Loading...
HomeMy WebLinkAbout02-19-2020 Hearing Examiner Agenda HEARING EXAMINER February 19, 2020 5:30 p.m. City Council Chambers 25 West Main Street I. Case No: CUP19-0003 Applicant(s): Phil Wood Dermody Properties (Contract Owner) 11900 NE 1st Street Suite 300 Bellevue, WA 98005 Agent: Howard Jeng, Project Manager Nelson Worldwide 1200 5th Ave., Suite 1300 Seattle, WA 98101 Property Owner: Mark A. Segale, President Auburn 8th Street LLC PO BOX 88028 Tukwila, WA 98138 Request: Request for a Conditional Use Permit to construct two warehouses totaling approx. 330,000 sq. ft. on an approx. 11.72-acre site within the M-2, Heavy Industrial zoning district. Project Location: The project site is located at 901 C St. SW, on the West side of C St. SW, approximately 400 feet north of the intersection with 15th St. SW. see Vicinity Map, Exhibit 2. Parcel Number(s): King Co. Parcel Nos. 242104-9001 and 242104- 9054. AGENDA BILL APPROVAL FORM HEARING EXAMINER Agenda Subject/Title: File No. CUP19-0003 Conditional Use Permit Application for LogistiCenter at Auburn Date: February 5, 2020 Department: Community Development DESCRIPTION: Request for a Conditional Use Permit to construct two warehouses totaling approx. 330,000 sq. ft. on an approx. 11.72-acre site within the M-2, Heavy Industrial zoning district. ADMINISTRATIVE RECOMMENDATION: Hearing Examiner to conduct a public hearing and approve the requested Conditional Use Permit, with conditions. BACKGROUND SUMMARY: Dermody Properties has requested a Conditional Use Permit (CUP) to construct two new single- story speculative warehouse buildings on an approximately 11.72 acre property composed of two parcels located within the M-2, Heavy Industrial zoning district. The proposed buildings are approximately 157,400 sq. ft. and 172,500 sq. ft. LOCATION: The project site is located at 901 C St. SW, on the West side of C St. SW , approximately 400 feet North of the intersection with 15th St. SW. see Vicinity Map, Exhibit 2. King Co. Parcel Nos. 242104-9001 and 242104-9054. STAFF: Jeremy Hammar, Planner APPLICANT: Phil Wood Dermody Properties (Contract Owner) 11900 NE 1st Street Suite 300 Bellevue, WA 98005 AGENT: Howard Jeng, Project Manager Nelson Worldwide 1200 5th Ave., Suite 1300 Seattle, WA 98101 1 of 111 PROPERTY OWNER: Mark A. Segale, President Auburn 8th Street LLC PO Box 88028 Tukwila, WA 98138 SEPA STATUS: A SEPA Determination of Non-Significance (DNS) was issued on January 30, 2020 with a comment period ending February 14, 2020. As of the date of this Staff Report. No comments have been submitted in response to the required public notice. If any comments are received prior to the public hearing they will be submitted as an additional exhibit. FINDINGS OF FACT: 1.Howard Jeng, Project Manager, of Nelson Worldwide on behalf of Phil Wood of Dermody Properties, (Applicant) submitted an application for a Conditional Use Permit (CUP) on October 18, 2019. The CUP application is for construction of two speculative warehouses in the M-2, Heavy Industrial zoning district. Future tenant or tenants are not identified. 2.The site is located at 901 C St. SW . The main part of the site is located approximately 630 feet west of C St. SW except for a pipe stem portion of the lot that extends diagonally to C St SW. The site is flat, approximately 11.72 acres in size and roughly square in shape with a missing SE corner 3.The site is currently vacant except for a wetland area and associated buffer and a separate temporary storm pond near the northwest corner. The site has been previously filled and graded as authorized by City permit. 4.While the Site is referred to as “901 C St SW”, the Site does not border the north-south aligned C St. SW. Instead, it has two access points to public streets. The southeast corner of the site has a diagonal pipe stem portion of the lot, leading to C St. SW. Also, the northeast corner of the site borders the cul-de-sac of the east-west aligned 8th St. SW , extending west from C St. SW. 5.The area surrounding the site is summarized in the following table: Comprehensive Plan Designation Zoning Classification Current Land Use Project Site Heavy Industrial M-2, Heavy Industrial Vacant North Light Industrial M-1, Light Industrial Warehouse and hotel South Heavy Industrial M-2, Heavy Industrial Vacant Warehouse/ COA M&O Facility with 2 of 111 school bus facility and park beyond East Heavy Commercial C-3, Heavy Commercial Logistics Facility West Heavy Industrial M-2 Heavy Industrial Zone Railroad & Interurban Trail with Shopping mall beyond 6.The City’s land use regulations and zoning development standards are contained in Chapter 18.23 ACC (Commercial and Industrial Zones). Per ACC Table 18.23.030, “warehousing and distribution” uses within the M-2 zone require issuance of a CUP. There is not a specific definition within the City’s code for “warehousing and distribution”. The proposed development configuration consists of a 157,400 sq. ft. building in the north half of the site (Building A) and a 172,500 sq. ft. building in the south half of the site (Building B) with a central truck court, in between. The facing walls on each side of the central truck court contain a row of dock height doors. There are a total of 63 dock doors. By the relative building sizes compared to the number of loading docks, the project does not meet the definition of “motor freight terminal” (ACC 18.04.635) which is characterized by “. . .more than one dock per 5,000 square feet of warehouse, storage, or related use and used for either (A) the loading, unloading, dispensing, receiving, interchanging, gathering, or otherwise physically handling freight for shipment. . .” A “motor freight terminal “is not a permitted use in the M-2 zone. 7.ACC 18.57.020(C)(1) includes additional development standards for warehousing and distribution uses as follows: “a. Motor freight transportation is permitted but only as an incidental use to the principal use of the property. b.Loading and unloading docks shall not be visible from the street. If this requirement cannot be met, an additional 10-foot width of landscaping along the abutting street, meeting the provisions of ACC 18.50.040(C) (Landscape Design and Planting Requirements), is required. c.All odors, noise, vibrations, heat, glare, or other emissions shall be controlled within the confines of a building unless specifically permitted elsewhere by this title. d.No on-site hazardous substance processing and handling, or hazardous waste treatment and storage facilities, shall be permitted, unless clearly incidental and secondary to a permitted use. On-site hazardous waste treatment and storage facilities shall be subject to the state siting criteria (Chapter 70.105 RCW).” 8.Per ACC 18.02.030(A), the intent of Title 18 ACC ‘Zoning’, is to: “…implement the City’s Comprehensive Plan. This title will be used to further the growth and development of the City consistent with the adopted Comprehensive Plan and its 3 of 111 implementing elements. This title will also further the purpose of promoting the health, safety, morals, convenience, comfort, prosperity, and general welfare of the City’s population and to prevent and abate public nuisances.” 9. In accordance with ACC 18.64.010 the intent of the Conditional Use (land use) Permit application, is: “A. It is the intent of this chapter to provide a process to allow for uses that are not permitted outright within a zone. Such uses typically require a special degree of control to make sure that they are consistent with the intent of the zone and compatible with other existing and permitted uses within the zone. Only those uses listed as requiring either an administrative or conditional use permit within a particular zone qualify for this process. The planning director or designee may determine that other similar uses which are not listed may also qualify for this process. This process shall not replace the variance procedure in Chapter 18.70 ACC or be used to permit uses that are prohibited within the zone.” “C. Uses subject to conditional use approval are those uses that typically have a greater intensity and/or potential for impacts to surrounding properties, and/or special characteristics that may not generally be appropriate as a use permitted outright within a zone, but may be permitted subject to review by the hearing examiner to establish conditions to protect public health, safety and welfare, and to assure compatibility with other uses in the zone.” 10. Per ACC 18.23.020(I) the stated intent of the M-2 zone is to: “…accommodate a broad range of manufacturing and industrial uses. Permitted activity may vary from medium to higher intensity uses that involve the manufacture, fabrication, assembly, or processing of raw and/or finished materials. Heavy industrial uses should not be located near residential development. While other uses may be sited within this zone, permits for such uses should not be issued if such uses will discourage use of adjacent sites for heavy industry, interrupt the continuity of industrial sites, or produce traffic in conflict with the industrial uses” 11. The City’s Comprehensive Plan describes the “Heavy Industrial” land use designation as: “This designation allows the full range of industrial uses, as well as certain heavy commercial uses that serve the needs of workers in light industries are also appropriate.” 12. A Notice of Application (NOA) and Notice of Public Hearing (NOH) was issued on January 30, 2020. No written comments were received on the NOA and NOH as of the date of this Staff Report. 13. A SEPA Determination of Non-Significance (DNS) and revised NOH was issued on January 30, 2020. No written comments were received as of the date of this Staff Report. 4 of 111 14. Per ACC 18.64.020(B) the City of Auburn Hearing Examiner is authorized to conduct a public hearing and render a final decision for the requested CUP. The Hearing Examiner’s decision is appealable to King Co. Superior Court. 15. Per ACC 18.64.030(C) a site plan that includes the details set forth in ACC 18.64.035(A) is required and shall be made a part of the final decision per ACC 18.64.035(B). This site plan is included as Exhibit 3. 16. The Applicant has provided a narrative of the project and how it conforms to the CUP approval criteria as Exhibit 4. CONCLUSIONS: ACC 18.64.040 contains the criteria for approval of a Conditional Use Permit. The following is a staff analysis of this Conditional Use Permit application’s compliance with each criterion. The criteria are listed below in italics, followed by a staff analysis. A. The use will not have a substantively greater adverse effect on the health, safety, or comfort of persons living or working in the area and will not be substantively more injurious, economically or otherwise, to property or improvements in the surrounding area than would any use generally permitted in the district. Among matters to be considered are traffic flow and control, access to and circulation within the property, off- street parking and loading, refuse and service area, utilities, screening and buffering, signs, yards and other open spaces, height, bulk, and location of structures, location of proposed open space uses, hours and manner of operation, and noise, lights, dust, odor, fumes and vibration; Staff Analysis: ’C’ St. SW is designated a principal arterial and also a local truck route within the City’s Comprehensive Transportation Plan. Access to the site will be provided by driveways on ‘C’ St. SW and 8th St. SW (connects directly to ‘C’ St. SE) to meet International Fire Code (IFC) requirements for access. The ‘C’ St SW driveway will be restricted to right-in, right-out while the 8th St SW driveway will be full access. Trip generation and Levels of Service (LOS) is included in the Traffic Impact Analysis (TIA) (Exhibit 7) and indicates that off-site intersections included in the study (as coordinated with the City’s Senior Traffic Engineer) will continue to operate at an LOS C or better. No additional traffic mitigation measures are necessitated. Refuse and service areas will be located internal to the site and adequately screened with fencing and vegetation, consistent with ACC 18.50.040(5)(a). Utility facility locations (e.g. PSE) are not known at this time, however, will be coordinated with the site landscaping to ensure they are adequately screened, as conditioned below. A minimum of 10% of the site must be in landscaping, consistent with Zoning Code Standards of Chapter 18.50 ACC. 5 of 111 The location of this facility and enclosed nature of the facility does not currently lend itself to limiting the hours and manners of operation as it is not located near any noise-sensitive uses, such as residential. The closest noise sensitive use is a hotel located approximately 315 feet from the northwest corner of the Site. According to the TIA (Exhibit #7) the proposed project is estimated to generate 567 weekday daily trips, with 65 trips occurring during the weekday AM peak hour (50 entering, 15 exiting), and 67 trips occurring during the weekday PM peak hour (18 entering, 49 exiting) while this is based on a speculative tenant, the exact numbers are not known at this time, there could be and potential impacts to roadways with the increase of truck traffic during events at the Outlet Collection (shopping mall) such as during the holidays, sports tournaments (at Fieldhouse USA (indoor sports field complex), currently under construction in the former Sam’s Club tenant space at the mall), and other events (such as carnivals). Such impacts would be temporary. Payment of the City of Auburn transportation impact fee will mitigate permanent project-related transportation impacts of the proposed 330,000 sq. ft. warehouse. All industrial facilities are subject to ACC 18.31.180, ‘Performance Standards’; as such, the proposed use would meet the limits for noise, odors, etc. listed in this Code section. The Applicant provided the following response for this criterion: “The use will not have substantively greater adverse effect on the health, safety or comfort of persons living or working in the area. The use for this site will maintain the same use. The site is isolated and there is no direct street frontage except for the ingress/egress points. The site is bounded by railroad track and the Interurban Trail on the west, by an Industrial service center on the east, by an industrial warehouse facility to the north, and by a vacant industrial site to the south. Since the site is undeveloped, this development will bring jobs to this area and better the economy.” B. The proposal is in accordance with the goals, policies, and objectives of the comprehensive plan; Staff Analysis: The site has a Comprehensive Plan (Comp Plan) Land Use Designation of “Heavy Industrial” which includes the following policies (from Volume 1, Land Use Element): “LU-85 – While this zone should be reserved primarily for the heavier forms of industrial activities, a wide range of industrial activities may be permitted. These heavier forms of industrial activities may include outdoor or semi-enclosed manufacturing, processing, or assembling activities, significant outdoor storage, and uses involving substantial storage or processing of hazardous materials. Heavy commercial uses that serve the needs of workers in heavy industries are also appropriate.” 6 of 111 This policy expresses a desire on the part of the City to reserve appropriate areas for heavier industrial uses that are more difficult to site due to compatibility. However, the policy also says a wide range of uses may be permitted. Based on this policy, “warehousing” could be considered within the realm of “…a wide range of industrial activities…” and thus is not contrary to this policy. The exact user at this time is unknown, however, a warehousing/distribution use is anticipated and future tenants must meet City use regulations “LU-86 – Parking lots must be located and designed in a manner that softens their appearance from adjacent public roads. This is accomplished through landscaping, pedestrian spaces, and the location of buildings on the property. Where practicable, low-impact development techniques and landscaping should be used to promote on site stormwater infiltration and shading of hard surfaces. Minimum and maximum parking ratios must be established for each type of permitted use.” Parking areas are shown to be on all four sides of the buildings with the semi-truck parking located along the west side of Building A and the southeastern side of the property (See Exhibit 3). Landscaping is required (ACC Table 18.50.040(A)) and proposed on perimeter areas of the property and between the on-site parking stalls. Per ACC 18.57.020(C)(1)(b) any dock doors shall either not be visible from the street, or an additional 10 ft. of landscaping abutting the street is required. A perspective view drawing will be required along with future submittals to ensure this requirement is met, as conditioned below. “LU-88 – Where a heavy industrial use is located adjacent to a property with a less intense zoning designation, the heavy industrial use bears the burden of incorporating techniques that mitigate the visual, noise, dust, and odor impacts.” The property to the east (Marmon Keystone, a logistics facility) is zoned as C-3, Heavy Commercial, a less intense zoning district, however, there are not any identified impacts to this adjacent site from the proposed warehouse. Volume 5, the Transportation Element, of the Comprehensive Plan lists ‘C’ St. SW as part of the truck route. ‘C’ St. SW is a direct connection to SR 18 and connects to SR 167 (via 15th Ave SW ). ‘C’ St. SW is also designated as a “Principal Arterial” per Volume 5. Volume 5 also contains the Policies for freight movement within the City. In general, the policies listed are to ensure the Objective of facilitating freight movement through the City while limiting adverse impacts to traffic. The following Policies are applicable to the requested CUP: “Freight-01 – The movement of freight and goods is recognized as an important component of Auburn’s transportation system.” “Freight-02 – The movement of freight and goods which serve largely national, state, or regional needs should take place in such a way so that the impacts on the local transportation system are minimized. These movements should take 7 of 111 place primarily on state highways, Interstates, or on grade-separated rail corridors in order to minimize the local impacts.” Having the potential warehouse located on a Principal Arterial designated road which is also part of the City’s truck route assists in limiting impacts to lesser classifications of public streets. ‘C’ St. SW provides direct access to SR 167 (via 15th St SW). An exact user is not known at this time, hence, the destination of freight is also not known but can be anticipated to likely use the state highways. Truck traffic within the City is subject to ACC 9.90.020 ‘Truck route designation and restrictions’ which is appropriate for trips with origins and destinations outside the city and subject to vehicle weight restrictions. ‘C’ St. SW currently contains a mixture of vehicle types and trip purposes. The arterial street is characterized by a mixture of employee traffic to the Boeing aircraft manufacturing plant and other industrial uses developed on its grounds. The street also contains platoons of schools buses with the nearby school bus facility arriving and departing to coincide with school hours. Added to this traffic stream is retail consumers visiting the nearby retail shopping center and future indoor sports fields venue. This consumer traffic can include a proportion of out-of-town travelers. Volume 6, the Economic Development Element, includes information relating to the State’s adoption in 2008 of the “streamlined sales tax” (SST) which provides sales tax revenue to jurisdictions that have an abundance of warehousing and distribution uses to offset the change to a destination-based sales tax system. The SST was initially not included to be extended in the State’s budget after this year, however, has been extended until 2021. The future fate of this funding source is unknown but has been subject to repeated threat of expiration. Volume 6 contains the following policies relating to warehousing: “ED-15 – Warehouse and distribution land uses are not preferred long-term economic development and land use priorities for industrially zoned areas of the City, due to: the loss of sales tax revenue associated with the State’s implementation of streamlined sales tax legislation in 2008; no substantive contribution to an increase in per capita income for Auburn residents; no reduction in the tax burden of Auburn residents; low employment densities, lower property values; and land use inefficiencies.” “ED-16 – Increasing the utilization of land for manufacturing and industrial land uses should be the City’s preferred economic development and land use priority for industrially zoned areas of the City that are currently dominated by warehouse and distribution land uses. The City should promote and create incentives for new manufacturing and light industrial uses, and for the gradual conversion of existing warehouse and distribution land uses to manufacturing and sales tax generating land uses.” These policies indicate that for economic purposes, warehousing and distribution are more of an economic burden on the City than a preferred land use. 8 of 111 Limited information was provided by the Applicant in regards to potential economic impacts on the City. The information that was provided was vague and does not appear to address the concerns raised by these Economic Development policies. The Applicant provided the following response for this criterion: “The proposed project is in accordance with the goals, policies and objectives of the comprehensive plan. The new buildings will sit away from the streets and the truck court will face each other to minimize visibility from the streets. Although some trailer storage will be located onsite, it will be located further away from the main road and will be screen by adjacent property’s building from the right of way. This new building will attract new and economic forward-thinking tenants that will diversify the economy, which in terms will have job growth. The new building will revitalize the undeveloped site by creating modern industrial buildings that consist of concrete tilt-up walls with reveals to create interesting lines and storefront office nodes that will create an inviting look at the building corners.” Staff finds that the project is both consistent with, and not consistent with, this criterion. C. The proposal complies with all requirements of this title; Staff Analysis: The project, as proposed, will meet development standards relating to setbacks, height, landscaping, and parking consistent with the requirements for a warehouse within the M-2 zone. The Applicant provided the following response for this criterion: “The proposed project complies with all requirements of this title for the conditional use permit.” If this request for a CUP is granted, the project will require subsequent applications to the City; through review and approval of these applications, the City can ensure consistency with requirements of Title 18 ACC ‘Zoning’. One of the applications will be a boundary line elimination to combine parcels and avoid property lines through buildings. If this request for a CUP is granted, the project will be consistent with Title 18 ACC ‘Zoning’ and thus this criterion. D. The proposal can be constructed and maintained so as to be harmonious and appropriate in design, character, and appearance with the existing or intended character of the general vicinity; Staff Analysis: The proposed site / landscaping plans and building elevations are included as Exhibit 3. As proposed, the project appears to not be physically out of character with other uses and properties in the general vicinity. As noted in the table above under ‘Findings of Fact’ No. 4, the surroundings have a wide variety of uses from warehouse and logistics related uses to the City’s Maintenance & Operations facility. 9 of 111 Other uses in the vicinity have an even wider range from baseball fields and the Outlet Collection shopping center to warehouses and wholesalers. The intent of the M-2 zone is included as ‘Findings of Fact’ No. 9, above. In general the proposed warehouse use appears to meet the intent of the M-2 zone as it would be included within the term “industrial uses” and would not interrupt other nearby industrial uses or the traffic associated with industrial uses as the site is located on a City- identified truck route. The Applicant provided the following response for this criterion: “The proposed project can be constructed and maintained to be harmonious and appropriate in design, character, and appearance with the general vicinity. The design is parallel to similar newer industrial building around the vicinity and will harmonize the industrial area.” Staff finds the request meets this criterion. E. The proposal will be supported by adequate public facilities and services and will not adversely affect the public infrastructure; Staff Analysis: Adequate public facilities are available or will be made available for the project including water, sewer, storm, and other utilities. Also, and as discussed above, the site is located on a truck route and therefore should not adversely affect public roads or traffic circulation. The Applicant provided the following response for this criterion: “The proposed project will be supported by adequate public facilities and services and will not adversely affect the public infrastructure. The existing accessible public sidewalk on 8th Street SW will lead to the existing public right away on C Street SW, which will have access to public transit at the corner of 8th Street SW and C Street SW.” Staff finds the request meets this criterion. F. The proposal will not cause or create a public nuisance; Staff Analysis: No impacts relating to air and water pollution, noise, vibration, glare or odor are anticipated and the future use(s) will be required to comply with all applicable City codes, including ACC 18.31.180 ‘Performance Standards’ and Chapter 8.12 ACC ‘Public Nuisances’. The Applicant provided the following response for this criterion: “The proposed project has harmonious design and appearance similar to the adjacent buildings and will not cause or create a public nuisance.” Staff finds the request meets this criterion. 10 of 111 G. The proposal’s impacts can be appropriately mitigated through the application of conditions of approval, as applicable. Staff Analysis: Other than minor landscaping conditions to ensure the site is properly vegetated and screened, no other conditions are proposed. Conditions to satisfy the economic impacts to the City are not likely defensibly quantifiable. The Applicant has not provided any proposal to offset the economic impacts. The Applicant provided the following response for this criterion: “If the review of proposed project is found impactful in any way, it is understood that it can be appropriately mitigated through the application’s condition of approval.” CONDITIONS OF APPROVAL: 1. The site plan that was formally submitted with the Conditional Use Permit Application is hereby incorporated into the decision. Any modifications to the site plan shall meet the following requirements of Chapter 18.64 ACC Minor Adjustments. Minor adjustments to the site plan may be made and approved by the planning director or designee. Minor adjustments are those which may affect the precise dimensions or siting of buildings, but which do not affect the basic character or arrangement of buildings approved, nor the development coverage of the development or the open space requirements. Such dimensional adjustments shall not vary more than 10 percent from the original. Major Adjustments. Major adjustments are those, when determined by the planning director or designee that substantially change the basic design, coverage, open space or other requirements of the permit. When the planning director or designee determines a change constitutes a major adjustment, no building or other permit shall be issued for the use without prior review and approval such adjustment. The submittal requirements, and review and approval process for a major adjustment to the site plan of an approved administrative or conditional use permit shall be substantially the same as that required for the original administrative or conditional use permit. An application for major adjustment meeting the information requirements of ACC 18.64.030 shall be submitted. At the discretion of the planning director or designee, the applicant may be able to resubmit or incorporate by reference some portions of the original administrative or conditional use permit submittal as part of the application for major adjustment; however, the application for major adjustment shall be subject to the same submittal, processing, and findings of fact requirements of this chapter for administrative or conditional use permits, as applicable. 2. All above ground utility facilities shall be visually screened with landscaping that provides year-round screening from the public way, including the Interurban Trail. The 11 of 111 landscaping plans shall propose an approach that can be implemented where above ground utility features cannot be predicted in advance. 3. A submittal such as a perspective-view drawing shall be submitted showing the view from the right-of-way and Interurban Trail to the location of the dock doors on the buildings. This drawing will be used to ensure the project meets ACC 18.57.020(C)(1)(b). ATTACHMENTS: Exhibit 1. Staff Report Exhibit 2. Vicinity Map on 2015 aerial photograph Exhibit 3. Site, Landscaping, and Elevation Plans, prepared by Nelson, 12/4/2019 Exhibit 4. Applicant’s Written Statement for CUP Criteria, prepared by Nelson 9/24/2019. Exhibit 5. Completed Land Use Application Form s Exhibit 6. Notice of Application (NOA), Notice of Public Hearing (NOH), and SEPA DNS Exhibit 7. LogistiCenter at Auburn, Traffic Impact Analysis, prepared by TENW, 11/25/2019 12 of 111 666.7 NAD_1983_StatePlane_Washington_North_FIPS_4601_Feet Feet666.7333.30 1:4,0001in =333 ft 2/3/2020Printed Date: Map Created by City of Auburn eGIS Imagery Date: May 2015 Information shown is for general reference purposes only and does not necessarily represent exact geographic or cartographic data as mapped. The City of Auburn makes no warranty as to its accuracy. 13 of 111 14 of 111 15 of 111 16 of 111 17 of 111 18 of 111 19 of 111 Nelco Architecture, Inc.Phone:Suite 1300Seattle, WA 98101(206) 408-85001200 Fifth Ave.WWW.NELSONWORLDWIDE.COM       LANDSCAPEWBLA, INC.16630 30TH DRIVE SEBOTHELL, WA 98012T: 425.417.4609E-mail:CORKY_B@COMCAST.NETProj. No:Reviewed By:SEAL:CITY STAMP:DERMODY PROPERTIESPA/PM SEGALE901 C STREETAUBURN, WA 9800119.0002758.000 CLIENT:PROJECT:11900 NE 1ST STREET, SUITE 300BELLEVUE, WAS 98005L-1BLDG. ALANDSCAPEPLANLANDSCAPE PLANSCALE: 1" = 30' - 0"20 of 111 Nelco Architecture, Inc.Phone:Suite 1300Seattle, WA 98101(206) 408-85001200 Fifth Ave.WWW.NELSONWORLDWIDE.COM       LANDSCAPEWBLA, INC.16630 30TH DRIVE SEBOTHELL, WA 98012T: 425.417.4609E-mail:CORKY_B@COMCAST.NETProj. No:Reviewed By:SEAL:CITY STAMP:DERMODY PROPERTIESPA/PM SEGALE901 C STREETAUBURN, WA 9800119.0002758.000 CLIENT:PROJECT:11900 NE 1ST STREET, SUITE 300BELLEVUE, WAS 98005L-2BLDG. ALANDSCAPEPLANLANDSCAPE PLANSCALE: 1" = 30' - 0"21 of 111 Nelco Architecture, Inc.Phone:Suite 1300Seattle, WA 98101(206) 408-85001200 Fifth Ave.WWW.NELSONWORLDWIDE.COM       LANDSCAPEWBLA, INC.16630 30TH DRIVE SEBOTHELL, WA 98012T: 425.417.4609E-mail:CORKY_B@COMCAST.NETProj. No:Reviewed By:SEAL:CITY STAMP:DERMODY PROPERTIESPA/PM SEGALE901 C STREETAUBURN, WA 9800119.0002758.000 CLIENT:PROJECT:11900 NE 1ST STREET, SUITE 300BELLEVUE, WAS 98005L-3BLDG. BLANDSCAPEPLANLANDSCAPE PLANSCALE: 1" = 30' - 0"22 of 111 L-4BLDG. BLANDSCAPEPLANNelco Architecture, Inc.Phone:Suite 1300Seattle, WA 98101(206) 408-85001200 Fifth Ave.WWW.NELSONWORLDWIDE.COM       LANDSCAPEWBLA, INC.16630 30TH DRIVE SEBOTHELL, WA 98012T: 425.417.4609E-mail:CORKY_B@COMCAST.NETProj. No:Reviewed By:SEAL:CITY STAMP:DERMODY PROPERTIESPA/PM SEGALE901 C STREETAUBURN, WA 9800119.0002758.000 CLIENT:PROJECT:11900 NE 1ST STREET, SUITE 300BELLEVUE, WAS 98005LANDSCAPE PLAN23 of 111 Interior Design Architecture Branding Workplace Services Consulting Services NELSON 1200 Fifth Avenue # 1300 Seattle, WA 98101 206.408.8500 NELSONonline.com September 24, 2019 Application No. PRE19-0040 Conditional Use Permit Written Statement and Finding of Fact: The site is approximately 815,443 sf (18.72 acres to be confirmed by survey). The site is currently un- developed. Dermody Properties plans to redevelop the site by constructing two buildings. Building A (approx. size 157,400 sf), and Building B (approx. size 172,500 sf) with associated loading/truck yard, parking, landscaping, and storm water detention similar to the attached site plan. Project Description: The existing site has two ingress/egress points. One is in the northeast corner of the site off of 8th Street SW, the other is located in the southeast corner of the site off of C Street SW. The site is isolated and there is no direct street frontage except for the ingress/egress points. The site is bounded by railroad tracks and the Interurban Trail on the west, by a Industrial service center on the east, by an industrial warehouse facility to the north, and by a vacant industrial site to the south. The proposed buildings are approximately 157,400 sf, and 172,500 sf, with a rectangular footprint oriented in the east/west direction with a shared truck court between the two. The buildings will be one story, Type III-B construction, fully sprinklered. While the tenant(s) are not identified at this time, industry norms are generally 93% warehouse and 7% associated office space. The building height will be based upon tenant needs, approximately 38’ to 40’, at most 45’ per the M-2 zoning height allowed. Interior racking and mezzanines will be provided to meet tenant requirements. The south side of Building A has a truck court with approximately 25 truck loading bays facing south. The north side of Building B has a truck yard with approximately 35 loading bays facing north. Parking is located around the remaining sides of the building. Storm water detention and management is provided at the northwest corner of the site. We are showing approximately 3.3% of the site area to be confirmed. There is an existing wetland to the west of building A. Any additional detention requirements would be handled in an underground vault. Finding of Fact: A. The use will not have substantively greater adverse effect on the health, safety or comfort of persons living or working in the area. The use for this site will maintain the same use. The site is isolated and there is no direct street frontage except for the ingress/egress points. The site is bounded by railroad tracks and the Interurban Trail on the west, by an Industrial service center on the east, by an industrial warehouse facility to the north, and by a vacant industrial site to the south. Since the site is undeveloped, this development will bring jobs to this area and better the economy. B. The proposed project is in accordance with the goals, policies and objectives of the comprehensive plan. The new buildings will sit away from the streets and the truck court will face each other to minimize visibility from the streets. Although some trailer storage will be located onsite, it will be located further away from the main road and will be screen by adjacent property’s building from the 24 of 111 Interior Design Architecture Branding Workplace Services Consulting Services NELSON 1200 Fifth Avenue # 1300 Seattle, WA 98101 206.408.8500 NELSONonline.com right of way. This new building will attract new and economic forward-thinking tenants that will diversify the economy, which in terms will have job growth. The new building will revitalize the undeveloped site by creating modern industrial buildings that consist of concrete tilt-up walls with reveals to create interesting lines and storefront office nodes that will create an inviting look at the building corners. C. The proposed project complies with all requirements of this title for the conditional use permit. D. The proposed project can be constructed and maintained to be harmonious and appropriate in design, character, and appearance with the general vicinity. The design is parallel to similar newer industrial building around the vicinity and will harmonize the industrial area. E. The proposed project will be supported by adequate public facilities and services and will not adversely affect the public infrastructure. The existing accessible public sidewalk on 8th Street SW will lead to the existing public right away on C Street SW, which will have access to public transit at the corner of 8th Street SW and C Street SW. F. The proposed project has harmonious design and appearance similar to the adjacent buildings and will not cause or create a public nuisance. G. If the review of proposed project is found impactful in any way, it is understood that it can be appropriately mitigated through the application’s condition of approval. 25 of 111 26 of 111 27 of 111 4 CITY OF AUBURN CONDITIONAL USE PERMIT Planning & Development Department APPLICATION Auburn City Hall Annex, 2nd Floor 1 East Main Street Auburn, WA 98001 Tel: 253.931.3090 Fax: 253.804.3114 permitcenter@auburnwa.gov www.auburnwa.gov CONDITIONAL USE PERMIT APPLICATION – CONCURRENT APPLICATIONS Please indicate whether you are submitting one or more concurrent applications with this application by checking one or more of the boxes below: Type I Applications (administrative decisions made by the City which are not subject to environmental review under the State Environmental Policy Act [SEPA]):  Administrative Use Permit  Boundary Line Adjustment  Boundary Line Elimination  Building Permit  Excavation Permit  Floodplain Development Permit  Grading Permit  Home Occupation Permit  Land Clearing Permit  Mechanical Permit  Plumbing Permit  Public Facility Extension Agreement  Right-of-way Use Permit  Short Subdivision  Special Permit  Temporary Use Permit (administrative)  Utility Permit Type II Applications (administrative decisions made by the City which include threshold determinations under SEPA):  Administrative Use Permit  Building Permit  Floodplain Development Permit  Grading Permit  Land Clearing Permit  Public Facility Extension Agreement  Short Subdivision Type III Applications (quasi-judicial final decisions made by the hearing examiner following a recommendation by staff):  Conditional Use Permit  Preliminary Plat  Special Exceptions  Special Home Occupation Permit  Substantial Shoreline Development Permit  Surface Mining Permit  Temporary Use Permit  Variance Type IV Applications (quasi- judicial decisions made by the City Council following a recommendation by the hearing examiner):  Rezone (site-specific) OTHER - as may apply:  __________________  __________________ 28 of 111 NOTICE OF APPLICATION (NOA) NOTICE OF PUBLIC HEARING (NOH) and DETERMINATION OF NON-SIGNIFICANCE (DNS) Logisticenter at Auburn SEP19-0031 / CUP19-0003 The City of Auburn is issuing a Notice of Application (NOA), Notice of Public Hearing (NOH), and Determination of Non-Significance (DNS) for the following described project. The permit applications and listed studies may be reviewed at the Auburn Department of Community Development at 1 E Main St., 2nd Floor, Customer Service Center, Auburn, WA 98001. Proposal: Request for a Conditional Use Permit (CUP) for 2 warehouses on a site within the M-2, Heavy Industrial zoning district. The proposed buildings are approximately 157,400 sq. ft. and 172,500 sq. ft. in size. Location: 901 C st., see Vicinity Map below. King Co. Parcel No. 242104-9001 and 242104-9054. Notice of Application: January 30, 2020 Application Complete: January 21, 2020 Permit Application: October 18, 2019 File Nos. SEP19-0031 CUP19-0003 Owner: Auburn 8th Street LLC PO Box 88028 Tukwila, WA 98138 Applicant: Dermody Properties 11900 NE 1st Street Suite 300 Bellevue, WA 98005 Applicant’s Representative: Howard Jeng Nelson Worldwide 1200 5th Ave Suite 1300 Seattle, WA 98101 Studies/Plans Submitted With Application:  Preliminary Civil Plans (1/17/2020)  Geotechnical Report (1/17/2020)  Traffic Impact Analysis (1/17/2020)  SEPA Checklist (12/4/2019) 29 of 111 Other Permits, Plans, and Approvals Needed: Building and Civil Permits Statement of Consistency and List of Applicable Development Regulations: This proposal is subject to and shall be consistent with the Auburn City Code, Comprehensive Plan, and Public Works Design and Construction Standards. Lead Agency: City of Auburn The lead agency for this proposal has determined that it does not have probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. Public Comment Period: This may be your only opportunity to comment on the environmental impact of the proposal. All persons may comment on this application. This DNS is issued under WAC 197-11-340(2); the lead agency will not act on this proposal for 15 days from the date issued below. Comments must be in writing and submitted by 5:00 p.m. on February 14, 2020 to the mailing address of 25 W Main St., Auburn, WA, 98001 or to the email address below. Any person wishing to become a party of record, shall include in their comments that they wish to receive notice of and participate in any hearings, if relevant, and request a copy of decisions once made. Any person aggrieved of the City's determination may file an appeal with the Auburn City Clerk at 25 West Main Street, Auburn, WA 98001within 14 days of the close of the comment period, or by 5:00 p.m. on February 28, 2020. Public Hearing: The Hearing Examiner will conduct a public hearing on the Conditional Use Permit in the City Council Chambers, 25 W. Main St., Auburn, WA, 98001, on February 19, 2020 at 5:30 p.m. Any interested person is invited to appear and express comments or opinions on the proposed project. Written comments may be emailed to the contact person below, mailed attention to the contact person below to 25 W. Main St., Auburn WA, 98001, or submitted at the public hearing. For citizens with speech, sight, or hearing disabilities wishing to review documents pertaining to this hearing should contact the person below within 10 calendar days prior to the hearing. Each request will be considered individually according to the type of request, the availability of resources, and the financial ability of the City to provide the requested services or equipment. For questions regarding this project, please contact Jeremy Hammar, Planner, at planning@auburnwa.gov or 253-288-4301. RESPONSIBLE OFFICIAL: Jeff Tate POSITION/TITLE: Director of Community Development ADDRESS: 25 West Main Street Auburn, Washington 98001 253-931-3090 DATE ISSUED: SIGNATURE: January 30, 2020 30 of 111 Note: This determination does not constitute approval of the proposal. Approval of the proposal can only be made by the legislative or administrative body vested with that authority. The proposal is required to meet all applicable regulations. Vicinity Map PROJECT SITE 15th ST SW C St SW 31 of 111 LogistiCenter at Auburn Traffic Impact Analysis November 25, 2019 Prepared for: Dermody Properties 11900 NE 1st Street, Suite 300 Bellevue, WA 98005 Prepared by: TENW Transportation Engineering NorthWest 11400 SE 8th Street, Suite 200 Bellevue, WA 98004 Office: (425) 889-6747 Fax: (425) 889-8369 32 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page i Table of Contents FINDINGS/CONCLUSIONS ........................................................................................ 1 INTRODUCTION ....................................................................................................... 2 Project Description ..................................................................................................... 2 Project Approach ...................................................................................................... 2 Primary Data and Information Sources ........................................................................... 2 EXISTING CONDITIONS ............................................................................................. 5 Roadway Network .................................................................................................... 5 Existing Traffic Volumes ............................................................................................... 5 Level of Service ......................................................................................................... 7 Collision History ........................................................................................................ 7 FUTURE TRAFFIC CONDITIONS AND PROJECT IMPACTS ................................................ 9 Planned Transportation Improvements ............................................................................ 9 Project Trip Generation ............................................................................................... 9 Project Trip Distribution and Assignment ......................................................................... 9 Future Traffic Volumes ............................................................................................... 13 Future Level of Service .............................................................................................. 16 Site Access Analysis ................................................................................................. 17 MITIGATION .......................................................................................................... 18 Appendices Appendix A – Peak Hour Turning Movement Counts Appendix B – Level of Service (LOS) Calculations Appendix C – Trip Generation Calculations 33 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page ii List of Figures and Tables Figure 1 Project Site Vicinity ....................................................................................................... 3 Figure 2 Preliminary Site Plan ..................................................................................................... 4 Figure 3 2019 Existing Weekday Peak Hour Traffic Volumes ........................................................... 6 Figure 4 Project Trip Distribution ................................................................................................ 11 Figure 5 Peak Hour Project Trip Assignment................................................................................. 12 Figure 6 2021 Without Project Weekday Peak Hour Traffic Volumes .............................................. 14 Figure 7 2021 With Project Weekday Peak Hour Traffic Volumes .................................................. 15 Table 1 Existing Roadway Network Summary – Project Site Vicinity .................................................. 5 Table 2 2019 Existing AM and PM Peak Hour LOS Summary ......................................................... 7 Table 3 Collision Data Summary, January 1, 2016 to December 31, 2018 ...................................... 8 Table 4 Collision Data Summary By Type, January 1, 2016 to December 31, 2018 .......................... 8 Table 5 Project Trip Generation Summary .................................................................................... 9 Table 6 Project Trip Distribution.................................................................................................. 9 Table 7 Year 2021 Peak Hour LOS Summary ............................................................................ 16 Table 8 Year 2021 Peak Hour Level of Service Summary at Site Access Locations ............................ 17 34 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 1 FINDINGS/CONCLUSIONS This traffic impact analysis (TIA) has been prepared for the proposed LogistiCenter at Auburn warehouse project located south of 8th Street SW between the C Street SW and the Union Pacific railroad tracks in Auburn, WA. Project Proposal. Current plans for the project include the development of approximately 330,000 square feet (SF) of warehouse building area. The existing site is currently vacant. Access to the site would be provided by a full access driveway on 8th Street SW and a right-in/right-out driveway on C Street SW. Full buildout of the project is estimated to occur in 2021. Trip Generation. The proposed warehouse project is estimated to generate 567 weekday daily trips, with 65 trips occurring during the weekday AM peak hour (50 entering, 15 exiting), and 67 trips occurring during the weekday PM peak hour (18 entering, 49 exiting). Future Year LOS. LOS analyses were conducted for future year 2021 conditions at three off-site study intersections along C Street SW during the weekday AM and PM peak hour. Based on the analysis results, all off-site study intersections are anticipated to operate at LOS C or better during both the weekday AM and PM peak hours in 2021 without or with the proposed project. Mitigation. The payment of transportation impact fees will mitigate project-related transportation impacts. Transportation impact fees will be determined by the City of Auburn and will need to be paid at the time of a building permit issuance. As of the date of this study, the adopted City of Auburn 2019 impact fee schedule identifies a non-downtown fee of $2.65 per square foot for the warehousing land use. 35 of 111 Figure 1 Project Site Vicinity 36 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 4 Figure 2 Preliminary Site Plan 37 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 5 EXISTING CONDITIONS Roadway Network Table 1 describes the existing characteristics of the streets that would be used as primary routes to and from the site. Roadway characteristics are described in terms of orientation, arterial classification, posted speed limits, number of lanes, street parking, pedestrian facilities, and bicycle facilities. The relationship of these roadways to the project site is shown in Figure 1. Table 1 Existing Roadway Network Summary – Project Site Vicinity Roadway Orientation Classification Speed Limit Number of Travel Lanes Street Parking Sidewalks Bicycle Facilities 8th Street SW E/W Local Non- residential 25 2 Yes Both Sides None C Street SW N/S Principal Arterial 40 4 None West Side Only Non- motorized trail on west side to the south of 15th St SW Existing Traffic Volumes Existing weekday AM and PM peak hour traffic volumes at the three study intersections were based on counts collected by All Traffic Data in September 2019. Figure 3 illustrates the 2019 existing weekday AM and PM peak hour traffic volumes at the study intersections. The detailed peak hour turning movement count sheets are provided in Appendix A. 38 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 7 Level of Service Weekday AM and PM peak hour level of service (LOS) analyses at the study intersections were conducted at the following three signalized study intersections: 1. C Street SW / WB SR-18 Ramps 2. C Street SW / EB SR-18 Ramps 3. C Street SW / 8th Street SW The LOS analyses were conducted using the methodologies and procedures outlined in the latest edition of the Highway Capacity Manual (6th Edition). LOS serves as an indicator of the quality of traffic flow and degree of congestion at an intersection or roadway segment. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. The LOS methodology is described in Appendix B. The Synchro Version 10 software package was used to determine LOS. Existing signal timing used in the analysis was provided by the City of Auburn and WSDOT. The 2019 existing AM and PM peak hour LOS analysis results for the study intersections are summarized in Table 2. The 2019 existing LOS worksheets are included in Appendix B. Table 2 2019 Existing AM and PM Peak Hour LOS Summary Adopted LOS Standard 3 2019 Existing Conditions Study Intersection / Movement LOS 1 Delay (sec) 2 AM Peak Hour 1. C Street SW / WB SR-18 Ramps D B 13.9 2. C Street SW / EB SR-18 Ramps D B 15.9 3. C Street SW / 8th Street SW D A 5.5 PM Peak Hour 1. C Street SW / WB SR-18 Ramps D C 24.0 2. C Street SW / EB SR-18 Ramps D C 26.7 3. C Street SW / 8th Street SW D A 5.7 1. LOS = Level of Service 2. Delay refers to average control delay expressed in seconds per vehicle. 3. Per City of Auburn Comprehensive Transportation Plan. As shown in Table 2, all study intersections currently operate at LOS C or better during both the weekday AM and PM peak hours. Collision History Historic collisions at the study intersections were analyzed for the three-year period from 2016 to 2018. Collision data was provided by the City of Auburn. Summaries of the total and yearly average collisions during this period are provided in Table 3. Summaries of collisions by type over the three-year period are provided in Table 4. 39 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 8 Table 3 Collision Data Summary, January 1, 2016 to December 31, 2018 Intersection 2016 2017 2018 Three-Year Total Collisions Average Annual Collisions C St SW / SR 18 WB Ramps 2 3 1 6 2.00 C St SW / SR 18 EB Ramp 2 3 4 9 3.00 C St SW / 8th St SW 5 7 4 16 5.33 Sources: City of Auburn Collision Records. Table 4 Collision Data Summary By Type, January 1, 2016 to December 31, 2018 Collision Type Location 3-Year Total Collisions Average Annual Collision Rate Approach Turn Sideswipe Right Angle Rear-end Parked Veh / Fixed Ped / Cycle Other C St SW / SR 18 Westbound Ramps 6 2.00 1 2 0 2 1 0 0 C St SW / SR 18 Eastbound Ramps 9 3.00 0 2 2 4 1 0 0 C St SW / 8th St SW 16 5.33 0 7 1 5 2 0 1 Source: City of Auburn Collision Records. The City of Auburn collects and reviews collision data to identify intersection and road locations where potential hazards exist. Potential safety problems are identified using the Safety Priority Index System (SPIS) methodology. The SPIS score for a location considers three years of data and considers frequency, collision rate, and severity. Based on CityÊs 2016-2018 SPIS, there were 97 intersections included and the SPIS scores ranged from 31.32 to 94.88 with a Citywide average of 51.71. One of the study intersections (C St SW / SR 18 Eastbound Ramps) is included on the SPIS list with a SPIS Value of 31.32. 40 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 9 FUTURE TRAFFIC CONDITIONS AND PROJECT IMPACTS Planned Transportation Improvements This section documents the known transportation improvements planned by the City in the study area. No planned transportation improvement projects identified in the City of AuburnÊs adopted 2020- 2025 Transportation Improvement Program (TIP) add capacity within the study area or occur within the analysis horizon for this study. Project Trip Generation The trip generation estimate for the proposed 330,000 SF warehouse project was based on the methodology included in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10th edition for Land Use Code (LUC) 150 (Warehousing). Table 5 summarizes the resulting weekday daily, AM peak hour, and PM peak hour trip generation estimates for proposed project. Detailed trip generation calculations are included in Appendix C. Table 5 Project Trip Generation Summary Passenger Vehicle Trips Truck Trips Total Trip Generation Time Period In Out Total In Out Total In Out Total Daily 227 227 454 57 56 113 284 283 567 AM Peak Hour 40 12 52 10 3 13 50 15 65 PM Peak Hour 14 40 54 4 9 13 18 49 67 As shown in Table 5, the proposed project is estimated to generate 567 weekday daily trips, with 65 trips occurring during the weekday AM peak hour (50 entering, 15 exiting), and 67 trips occurring during the weekday PM peak hour (18 entering, 49 exiting). Project Trip Distribution and Assignment The distribution of the new project trips generated by the Warehouse project was based on anticipated travel patterns in the study area and coordination with City of Auburn staff as part of the Traffic Scoping for the project. The following Table 6 summarizes the resulting general trip distribution patterns. The distribution of project trips is shown graphically in Figure 4. Table 6 Project Trip Distribution Route (Direction) Trip Distribution SR 167 (north) 25% SR 167 (south) 20% Highway 18 (west) 25% Highway 18 (east) 20% C Street SW (north) 10% TOTAL 100% 41 of 111 Figure 4 Project Trip Distribution 42 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 12 Figure 5 Peak Hour Project Trip Assignment 43 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 13 Future Traffic Volumes Future year 2021 Without-Project peak hour traffic volumes were estimated by applying a 2 percent annual background growth rate to the existing traffic volumes. The 2 percent annual growth rate was determined to be appropriate based on conversations with the City during the Traffic Scoping process. In addition to the background growth rate, traffic from the following pipeline projects were included in the future without-project peak hour traffic volume estimates: · Holliday Inn on C Street SW · Supervalue Warehouse on 15th Street SW · Sound Transit Parking Garage The resulting future 2021 without-project weekday AM and PM peak hour traffic volumes are shown in Figure 6. The 2021 With-Project traffic volumes were determined by adding the trip assignment from the proposed development (shown in Figure 5) to the future 2021 Without-Project traffic volumes. The resulting future 2021 With-Project weekday AM and PM peak hour traffic volumes at the study intersections are shown in Figure 7. 44 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 14 Figure 6 2021 Without Project Weekday Peak Hour Traffic Volumes 45 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 15 Figure 7 2021 With Project Weekday Peak Hour Traffic Volumes 46 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 16 Future Level of Service Future year 2021 Level of Service (LOS) analyses were conducted at the three study intersections for weekday AM and PM peak hour without-project and with-project conditions. Existing intersection geometry and signal timing was assumed at the study intersections as there are no City-planned improvements that are expected to be complete by 2021. The 2021 weekday AM and PM peak hour LOS results at the study intersections without and with the proposed project are summarized in Table 7. The detailed LOS worksheets are included in Appendix B. As shown in Table 7 the study intersections are anticipated to operate at LOS C or better during both the weekday AM and PM peak hours in 2021 without or with the proposed project. Table 7 Year 2021 Peak Hour LOS Summary Adopted LOS Standard 3 2021 Without Project 2021 With Project Study Intersection / Movement LOS 1 Delay (sec) 2 LOS 1 Delay (sec) 2 AM Peak Hour 1. C Street SW / WB SR-18 Ramps D B 14.1 B 14.2 2. C Street SW / EB SR-18 Ramps D B 15.9 B 16.1 3. C Street SW / 8th Street SW D A 6.4 A 6.9 PM Peak Hour 1. C Street SW / WB SR-18 Ramps D C 26.0 C 26.4 2. C Street SW / EB SR-18 Ramps D C 29.1 C 30.0 3. C Street SW / 8th Street SW D A 7.1 A 8.0 1. LOS = Level of Service 2. Delay refers to average control delay expressed in seconds per vehicle. 3. Per City of Auburn Comprehensive Transportation Plan. 47 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 17 Site Access Analysis Level of service analyses were conducted at the proposed site accesses on 8th St SW and C Street SW for 2021 With-Project traffic conditions in the weekday AM and PM peak hours. The proposed site access on C St SW was assumed to be restricted to allow only right-in and right-out turn movements. The LOS analyses were conducted based on the methodology and procedures outlined in the 6th Edition of the Highway Capacity Manual (HCM) using the Synchro 10.3 software program. The 2021 With Project AM and PM peak hour volumes at the site access location used in the LOS analyses are shown in Figure 7. The weekday AM and PM peak hour LOS results at the site access location for 2021 With-Project conditions are summarized in Table 8. The LOS worksheets are included in Appendix B. Table 8 Year 2021 Peak Hour Level of Service Summary at Site Access Locations AM Peak Hour PM Peak Hour Driveway Location and Movement LOS 1 Delay (sec) 2 V/C3 LOS 1 Delay (sec) 2 V/C3 A. Proposed Site Access / 8th Street SW Northbound Shared Left-Thru-Right A 8.7 0.04 A 8.7 0.05 Eastbound Left Turn A 0 - A 0 - Westbound Left Turn A 7.5 0.04 A 7.5 0.02 Southbound Shared Left-Thru-Right B 10.2 0.02 A 9.4 0.01 B. Proposed Site Access / C Street SW Eastbound Right Turn B 11.0 0.02 B 14.3 0.05 1. LOS = Level of Service 2. Delay refers to average control delay expressed in seconds per vehicle. 3. V/C = Volume/capacity ratio. As shown in Table 8, the results of the LOS analyses show that the exiting stop controlled right-turn movement at the proposed site access is anticipated to operate at LOS B during the weekday AM and PM peak hours. 48 of 111 Traffic Impact Analysis LogistiCenter at Auburn TENW November 25, 2019 Page 18 MITIGATION Payment of the City of Auburn transportation impact fee will mitigate project-related transportation impacts of the proposed 330,000 sf warehouse. Transportation impact fees will need to be paid at the time of a building permit issuance. As of the date of this study, the adopted City of Auburn 2019 impact fee schedule identifies a non-downtown fee of $2.65 per square foot for the warehousing land use. 49 of 111 Traffic Impact Analysis LogistiCenter at Auburn Appendix A Peak Hour Turning Movement Counts 50 of 111 Peak Hour:07:00 AM - 08:00 AM C ST SW C ST SW3RD STSR18 RAMPS (303) 216-2439 www.alltrafficdata.net Location:1 C ST SW & 3RD ST AM Tuesday, September 24, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk101120 4 8 206 6 81 259 802 12 18 1,068370 294 443 N S EW 0 1 155337720101SR18 RAMPS 3RD STC ST SWC ST SW1,633 1 000N S EW 0000 0 1 00Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 1,6330 23 3 0 4 1 1 89 184 0 1 28 406480222 7:15 AM 1,5920 19 2 0 1 3 0 92 166 1 0 35 412560433 7:30 AM 1,4991 18 0 0 0 0 0 95 187 0 1 36 403440021 7:45 AM 1,4080 21 1 0 3 0 0 61 183 0 0 56 412580425 8:00 AM 1,2900 18 2 0 0 0 0 83 151 0 0 49 365400220 8:15 AM 0 17 0 0 1 0 0 81 122 0 0 47 319350115 8:30 AM 0 18 0 0 0 0 1 85 105 0 0 37 312390126 8:45 AM 0 10 0 0 0 0 1 65 108 0 0 47 294340326 Count Total 1 144 8 0 9 4 3 651 1,206 1 2 335 2,923354017188 Peak Hour 1 81 6 0 8 4 1 337 720 1 2 155 1,633206010101 HV% PHF 0.92 0.60 0.95 0.80 6.5% 0.0% 5.0% 18.5% 7.3% 0.99 EB WB NB SB All 24000 0 0 13 0 6 48 35 0 0 5337 19 48 N S EW 0 0 24242900Heavy VehiclesInterval Start Time EB NB TotalWB SB 7:00 AM 3 23 0 8 34 7:15 AM 6 12 0 21 39 7:30 AM 5 13 0 8 26 7:45 AM 5 5 0 11 21 8:00 AM 6 22 0 11 39 8:15 AM 6 18 0 10 34 8:30 AM 12 23 0 13 48 8:45 AM 5 10 0 11 26 Count Total 48 126 0 93 267 Peak Hour 19 53 0 48 120 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 7:00 AM 0 0 0 0 0 7:15 AM 0 0 0 0 0 7:30 AM 0 0 0 0 0 7:45 AM 0 0 0 1 1 8:00 AM 0 0 0 0 0 8:15 AM 0 0 0 0 0 8:30 AM 0 0 0 0 0 8:45 AM 0 0 0 0 0 Count Total 0 0 0 1 1 Peak Hour 0 0 0 1 1 51 of 111 Peak Hour:07:15 AM - 08:15 AM C ST SW C ST SW EB SR18 RAMP (303) 216-2439 www.alltrafficdata.net Location:5 C ST SW & EB SR18 RAMP AM Tuesday, September 10, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk2600144 0 426 453 1,305 960571 570 107 N S EW 0 4278187900EB SR18 RAMP C ST SWC ST SW1,983 0 40N S EW 04 0 0 00Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 1,9620 103 0 0 24 223 0 0 87 4682902 7:15 AM 1,9830 115 0 0 12 236 0 0 88 4913109 7:30 AM 1,9120 109 0 0 19 197 0 0 94 4634004 7:45 AM 1,8690 101 0 0 27 244 0 0 124 5403707 8:00 AM 1,7790 101 0 0 23 202 0 0 121 4893606 8:15 AM 0 79 0 0 28 184 0 0 91 4203008 8:30 AM 0 76 0 1 16 179 0 0 106 4203408 8:45 AM 0 92 0 1 9 178 0 0 117 4504607 Count Total 0 776 0 2 158 1,643 0 0 828 3,741283051 Peak Hour 0 426 0 0 81 879 0 0 427 1,983144026 HV% PHF 0.96 0.89 0.86 5.1% 7.6% 10.6% 7.6% 0.92 EB WB NB SB All 20017 0 12 48 74 7363 29 13 N S EW 0 46116200Heavy VehiclesInterval Start Time EB NB TotalWB SB 7:00 AM 7 34 7 48 7:15 AM 3 16 6 25 7:30 AM 6 19 9 34 7:45 AM 7 15 20 42 8:00 AM 13 23 13 49 8:15 AM 8 22 11 41 8:30 AM 15 26 17 58 8:45 AM 21 16 19 56 Count Total 80 171 102 353 Peak Hour 29 73 48 150 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 7:00 AM 0 0 0 0 7:15 AM 0 0 0 0 7:30 AM 0 2 0 2 7:45 AM 0 1 0 1 8:00 AM 0 1 0 1 8:15 AM 0 1 0 1 8:30 AM 0 0 0 0 8:45 AM 0 1 0 1 Count Total 0 6 0 6 Peak Hour 0 4 0 4 52 of 111 Peak Hour:07:00 AM - 08:00 AM C ST SW C ST SW 8TH ST SW (303) 216-2439 www.alltrafficdata.net Location:6 C ST SW & 8TH ST SW AM Tuesday, September 10, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk370016 0 67 534 963 905513 83 46 N S EW 0 4979896008TH ST SW C ST SWC ST SW1,522 0 01N S EW 00 0 0 10Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 1,5220 17 0 0 2 229 0 0 111 3722011 7:15 AM 1,4980 19 0 0 1 213 0 0 114 358308 7:30 AM 1,4840 14 0 0 1 223 0 0 115 365408 7:45 AM 1,4520 17 0 0 5 231 0 0 157 4277010 8:00 AM 1,3610 12 0 0 5 190 1 0 124 3486010 8:15 AM 0 6 0 0 2 202 0 0 125 344108 8:30 AM 0 17 0 0 1 183 0 0 116 3335011 8:45 AM 0 19 0 0 3 144 0 0 153 3363014 Count Total 0 121 0 0 20 1,615 1 0 1,015 2,88331080 Peak Hour 0 67 0 0 9 896 0 0 497 1,52216037 HV% PHF 0.86 0.96 0.80 14.5% 7.6% 8.4% 8.3% 0.89 EB WB NB SB All 2000 0 12 45 81 6943 12 2 N S EW 0 4306900Heavy VehiclesInterval Start Time EB NB TotalWB SB 7:00 AM 3 31 6 40 7:15 AM 3 11 8 22 7:30 AM 5 14 10 29 7:45 AM 1 13 21 35 8:00 AM 4 20 17 41 8:15 AM 1 21 19 41 8:30 AM 4 24 18 46 8:45 AM 4 15 28 47 Count Total 25 149 127 301 Peak Hour 12 69 45 126 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 7:00 AM 0 0 0 0 7:15 AM 0 0 0 0 7:30 AM 0 0 0 0 7:45 AM 1 0 0 1 8:00 AM 1 0 0 1 8:15 AM 2 0 0 2 8:30 AM 1 0 0 1 8:45 AM 0 0 0 0 Count Total 5 0 0 5 Peak Hour 1 0 0 1 53 of 111 Peak Hour:07:00 AM - 08:00 AM S DWY N DWY8TH ST SWW DWY (303) 216-2439 www.alltrafficdata.net Location:3 S DWY & 8TH ST SW AM Tuesday, September 24, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk00127 20 0 0 13 0 12 7 30 53 250 13 20 N S EW 3 0 000250W DWY 8TH ST SWS DWYN DWY80 0 000N S EW 0000 0 0 00Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 800 0 4 0 0 3 0 0 0 0 5 0 220190 7:15 AM 700 0 4 2 0 7 0 0 0 0 4 0 220140 7:30 AM 540 0 2 1 0 6 0 0 0 0 2 0 180160 7:45 AM 460 0 3 0 0 4 0 0 0 0 1 0 180460 8:00 AM 420 0 2 2 0 2 0 0 0 0 2 0 120040 8:15 AM 0 0 0 2 0 1 0 0 0 0 1 0 60020 8:30 AM 0 0 4 0 0 2 0 0 0 0 1 0 100030 8:45 AM 0 0 1 2 1 1 0 0 0 0 3 0 140060 Count Total 0 0 20 9 1 26 0 0 0 0 19 0 12207400 Peak Hour 0 0 13 3 0 20 0 0 0 0 12 0 8007250 HV% PHF 0.81 0.75 0.69 0.60 38.5% 0.0% 24.0% 8.3% 15.0% 0.91 EB WB NB SB All 0010 0 0 0 5 0 1 0 0 12 60 5 0 N S EW 0 0 00060Heavy VehiclesInterval Start Time EB NB TotalWB SB 7:00 AM 2 1 0 1 4 7:15 AM 2 0 0 0 2 7:30 AM 0 3 0 0 3 7:45 AM 1 2 0 0 3 8:00 AM 1 1 2 0 4 8:15 AM 0 0 0 0 0 8:30 AM 1 0 0 0 1 8:45 AM 0 2 1 0 3 Count Total 7 9 3 1 20 Peak Hour 5 6 0 1 12 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 7:00 AM 0 0 0 0 0 7:15 AM 0 0 0 0 0 7:30 AM 0 0 0 0 0 7:45 AM 0 0 0 0 0 8:00 AM 0 0 0 1 1 8:15 AM 0 0 0 0 0 8:30 AM 0 0 0 0 0 8:45 AM 0 1 0 0 1 Count Total 0 1 0 1 2 Peak Hour 0 0 0 0 0 54 of 111 Peak Hour:07:15 AM - 08:15 AM C ST SW C ST SW W DWY (303) 216-2439 www.alltrafficdata.net Location:2 C ST SW & W DWY AM Tuesday, September 24, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk24008 0 3 543 965 964527 11 26 N S EW 0 519296200W DWY C ST SWC ST SW1,518 0 06N S EW 00 0 0 42Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 7:00 AM 1,5040 0 0 0 1 225 0 0 128 356101 7:15 AM 1,5180 1 0 0 1 234 0 0 133 375006 7:30 AM 1,4790 0 0 0 0 252 0 0 110 371306 7:45 AM 1,4330 0 0 0 0 256 0 0 142 402202 8:00 AM 1,3500 2 0 0 1 220 0 0 134 3703010 8:15 AM 0 1 0 0 2 206 0 0 126 336001 8:30 AM 0 0 0 0 1 188 0 0 126 325208 8:45 AM 0 1 0 0 1 187 0 0 121 319603 Count Total 0 5 0 0 7 1,768 0 0 1,020 2,85417037 Peak Hour 0 3 0 0 2 962 0 0 519 1,5188024 HV% PHF 0.55 0.94 0.94 18.2% 5.9% 9.6% 7.3% 0.94 EB WB NB SB All 1002 0 0 52 56 5753 2 2 N S EW 0 5115600Heavy VehiclesInterval Start Time EB NB TotalWB SB 7:00 AM 1 27 11 39 7:15 AM 0 14 17 31 7:30 AM 1 12 6 19 7:45 AM 0 9 14 23 8:00 AM 1 22 15 38 8:15 AM 0 24 11 35 8:30 AM 0 28 19 47 8:45 AM 2 7 17 26 Count Total 5 143 110 258 Peak Hour 2 57 52 111 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 7:00 AM 2 0 0 2 7:15 AM 0 0 0 0 7:30 AM 4 0 0 4 7:45 AM 1 0 0 1 8:00 AM 1 0 0 1 8:15 AM 0 0 0 0 8:30 AM 0 0 0 0 8:45 AM 0 0 0 0 Count Total 8 0 0 8 Peak Hour 6 0 0 6 55 of 111 Peak Hour:04:00 PM - 05:00 PM C ST SW C ST SW3RD STSR18 RAMPS (303) 216-2439 www.alltrafficdata.net Location:1 C ST SW & 3RD ST PM Tuesday, September 24, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk226153 8 25 294 3 39 1,005 282 36 17 4421,092 336 428 N S EW 0 0 77319423990SR18 RAMPS 3RD STC ST SWC ST SW1,819 2 300N S EW 1200 1 1 00Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 1,8190 11 1 0 6 1 0 40 61 0 1 206 456700356 4:15 PM 1,8030 10 1 0 6 2 0 45 74 0 3 177 452832148 4:30 PM 1,8060 9 1 0 8 2 0 57 52 1 0 195 454680160 4:45 PM 1,7420 9 0 0 5 3 0 52 52 0 1 195 457731462 5:00 PM 1,6300 11 0 0 10 2 0 45 49 0 0 214 440621343 5:15 PM 0 16 1 0 2 0 0 59 64 0 1 188 455690748 5:30 PM 0 6 0 0 10 2 1 57 53 0 1 151 390604540 5:45 PM 1 7 0 0 4 1 0 25 60 0 2 151 345590332 Count Total 1 79 4 0 51 13 1 380 465 1 9 1,477 3,449544827389 Peak Hour 0 39 3 0 25 8 0 194 239 1 5 773 1,81929439226 HV% PHF 0.89 0.90 0.92 0.96 12.2% 0.0% 5.2% 3.9% 5.7% 1.00 EB WB NB SB All 9010 0 0 36 0 5 39 14 0 1 2365 41 23 N S EW 0 0 2914900Heavy VehiclesInterval Start Time EB NB TotalWB SB 4:00 PM 3 8 0 7 18 4:15 PM 10 3 0 9 22 4:30 PM 15 4 0 13 32 4:45 PM 13 8 0 10 31 5:00 PM 6 2 0 7 15 5:15 PM 7 3 0 3 13 5:30 PM 9 5 0 7 21 5:45 PM 4 6 0 7 17 Count Total 67 39 0 63 169 Peak Hour 41 23 0 39 103 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 4:00 PM 0 0 3 2 5 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 0 0 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 2 0 1 1 4 5:45 PM 0 0 0 0 0 Count Total 2 0 4 3 9 Peak Hour 0 0 3 2 5 56 of 111 Peak Hour:04:15 PM - 05:15 PM C ST SW C ST SW EB SR18 RAMP (303) 216-2439 www.alltrafficdata.net Location:4 C ST SW & EB SR18 RAMP PM Tuesday, September 24, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk12710134 0 282 1,118 1,054 1,0311,125 416 386 N S EW 0 99025977101EB SR18 RAMP C ST SWC ST SW2,565 0 110N S EW 47 0 0 00Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 2,5180 62 0 2 68 178 0 0 212 59146023 4:15 PM 2,5650 74 0 0 64 195 0 0 280 67335025 4:30 PM 2,5260 68 0 1 65 198 0 0 221 62338032 4:45 PM 2,5200 69 0 0 56 177 0 0 262 63132035 5:00 PM 2,4650 71 0 0 74 201 1 0 227 63829035 5:15 PM 0 87 0 1 43 190 0 0 236 63442035 5:30 PM 0 81 0 0 50 174 2 0 257 61727026 5:45 PM 0 89 0 0 40 165 0 0 219 57645018 Count Total 0 601 0 4 460 1,478 3 0 1,914 4,9832940229 Peak Hour 0 282 0 1 259 771 1 0 990 2,5651340127 HV% PHF 0.95 0.94 0.92 4.1% 2.9% 7.1% 4.9% 0.95 EB WB NB SB All 30011 0 6 79 29 3087 17 10 N S EW 0 7672300Heavy VehiclesInterval Start Time EB NB TotalWB SB 4:00 PM 7 10 9 26 4:15 PM 4 7 16 27 4:30 PM 5 7 30 42 4:45 PM 4 10 23 37 5:00 PM 4 6 10 20 5:15 PM 6 3 8 17 5:30 PM 6 3 15 24 5:45 PM 3 3 9 15 Count Total 39 49 120 208 Peak Hour 17 30 79 126 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 4:00 PM 0 0 0 0 4:15 PM 0 4 0 4 4:30 PM 0 4 0 4 4:45 PM 0 1 0 1 5:00 PM 0 2 0 2 5:15 PM 0 1 0 1 5:30 PM 0 3 0 3 5:45 PM 0 0 0 0 Count Total 0 15 0 15 Peak Hour 0 11 0 11 57 of 111 Peak Hour:04:15 PM - 05:15 PM C ST SW C ST SW 8TH ST SW (303) 216-2439 www.alltrafficdata.net Location:5 C ST SW & 8TH ST SW PM Tuesday, September 24, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk860014 0 93 1,130 1,003 9281,058 107 104 N S EW 0 1,04418910008TH ST SW C ST SWC ST SW2,165 1 08N S EW 00 0 1 35Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 2,1181 13 0 0 2 234 0 0 241 5185022 4:15 PM 2,1650 23 0 0 3 210 0 0 289 5522025 4:30 PM 2,1290 18 0 0 1 248 0 0 244 5416024 4:45 PM 2,0650 22 0 0 4 214 0 0 247 5073017 5:00 PM 2,0190 30 0 0 10 238 0 0 264 5653020 5:15 PM 0 18 0 0 2 219 0 0 256 5164017 5:30 PM 0 19 0 0 2 188 0 0 247 4773018 5:45 PM 0 20 0 0 3 179 0 0 238 4614017 Count Total 1 163 0 0 27 1,730 0 0 2,026 4,137300160 Peak Hour 0 93 0 0 18 910 0 0 1,044 2,16514086 HV% PHF 0.81 0.93 0.90 2.8% 2.9% 8.1% 5.6% 0.96 EB WB NB SB All 6000 0 3 91 28 2785 3 8 N S EW 0 8522500Heavy VehiclesInterval Start Time EB NB TotalWB SB 4:00 PM 1 10 13 24 4:15 PM 0 7 20 27 4:30 PM 2 4 32 38 4:45 PM 1 9 27 37 5:00 PM 0 7 12 19 5:15 PM 1 3 11 15 5:30 PM 1 1 17 19 5:45 PM 0 4 10 14 Count Total 6 45 142 193 Peak Hour 3 27 91 121 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 4:00 PM 2 0 0 2 4:15 PM 3 0 1 4 4:30 PM 2 0 0 2 4:45 PM 2 0 0 2 5:00 PM 1 0 0 1 5:15 PM 3 0 0 3 5:30 PM 3 0 0 3 5:45 PM 0 0 0 0 Count Total 16 0 1 17 Peak Hour 8 0 1 9 58 of 111 Peak Hour:04:15 PM - 05:15 PM S DWY N DWY8TH ST SWW DWY (303) 216-2439 www.alltrafficdata.net Location:3 S DWY & 8TH ST SW PM Tuesday, September 24, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk00811 9 2 1 14 0 8 11 28 31 33 15 9 N S EW 6 0 00030W DWY 8TH ST SWS DWYN DWY54 1 000N S EW 0000 0 1 00Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 490 0 3 1 3 3 0 0 0 0 3 0 150110 4:15 PM 540 0 1 3 2 2 0 0 0 0 1 0 131120 4:30 PM 520 0 6 1 0 3 0 0 0 0 1 0 120100 4:45 PM 510 0 2 1 0 1 0 0 0 0 1 0 90400 5:00 PM 490 0 5 1 0 3 0 0 0 0 5 0 200510 5:15 PM 0 0 4 1 0 1 0 0 0 0 3 0 110200 5:30 PM 0 0 4 1 0 2 0 0 0 0 1 0 110210 5:45 PM 0 0 3 0 0 1 0 0 0 0 2 0 70100 Count Total 0 0 28 9 5 16 0 0 0 0 17 0 9811750 Peak Hour 0 0 14 6 2 9 0 0 0 0 8 0 5411130 HV% PHF 0.63 0.78 0.38 0.40 13.3% 14.3% 0.0% 0.0% 11.1% 0.68 EB WB NB SB All 0000 4 0 0 2 0 0 0 4 2 00 2 4 N S EW 0 0 00000Heavy VehiclesInterval Start Time EB NB TotalWB SB 4:00 PM 0 0 2 0 2 4:15 PM 0 0 1 0 1 4:30 PM 1 0 1 0 2 4:45 PM 1 0 0 0 1 5:00 PM 0 0 2 0 2 5:15 PM 1 0 1 0 2 5:30 PM 1 0 1 0 2 5:45 PM 0 0 0 0 0 Count Total 4 0 8 0 12 Peak Hour 2 0 4 0 6 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 4:00 PM 0 0 0 0 0 4:15 PM 0 0 0 0 0 4:30 PM 0 0 0 0 0 4:45 PM 0 0 0 1 1 5:00 PM 0 0 0 0 0 5:15 PM 0 0 0 0 0 5:30 PM 0 0 0 0 0 5:45 PM 0 0 0 2 2 Count Total 0 0 0 3 3 Peak Hour 0 0 0 1 1 59 of 111 Peak Hour:04:15 PM - 05:15 PM C ST SW C ST SW W DWY (303) 216-2439 www.alltrafficdata.net Location:2 C ST SW & W DWY PM Tuesday, September 24, 2019Date: All Vehicles Pedestrians/Bicycles in Crosswalk Traffic Counts - All Vehicles Heavy Vehicles Peak Hour Traffic Counts - Heavy Vehicles and Pedestrians/Bicycles in Crosswalk4007 0 0 1,070 957 9571,073 7 4 N S EW 0 1,066095700W DWY C ST SWC ST SW2,034 0 06N S EW 00 0 0 24Interval Start Time RightLeft Thru Total Eastbound Westbound Northbound Southbound U-Turn Rolling HourRightLeft ThruU-Turn RightLeft ThruU-Turn RightLeft ThruU-Turn 4:00 PM 2,0100 0 0 0 0 242 0 0 252 498400 4:15 PM 2,0340 0 0 0 0 231 0 0 280 515202 4:30 PM 1,9990 0 0 0 0 247 0 0 254 502100 4:45 PM 1,9520 0 0 0 0 224 0 0 266 495401 5:00 PM 1,8780 0 0 0 0 255 0 0 266 522001 5:15 PM 0 0 0 0 0 211 0 0 264 480203 5:30 PM 0 0 0 0 0 200 0 0 255 455000 5:45 PM 0 0 0 0 0 175 0 0 246 421000 Count Total 0 0 0 0 0 1,785 0 0 2,083 3,8881307 Peak Hour 0 0 0 0 0 957 0 0 1,066 2,034704 HV% PHF 0.44 0.94 0.95 0.0% 3.0% 7.6% 5.4% 0.97 EB WB NB SB All 1000 0 0 81 29 2980 0 1 N S EW 0 8002900Heavy VehiclesInterval Start Time EB NB TotalWB SB 4:00 PM 0 9 9 18 4:15 PM 0 8 19 27 4:30 PM 0 5 25 30 4:45 PM 0 9 23 32 5:00 PM 0 7 14 21 5:15 PM 0 3 6 9 5:30 PM 0 2 16 18 5:45 PM 0 4 9 13 Count Total 0 47 121 168 Peak Hour 0 29 81 110 Pedestrians/Bicycles on CrosswalkInterval Start Time EB NB TotalWB SB 4:00 PM 4 0 0 4 4:15 PM 2 0 0 2 4:30 PM 1 0 0 1 4:45 PM 1 0 0 1 5:00 PM 2 0 0 2 5:15 PM 4 0 0 4 5:30 PM 2 0 0 2 5:45 PM 1 0 0 1 Count Total 17 0 0 17 Peak Hour 6 0 0 6 60 of 111 Traffic Impact Analysis LogistiCenter at Auburn Appendix B Level of Service (LOS) Calculations 61 of 111 Traffic Impact Analysis LogistiCenter at Auburn Level of Service Methodology Level of service calculations for intersections were based on methodology and procedures outlined in the 2016 update of the Highway Capacity Manual, Transportation Research Board (6th Edition) using Synchro 10 traffic analysis software. LOS generally refers to the degree of congestion on a roadway or intersection. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. A letter scale from A to F generally describes intersection LOS. At signalized intersections, LOS A represents free-flow conditions (motorists experience little or no delays), and LOS F represents forced-flow conditions where motorists experience an average delay in excess of 80 seconds per vehicle. The LOS reported for signalized intersections represents the average control delay (sec/veh) and can be reported for the overall intersection, for each approach, and for each lane group (additional v/c ratio criteria apply to lane group LOS only). The LOS reported at stop-controlled intersections is based on the average control delay and can be reported for each controlled minor approach, controlled minor lane group, and controlled major- street movement (and for the overall intersection at all-way stop controlled intersections. Additional v/c ratio criteria apply to lane group or movement LOS only). Table B1 outlines the current HCM (6th Edition) LOS criteria for signalized and stop-controlled intersections based on these methodologies. Table B1 LOS Criteria for Signalized and Stop Controlled Intersections1 SIGNALIZED INTERSECTIONS STOP-CONTROLLED INTERSECTIONS LOS by Volume-to Capacity (V/C) Ratio2 LOS by Volume-to Capacity (V/C) Ratio3 Control Delay (sec/veh) £ 1.0 > 1.0 Control Delay (sec/veh) £ 1.0 > 1.0 £ 10 A F £ 10 A F > 10 to £ 20 B F > 10 to £ 15 B F > 20 to £ 35 C F > 15 to £ 25 C F > 35 to £ 55 D F > 25 to £ 35 D F > 55 to £ 80 E F > 35 to £ 50 E F > 80 F F > 50 F F 1 Source: HCM2010 Highway Capacity Manual, Transportation Research Board, 2010. 2 For approach-based and intersection-wide assessments at signals, LOS is defined solely by control delay. 3 For two-way stop controlled intersections, the LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole at two-way stop controlled intersections. For approach-based and intersection-wide assessments at all-way stop controlled intersections, LOS is solely defined by control delay. 62 of 111 Traffic Impact Analysis LogistiCenter at Auburn 2019 Existing 63 of 111 Lanes, Volumes, Timings 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)82 6 206 8 4 0 338 720 10 3 155 101 Future Volume (vph)82 6 206 8 4 0 338 720 10 3 155 101 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 200 75 0 400 0 210 170 Storage Lanes 0 1 1 0 2 0 1 1 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)25 25 40 40 Link Distance (ft)374 361 651 322 Travel Time (s)10.2 9.8 11.1 5.5 Confl. Peds. (#/hr)1 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Heavy Vehicles (%)7% 0% 6% 0% 0% 0% 7% 4% 0% 0% 16% 24% Shared Lane Traffic (%) Turn Type Split NA Prot Split NA Prot NA Prot NA pm+ov Protected Phases 6 6 6 2 2 7 4 3 8 6 Permitted Phases 8 Detector Phase 6 6 6 2 2 7 4 3 8 8 6 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0 5.0 Minimum Split (s)9.5 9.5 9.5 42.0 42.0 9.5 30.0 9.5 15.0 9.5 Total Split (s)44.5 44.5 44.5 25.0 25.0 44.5 75.0 24.5 65.0 44.5 Total Split (%)24.9% 24.9% 24.9% 14.0% 14.0% 24.9% 41.9% 13.7% 36.3% 24.9% Yellow Time (s)3.5 3.5 3.5 4.0 4.0 3.5 4.0 3.5 4.0 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 5.0 5.0 4.5 5.0 4.5 5.0 4.5 Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Recall Mode None None None None None None Min None Min None Intersection Summary Area Type:Other Cycle Length: 179 Actuated Cycle Length: 62.5 Natural Cycle: 95 Control Type: Actuated-Uncoordinated Splits and Phases: 1: C St SW & SR 18 WB Ramps/Park and Ride Access 64 of 111 HCM 6th Signalized Intersection Summary 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - AM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 82 6 206 8 4 0 338 720 10 3 155 101 Future Volume (veh/h) 82 6 206 8 4 0 338 720 10 3 155 101 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1750 1750 1668 1750 1750 1750 1654 1695 1695 1750 1532 1422 Adj Flow Rate, veh/h 83 6 37 8 4 0 341 727 10 3 157 45 Peak Hour Factor 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 0.99 Percent Heavy Veh, % 0 0 6 0 0 0 7 4 4 0 16 24 Cap, veh/h 146 11 132 26 27 0 599 1221 17 80 697 401 Arrive On Green 0.09 0.09 0.09 0.02 0.02 0.00 0.20 0.38 0.38 0.05 0.24 0.24 Sat Flow, veh/h 1559 113 1414 1667 1750 0 3057 3253 45 1667 2910 1204 Grp Volume(v), veh/h 89 0 37 8 4 0 341 360 377 3 157 45 Grp Sat Flow(s),veh/h/ln 1672 0 1414 1667 1750 0 1528 1611 1687 1667 1455 1204 Q Serve(g_s), s 2.1 0.0 1.0 0.2 0.1 0.0 4.2 7.5 7.5 0.1 1.8 1.1 Cycle Q Clear(g_c), s 2.1 0.0 1.0 0.2 0.1 0.0 4.2 7.5 7.5 0.1 1.8 1.1 Prop In Lane 0.93 1.00 1.00 0.00 1.00 0.03 1.00 1.00 Lane Grp Cap(c), veh/h 156 0 132 26 27 0 599 605 634 80 697 401 V/C Ratio(X)0.57 0.00 0.28 0.31 0.15 0.00 0.57 0.60 0.60 0.04 0.23 0.11 Avail Cap(c_a), veh/h 1603 0 1355 799 839 0 2930 2702 2830 799 4184 1844 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.1 0.0 17.6 20.3 20.3 0.0 15.2 10.5 10.5 18.9 12.8 9.6 Incr Delay (d2), s/veh 4.6 0.0 1.6 9.3 3.5 0.0 1.2 1.1 1.1 0.2 0.4 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 0.3 0.1 0.1 0.0 1.2 2.0 2.1 0.0 0.5 0.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 22.7 0.0 19.2 29.6 23.7 0.0 16.4 11.6 11.6 19.2 13.2 10.0 LnGrp LOS C A B C C A B B B B B A Approach Vol, veh/h 126 12 1078 205 Approach Delay, s/veh 21.7 27.6 13.1 12.6 Approach LOS C C B B Timer - Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 5.6 7.0 20.7 8.4 12.7 15.0 Change Period (Y+Rc), s 5.0 5.0 * 5 4.5 4.5 5.0 Max Green Setting (Gmax), s 20.0 20.0 * 70 40.0 40.0 60.0 Max Q Clear Time (g_c+I1), s 2.2 2.1 9.5 4.1 6.2 3.8 Green Ext Time (p_c), s 0.0 0.0 6.1 1.0 2.0 2.8 Intersection Summary HCM 6th Ctrl Delay 13.9 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. User approved changes to right turn type. 65 of 111 Lanes, Volumes, Timings 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - AM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 426 144 81 879 427 26 Future Volume (vph) 426 144 81 879 427 26 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)385 0 425 0 Storage Lanes 1 1 1 0 Taper Length (ft)25 25 Right Turn on Red Yes Yes Link Speed (mph)25 40 40 Link Distance (ft)946 862 651 Travel Time (s)25.8 14.7 11.1 Confl. Peds. (#/hr)4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)3% 12% 14% 7% 11% 8% Shared Lane Traffic (%) Turn Type Prot Perm Prot NA NA Protected Phases 1 7 4 8 Permitted Phases 1 Detector Phase 1 1 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 10.0 10.0 Minimum Split (s)35.0 35.0 9.5 15.0 15.0 Total Split (s)40.0 40.0 34.5 55.0 55.0 Total Split (%)30.9% 30.9% 26.6% 42.5% 42.5% Yellow Time (s)4.0 4.0 3.5 4.0 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.0 5.0 4.5 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None None Min None Intersection Summary Area Type:Other Cycle Length: 129.5 Actuated Cycle Length: 80.3 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 2: C St SW & SR 18 EB Ramp 66 of 111 HCM 6th Signalized Intersection Summary 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - AM Peak Hour Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 426 144 81 879 427 26 Future Volume (veh/h) 426 144 81 879 427 26 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1709 1586 1559 1654 1600 1600 Adj Flow Rate, veh/h 463 61 88 955 464 28 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 3 12 14 7 11 11 Cap, veh/h 564 466 146 1478 843 51 Arrive On Green 0.35 0.35 0.10 0.47 0.29 0.29 Sat Flow, veh/h 1628 1344 1485 3226 2993 175 Grp Volume(v), veh/h 463 61 88 955 242 250 Grp Sat Flow(s),veh/h/ln 1628 1344 1485 1572 1520 1568 Q Serve(g_s), s 14.2 1.7 3.1 12.6 7.3 7.4 Cycle Q Clear(g_c), s 14.2 1.7 3.1 12.6 7.3 7.4 Prop In Lane 1.00 1.00 1.00 0.11 Lane Grp Cap(c), veh/h 564 466 146 1478 440 454 V/C Ratio(X)0.82 0.13 0.60 0.65 0.55 0.55 Avail Cap(c_a), veh/h 1044 862 816 2880 1392 1437 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 16.3 12.2 23.6 11.0 16.4 16.4 Incr Delay (d2), s/veh 4.3 0.2 4.8 0.7 1.5 1.5 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.4 1.6 1.2 3.4 2.3 2.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 20.5 12.4 28.4 11.7 17.9 17.9 LnGrp LOS C B C B B B Approach Vol, veh/h 524 1043 492 Approach Delay, s/veh 19.6 13.1 17.9 Approach LOS B B B Timer - Assigned Phs 4 6 7 8 Phs Duration (G+Y+Rc), s 30.7 23.9 9.9 20.8 Change Period (Y+Rc), s 5.0 5.0 4.5 5.0 Max Green Setting (Gmax), s 50.0 35.0 30.0 50.0 Max Q Clear Time (g_c+I1), s 14.6 16.2 5.1 9.4 Green Ext Time (p_c), s 11.0 2.8 0.3 4.5 Intersection Summary HCM 6th Ctrl Delay 15.9 HCM 6th LOS B 67 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - AM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph)67 16 9 896 497 37 Future Volume (vph)67 16 9 896 497 37 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Satd. Flow (prot)1553 0 0 3345 3279 0 Flt Permitted 0.961 0.950 Satd. Flow (perm)1553 0 0 3178 3279 0 Right Turn on Red Yes Yes Satd. Flow (RTOR)12 11 Link Speed (mph)25 40 40 Link Distance (ft)998 1775 862 Travel Time (s)27.2 30.3 14.7 Confl. Peds. (#/hr)1 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 Heavy Vehicles (%) 18% 0% 0% 8% 9% 5% Shared Lane Traffic (%) Lane Group Flow (vph) 93 0 0 1017 600 0 Turn Type Prot pm+pt NA NA Protected Phases 6 7 4 8 Permitted Phases 4 Detector Phase 6 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 Minimum Split (s)9.0 9.0 9.0 28.0 Total Split (s)29.0 19.0 49.0 49.0 Total Split (%)29.9% 19.6% 50.5% 50.5% Yellow Time (s)3.0 3.0 3.0 3.0 All-Red Time (s)1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None Min Min Act Effct Green (s)9.3 32.9 32.9 Actuated g/C Ratio 0.20 0.71 0.71 v/c Ratio 0.29 0.45 0.26 Control Delay 17.9 5.3 4.1 Queue Delay 0.0 0.0 0.0 Total Delay 17.9 5.3 4.1 LOS B A A Approach Delay 17.9 5.3 4.1 Approach LOS B A A Intersection Summary Area Type:Other Cycle Length: 97 Actuated Cycle Length: 46.1 Natural Cycle: 50 Control Type: Actuated-Uncoordinated 68 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - AM Peak Hour Maximum v/c Ratio: 0.45 Intersection Signal Delay: 5.5 Intersection LOS: A Intersection Capacity Utilization 42.4%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: C St SW & 8th St SW 69 of 111 Lanes, Volumes, Timings 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)39 3 294 25 8 3 194 239 9 6 773 226 Future Volume (vph)39 3 294 25 8 3 194 239 9 6 773 226 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 200 75 0 400 0 210 170 Storage Lanes 0 1 1 0 2 0 1 1 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)25 25 40 40 Link Distance (ft)374 361 651 322 Travel Time (s)10.2 9.8 11.1 5.5 Confl. Peds. (#/hr)2 3 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%) 13% 0% 12% 0% 0% 0% 7% 4% 0% 20% 4% 4% Shared Lane Traffic (%) Turn Type Split NA Prot Split NA Prot NA Prot NA pt+ov Protected Phases 6 6 6 2 2 7 4 3 8 8 6 Permitted Phases Detector Phase 6 6 6 2 2 7 4 3 8 8 6 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0 Minimum Split (s)9.5 9.5 9.5 42.0 42.0 9.5 30.0 9.5 15.0 Total Split (s)44.5 44.5 44.5 25.0 25.0 44.5 75.0 24.5 65.0 Total Split (%)24.9% 24.9% 24.9% 14.0% 14.0% 24.9% 41.9% 13.7% 36.3% Yellow Time (s)3.5 3.5 3.5 4.0 4.0 3.5 4.0 3.5 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 5.0 5.0 4.5 5.0 4.5 5.0 Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Intersection Summary Area Type:Other Cycle Length: 179 Actuated Cycle Length: 86.2 Natural Cycle: 95 Control Type: Actuated-Uncoordinated Splits and Phases: 1: C St SW & SR 18 WB Ramps/Park and Ride Access 70 of 111 HCM 6th Signalized Intersection Summary 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 39 3 294 25 8 3 194 239 9 6 773 226 Future Volume (veh/h) 39 3 294 25 8 3 194 239 9 6 773 226 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1750 1750 1586 1750 1750 1750 1654 1695 1695 1477 1695 1695 Adj Flow Rate, veh/h 39 3 197 25 8 3 194 239 9 6 773 146 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 0 0 12 0 0 0 7 4 4 20 4 4 Cap, veh/h 287 22 248 67 48 18 310 441 17 529 1355 870 Arrive On Green 0.18 0.18 0.18 0.04 0.04 0.04 0.10 0.14 0.14 0.38 0.42 0.42 Sat Flow, veh/h 1553 119 1344 1667 1210 454 3057 3164 119 1407 3221 1437 Grp Volume(v), veh/h 42 0 197 25 0 11 194 121 127 6 773 146 Grp Sat Flow(s),veh/h/ln 1672 0 1344 1667 0 1663 1528 1611 1673 1407 1611 1437 Q Serve(g_s), s 1.6 0.0 10.5 1.1 0.0 0.5 4.6 5.3 5.3 0.2 13.7 3.4 Cycle Q Clear(g_c), s 1.6 0.0 10.5 1.1 0.0 0.5 4.6 5.3 5.3 0.2 13.7 3.4 Prop In Lane 0.93 1.00 1.00 0.27 1.00 0.07 1.00 1.00 Lane Grp Cap(c), veh/h 309 0 248 67 0 67 310 225 233 529 1355 870 V/C Ratio(X)0.14 0.00 0.79 0.37 0.00 0.17 0.62 0.54 0.54 0.01 0.57 0.17 Avail Cap(c_a), veh/h 891 0 716 444 0 443 1629 1502 1560 529 2575 1414 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 25.6 0.0 29.2 35.1 0.0 34.8 32.3 30.1 30.1 14.7 16.6 6.5 Incr Delay (d2), s/veh 0.3 0.0 7.9 4.9 0.0 1.6 2.9 2.4 2.4 0.0 1.0 0.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.6 0.0 3.7 0.5 0.0 0.2 1.7 2.1 2.2 0.1 4.6 1.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 25.9 0.0 37.1 40.0 0.0 36.5 35.3 32.5 32.4 14.7 17.6 6.8 LnGrp LOS C A D D A D D C C B B A Approach Vol, veh/h 239 36 442 925 Approach Delay, s/veh 35.2 38.9 33.7 15.9 Approach LOS D D C B Timer - Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 8.0 33.2 15.5 18.4 12.1 36.6 Change Period (Y+Rc), s 5.0 5.0 * 5 4.5 4.5 5.0 Max Green Setting (Gmax), s 20.0 20.0 * 70 40.0 40.0 60.0 Max Q Clear Time (g_c+I1), s 3.1 2.2 7.3 12.5 6.6 15.7 Green Ext Time (p_c), s 0.1 0.0 1.7 1.4 1.1 15.8 Intersection Summary HCM 6th Ctrl Delay 24.0 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 71 of 111 Lanes, Volumes, Timings 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 282 134 260 771 990 127 Future Volume (vph) 282 134 260 771 990 127 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)385 0 425 0 Storage Lanes 1 1 1 0 Taper Length (ft)25 25 Right Turn on Red Yes Yes Link Speed (mph)25 40 40 Link Distance (ft)946 862 651 Travel Time (s)25.8 14.7 11.1 Confl. Peds. (#/hr)11 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%)2% 8% 3% 3% 8% 2% Shared Lane Traffic (%) Turn Type Prot Perm Prot NA NA Protected Phases 1 7 4 8 Permitted Phases 1 Detector Phase 1 1 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 10.0 10.0 Minimum Split (s)35.0 35.0 9.5 15.0 15.0 Total Split (s)40.0 40.0 34.5 55.0 55.0 Total Split (%)30.9% 30.9% 26.6% 42.5% 42.5% Yellow Time (s)4.0 4.0 3.5 4.0 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.0 5.0 4.5 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None None Min None Intersection Summary Area Type:Other Cycle Length: 129.5 Actuated Cycle Length: 115.2 Natural Cycle: 90 Control Type: Actuated-Uncoordinated Splits and Phases: 2: C St SW & SR 18 EB Ramp 72 of 111 HCM 6th Signalized Intersection Summary 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - PM Peak Hour Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 282 134 260 771 990 127 Future Volume (veh/h) 282 134 260 771 990 127 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1723 1641 1709 1709 1641 1641 Adj Flow Rate, veh/h 297 0 274 812 1042 134 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 8 3 3 8 8 Cap, veh/h 343 291 313 2230 1242 160 Arrive On Green 0.21 0.00 0.19 0.69 0.45 0.45 Sat Flow, veh/h 1641 1391 1628 3333 2860 357 Grp Volume(v), veh/h 297 0 274 812 584 592 Grp Sat Flow(s),veh/h/ln 1641 1391 1628 1624 1559 1577 Q Serve(g_s), s 16.8 0.0 15.7 10.0 31.8 31.9 Cycle Q Clear(g_c), s 16.8 0.0 15.7 10.0 31.8 31.9 Prop In Lane 1.00 1.00 1.00 0.23 Lane Grp Cap(c), veh/h 343 291 313 2230 697 705 V/C Ratio(X)0.87 0.00 0.87 0.36 0.84 0.84 Avail Cap(c_a), veh/h 598 507 509 2230 812 821 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 36.7 0.0 37.6 6.3 23.5 23.5 Incr Delay (d2), s/veh 9.0 0.0 10.7 0.1 7.4 7.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 7.5 0.0 6.9 2.8 12.1 12.3 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 45.7 0.0 48.3 6.4 30.9 30.9 LnGrp LOS D A D A C C Approach Vol, veh/h 297 1086 1176 Approach Delay, s/veh 45.7 17.0 30.9 Approach LOS D B C Timer - Assigned Phs 4 6 7 8 Phs Duration (G+Y+Rc), s 70.9 25.1 23.0 47.9 Change Period (Y+Rc), s 5.0 5.0 4.5 5.0 Max Green Setting (Gmax), s 50.0 35.0 30.0 50.0 Max Q Clear Time (g_c+I1), s 12.0 18.8 17.7 33.9 Green Ext Time (p_c), s 9.0 1.3 0.8 9.0 Intersection Summary HCM 6th Ctrl Delay 26.7 HCM 6th LOS C 73 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph)93 14 18 910 1044 86 Future Volume (vph)93 14 18 910 1044 86 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Satd. Flow (prot)1742 0 0 3496 3299 0 Flt Permitted 0.958 0.927 Satd. Flow (perm)1742 0 0 3244 3299 0 Right Turn on Red Yes Yes Satd. Flow (RTOR)6 18 Link Speed (mph)25 40 40 Link Distance (ft)998 1775 862 Travel Time (s)27.2 30.3 14.7 Confl. Peds. (#/hr)8 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 Heavy Vehicles (%)3% 0% 11% 3% 8% 7% Shared Lane Traffic (%) Lane Group Flow (vph) 112 0 0 967 1178 0 Turn Type Prot pm+pt NA NA Protected Phases 6 7 4 8 Permitted Phases 4 Detector Phase 6 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 Minimum Split (s)9.0 9.0 9.0 28.0 Total Split (s)15.0 15.0 85.0 70.0 Total Split (%)15.0% 15.0% 85.0% 70.0% Yellow Time (s)3.0 3.0 3.0 3.0 All-Red Time (s)1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None Min Min Act Effct Green (s)9.1 34.7 34.7 Actuated g/C Ratio 0.19 0.72 0.72 v/c Ratio 0.33 0.41 0.49 Control Delay 20.2 4.7 5.2 Queue Delay 0.0 0.0 0.0 Total Delay 20.2 4.7 5.2 LOS C A A Approach Delay 20.2 4.7 5.2 Approach LOS C A A Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 48 Natural Cycle: 50 Control Type: Actuated-Uncoordinated 74 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2019 Existing - PM Peak Hour Maximum v/c Ratio: 0.49 Intersection Signal Delay: 5.7 Intersection LOS: A Intersection Capacity Utilization 50.6%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: C St SW & 8th St SW 75 of 111 Traffic Impact Analysis LogistiCenter at Auburn 2021 Without Project 76 of 111 Lanes, Volumes, Timings 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 100 6 226 8 4 0 356 780 10 3 182 115 Future Volume (vph) 100 6 226 8 4 0 356 780 10 3 182 115 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 200 75 0 400 0 210 170 Storage Lanes 0 1 1 0 2 0 1 1 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)25 25 40 40 Link Distance (ft)374 361 651 322 Travel Time (s)10.2 9.8 11.1 5.5 Confl. Peds. (#/hr)1 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%)7% 0% 6% 0% 0% 0% 7% 4% 0% 0% 15% 24% Shared Lane Traffic (%) Turn Type Split NA Prot Split NA Prot NA Prot NA pm+ov Protected Phases 6 6 6 2 2 7 4 3 8 6 Permitted Phases 8 Detector Phase 6 6 6 2 2 7 4 3 8 8 6 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0 5.0 Minimum Split (s)9.5 9.5 9.5 42.0 42.0 9.5 30.0 9.5 15.0 9.5 Total Split (s)44.5 44.5 44.5 25.0 25.0 44.5 75.0 24.5 65.0 44.5 Total Split (%)24.9% 24.9% 24.9% 14.0% 14.0% 24.9% 41.9% 13.7% 36.3% 24.9% Yellow Time (s)3.5 3.5 3.5 4.0 4.0 3.5 4.0 3.5 4.0 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 5.0 5.0 4.5 5.0 4.5 5.0 4.5 Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Recall Mode None None None None None None Min None Min None Intersection Summary Area Type:Other Cycle Length: 179 Actuated Cycle Length: 65.7 Natural Cycle: 95 Control Type: Actuated-Uncoordinated Splits and Phases: 1: C St SW & SR 18 WB Ramps/Park and Ride Access 77 of 111 HCM 6th Signalized Intersection Summary 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - AM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 100 6 226 8 4 0 356 780 10 3 182 115 Future Volume (veh/h) 100 6 226 8 4 0 356 780 10 3 182 115 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1750 1750 1668 1750 1750 1750 1654 1695 1695 1750 1545 1422 Adj Flow Rate, veh/h 100 6 48 8 4 0 356 780 10 3 182 53 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 0 0 6 0 0 0 7 4 4 0 15 24 Cap, veh/h 178 11 159 26 27 0 610 1283 16 43 680 415 Arrive On Green 0.11 0.11 0.11 0.02 0.02 0.00 0.20 0.39 0.39 0.03 0.23 0.23 Sat Flow, veh/h 1577 95 1414 1667 1750 0 3057 3257 42 1667 2936 1204 Grp Volume(v), veh/h 106 0 48 8 4 0 356 386 404 3 182 53 Grp Sat Flow(s),veh/h/ln 1671 0 1414 1667 1750 0 1528 1611 1688 1667 1468 1204 Q Serve(g_s), s 2.6 0.0 1.3 0.2 0.1 0.0 4.6 8.2 8.2 0.1 2.2 1.3 Cycle Q Clear(g_c), s 2.6 0.0 1.3 0.2 0.1 0.0 4.6 8.2 8.2 0.1 2.2 1.3 Prop In Lane 0.94 1.00 1.00 0.00 1.00 0.02 1.00 1.00 Lane Grp Cap(c), veh/h 188 0 159 26 27 0 610 634 665 43 680 415 V/C Ratio(X)0.56 0.00 0.30 0.31 0.15 0.00 0.58 0.61 0.61 0.07 0.27 0.13 Avail Cap(c_a), veh/h 1549 0 1310 772 811 0 2834 2613 2738 772 4082 1810 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.1 0.0 17.6 21.0 21.0 0.0 15.6 10.4 10.4 20.5 13.6 9.7 Incr Delay (d2), s/veh 3.7 0.0 1.5 9.3 3.5 0.0 1.3 1.1 1.1 0.8 0.6 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.4 0.1 0.1 0.0 1.4 2.2 2.3 0.0 0.6 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.8 0.0 19.1 30.3 24.4 0.0 16.9 11.6 11.5 21.3 14.2 10.1 LnGrp LOS C A B C C A B B B C B B Approach Vol, veh/h 154 12 1146 238 Approach Delay, s/veh 21.0 28.4 13.2 13.3 Approach LOS C C B B Timer - Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 5.7 6.1 22.0 9.4 13.1 15.0 Change Period (Y+Rc), s 5.0 5.0 * 5 4.5 4.5 5.0 Max Green Setting (Gmax), s 20.0 20.0 * 70 40.0 40.0 60.0 Max Q Clear Time (g_c+I1), s 2.2 2.1 10.2 4.6 6.6 4.2 Green Ext Time (p_c), s 0.0 0.0 6.7 1.2 2.1 3.2 Intersection Summary HCM 6th Ctrl Delay 14.1 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. User approved changes to right turn type. 78 of 111 Lanes, Volumes, Timings 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - AM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 460 204 93 933 469 35 Future Volume (vph) 460 204 93 933 469 35 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)385 0 425 0 Storage Lanes 1 1 1 0 Taper Length (ft)25 25 Right Turn on Red Yes Yes Link Speed (mph)25 40 40 Link Distance (ft)946 862 651 Travel Time (s)25.8 14.7 11.1 Confl. Peds. (#/hr)4 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%)3% 12% 14% 7% 11% 8% Shared Lane Traffic (%) Turn Type Prot Perm Prot NA NA Protected Phases 1 7 4 8 Permitted Phases 1 Detector Phase 1 1 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 10.0 10.0 Minimum Split (s)35.0 35.0 9.5 15.0 15.0 Total Split (s)40.0 40.0 34.5 55.0 55.0 Total Split (%)30.9% 30.9% 26.6% 42.5% 42.5% Yellow Time (s)4.0 4.0 3.5 4.0 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.0 5.0 4.5 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None None Min None Intersection Summary Area Type:Other Cycle Length: 129.5 Actuated Cycle Length: 81.1 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 2: C St SW & SR 18 EB Ramp 79 of 111 HCM 6th Signalized Intersection Summary 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - AM Peak Hour Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 460 204 93 933 469 35 Future Volume (veh/h) 460 204 93 933 469 35 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1709 1586 1559 1654 1600 1600 Adj Flow Rate, veh/h 460 111 93 933 469 35 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 3 12 14 7 11 11 Cap, veh/h 570 470 152 1458 796 59 Arrive On Green 0.35 0.35 0.10 0.46 0.28 0.28 Sat Flow, veh/h 1628 1344 1485 3226 2948 213 Grp Volume(v), veh/h 460 111 93 933 248 256 Grp Sat Flow(s),veh/h/ln 1628 1344 1485 1572 1520 1561 Q Serve(g_s), s 13.7 3.1 3.2 12.1 7.6 7.6 Cycle Q Clear(g_c), s 13.7 3.1 3.2 12.1 7.6 7.6 Prop In Lane 1.00 1.00 1.00 0.14 Lane Grp Cap(c), veh/h 570 470 152 1458 422 433 V/C Ratio(X)0.81 0.24 0.61 0.64 0.59 0.59 Avail Cap(c_a), veh/h 1061 877 830 2928 1416 1454 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 15.8 12.4 23.1 11.0 16.7 16.8 Incr Delay (d2), s/veh 3.9 0.4 4.7 0.7 1.9 1.8 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.1 2.8 1.2 3.2 2.4 2.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 19.7 12.7 27.8 11.6 18.6 18.6 LnGrp LOS B B C B B B Approach Vol, veh/h 571 1026 504 Approach Delay, s/veh 18.4 13.1 18.6 Approach LOS B B B Timer - Assigned Phs 4 6 7 8 Phs Duration (G+Y+Rc), s 29.9 23.8 10.0 19.9 Change Period (Y+Rc), s 5.0 5.0 4.5 5.0 Max Green Setting (Gmax), s 50.0 35.0 30.0 50.0 Max Q Clear Time (g_c+I1), s 14.1 15.7 5.2 9.6 Green Ext Time (p_c), s 10.7 3.0 0.3 4.6 Intersection Summary HCM 6th Ctrl Delay 15.9 HCM 6th LOS B 80 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - AM Peak Hour Page 1 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph)90 17 9 939 566 58 Future Volume (vph)90 17 9 939 566 58 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Satd. Flow (prot)1551 0 0 3345 3270 0 Flt Permitted 0.960 0.949 Satd. Flow (perm)1551 0 0 3174 3270 0 Right Turn on Red Yes Yes Satd. Flow (RTOR)9 15 Link Speed (mph)25 40 40 Link Distance (ft)998 1775 862 Travel Time (s)27.2 30.3 14.7 Confl. Peds. (#/hr)1 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 Heavy Vehicles (%) 18% 0% 0% 8% 9% 5% Shared Lane Traffic (%) Lane Group Flow (vph) 120 0 0 1065 701 0 Turn Type Prot pm+pt NA NA Protected Phases 6 7 4 8 Permitted Phases 4 Detector Phase 6 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 Minimum Split (s)9.0 9.0 9.0 28.0 Total Split (s)29.0 19.0 49.0 49.0 Total Split (%)29.9% 19.6% 50.5% 50.5% Yellow Time (s)3.0 3.0 3.0 3.0 All-Red Time (s)1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None Min Min Act Effct Green (s)10.5 32.9 32.9 Actuated g/C Ratio 0.22 0.70 0.70 v/c Ratio 0.34 0.48 0.31 Control Delay 18.8 6.1 4.8 Queue Delay 0.0 0.0 0.0 Total Delay 18.8 6.1 4.8 LOS B A A Approach Delay 18.8 6.1 4.8 Approach LOS B A A Intersection Summary Area Type:Other Cycle Length: 97 Actuated Cycle Length: 47.1 Natural Cycle: 50 Control Type: Actuated-Uncoordinated 81 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - AM Peak Hour Page 2 Maximum v/c Ratio: 0.48 Intersection Signal Delay: 6.4 Intersection LOS: A Intersection Capacity Utilization 45.0%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: C St SW & 8th St SW 82 of 111 Lanes, Volumes, Timings 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)49 3 311 26 8 3 206 269 9 6 841 253 Future Volume (vph)49 3 311 26 8 3 206 269 9 6 841 253 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 200 75 0 400 0 210 170 Storage Lanes 0 1 1 0 2 0 1 1 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)25 25 40 40 Link Distance (ft)374 361 651 322 Travel Time (s)10.2 9.8 11.1 5.5 Confl. Peds. (#/hr)2 3 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%) 13% 0% 12% 0% 0% 0% 7% 4% 0% 20% 4% 4% Shared Lane Traffic (%) Turn Type Split NA Prot Split NA Prot NA Prot NA pt+ov Protected Phases 6 6 6 2 2 7 4 3 8 8 6 Permitted Phases Detector Phase 6 6 6 2 2 7 4 3 8 8 6 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0 Minimum Split (s)9.5 9.5 9.5 42.0 42.0 9.5 30.0 9.5 15.0 Total Split (s)44.5 44.5 44.5 25.0 25.0 44.5 75.0 24.5 65.0 Total Split (%)24.9% 24.9% 24.9% 14.0% 14.0% 24.9% 41.9% 13.7% 36.3% Yellow Time (s)3.5 3.5 3.5 4.0 4.0 3.5 4.0 3.5 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 5.0 5.0 4.5 5.0 4.5 5.0 Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Intersection Summary Area Type:Other Cycle Length: 179 Actuated Cycle Length: 90.9 Natural Cycle: 95 Control Type: Actuated-Uncoordinated Splits and Phases: 1: C St SW & SR 18 WB Ramps/Park and Ride Access 83 of 111 HCM 6th Signalized Intersection Summary 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 49 3 311 26 8 3 206 269 9 6 841 253 Future Volume (veh/h) 49 3 311 26 8 3 206 269 9 6 841 253 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1750 1750 1586 1750 1750 1750 1654 1695 1695 1477 1695 1695 Adj Flow Rate, veh/h 49 3 208 26 8 3 206 269 9 6 841 173 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 0 0 12 0 0 0 7 4 4 20 4 4 Cap, veh/h 301 18 257 66 48 18 314 428 14 560 1404 901 Arrive On Green 0.19 0.19 0.19 0.04 0.04 0.04 0.10 0.13 0.13 0.40 0.44 0.44 Sat Flow, veh/h 1575 96 1344 1667 1209 454 3057 3179 106 1407 3221 1437 Grp Volume(v), veh/h 52 0 208 26 0 11 206 136 142 6 841 173 Grp Sat Flow(s),veh/h/ln 1671 0 1344 1667 0 1663 1528 1611 1675 1407 1611 1437 Q Serve(g_s), s 2.1 0.0 12.2 1.3 0.0 0.5 5.3 6.6 6.6 0.2 16.4 4.2 Cycle Q Clear(g_c), s 2.1 0.0 12.2 1.3 0.0 0.5 5.3 6.6 6.6 0.2 16.4 4.2 Prop In Lane 0.94 1.00 1.00 0.27 1.00 0.06 1.00 1.00 Lane Grp Cap(c), veh/h 319 0 257 66 0 66 314 217 225 560 1404 901 V/C Ratio(X)0.16 0.00 0.81 0.40 0.00 0.17 0.66 0.63 0.63 0.01 0.60 0.19 Avail Cap(c_a), veh/h 812 0 653 405 0 404 1485 1370 1424 560 2348 1322 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 27.8 0.0 31.9 38.6 0.0 38.2 35.5 33.7 33.7 15.0 17.7 6.5 Incr Delay (d2), s/veh 0.3 0.0 8.4 5.4 0.0 1.7 3.3 3.6 3.5 0.0 1.1 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 4.3 0.6 0.0 0.2 2.0 2.7 2.8 0.1 5.7 1.9 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 28.1 0.0 40.2 44.0 0.0 39.9 38.8 37.2 37.2 15.0 18.9 6.8 LnGrp LOS C A D D A D D D D B B A Approach Vol, veh/h 260 37 484 1020 Approach Delay, s/veh 37.8 42.8 37.9 16.8 Approach LOS D D D B Timer - Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 8.2 37.8 16.1 20.2 13.0 40.9 Change Period (Y+Rc), s 5.0 5.0 * 5 4.5 4.5 5.0 Max Green Setting (Gmax), s 20.0 20.0 * 70 40.0 40.0 60.0 Max Q Clear Time (g_c+I1), s 3.3 2.2 8.6 14.2 7.3 18.4 Green Ext Time (p_c), s 0.1 0.0 2.0 1.6 1.1 17.5 Intersection Summary HCM 6th Ctrl Delay 26.0 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 84 of 111 Lanes, Volumes, Timings 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 303 171 281 816 1056 148 Future Volume (vph) 303 171 281 816 1056 148 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)385 0 425 0 Storage Lanes 1 1 1 0 Taper Length (ft)25 25 Right Turn on Red Yes Yes Link Speed (mph)25 40 40 Link Distance (ft)946 862 651 Travel Time (s)25.8 14.7 11.1 Confl. Peds. (#/hr)11 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%)2% 8% 3% 3% 8% 2% Shared Lane Traffic (%) Turn Type Prot Perm Prot NA NA Protected Phases 1 7 4 8 Permitted Phases 1 Detector Phase 1 1 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 10.0 10.0 Minimum Split (s)35.0 35.0 9.5 15.0 15.0 Total Split (s)40.0 40.0 34.5 55.0 55.0 Total Split (%)30.9% 30.9% 26.6% 42.5% 42.5% Yellow Time (s)4.0 4.0 3.5 4.0 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.0 5.0 4.5 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None None Min None Intersection Summary Area Type:Other Cycle Length: 129.5 Actuated Cycle Length: 116.9 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Splits and Phases: 2: C St SW & SR 18 EB Ramp 85 of 111 HCM 6th Signalized Intersection Summary 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - PM Peak Hour Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 303 171 281 816 1056 148 Future Volume (veh/h) 303 171 281 816 1056 148 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1723 1641 1709 1709 1641 1641 Adj Flow Rate, veh/h 303 0 281 816 1056 148 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 2 8 3 3 8 8 Cap, veh/h 347 294 319 2235 1229 172 Arrive On Green 0.21 0.00 0.20 0.69 0.45 0.45 Sat Flow, veh/h 1641 1391 1628 3333 2828 384 Grp Volume(v), veh/h 303 0 281 816 599 605 Grp Sat Flow(s),veh/h/ln 1641 1391 1628 1624 1559 1572 Q Serve(g_s), s 17.8 0.0 16.8 10.5 34.4 34.6 Cycle Q Clear(g_c), s 17.8 0.0 16.8 10.5 34.4 34.6 Prop In Lane 1.00 1.00 1.00 0.24 Lane Grp Cap(c), veh/h 347 294 319 2235 698 703 V/C Ratio(X)0.87 0.00 0.88 0.37 0.86 0.86 Avail Cap(c_a), veh/h 575 487 489 2235 780 786 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 38.1 0.0 39.1 6.5 24.8 24.8 Incr Delay (d2), s/veh 10.4 0.0 12.7 0.1 9.3 9.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 8.1 0.0 7.6 2.9 13.5 13.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 48.5 0.0 51.8 6.6 34.0 34.1 LnGrp LOS D A D A C C Approach Vol, veh/h 303 1097 1204 Approach Delay, s/veh 48.5 18.2 34.1 Approach LOS D B C Timer - Assigned Phs 4 6 7 8 Phs Duration (G+Y+Rc), s 73.8 26.1 24.1 49.7 Change Period (Y+Rc), s 5.0 5.0 4.5 5.0 Max Green Setting (Gmax), s 50.0 35.0 30.0 50.0 Max Q Clear Time (g_c+I1), s 12.5 19.8 18.8 36.6 Green Ext Time (p_c), s 9.1 1.3 0.8 8.2 Intersection Summary HCM 6th Ctrl Delay 29.1 HCM 6th LOS C 86 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 118 15 19 951 1121 110 Future Volume (vph) 118 15 19 951 1121 110 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Satd. Flow (prot)1745 0 0 3496 3291 0 Flt Permitted 0.958 0.921 Satd. Flow (perm)1745 0 0 3223 3291 0 Right Turn on Red Yes Yes Satd. Flow (RTOR)5 22 Link Speed (mph)25 40 40 Link Distance (ft)998 1775 862 Travel Time (s)27.2 30.3 14.7 Confl. Peds. (#/hr)8 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 Heavy Vehicles (%)3% 0% 11% 3% 8% 7% Shared Lane Traffic (%) Lane Group Flow (vph) 139 0 0 1011 1283 0 Turn Type Prot pm+pt NA NA Protected Phases 6 7 4 8 Permitted Phases 4 Detector Phase 6 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 Minimum Split (s)9.0 9.0 9.0 28.0 Total Split (s)15.0 15.0 85.0 70.0 Total Split (%)15.0% 15.0% 85.0% 70.0% Yellow Time (s)3.0 3.0 3.0 3.0 All-Red Time (s)1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None Min Min Act Effct Green (s)10.0 34.1 34.1 Actuated g/C Ratio 0.19 0.65 0.65 v/c Ratio 0.41 0.48 0.59 Control Delay 22.0 5.6 6.6 Queue Delay 0.0 0.0 0.0 Total Delay 22.0 5.6 6.6 LOS C A A Approach Delay 22.0 5.6 6.6 Approach LOS C A A Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 52.1 Natural Cycle: 50 Control Type: Actuated-Uncoordinated 87 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 Without Project - PM Peak Hour Maximum v/c Ratio: 0.59 Intersection Signal Delay: 7.1 Intersection LOS: A Intersection Capacity Utilization 53.9%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: C St SW & 8th St SW 88 of 111 Traffic Impact Analysis LogistiCenter at Auburn 2021 With Project 89 of 111 Lanes, Volumes, Timings 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 100 6 236 8 4 0 364 781 10 3 187 115 Future Volume (vph) 100 6 236 8 4 0 364 781 10 3 187 115 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 200 75 0 400 0 210 170 Storage Lanes 0 1 1 0 2 0 1 1 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)25 25 40 40 Link Distance (ft)374 361 651 322 Travel Time (s)10.2 9.8 11.1 5.5 Confl. Peds. (#/hr)1 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%)7% 0% 7% 0% 0% 0% 7% 4% 0% 0% 15% 24% Shared Lane Traffic (%) Turn Type Split NA Prot Split NA Prot NA Prot NA pm+ov Protected Phases 6 6 6 2 2 7 4 3 8 6 Permitted Phases 8 Detector Phase 6 6 6 2 2 7 4 3 8 8 6 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0 5.0 Minimum Split (s)9.5 9.5 9.5 42.0 42.0 9.5 30.0 9.5 15.0 9.5 Total Split (s)44.5 44.5 44.5 25.0 25.0 44.5 75.0 24.5 65.0 44.5 Total Split (%)24.9% 24.9% 24.9% 14.0% 14.0% 24.9% 41.9% 13.7% 36.3% 24.9% Yellow Time (s)3.5 3.5 3.5 4.0 4.0 3.5 4.0 3.5 4.0 3.5 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 5.0 5.0 4.5 5.0 4.5 5.0 4.5 Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Recall Mode None None None None None None Min None Min None Intersection Summary Area Type:Other Cycle Length: 179 Actuated Cycle Length: 66 Natural Cycle: 95 Control Type: Actuated-Uncoordinated Splits and Phases: 1: C St SW & SR 18 WB Ramps/Park and Ride Access 90 of 111 HCM 6th Signalized Intersection Summary 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 100 6 236 8 4 0 364 781 10 3 187 115 Future Volume (veh/h) 100 6 236 8 4 0 364 781 10 3 187 115 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1750 1750 1654 1750 1750 1750 1654 1695 1695 1750 1545 1422 Adj Flow Rate, veh/h 100 6 54 8 4 0 364 781 10 3 187 53 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 0 0 7 0 0 0 7 4 4 0 15 24 Cap, veh/h 181 11 161 26 27 0 619 1281 16 46 676 415 Arrive On Green 0.11 0.11 0.11 0.02 0.02 0.00 0.20 0.39 0.39 0.03 0.23 0.23 Sat Flow, veh/h 1577 95 1402 1667 1750 0 3057 3257 42 1667 2936 1204 Grp Volume(v), veh/h 106 0 54 8 4 0 364 386 405 3 187 53 Grp Sat Flow(s),veh/h/ln 1671 0 1402 1667 1750 0 1528 1611 1688 1667 1468 1204 Q Serve(g_s), s 2.6 0.0 1.5 0.2 0.1 0.0 4.7 8.3 8.3 0.1 2.3 1.3 Cycle Q Clear(g_c), s 2.6 0.0 1.5 0.2 0.1 0.0 4.7 8.3 8.3 0.1 2.3 1.3 Prop In Lane 0.94 1.00 1.00 0.00 1.00 0.02 1.00 1.00 Lane Grp Cap(c), veh/h 192 0 161 26 27 0 619 633 664 46 676 415 V/C Ratio(X)0.55 0.00 0.34 0.31 0.15 0.00 0.59 0.61 0.61 0.06 0.28 0.13 Avail Cap(c_a), veh/h 1538 0 1291 767 805 0 2814 2594 2719 767 4054 1800 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 18.2 0.0 17.7 21.2 21.1 0.0 15.7 10.5 10.5 20.6 13.8 9.8 Incr Delay (d2), s/veh 3.5 0.0 1.7 9.3 3.5 0.0 1.3 1.2 1.1 0.7 0.6 0.4 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.1 0.0 0.5 0.1 0.1 0.0 1.4 2.2 2.3 0.0 0.6 0.4 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 21.7 0.0 19.4 30.5 24.6 0.0 17.0 11.7 11.6 21.3 14.4 10.1 LnGrp LOS C A B C C A B B B C B B Approach Vol, veh/h 160 12 1155 243 Approach Delay, s/veh 20.9 28.5 13.3 13.5 Approach LOS C C B B Timer - Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 5.7 6.2 22.1 9.5 13.3 15.0 Change Period (Y+Rc), s 5.0 5.0 * 5 4.5 4.5 5.0 Max Green Setting (Gmax), s 20.0 20.0 * 70 40.0 40.0 60.0 Max Q Clear Time (g_c+I1), s 2.2 2.1 10.3 4.6 6.7 4.3 Green Ext Time (p_c), s 0.0 0.0 6.7 1.2 2.1 3.3 Intersection Summary HCM 6th Ctrl Delay 14.2 HCM 6th LOS B Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. User approved changes to right turn type. 91 of 111 Lanes, Volumes, Timings 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 460 236 96 942 484 35 Future Volume (vph) 460 236 96 942 484 35 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)385 0 425 0 Storage Lanes 1 1 1 0 Taper Length (ft)25 25 Right Turn on Red Yes Yes Link Speed (mph)25 40 40 Link Distance (ft)946 862 651 Travel Time (s)25.8 14.7 11.1 Confl. Peds. (#/hr)4 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%)3% 13% 15% 7% 11% 9% Shared Lane Traffic (%) Turn Type Prot Perm Prot NA NA Protected Phases 1 7 4 8 Permitted Phases 1 Detector Phase 1 1 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 10.0 10.0 Minimum Split (s)35.0 35.0 9.5 15.0 15.0 Total Split (s)40.0 40.0 34.5 55.0 55.0 Total Split (%)30.9% 30.9% 26.6% 42.5% 42.5% Yellow Time (s)4.0 4.0 3.5 4.0 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.0 5.0 4.5 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None None Min None Intersection Summary Area Type:Other Cycle Length: 129.5 Actuated Cycle Length: 81.9 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Splits and Phases: 2: C St SW & SR 18 EB Ramp 92 of 111 HCM 6th Signalized Intersection Summary 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 460 236 96 942 484 35 Future Volume (veh/h) 460 236 96 942 484 35 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1709 1573 1545 1654 1600 1600 Adj Flow Rate, veh/h 460 140 96 942 484 35 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 3 13 15 7 11 11 Cap, veh/h 572 468 154 1462 799 58 Arrive On Green 0.35 0.35 0.10 0.47 0.28 0.28 Sat Flow, veh/h 1628 1333 1472 3226 2955 207 Grp Volume(v), veh/h 460 140 96 942 255 264 Grp Sat Flow(s),veh/h/ln 1628 1333 1472 1572 1520 1563 Q Serve(g_s), s 13.9 4.1 3.4 12.5 7.9 8.0 Cycle Q Clear(g_c), s 13.9 4.1 3.4 12.5 7.9 8.0 Prop In Lane 1.00 1.00 1.00 0.13 Lane Grp Cap(c), veh/h 572 468 154 1462 422 434 V/C Ratio(X)0.80 0.30 0.62 0.64 0.60 0.61 Avail Cap(c_a), veh/h 1047 857 811 2888 1396 1435 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 16.0 12.8 23.3 11.1 17.1 17.1 Incr Delay (d2), s/veh 3.8 0.5 4.9 0.7 2.0 2.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.2 0.1 1.3 3.3 2.6 2.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 19.8 13.3 28.3 11.8 19.0 19.0 LnGrp LOS B B C B B B Approach Vol, veh/h 600 1038 519 Approach Delay, s/veh 18.3 13.3 19.0 Approach LOS B B B Timer - Assigned Phs 4 6 7 8 Phs Duration (G+Y+Rc), s 30.3 24.1 10.2 20.1 Change Period (Y+Rc), s 5.0 5.0 4.5 5.0 Max Green Setting (Gmax), s 50.0 35.0 30.0 50.0 Max Q Clear Time (g_c+I1), s 14.5 15.9 5.4 10.0 Green Ext Time (p_c), s 10.9 3.2 0.3 4.8 Intersection Summary HCM 6th Ctrl Delay 16.1 HCM 6th LOS B 93 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 105 17 14 936 566 105 Future Volume (vph) 105 17 14 936 566 105 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Satd. Flow (prot)1548 0 0 3340 3215 0 Flt Permitted 0.959 0.943 Satd. Flow (perm)1548 0 0 3153 3215 0 Right Turn on Red Yes Yes Satd. Flow (RTOR)8 29 Link Speed (mph)25 40 40 Link Distance (ft)686 1203 862 Travel Time (s)18.7 20.5 14.7 Confl. Peds. (#/hr)1 Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 Heavy Vehicles (%) 18% 0% 7% 8% 9% 11% Shared Lane Traffic (%) Lane Group Flow (vph) 137 0 0 1068 754 0 Turn Type Prot pm+pt NA NA Protected Phases 6 7 4 8 Permitted Phases 4 Detector Phase 6 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 Minimum Split (s)9.0 9.0 9.0 28.0 Total Split (s)29.0 19.0 49.0 49.0 Total Split (%)29.9% 19.6% 50.5% 50.5% Yellow Time (s)3.0 3.0 3.0 3.0 All-Red Time (s)1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None Min Min Act Effct Green (s)11.2 33.0 33.0 Actuated g/C Ratio 0.23 0.69 0.69 v/c Ratio 0.38 0.49 0.34 Control Delay 19.1 6.6 5.2 Queue Delay 0.0 0.0 0.0 Total Delay 19.1 6.6 5.2 LOS B A A Approach Delay 19.1 6.6 5.2 Approach LOS B A A Intersection Summary Area Type:Other Cycle Length: 97 Actuated Cycle Length: 48 Natural Cycle: 50 Control Type: Actuated-Uncoordinated 94 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Maximum v/c Ratio: 0.49 Intersection Signal Delay: 6.9 Intersection LOS: A Intersection Capacity Utilization 49.3%ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 3: C St SW & 8th St SW 95 of 111 Lanes, Volumes, Timings 4: Site Access/Driveway & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 14 0 55 21 7 0 0 41 12 0 0 Future Volume (vph)0 14 0 55 21 7 0 0 41 12 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Link Speed (mph)25 30 25 25 Link Distance (ft)312 686 374 207 Travel Time (s)8.5 15.6 10.2 5.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)0% 36% 0% 19% 0% 0% 0% 0% 22% 8% 0% 0% Shared Lane Traffic (%) Sign Control Free Free Stop Stop Intersection Summary Area Type:Other Control Type: Unsignalized 96 of 111 HCM 6th TWSC 4: Site Access/Driveway & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Intersection Int Delay, s/veh 6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 14 0 55 21 7 0 0 41 12 0 0 Future Vol, veh/h 0 14 0 55 21 7 0 0 41 12 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 0 36 0 19 0 0 0 0 22 8 0 0 Mvmt Flow 0 15 0 60 23 8 0 0 45 13 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 31 0 0 15 0 0 162 166 15 185 162 27 Stage 1 - - - - - - 15 15 - 147 147 - Stage 2 - - - - - - 147 151 - 38 15 - Critical Hdwy 4.1 - - 4.29 - - 7.1 6.5 6.42 7.18 6.5 6.2 Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.18 5.5 - Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.18 5.5 - Follow-up Hdwy 2.2 - - 2.371 - - 3.5 4 3.498 3.572 4 3.3 Pot Cap-1 Maneuver 1595 - - 1499 - - 808 730 1009 763 734 1054 Stage 1 - - - - - - 1010 887 - 842 779 - Stage 2 - - - - - - 860 776 - 962 887 - Platoon blocked, %- -- - Mov Cap-1 Maneuver 1595 - - 1499 - - 783 700 1009 707 704 1054 Mov Cap-2 Maneuver - - - - - - 783 700 - 707 704 - Stage 1 - - - - - - 1010 887 - 842 747 - Stage 2 - - - - - - 825 744 - 920 887 - Approach EB WB NB SB HCM Control Delay, s 0 5 8.7 10.2 HCM LOS A B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h)1009 1595 - - 1499 - - 707 HCM Lane V/C Ratio 0.044 - - - 0.04 - - 0.018 HCM Control Delay (s) 8.7 0 - - 7.5 0 - 10.2 HCM Lane LOS A A - - A A - B HCM 95th %tile Q(veh) 0.1 0 - - 0.1 - - 0.1 97 of 111 Lanes, Volumes, Timings 5: C St SW & Site Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph)0 11 0 1013 589 25 Future Volume (vph)0 11 0 1013 589 25 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Link Speed (mph)30 40 40 Link Distance (ft)484 572 1203 Travel Time (s)11.0 9.8 20.5 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)0% 18% 0% 6% 10% 4% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized 98 of 111 HCM 6th TWSC 5: C St SW & Site Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - AM Peak Hour Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 11 0 1013 589 25 Future Vol, veh/h 0 11 0 1013 589 25 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 18 0 6 10 4 Mvmt Flow 0 12 0 1101 640 27 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 334 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 7.26 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.48 - - - - Pot Cap-1 Maneuver 0 617 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, %- - - Mov Cap-1 Maneuver - 617 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 11 0 0 HCM LOS B Minor Lane/Major Mvmt NBT EBLn1 SBT SBR Capacity (veh/h)- 617 - - HCM Lane V/C Ratio - 0.019 - - HCM Control Delay (s) - 11 - - HCM Lane LOS - B - - HCM 95th %tile Q(veh) - 0.1 - - 99 of 111 Lanes, Volumes, Timings 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)49 3 315 26 8 3 230 274 9 6 842 253 Future Volume (vph)49 3 315 26 8 3 230 274 9 6 842 253 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 1750 Storage Length (ft)0 200 75 0 400 0 210 170 Storage Lanes 0 1 1 0 2 0 1 1 Taper Length (ft)25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph)25 25 40 40 Link Distance (ft)374 361 651 322 Travel Time (s)10.2 9.8 11.1 5.5 Confl. Peds. (#/hr)2 3 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%) 12% 0% 12% 0% 0% 0% 8% 4% 0% 20% 4% 4% Shared Lane Traffic (%) Turn Type Split NA Prot Split NA Prot NA Prot NA pt+ov Protected Phases 6 6 6 2 2 7 4 3 8 8 6 Permitted Phases Detector Phase 6 6 6 2 2 7 4 3 8 8 6 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 5.0 5.0 10.0 5.0 10.0 Minimum Split (s)9.5 9.5 9.5 42.0 42.0 9.5 30.0 9.5 15.0 Total Split (s)44.5 44.5 44.5 25.0 25.0 44.5 75.0 24.5 65.0 Total Split (%)24.9% 24.9% 24.9% 14.0% 14.0% 24.9% 41.9% 13.7% 36.3% Yellow Time (s)3.5 3.5 3.5 4.0 4.0 3.5 4.0 3.5 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)4.5 4.5 5.0 5.0 4.5 5.0 4.5 5.0 Lead/Lag Lead Lead Lag Lag Lead-Lag Optimize?Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Intersection Summary Area Type:Other Cycle Length: 179 Actuated Cycle Length: 92.5 Natural Cycle: 95 Control Type: Actuated-Uncoordinated Splits and Phases: 1: C St SW & SR 18 WB Ramps/Park and Ride Access 100 of 111 HCM 6th Signalized Intersection Summary 1: C St SW & SR 18 WB Ramps/Park and Ride Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 49 3 315 26 8 3 230 274 9 6 842 253 Future Volume (veh/h) 49 3 315 26 8 3 230 274 9 6 842 253 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 0.99 1.00 0.99 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1750 1750 1586 1750 1750 1750 1641 1695 1695 1477 1695 1695 Adj Flow Rate, veh/h 49 3 200 26 8 3 230 274 9 6 842 172 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 0 0 12 0 0 0 8 4 4 20 4 4 Cap, veh/h 291 18 248 66 48 18 340 432 14 570 1400 890 Arrive On Green 0.18 0.18 0.18 0.04 0.04 0.04 0.11 0.14 0.14 0.40 0.43 0.43 Sat Flow, veh/h 1575 96 1344 1667 1209 454 3032 3182 104 1407 3221 1437 Grp Volume(v), veh/h 52 0 200 26 0 11 230 138 145 6 842 172 Grp Sat Flow(s),veh/h/ln 1671 0 1344 1667 0 1663 1516 1611 1675 1407 1611 1437 Q Serve(g_s), s 2.2 0.0 11.8 1.3 0.0 0.5 6.0 6.7 6.8 0.2 16.6 4.3 Cycle Q Clear(g_c), s 2.2 0.0 11.8 1.3 0.0 0.5 6.0 6.7 6.8 0.2 16.6 4.3 Prop In Lane 0.94 1.00 1.00 0.27 1.00 0.06 1.00 1.00 Lane Grp Cap(c), veh/h 309 0 248 66 0 65 340 219 228 570 1400 890 V/C Ratio(X)0.17 0.00 0.81 0.40 0.00 0.17 0.68 0.63 0.64 0.01 0.60 0.19 Avail Cap(c_a), veh/h 806 0 649 402 0 401 1463 1360 1414 570 2331 1305 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 28.4 0.0 32.4 38.9 0.0 38.5 35.4 33.9 33.9 14.7 17.9 6.8 Incr Delay (d2), s/veh 0.4 0.0 8.4 5.4 0.0 1.7 3.3 3.6 3.5 0.0 1.2 0.3 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.9 0.0 4.2 0.6 0.0 0.2 2.3 2.7 2.8 0.1 5.7 2.0 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 28.8 0.0 40.8 44.3 0.0 40.2 38.7 37.5 37.4 14.8 19.1 7.1 LnGrp LOS C A D D A D D D D B B A Approach Vol, veh/h 252 37 513 1020 Approach Delay, s/veh 38.3 43.1 38.0 17.1 Approach LOS D D D B Timer - Assigned Phs 2 3 4 6 7 8 Phs Duration (G+Y+Rc), s 8.3 38.6 16.3 19.8 13.8 41.0 Change Period (Y+Rc), s 5.0 5.0 * 5 4.5 4.5 5.0 Max Green Setting (Gmax), s 20.0 20.0 * 70 40.0 40.0 60.0 Max Q Clear Time (g_c+I1), s 3.3 2.2 8.8 13.8 8.0 18.6 Green Ext Time (p_c), s 0.1 0.0 2.0 1.5 1.3 17.4 Intersection Summary HCM 6th Ctrl Delay 26.4 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. * HCM 6th computational engine requires equal clearance times for the phases crossing the barrier. 101 of 111 Lanes, Volumes, Timings 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 303 183 291 845 1061 148 Future Volume (vph) 303 183 291 845 1061 148 Ideal Flow (vphpl)1750 1750 1750 1750 1750 1750 Storage Length (ft)385 0 425 0 Storage Lanes 1 1 1 0 Taper Length (ft)25 25 Right Turn on Red Yes Yes Link Speed (mph)25 40 40 Link Distance (ft)946 862 651 Travel Time (s)25.8 14.7 11.1 Confl. Peds. (#/hr)11 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Heavy Vehicles (%)2% 9% 3% 3% 8% 3% Shared Lane Traffic (%) Turn Type Prot Perm Prot NA NA Protected Phases 1 7 4 8 Permitted Phases 1 Detector Phase 1 1 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 10.0 10.0 Minimum Split (s)35.0 35.0 9.5 15.0 15.0 Total Split (s)40.0 40.0 34.5 55.0 55.0 Total Split (%)30.9% 30.9% 26.6% 42.5% 42.5% Yellow Time (s)4.0 4.0 3.5 4.0 4.0 All-Red Time (s)1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 0.0 0.0 Total Lost Time (s)5.0 5.0 4.5 5.0 5.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None None Min None Intersection Summary Area Type:Other Cycle Length: 129.5 Actuated Cycle Length: 117.6 Natural Cycle: 100 Control Type: Actuated-Uncoordinated Splits and Phases: 2: C St SW & SR 18 EB Ramp 102 of 111 HCM 6th Signalized Intersection Summary 2: C St SW & SR 18 EB Ramp 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (veh/h) 303 183 291 845 1061 148 Future Volume (veh/h) 303 183 291 845 1061 148 Initial Q (Qb), veh 0 0 0 0 0 0 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No Adj Sat Flow, veh/h/ln 1723 1627 1709 1709 1641 1641 Adj Flow Rate, veh/h 303 0 291 845 1061 148 Peak Hour Factor 1.00 1.00 1.00 1.00 1.00 1.00 Percent Heavy Veh, % 2 9 3 3 8 8 Cap, veh/h 346 291 328 2243 1223 170 Arrive On Green 0.21 0.00 0.20 0.69 0.45 0.45 Sat Flow, veh/h 1641 1379 1628 3333 2830 383 Grp Volume(v), veh/h 303 0 291 845 601 608 Grp Sat Flow(s),veh/h/ln 1641 1379 1628 1624 1559 1572 Q Serve(g_s), s 18.2 0.0 17.7 11.1 35.5 35.6 Cycle Q Clear(g_c), s 18.2 0.0 17.7 11.1 35.5 35.6 Prop In Lane 1.00 1.00 1.00 0.24 Lane Grp Cap(c), veh/h 346 291 328 2243 694 700 V/C Ratio(X)0.88 0.00 0.89 0.38 0.87 0.87 Avail Cap(c_a), veh/h 564 474 480 2243 766 772 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 38.9 0.0 39.5 6.6 25.5 25.5 Incr Delay (d2), s/veh 11.0 0.0 14.2 0.1 10.1 10.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 8.4 0.0 8.1 3.1 14.0 14.2 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 49.8 0.0 53.8 6.7 35.6 35.7 LnGrp LOS D A D A D D Approach Vol, veh/h 303 1136 1209 Approach Delay, s/veh 49.8 18.8 35.7 Approach LOS D B D Timer - Assigned Phs 4 6 7 8 Phs Duration (G+Y+Rc), s 75.3 26.5 25.0 50.3 Change Period (Y+Rc), s 5.0 5.0 4.5 5.0 Max Green Setting (Gmax), s 50.0 35.0 30.0 50.0 Max Q Clear Time (g_c+I1), s 13.1 20.2 19.7 37.6 Green Ext Time (p_c), s 9.5 1.3 0.8 7.7 Intersection Summary HCM 6th Ctrl Delay 30.0 HCM 6th LOS C 103 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 157 15 20 951 1121 127 Future Volume (vph) 157 15 20 951 1121 127 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Satd. Flow (prot)1687 0 0 3496 3277 0 Flt Permitted 0.956 0.918 Satd. Flow (perm)1687 0 0 3213 3277 0 Right Turn on Red Yes Yes Satd. Flow (RTOR)4 25 Link Speed (mph)25 40 40 Link Distance (ft)696 1210 862 Travel Time (s)19.0 20.6 14.7 Confl. Peds. (#/hr)8 Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 Heavy Vehicles (%)7% 0% 10% 3% 8% 9% Shared Lane Traffic (%) Lane Group Flow (vph) 180 0 0 1012 1300 0 Turn Type Prot pm+pt NA NA Protected Phases 6 7 4 8 Permitted Phases 4 Detector Phase 6 7 4 8 Switch Phase Minimum Initial (s)5.0 5.0 5.0 5.0 Minimum Split (s)9.0 9.0 9.0 28.0 Total Split (s)15.0 15.0 85.0 70.0 Total Split (%)15.0% 15.0% 85.0% 70.0% Yellow Time (s)3.0 3.0 3.0 3.0 All-Red Time (s)1.0 1.0 1.0 1.0 Lost Time Adjust (s)0.0 0.0 0.0 Total Lost Time (s)4.0 4.0 4.0 Lead/Lag Lead Lag Lead-Lag Optimize?Yes Yes Recall Mode None None Min Min Act Effct Green (s)11.0 31.9 31.9 Actuated g/C Ratio 0.22 0.63 0.63 v/c Ratio 0.49 0.50 0.63 Control Delay 22.5 6.2 7.4 Queue Delay 0.0 0.0 0.0 Total Delay 22.5 6.2 7.4 LOS C A A Approach Delay 22.5 6.2 7.4 Approach LOS C A A Intersection Summary Area Type:Other Cycle Length: 100 Actuated Cycle Length: 50.9 Natural Cycle: 50 Control Type: Actuated-Uncoordinated 104 of 111 Lanes, Volumes, Timings 3: C St SW & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Maximum v/c Ratio: 0.63 Intersection Signal Delay: 8.0 Intersection LOS: A Intersection Capacity Utilization 56.8%ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 3: C St SW & 8th St SW 105 of 111 Lanes, Volumes, Timings 4: Site Access/Driveway & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph)0 15 1 20 9 11 0 0 42 8 0 0 Future Volume (vph)0 15 1 20 9 11 0 0 42 8 0 0 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Link Speed (mph)25 30 25 25 Link Distance (ft)302 696 478 187 Travel Time (s)8.2 15.8 13.0 5.1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)0% 13% 0% 20% 44% 0% 0% 0% 17% 0% 0% 0% Shared Lane Traffic (%) Sign Control Free Free Stop Stop Intersection Summary Area Type:Other Control Type: Unsignalized 106 of 111 HCM 6th TWSC 4: Site Access/Driveway & 8th St SW 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Intersection Int Delay, s/veh 5.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 15 1 20 9 11 0 0 42 8 0 0 Future Vol, veh/h 0 15 1 20 9 11 0 0 42 8 0 0 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - - - - - - - - - - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, %- 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 0 13 0 20 44 0 0 0 17 0 0 0 Mvmt Flow 0 16 1 22 10 12 0 0 46 9 0 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 22 0 0 17 0 0 77 83 17 100 77 16 Stage 1 - - - - - - 17 17 - 60 60 - Stage 2 - - - - - - 60 66 - 40 17 - Critical Hdwy 4.1 - - 4.3 - - 7.1 6.5 6.37 7.1 6.5 6.2 Critical Hdwy Stg 1 - - - - - - 6.1 5.5 - 6.1 5.5 - Critical Hdwy Stg 2 - - - - - - 6.1 5.5 - 6.1 5.5 - Follow-up Hdwy 2.2 - - 2.38 - - 3.5 4 3.453 3.5 4 3.3 Pot Cap-1 Maneuver 1607 - - 1491 - - 917 811 1020 886 817 1069 Stage 1 - - - - - - 1008 885 - 957 849 - Stage 2 - - - - - - 957 844 - 980 885 - Platoon blocked, %- -- - Mov Cap-1 Maneuver 1607 - - 1491 - - 907 799 1020 836 805 1069 Mov Cap-2 Maneuver - - - - - - 907 799 - 836 805 - Stage 1 - - - - - - 1008 885 - 957 836 - Stage 2 - - - - - - 943 831 - 936 885 - Approach EB WB NB SB HCM Control Delay, s 0 3.7 8.7 9.4 HCM LOS A A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h)1020 1607 - - 1491 - - 836 HCM Lane V/C Ratio 0.045 - - - 0.015 - - 0.01 HCM Control Delay (s) 8.7 0 - - 7.5 0 - 9.4 HCM Lane LOS A A - - A A - A HCM 95th %tile Q(veh) 0.1 0 - - 0 - - 0 107 of 111 Lanes, Volumes, Timings 5: C St SW & Site Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph)0 17 0 1001 1144 4 Future Volume (vph)0 17 0 1001 1144 4 Ideal Flow (vphpl)1900 1900 1900 1900 1900 1900 Link Speed (mph)25 40 40 Link Distance (ft)689 565 1210 Travel Time (s)18.8 9.6 20.6 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Heavy Vehicles (%)0% 12% 0% 3% 8% 25% Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type:Other Control Type: Unsignalized 108 of 111 HCM 6th TWSC 5: C St SW & Site Access 10/11/2019 LogistiCenter at Auburn Synchro 10 Report 2021 With Project - PM Peak Hour Intersection Int Delay, s/veh 0.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 17 0 1001 1144 4 Future Vol, veh/h 0 17 0 1001 1144 4 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, %0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 0 12 0 3 8 25 Mvmt Flow 0 18 0 1088 1243 4 Major/Minor Minor2 Major1 Major2 Conflicting Flow All - 624 - 0 - 0 Stage 1 - - - - - - Stage 2 - - - - - - Critical Hdwy - 7.14 - - - - Critical Hdwy Stg 1 - - - - - - Critical Hdwy Stg 2 - - - - - - Follow-up Hdwy - 3.42 - - - - Pot Cap-1 Maneuver 0 405 0 - - - Stage 1 0 - 0 - - - Stage 2 0 - 0 - - - Platoon blocked, %- - - Mov Cap-1 Maneuver - 405 - - - - Mov Cap-2 Maneuver - - - - - - Stage 1 - - - - - - Stage 2 - - - - - - Approach EB NB SB HCM Control Delay, s 14.3 0 0 HCM LOS B Minor Lane/Major Mvmt NBT EBLn1 SBT SBR Capacity (veh/h)- 405 - - HCM Lane V/C Ratio - 0.046 - - HCM Control Delay (s) - 14.3 - - HCM Lane LOS - B - - HCM 95th %tile Q(veh) - 0.1 - - 109 of 111 Traffic Impact Analysis LogistiCenter at Auburn Appendix C Detailed Trip Generation Calculations 110 of 111 ITELand UseUnits 1LUC 2In Out Trip Rate In Out TotalTruck % Enter Exit Total Enter Exit Total DailyProposed Use:Warehousing330,000 GFA15050%50%Equation28428356720%5756113227227454New Daily Trips = 2842835675756113227227454AM Peak HourProposed Use:Warehousing330,000 GFA15077%23%Equation50156520%10313401252New AM Peak Hour Trips = 50156510313401252PM Peak HourProposed Use:Warehousing330,000 GFA15027%73%Equation18496720%4913144054New PM Peak Hour Trips = 1849674913144054Notes:2 Institute of Transportation Engineers, Trip Generation Manual, 10th edition, Land Use Code. 1 GFA = Gross Floor Area.Truck Trip GenerationNon-Truck Trip Directional DistributionTrips GeneratedLogistiCenter at AuburnTrip Generation Summary10/11/2019 111 of 111