Loading...
HomeMy WebLinkAboutLocal Agency Federal Aid Project - CP2007 - Lea Hill Rd Bridge Deck Preservation Washington State �AMIL � Department of Transportation Local Agency Federal Aid Project Prospectus Prefix 1 Route ( ) Date August 7, 2020 Federal Aid i Project Number DUNS Number 032942575 Local Agency CP2007 FederalEmployer( wsooi Use Only Tax ID Number 91-6001228 Agency ' CA Agency Federal Program Title City of Auburn l✓l Yes ❑ No ✓120.205 ❑Other Project Title Start Latitude N 47.31547 Start Longitude W 122.20611 Lea Hill Rd Bridge Deck Preservation End Latitude N 47.31547 End Longitude W 122.20555 Project Termini From-To Nearest City Name Project Zip Code(+4) R St NE Garden Avenue Auburn 98092-3005 Begin Mile Post End Mile Post Length of Project Award Type N/A N/A 0.04 miles ✓ Local❑Local Forces❑State❑Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name N/A N/A N/A 00.5.5 17 King WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number Northwest Region 47 8 29 Total Local Agency Phase Start Phase Estimated Cost Funding Federal Funds Date (Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar) P.E. $80,000 Month Year $80,000 July 2020 R/W Const. $567,850 $50,000 $517,850 Total $647,850 $50,000 $597,850 I Description of Existing Facility (Existing Design and Present Condition) Roadway Width Number of Lanes 50 feet 3 lanes Description of Proposed Work Description of Proposed Work(Attach additional sheet(s)if necessary) Lea Hill Bridge Deck Preservation The project will grind and overlay the Lea Hill bridge deck in an effort extend the overall service life of the bridge. Local Agency Contact Person Title Phone Kim Truong Project Engineer (253) 804-5059 Mailing Address City State Zip Code 25 W Main St I Auburn WA 98001 By f i‘e 41_ Project Prospectus _ Approving Authority Title City Engineer Date 7/29/2020 DOT Form 140-101 Revised 04/2015 Previous Editions Obsolete Page 1 Agency Project Title Date City of Auburn Lea Hill Rd Bridge Deck Preservation August 7, 2020 Type of Proposed Work Project Type(Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path /Trail ❑3-R 50 feet 3 lanes ❑ Reconstruction ❑ Pedestrian / Facilities ❑2-R ❑ Railroad ❑ Parking ❑Other �✓ Brid e g Geometric Design Data Description Through Route Crossroad ❑ Principal Arterial ❑ Principal Arterial Federal Urban Minor Arterial 0 Minor Arterial ❑Collector ❑ Urban Functional ❑ Rural ❑ Rural ❑Collector Classification ❑ NHS ❑ Major Collector ❑ Major Collector ❑ NHS ❑ Minor Collector ❑ Minor Collector ❑ Local Access 0 Local Access Terrain ✓ Flat ❑ Roll ❑ Mountain ❑ Flat ❑ Roll ❑ Mountain Posted Speed 35 mph Design Speed 45 mph I Existing ADT 24,294 (2019) Design Year ADT 50,031 Design Year 2040 Design Hourly Volume (DHV) 5,003 Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant 100 % 0 Construction Will Be Performed By Contract Agency Contractor 100 % 0 Environmental Classification 0 Class I - Environmental Impact Statement (EIS) Class ll - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑Class III - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations The project improvements will be completed within an existing developed area and no addition right-of-way is required to complete the project. There are no long term environmental impacts anticipated. The City will coordinate with the permitting agencies to assure the project meets the requirements set forth during the State Environmental Policy Act (SEPA) and National Environmental Policy Act (NEPA) processes. DOT Form 140-101 Revised 04/2015 Previous Editions Obsolete Page 2 Agency Project Title City of Auburn Date Lea Hill Rd Bridge Deck Preservation August 7, 2020 Right of Way ✓ No Right of Way Needed ❑ Right of Way Needed *All construction required by the N El No Relocation 0 Relocation Required contract can be accomplished q fired within the exiting right of way. Utilities Railroad ✓� No utility work required III No railroad work required ❑All utility work will be completed prior to the start nAll railroad work will be completed prior to the start of of the construction contract the construction contract ❑All utility work will be completed in coordination fAll the railroad work will be completed in coordination with the construction contract with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project There are no major utility relocations/adjustments or major structure modification/relocations anticipated for this bridge deck preservation project. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? Yes 0 No Remarks The Auburn Municipal Airport is located approximately 1.5 miles from the project site location. The proposed improvements will not have any affect on the Auburn Municipal Airport. This project has been reviewed by the legislative body of the administration agency or agencies, or it's designee, and is not inconsistent with the agency's comprehensive plan for community development. Agency City of Auburn Date t6% '/ • By ayor/Chairperson DOT Form 140-101 Revised 04/2015 Previous Editions Obsolete Page 3