Loading...
HomeMy WebLinkAbout06-20-2018 Agenda � � Airport Advisory Board Regular Meeting June 20, 2018, 7:30 AM Airport Office Conference Room 1 AGENDA A. CALL THE MEETING TO ORDER/ROLL CALL— INTRODUCTION OF NEW MEMBERS B. ANNOUNCMENTS: Sparrow Tang's Resignation from the Board. C. PUBLIC COMMENT: Members of the public may make comments at this time on any items not appearing on the agenda that are of interest to the public and are within the jurisdiction of the Board. Comments relating to items on todays agenda are to be taken at the time the item is heard. The Board Chair determines time allotted to each speaker. D. APPROVAL OF MINUTES: 1. APRIL 18, 2018 REGULAR MEETING 2. MAY 16, 2018 SPECIAL MEETING E. PRESENTATIONS: NONE E. BOARD ACTION ITEMS: Please note that Board action items are recommendations only to the City Council pursuant to the Board's adopted role as an advisory only body to the City Council. 1. NONE F. BOARD DISCUSSION ITEMS: Please note that no action will be taken on Board discussion items. 1. PROCESS FOR PROVIDING NEW MEMBERS BACKGROUND AND INFORMATION ON THE AIRPORT (5 Min) 2. BOARD MEEETING LOCATION (5 Min) 3. 2018 WORK PLAN REVIEW OF ACTIVE ITEMS A. AIRPORT MANAGEMENT UPDATE (10 Min) B. BUDGET AMENDMENT — CHANGES IN PROJECTS FOR 2018 (5 Min) C. RUNWAY ENHANCEMENT PROJECT UPDATE (5 Min) D. JET A FUEL PROGRAM STATUS UPDATE (5 Min) E. COMPETATIVE MARKET ASSESSMENT & LONG-TERM RATE STUDY UPDATE (5 Min) F. DRAFT CAPITAL FACILITIES PLAN FOR 2019-2024 (15 Min) Page 1 of 2 Ph: _'S3-333-68'lI'�x: 253-333-6R22 Emaih inFo iusSUwa.com Website: www.s�Owa.com Airport Advisorv Board Meetin� AQenda June 20. 2018 4. AIRPORT ADVISORY BOARD—TRACKING MATRIX (GENERAL BUSINESS)AND 2018 ONLY STRATEGIC BUSINESS FLAN PRIORITY ACTIONS MATRIX (10 Min) G. BOARD GUIDANCE AND INFORMATION ITEMS: 1. AIRPORT MANAGER'S REPORT (5 Min) H. SCHEDULE FOR UPCOMING MEETINGS: Scheduled meetings of the Auburn Advisory Board are as follows*: 2018 Meeting Schedule: August 15, 2018 October 17, 2018 December 19, 2018 Unless otherwise noted and advertised, all meetings will startat 7:30 a.m. a.nd will take place at the Auburn Airport Office Conference Room 1 located at 2143 E St. NE, Auburn, WA 98002. *Please note that subject to advanced public noticing the Board may elect to schedule additional special meetings beyond the meeting dates specified above. I. ADJOURNMENT OF MEETING Page 2 of 2 AUBURIV AIRPORT ADVISORY �OARD �VIEETIIVG MINUTES nAEETING DATE: April 18, 2018 nAEETING TINiE:- 7:30 A.M. MEETING LOCAYIOIV: Auburn Municipal Airport, 2143 E ST NE Suite #1 Auburn WA 98001 nAeeting Attendance Record: : • , o o - John Theisen, Chairperson Deanna Clark, Vice Chair � Mark Kornei, Board Member Ingrid Gaub, Assistant Director of Engineering Services/City Engineer _ _. _ Jacob Sweeting, Assistant City Engineer � oo .o— _._ ____ Jamelle Garcia, Aviation Management Group, LLC Guillermo Arevalo, Aviation Management Group, LLC T_anya Rottkamp, Aviation IVlanagement Group, LLC .- o - � . Danielle Butsick (Tenant/Citizen) Wayne Osborne (Citizen) Gary Miller (Tenant/Citizen) Sarah Partap (MENG Analysis) Page 1 of 3 �4UBURIV AIRPORT A►DVISORY BOARD AA�E1'ING iiAIIVUTES A. CALL THE MEETING TO Oi2DER: Chairperson Theisen called the meeting to order and welcomed attendees and guests. Chairperson Theisen noted that Board Member Sparrow Tang was an excused absence. B. PUBLIC COnAl1AENTS: NONE C. APPROVAL OF IIAINUTES: A motion was� made, seconded and unanimously passed to approve the Auburn AirportAdVisory Board Meeting Minutes of February 21, 2018. D. PRESENTATIONS: MENG Analysis- Sarah Partap. Ms. Partap made a presentation of the Airport Facilities Condition Assessment Study to date. The presentation including key findings; including maintenance items (2017-2022), future Capital needs (2023-2036) and Facility Condition Index. E. BOARD ACTION ITEMS: iVONE F. BOARD DISCUSSION ITEMS: 'i) Status of Airport Management Grou.p after 2018. �� Ms. Gaub discussed the letter received by AMG stating that if the City decided to go out to bid=AMG will not submit a proposal. Mr. Garcia stated if the City decided to take management into the City, AMG will assist the City in any way possible. There was discussion by members of the board, staff and the public regarding this matter. 2) 2018 Work Plan Review of Active Items. , A. Runway Enhancement Project Update. Ms. Gaub discussed the I Federal Aviation Administration position on the runway enhancement is limited to 3,600 feet for FAA grant eligibility. She presented 3 options the City is considering. Option 1 v�{as to proceed with design and construction of 3,600 feet. Option 2 proceed with design construction of 4,000-foot runway without full FAA support. Page 2 of 3 AU�URIV AIRPORT ADVISORY BOARD iVIEETIIVG MIIVUTES Option 3 leave runway as is for now. All options were discussed in length. B. Jet Fuel program status update. Ms. Gaub advised the license agreement befinreen the City and Cascade Helicopters has been completed and signed. She also discussed with AMG's d.ecision to not eontinue past 2018 that retail Jet fuel program will have to be reconsidered. C. Competitive Market Assessment & Long-Term Rate Study. Ms.. Gaub advised a summa.ry of Phase 1 should be completed and ready for review in May 2018. Based on the discussion, Chair requested a special meeting to cover this study. This special meeting will be held May 16, 2018 at 7:30am. D. Facility Condition Assessment Project update-MEiVG Analysis (discussed in presentation.) 3) Airport Advisory Board Tracking Matrix. Ms. Gaub reviewed the entire Matrix. G. BOARD GUIDENCE AND IIdFORMATION ITEMS: 1. AIRPORT MANAGER'S REPORT: Mr. Garcia presented the March 2018 report which ineluded airport revenues with year-to-year comparisons (2017 versus 2018). Additionally, the occupancy report and current fuel operations were reviewed and discussed. Mr. Garcia gave an update regarding the change in fuel vendor including the level of service and pricing. H. SCHEDULE FOR UPCOMIfVG MEETINGS: May 16, 2018 (Special Meeting) , June 20, 2018 August 15, 2018 October 17, 2018 December 19, 2018. I. ADJOURNflAEIVT OF MEETIIVG: There being no other business the Board Chairperson adjourned the meeting at 9:22 a.m. Prepared by: Aviation Management Group, LLC on behalf of the City of Auburn Page 3 of 3 AUBURN �41RPORT A►DVISORY BOARD MEETIIVG MIiVlJ`TES MEETIiVG DATE: May 16, 2Q18-Special Meefing MEETING TIME: 7:30 A.M. i�iEETING LOCATION: Auburn Municipal Airport; 2143 E ST NE Suite #1 Auburn WA 98001 Nleeting Attendance Record: es . • • - John Theisen, Chairperson Deanna Clark, Vice Chair Ingrid Gaub, Assistant Director of Engineering Services/City Engineer Jacob Sweeting, Assistant City Engineer Doug Lein, Economic Development Manager Josh Arndt, Real Property Analyst ' ss .e� Jamelle Garcia,Aviation Management Group, LLC Guillermo Arevalo, Aviation Management Group, LLC Tanya Rottkamp, Aviation Management Group, LLC o- . - - Danielle Butsick (Tenant/Citizen) __-- - Robert Jones (Citizen) , Page 1 of 2 AU�dJRN AIRPORT ADVISORY �0�4RD MEETIIVG IVIINUTES A. CALL THE MEETING TO ORDER: Chairperson Theisen called the meeting to order and welcomed attendees and guests. Chairperson Theisen noted that Board Member Mark Kornei and Sparrow Tang were both excused absences. PUBLIC COnANiENTS: IVONE D. PRESENTATIONS: FCS Group E. BOARD ACTION ITEMS: NONE F. BOARD DISCUSSIOIV ITEflAS: 1. FCS Group presented the current status and the next milestones of the Auburn Airport Market Assessment and Long-Term Rate Study commissioned by the City of Auburn. Presentation included a discussion on the Facility Planning Options needed for the inclusion in the Rate Study. H. SCHEDULE FOR UPCOflAIIVG flAEETIIVGS: June 20, 2018 August 15, 2018 October 17, 2018 December 19, 2018. , I. ADJOURidMENT OF iIAEETING: There being no other business the Board Chairperson adjourned the meeting at 9:30 a.m. Prepared by: Aviation Management Group, LLC on behalf of the City of Auburn Page 2 of 2 * ��-.* ����c��r oF .,,..n,:,���� � ��*� ilAernorandum Engineering Division * WASHIlVG'TON To: Airport Advisory Board From: Ingrid Gaub, Assistant Director of Engineering/City Engineer Date: June 14, 2018 Re: Airport Project Budget Adjustments for 2018 As the Board is aware, there continues to be issues with the Airport Runway Enhancement Project that are delaying the final design and construction of this project, This project was fully budgeted in 2018 and with the delay, staff has proposed to revise the 2018 budgetto address this project and to add some additional work at the Airport that we feel is needed as follows. Project Name Description Original Budget Revised Bud et Revision Bud et __ Runway Design and Construction ofthe $2,155,300 ($1,833,300) $322,000 Enhancement extension of the Runway. This is revised to desi n onl for 2018. Fueling Terminal Replacement of the Fueling $20,000 Replacement Terminal which is at the end of its service life and has had o erational issues. Tree Trimming Address wildlife habitat issues by $40,000 cutting down trees on the west side of the Airport that have rown_too tall fo[_FAA re ulations Weather Interim solution for providing $10,000 Reporting System general weather information at the Airport until a full AWOS s stem can be im lemented. Page 1 of 1 j;j$U� � M4FZE THAN YOU.IMAGINED DRAFT TABLE A-2 _ CAPITAL FACIUTIES PLAN PROJECTS AND FINANCING AIRPORT FUND 2019 2020 2021 2022 202$ . _ _ _2024._ _ Total Cauacitv P_roiects: None � Non-Caoacitv Proiects: 1 Runway Enhancements Capital Costs 1,833,400 - - - - - 1,833,400 Funding Sources: Aitport Fund 91,700 - - - - - 91,700 Grants 1741,700 - - - - - 1,741,700 2 Jet A Fueling Facility Capital Costs - 50,000 350,000 - - 400,000 Funding Sources: Airport Fund - 50,000 - - - - 50,000 Ofher - - 350,000 - - - 350,0�0 Grants - - - - 3 Annu.al Repair and Maintenance of Airport Facilities Capital Co,sts 100,000 100,000 100,000 250,000 500,000 100,000 1,750,000 Funding Sources: Airport Fund 100,000 100,000 100,000 250,000 500,000 100,000 1,150,000 Grants - - - - - - - 4 Automated Weather Observation System Capital Cosfs - - - - - 166,700 766,700 Funding Sources: Airp6rt Fuhtl - - - - - 8,400 8,400 Grants - - - - - 158,300 158,300 5 Ai►port Security Camera 8 Gate Access Upgrades Capital Costs 70,000 - - - - - 70,000 Funding Sources: Airport Fund 70,000 - - - - - 70,000 GraM - - - - - 6 Precision Approach Path Indicator(PAPq for Runway Capital Costs - - - 168,000 - - 168,000 Funding Sources: Airport Fund - - - , 168,000 - - 168,000 Grants - - - - - - - 7 Land Acquisition for Future Approaches Capital Costs - - - 3,666,700 - - 3,666,700 Funding Sources: Airport Fund - - - 183,400 - - 183,400 Grants _ _ __ _ - - - 3,483;300 - - 3,483,300 8 Runway RSA Improvements Capital Costs - 500,000 - - - - 500,000 Funding Sources: Airport Fund - 25,000 - - - - 25,000 Grants 475,000 - - - - 475,000 9 West Side Fencing Capital Costs - 52,900 - - - - 52,900 Funding Sources: Airport Fund - 2,700 - - - - 2,700 Grants - 50,200 - - - _50,200 1�Hangar Replacment Program Gapital Costs 50,000 50,000 2,750,000 75,000 75,000 3,000,000 6,000,000 Funding Sources: Airport Fund 50,000 50,000 - 75,000 75,000 - 250,000 Bond Proceeds - - 2;750,000 - - - 2,750,000 Other Agencies - - - - - 3,000,000 3,000,000 D RAFT 2019 2020 2021 2022 2023 2024 Totai Non-Capaciri Proiects: 11 West Side Preliminary Environmental Permit4ing Capital Costs 50,000 - - - - - 50,000 Funding$ources: Airport Fund 50,000 - - - - - 50,000 Grants - - - - - SUMMARY: CAPITAL COSTS Capacity Projects - - - - - - - Non-Capacity Projeds 2,103,400 752,900 3,200,000 4,159,700 575,000 3;266,700 14,057,700 Total Costs 2,103,400 752,900 3,200,000 4,159,700 575,000 3,266,700 14,057,700 FUNDING SOUR6ES: Airport Fund 361,700 227,700 100,000 676,400 575,000 108,400 2,049,200 OtherAgencies - - 350,000 - - 3,000,000 3;350,000 Bond Proceeds - - 2,750,000 - - - 2,750,000 Grants(Fed,State,Locaq 1,741,700 525,200 - 3,483,3Q0 - 158,300 5,908,500 Total Funding 2,103,400 752,900 3,200,000 4,159,700 575,000 3,266,700 14,057,700 DRAFT AIRPORT FUND (465) Capital Facilities Plan Six Year Capital Facilities Pian,2019-2024 EnterpNse Funds P�ojeet Title: Runway Enhancements Project No: cp1516 Project Type: Nor1-CBpaCity Project Manager: Seth WiCkstrOm Description: Enhance Runway 16/34 per Airport Layout Plan 8�Master Plan Update for increased safety and utilization. This also includes the As- built AGIS Survey that is required following the runway construction. Progress Summary: Environmental Assessment is complete. Design planned for Federal FY 2017 and construction is anticipated to begin in Federal FY 2018. BudgeY has been adjusted to account for the anticipated funding plan identified by FAA for Design and Construction of the project per their letter of April 17,2017. _ ._ _ Future Impact on Operating Budget: Activlty: . _ -_ 2018 YE 2019 Year End Funding Sources: Prior to 2018 Estimate 2019 Bud et 2020 Bud et Pro ect Total UniestnctedAiiportRevenue 13,285 19,300 91,700 - 124,285 Federal-Non-PnmaryEntit/ement 13,992 286,000 150,000 - 449,992 Federa/Grant-Secured 215,027 - - 215,027 Federa/Grant-Unseoured - - 1,500,000 - 1,500,000 StateGranG-Secured 12,161 - - t2,161 State Grant-Unsecured 16 700 . 91 700 108,400 Total Funding Sources: 254,465- - 322,000 1,833,400 - 2,409,865 Cap'ital Expenditures: Design 15,547 322,000 - - 337,547 Environmental Assessment 238,918 - - - 238,918 Construcfion ]833 400 1 833,400_ Total Expenditures: 254,465 322,000 1,833,400 - 2,409,865 Forecasted Project Cost: Total 2021 2022 2023 2024 2019-2024 Funding Sources: , Un2stricted AirpoR Revenue - - - - 91,700 Federal-Non-Primary Entit/ement - - - - 150,000 Federal Grant-Unsecured - - - - 1,500,000 State Grant-Unsecured - - - 91 700 Total Funding Sources: - - - - 1,833,400 Capital Expenditures: Design - - - - - Environmental Assessment - - - - - Construction - - - - 1833,400 Total F�cpenditures: - - - - 1,833,400 Grants/Other Sources: Federal Aviation Administration and Washington State Departmerit of Transportation D RAFT AIRPORT FUND (465) Capital Factlities Plan Six Year Capital Facilities Plan,2019-2024 Enterprise Funds Project TiUe: Jet A Fueling Facility Project No: apbd04 Project Type: Non-Capacity Project Manage.r: Ingrid Gaub Descriptionc Construct any necessary site improVements fo accommodate a temporary 2,000 gallon fueling truck for Jet A fuel on site in 2018. Des,ig. and Gonstruct a permanent 12,000 gallon Fuel Tank for Jet A service at Airport in 2020 and 2021 after the runway extension is complete and demand for Jet A fuel is established. Progress Summary: Future Impacf on Operating Budget: On-going operational costs will be minimat as the estimated$S,OOOfmonth expenses will be offset by fuel sale revenues. Activity: 2018 YE 2019 Year End Funding Sources: Prior to 2018 Estimate 2019 Budget 2020 Bud et Pro ect Total Unrestricted Airport Revenue - - - 50,000 Other-Unsecured - - - - - State Grant-Unsecu2d - Total Funding Sources: - - - 50,000 - Capital Expenditures: Design - - - 50,000 - Right of Way - - - - - Construction - Total Expenditures: - - - 50,000 - Forecasted Project Cost: Total 2021 2022 2023 2024 2019-2024 Funding Sources: Unreshicted Ai�port Revenue - - - - 50,000 Other-Unsecured 350,000 - - - 350,000 StBte Grant-Unsecuietl - Total Funding Sources: 350,000 - - 400,000 Capital E�cpenditures: Design - - - - 50,000 Right of Way - - - - - Construction 350 000 - - - 350 000 Total Expenditures: 350,000 - - - 400,000 Grants/Other Sources: D RAFT AIRPORT FUND (465) Capital Facilities Plan Six Year Capital Facilities Plan,2019-2024 Enterprise Funds Project TiUe: Annual Repair and Maintenance of Airport Facilities Project No: apbd05 Project Type: Non-Capacity Project Manager: I.ngrid Gaub Descriptibn: Due to the current conditions of the Facilities at 4he Airport,this program provides for necessary maintenance and repair work such as slab sealing,roof replacement,hangar beam replacement,painting,electrical repairs,etc.for buildings iden4ified in the 2018 Facility Condifion Rssessment as being in"Fair"to"Good"condition.Repair and maintenance of these facilities will help prolong the service life of these buildings. Progress Summary: Program began in 2017. In 2018,a Facilities Condition Assessment was completed. - Future Impact on Operating Budgef: This project will decrease the need for more costly repairs and maintenance on older buildings. Activity: 2018 YE 2019 Year End Funding Sources: Prior to 2018 Estimate 2019 Bud et 2020_Budget_ . Pro ect Total_ Unrestricted AirporE Revenue - 20,000 100,000 100,000 120,000 Grants(Fed,State,Local) - - - - - Other - - - - Total Funcling Sources; - 20,000 100,000 100,000 120,000 Capital Expenditures: Desfgn - - 20,0.00 20,000 20,000 Right of Way - - - - - Construction 20 000 80 000 80,000 100,000 Total Eiipendifures: - 20,000 100,000 100,000 120,000 Forecasted Project Cost: Tota1 2021 2022 2023 2024 2019-2024,_ _ Funding Sources: UnrestrictedAi�po�tRevenue 100,000 250,000 500,000 100,000 1,150,000 Grants(Fed,State,Local) - - - - - Other - - - - - _ - - _- Total Funding Sources: 100,000 250,000 500,000 900,000 1;150,000 Capital�pendifures: Design 20,000 50,000 140,000 20,000 230,000 Right of Way - - - - - Construction 80 000 200,000 400,000 80 000 920 000_ Total F�cpenditures: 100,000 250,d00 500,000 100;000 1;150;000- Grants/Other Sources: D RAFT AIRPORT FUND (465) �ap�ta�Fac��it�es P�an Six Year Capital Facillties Plan,2019-2024 Enterprlse Funds Project Title: Automated Weather Observation System Project No: cpXxxx Project Type: Non-Capacity Project Manager: I.ngrid Gaub Description: Install weather reporting equipment for instrument approach. _-. Progress Summary: This project is dependent on grant funding which has been delayed.in order tq complete the Runway Enhancement project pe FAA�equirements. , Future Impact on Operating Budget: $2,U00 annually f.or on-going maintenance and repair Activity: 2018 YE 2019 Year End Funding Sources: Prior to 2018 Estimate 2019 Bud et 2020 Bud et Pro'ecf Total Unrestricted Airport Revenue = - - - - Federal-Non-Pnmary Entiflements - - - - - State Grant-Unsecured - - Total Funding Sources: - - - - - Capital Expenditures: Design - - - - - Right of Way - - - - - Constiuction Total Ezpenditures: - - - - - Forecasted Project Cost: Total 2021 2022 2023 2024 2019-2024 Funding Sources: Unrestncted Airport Revenue - - - 8,400 8,400 Federal=Non-Primary Entitlements - - - 150,000 750,000 State Grant-Unsecured - - - 8,300 8,300 Total Funding Sources: - - - 166,700 166,700 Capital Expenditures: Design - - - 111,100 111,100 Rrght of Wey - - - - - Construcfron 55,600 55,60U Total Expenditures; - - 166,700 766,700 , _ -- _ ._ ..._ __ _ I - - -- - Grants/Other Sources: Federal Aviation Administration and Washington State Department of Transportation I DRAFT -- __ - _ AIRPORT FUND (4.65) Capital Facilities Plan Six Year CapitaJ Facilities Plan,2019-2024 _ __ _ Enterprise Funds Project Tit�e: Airport Security Camera �Gate Access Upgrades Project No: apbd07 Project Type: Non-Capacity ProjectManager. Ingrid Gaub _ __ _ -. Description: Increased security identified by the Federal Aviation Administration and the Tra.nsportation$ecurity Administration for Airport conVol access gates(both vehicle and personnel). This project will install security cameras and replace the obsolete gate , operator access control units. The proposed system will inGude cards and keypad operation with both inbound and outbound trac.king of the authorized tenanUguest. Personnel gates will also have fhe same system. Progress Summary: Future Impact:on Operating Budget: Estimated fo be$2,000 annually to conduct maintenance and repair activities as needed. Activlty: 2018 YE 2019 Year End Funding Sources: Prior to 2018 Estimate 2019 Budget 2020 Bud et Pro ect Total Unrestrictetl Airporf Revenue - - 70,000 - 70,000 Federa/Grant-Unsecured - - - - - State Grant-Unsecured - - - Total Funifing Sources: - - 70,000 - 70,000 Capital Expenditures: Design - - 10,500 - 10,500 Riqht of Way - - - - - Construction - 59,500 - 59,500 Total Expendifures: - - 70,000 - 70,000 Forecasted Project Cost: 7otal 2021 2022 2023 2024 2019•2024 Funding Sources: Unrestricted Aiiport Revenue - - - - 70,000 Fedeial Grant-Unseoured - - - - - State Grant-Unsecured - - - Totat Funding Sources: - - - - T0,000 Capital Expenditures: Design - - - - 10,500 Right of Way - - - - - Construction - - - - 59 500 Totel Expenditures: - - - 70,000 Grant/Other Sources: Project is not AIP Eligible DRAFT AIRPORT FUND (465) Capital Facilities Plan Six Year Capital Facilities Plan,2019-2024 _ _ Enterprise Funds Project Tif�e: Precision Approach Path Indicator(PAPI)for Runway Project No: Cpxxxx. Project Type: Non-CapaCity Project Manager: Ingrid Gaub Description: - _. -_ Install Precision Approach Path Indicator(PAPI)for Runway to replace aging Visual Approach Slope Indicator(VASI)system. _ _ _ Progress Summary: Future Impacton Operating Budget: $2,000 annually for on-going maintenance and repair Activityc 2018 YE 2019 Year End Funding Sources; Prior to 2018 Estimate 2019 Bud et 2020 Bud et Pro ect Total Unrestricted Airport Revenue - - - - - Federal Grant-Unsecur�d - - - State Grant-Unsecured - Total Funding Sources: - - • - - Capi�l Expenditures: Design - - - - - Right of Way - - - - - Construction Total Expenditures: - - - - - Forecasted Project Costc Totai 2021 2022 2023 2024 2019-2024 Funding Sources: - Unrestricted AirPorf Revenue - 168,000 - 168,000 Federal-Non-Primary Entitlement - - - - Federal Grant-Unsecured - - - • - State Grant-Unsecured - - - Totel Funding Sources: - 168,000 - - 168,000 Capital Expendifures: Design - 33,600 - - 33,600 Right of Way - - - - Construction 134,A00._ 134 400 _._ _ Total Expenditures: - 768,000 - - - -168;000 Grants 7 Other Sources: DRAFT AIRPORT FUND (465) Capital Facllities Plan Six Year Capital Facilities Plan,2019-2024 Enterprise Funds _ _ _ ____ _ Projec#Ti#le: Land Acquisition for Future Approaches Projest No: ms1811, cpxxxx Project Type: NOn-Capacity Project Manager: Seth WiCkst�Om Descrlptions Acquire a portion of land at the current Park and Ridefor addressingthe Runway Safety Area(RSA)and acquire the remainder of the Park and Ride for addressing the Runway Protection Zone(RPZ). Progress Su:mmary: Per di'scussions with FAA,the acquisition for the RSA was moved from 2021 to 2018 and the acquisition for the RPZ area was added to 2021. Budget has been adjusted to account for the anticipated funding plan identified by FAA for Design and Construction of the project pe�their letter of April 17,2017. Futu:re Impact on Operating Budget: None Activity: � 2018 YE 2019 Year End Funding Sources: Prior to2018_ Estimate 2019 Budget 2020 Budget Pro ect Total Unrestricted Airpo�t Revenue - 27,800 - - 27,800 Federal-Non-Pnmary Entit/ement - - - - - Feileral Grant-Un.secured - 540,000 - - 500,000 StateGrant-Unsecured - 27,800 - 27,800 Total Funding Sources: - 555,600 - - 555,600 Capital Expenditures; Design - - - Acquisition - 555,600 555,600 Construction Total Expenditures: - 555,600 - - 555,600 Forecasted Project Cost: Total 2021 2022 2023 2024 2019-2024 Funding Sources: Unrestricted AirpoR Revenue - 183,400 - - 183,400 Federal-Non-Primary Entit/ement - 300,000 - - 300,000 Federa/Grant-Unsecured - 3,000,000 - - 3,000,000 Stafe Grant-Unsecured - 183 300 . 183 300 Total Funding Sources: - 3,666,T00 - - 3,666;700 Capital Expenditures: Design - - - - - Acquisition - 3,666,700 - 3,666,700 Construction - - - _ _ _ _ Total Ezpenditures: _- 3,666;700 - - 3,666;700 Grants/Other Sources: Federal Aviation Administration and Washington State Department of Transportation _ _ _ _ D RAFI" AIRPORT FUND (465) �ap�ta�Facttities P�an Six Year Capital Facilities Plan,2019-2024 Enterprise Funds Project Title: Runway RSA Improvements Project No: Cpxxxx Project Type: NOn-CepaClty Project Manager: Ingrid Gaub Description: This project will complete necessary improvements to the property purchased from the Park and Ride to be in compliance with the FAA requirements for the Runway Safety Area. Progress Summary: Future Impact on Operating Budget: --- - - - - _ _ Activity: 201 B YE 2019 Year End Funding Sources: Prior to 2017 E§timate 2019 Bud et 2020 Bud et Pro"ecfTotal Unrestricted Airport Revenue - - - 25,000 - Fealerel-Non-Prirnary Entitlement - - - 150,000 - Federal Grant-Unsecured - - - 300,000 - StateGrant-Unsecured - - - 25,000 - Total Funding Sources: - - - 500,000 - Gapital Expenditures: Design - - - 125,000 - Right of Way - - - - - Consfrucfion - 375,000 Total Expenditures: - - - 500,000 - Forecasted Project Cost: Total 2021 2022 2023 2024 2079-2024 Funding Sources: Unrestricted AirporF Revenue - - - - 25,000 Federal-Non-Primary Entit/ement - - - - 150,000 Federa/Grant-Unsecured - - - - 300,000 State Grant-Unsecured - - 25 000. Total Funding Sources.: - - • 500,000 Capital Expenditures: Des�gn - - - - 125,000 Right of Way - - - - Construction - - - - 375 000 Total Expenditures: - - - - 500,000 G�ants/Otlier Sources: DRAFT AIRPORT FUND (465) Capttal Facilitles Plan Six Year Gapital Facilities Plan,2019-2024 ___ _.. Enterprise F_unds Prqject Title: West Side Fencing Project No: apbd09 Project Type: No11-Capacity Project Manager: Ingfld Gaub Description: _ Install fence on west side of property to complete perimeter security fencing and heip control wildlife on the airport. _ Progress Summary: Future Impact on Operating Budget: Acti�ity: 2018 YE 2019 Year End Funding Sources: Prior to 2018 Estima4e 2019 Bud et 2020 Bud et Pro ectTotal Unrestricted Airport Reyenue - - - 2;700 - - Federa/Grant-Unsecured - - - 47,600 - StafeGrant-Unsecured - 2,600 _ Total Funding Sources: _ - - 52,900 - Capital Expenditures: Design - - - 5,300 - Righf of Way - - - - - Construction - - - 97 600 ___ _ . _ - _ Total Expenditures: - - - 52;9.00 - Forecasted Project Cost: rotal 2021 2022 2023 2024 2019-2024 Funding Sources: Unrestricted Airport Revenue - - - - 2,700 Federa/Grant-Unsecured - - - - 47,60U SYate Grant-Unsecured - - - - 2 600 ToEai Funding Sources: - - - - 52,900 Capital Expendituies: Design - - - - 5,300 Right of Way - - - - - Construction - 47 600 Total Expenditures: - - - - 52,900 Grants/Other Sources` Federal AviaGon Administration and Wasfiington State Departmenf of Transport2tion AIRPORT ADVISORY BOARD-TRACKING i1AATRIX � ;LEAb ��'�PRO:fECI' ��;�,`_ ; ,��?s� CURRENT STATtfS � :x. ' �F,���, ` :,; : x _, � xf :., _� 4.... ..,.., �_ �. , :� . cm � ;;, � � ,_ ,r �: ,�g YYHAT'S�N�X7'= ,, �, � =w;START�= #�3�3,�T��� ��,EST�`}C0�7' �DES�I;RIRTION, z.. ra� �' ��� � y a� ,.,.� � � � � 4 � , .K <`' , �� �� ��� �, � � � � �_. � ��DA�'� GQMP�L.� ,��s���t., � , : " �, ^ €��, '. � � � . _. ` r �� _, ` � �r�._:m _ . ,..., _.. ,P ,,.��� , � ._,. � . �: � .: �?� ,,� s� �� �� �� "���' ,; , . < � ; ; r_ ,.�.a ; � sy_ _ �Di1'�E � •o- ,.�.:U�� Ciry St�ategic Business 'Board reviewed and discussed 2018 only priority maUix Board to continue to review and discuss 2018 only action items: On- On- Action costs will Plan action items at each�Board Meeting in 2098. going going be:identified for each action at tlme of Board effort City Airport Enterprise City CounciC passed 2017-2018 Bienniai Budget and FinanceiDirector Coleman provided City Council an update on the On- On- WA Fund 201&2023 Capital Improvement Program 4"'Quarter'2017 Financials in March:2018;staff provided a copy going going of this re ort to the Board on March 15 2018. City/CW Runway Runway length Justiflcation Discussion with FAA FAA ADO has requested additional evaluation of the proposed 06/2017 1072U18 $333,333 Enhancement continues; however, there are delays due to a runway length. The Cfty continues working with FAA and our ' (90/10) Project—Design disagreementbetween the City and FAA on the Runway designer, Century West; however, additional steps are being Length. taken to elevate this issue. A grant application for additionai funding from the State is in,process and due April 20,2018. ,City Runway Appraisal is complete and Appraisal Review is After appraisal and appraisal review are complete,1he City will �01/2018 12/2018 '; $500,000 Enhancement undenroay for a portion of the Park and.Ride area forthe 'work with FAA to get approval to make an offer for fair market (90/5/5) Project — Property future Runway Safety Area. value. A uisition CitylCW Runway Scheduled to begin this phase in 2019 following the Design phase approval and applying for and obligating State and 10/2018 '10/2019 $1;833,333 Enhancement completion of the.Design Phase. Federal Grant funding in 2019. (90/5/5) P�oject — Construction City/MENG Facility Condition Facility Condition Assessment is complete: Incorporation of this information into the 2019-2020 budget 10/2017 12/2018 $50,000 Assessment process and into the Maiicet Assessment and Long term Rate COMPLETE Stud . City On-going Business Continue to pursue right-of-first refusals on ALP Work with Economic Development staff on targeted marketing On- On- TBD Develo menf identified a uisition arcels efforts oin oi 4/12/2018 1 AIRPORT ADVISORY BOARD-TRACKING NiATRIX � : . . w AAB PrfOrity '� �#�RA, `Goat:�� �� ,Key,Restih A a�G:'' � ;�t�ad��s9i ���. y- ,;�,: �H- ,::• �� N� �,::, y�. �� -� ., ,.::� : ...�,, '; �, z �,�... � ';� , I��t�si#i�teDasc�iption :,, ..� �'it�! :Goiii letic� : ��Rsnkln �.:=its �',� �.. < (A�t;fnPcw - �° �, € �'! _. ,� '��a .,.., 2 �i�-.. _ F, . ��.. ..�i -�. � ��.�-. , ,��,:�.. . . : : , �;; `"��... � '..,,�� .�"��.. ' D���. ��`� ';; � ..,. �.� w,. � A 1 1 5 Develop and implement a Jet-A- Comm.Dev.8 Based on interest from the Board and other interested parties,the 1�' Temporary-15t Fueftemporary pilot program Public�Works currently adopted Capital Facilities Plan had proposed the quarter quarter 2018 DirectoNCity permanent instailation.of Jet,A-Fuel fuel service.However,because 201�7 (Cascade Engineer of 1:)uncertainimarketmeed and'response to warrant investment;<and License'is 2) highee than anticipated costs, permanent instailation cannot be complete achieved in the near-tertn.Funding for the temporary pilot program 3/2018) has been included in the proposed 2017-2022 City Capital Facilities Permanent-4'" Plan. On September 11, 2017 City Council concurred with the quarter2019 Private Partnership Option and staff are working on the Draft Operating Agreement. License Agreement with Cascade is com lete. 1 2 6 Annual Board Work Plan Airport Advisory Prepare for each calendar year a focused work plan for the Board to Annually Annually Board utilize in agenda setting, coordination with City staff and 12/20/2017 development of policy and fiduciary recommendations to City Council 1—Should be 2 3 Long-Tertn Rate Study Airport Rates charged to tenants and users of the airport are the primary 2^� 4�"quarter 2018 part of market Management funding source for the airport, exduding grants for capital quarter study effort development.To assure that the Airport Enterprise Fund remains 2017 self-sustaining into the future,current and+future rate structures must be evaluated balancing market competkiveness with short-term and long-term airport operation needs:Contract executed and work;has be un. 1 3 Y Competitive Market Assessmenf Comm:Dev.& Engage with a qualified professional with experience in airport 2� 4b quarter Study Public Works market analysis to assess the Airport's current and future sub- quarter 2018 Director regional and regional market positions and identify strategies for 2017 maintaining and enhancing these positions.Contract executed and work has be un. 1 3 2 Recommendations -City's 10- Comm.Dev.& Working with the Boarcl and City Administration; evaluate and On- On-going Year Economic Development Public Works implement recommendatfons of the City's 10-Year Economic going SVate ic Plan Director Develo ment SUate ic Pian. 1 3 6 Airport Growth Areas6 Comm:Dev:& Pursue opportunities for physical growlh of the Airport consistent Ongoing Ongoing Public Works with the approved Airport Master Plan induding but not limited to Director/City Real acquisition of first rights of refusal on potential future acquisition Estate Anal sV ro erties3. ''KRA 1=Airport Capital Improvement Program;KRA-2=Airport Operations;KRA-3=Economic Development z Please note that actions thet start in 2017 and extend into 2018 are listed. 3�Please note that the timeframes shovm for this Goal are aspiretional.The ability to achieve them in the timeframes stated are influenced by market factors beyond the City's direct control,As such,this Goal.may not be achieved.in;the:specified timeframe,however,the City will pursue all reasonable and appropriate actions to do so. 4/12/2018 2 AIRPORT ADVISORY BOARD—TRACKING MIATRIX � o . �-AAe F�[io ^;K1�A �; x � �•.- .�t ,y,�.,�,� � �'M �,��✓ �.��s, .� ��,r� '�, , �c�al� � Key�Result Ar�a��aals� Lea�, ;� ✓�, � Na,`rrativs,Qesc on" r� � � �Sta �< Ga�ii�ti�� 'p�, n. '.. �� ,A«� .,`,� fr�i� : 4 /�z y ' � �� .;� (�/�p�� �;v��..� nY �. , ;�.: , . ;���,�i�� : .,'. ..;/ii ^IS'�[i[1v��:MVt 4!G 9 �. �, tF ��//��.�', � ��; �,'/i,'�. ..�� ". . •W� ': � . � , .N -: � ,._ � " � . , .. ' ' ...,>. ...,:.. , �,• t 5,,. , .,,.,�� . :': 3 .:;.,,. /...;, t,..:: ":.. . , : � n:��. ,_�'",��' . , .... , , ,. „ �. .. .., . ....,� „ . ,.. ; .. :-�. 1 3 5 Current Development Sites Comm Dev.& Market and lease the two on-airport development sites approved in Ongoing Ongoing Marketing5 Public Works the approved Airport Master Plan to prospective tenants and Director/City Real developers6 Estate AnalysUAirport Mana ement 2 2 2 Annual'Tenant Survey Airport Rrepare, transmiY and analyze with the ,Board an annual tenant 'Annually Annually Management survey.The ques6ons will be developed+in consuftation with the Board Juy 19;2017 and tenant feedback will be shared wRh the Board for potential immediate action; ff appropriate or incorporation into the Strategic Business Plan 2 2 8 Long-Term Airport Management Comm.Dev.& Evaluate with Board;:City Council,City Administration and appropriate 78� 2�quarter Strategy Public Works stakeholders aiong-term airportmanagement strategy '�quarter 2018 Director Antici ate be innin �Board Discussion on this soon. 2017 2 7 9 Airport Marketing Flan Comm:Dev.& Prepare a comprehensive marlceting plan. that will act as a �3�' 2nd quarter Public Works communication.and implementation tool that can be used to achieve 'quarter 2018 Director the goals established for the Airport.The Plan will.utilize the Five Ps 2077 (Product,Price,Placement,Promoiion,and People)that focus omihe oints of view of the Ai ort's tar t.audiences. 2 3 3 Airport Zoning Regulations Update Comm.Dev.& Coordinate with City's Community Development Service Area to 18� 1�quarter Public Works assess and potentially implement new zoning regulations quarter 2019 Ditector amendments to cuRent City of Aubum zoning standards.for the 2018 Airport and surrounding:propertles to address operational needs or requirements and support current and future economic development efforts. 3 1 6 Wildlife Hazard Management Plan Comm.Dev.& Pec the 2015 Wildlife Hazard Management Plan, obtain a.scope of 2nd 4�h quarter Implementation Public Works work and budget, modify Capital Facilities Plan, obtain required quarter 2018 Director/City permits and approvais and conduct recommended tree removal 2017 Engineer activities. Century West is currently reviewing the Plan and wili prepare a technical memorandum to City staff recommending key neM ste s. 'KRA 1=Airport Capital Improvement Program;KRA-2=Airport Operations;KRA-3=�Economic Development 5 Please note that actions that start in 2017 and extend i�to2018 are listed: e Please rrote that the timeframes shown for this Goaf are-aspirational.The ability to achieve them in the timeframes stated are influenced by market fadors beyond the City's difect control.As such,ttiis Goal may not be achieved in the specified timeframe,however,the-City will pursue alPreasonable and appropriate actions to do so. 4/12/2018 3 AIRPORT ADVISORY BOARD—TRACKING 11flATRIX � : o 0 »" PnoCity � �CRA�� ."l�oal��, � ; Key Resutf./liea�GOa�ts '�„'' �;�I.�a+� �,� ;�� � ,,,��;�N81T�tive pescri' itlt � �,' %Ra�►ki,.,., ; ;% °Ref��e .= �� � � '�(fkt�it Irr; ,� r ' s� ''' r � �� � P� � �� � �� � �D�q�' �. � s� �. � ��.�� /��' � y j � z', k� x.. �, i„ ,. s . , ,. �. . , ,,, ; d, �. �..,,; 3 . 3' 2 5 Board Composition Review Airport Advisory Conduct a rewew of ihe current composition and focuses of the Annually Annually Board Airport Advisory Board to determine potenGal for recommended code 12/20/2017 changes.Areas of interest could inGude but are not limfted to current numberof authorizediboard members�and s ecific Board focuses Purposely IeR 1 1 Annual Capital Improvement Airport Advisory The Cityis required by the Federal Aviation Administration(FAAj and' Annually Annually blank—being ProgramReview Board the Washington State Department of Transportation-Aviation 9/Z0/2017 done or to be Division.(WSDOT-Aviation) to annually submit an updated Capftal done Improvement Program(CIP).The CIP forms the basis for potential state and federal funding; for airport capital improvements. In coordination with City staff,the Boarci will annually review and advise on the required update to the Capital Improvement:Program required prior to its submittal.Reviewed�with the Board at its 09/20/17 regular meeti Purposely left 1 2 Airyort Six-Year Capkal Facilities Comm.'Dev.& The City wil�be updating the Six-Year Capital Facilities Plan for the Bi- 3'�quarter blank—being Plan and 2019-2020 Budget Public Works Airport as part of the 20t9-2020 budget process and develop the Annually 2018 done or to be Director/City proposed•budget forthe Airport for 2019-2020 done En ineer Purposelyiett 2 18 CJnmanned:Aeriaf Vehicle(UA� Innovation& Investigate the potenUal esta6lishment of a UAV training area at the 4�" 2nd quarter bWnk—.being Training Area Technology Airport foruse by City staff for required UAV flight training subject to' quarter 2018 done orto be DepartmenUAirport FAA approval � pp�7 done Mana ement Purposely leit 2 15 Annual Lease Rates Survey& Real Property— Conduct comparison survey and valuation analysis for rates for Annualiy .Annually blank—�befng Anatysis Mayor's Open T and Closed Hangars,Tie-Downs. 8/23/2077 done orto be Office/Airport done Mana ement Purposelyleit 2 13 Aviation Day Airport Develop a plan for establishment of a free 1-day Aviation Day that is Annuaily Annualiy(first blank—:being Management open to the public and will ptovide up-close viewing of aircraft, (first evenbin.20t8) done orto be aviation exhibits,Kids Zone,food trucks,and more.Pursue sponsors event in done to cover 100 perceM of event cost 2018) Target SepG 2018 4N2/2018 4