HomeMy WebLinkAboutLocal Agency Federal Aid Project - CP2007 - Lea Hill Rd Bridge Deck Preservation Washington State
�AMIL
� Department of Transportation Local Agency Federal Aid
Project Prospectus
Prefix 1 Route ( ) Date August 7, 2020
Federal Aid
i Project Number DUNS Number 032942575
Local Agency CP2007 FederalEmployer( wsooi
Use Only Tax ID Number 91-6001228
Agency ' CA Agency Federal Program Title
City of Auburn l✓l Yes ❑ No ✓120.205 ❑Other
Project Title
Start Latitude N 47.31547 Start Longitude W 122.20611
Lea Hill Rd Bridge Deck Preservation
End Latitude N 47.31547 End Longitude W 122.20555
Project Termini From-To Nearest City Name Project Zip Code(+4)
R St NE Garden Avenue Auburn
98092-3005
Begin Mile Post End Mile Post Length of Project Award Type
N/A N/A 0.04 miles ✓ Local❑Local Forces❑State❑Railroad
Route ID Begin Mile Point End Mile Point
City Number County Number County Name
N/A N/A N/A 00.5.5 17 King
WSDOT Region Legislative District(s) Congressional District(s) Urban Area Number
Northwest Region 47 8 29
Total Local Agency Phase Start
Phase Estimated Cost Funding Federal Funds Date
(Nearest Hundred Dollar) (Nearest Hundred Dollar) (Nearest Hundred Dollar)
P.E. $80,000 Month Year
$80,000 July 2020
R/W
Const. $567,850 $50,000
$517,850
Total $647,850 $50,000 $597,850
I
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width Number of Lanes
50 feet 3 lanes
Description of Proposed Work
Description of Proposed Work(Attach additional sheet(s)if necessary)
Lea Hill Bridge Deck Preservation
The project will grind and overlay the Lea Hill bridge deck in an effort extend the overall service life of the
bridge.
Local Agency Contact Person Title Phone
Kim Truong Project Engineer (253) 804-5059
Mailing Address City State Zip Code
25 W Main St I Auburn WA 98001
By
f
i‘e 41_
Project Prospectus _ Approving Authority
Title City Engineer Date 7/29/2020
DOT Form 140-101
Revised 04/2015 Previous Editions Obsolete Page 1
Agency Project Title Date
City of Auburn Lea Hill Rd Bridge Deck Preservation August 7, 2020
Type of Proposed Work
Project Type(Check all that Apply) Roadway Width Number of Lanes
❑ New Construction ❑ Path /Trail ❑3-R 50 feet 3 lanes
❑ Reconstruction ❑ Pedestrian / Facilities ❑2-R
❑ Railroad ❑ Parking ❑Other
�✓ Brid e
g
Geometric Design Data
Description Through Route Crossroad
❑ Principal Arterial ❑ Principal Arterial
Federal Urban Minor Arterial 0 Minor Arterial
❑Collector ❑ Urban
Functional ❑ Rural ❑ Rural ❑Collector
Classification ❑ NHS ❑ Major Collector ❑ Major Collector
❑ NHS
❑ Minor Collector ❑ Minor Collector
❑ Local Access 0 Local Access
Terrain ✓ Flat ❑ Roll ❑ Mountain ❑ Flat ❑ Roll ❑ Mountain
Posted Speed 35 mph
Design Speed 45 mph
I Existing ADT 24,294 (2019)
Design Year ADT 50,031
Design Year 2040
Design Hourly Volume (DHV) 5,003
Performance of Work
Preliminary Engineering Will Be Performed By Others Agency
Consultant 100 % 0
Construction Will Be Performed By Contract Agency
Contractor 100 % 0
Environmental Classification
0 Class I - Environmental Impact Statement (EIS) Class ll - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ❑ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑Class III - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
The project improvements will be completed within an existing developed area and no addition
right-of-way is required to complete the project. There are no long term environmental impacts
anticipated.
The City will coordinate with the permitting agencies to assure the project meets the requirements
set forth during the State Environmental Policy Act (SEPA) and National Environmental Policy Act
(NEPA) processes.
DOT Form 140-101
Revised 04/2015 Previous Editions Obsolete Page 2
Agency Project Title
City of Auburn Date
Lea Hill Rd Bridge Deck Preservation August 7, 2020
Right of Way
✓ No Right of Way Needed ❑ Right of Way Needed
*All
construction required by the
N
El No Relocation 0 Relocation Required
contract can be accomplished q fired
within the exiting right of way.
Utilities Railroad
✓� No utility work required III No railroad work required
❑All utility work will be completed prior to the start nAll railroad work will be completed prior to the start of
of the construction contract the construction contract
❑All utility work will be completed in coordination fAll the railroad work will be completed in coordination
with the construction contract with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
There are no major utility relocations/adjustments or major structure modification/relocations anticipated for
this bridge deck preservation project.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? Yes 0 No
Remarks
The Auburn Municipal Airport is located approximately 1.5 miles from the project site location. The
proposed improvements will not have any affect on the Auburn Municipal Airport.
This project has been reviewed by the legislative body of the administration agency or agencies, or it's
designee, and is not inconsistent with the agency's comprehensive plan for community development.
Agency City of Auburn
Date t6% '/ • By
ayor/Chairperson
DOT Form 140-101
Revised 04/2015 Previous Editions Obsolete Page 3