Loading...
HomeMy WebLinkAboutHE Decision PLT18-0004; DEV19-0010; DEV19-0032 10.31.192 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 BEFORE THE HEARING EXAMINER FOR THE CITY OF AUBURN Phil 01brechts, Hearing Examiner RE: West Hill Preliminary Plat Preliminary Plat and Engineering Standard Deviations File Nos. PLT18-0004; DEV19-0010; DEV19-0032 FINDINGS OF FACT, CONCLUSIONS OF LAW AND FINAL DECISION OVERVIEW The Applicant requests approval of a preliminary plat and two engineering deviations for a 19 -lot single-family residential subdivision of a 4.77 -acre parcel located at the northeast corner of S 294th St. and 59th Ave. S. The plat and deviations are approved subject to conditions. ORAL TESTIMONY Note: This hearing summary is provided as a courtesy to those who would benefit from a general overview of hearing testimony. The summary is not required or necessary to the decision issued by the Hearing Examiner. No assurances are made as to completeness or accuracy. Nothing in this summary should be construed as a finding or legal conclusion made by the Examiner or an indication of what the Examiner found significant to his decision. Findings of Fact and Conclusions of Law are issued in separate sections of this decision. Thaniel Gouk, City of Auburn senior planner, summarized the staff report. In response to Examiner questions, Mr. Gouk responded that most of the surrounding development was developed under King County standards prior to annexation, which means that surrounding lots may be smaller than those proposed. No perimeter landscaping is required by the City except along the stormwater tract and frontage improvements. The stormwater vault deviation request was approved because the proposal follows criteria that the City is in the process of adopting and. will be in place at the beginning of next year. In response to examiner questions, James Webb, City senior traffic engineer, noted that the deviation request for reduced design speed was approved by the City Engineer Preliminary Plat P. 1 Findings, Conclusions and Decision 2 3 4 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 because it involves such a short stretch of road that vehicles wouldn't be able to reach design speed. In response to examiner questions, Shannon Howard, City development review engineer, noted that enhanced water treatment is a designation adopted by the Department of Ecology and the modular wetland proposed by the Applicant is one of the strongest types of enhanced. water treatment. In response to examiner questions, Mr. Gouk noted that the City has no standards for addressing the soil contamination comments made by the Department of Ecology. He noted that the project is located in an area that has the lowest potential for contamination as identified in DOE mapping. Staff didn't feel that the City had standing to address that type of impact. Evan. Mann, Applicant, noted that the project is being developed by Copper Ridge, LLC. Mr. Mann noted that the plat name had been recently changed to West Hill Preliminary Plat and requested that the decision reference the plat with that name. He confirmed that for the design speed deviation the roadway is so short that vehicles can't get to the design speed. For the storinwater deviation, the stormwater vault has been designed to meet the upcoming amended engineering design standards. Mary Beth Dahl, neighbor, noted that the lots along 59th between 296th and 292"d are much larger. Ms. Dahl lives next door. The only access to her house is from 294tH She opposes the project on aesthetic, practical and environmental grounds. Trees and wildlife will be destroyed to be replaced with 19 houses, adversely affecting the quality of life for surrounding neighbors. For practical impacts, every house comes with two or three cars, at least. 59th Ave S is a narrow two-lane road with no shoulder on either side. It's already hard to walls on that street. This is not compatible with all the additional traffic caused by the 2-3 cars per proposed home. There will be more traffic, noise, pollution and crowding. When she purchased her house six years ago, she was told that the project site would not be developed due to wetlands. Her backyard and her neighbor's back yard partially floods during rain events. She's not convinced that the proposal will not cause flooding on her property. She believes an environmental impact statement needs to be prepared for the project. Sharon Wisenburg, neighbor, is concerned about surface water management. She noted that when a development was constructed several years ago south of the project site, she was told that stormwater standards would control runoff but nonetheless after the development was completed her garage flooded on a regular basis. Her house had been constructed with swales on either side and there were no flooding problems before installation of the new development. She got the City to place berms along the side of the road to fix the problem. She noted that the project has a significant amount of wildlife, such as rabbits and coyotes. Robert Wisenburg, neighbor, noted he lives across the street and his property is over three-quarters of an acre and that all other lots on his side of the street are over three Preliminary Plat p. 2 Findings, Conclusions and Decision 2 3 V 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 quarters of an acre. The proposed lots will be considerably smaller. The new development to the south mentioned by Mrs. Wisenburg is also considerably smaller. He noted that when the new development was installed the road grade in front of his house was lowered to improve site distance. On 296th and 59th there's a significant hill that also has poor and dangerous site distance. That problem needs to be solved given the increase in traffic caused by the proposal. He doesn't believe there's room for sidewalks. In rebuttal, Shannon Howard noted that the Applicant has met or exceeded the stormwater standards required by state law. These requirements include matching pre - development off-site stormwater discharge volumes. The existing roads have been inherited by the City from its annexation of unincorporated King County and the roads were built under less stringent stormwater requirements. As far as what happened to the Wisenburgs, Mr. Howard doesn't have specific knowledge about their circumstances, but he is aware that the roads on their street don't have curb and gutter and that was likely the reason for the flooding. In rebuttal, James Webb noted that the Applicant was required to evaluate site distance at its connection to the existing 59th intersection and no site distance problem was found. The City isn't aware of any site distance problem at the intersection of 59th and 296th to the south, but that will be evaluated. Mr. Wisenburg noted he and his wife were assured when the new development to the south was installed that they would take care of stormwater problems after they happened, and they didn't. As a result, their garage floor sunk because the soils underneath were washed away. They had to spend $5,000 to jack the floor back up again. He wanted to know what they could do if the problems don't get taken care of again. Mr. Howard responded that the City's stormwater standards are much stricter than they were at the time of the development identified by the Wisenburgs. The Department of Ecology imposed much stricter stormwater standards in 2017. In conclusion, Mr. Mann noted that the proposed densities are consistent with the comprehensive plan and zoning requirements and is consistent with much of the surrounding land use, such as property to the south, to the west across the wetland area and directly to the east of the larger lot development towards 2941h. Currently, at the project site stormwater sheet flows to the east towards 294th in the direction of the Wisenburg property. The proposed improvements would capture that water and divert it into the City stormwater system before it could get to the Wisenburg property, so the proposed stormwater system should be a massive improvement over current conditions. No reductions in critical area buffers were requested. The project is T'ing off of 294th and 58th and site distance will be evaluated and then mitigated as necessary. Preliminary Plat EXHIBITS p. 3 Findings, Conclusions and Decision 2 The 14 exhibits identified at page 21-22 of the October 1, 2019 staff report were admitted into the record during the October 16, 2019 public hearing 3 4 c Procedural: 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 FINDINGS OF FACT 1. Applicant. Evan Mann, Entitlement Manager, Soundbuilt Northwest, PO Box 73790, Puyallup, WA 98373. 2. Hearing. A hearing was held on the application on October 16, 2019 at Auburn City Hall, Council Chambers. Substantive: 3. Site/Proposal Description. The Applicant requests approval of a preliminary plat for a 19 -lot single-family residential subdivision of a 4.77 -acre parcel located at the northeast corner of S 294th St. and 59th Ave. S. The proposed lots range in size from approximately 4,200 sq. ft. to 8,600 sq. ft. Roadways to be constructed include the on-site approximately 200 -foot extension of 58th Ave. S. north from S. 294th St. as a cul-de-sac and two private access tracts. Utility lines will be extended within the on-site public street and private access/utility tracts to serve the lots. Two open space tracts are proposed to contain on-site wetlands and a stream. The Applicant has also requested three engineering deviations. As required by ACC 17.18.010(A), the hearing examiner is only authorized to approve deviations approved by the City Engineer and the City Engineer has only approved two of the deviations. The two deviations approved by the City Engineer are (1) a request to construct a stormwater detention vault in lieu of a detention pond; and (2) a request to reduce the design speed for a crest curve from 30 MPH to 25 MPH and to reduce the sag curve design speed from 30 MPH to 15 MPH for 58th Ave. S. 4. Characteristics of the Area. The subdivision is surrounded by property zoned and developed for R5 single-family use. A city stormwater detention facility also adjoins the project site to the south. 5. Adverse Impacts. As conditioned, there are no significant adverse impacts associated with the proposal. More specifically, impacts are addressed as follows: A. Critical Areas. Critical areas on the project site are limited to two Class III wetlands, a Type N stream and a groundwater protection zone. The applicant has prepared a critical areas report, Ex. 7, which staff have found. to comply with the City's critical areas regulations. For this reason, it is Preliminary Plat p. 4 Findings, Conclusions and Decision NA 4 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 found that the proposal doesn't create any significant adverse impacts to critical areas. The buffers required by the City's critical areas ordinance for the wetlands is 25 feet. The Applicant's critical area's report doesn't identify whether any buffer is required for the stream and it's unclear from the City's critical areas ordinance what buffers are required for Type N streams' . A condition of approval requires the Critical Areas Report to identify applicable stream buffers and to ensure that they are included in the critical area/open space tracts of the proposal. The wetlands and stream along with the required buffers will be located within Tracts C and E for permanent open space preservation. As for the groundwater protection zone, the Site is located within Groundwater Protection Zone 4, the least stringent classification. Therefore, no impacts are anticipated that cannot be mitigated by utilizing Best Management Practices (BMPs). As recommended in the Preliminary Stormwater Report (Exhibit 9), stormwater runoff from the Project will be treated and detained in a stormwater detention facility ("stormwater vault") located in Tract E, per the Department of Ecology Stormwater Management Manual for Western Washington (SWMMWW) and Auburn Supplements. A couple neighbors expressed concern over loss of wildlife and wildlife habitat, specifically Ms. Dahl and Ms. Tarbuck, but the City's critical area regulations do not require protection of animals such as coyotes and rabbits. In written comment the Mucicleshoot Tribe asserted that the on-site stream is in fact fish bearing and also that enhanced water quality treatment is required. The Tribe's comments on the presence of fish were based upon WDFW maps. The applicant's biologist evaluated downstream conditions and found that the gradients were too steep for fish passage. His findings were confirmed by a WDFW biologist as identified in Ex. 5. For these reasons it is concluded that the on-site stream is not fish bearing. As to enhanced water quality treatment, a City engineer, Mr. Shannon, testified at the hearing that the Applicant will be employing one of the most effective forms of enhanced water treatment available, modular wetlands. B. Drainage. The proposal will not create any adverse stormwater impacts because the Applicant has proposed a preliminary design that staff have determined is consistent with the City's stormwater standards. The Applicant proposes water treatment through modular wetlands and the retention of stormwater in a stormwater vault that will discharge stormwater into wetland buffers, all in conformance with City design and treatment standards. ' It appears that DNR has adopted a new stream classification system and the City's critical areas ordinance still uses the older stream classification nomenclature. Preliminary Plat p. 5 Findings, Conclusions and Decision 2 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Drainage was a major issue of concern to some neighboring property owners, the Wisenburgs. As they testified, they had been assured in a prior development project that their property would not be adversely affected by new stormwater, but their project suffered significant flooding after the new development nonetheless. Ms. Dahl also expressed concern over stormwater impacts. As noted by Mr. Shannon, a City engineer, stormwater standards have significantly improved. over the years and Applicants must now demonstrate by detailed engineering calculations that their stormwater facility design will match predevelopment off-site flow conditions. Mr. Mann also noted that currently unrestricted stormwater sheet flow runs to the Wisenburg property from the project site and that the proposed stormwater facilities will capture this stormwater and ultimately divert it into the City's stormwater system. Given the requirements of current stormwater standards and the expertise involved in implementing those standards, the evidence in the record establishes that stormwater generated by the project site is sufficiently mitigated against damage to adjoining properties. 6. Adequacy of Infrastructure and Public Services. The proposal will be served by adequate and appropriate public infrastructure. Stormwater facilities have already been addressed in Finding of Fact No. 5 above. The preliminary design's conformance to the City's public work standards, as has been verified by the City's public work's staff, assures adequate of infrastructure. Final design for streets, sidewalks, storm drainage facilities, and. sewer mains will be required to meet the City's Design Standards during engineering review and shall be required to meet and implement those standards prior to final plat approval. These facilities will be reviewed as part of the facility extension, grading, and civil plans to be submitted by the Applicant. The following more specifically addresses infrastructure and services: A. Water. The proposal will be served by adequate and. appropriate water facilities. The Applicant has acquired a certificate of water availability from the Lakehaven Utility District. See Ex. 14. B. Sewer. The proposal will be served by adequate and appropriate water facilities. The Applicant has acquired a certificate of water availability from the Lakehaven Utility District. See Ex. 14. C. Transportation. As mitigated the proposal provides for adequate and appropriate on and off-site transportation facilities. The Project will be required to construct streets per ACC, Chapter 12.64A ACC `Required Public Improvements', the City's Engineering Design Standards, and the Comprehensive Transportation Plan. With the extension of 58th Ave. SE into the site and the completion of the half street improvements along S. 294th Preliminary Plat p. 6 Findings, Conclusions and Decision 2 0 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 St. and 59th Ave. S, the City's Transportation Division finds that there will be no decrease in the road network level of service (LOS) standard. The Applicant will be required, however, to provide an intersection control evaluation showing what intersection controls are necessitated, if any, at the intersection of 58th Ave. S and S. 294th St.. Two private access roads (within Tracts A & D) will be constructed off of the northern end of the cul-de-sac. Tract A will provide access for Lots 8- 10 and 11-13 and also provide a secondary emergency access onto 59th Ave. S; Tract D will provide access to Lots 14-16. Details of the road improvements, which are consistent with the City's engineering standards, as modified by DEV 19- 0032, are shown on Sheet 4 of 10 of the Preliminary Plat drawings (Exhibit 6). Proportionate share system -wide impacts will be mitigated. via payment of traffic impact fees during building permit review. D. Schools. Adequate and appropriate provisions are made for schools and walking conditions to and from school. The proposal's proportionate share mitigation for school facilities is addressed via the payment of school impact fees at the time of building permit review. The Site is located within the Federal Way School District boundary. Per the Applicant, students residing within the proposal will attend: 1) Meredith Hill Elementary School; 2) Kilo Middle School, and 3) Thomas Jefferson High School. Students will be bussed from a bus stop located near the intersection of 59th Ave. S and S. 294th St. to their respective schools. The proposal provides for sidewalks that provide for safe walking conditions to the bus stop. Students will have two options to walk to the bus stop (via sidewalks constructed with this project); 1) travel south on 58th Ave. S then west on S. 294th St. to the stop at 59th Ave. S; or 2) via the sidewalk within Tract A to 59th Ave. S then south along 59th to the stop at S. 294th St. It is unclear if the bus stop is located on the east or west side of 59th Ave. S. E. Parks and Open Space. Adequate and appropriate provision are made for parks and open space as the proposal complies with all applicable requirements. Adequate provisions for off-site parks are made through the payment of park impact fees at the time of building permit issuance for each lot or as may be deferred per ACC 19.08.030(G). ACC 17.14.100 provides that an Applicant should dedicate park land where a proposed subdivision will result in a substantial increase in demand for park land and that "generally" this will occur with subdivisions supporting 50 or more dwelling units. The proposal has less than 50 dwelling units, so no park Preliminary Plat p. 7 Findings, Conclusions and Decision 2 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 or open space dedication is required under ACC 17.14.100. No other park or open space requirements apply to the project. F. Police and Fire Protection. Police and Fire services will serve the proposed development and will be provided by the Valley Regional Fire Authority and the City of Auburn Police Department. Fire impact fees imposed during building permit review mitigate demand placed on fire services and facilities. CONCLUSIONS OF LAW Procedural: 1. Authority of Hearing Examiner. ACC 17.10.050 grants the Hearing Examiner with the authority to review and make a final decision on preliminary plat applications. ACC 17.18.010(A) grants the Hearing Examiner with the authority to approve modifications to the City's Engineering and Design Standards with the concurrence of the City Engineer, Substantive: 2. Zoning and Comprehensive Plan Designation. The site is zoned R-5 Residential and its Comprehensive Plan snap designation is Single -Family Residential. 3. Review Criteria and Application/Deviations Approved. ACC 17.06.070 governs the criteria for preliminary plat approval. Relevant criteria for the preliminary plat application are quoted below with corresponding conclusions of law. ACC 17.18.030 governs the criteria for public works standards deviations. The findings and conclusions of the analysis for the deviation applications contained in Ex. 11 and 13 are adopted by reference, and in conjunction with the deviation testimony identified in the Oral Testimony section of this decision, it is determined that the deviations meet city standards and should be approved. Preliminary Plat Standards: ACC 17.07.070(A): Adequate provisions are made for the public health, safety and general welfare and for open spaces, drainage ways, streets, alleys, other public ways, water supplies, sanitary wastes, parks, playgrounds and sites for schools and school grounds. 4. As identified in Finding of Fact No. 5 and 6, the proposal as mitigated and conditioned is adequately served by all public services and utilities required in the criterion above. As further determined in Finding of Fact No. 5, there are no adverse impacts associated with the proposal. Given the absence of any adverse impacts in Preliminary Plat P. 8 Findings, Conclusions and Decision 2 3 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 conjunction with adequate public facilities, it is concluded that adequate provision is made for the public health, safety and welfare. ACC 17.07.070(B): Conformance of the proposed subdivision to the general purposes of the Comprehensive Plan. 5. The proposal is consistent with the Comprehensive Plan for the reasons identified in Pages 11-14 of the staff report. ACC 17.07.070(C): Conformance of the proposed subdivision to the general purposes of any other applicable policies or plans that have been adopted by the City Council. 6. The proposal is consistent with all other applicable policies and plans for the reasons identified at pages 14 of the staff report. ACC 17.07.070(D): Conformance of the proposed subdivision to the general purposes of the Land Division Ordinance as enumerated in ACC Section 17.02.030. ACC 17.02.030: The purpose of this title is to regulate the division of land lying within the corporate limits of the city, and to promote the public health, safety and general welfare and prevent or abate public nuisances in accordance with standards established by the state and the city, and to: A. Prevent the overcrowding of land; B. Lessen congestion and promote safe and convenient travel by the public on streets and highways; C. Promote the effective use of land; D. Provide for adequate light and air; E. Facilitate adequate provision for water, sewerage, drainage, parks and recreational areas, sites for schools and school grounds, and other public requirements; F. Provide for proper ingress and egress; G. Provide for the expeditious review and approval of proposed land divisions which comply with this title, the Auburn zoning ordinance, other city plans, policies and land use controls, and Chapter 58.17 RCW; H. Adequately provide for the housing and commercial needs of the citizens of the state and city; I. Require uniform monumenting of land divisions and conveyance by accurate legal description; J. Implement the goals, objectives and policies of the Auburn comprehensive plan; K Prevent or abate public nuisances. 7. The proposal is consistent with the purposes of the Land Division Ordinance as enumerated above. The roads designed for the proposal are safely designed to meet Preliminary Plat P. 9 Findings, Conclusions and Decision 2 0 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 traffic demand and sidewalks on both sides of the subdivision street promote pedestrian safety. Applicable zoning setbacks and lot coverage standards in conjunction with the open space tracts provides for adequate light and air. The proposal does not result in overcrowding as it proposes the minimum density authorized for the R5 zone. As previously discussed, the proposal is consistent with and implements the Auburn Comprehensive Plan. As previously determined the proposal is adequately served by all essential public facilities and it is consistent with the comprehensive plan. The subdivision process, with the required surveying and recording of final plats, provides for uniform monumenting and conveyance by accurate legal description. ACC 17.07.070(E): Conformance of the proposed subdivision to the Auburn Zoning Ordinance and any other applicable planning or engineering standards and specifications as adopted by the City. 8. The proposal is in conformance with applicable development standards as applicable at this stage of review. The authorized R5 density range 4 to 5 dwelling units per acre, which as noted in Finding No. 3 of the staff report would allow 19 to 24 lots for the proposal. In the R5 zone minimum lot size is 4,500 square feet and one of the lots fails to meet this standard, being only 4,237 square feet in area. However, as is apparent from the plat map, it is not possible to meet both the minimum density requirement and the minimum lot size requirement at the same time due to the space taken up by critical areas. Staff has apparently found the minimum density standard to prevail over the minimum lot size requirement under that circumstance and deference will be given to that determination. Compliance with most of the other zoning standards and all building code standards, will be implemented during building permit review. Public works staff have determined that the preliminary design for plat infrastructure meets applicable engineering, public works and stormwater standards. ACC 17.07.070(F): The potential environmental impacts of the proposed subdivision are mitigated such that the preliminary plat will not have an unacceptable adverse effect upon the quality of the environment. 9. As determined in Finding of Fact No. 5 there are no significant adverse impacts associated with the proposal. ACC 17.07.070(G): Adequate provisions are made so the preliminary plat will prevent or abate public nuisances. 10. As determined in Finding of Fact No. 5, there are no significant adverse impacts associated with the proposal. Consequently, no public nuisance is anticipated.. Preliminary Plat P. 10 Findings, Conclusions and. Decision 2 3 4 5 6 7 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 DECISION The proposed preliminary plat and deviation requests DEV19-0010 and DEV19-0032 comply with all applicable requirements for the reasons identified above, subject to the following conditions of approval: 1. A final wetland buffer enhancement (mitigation) plan for Tracts C and E and the on-site wetlands and stream buffers shall be prepared and. submitted with the civil (FAC) plans and'consistent with Chapter 16.10 ACC. The wetlands and their associated 25 -ft. buffers shall be placed in separate tracts on which development is prohibited and protected by execution of an easement dedicated to the City. The easement shall grant the City access to on-site mitigation areas for the purposes of monitoring, maintaining, preserving, and enhancing the on-site wetlands and associated buffer areas, but not the obligation to do so. The location and limitations associated with the wetlands, stream and their buffers shall be shown on the face the final plat. The plan shall also ensure that areas within the open space tracts that are disturbed during the civil construction process will need to be restored; a planting / restoration plan shall be included with the FAC submittal. 2. A means of access for inspections and monitoring of the critical areas and their buffers within Tracts C and E (open space tracts) shall be designed and included with the FAC drawings, as reviewed and approved by the City. A note shall be included on the Final Plat indicating as such. 3. A note shall be placed on the Final Plat that the Homeowner's Association, and its heirs and successors (HOA), shall be responsible for ownership, maintenance of the open space Tracts C and E and that there shall not be removal of any vegetation without prior City approvals. 4. Fencing shall be placed around the perimeter of the critical area buffers consistent with Chapter 16.10 ACC. Maintenance of the fencing shall be the responsibility of the HOA. 5. FAC approval will not be provided by the City of Auburn until approval for the construction drawings is obtained from Lakehaven Water & Sewer District for public water and public sewer. The Applicant shall provide approved plans to the City of Auburn once obtained 6. Prior to City approval of the civil plans under the FAC, the Applicant must provide documentation of submittal of an application to the Washington State Department of Ecology for a General Storm Permit, as required for all projects over 1 acre in size. Preliminary Plat P. 11 Findings, Conclusions and Decision 2 E 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 7. Fencing shall be provided around the perimeter of the stormwater vault, the location of which to be reviewed and determined during the FAC review and consistent with current City standards. 8. As part of the civil plans, a landscaping plan for the publicly dedicated stormwater Tract B shall be provided for city review and approval. The type and location of landscaping shall be coordinated with the location and type of fencing installed in the storrnwater tract. The landscaping plan shall generally provide perimeter landscaping including shrubs designed to provide screening of the vault area and provide visual interest. The stormwater tract landscaping design must meet all applicable vehicle sight distance requirements. 9. A note shall be placed on the Final Plat indicating that the HOA shall be responsible to regularly maintain those portions of the stormwater Tract B outside of the fenced perimeter of the stormwater vault, as determined by the City Engineer. Additionally, the Covenants, Conditions, and Restrictions (CC&Rs) that are approved by the City at Final Plat application, and as recorded thereafter, shall establish the HOA's responsibility for regular landscape maintenance. 10. The Final Plat shall indicate if the property owner(s) or the HOA is responsible for maintenance of the storm drainage system dispersion areas. Access to these areas for maintenance shall be shown / indicated on the FAC plans and contained on the Final Plat. 11. Low impact development (LID) stormwater facilities are proposed within portions of the Tracts C and E (open space tracts) including but not limited to dispersion trenches and associated flow areas. An Operation and Maintenance Manual shall be prepared by the Design Engineer, reviewed by the Wetland consultant, and utilized by the HOA. A Stormwater Maintenance and Easement / Agreement will be on the Final Plat to ensure maintenance of the LID facilities 12. An intersection control evaluation is required at the intersection of S 294th St. and 58th. Ave. S to determine the appropriate intersection traffic controls, such as but not limited to signage and markings. The intersection control evaluation shall consider traffic control options necessary to meet City requirements for safety in the right of way and shall consider traffic movements from all directions of the intersection. The intersection control evaluation shall also include a horizontal sight distance analysis for all turning directions. The results of the intersection control evaluation shall be implemented by the review and approval of the civil plans. 13. Prior to City approval of the construction plans under the FAC, the plans shall show that appropriate portions of public streets shall be posted no parking due to its road width or presence of medians. Also, the cul-de-sac shall be posted "No Parking" around their entire perimeter. Posting shall be in accordance with ACC and. City of Auburn Engineering Design Standards. Preliminary Plat p. 12 Findings, Conclusions and. Decision 1 14. Any significant trees within the open space tracts should be retained to the fullest 2 extent possible. In the event significant trees are removed a replanting plan, that provides for replacement at a ratio commensurate with the tree(s) diameter at breast 3 height (DBH), should be developed as part of the civil plan review and approval. 4 15. If at the time of Final Plat application, the nature and location of the depicted occupation features remain unchanged and / or unresolved, then per RCW 58.17.255, a 5 "survey discrepancy note" shall be placed on the face of the FINAL SHORT PLAT 6 similar to the following example: 7 SURVEY DISCREPANCY NOTE: 8 EXISTING FENCES, RETAINING WALL AND ROCKERY HAVE BEEN SHOWN PURSUANT TO RCW 58.17.255 AND SHALL BE DISCLOSED IN THE TITLE 9 REPORT PREPARED BY THE TITLE INSURER AND ISSUED AFTER THE 10 FILING OF THIS PLAT 11 16, Tracts A and D are private access and utility tracts and will be owned and maintained by the HOA. An ingress and egress easement, or other instrument as 12 approved by the City, over Tract A must be granted to the City of Auburn, for the purpose of accessing Tract B (stormwater vault), providing emergency services, and 13 pedestrian access to 59th Ave. SE. A note shall be placed on the Final Plat that the HOA 14 is responsible for maintenance including associated retaining walls, walkways, signage, and other associated features. 15 17. The Applicant has requested a deviation to utilize a stormwater detention vault 16 rather than an open stormwater pond. The City Engineer supports and recommends the 17 Hearing Examiner approves the request with the following condition: 18 The associated appurtenances and structures that are required to meet all applicable storm requirements for flow control and treatment shall be modified during final 19 engineering design as needed to meet City requirements for maintenance and access. This includes modifications as needed to location, configuration, and depth of all 20 structures and appurtenances associated with the detention vault. 21 18. The Applicant has requested a deviation to reduce the design speed for a crest curve 22 from 30 MPH to 25 MPH and to reduce the sag curve design speed from 30 MPH to 15 MPH for the construction of 58th Ave. S. The City Engineer supports and recommends 23 the Hearing Examiner approves the request. 24 19. The Applicant's critical areas report shall be revised to identify the buffer 25 applicable to the on-site stream and shall further assure that the stream buffer is fully integrated into Tract C and. E. Preliminary Plat p. 13 Findings, Conclusions and Decision 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 20. Site distance shall be evaluated for the intersections of 296th and 59th and shall be mitigated by the Applicant as consistent with constitutional nexus/proportionality to assure safe site distance in conformance with City standards. DATED this 30th day of October 2019. 11hil A .rvOi�,° 1s 0 1w% City of Auburn Hearing Examiner Appeal Right and Valuation Notices This decision is final subject to appeal to superior court as governed by Chapter 36.70C RCW. property owners may request a change in valuation for property tax purposes anding any program of revaluation. Preliminary Plat p. 14 Findings, Conclusions and Decision