HomeMy WebLinkAboutCOA & Geodesign AG-C 511 THE CITY OF AUBURN AND GEODESIGN, INC.
AMENDMENT #2 TO AGREEMENT FOR SERVICES AG-C-511
RELATING TO ON-CALL GEOTECHNICAL SERVICES
THIS AMENDMENT TO THE AGREEMENT is made and entered into by and between the
CITY OF AUBURN, a municipal corporation of the State of Washington (hereinafter referred to
as the "CITY"), and GeoDesign, Inc. (hereinafter referred to as the "PROVIDER"). The City and
Provider agree to amend the Agreement AG-C-511 executed on the 14th day of February 2019.
The changes to the Agreement are described as follows:
1. CONTRACT TERM: The term of the Agreement for Professional Services is extended to
December 31, 2021.
2. COMPENSATION: The amount of this amendment is $50,000.00. As total compensation
for the Provider's performance of the services provided based on this Amended Agreement,
the City shall pay the Provider fees and costs not-to-exceed $100,000.00. See Amended
Exhibit B, which is attached hereto and by this reference made part of this Agreement.
REMAINING TERMS UNCHANGED: All other provisions of the Agreement between the parties
for AG-C -511 executed on the 14th day of February 2019 shall remain unchanged, and in full
force and effect.
IN WITNESS WHEREOF the parties hereto have executed this Agreement as of the day and
year first above written.
GEODESIGN, INC. CITY OF AUBURN
By:
Authorized signawre ancy B. s, ayor
Date: October 28, 2020fih
Date: I` 1 ' W
Approved as to form (Optional): Approved as to form:
Attorney for(Other Party) Kendra Comeau, City Attorney
Amendment No. 2 for Agreement No. AG-C-511
GeoDesign, Inc.
ENG-182, Revised 10/20
Page 1 of 1
EXHIBIT B
GEOTECHNICAL,GEOLOGICAL,AND MINE CONSULTING SCHEDULE OF CHARGES
COMPENSATION
Our compensation will be determined on the basis of time and expenses in accordance with the following schedule unless
a fixed fee amount is so indicated in the proposal or services agreement. Contracted professional and technical services
will be charged at the applicable hourly rates as listed below. Staff time spent in depositions,trial preparation,and court or
hearing testimony will be billed at 1.5 to 2 times the below rates. Time spent in either local or inter-city travel,when travel
is in the interest of this contract,will be charged in accordance with the foregoing schedule;when traveling by public
carrier,a maximum charge of eight hours per day will be made. Current rates are as follows.
Personnel Hourly Rate Personnel Hourly Rate
Support Staff S 77 Los Angeles Deputy Grading Inspector $ 107
Project Assistant/Technical Editor $ 90 Technical Specialist I S 144
Senior Project Assistant/Technical Editor $ 97 Technical Specialist II $ 160
Technician I $ 83 Senior Technical Specialist $ 174
Technician II $ 95 Project Manager I $ 154
Senior Technician $ 101 Project Manager II $ 164
CAD S 101 Senior Project Manager S 175
Senior CAD Technician $ 112 Associate $ 192
Staff I $ 106 Senior Associate S 204
Staff II 5 121 Principal $ 224
Staff III $ 133
Equipment Rate
Air compressor(per day) $ 59
Bladder pump(per day)(includes generator) $ 123
Brass/stainless steel rings S 12
Cement amending field tool $ 24
Cement scale and pan(per day) $ 29
Concrete field equipment $ 29
Core drill(per day) $ 236
Crack monitor $ 35
Cross-hole sonic logger(CSL)(per half day) $ 265
Cross-hole sonic logger(CSL)(per day) $ 531
D&M sampling kit $ 24
Data recorder $ 13
Datalogger(per day) $ 12
Datalogger(per week) $ 45
Datalogger(per month) $ 112
Disposable bailers(per item) $ 17
Double-ring infiltrometer $ 77
Drilled shaft inspection camera(DSIC)(per half day) $ 531
Drilled shaft inspection camera(DSIC)(per day) $ 1,062
Drilled shaft inspection camera(DSIC)(per week) $ 2,005
Drive probe(per hour) $ 12
Dynamic cone penetrometer(DCP)(per day) $ 112
Electric sampling pump(per day) $ 31
Field California bearing ratio(CBR)equipment(per day) 5 260
Falling weight deflectometer(FWD)(per day) $ 2,000
Falling weight deflectometer(FWD)with GPR(per day) $ 3,415
Field equipment $ 12
Field vane $ 59
Flag tape rolls(each) $ 6
Generator $ 59
Global positioning system(GPS)-differential(per day) S 112
Global positioning system(GPS)-hand-held(per day) S 34
Ground penetrating radar(GPR)-cart mounted(per day) $ 590
Ground penetrating radar(GPR)-truck mounted(per day) 5 1,416
Hand auger(per day) $ 41
Hydroacoustic monitoring equipment(per day) $ 295
Incremental borer(timber) $ 56
Laptop computer use(per day) $ 18
Mobile laboratory(per month) $ 1,200
Nuclear density gauge(per hour) $ 12
pH/conductivity/temperature meter(per day) $ 50
Pile Driving Analyzer®(PDA)(per day) $ 590
Pile Integrity Tester(per day) $ 236
Post pounder(per day) $ 12
GEO DESIGN= AN NMS COMPANY 1 122919, rev 101920
GEOTECHNICAL,GEOLOGICAL,AND MINE CONSULTING SCHEDULE OF CHARGES
Equipment Rate
Pressure Transducer Datalogger(per day) S 150
Range finder(per day) S 12
Resistivity meter(per day) S 118
Roto-hammer drill(per day) S 88
Roto-hammer drill(per week) S 324
Sand cone field density kit S 24
Satellite phone(per day) $ 24
Saximeter $ 24
Schmidt hammer $ 118
Seismic equipment(per day) S 590
Seismic source S 236
Shelby tube with caps $ 24
Sidewalk closure signage $ 22
Site reconnaissance kit $ 24
Slope inclinometer reading(per day) $ 171
Soil sample rings(per sample) $ 12
Sondex settlement probe(per week) $ 118
Spectral analysis of surface waves $ 1,770
Specialty software(MODFLOW,MAXIS,Slope/W,etc.,per day) $13-59
Thermometer-infrared $ 12
Total Station-survey equipment $ S9
Transit level and tripod S 35
Turbidity monitor $ 41
Unmanned aerial vehicle(DCI Mavic 2)(per day) S 500
Unmanned aerial vehicle(Trimble Ux5-HP)(per day) S 1,000
Vehicle(company)usage(full day,plus $0.67 per mile charge) $ 24
Vehicle(personal)usage(per mile) $ 0.67
Vibrating wire piezometer S 590
Vibration monitoring equipment(per day) $ 62
Vibration monitoring equipment(per week) $ 298
Vibration monitoring equipment(per month) $ 876
Vibration monitoring equipment(per month,long term) S 535
Vibrocore $ 472
Water level meter(per day) $ 50
WSDOT bridge toll $ 4
Ziplevel Pro 2000(per day) S 53
Reproduction Black/White Color
8%2 x 11 (per finished page) $0.11 S 0.17
11 x 17(per finished page) $0.21 S 0.34
C-or D-size plots(per finished plot) $26.75
D-size scan S 13.38
OTHER SERVICES,SUPPLIES,AND SPECIAL TAXES
Outside services(equipment,supplies,and facilities not furnished in accordance with the above schedule,and any unusual
items of expense not customarily incurred in our normal operations)are charged at cost plus 12 percent. This includes
shipping charges,subsistence,transportation,printing and reproduction,miscellaneous supplies and rentals,surveying
services,drilling equipment,construction equipment,watercraft,aircraft,and special insurance that may be required.
Specialized equipment will be quoted on a per-job basis. In-house disposable field supplies(routinely used field supplies
stocked in-house by GeoDesign)at current rates. Taxes required by local jurisdictions for projects in specific geographic
areas will be charged to projects at direct cost.
All rates are subject to change upon notification.
G EO DESIGN= AN NIVI5 C°MPANY 2 122919,rev 101920
GEOTECHNICAL AND GEOLOGICAL LABORATORY SCHEDULE OF CHARGES
TYPE OF TEST UNIT PRICE
Atterberg Limits(ASTM D4318-05) $ 191
CBR with 3-Point Proctor(ASTM Dl 883-07) $ 730
Compaction(ASTM Dl 557-07/ASTM D698-07;Methods A,B,and C)
1 Point $ 112
4 Points $ 270
Consolidation(ASTM D2435-04;with two timed rebounds) $ 494
Direct Shear(ASTM D3080-04)
1 Point $ 273
3 Points $ 520
Expansion Index of Soil(ASTM D4829) $ 278
Moisture Content-Oven Method(ASTM D2216-05) $ 29
Moisture/Density(ASTM D7263)
Rings S 44
Shelby tubes $ 44
Organic Content(ASTM D2974) $ 99
Particle-Size Analysis
Sieve(ASTM C1 17-04/ASTM Cl 36-06)(includes-200 Wash, Dry Sieve) $ 149
Percent passing No.200(ASTM Cl 17-04/ASTM 01140-00) S 93
Combined sieve and hydrometer(ASTM D422-63) $ 248
Oversize sieve analysis(ASTM Cl 17-04/ASTM Cl 36-06) $ 248
Permeability
Rigid wall constant/falling head(Army Corps Eng.EM 1 1 10-2-1906,VII-13) $ 434
Flexible wall with triaxial cell(ASTM D5084-03) $ 495
Flexible wall for cohesive soil(ASTM D5084/ASTM D4767) $ 671
pH of Soil(ASTM G51) S 99
Resilient Modulus(AASHTO T 307-99)
In situ sample $ 708
Remolded sample(includes compaction and sample preparation) 51,062
Rice Density(ASTM D2041) S 149
Sand Equivalent(ASTM D2419) S 223
Soil Resistivity(ASTM G57) S 229
Specific Gravity
Bulk specific gravity-asphalt(Parafilm coated)(ASTM D1 188) S 55
Maximum specific gravity-asphalt(Rice)(ASTM D2041) $ 112
Specific gravity-bulk specific gravity-asphalt(ASTM D2726) S 19
Specific gravity-coarse aggregate(ASTM C127) $ 88
Specific gravity-fine aggregate(ASTM Cl 28) S 118
Soil(ASTM D854) S 124
Swell(ASTM D4546)
Method A $ 390
Method B S 273
Method C S 682
GEODESIGN? ANNIVI5PANY 1 122919
GEOTECHNICAL AND GEOLOGICAL LABORATORY SCHEDULE OF CHARGES
TYPE OF TEST UNIT PRICE
Triaxial Compression
Unconsolidated,undrained(back pressure saturation)(ASTM D2850-03) $ 377
Consolidated,undrained, 1 point(ASTM D4767-06) $ 495
Consolidated, undrained,strength envelope(ASTM D4767-06) $1,486
Load-controlled cyclic(ASTM D531 1) $1,486
Unconfined Compression
Undisturbed soil(ASTM D2166-06) $ 143
Amended soil(ASTM D1633-00) $ 97
Sample Preparation(per hour) $ 77
Cyclic Direct Simple Shear
Test No, Test Description Unit Price
1 Strain-Controlled Cyclic Direct Simple Shear Test: Determine secant shear modulus and $1,350
damping ratio using up to 100 cycles at a specified single shear strain amplitude of between
0.1%and 2%. Test conducted using a sinusoidal wave with a frequency of up to 5 Hz and a
vertical stress of up to 1 MPa.
One sample and up to three strain levels. Consolidation periods for each stage of up to
24 hours.
2 Stress-Controlled Cyclic Direct Simple Shear Test: Determine cyclic stress ratio and vertical S1,800
stress ratio using up to 100 cycles at three specified stress ratios using a sinusoidal wave with a
frequency up to 5 Hz. Test conducted with vertical stresses of up to 1 MPa.
Three samples with one cyclic stress level each. Consolidation period of up to 24 hours
per sample.
3 Strain Rate-Controlled Static Direct Simple Shear Test: Determine stress-strain relationship $1,000
of a single sample at specified strain rates. Tests conducted with vertical stresses of up to
1 MPa.
One sample at three strain rates.
4 Stress-Controlled Cyclic Direct Simple Shear Test: Test conducted on one sample at a $750
specified stress ratio using a sinusoidal wave with a frequency up to 5 Hz for up to 100 cycles
with maximum vertical stresses of 1 MPa.
One sample with one cyclic stress ratio.
5 Post-Cyclic Static Direct Simple Shear Test: Stress-strain relationship at specified shear strain $250
rate. Tests conducted with vertical stresses of up to 1 MPa.
One sample in combination with tests 1,2, and 4.
6 Post-Cyclic Consolidation in Direct Simple Shear Test: Determine post-cyclic volumetric $250
strain over time. Conducted with vertical stresses of up to 1 MPa.
One sample in combination with tests 1,2, and 4.
7 Shear Wave Velocity: Measure shear wave velocity using Bender Elements based on first shear $160
wave arrival.
One sample in combination with tests 1,2,and 4.
8 Shear Wave Velocity: Measure shear wave velocity using Bender Elements based on first shear $250
wave arrival.
Stand-alone sample without DSS testing.
9 Cost per additional day for consolidation of DSS sample $300
Other tests charged at hourly rates. GeoDesign,Inc. reserves the right to subcontract any laboratory testing listed in our
scope of work and to apply charges for subcontracted testing at the rates listed above.
GEODESIGNY AN NI VI5COMPANY 2 122919