Loading...
HomeMy WebLinkAbout20151026001442 AGREEMENT FOR DEFERRAL OF IMPROVEMENTS 09/01/2015 o2 - LI - _ O FIRST n! RICAN V)/STAY< v3oc • Return Address: City of Auburn City Clerk 25 West Main III 111111 liii Auburn, WA 98001 111111111 III 1111111 if 20151026001442 FIRST AMERICAN AG 79.00 PAGE-001 OF 007 10/26/2015 16:20 KING COUNTY, WA Above this line reserved for recording information. AGREEMENT FOR DEFERRAL OF IMPROVEMENTS Project No. SDR15-0003 Reference # (if applicable): N/A Grantor/Borrower: Leslie Brown & Begum Brown Grantee/Assignee/Beneficiary: City of Auburn Legal Description/STR: NE Section 2 —Township 21 N — Range 05 E Assessor's Tax Parcel ID#: 221480-0070 THIS AGREEMENT made and entered into on the L day of -544c-silk 2015, by and between the City of Auburn, a municipal corporation of the State of Washington, hereinafter referred to as "City", and Leslie Brown & Begum Brown, hereinafter referred to as "Property Owners", WITNESSETH: WHEREAS, the Property Owners are the owners of real property in the City of Auburn, County of ® King ❑ Pierce, State of Washington, located at 6113 S 295th Ct. and described as shown on Exhibit "A," attached hereto. WHEREAS, the Property Owners desire to make certain improvements or develop the above-referenced property; and, WHEREAS, in connection with the improvement or development of such property, certain street-public works improvements would need to be made or otherwise provided for; and, WHEREAS, the Property Owners desire to defer those street-public works improvements to a later time, and have requested agreement by the City for such deferral; and, Agreement for Deferral of Improvements docurnqats were f e5t Page 1 of 7 WW1 es an ac commociation at. It has not been exemine4 ea dt BToper execution or as to its of rn' aeon htfo. WHEREAS, the Asst. Director of Engineering/City Engineer of the City of Auburn has approved the request to delay the placement of street-public works improvements to serve the herein legally described property; NOW THEREFORE, based upon good and valuable consideration, the sufficiency of which is hereby acknowledged, IT IS AGREED as follows: 1. DELAY OF IMPROVEMENTS In connection with this agreement, and in connection with the development and/or improvement to the land of the Property Owners, the City agrees to allow the Property Owners to delay the making, constructing, installing and providing for the street-public works improvements identified and set forth in paragraph 4 of this agreement. 2. CONSTRUCTION OF IMPROVEMENTS The Property Owners hereby agree and covenant that they shall construct or cause to be constructed the deferred improvements described below at his/her/their expense upon determination by the City of Auburn that the improvements have become necessary. In the event the City determines to construct the improvements as part of a public works project the property owner, or owners, shall make payment to the City of Auburn of the pro-rata share of the cost of the project. Such costs shall include but are not limited to engineering, permitting, construction, inspection and other project related expenses, which benefit the property of the Property Owners, described on Exhibit "A" attached hereto and incorporated herein by this reference. In the event that said property is subdivided or sold in the future, the Property Owners agree to include as a condition of sale and/or a restrictive covenant the condition that the obligations to make, construct, install or provide for the street-public works improvements identified and set forth in paragraph 4, below, shall apply to the subdivisions and future sales of portions of the property identified on Exhibit "A". The condition of sale and/or restrictive covenant shall also provide that the aforesaid pro-rata fair share of each portion of the property shall be divided amongst the subdivided lots 3. NOTICE AND TIME OF CONSTRUCTION The obligation of the Property Owners to make, construct, install and provide for the street-public works improvements described and set forth in paragraph 4, below, shall arise upon not less than thirty (30) days prior written notice to the Property Owners by the City. The time by which the Property Owners shall make, construct, install or provide for said improvements shall be not later than twelve (12) months after the written notice by the City. It is provided, however, that the improvements shall be completed not later than ten years from the date this agreement is executed. Agreement for Deferral of Improvements Page 2 of 7 4. DESCRIPTION OF IMPROVEMENTS The improvements to be included in connection with this agreement shall be as follows: Half-street improvements along the south edge of the cul-de-sac S 295th Ct. consistent with the City of Auburn Design Standards for a local residential street, which include 75-ft paved diameter, concrete curb & gutter, 5-ft sidewalk, street trees, storm drainage, and undergrounding of utilities. Note that the width of pavement widening above is the minimum required. Additional paving and right-of-way dedication may be necessary to accommodate the roadway improvements depending on the surveyed location of the existing centerline and cul-de-sac center of S 295th Ct. All improvements shall be constructed in conformance with the City's design and construction standards in place at the time of design and construction. 5. NONEXCLUSIVE REMEDIES In addition to any and all other remedies available to the City, at law or in equity, if the Property Owners fail to make, construct, install or provide for the improvements, or otherwise arrange for the construction and installation of such improvements, then the City shall be entitled and authorized to make, construct, install or provide for such improvements and bill the Property Owners for the costs incurred in connection therewith, and/or file a lien on the property of the Property Owners for the amount of the City's full costs and expenses therefore, and enforce the lien in accordance with legal process. Any such billing by the City to the Property Owners shall be paid by the Property Owners within sixty (60) days of the billing, unless other arrangements are made in advance. 6. BINDING ON HEIRS, ASSIGNS This agreement shall be binding on the heirs, assigns and successors in interest of the parties hereto, and the obligations hereunder shall run with the land described in Exhibit "A". 7. CONSTRUCTION AND VENUE This agreement shall be construed in accordance with the laws in the State of Washington. In the event of any litigation regarding the construction or effect of this agreement, or the rights of the parties to this agreement, it is agreed that venue shall be in ®King ❑Pierce County, Washington. 8. COSTS TO PREVAILING PARTY In the event that either party initiates any action to enforce the terms and conditions of this agreement, the prevailing party shall be entitled to reasonable costs and attorney's fees. SDR15-0003 Agreement for Deferral of Improvements Page 3 of 7 9. LOCAL IMPROVEMENT DISTRICT The Property Owner also agrees not to protest the formation of a Local Improvement District for any or all of the street improvements listed above, if initiated by the City or by property owners adjacent to or benefiting the property. 10. RECORDING An executed copy of this agreement shall be recorded among the land records of the King ❑Pierce County Auditor or Recorder. 11. INDEMNIFICATION The Property Owner shall indemnify and hold the City and its agents, employees, and/or officers, harmless from and shall process and defend at its own expense any and all claims, demands, suits, at law or equity, actions, penalties, losses, damages, or costs, of whatsoever kind or nature, brought against the City arising out of, in connection with, or incident to the execution of this Agreement and/or the Property Owner's performance or failure to perform any aspect of this Agreement. No liability shall attach to the City by reason of entering into this Agreement except as expressly provided herein. 12. ENTIRE AGREEMENT This agreement contains the entire understanding of the parties with respect to the matters set forth herein and any prior or contemporaneous understandings are merged herein. This contract shall not be modified except by written instrument executed by the parties hereto. IN WITNESS WHEREOF, the parties hereto have executed this agreement on the date and year first above set forth. SDR15-0003 Agreement for Deferral of Improvements Page 4 of 7 CITY OF AUBURN DATED this 15'T e day of ,�a,plGn.blr , 2015. I Ingrid , # t. i ctor of e'.—. • ngineering/City Engineer STATE OF WASHINGTON ) ) ss COUNTY OF KING ) I certify that I know or have satisfactory evidence that Ingrid Gaub is the person who appeared before me, and said person acknowledged that she signed this instrument, on oath stated that she was authorized to execute the instrument and acknowledged it as the Assistant Director of Engineering/City Engineer of the City of Auburn to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument. GIVEN under my hand and official seal this 1 day of L .1 Lw&, 2015. LE �ppG r � t a No . , °ublic in and fort e Wate of ashington st te It s p Residing at —Pane/ ou�l yt~ h= My appointment expires «/i9fts- .3'. E PAZ. _ SDR15-0003 Agreement for Deferral of Improvements Page 5 of 7 • PROPERTY OWNER(S): t ec ,e M row''\ OWNER g e k Apia- TITLE OWNER rL P✓e a(%✓* TITLE STATE OF WASHINGTON) )ss. COUNTY OF KING On this day personally appeared before me, \.(c5\.',e_ VA' C) "\ , and (-2.0))r-0. ti. u,r —�u'�, to me known to be the Property Owners, and the individuals describ i in and who executed the within foregoing instrument, and acknowledged that they signed the same as their free and voluntary act and deed, for the uses and purposes therein mentioned, and on oath stated that they are authorized to execute the above agreement as the Property Owners. GIVEN under my hand and official seal this \°{`' day of A�.r ,.�� , 2015. 410 39nNits y :Ian 282078 \Co I* 'PU9l.le�'a- Notary Public in and for the State of Washington 5, O Residing at 3\b\\ `Zo c C •e H .\5 p S My appointment expires 7N, , -7-, -� JAK/tlb/mm Ref: H:\Development\Projects\Brown & Brown SFR\SDR15-0003\Legal Documents\2015 SDR15-0003 Agreement for Deferral of Improvements Page 6 of 7 EXHIBIT "A" LEGAL DESCRIPTION Lot 7 of Eastview Vista as recorded in Volume 108 of Plats at Pages 51 through 53 under recording no. 20131007001580, records of King County, WA. SDR15-0003 Agreement for Deferral of Improvements Page 7 of 7