Loading...
HomeMy WebLinkAboutAG-C-481 with Materials Testing & Consulting CITY OF a-0I q AUBURN Nancy Backus, Mayor WASHINGTON 25 West Main Street * Auburn WA 98001-4998*www.auburnwa.gov*253-931-3000 September 6, 2019 Curtis Shear Materials Testing & Consulting, Inc. 2118 Black Lake Blvd SW Olympia, WA 98512 RE: Task Assignment No. 16 to Agreement for Professional Services, AG-C-481 Project No. CP1726, 2019 Local Street Reconstruction Notice to Proceed Dear Mr. Shear: Enclosed please find an executed copy of the above-referenced Task Assignment. This Task Assignment has a completion date of December 31, 2019 and a not-to-exceed amount of $10,085.00. You are not authorized to perform work beyond the completion date, or expend funds above and beyond the not-to-exceed amount. This letter serves as your Notice to Proceed. As the project manager, I am the designated contact for this task assignment. Questions, assignments and coordination shall be routed through me. You can contact me at 253-804- 5059. Sincerely, `Kim Tr ong Project Engineer Public Works Department KT/js/mm Enclosure cc: Shawn Campbell, City Clerk AG-C-481 ENG 221, Revised 12/18 AUBURN * MORE THAN YOU IMAGINED TASK ASSIGNMENT FOR ON-CALL PROFESSIONAL SERVICES AGREEMENT NO: AG-C-481 TASK NO: AGC481-T016 CONSULTANT: Materials Testing & Consulting, Inc. PROJECT NO/DESCRIPTION: CP1726, 2019 Local Street Reconstruction The general provisions and clauses of the Agreement referenced above shall be in full force and effect for this Task Assignment. Location of Project: Various sites in Auburn Maximum Amount Payable per this Task Assignment: $10,085.00 Completion Date: December 31, 2019 Scope of Work: See Exhibit A, which is attached hereto and by this reference made part of this Agreement. Approvals: Consultant Project Manager: Signature: Date: 8/28/19 City Project Manager: Signature: i Date: /..9.//, Public Works Direc or: Signature: G�Date: /r-511q (51 ENG-186, Revised 8/19 Page 1 of 1 Materials Testing & Consulting, Inc. ihigtm Geotechnical Engineering&Consulting•Materials Testing•Special Inspection•Environmental Consulting r • Date: August 05,2019 Client Name: City of Auburn Contact Kim Truong Address. 25 West Main Street, Auburn, WA 98001 Phone: 253.804.5059 Email. kbtruong@auburnwa.gov Fax. Architect- KPG Interdisciplinary Design Based on Plans Dated- May 22,2019 Project Name/Location: 2019 Local Street Reconstruction-Project#CP1 726,Auburn, WA Materials Testing&Consulting,Inc.(MTC)thanks you for the opportunity,and respectfully submits the following proposal to provide materials testing and special inspection services during construction of the above-referenced project. Combined with our past experience with projects of similar size and scope.we estimate the total cost of our services for this project to be: (01) Earthw(irk& Asphalt Services Item Unit r 1, Rate Total IPD-S-Utilit'Trench Compaction Hour 60 $ 60.00 $ 3 600.00 1PD-A-Asphalt Pavin: Hour 24 $ 60.00 $ 1,440.00 SAMPU-Sam)1e Picku if R •uired Allowance Hour 4 $ 60.00 $ 240.00 Subtotal-Earthwork&As halt Services: $ 5,280.00 (02) Laboratory Testing for Earthwork& Asphalt/Advanced Geotechnical Laborator, Fests Item I= UnitRate Total PROC-Moisture Densis•Relationshi. Proctor with Sieve Each $235.00 $ 470.00 SE-Sand E uivalent __ Each $ 80.00 $ 80.00 FRAC-Fracture Percentage Each $ 60.00 5 60.00 EXT-As halt Extraction with Gradation Each $235.00 $ 1 175.00 RICE-Rice Densis Each 5 $ 80.00 $ 400.00 Subtotal- I,abora to for Earthwork&As•halt: $ 2,185.00 (03) Special & Construction Inspection Item Unit I uantitv Rate _ Total RC-Sidewalks&Drivewa A.'roaches Hour 28 $ 60.00 $ 1,680.00 Subtotal-S ecial&Construction Ins.ection: $ 1,680.00 (04) Laboratory Testing - Special&Construction Inspection Item Unit =El Rate Total CONC-Concrete Compression Test Cylinders-4"x8"-Sets of 5 Bach 25 $ 24.00 $ 600.00 Subtotal-S)ecial&Construction Ins'ection: S 600.00 (311) Project Management& Consulting Services Item Unit Rate Total PM-Pro'ect Man :er Hour $ 85_00 $ 340.00 Subtotal- Pro'eel Mann:ement&Consultin l Services: $ 340.00 Budget Estimate for Services-Total: S 10,085.00 • Prices are subject to change if this agreement is not executed within 90 days from the date of the hid • All services will be provided on a time and materials basis. The total is an estimate the actual construction cost will be based on the project schedule and sequencing.The estimate is not a guaranteed price.A four hour minimum charge applies to all work performed,billing is also based on a portal to portal basis A premium rate of 1.5 times the regular rate will be charge for overtime and 2 times the regular charge for Sunday's and holidays. • MTC will utilize the laboratory based closest to the project site.MTC offers additional services upon request which will be billed at our regular fee schedule Acceptance of this proposal will constitute agreement to MTC standard general terms and conditions. • In closing,our experienced inspection staff will ensure the highest level of quality is brought to your project. We believe that our local staff and vast experience on projects of-sunder size and scope make MTC the clear team member of choice for this project. We look tbnvard to working with you Respectfully Submitted, Client Authorized Signature Curtis Shear,Business Development (360)404-5269 Printed Name&Title Date Corporate•777 Chrysler Drive•Burlington,WA 98233•Phone 360.755.1990•Fax 360.755.1980 Regional Offices: Olympia.360.543.9777•Bellingham:360.647.6061 •Silverdale:360.328.2500•Tukwila:206.241.1974 Website:www.mtc-inc.net Page 1 of 1