Loading...
HomeMy WebLinkAboutLocal Agency Federal Aid Project LA-CP2006 - 3RD ST SW Bridge Decks Preservation � Washington State Local Agency Federal Aid VI/ Department of Transportation Project Prospectus Prefix Route ( ) Date July 1, 2020 Federal Aid DUNS Number 032942575 Project Number Local Agency CP2006 WSDO 1 Federal Employer 91-6001228 Project Number Use OnlyJ Tax ID Number Agency CA Agency Federal Program Title , City of Auburn ✓ Yes ❑ No l✓ 20.205 ❑ Other Project Title Start Latitude N 47.30485 Start Longitude W 122.23090 3rd Street SW Bridge Decks Preservation End Latitude N 47.30485 End Longitude W 122.23348 Project Termini From-To Nearest City Name Project Zip Code(+4) C Street SW S Division Street Auburn 98001-5327 Begin Mile Post End Mile Post Length of Project Award Type N/A N/A 0.13 miles ✓ Local❑Local Forces❑State❑Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name N/A N/A N/A 0055 17 King WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number Northwest Region 47 8 29 Total Local Agency Phase Start Federal Funds Phase Estimated Cost Funding Date (Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) Month Year P.E. $120,000 $0 $120,000 July 2020 R/W Const. $553,540 $50,000 $503,540 Total $673,540 $50,000 11$623,540 Description of Existing Facility (Existing Design and Present Condition) II Roadway Width Number of Lanes Varies between 46 ft - 141 ft Varies 2-5 lanes Description of Proposed Work Description of Proposed Work(Attach additional sheet(s)if necessary) 3rd Street SW Bridges Deck Preservation The project will seal and overlay the 3rd Street SW bridge decks in an effort to extend the overall service life of the bridges. The following bridges are included in the project: 3rd Street off-ramp, 3rd Street SW over the BNSF railroad, and 3rd Street SW over A Street SW. Local Agency Contact Person Title Phone Kim Truong Project Engineer (253) 804-5059 Mailing Address City State Zip Code 25 W Main St Auburn WA 98001 Byate.+/ e, .,:f:,4 Project Prospectus Approving Authority Title City Engineer Date 7/29/20 DOT Form 140-101 Page 1 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of Auburn 3rd Street SW Bridge Decks Preservation July 1, 2020 Type of Proposed Work Project Type(Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path /Trail El 3-R 46 - 141 ft 3 -5 lanes ❑ Reconstruction El Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑Other ✓� Bridge Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal ✓ Urban Minor Arterial ❑ Urban ❑ Minor Arterial ❑Collector ❑Collector Functional ❑ Rural El Rural ❑ Major Collector ❑ Major Collector Classification ❑ NHS ❑ Minor Collector ❑ NHS ❑ Minor Collector ❑ Local Access ' ❑ Local Access Terrain ✓ Flat ❑ Roll ❑ Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed 25 mph Design Speed 35 mph Existing ADT 21,747 (2019) Design Year ADT 44,786 Design Year 2040 Design Hourly Volume (DHV) 4,479 Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant 100 % 0 Construction Will Be Performed By Contract Agency Contractor 100 % 0 Environmental Classification ❑Class I - Environmental Impact Statement (EIS) Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) El Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations The project improvements will be completed within an existing developed area and no addition right-of-way is required to complete the project. There are no long term environmental impacts anticipated. The City will coordinate with the permitting agencies to assure the project meets the requirements set forth during the State Environmental Policy Act (SEPA) and National Environmental Policy Act (NEPA) processes. DOT Form 140-101 Page 2 Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of Auburn 3rd Street SW Bridge Decks Preservation July 1, 2020 Right of Way �✓ No Right of Way Needed ❑ Right of Way Needed *All construction required by the ❑ No Relocation ❑ Relocation Required contract can be accomplished within the exiting right of way. Utilities Railroad ✓ No utility work required ✓ No railroad work required nAll utility work will be completed prior to the start nAll railroad work will be completed prior to the start of of the construction contract the construction contract ❑All utility work will be completed in coordination All the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project There are no major utility relocations/adjustments or major structure modification/relocations anticipated for this bridge deck preservation project. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? ✓ Yes ❑ No Remarks The Auburn Municipal Airport is located approximately 1.3 miles from the project site location. The proposed improvements will not have any affect on the Auburn Municipal Airport. This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency Cit of Auburn Date t' 11' By t°Wee4AV44 1L C, ayor/Chairperson DOT Form 140-101 Page 3 Revised 04/2015 Previous Editions Obsolete