open Space 40.98 29630 Green River Road SE Lakeland Hills Nature Area 46.07 500 182nd Ave. S Olson Canyon Open Space 47.00 28728 Green River Road West Auburn Lake 9.25 32054 58th Ave. S Total Open Space Areas 386.89 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2021 Projected Inventory Total - Open Space Areas -386.89 City of Auburn Capital Facilities Plan 172 TABLE PR-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING PARKS, ARTS and RECREATION (Municipal Parks Construction Fund) 2016 2017 2018 2019 2020 2021 Total Capacity Projects: 1 Park Acquisitions/Development Capital Costs - 125,000 125,000 125,000 - - 375,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - Bond Proceeds - - - - - - - KC Prop 2 - 125,000 125,000 125,000 - - 375,000 Subtotal, Capacity Projects: Capital Costs - 125,000 125,000 125,000 - - 375,000 Non-Capacity Projects: 2 Isaac Evans Park Capital Costs 100,000 - - - - - 100,000 Funding Sources: Fund Balance 50,000 - - - - - 50,000 Grants (Fed,State,Local)- - - - - - - Other (Park Impact Fee)50,000 - - - - - 50,000 3 Jacobsen Tree Farm Site Plan Capital Costs - 12,000,000 - - - - 12,000,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- 2,000,000 - - - - 2,000,000 Other (Developer)- 4,000,000 - - - - 4,000,000 Bond Proceeds - 6,000,000 - - - - 6,000,000 4 Auburn Community and Youth/Teen Center Capital Costs 5,100,000 - - - - - 5,100,000 Funding Sources: REET 1 759,219 - - - - - 759,219 Other 2,340,781 - 2,340,781 Grants (Fed,State,Local)2,000,000 - - - - - 2,000,000 5 Les Gove Park Improvements Capital Costs 260,000 - - - - - 260,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - KC Prop 2 260,000 - - - - - 260,000 6 Rotary Park Improvements Capital Costs - 30,000 30,000 - - - 60,000 Funding Sources: Fund Balance - 30,000 30,000 - - - 60,000 Grants (Fed,State,Local)- - - - - - - Other - - - - - - - City of Auburn Capital Facilities Plan 173 TABLE PR-2 (continued) 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 7 Miscellaneous Parks Improvements Capital Costs 100,000 175,000 175,000 175,000 175,000 175,000 975,000 Funding Sources: Fund Balance - 25,000 25,000 25,000 25,000 25,000 125,000 Grants (Fed,State,Local)50,000 75,000 75,000 75,000 75,000 75,000 425,000 Other (Park Impact Fee)50,000 75,000 75,000 75,000 75,000 75,000 425,000 8 Cameron Park Capital Costs - - - 55,000 - - 55,000 Funding Sources: Fund Balance - - - 25,000 - - 25,000 Grants (Fed,State,Local)- - - 30,000 - - 30,000 Other - - - - - - - 9 Game Farm Park Improvements Capital Costs - 40,000 - - - - 40,000 Funding Sources: Fund Balance - 40,000 - - - - 40,000 Grants (Fed,State,Local)- - - - - - - Other - - - - - - - 10 Gaines Park Capital Costs - 35,000 - - - - 35,000 Funding Sources: Fund Balance - 35,000 - - - - 35,000 Grants (Fed,State,Local)- - - - - - - Other - - - - - - - 11 Roegner Park Capital Costs - 50,000 - - - - 50,000 Funding Sources: Fund Balance - 50,000 - - - - 50,000 Grants (Fed,State,Local)- - - - - - - KC Prop 2 - - - - - - - 12 Auburndale Park Capital Costs 25,000 - 350,000 - - - 375,000 Funding Sources: Fund Balance 25,000 - - - - - 25,000 KC Prop 2 - - 100,000 - - - 100,000 Other (Park Impact Fee)- - 250,000 - - - 250,000 13 Auburndale Park II Capital Costs - - 575,000 - - - 575,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - - - - Other - - 575,000 - - - 575,000 14 Sunset Park Capital Costs 385,000 - - - - - 385,000 Funding Sources: Fund Balance - - - - - - - Other (Park Impact Fee)185,000 - - - - - 185,000 Other (Contributions)200,000 - - - - - 200,000 City of Auburn Capital Facilities Plan 174 TABLE PR-2 (continued) 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 15 BPA Trail on Lea Hill Capital Costs - - - - 150,000 - 150,000 Funding Sources: Fund Balance - - - - - - - Grants (Fed,State,Local)- - - - 150,000 - 150,000 KC Prop 2 - - - - - - - 16 Lakeland Park #4 Capital Costs - 25,000 150,000 - - - 175,000 Funding Sources: Fund Balance - 25,000 - - - - 25,000 Other - - 150,000 - - - 150,000 Subtotal, Non-Capacity Projects: Capital Costs 5,970,000 12,355,000 1,280,000 230,000 325,000 175,000 20,335,000 SUMMARY: CAPITAL COSTS Capacity Projects - 125,000 125,000 125,000 - - 375,000 Non-Capacity Projects 5,970,000 12,355,000 1,280,000 230,000 325,000 175,000 20,335,000 Total Costs 5,970,000 12,480,000 1,405,000 355,000 325,000 175,000 20,710,000 FUNDING SOURCES: Fund Balance 75,000 205,000 55,000 50,000 25,000 25,000 435,000 Grants (Fed,State,Local)2,050,000 2,075,000 75,000 105,000 225,000 75,000 4,605,000 REET 1 759,219 - - - - - 759,219 Bond Proceeds - 6,000,000 - - - - 6,000,000 KC Prop 2 260,000 125,000 225,000 125,000 - - 735,000 Other -Parks Impact 285,000 75,000 325,000 75,000 75,000 75,000 910,000 Other 2,540,781 4,000,000 725,000 - - - 7,265,781 Total Funding 5,970,000 12,480,000 1,405,000 355,000 325,000 175,000 20,710,000 City of Auburn Capital Facilities Plan 175 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Park Acquisitions/Development Project No:cpxxxx Project Type:Capacity Project Manager:Daryl Faber Description: Activity: (Previous 2 Yrs.)2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - General Fund Transfer In - - - - - KC Prop 2 23,914 46,414 - 125,000 70,328 23,914 46,414 - 125,000 70,328 Capital Expenditures: Design - - - - - Acquisition 23,914 46,414 - 125,000 70,328 Construction - - - - 23,914 46,414 - 125,000 70,328 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - General Fund Transfer In - - - - - KC Prop 2 125,000 125,000 - - 375,000 125,000 125,000 - - 375,000 Capital Expenditures: Design - - - - - Acquisition 125,000 125,000 - - 375,000 Construction - - - - - 125,000 125,000 - - 375,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Land acquisitions to occur based on demand and deficiencies including parks, open space, trails and corridors. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 176 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Isaac Evans Park Project No:gpbd07 Project Type:Non-Capacity Project Manager:Daryl Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - 50,000 - 50,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Park Impact Fee)*- - 50,000 - 50,000 - - 100,000 - 100,000 Capital Expenditures: Design - - 10,000 - 10,000 Right of Way - - - - - Construction - - 90,000 - 90,000 - - 100,000 - 100,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 50,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Park Impact Fee)*- - - - 50,000 - - - - 100,000 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 90,000 - - - - 100,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Increased mowing and utilities- $6,000 Repair trail throughout park, improve playground and develop reforestation plan. Progress Summary: None Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 177 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Jacobsen Tree Farm Site Plan Project No:cp0609 Project Type:Non-Capacity Project Manager:Daryl Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance 25,321 - - - 25,321 Grants- Unsecured (Fed,State,Local)- - - 2,000,000 - Bond Proceeds - - - 6,000,000 - REET - - - - - Other (Development)- - - 4,000,000 - 25,321 - - 12,000,000 25,321 Capital Expenditures: Design 25,321 - - 1,000,000 25,321 Right of Way - - - - - Construction - - - 11,000,000 - 25,321 - - 12,000,000 25,321 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (Fed,State,Local)- - - - 2,000,000 Bond Proceeds - - - - 6,000,000 REET - - - - - Other (Development)- - - - 4,000,000 - - - - 12,000,000 Capital Expenditures: Design - - - - 1,000,000 Right of Way - - - - - Construction - - - - 11,000,000 - - - - 12,000,000 Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Implement Master Plan for the development of this 31 acre site. Lea Hill area is deficient in park acreage. Progress Summary: Future Impact on Operating Budget: No significant impact due to master plan. Future park development will result in maintenance and utility expenses undeterminable at this time. City of Auburn Capital Facilities Plan 178 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Auburn Community and Youth/Teen Center Project No:cp1412 Project Type:Non-Capacity Project Manager:Jacob Sweeting Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance 5,294 - - - 5,294 Grants- Secured -State - 1,000,000 2,000,000 - 3,000,000 REET 1 133,944 560,762 759,219 - 1,453,925 Other (Solid Waste Fees)- - - - - Other - 2,200,000 2,340,781 - 4,540,781 139,238 3,760,762 5,100,000 - 9,000,000 Capital Expenditures: Property Acquisition - - - - Design 139,238 1,789,162 - - 1,928,400 Demolition - - - - - Construction - 1,971,600 5,100,000 - 7,071,600 139,238 3,760,762 5,100,000 - 9,000,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured -State - - - - 2,000,000 REET 1 - - - - 759,219 Other (Solid Waste Fees)- - - - - Other - - - - 2,340,781 - - - - 5,100,000 Capital Expenditures: Property Acquisition - - - - - Design - - - - - Professional Services - - - - - Construction - - - - 5,100,000 - - - - 5,100,000 Grants / Other Sources: Washington State capital budget appropriation through the Department of Commerce Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Construct a new approximately 13,000 sq. ft. Community Center facility as well as repurpose the existing Parks, Recreation and Arts Administration building into a Youth/Teen Center. The project includes site improvements associated with the construction at Les Gove Campus and administrative space for the Parks Department, meeting, activity and fitness space as well as a dedicated youth/teen center. The State has allocated $3 million of the capital budget to the City to fund the project. Progress Summary: Design in 2014 & 2015, bid and begin construction in 2015 with construction completed in 2016. Future Impact on Operating Budget: The annual operating budget fiscal impact is estimated to be $150,000 City of Auburn Capital Facilities Plan 179 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Les Gove Park Improvements Project No:cp1510 Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other-Transfer In - 36,000 - - 36,000 KC Prop 2 - 40,000 260,000 - 300,000 - 76,000 260,000 - 336,000 Capital Expenditures: Design - 22,498 10,000 - 32,498 Right of Way - - - - Construction - 53,502 250,000 - 303,502 - 76,000 260,000 - 336,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other-Transfer In - - - - - KC Prop 2 - - - - 260,000 - - - - 260,000 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 250,000 - - - - 260,000 $5,000 Utilities Based on "to be completed" Les Gove Master Plan, design and implement recommendations that will increase user safety, encourage public use and community connectivity. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 180 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Rotary Park Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - 30,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - 30,000 - Capital Expenditures: Design - - - 5,000 - Right of Way - - - - - Construction - - - 25,000 - - - - 30,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance 30,000 - - - 60,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - 30,000 - - - 60,000 Capital Expenditures: Design 5,000 - - - 10,000 Right of Way - - - - - Construction 25,000 - - - 50,000 30,000 - - - 60,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Coordinate improvements with neighborhood and Rotary Club of Auburn to add walking path. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 181 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Miscellaneous Parks Improvements Project No:gpbd03 Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - 25,000 - Grants- Unsecured State - 50,000 50,000 75,000 100,000 Bond Proceeds - - - - - REET - - - - - Other (Park Impact Fee)*10,922 35,400 50,000 75,000 96,322 10,922 85,400 100,000 175,000 196,322 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 10,922 85,400 100,000 175,000 196,322 10,922 85,400 100,000 175,000 196,322 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance 25,000 25,000 25,000 25,000 125,000 Grants- Unsecured State 75,000 75,000 75,000 75,000 425,000 Bond Proceeds - - - - - REET - - - - - Other (Park Impact Fee)*75,000 75,000 75,000 75,000 425,000 175,000 175,000 175,000 175,000 975,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 175,000 175,000 175,000 175,000 975,000 175,000 175,000 175,000 175,000 975,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Minor park improvements including shelters, roofs, playgrounds, irrigation and restrooms. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 182 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Cameron Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - 25,000 - - 25,000 Grants- Unsecured (Fed,State,Local)- 30,000 - - 30,000 Bond Proceeds - - - - - REET - - - - - Other - - - - - - 55,000 - - 55,000 Capital Expenditures: Design - 5,000 - - 5,000 Right of Way - - - - Construction - 50,000 - - 50,000 - 55,000 - - 55,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None This project will improve the pedestrian trail and add landscape and fencing to serve as buffer to the neighborhood and play structure. This project is identified in the Parks Improvement Plan. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 183 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Game Farm Park Improvements Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year EndFunding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - 40,000 40,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - 40,000 40,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - 40,000 - - - - 40,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 40,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - - 40,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 40,000 - - - - 40,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Improve interior lighting and pathways and provide access from the newly acquired property on southwest corner of the park. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 184 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Gaines Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - 35,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - 35,000 - Capital Expenditures: Design - - - 10,000 - Right of Way - - - - - Construction - - - 25,000 - - - - 35,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 35,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - - 35,000 Capital Expenditures: Design - - - - 10,000 Right of Way - - - - - Construction - - - - 25,000 - - - - 35,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Develop Horticulture Plan for the Park as indicated in the Parks Improvement Plan and repair boardwalk. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 185 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Roegner Park Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - 50,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Prop Levy 2)- - - - - - - - 50,000 - Capital Expenditures: Design - - - 5,000 - Right of Way - - - - - Construction - - - 45,000 - - - - 50,000 - Forecasted Project Cost: Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 50,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other (Prop Levy 2)- - - - - - - - - 50,000 Capital Expenditures: Design - - - - - Right of Way - - - - 5,000 Construction - - - - - - - - - 5,000 This project will provide for trail system maintenance, play structure replacement and riverbank stabilization. Progress Summary: Future Impact on Operating Budget: None Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: City of Auburn Capital Facilities Plan 186 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Auburndale Park Project No:gpbd01 Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - 25,000 - 25,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other (Park Impact Fee)- - - - - Other (KC Prop 2)- - - - - - - 25,000 - 25,000 Capital Expenditures: Design - - 25,000 - 25,000 Right of Way - - - - - Construction - - - - - - - 25,000 - 25,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 25,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Other (Park Impact Fee)250,000 - - - 250,000 Other (KC Prop 2)100,000 - - - 100,000 350,000 - - - 375,000 Capital Expenditures: Design - - - - 25,000 Right of Way - - - - - Construction 350,000 - - - 350,000 350,000 - - - 375,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Utilities would increase by $5,000 Develop a Master Plan for the Park, install an irrigation system, new play structure and improve signage. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 187 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Auburndale Park II Project No:gpbd05 Project Type:Non-Capacity Project Manager:Faber Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other TBD - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other TBD 575,000 - - - 575,000 575,000 - - - 575,000 Capital Expenditures: Design 75,000 - - - 75,000 Right of Way - - - - - Construction 500,000 - - - 500,000 575,000 - - - 575,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: Develop a Master Plan in 2015; improve the existing trail system and install signage and play structure. Progress Summary: Future Impact on Operating Budget: Increased utility costs of $2,000 City of Auburn Capital Facilities Plan 188 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Sunset Park Project No:gpbd06 Project Type:Non-Capacity Project Manager:Faber Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Park Impact Fees - 15,000 185,000 - 200,000 Other -Contributions & Donations - - 200,000 - 200,000 - 15,000 385,000 - 400,000 Capital Expenditures: Design - 15,000 - - 15,000 Right of Way - - - - - Construction - - 385,000 - 385,000 - 15,000 385,000 - 400,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Park Impact Fees - - - - 185,000 Other -Contributions & Donations - - - - 200,000 - - - - 385,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 385,000 - - - - 385,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: Expand playground area to include spray park and additional play activities. Coordinate improvements with service club and Lakeland Hills Homeowners Association. Progress Summary: Future Impact on Operating Budget: Increase in Utilities of $10,000 per year City of Auburn Capital Facilities Plan 189 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: BPA Trail on Lea Hill Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (State RCO)- - - - - Bond Proceeds - - - - - REET - - - - - Other (KC Prop. 2)*- - - - - - - - - - Capital Expenditures: Predesign - - - - - Design - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - - Grants- Unsecured (State RCO)- - 150,000 - 150,000 Bond Proceeds - - - - - REET - - - - - Other (KC Prop. 2)*- - - - - - - 150,000 - 150,000 Capital Expenditures: Predesign - - 25,000 - 25,000 Design - - 125,000 - 125,000 Construction - - - - - - - 150,000 - 150,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: None Develop a feasibility study related to constructability of a pedestrian trail linking the Jacobsen Tree Farm site to the west end of Lea Hill. This trail would follow the alignment of the Bonneville Power Administration (BPA) transmission lines from 132nd to 108th Avenue SE. Construction would be in phases based on constructability. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 190 MUNICIPAL PARKS CONSTRUCTION FUND (321)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Lakeland Park #4 Project No:cpxxxx Project Type:Non-Capacity Project Manager:Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund 321 -Unrestricted Fund Balance - - - 25,000 - Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other - - - - - - - - 25,000 - Capital Expenditures: Design - - - 25,000 - Right of Way - - - - - Construction - - - - - - - - 25,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund 321 -Unrestricted Fund Balance - - - - 25,000 Grants- Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - REET - - - - - Other 150,000 - - - 150,000 150,000 - - - 175,000 Capital Expenditures: Design - - - - 25,000 Right of Way - - - - - Construction 150,000 - - - 150,000 150,000 - - - 175,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Increased maintenance costs of $5,000 Complete Master Plan to include the development and construction of an environmental community park. Trails, fencing, parking and visitor amenities are included in the project. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 191 TABLE PR-3 Impact on Future Operating Budgets PARKS, ARTS & RECREATION - MUNICIPAL PARKS CONSTRUCTION Project:2017 2018 2019 2020 2021 2022 Total 1 Park Acquisitions -$ -$ -$ -$ -$ -$ -$ - 2 Issac Evans Park 6,000 6,000 6,000 6,000 6,000 6,000 36,000 3 Jacobsen Tree Farm - - - - - - - - - 4 Auburn Community and Youth/Teen Center 150,000 150,000 150,000 150,000 150,000 150,000 900,000 5 Les Gove Park Imp.5,000 5,000 5,000 5,000 5,000 5,000 30,000 6 Rotary Park Improv.- - - - - - - 7 Misc Park Improvements - - - - - - - 8 Cameron Park - - - - - - - 9 Game Farm Park - - - - - - - 10 Gaines Park - - - - - - - 11 Roegner Park - - - - - - - 12 Auburndale Park - - 5,000 5,000 5,000 5,000 20,000 13 Auburndale Park II - - 2,000 2,000 2,000 2,000 8,000 14 Sunset Park 10,000 10,000 10,000 10,000 10,000 10,000 60,000 15 BPA Trail Lea Hill - - - - - - - 16 Lakeland Park #4 - - 5,000 5,000 5,000 5,000 20,000 Total 171,000$ 171,000$ 183,000$ 183,000$ 183,000$ 183,000$ 1,074,000$ City of Auburn Capital Facilities Plan 192 COMMUNITY AND YOUTH/TEEN CENTER Current Facilities The City of Auburn currently does not have a Community and Youth/Teen Center. Level of Service (LOS) The City does not have a current LOS for a Community Center. The proposed LOS of 244.44 square feet per 1,000 population is based on the projected inventory divided by the 2021 projected citywide population of 85,912. Capital Facilities Projects and Financing The proposed Community and Youth/Teen Center facility construction project will cost approximately $9,000,000 and the project detail worksheet is presented on page 178. Impact on Future Operating Budgets As Table PR – 3 shows, estimated operating budget impact of $900,000 is forecasted for the Community and Youth/Teen Center Facility during the six years 2017-2022. TABLE PR-4 Facilities Inventory Community and Youth/Teen Center CAPACITY FACILITY (Square Feet)LOCATION Existing Inventory: None - Total Existing Inventory - Proposed Capacity Projects: New Youth/Teen Center (Remodel)7,300 New Community Center 13,700 Total Proposed Capacity Projects 21,000 2021 Projected Inventory Total 21,000 City of Auburn Capital Facilities Plan 193 SENIOR CENTER Current Facilities The City of Auburn currently has one Senior Center. Table PR-5 Facilities Inventory lists the facility along with its current capacity and location. Level of Service (LOS) The current LOS of 154.43 square feet per 1,000 population is based on the existing inventory divided by the 2015 citywide population of 75,545. The proposed LOS of 135.80 square feet per 1,000 population is based on the projected inventory divided by the 2021 projected citywide population of 85,912. Capital Facilities Projects and Financing The CFP does not include any senior center capital facilities projects during 2016-2021. Impact on Future Operating Budgets There are no operating budget impacts forecasted for the senior center facility during the six years 2017 – 2022. TABLE PR-5 Facilities Inventory Senior Center CAPACITY FACILITY (Square Feet)LOCATION Existing Inventory: Senior Center 11,667 808 9th Street SE Total Existing Inventory 11,667 Proposed Capacity Projects: None - Total Proposed Capacity Projects - 2021 Projected Inventory Total 11,667 City of Auburn Capital Facilities Plan 194 City of Auburn Capital Facilities Plan 195 GENERAL MUNICIPAL BUILDINGS Current Facilities The current inventory of City government administration and operations facilities include 194,015 square feet for general government operations, 61,680 square feet for police services, and 38,646 square feet for fire protection, for a total of 294,341 square feet. Table GM – 1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 3,895.98 square feet per 1,000 population is based on the existing inventory divided by the 2015 citywide population of 75,545. The proposed LOS of 3,585.62 square feet per 1,000 population is based on the projected inventory divided by the 2021 projected citywide population of 85,912. Capital Facilities Projects and Financing The City’s General Municipal Building facilities include five capital projects at a cost of $1,195,000 and debt service at a cost of $3,945,850 for a total of $5,140,850. The projects include (1) $150,000 for M&O Vehicle Storage Bay Improvements, (2) $500,000 for Equipment Rental Vehicle Maintenance Bay (3) $320,000 for M&O Fuel Tank (4) $105,000 for M&O Lunchroom expansion (5) $120,000 for Council Chamber Remodel and $3,945,850 for City Hall Annex debt service costs. Table GM – 2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets Operating budget impacts annually are not yet forecast for general municipal buildings during the six years 2017 – 2022. City of Auburn Capital Facilities Plan 196 TABLE GM-1 Facilities Inventory General Municipal Buildings CAPACITY FACILITY (Square Feet)LOCATION Existing Inventory: General Government: City Hall 61,721 25 W Main Street City Hall Annex 45,034 1 W Main Street City Maintenance & Operations Facility 17,940 1305 C Street SW Herr Buildings 15,246 Various Municipal Court (Justice Center-Leased to King County)12,200 340 E Main Street Activity Center 10,074 910 9th Street SE R Street Building 9,766 2840 Riverwalk Drive Parks & Recreation Admin. Facility 7,804 910 9th Street SE Auburn Valley Humane Society -(Leased to AVHS)5,900 4910 A Street GSA Building 5,580 2905 C Street SW #815 Street Waste Handling Facility 2,750 1305 C Street SW Total 194,015 Police: Gun range 32,880 1600 Block 15th St NW Headquarters (Justice Center)24,800 340 E Main Street GSA Building 1,000 2905 C Street SW #815 Seized vehicle parking stalls 3,000 2905 C Street SW Total 61,680 Fire: Stations: GSA Station #35 16,526 2905 C Street SW North Station #31 12,220 1101 D Street NE South Station #32 5,200 1951 R Street SE Other Facilities: North Station Maint. Facility 4,700 1101 D Street NE Total 38,646 Total Existing Inventory 294,341 Proposed Capacity Projects: Community Center 13,700 Total Proposed Capacity Projects 13,700 2021 Projected Inventory Total 308,041 City of Auburn Capital Facilities Plan 197 TABLE GM-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING GENERAL MUNICIPAL BUILDINGS 2016 2017 2018 2019 2020 2021 Total Capacity Projects: None Non-Capacity Projects: 1 M & O Vehicle Storage Bay Improvements Capital Costs 150,000 - - - - - 150,000 Funding Sources: Equip. Rental Fund 150,000 - - - - - 150,000 2 Equipment Rental Vehicle Maintenance Bay Capital Costs 250,000 250,000 - - - - 500,000 Funding Sources: Equip. Rental Fund 250,000 250,000 - - - - 500,000 3 M&O Fuel Tank Replacement Capital Costs 70,000 250,000 - - - - 320,000 Funding Sources: Equip. Rental Fund 70,000 250,000 - - - - 320,000 4 M&O Lunchroom Expansion Capital Costs 105,000 - - - - - 105,000 Funding Sources: Equip. Rental Fund 105,000 - - - - - 105,000 5 Council Chamber Remodel Capital Costs 120,000 - - - - - 120,000 Funding Sources: REET 1 120,000 - - - - - 120,000 6 City Hall Annex Long-Term Debt 657,750 658,400 658,150 657,100 658,200 656,250 3,945,850 Funding Sources: Capital Improv. Fund - - - - - - - REET 1 657,750 658,400 658,150 657,100 658,200 656,250 3,945,850 Subtotal, Non-Capacity Projects: Capital Costs 695,000 500,000 - - - - 1,195,000 SUMMARY: CAPITAL COSTS Non-Capacity Projects 695,000 500,000 - - - - 1,195,000 Long-Term Debt 657,750 658,400 658,150 657,100 658,200 656,250 3,945,850 Total Costs 1,352,750 1,158,400 658,150 657,100 658,200 656,250 5,140,850 FUNDING SOURCES: Equip. Rental Fund 575,000 500,000 - - - - 1,075,000 REET 1 777,750 658,400 658,150 657,100 658,200 656,250 4,065,850 Total Funding 1,352,750 1,158,400 658,150 657,100 658,200 656,250 5,140,850 City of Auburn Capital Facilities Plan 198 EQUIPMENT RENTAL FUND (550)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: M&O Vehicle Storage Bay Improvements Project No:cp0711 Project Type: Project Manager:Randy Bailey Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Equip. Rental Revenue 5,451 50,000 150,000 - 205,451 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - 5,451 50,000 150,000 - 205,451 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 5,451 50,000 150,000 - 205,451 5,451 50,000 150,000 - 205,451 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 150,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - - - 150,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 150,000 - - - - 150,000 Non-Capacity Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Enclose the 8 existing bays to provide necessary weather protection for street sweepers, vactors, sanding, and snow plow equipment. Construct storage shed to facilitate removal of portable containers, improving space utilization and traffic flow throughout M&O. Progress Summary: Future Impact on Operating Budget: None City of Auburn Capital Facilities Plan 199 EQUIPMENT RENTAL FUND (550)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Equipment Rental Vehicle Maintenance Bay Project No:cp1223 Project Type: Project Manager:Randy Bailey Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Equip. Rental Revenue 29,276 - 250,000 250,000 279,276 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - 29,276 - 250,000 250,000 279,276 Capital Expenditures: Design - - - Right of Way - - - Construction 29,276 - 250,000 250,000 279,276 29,276 - 250,000 250,000 279,276 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 500,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - - - 500,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 500,000 - - - - 500,000 None Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Non-Capacity Build additional vehicle bay at Equipment Rental shop for heavy equipment and large vehicles to improve efficiency and remove choke points. Adding a large vehicle bay with a large vehicle lift will enable us to perform inspections and maintenance on more than one large vehicle at a time, this becomes extremely important during emergency operations such as snow and ice events. The City currently has 2.5 maintenance bays, this project will add one more maintenance bay for a total of 3.5 bays. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 200 NAME OF FUND/DEPT Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: M&O Fuel Tank Replacement Project No:cpxxxx Project Type: Project Manager:Randy Bailey Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Equip. Rental Revenue - - 70,000 250,000 70,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - 70,000 250,000 70,000 Capital Expenditures: Design - - 70,000 - 70,000 Right of Way - - - - - Construction - - - 250,000 - - - 70,000 250,000 70,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 320,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - - - 320,000 Capital Expenditures: Design - - - - 70,000 Right of Way - - - - - Construction - - - - 250,000 - - - - 320,000 None Non-Capacity Replace our three 10,000 gallon underground tanks with new above ground tanks. Our existing tanks were installed in 1989 and they are single wall fiberglass tanks. The City's current insurance carrier will not insure these tanks once they become 25 years old which will occur in 2014. The city is looking at other insurance options that may remove this age restriction. It will be a benefit to the City to have the tanks above ground in the future due to the reduced maintenance and inspection cost. Progress Summary: Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 201 NAME OF FUND/DEPT Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: M&O Lunchroom Expansion Project No:cpxxxx Project Type: Project Manager:Randy Bailey Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Equip. Rental Revenue - 45,000 105,000 - 150,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - 45,000 105,000 - 150,000 Capital Expenditures: Design - 45,000 - - 45,000 Right of Way - - - - - Construction - - 105,000 - 105,000 - 45,000 105,000 - 150,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Equip. Rental Revenue - - - - 105,000 Grants- Secured (Fed,State,Local)- - - - - Other - - - - - - - - - 105,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - 105,000 - - - - 105,000 None Non-Capacity Expansion of the current lunchroom by redesigning the area to accommodate All-Staff meetings, provide for a training facility, lunch room and also serve as the Department Operations Center (DOC) during an emergency event. In addition, the design would include sliding doors which would allow the area to serve two purposes at once, for example, one half of the room being used as a DOC and the other half open to employees to use as a lunch/break room. Progress Summary: This project will be designed and built in 2015 Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 202 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Council Chamber Remodel Project No:cp1518 Project Type:Non-Capacity Project Manager:Lisa Moore Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Cap Improve - - - - Grants - Secured (Fed,State,Local)- - - - - REET 1 120,000 120,000 - - 120,000 - 120,000 Capital Expenditures: Land - - - - - Design - - - - - Construction - - 120,000 - 120,000 - - 120,000 - 120,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Cap Improve - - - - - Grants - - - - - REET 1 120,000 - - - - 120,000 Capital Expenditures: Design - - - - - Construction - - - - - Construction - - - - 120,000 - - - - 120,000 Remodel Council Chambers to include new carpet, dais construction, refinish wood furniture, wall reconfiguration and improvements to lighting, sound and technical upgrades. Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 203 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: City Hall Annex Project No: Project Type: Project Manager: Description: Activity: (Previous 2 Yrs.)2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Cap Improve - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 1 1,290,000 659,629 657,750 658,400 2,607,379 1,290,000 659,629 657,750 658,400 2,607,379 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 1,290,000 659,629 657,750 658,400 2,607,379 1,290,000 659,629 657,750 658,400 2,607,379 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Cap Improve - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 1 658,150 657,100 658,200 656,250 3,945,850 658,150 657,100 658,200 656,250 3,945,850 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 658,150 657,100 658,200 656,250 3,945,850 658,150 657,100 658,200 656,250 3,945,850 To pay scheduled debt service costs on 2010 General Obligation bonds issued for the City Hall Annex. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 204 City of Auburn Capital Facilities Plan 205 COMMUNITY IMPROVEMENTS Current Facilities Community Improvements include sidewalk and traffic signal improvements, neighborhood traffic calming program, public art and phase 2 of the Auburn Environmental Park Boardwalk project. Level of Service (LOS) No Level of Service for community improvement projects have been identified at this time. Capital Facilities Projects and Financing The City’s proposed Community Improvements include ten capital projects at a cost of $4,389,070 and debt service at a cost of 1,335,600 for a total of $5,724,670. Table CI-2 shows the proposed financing plan followed by individual work sheets showing the project detail. Impact on Future Operating Budgets As Table CI-3 shows, operating budget impacts of $40,000 are forecasted for community improvement facilities during the six years 2017-2022. City of Auburn Capital Facilities Plan 206 TABLE CI-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING COMMUNITY IMPROVEMENTS 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 1 Citywide Sidewalk Repairs & Improvements Capital Costs 325,000 125,000 125,000 125,000 125,000 125,000 950,000 Funding Sources: Capital Improvement Fund 25,000 25,000 25,000 25,000 25,000 25,000 150,000 REET2 200,000 - - - - - 200,000 Grants (Fed, State, Local)100,000 100,000 100,000 100,000 100,000 100,000 600,000 2 Annual Traffic Signal Improvements Capital Costs 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 175,000 175,000 175,000 175,000 175,000 175,000 1,050,000 3 Mohawks Plastics Site Mitigation Project Capital Costs 20,000 20,000 65,000 20,000 - - 125,000 Funding Sources: Capital Improvement Fund - - - - - - - Other (Fund 124 -Traffic Imp.)20,000 20,000 65,000 20,000 - - 125,000 REET 2 - - - - - - - 4 Neighborhood Traffic Calming Program Capital Costs 100,000 100,000 100,000 100,000 100,000 100,000 600,000 Funding Sources: Capital Improvement Fund - - - - - - - Grants - - - - - - - REET 2 100,000 100,000 100,000 100,000 100,000 100,000 600,000 5 Public Art Capital Costs 30,000 30,000 30,000 30,000 30,000 30,000 180,000 Funding Sources: Capital Improvement Fund - - - - - - - Grants - - - - - - - REET 2 30,000 30,000 30,000 30,000 30,000 30,000 180,000 6 City Wetland Mitigation Projects Capital Costs - 20,790 7,694 7,694 7,696 7,696 51,570 Funding Sources: Capital Improvement Fund - - - - - - - REET 1 - - - - - - - Other (Fund 124-Wetland Mit.)- 20,790 7,694 7,694 7,696 7,696 51,570 7 Auburn Environmental Park Boardwalk -Phase 2 Capital Costs 50,000 - 800,000 - - - 850,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 50,000 - - - - - 50,000 Grants - - 550,000 - - - 550,000 Other -To Be Determined - - 250,000 - - - 250,000 8 Downtown Wayfinding Program Capital Costs 120,000 - - - - - 120,000 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 120,000 - - - - - 120,000 City of Auburn Capital Facilities Plan 207 TABLE CI-2 (continued) 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 9 Green River Park Design Capital Costs 37,500 - - - - - 37,500 Funding Sources: Capital Improvement Fund - - - - - - - REET 2 37,500 - - - - - 37,500 10 Local Revitalization Long Term Debt 222,600 221,900 225,600 220,500 220,300 224,700 1,335,600 Funding Sources: REET 2 222,600 221,900 225,600 220,500 220,300 224,700 1,335,600 11 Purchase King County Public Health Building Capital Costs 425,000 - - - - - 425,000 Funding Sources: REET 1 425,000 - - - - - 425,000 Subtotal, Non-Capacity Projects: Capital Costs 1,282,500 470,790 1,302,694 457,694 437,696 437,696 4,389,070 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 1,282,500 470,790 1,302,694 457,694 437,696 437,696 4,389,070 Long-Term Debt 222,600 221,900 225,600 220,500 220,300 224,700 1,335,600 Total Costs 1,505,100 692,690 1,528,294 678,194 657,996 662,396 5,724,670 FUNDING SOURCES: Capital Improvement Fund 328 25,000 25,000 25,000 25,000 25,000 25,000 150,000 Grants 100,000 100,000 650,000 100,000 100,000 100,000 1,150,000 REET 1 425,000 - - - - - 425,000 REET 2 935,100 526,900 530,600 525,500 525,300 529,700 3,573,100 Other -To Be Determined - - 250,000 - - - 250,000 Other (Fund 124 -Traffic Imp.)20,000 20,000 65,000 20,000 - - 125,000 Other (Fund 124-Wetland Mit.)- 20,790 7,694 7,694 7,696 7,696 51,570 Total Funding 1,505,100 692,690 1,528,294 678,194 657,996 662,396 5,724,670 City of Auburn Capital Facilities Plan 208 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Citywide Sidewalk Repairs & Improvements TIP #32 Project No:Various Project Type:Non-Capacity (Annual) Project Manager:Jai Carter LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund Balance - 147,493 25,000 25,000 172,493 Grants -Unsecured State - - 100,000 100,000 100,000 REET 2 - 200,000 200,000 - 400,000 Other - - - - - - 347,493 325,000 125,000 672,493 Capital Expenditures: Design - - 15,000 15,000 15,000 Right of Way - - - Construction - 347,493 310,000 110,000 767,493 - 347,493 325,000 125,000 672,493 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund Balance 25,000 25,000 25,000 25,000 150,000 Grants -Unsecured State 100,000 100,000 100,000 100,000 600,000 REET 2 - - - - 200,000 Other - - - - - 125,000 125,000 125,000 125,000 950,000 Capital Expenditures: Design 15,000 15,000 15,000 15,000 90,000 Right of Way - Construction 110,000 110,000 110,000 110,000 860,000 125,000 125,000 125,000 125,000 950,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Total Funding Sources: Description: Project funds sidewalk improvements at multiple locations throughout the City. A sidewalk inventory was completed in 2004. Annual projects are selected based upon criteria such as: gap closure, safe walking routes to schools, completion of downtown pedestrian corridor or "linkage", connectivity to transit service, ADA requirements, and "Save our Streets" (SOS) project locations. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 209 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Annual Traffic Signal Replacement & Improvements TIP #34 Project No:Various Project Type:Non-Capacity (Annual) Project Manager:TBD LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund Balance - - - - - Grants - Unsecured (Fed,State,Local)- - - - - REET 2 - 220,800 175,000 175,000 395,800 Other - - - - - - 220,800 175,000 175,000 395,800 Capital Expenditures: Design - - 25,000 25,000 25,000 Right of Way - - - - - Construction - 220,800 150,000 150,000 370,800 - 220,800 175,000 175,000 395,800 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund Balance - - - - - Grants - Unsecured (Fed,State,Local)- - - - - REET 2 175,000 175,000 175,000 175,000 1,050,000 Other - - - - - 175,000 175,000 175,000 175,000 1,050,000 Capital Expenditures: Design 25,000 25,000 25,000 25,000 150,000 Right of Way - - - - - Construction 150,000 150,000 150,000 150,000 900,000 175,000 175,000 175,000 175,000 1,050,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Description: This project includes replacing traffic signal cabinets and equipment, video detection cameras and pedestrian pushbuttons. This project will also make safety improvements to our signals including auxiliary heads and flashing yellow arrows, or capacity improvements such as right-turn overlap signals. The City uses current traffic counts and collision data to determine the intersections to improve. Progress Summary: The project is ongoing and continues to successfully complete annual traffic signal improvement projects citywide. Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 210 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Mohawks Plastics Site Mitigation Project TIP #13 Project No:cp0767 Project Type: Non-Capacity Project Manager: Jeff Dixon/Matt Larson LOS Corridor ID# N/A Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Traffic Impact Fees 480,906 57,649 20,000 20,000 558,555 REET 2 78,283 - - - 78,283 559,189 57,649 20,000 20,000 636,838 Capital Expenditures: Design 170,706 - - - 170,706 Right of Way - - - - - Construction 388,483 57,649 20,000 20,000 466,132 559,189 57,649 20,000 20,000 636,838 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - Bond Proceeds - - - - - Traffic Impact Fees 65,000 20,000 - 125,000 REET 2 - - - - - 65,000 20,000 - - 125,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 65,000 20,000 - 125,000 65,000 20,000 - - 125,000 Description: The project consists of the design, construction, maintenance and monitoring of approximately 2.2-acres of wetland creation and approximately 0.4-acres of wetland enhancement within the Goedecke South Property owned by the Sewer Utility in order to compensate for approximately 1.6-acre wetland loss on the Mohawk Plastics property (Parcel # 1321049056). The project was approved under an existing agreement approved by Resolution No. 4196, June 2007. Progress Summary: The City received the DOE WQ Certification, WDFW HPA, and on May 7, 2009, the Army Corps of Engineers (Corps) 404 wetland permit (NWS-2007-1913). Subsequently, bid specifications and construction plans were prepared and construction began in October 2009. Construction was completed in January 2010 and the project is currently within the 10- year monitoring period, which involves annual maintenance, monitoring and reporting. Future Impact on Operating Budget: It is anticipated that annual maintenance, monitoring and reporting on the performance of the wetland mitigation project will be required for a period of 10 years, in conformance with permit requirements. After the successful conclusion of this 10- year monitoring period, which is anticipated to be in December 2019, ongoing operation expenses should be minimal. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 211 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Neighborhood Traffic Calming Program TIP #33 Project No:gcbd06 Project Type:Non-Capacity (Annual) Project Manager:TBD Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund Balance - - - - - Grants - Unsecured (Fed,State,Local)- - - - - REET 2 - 100,000 100,000 100,000 200,000 Other - - - - - - 100,000 100,000 100,000 200,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 100,000 100,000 100,000 200,000 - 100,000 100,000 100,000 200,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund Balance - - - - - Grants - Unsecured (Fed,State,Local)- - - - - REET 2 100,000 100,000 100,000 100,000 600,000 Other - - - - - 100,000 100,000 100,000 100,000 600,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 100,000 100,000 100,000 100,000 600,000 100,000 100,000 100,000 100,000 600,000 Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Total Expenditures: Description: This project will implement neighborhood traffic calming strategies including street lighting, speed cushions, signage, speed radar signs, chicanes, traffic circles, and other approved traffic calming devices. Projects will be selected annually based on neighborhood meetings, public surveys, and engineering studies. Progress Summary: Future Impact on Operating Budget: This project will have no impact on the operating budget for street maintenance. City of Auburn Capital Facilities Plan 212 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Public Art Project No: gcbd02 Project Type: Project Manager: Krueger Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund Balance 22,000 - - 22,000 Grants - Secured (Fed,State,Local)- - - - - REET 2 30,000 30,000 30,000 30,000 90,000 Other - - - - - 30,000 52,000 30,000 30,000 112,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 30,000 52,000 30,000 30,000 142,000 30,000 52,000 30,000 30,000 112,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 2 30,000 30,000 30,000 30,000 180,000 Other - - - - - 30,000 30,000 30,000 30,000 180,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 30,000 30,000 30,000 30,000 180,000 30,000 30,000 30,000 30,000 180,000 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: None The City designates $30,000 annually toward the purchase of public art, for placement at designated locations throughout the City. Progress Summary: Arts Commission will meet to assess future needs and seek approval from City Council on placement. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 213 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: City Wetland Mitigation Projects Project No:cp1315 Project Type:Non-Capacity Project Manager:Andersen Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - Fund 124 Wetland Mitigation Account 4,355 - 20,790 25,145 REET - - - - - 4,355 - - 20,790 25,145 Capital Expenditures: Design - - - 4,000 4,000 Right of Way - - - 12,090 12,090 Construction 4,355 - - 4,700 4,700 4,355 - - 20,790 20,790 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund Balance - - - - - Grants - Secured (Fed,State,Local)- - - - - Fund 124 Wetland Mitigation Account 7,694 7,694 7,696 7,696 51,570 REET - - - - - 7,694 7,694 7,696 7,696 51,570 Capital Expenditures: Design - - - - 4,000 Right of Way - - - - 12,090 Construction 7,694 7,694 7,696 7,696 30,780 7,694 7,694 7,696 7,696 51,570 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project designs and constructs off-site wetland mitigation in the Auburn Environmental Park for participating development projects as approved through the City's development review process. Design, construction, monitoring, and maintenance of the mitigation is funded through wetland mitigation fees collected by the City. Progress Summary: Future Impact on Operating Budget: After construction, each wetland mitigation site is monitored and maintained for a period of three to ten years, depending on the specific requirements for the project. Funding for future year monitoring and maintenance is included in the development fees collected by the City, and is budgeted as part of the Capital Facilities Plan. Construction and monitoring are ongoing. City of Auburn Capital Facilities Plan 214 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Auburn Environmental Park Boardwalk - Phase 2 Project No:gcbd01 Project Type:Non-Capacity Project Manager:Andersen Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund Balance - - - - - Grants - Unsecured State - - - - - REET 2 - 25,000 50,000 - 75,000 Other -TBD - - - - 25,000 50,000 - 75,000 Capital Expenditures: Design - 25,000 50,000 - 75,000 Right of Way - - - - - Construction - - - - - - 25,000 50,000 - 50,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Fund Balance - - - - - Grants - Unsecured State 550,000 - - - 550,000 REET 2 - - - - 50,000 Other -TBD 250,000 250,000 800,000 - - - 850,000 Capital Expenditures: Design - - - - 50,000 Right of Way - - - - - Construction 800,000 - - - 800,000 800,000 - - - 850,000 The Auburn Environmental Park (AEP) provides vegetated natural open space within an urbanized area. The AEP provides opportunities for local economic development, water quality improvement, storm water detention, flood control, fish and wildlife enhancement, visual resources, public education, and passive recreation, including walking trails and bird viewing amenities. In 2012, the City completed the construction of approximately 1,200 lineal feet of the first phase (Phase 1) of an elevated boardwalk trail in the Auburn Environmental Park (AEP). This trail extended from West Main Street through existing wetlands in the AEP terminating at the base of the Bird Viewing Tower constructed in 2009. As part of the construction of the elevated boardwalk, the City also installed interpretative signage, bench seating, limited new vehicle parking on Western Avenue and over two acres of wetland species of trees, plants and shrubs. Phase 2 of the elevated boardwalk trail would construct a combination of approximately 2,000 lineal feet of surface trail and elevated boardwalk trail from the current terminus at the Bird Viewing Tower to a connection with the Interurban Trail. The Phase 2 project will further previous and current Councils’ visions of the AEP providing passive recreation and environmental education opportunities for all Auburn citizens. Progress Summary: This is a new capital improvement proposal. Future Impact on Operating Budget: Construction of the Phase 2 project is anticipated to incur approximately $10,000 in annual operating costs to the City’s operating budget. This operating cost is covered in existing program improvement funding for the Environmental Services portion of the Community Development and Public Works Department budget. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 215 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Downtown Wayfinding Program Project No:gcbd03 Project Type:Non-Capacity Project Manager:Lauren Flemister Description: Activity: 2015 YE 2015 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Fund Balance - - - - - REET 2 - - 120,000 - 120,000 Other - - - - - - - 120,000 - 30,000 Capital Expenditures: Design - - 23,000 - 23,000 Right of Way - - - - - Construction - - 97,000 - 97,000 - - 120,000 - 120,000 Total 2017 2018 2019 2020 2015-2020 Funding Sources: Fund Balance - - - - - REET 2 - - - - 120,000 Other - - - - - - - - - 120,000 Capital Expenditures: Design - - - - 23,000 Right of Way - - - - - Construction - - - - 97,000 - - - - 120,000 Phase 1: The downtown Pedestrian Kiosks were developed in 2012 as a result of additional funding being available through Local Revitalization Financing. Nine locations were selected within Downtown Auburn for a pedestrian kiosk to be constructed. With the budget available, three kiosks were constructed in 2013 at the Interurban Trail, Sound Transit Plaza, and at 1st Street/South Division Street. Phase 1 proposes construction of three additional kiosks in 2016. Phase 2: Develop an updated wayfinding program, both pedestrian and vehicular, that would initially begin within Downtown Auburn that could then be expanded Citywide. The current vehicular wayfinding program is lacking in aesthetic appeal, does not coordinate with the vision for Downtown Auburn, and needs refreshing. A design and color scheme have been established with the pedestrian kiosk design that an updated wayfinding program can build upon. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 216 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Green River Park Design Project No:gcbd04 Project Type:Non-Capacity Project Manager:Daryl Faber Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Cap Improve - - - - - Grants - Secured (Fed,State,Local)- - - - - REET 2 - 37,500 37,500 - 75,000 - 37,500 37,500 - 75,000 Capital Expenditures: Design - - 37,500 - 37,500 Construction - - - - - Long-Term Debt Service - 37,500 - - 37,500 - 37,500 37,500 - 75,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Cap Improve - - - - - Grants - - - - - REET 2 - - - - 37,500 - - - - 37,500 Capital Expenditures: Design - - - - 37,500 Construction - - - - - Long-Term Debt Service - - - - - - - - - 37,500 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project provides funding to complete of a Green River Park Master Plan. The City has recently received, via a property transfer from King County and the State of Washington, the riverfront property located along a bend in the Green River between 102nd and 104th Ave SE. These two parcels comprise an approximate 14 acre site, intended to be developed for public use. This future park continues more than 1,000 feet of water access. Much of the property is subject to shoreline regulations as well as other restrictions. Community input is vital to the long-term vision and success of the property. Progress Summary: Future Impact on Operating Budget: No impact on the Parks Department Operating Budget. The City's funding of a Park Master Plan for this site is critical in an effort to receive grant funding and can be a reimbursable expense should funding be allocated for construction for the proposed park site. City of Auburn Capital Facilities Plan 217 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Local Revitalization Project No: Project Type: Project Manager: Description: Activity: (Previous 2 Yrs)2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Cap Improve - - - - Grants - Secured (Fed,State,Local)- - - - - REET 2 411,927 223,073 222,600 221,900 857,600 411,927 223,073 222,600 221,900 857,600 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 411,927 223,073 222,600 221,900 857,600 411,927 223,073 222,600 221,900 857,600 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Cap Improve - - - - - Grants - - - - - REET 2 225,600 220,500 220,300 224,700 1,335,600 225,600 220,500 220,300 224,700 1,335,600 Capital Expenditures: Design - - - - - Construction - - - - - Long-Term Debt Service 225,600 220,500 220,300 224,700 1,335,600 225,600 220,500 220,300 224,700 1,335,600 Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: To pay debt service costs on 2010 General Obligation bonds issued for the Downtown Promenade Improvements. Local Revitalization financing is a credit on the State's portion of sales tax that the City will receive through 2035. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 218 CAPITAL IMPROVEMENT FUND (328)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Capital Projects Fund Project Title: Purchase King County Public Health Building Project No:cpxxxx Project Type:Non-Capacity Project Manager:TBD Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Cap Improve - - - - Grants - Secured (Fed,State,Local)- - - - - REET 1 425,000 425,000 - - 425,000 - 425,000 Capital Expenditures: Land - - 350,000 - 350,000 Design - - - - - Construction - - 75,000 - 75,000 - - 425,000 - 425,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Cap Improve - - - - - Grants - - - - - REET 1 425,000 - - - - 425,000 Capital Expenditures: Design - - - - 350,000 Construction - - - - - Construction - - - - 75,000 - - - - 425,000 The City has agreed to purchase the King County Public Health Building from King County for redevelopment purposes. Progress Summary: This is a new capital improvement proposal. Future Impact on Operating Budget: To be determined based on end use. Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 219 TABLE CI-3 Impact on Future Operating Budgets COMMUNITY IMPROVEMENTS Project:2017 2018 2019 2020 2021 2022 Total 1 Citywide Sidewalk Repair & Improvement -$ -$ -$ -$ -$ -$ -$ 2 Annual Traffic Signal Improvements - - - - - - - 3 Mohawks Plastics Site Mitigation - - - - - - - 4 Neighborhood Traffic Calming Program - - - - - - - 5 Public Art - - - - - - - 6 City Wetland Mitigation Projects - - - - - - - 7 AEP Boardwalk -Phase 2 - - 10,000 10,000 10,000 10,000 40,000 8 Downtown Wayfinding Program - - - - - - - 9 Green River Park Design - - - - - - - 10 Local Revitalization 11 Purchase KCPH Building - - - - - - - Total -$ -$ 10,000$ 10,000$ 10,000$ 10,000$ 40,000$ City of Auburn Capital Facilities Plan 220 City of Auburn Capital Facilities Plan 221 AIRPORT Current Facilities The City of Auburn operates the Auburn Municipal Airport, providing hangar and tie-down facilities/leasing space for aircraft-related businesses. As of 2012, there were approximately 96,036 take-offs and landings (aircraft operations) at the airport annually. Table A-1 “Facilities Inventory” lists the facilities with current capacity and location. The Airport Master Plan was completed in May 2015 for the period 2012 through 2032. Level of Service (LOS) The Auburn Municipal Airport Master Plan provides a maximum runway capacity (LOS standard) of 231,000 aircraft operations annually; one take-off or landing equals one aircraft operation. This LOS is recognized by the Federal Aviation Administration (FAA). The FAA requires the airport to have the capital facilities capacity (i.e., runways, taxiways, holding areas, terminal, hangars, water/sewer system, etc.) necessary to accommodate 100% of aircraft operations during any one year. By 2022 the Airport Master Plan forecasts the number of operations to be 198,623 – well below the capacity of the airport runway. Capital Facilities Projects and Financing The City’s Airport facilities include eleven non-capacity capital projects at a cost of $ 8,078,650. These projects include the runway enhancements project, west helicopter parking, facilities, access road improvements and land acquisition for future approaches. Table A-2 shows the proposed financing plan followed by individual worksheets showing the project detail. Impact on Future Operating Budgets There are no operating expense budget impacts forecast for the airport during the six years 2017 – 2022. TABLE A-1 Facilities Inventory Airport FACILITY # of Aircraft # of Feet LOCATION Existing Inventory: Hangars 145 400 23rd Street NE Tiedowns 214 400 23rd Street NE Air Strip 3,400 400 23rd Street NE Total Existing Inventory 359 3,400 Proposed Capacity Projects: 2020 Land Acquisition 30 400 23rd Street NE 2017 Runway Extension - 718 400 23rd Street NE Total Proposed Capacity Projects 30 718 2020 Projected Inventory Total 389 4,118 CAPACITY City of Auburn Capital Facilities Plan 222 TABLE A-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING AIRPORT 2016 2017 2018 2019 2020 2021 Total Capacity Projects: None - Non-Capacity Projects: 1 Airport Security Camera & Gate Access Upgrades Capital Costs - - - - 70,000 - 70,000 Funding Sources: Airport Fund - - - - 3,500 - 3,500 Grant - - - - 66,500 - 66,500 2 Land Acquisition for Future Approaches Capital Costs - 420,000 - - - - 420,000 Funding Sources: Airport Fund - 21,000 - - - - 21,000 Grants - 399,000 - - - - 399,000 3 Runway Enhancements Capital Costs 140,000 1,064,000 - - - - 1,204,000 Funding Sources: Airport Fund 7,000 53,200 - - - - 60,200 Grants 133,000 1,010,800 - - - - 1,143,800 4 Automated Weather Observation System Capital Costs - - - 268,800 - - 268,800 Funding Sources: Airport Fund - - - 13,440 - - 13,440 Grants - - - 255,360 - - 255,360 5 Fuel Farm Capital Costs - 140,000 - - - - 140,000 Funding Sources: Airport Fund - 140,000 - - - - 140,000 Grants - - - - - - - 6 Land Acquisition Capital Costs - - - - - 4,429,810 4,429,810 Funding Sources: Airport Fund - - - - - 221,491 221,491 Grants - - - - - 4,208,319 4,208,319 7 Precision Approach Path Indicator (PAPI) for Runway Capital Costs - - - - - 168,000 168,000 Funding Sources: Airport Fund - - - - - 8,400 8,400 Grants - - - - - 159,600 159,600 8 West Side Fencing Capital Costs - - - 52,920 - - 52,920 Funding Sources: Airport Fund - - - 2,646 - - 2,646 Grants - - - 50,274 - - 50,274 City of Auburn Capital Facilities Plan 223 TABLE A-2 (continued) 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 9 Taxiway Seal Coat & Restripe Capital Costs - - - - 50,120 - 50,120 Funding Sources: Airport Fund - - - - 2,506 - 2,506 Grants - - - - 47,614 - 47,614 10 West Helicopter Parking Pads, Facilities and Access Road Capital Costs - - - - 200,000 600,000 800,000 Funding Sources: Airport Fund - - - - 10,000 30,000 40,000 Grants - - - - 190,000 570,000 760,000 11 Runway 16/34 Sealcoat Capital Costs - - - - - 475,000 475,000 Funding Sources: Airport Fund - - - - - 23,750 23,750 Grants - - - - - 451,250 451,250 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 140,000 1,624,000 - 321,720 320,120 5,672,810 8,078,650 Total Costs 140,000 1,624,000 - 321,720 320,120 5,672,810 8,078,650 FUNDING SOURCES: Airport Fund 7,000 214,200 - 16,086 16,006 283,641 536,933 Grants (Fed,State,Local)133,000 1,409,800 - 305,634 304,114 5,389,169 7,541,717 Total Funding 140,000 1,624,000 - 321,720 320,120 5,672,810 8,078,650 City of Auburn Capital Facilities Plan 224 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Airport Security Camera & Gate Access Upgrades Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - 3,500 - 3,500 Federal Grant -Unsecured - - 63,000 - 63,000 State Grant -Unsecured - - 3,500 - 3,500 - - 70,000 - 70,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 70,000 - 70,000 - - 70,000 - 70,000 Grant / Other Sources:Federal Aviation Administration Increased security identified by the Federal Aviation Administration and the Transportation Security Administration for Airport control access gates (both vehicle and personnel). This project will install security cameras and replace the obsolete gate operator access control units. The proposed system will include cards and keypad operation with both inbound and outbound tracking of the authorized tenant/guest. Personnel gates will also have the same system. Progress Summary: Future Impact on Operating Budget: None Total Funding Sources: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: City of Auburn Capital Facilities Plan 225 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Land Acquisition for Future Approaches Project No:cpxxxx Project Type: Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - 21,000 - Federal Grant -Unsecured - - - 378,000 - State Grant -Unsecured - - - 21,000 - - - - 420,000 - Capital Expenditures: Design - - - - - Acquisition - - - 420,000 - Construction - - - - - - - - 420,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - - - 21,000 Federal Grant -Unsecured - - - - 378,000 State Grant -Unsecured - - - - 21,000 - - - - 420,000 Capital Expenditures: Design - - - - - Acquisition - - - - 420,000 Construction - - - - - - - - - 420,000 Grant / Other Sources:Federal Aviation Administration Non-Capacity Acquire land at the current Park and Ride for future approaches. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: None Total Funding Sources: City of Auburn Capital Facilities Plan 226 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Runway Enhancements Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - 8,050 7,000 53,200 15,050 Federal Grant -Secured - 144,900 126,000 957,600 270,900 State Grant -Unsecured - 8,050 7,000 53,200 15,050 - 161,000 140,000 1,064,000 301,000 Capital Expenditures: Design - - 140,000 - 140,000 Environmental Assessment - 161,000 - - 161,000 Construction - - - 1,064,000 - - 161,000 140,000 1,064,000 301,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - - - 60,200 Federal Grant -Secured - - - - 1,083,600 State Grant -Unsecured - - - - 60,200 - - - - 1,204,000 Capital Expenditures: Design - - - - 140,000 Environmental Assessment - - - - - Construction - - - - 1,064,000 - - - - 1,204,000 Grants / Other Sources:Federal Aviation Administration Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: Enhance Runway 16/34 per Airport Layout Plan & Master Plan Update for increased safety and utilization. Progress Summary: Environmental Assessment is planned for 2015, design and scope of work to be completed in 2016 and construction is anticipated to begin in 2017. Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 227 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Automated Weather Observation System Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - 13,440 - - 13,440 Federal Grant -Unsecured - 241,920 - - 241,920 State Grant -Unsecured - 13,440 - - 13,440 - 268,800 - - 268,800 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 268,800 - - 268,800 - 268,800 - - 268,800 Grants / Other Sources:Federal Aviation Administration Install weather reporting equipment for instrument approach. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 228 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Fuel Farm Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - 140,000 Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - 140,000 - Capital Expenditures: Design - - - 25,000 - Right of Way - - - - - Construction - - - 115,000 - - - - 140,000 - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - - - 140,000 Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - 140,000 Capital Expenditures: Design - - - - 25,000 Right of Way - - - - - Construction - - - - 115,000 - - - - 140,000 Grants / Other Sources: Construct a Fuel Farm for Jet A service at Airport Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 229 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Land Acquisition Project No:cpxxxx Project Type: Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Acquisition - - - - - Construction - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - - 221,491 221,491 Federal Grant -Unsecured - - - 3,986,829 3,986,829 State Grant -Unsecured - - - 221,490 221,490 - - - 4,429,810 4,429,810 Capital Expenditures: Design - - - - - Acquisition - - - 4,429,810 4,429,810 Construction - - - - - - - - 4,429,810 4,429,810 Grant / Other Sources:Federal Aviation Administration None Non-Capacity Land Acquisition -Armstrong Progress Summary: Future Impact on Operating Budget: Total Funding Sources: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: City of Auburn Capital Facilities Plan 230 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Precision Approach Path Indicator (PAPI) for Runway Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - - 8,400 8,400 Federal Grant -Unsecured - - - 151,200 151,200 State Grant -Unsecured - - - 8,400 8,400 - - - 168,000 168,000 Capital Expenditures: Design - - - 20,000 20,000 Right of Way - - - - - Construction - - - 148,000 148,000 - - - 168,000 168,000 Grants / Other Sources:Federal Aviation Administration Install Precision Approach Path Indicator (PAPI) for Runway to replace aging VASI system. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 231 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: West Side Fencing Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - 2,646 - - 2,646 Federal Grant -Unsecured - 47,628 - - 47,628 State Grant -Unsecured - 2,646 - - 2,646 - 52,920 - - 52,920 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - 52,920 - - 52,920 - 52,920 - - 52,920 Grants / Other Sources:Federal Aviation Administration Install fence on west side of property to complete perimeter security fencing and help control wildlife on the airport. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 232 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Taxiway Seal Coat & Restripe Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - 2,506 - 2,506 Federal Grant -Unsecured - - 45,108 - 45,108 State Grant -Unsecured - - 2,506 - 2,506 - - 50,120 - 50,120 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - 50,120 - 50,120 - - 50,120 - 50,120 Grants / Other Sources:Federal Aviation Administration Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: This project will provide funding for seal coating and restriping of the taxiway that was replaced in 2009. Progress Summary: Future Impact on Operating Budget: City of Auburn Capital Facilities Plan 233 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: West Helicopter Parking Pads, Facilities and Access Road Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Environmental - - - - - Property - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - 10,000 30,000 40,000 Federal Grant -Unsecured - - 180,000 540,000 720,000 State Grant -Unsecured - - 10,000 30,000 40,000 - - 200,000 600,000 800,000 Capital Expenditures: Design - - 125,000 - 125,000 Environmental - - 75,000 - 75,000 Property - - - 350,000 350,000 Construction - - - 250,000 250,000 - - 200,000 600,000 800,000 Grants / Other Sources:Federal Aviation Administration This project will install four helicopter parking positions pads on the west side of the Airport. In addition this project will construct two aviation -use buildings and an access road to NE 16th Street. Environmental work may be required due to property acquisition and to mitigate any potential impacts to wetlands. Design work will consist of designing helicopter parking positions to meet FAA standards and design of access road and site improvements to construct the buildings. Progress Summary: Future Impact on Operating Budget: Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 234 AIRPORT FUND (435)Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Enterprise Funds Project Title: Runway 16/34 Sealcoat Project No:cpxxxx Project Type:Non-Capacity Project Manager:Kevin Snyder Description: Activity: 2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Unrestricted Airport Revenue - - - - - Federal Grant -Unsecured - - - - - State Grant -Unsecured - - - - - - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Construction - - - - - - - - - - Total 2018 2019 2020 2021 2016-2021 Funding Sources: Unrestricted Airport Revenue - - - 23,750 23,750 Federal Grant -Unsecured - - - 427,500 427,500 State Grant -Unsecured - - - 23,750 23,750 - - - 475,000 475,000 Capital Expenditures: Design - - - 100,000 100,000 Right of Way - - - - - Construction - - - 375,000 375,000 - - - 475,000 475,000 Grants / Other Sources:Federal Aviation Administration Unmaintained asphalt can crack allowing water penetration which then weaken the subsurface creating a larger area of failure making an unsafe environment for departing or landing during a critical phase of flight. The FAA recommends a seal coat every 5 years to extend the life of the asphalt. It is less expensive to maintain the asphalt than to rehab or reconstruct. This project should include any crack sealing, sealcoat and re-paining of the runway environment. Progress Summary: Future Impact on Operating Budget: None Total Expenditures: Total Funding Sources: Total Expenditures: Forecasted Project Cost: Total Funding Sources: City of Auburn Capital Facilities Plan 235 CEMETERY Current Facilities The City owns two cemeteries. The Mountain View Cemetery is a fully developed facility (50 acres and five buildings) that provides burial services and related merchandise for the community. The Pioneer Cemetery is a historic cemetery which is no longer used for burial purposes. Table C-1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 27 burial plots/niches per 1,000 population is based on the existing inventory divided by the 2015 citywide population of 75,545. The proposed LOS of 40 burial plots/niches per 1,000 population is based on the projected inventory divided by the 2021 projected citywide population of 85,912. Capital Facilities Projects and Financing The CFP does not include any Cemetery capital facilities projects during 2016 - 2021. Impact on Future Operating Budgets There are no operating budget impacts forecast for the cemetery during the six years 2017 – 2022. TABLE C-1 Facilities Inventory Cemetery CAPACITY FACILITY # of Burial Plots/Niches LOCATION Existing Inventory: Mountain View Cemetery 2,050 2020 Mountain View Dr. Pioneer Cemetery - 8th & Auburn Way No. Total Existing Inventory 2,050 Proposed Capacity Projects: New Development - Burial Plots 660 Memory Heights New Development - Burial Plots 764 10th Addition Total Proposed Capacity Projects 1,424 2021 Projected Inventory Total 3,474 City of Auburn Capital Facilities Plan 236 City of Auburn Capital Facilities Plan 237 POLICE Current Facilities The City of Auburn Police Department provides a full range of law enforcement services to the citizens of Auburn. All Divisions of the Auburn Police Department are housed at 340 East Main Street, Suite 201. The Divisions include Patrol, Investigations, Administrative Services, Inspectional Services, and Records. Level of Service (LOS) The City of Auburn Police Department contracts with SCORE, an outside entity, for housing of all misdemeanant inmates. Capital Facilities Projects and Financing The CFP does not include any Police capital facilities projects during 2016 - 2021. Impact on Future Operating Budgets The jail services expenses are dependent on the City’s contract agreement with SCORE. City of Auburn Capital Facilities Plan 238 City of Auburn Capital Facilities Plan 239 FIRE PROTECTION Current Facilities The Valley Regional Fire Authority provides fire protection and rescue services to a 25-square mile area which includes the City of Auburn, the City of Algona, the City of Pacific and King County Fire Protection District 31. The Valley Regional Fire Authority operates out of five stations, which are manned 24 hours per day. The North Station #31 also serves as the department headquarters and includes a hose and training tower. Each station is assigned fire apparatus (Engines and Aid Vehicles). Table F–1 “Facilities Inventory” lists the facilities along with their current capacity and location. Level of Service (LOS) The current LOS of 0.23 fire apparatus per 1,000 population is based on the existing inventory (17 fire apparatus) divided by the 2015 citywide population of 75,545. The proposed LOS of 0.21 fire apparatus per 1,000 is based on the 2021 planned inventory (18 fire apparatus) divided by the 2021 projected citywide population of 85,912. Capital Facilities Projects and Financing The Valley Regional Fire Authority includes one capital project at a cost of $840,000 for fire apparatus enhancements and improvements. Table F-2 shows the proposed financing plan followed by an individual worksheet showing the project detail. Impact on Future Operating Budgets There are no operating budget impacts forecasted for fire protection during the six years 2017 – 2022. City of Auburn Capital Facilities Plan 240 TABLE F-1 Facilities Inventory Valley Regional Fire Authority FACILITY Fire Apparatus Aid Vehicles LOCATION Existing Inventory: Stations: North Station #31 1101 'D' Street NE, Auburn First Line 2 1 Reserve 1 1 South Station #32 1951 'R' Street SE, Auburn First Line 1 1 Reserve 1 1 Lakeland Station #33 500 182nd Ave E, Auburn First Line 1 - Reserve 1 - Lea Hill Station #34 31290 124th Ave SE, Auburn First Line 1 - Reserve 1 - GSA Station #35 2815 C St SW, Auburn Reserve 1 1 Pacific Station #38 133 3rd Ave SE, Pacific First Line 1 - Reserve 1 - Total Existing Inventory 12 5 Proposed Inventory Additions: First Line 1 - Total Proposed Capacity Projects 1 - 2021 Projected Inventory Total 13 5 CAPACITY City of Auburn Capital Facilities Plan 241 TABLE F-2 CAPITAL FACILITIES PLAN PROJECTS AND FINANCING VALLEY REGIONAL FIRE AUTHORITY 2016 2017 2018 2019 2020 2021 Total Non-Capacity Projects: 1 Fire Station Facility Relocation, Enhancements & Improvements Capital Costs 240,000 100,000 100,000 100,000 150,000 150,000 840,000 Funding Sources: Grants - - - - - - - Bond Proceeds - - - - - - - Impact/Mitigation Fees 240,000 100,000 100,000 100,000 150,000 150,000 840,000 SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projects 240,000 100,000 100,000 100,000 150,000 150,000 840,000 Total Costs 240,000 100,000 100,000 100,000 150,000 150,000 840,000 FUNDING SOURCES: Cemetery Fund - - - - - - - Grants (Fed,State,Local)- - - - - - - Bond Proceeds 240,000 100,000 100,000 100,000 150,000 150,000 840,000 Total Funding 240,000 100,000 100,000 100,000 150,000 150,000 840,000 City of Auburn Capital Facilities Plan 242 Valley Regional Fire Authority Capital Facilities Plan Six Year Capital Facilities Plan, 2016-2021 Project Title: Fire Station Facility Relocation, Enhancements & Improvements Project No:cpxxxx Project Type: Project Manager:Mark Horaski Description: Activity: (Previous 2 Yrs.)2015 YE 2016 Year End Funding Sources:Prior to 2015 Estimate 2016 Budget 2017 Budget Project Total Grants - - - - - Bond Proceeds - - - - - Impact/Mitigation Fees 100,000 460,000 240,000 100,000 800,000 100,000 460,000 240,000 100,000 800,000 Capital Expenditures: Design - - - - - Right of Way - - - - - Construction 100,000 460,000 240,000 100,000 800,000 100,000 460,000 240,000 100,000 800,000 Total 2018 2019 2020 2021 2016-2021 Funding Sources: Grants - - - - - Bond Proceeds - - - - - Impact/Mitigation Fees 100,000 100,000 150,000 150,000 840,000 100,000 100,000 150,000 150,000 840,000 Capital Expenditures:- Design - - - - - Right of Way - - - - - Construction 100,000 100,000 150,000 150,000 840,000 100,000 100,000 150,000 150,000 840,000 Total Expenditures: Total Expenditures: Total Funding Sources: Forecasted Project Cost: Facility Improvement projects are identified and prioritized annually and are subject to delay to accommodate emergency repairs. The Valley Regional Fire Authority includes one project in 2015 for apparatus enhancements and improvements. The amount presented in 2016 will complete the acquisition and improvement of the new apparatus. Progress Summary: Fire mitigation and impact fees will be transferred to the Valley Regional Fire Authority to pay for apparatus enhancements and improvements in 2015 and 2016. Future Impact on Operating Budget: Total Funding Sources: