HomeMy WebLinkAboutWashington State Historical Society HISTORICAL SrArg0.4
SOCIETY >-°°q
`Py t 1889
State of Washington
Washington State History Society
Amendment No.2 to 19-10
Grantee: City of Auburn
WHEREAS, the WASHINGTON STATE HISTORICAL SOCIETY, 1911 Pacific Avenue,Tacoma, WA
98402 (AGENCY) and the City of Auburn, White River Valley Museum 918 H Street, Auburn WA
98002 (GRANTEE), desire to amend this state funded contract for Heritage Capital Projects, 19-
10 (CONTRACT), to provide for an adjustment,the CONTRACT is hereby amended as follows:
•Attachment B-Scope of Work is deleted and replaced inlits entirety as attached.
The effective date of this Amendment is the last date of execution. All other terms and
conditions of the CONTRACT remain in full force and effect.
IN WITNESS WHEREOF,the parties hereby execute this Amendment.
r �
Jennifer Kilmer "fancy Backus 1
Executive Director Mayor
Washington State Historical Society City of Auburn
P4);11
Date Date
MP/4.2313.
19-10
ATTACHMENT B
PROJECT SCOPE OF WORK
PROJECT SCOPE OF WORK NARRATIVE
This project is to improve the area adjacent to the White River Valley Museum, including new roadway
access, parking,exterior lighting and walkways,and a programmable heritage classroom.
MATCH (2016/2017):The existing dark enclosed Museum lobby was removed and replaced with a glassed in
entry. The Museum exterior was painted. H Street was extended approximately 1000 feet stalls to provide
public access for the museum,and parking was improved from 24 to 46 stalls.A new monument sign was
installed.
HCP(2018/2019):A 795 square foot existing garage will be remodeled into a heritage enrichment classroom.
PROJECT SCOPE OF WORK BY ARCHITECTURAL DIVISIONS
DIV 2 CONCRETE-Existing: concrete floor on grade,will lay down laminate flooring
DIV 4 MASONRY-Existing: 1/2 of walls are brick, 1/2 wood frame
DIV 6 WOOD, PLASTICS,&COMPOSITES- New: laminate counters and bathroom stall
DIV 7 THERMAL&MOISTURE PROTECTION-Existing: no insulation or HVAC,will bring up to code for occupied
space; new insulating and TPO roofing at classroom
DIV 8 OPENINGS-Existing:2 wooden garage doors, replace with glass doors
DIV 9 FINISHES-paint interior and exterior
DIV 21 FIRE SUPPRESSION-Existing:fire extinguishers,will bring space up to code
DIV 22 PLUMBING-Existing:no plumbing,will add toilet and two sinks
DIV 23 HVAC-Existing: no HVAC,will add HVAC system to code
DIV 26 ELECTRICAL-Existing:overhead lights only,will add full electrical systems
DIV 31 EARTHWORK- New:improve parking
DIV 32 EXT. IMPROVEMENTS-MONUMENT SIGN
CERTIFICATION
The GRANTEE, by its signature,certifies that the Project Scope of Work set forth above has been reviewed
and approved by the GRANTEE's governing body or board of directors,as applicable,as of the date written
below. The GRANTEE shall make all plans and documents funded in whole or in part by this contract
available to the AGENCY upon reasonable request.
cy 6Ba1kusw ° 1 �Ask
Mayor, City of Auburn
Date
/2 / 1//ei
g ,PLA,P per-- ik-IU,�. 12 .Z 7 (9