HomeMy WebLinkAboutAG-C-507 with MAKERS Architecture and Urban Design, LLP - Facility Needs Study & Master PlanAGREEMENT FOR PROFESSIONAL SERVICES AG -C-507 THIS AGREEMENT made and entered into by and between the CITY OF AUBURN, a Washington Municipal Corporation ("CITY") and MAKERS Architecture and Urban Design, LLP whose address is 500 Union Street, Suite 700, Seattle, WA 98101, ("CONSULTANT.") In consideration of the covenants and conditions of this Agreement, the parties agree as follows: 1. SCOPE OF WORK. See Exhibit A. 2. TERM. The CONSULTANT shall not begin any work under this Agreement until authorized in writing by the CITY. All work under this Agreement shall be completed by December 31, 2020 and can be amended by both parties for succeeding years. The established completion time shall not be extended because of any delays attributable to the CONSULTANT, but may be extended by the CITY in the event of a delay attributable to the CITY, or because of unavoidable delays caused by conditions beyond the control of the CONSULTANT. A supplemental Agreement to extend the established completion time must be signed before original completion date. 3. COMPENSATION. The CITY agrees to pay the CONSULTANT in accordance with the fee schedule (Exhibit B). The compensation to be paid to the CONSULTANT shall not exceed $125,000.00 for the year 2019. Compensation to be paid to the CONSULTANT for authorized work in succeeding years will be contingent upon availability of funds. The Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 1 of 11 CONSULTANT will not undertake any work or otherwise financially obligate the CITY in excess of this not -to -exceed amount without prior written authorization. The total compensation for this agreement shall not exceed $250,000.00 which includes a Management Reserve Fund amount of $2,868.00. Expenditure of Management Reserve Funds must be authorized by the CITY as set forth in Section 4 of this Agreement. The CONSULTANT shall be paid by the CITY for direct non -salary costs, at the actual cost to the CONSULTANT plus 10%. These charges may include, but are not limited to the following items: outside reproduction fees, courier fees, subconsultant fees, vehicle mileage, materials, and supplies. The billing for non -salary costs that are directly identifiable to the project shall be submitted as an itemized listing of charges. Copies of the original supporting documents shall be supplied to the CITY upon request. If services are required beyond those specified in the Scope of Work, and not included in the compensation listed in this Agreement, a contract modification must be negotiated and approved by the CITY prior to any effort being expended on those services or work shall be authorized in writing under the Management Reserve Fund as detailed in Section 4, if a Management Reserve Fund has been established by this Agreement. 4. MANAGEMENT RESERVE FUND. The Management Reserve Fund established in Section 3 of this Agreement, if any, has been established to provide flexibility of authorizing additional funds to the Agreement for allowable unforeseen costs, or reimbursing the CONSULTANT for additional work beyond that already defined in this Agreement. Such authorizations) shall be in writing, prior to the CONSULTANT expending any effort on such services and shall not exceed the amount established in Section 3 of this Agreement. --------------------------------------------------------------- Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 2 of 11 5. SUBCONTRACTING. The CONSULTANT shall not subcontract for the performance of any work under this AGREEMENT without prior written permission of the CITY. No permission for subcontracting shall create, between the CITY and subcontractor, any contract or any other relationship. Compensation for any subconsultant work is included in Section 3 of this Agreement and all reimbursable direct labor, overhead, direct non -salary costs and fixed fee costs for the subconsultant shall be substantiated in the same manner as outlined in Section 3. All subcontracts shall contain all applicable provisions of this AGREEMENT. 6. RESPONSIBILITY OF CONSULTANT. The CONSULTANT is responsible for the professional quality, technical accuracy, timely completion and the coordination of all studies, analysis, designs, drawings, specifications, reports and other services performed by the CONSULTANT under this Agreement. The CONSULTANT shall, without additional compensation, correct or revise any negligent errors, omissions or other deficiencies in its plans, designs, drawings, specifications, reports and other services required. The CONSULTANT shall perform its services to conform to generally -accepted professional engineering standards and the requirements of the CITY. Any approval by the CITY under this Agreement shall not in any way relieve the CONSULTANT of responsibility for the technical accuracy and adequacy of its services. Except as otherwise provided in this Agreement, neither the CITY'S review, approval, or acceptance of, nor payment for, any of the services shall be construed to operate as a waiver of any rights under this Agreement or of any cause of action arising out of the performance of this Agreement to the full extent of the law. --------------------------------------------------------------- Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 3 of 11 7. INDEMNIFICATION/HOLD HARMLESS. The CONSULTANT shall defend, indemnify and hold the CITY, its officers, officials, volunteers, and employees harmless from any and all claims, injuries, damages, losses, or suits, including attorney fees, arising out of or resulting from the acts, errors or omissions of the CONSULTANT in performance of this Agreement, except for injuries or damages caused by the sole negligence of the CITY. Should a court of competent jurisdiction determine that this Agreement is subject to RCW 4.24.115, then, in the event of liability for damages arising out of bodily injury to persons or damages to property caused by or resulting from the concurrent negligence of the CONSULTANT and the City, its officers, officials, employees, and volunteers, the CONSULTANT's liability, including the duty and cost to defend, under this Agreement shall be only to the extent of the CONSULTANT's negligence. The CONSULTANT specifically and expressly agrees that this indemnification includes the CONSULTANT'S waiver of immunity under Industrial Insurance, Title 51 RCW, solely for the purposes of this indemnification. This waiver has been mutually negotiated by the parties. The provisions of this section shall survive the expiration or termination of this Agreement. 8. INDEPENDENT CONTRACTOR/ASSIGNMENT. The parties agree and understand that the CONSULTANT is an independent contractor and not the agent or employee of the CITY and that no liability shall attach to the CITY by reason of entering into this Agreement except as otherwise provided in this Agreement. The parties agree that this Agreement may not be assigned in whole or in part without the written consent of the CITY. 9. INSURANCE. CONSULTANT shall procure and maintain for the duration of this Agreement, insurance against claims for injuries to persons or damage to property that may arise --------------------------------------------------------------- Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 4 of 11 from or in connection with the performance of the work hereunder by the CONSULTANT, its agents, representatives, or employees. CONSULTANT'S maintenance of insurance as required by the Agreement shall not be construed to limit the liability of the CONSULTANT to the coverage provided by such insurance, or otherwise limit the City's recourse to any remedy available at law or in equity. CONSULTANT shall obtain insurance of the types and in the amounts described below: a. Automobile Liability insurance covering all owned, non -owned, hired and leased vehicles, with a minimum combined single limit for bodily injury and property damage of $1,000,000 per accident. Coverage shall be written on Insurance Services Office (ISO) form, CA 00 01 or a substitute form providing equivalent liability coverage. If necessary, the policy shall be endorsed to provide contractual liability coverage. b. Commercial General Liability insurance shall be written on ISO occurrence form CG 00 01 and shall cover liability arising from premises, operations, independent contractors, and personal injury and advertising injury, with limits no less than $1,000,000 each occurrence, $2,000,000 general aggregate. The CITY shall be included as an additional insured under the CONSULTANT'S Commercial General Liability insurance policy with respect to the work performed for the CITY using the applicable ISO Additional Insured endorsement or equivalent. c. Worker's Compensation coverage as required by the Industrial Insurance laws of the State of Washington. If the consultant is a sole proprietor, the parties agree that Industrial Insurance would be required if the --------------------------------------------------------------- Agreement for Professional Services AG -0-507 ENG -181, Revised 02/19 June 24, 2019 Page 5 of 11 CONSULTANT had employees. However, the parties agree that a CONSULTANT who has no employees would not be required to have Worker's Compensation coverage. d. Professional Liability insurance appropriate to the CONSULTANT'S profession, with limits no less than $1,000,000 per claim and $1,000,000 policy aggregate limit. The insurance policies are to contain, or be endorsed to contain, the following provisions: a. The CONSULTANT'S Automobile Liability and Commercial General Liability insurance coverage shall be primary insurance as respects the CITY. Any insurance, self- insurance, or insurance pool coverage maintained by the CITY shall be excess of the CONSULTANT'S insurance and shall not contribute with it. b. The CONSULTANT shall provide the Public Entity with written notice of any policy cancellation within two business days of their receipt of such notice. All insurance shall be obtained from an insurance company authorized to do business in the State of Washington. Insurance is to be placed with insurers with a current A.M. Best rating of not less than A:VII. The CONSULTANT shall furnish the City with certificates of insurance and a copy of the amendatory endorsements, including but not necessarily limited to the additional insured endorsement, evidencing the insurance coverage required by this section, before commencement of the work. The CITY reserves the right to require that complete, certified copies of all required insurance policies be submitted to the CITY at any time. The CITY will pay no progress payments under Section 3 until the CONSULTANT has fully complied with this section. --------------------------------------------------------------- Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 6 of 11 Failure on the part of the CONSULTANT to maintain the insurance as required shall constitute a material breach of contract. The CITY may, after giving five business days' notice to the CONSULTANT to correct the breach, immediately terminate the contract or, at its discretion, procure or renew insurance and pay any and all premiums for that insurance. If the CONSULTANT does not repay the premiums on request of the CITY, the CITY will offset those costs against funds due the CONSULTANT from the CITY. If the CONSULTANT maintains higher insurance limits than the minimums shown above, the CITY shall be insured for the full available limits of Commercial General and Excess or Umbrella liability maintained by the CONSULTANT, irrespective of whether such limits maintained by the CONSULTANT are greater than those required by this contractor whether any certificate of insurance furnished to the CITY evidences limits of liability lower than those maintained by the Consultant. 10. NONDISCRIMINATION. The CONSULTANT will not discriminate regarding any services or activities to which this Agreement may apply directly or through contractual, hiring, or other arrangements on the grounds of race, color, creed, religion, national origin, sex, sexual orientation, age, or where there is the presence of any sensory, mental or physical handicap. 11. OWNERSHIP OF RECORDS AND DOCUMENTS. The CONSULTANT agrees that all drawings, computer discs, documents, records, books, specifications, reports, estimates, summaries and such other information and materials as the CONSULTANT may have accumulated, prepared or obtained as part of providing services under the terms of this Agreement by the Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 7 of 11 CONSULTANT, shall belong to and shall remain the property of the CITY OF AUBURN. In addition, the CONSULTANT agrees to maintain all books and records relating to its operation and concerning this Agreement for a period of six (6) years following the date that this Agreement is expired or otherwise terminated. The CONSULTANT shall allow the CITY to inspect all documents held by the CONSULTANT and relating to this Agreement upon good cause at any reasonable time within the six (6) year period. The CONSULTANT also agrees to provide to the CITY, at the CITY'S request, the originals of all drawings, documents, and items specified in this Section and information compiled in providing services to the CITY under the terms of this Agreement. 12. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS -PRIMARY COVERED TRANSACTIONS. The CONSULTANT certifies to the best of its knowledge and belief, that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any federal department or agency; (b) Have not within a three-year period preceding the effective date of this Agreement been convicted of or had a civil judgment rendered against them for commission or fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (federal, state, or local) transaction or contract under a public transaction; violation of federal or state antitrust statues or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 8 of 11 (c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (federal, state, or local) with commission of any of the offenses enumerated in paragraph "(b)" of this certification; and (d) Have not within a three-year period preceding the effective date of this Agreement had one or more public transactions (federal, state, or local) terminated for cause or default. 13. TERMINATION OF AGREEMENT. This Agreement may be terminated by either party on twenty (20) days written notice to the other party. In the event of termination due to the fault of other(s) than the CONSULTANT, the CONSULTANT shall be paid by the CITY for services performed to the date of termination. Upon receipt of a termination notice under the above paragraph, the CONSULTANT shall (1) promptly discontinue all services affected as directed by the written notice, and (2) deliver to the CITY all data, drawings, specifications, reports, estimates, summaries, and such other information and materials as the CONSULTANT may have accumulated, prepared or obtained in performing this Agreement, whether completed or in process. 14. GENERAL PROVISIONS. 14.1. This Agreement shall be governed by the laws, regulations and ordinances of the City of Auburn, the State of Washington, King County, and where applicable, Federal laws. 14.2. All claims, disputes and other matters in question arising out of, or relating to, this Agreement, except with respect to claims which have been waived, will be decided by a court of competent jurisdiction in King County, Washington. Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 9of11 14.3. If any dispute or conflict arises between the parties while this Agreement is in effect, the CONSULTANT agrees that, notwithstanding such dispute or conflict, the CONSULTANT shall continue to make a good faith effort to cooperate and continue work toward successful completion of assigned duties and responsibilities. 14.4. The CITY and the CONSULTANT respectively bind themselves, their partners, successors, assigns, and legal representatives to the other party to this Agreement with respect to all covenants to this Agreement. 14.5. This Agreement represents the entire and integrated Agreement between the CITY and the CONSULTANT and supersedes all prior negotiations, representations or agreements either oral or written. This Agreement may be amended only by written instrument signed by both the CITY and the CONSULTANT. 14.6. All costs of enforcement, including reasonable attorney's fees, expenses and court costs shall be paid to the substantially prevailing party. 14.7. The CONSULTANT agrees to comply with all local, state and federal laws applicable to its performance as of the date of this Agreement. 14.8. If any provision of this Agreement is invalid or unenforceable, the remaining provisions shall remain in force and effect. 14.9. This Agreement shall be administered by consultant representative on behalf of the CONSULTANT, and by the Mayor of the CITY, or designee, on behalf of the CITY. Any written notices required by the terms of this Agreement shall be served on or mailed to the following addresses: CITY OF AUBURN Attn: Matthew Larson 25 W Main Street Auburn WA 98001 Phone: 253-804-5032 E-mail: mlarson@auburnwa.gov Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 10 of 11 MAKERS Attn: Julie Bassuk 500 Union Street, Suite 700 Seattle, WA 98101 Phone: 206-652-5080 E-mail: julieb@makersarch.com 14.10. All notices or communications permitted or required to be given under this Agreement shall be in writing and shall be delivered in person or sent by regular United States mail, postage prepaid. Any party may change their address by giving notice in writing to any other party. 14.11. This Agreement may be executed in multiple counterparts, each of which shall be one and the same Agreement and shall become effective when one or more counterparts have been signed by each of the parties and delivered to the other party. CITY OF AUBURN NI'anc'y Baf u, ayor Date ` `Ig APPROVED AS TO FORM: 2 - Steve Gross, C-11yAfforney MAKERS Architecture and Urban Design, LLP BY: XAS—� Title: �d Y�vi ex - Federal Tax ID#96-0 ID 3933 Agreement for Professional Services AG -C-507 ENG -181, Revised 02/19 June 24, 2019 Page 11 of 11 i'ixhibit A (VITA' OF AUBIJRN I A(`ll..l"I Y NEEDS S'1't.JDY & NI ASTFI( Pl.,AN S( ( )I�i (.)l; W ( )R k JRA i ! r o June 21, 2019 }'ROJI: C:''I" C: o AI, This project aims to define City of Auburn (City) facility needs and recommend an investment strategy to meet those needs for four areas of focus: Public Works Maintenance & Operations, Parks Maintenance & Operations, Courts, and Police. Facility needs, property assets, and future plans for other City departments, including City -owned property not in active use, will also be considered to identify opportunities for joint use and cost-effective investment and to understand how citywide facilities needs may impact funding availability. PHASE , 1: NE;ED ASSES MI N'I' (; MC::)le TI:is) This phase includes project initiation and management as well as the facility needs assessment. A. I'R( Xur KICK -OFT", MANAGEMENT ; C OC)RDINATIC;: N MAKERS will coordinate with the City project team (PT) to launch the project, develop a communication plan, prepare monthly invoicing and progress reports, participate in monthly check-in briefings, and track scope, budget, and schedule. The PT will include the City staff directly responsible for edordinating the overall project effort, making decisions on behalf of the City, and providing in156 o' plar3 stratdgy addirection, The PT will facilitate coordination between MAKERS and City project stakeholders, including the Leadership Team (LT). The LT will include members of City leadership selected by the PT; their primary purpose is to provide input and feedback during the development of project goals and plan recommendations through their OarliGipatipii at project workshops and through deliverable review. 1. Management. Prepare monthly invoices and progress reports. Prepare for, conduct, and summarize monthly, one- hour project progress phone calls to review progress to date and discuss strategy for upcoming work items, including a planning call for the initial project ]tick -off meeting. Progress calls will be attended by City and consultant project managers, with optional attendance by additional City staff and the consultant partner -in -charge. 2. Schedule. Develop a project work plan and schedule. Update prior to the commencement of each task for a total of three updates. 3. Coordination. In addition to scheduled monthly progress calls, two to three hours per month of coordination phone calls and/or emails are assumed between the consultant team, the PT, and other City staff as deemed appropriate by the PT. 4. Kick-off meeting. Coordinate with the PT and LT at a 90 -minute in-person kick-off meeting to clarify project needs and goals, confirm the project work plan and schedule, and establish evaluation criteria to be used in evaluating alternative investment strategies. The mayor and other stakeholders may also be invited to this kick-off as desired by the PT; the council project initiation briefing (Task 6 below) will comprise a summary of materials presented during the kick-off meeting and a summary of discussion outcomes from the kick-off. 5. Communication plan. Develop a project communication plan that identifies the members of PT, LT, and department participants. The plan will include roles and responsibilities for the PT, LT, department participants, and MAKERS as well as, target timeframes and guidelines for communications. MAKERS will provide the City with materials to support the City's internal messaging and engagement efforts. These materials will be excerpted from project presentations and deliverables produced in support of other scoped tasks; no additional materials will be developed to supp&t these internal messaging and engagement efforts. 6. Council p1lojeet initi4,ti0n briefing. Conduct introductory briefing at a city council study session meeting to share project goals aid timeline and gather feedback. A one-hour run-through via phone with the PT during a monthly progress call, a one-hour in-person run-through with the Mayor, and two rounds of updates to the briefing is assumed. One round of updates to the briefing will be limited to minor adjustments and editorial tweaks. Total briefing duration (presentation and questions) not to exceed 45 minutes; briefing to be attended by two MAKERS staff. CITY OF AUBURN l AC'II.,I 1.Y Nl:?I I)S SI-11DY 8-, MAS]" ER PI.,AN S(.'()V OU WORK 1..iE'`aAFT rev3 June 21, 2019 111,':1 -a'l't N C S • Monthly PT progress calls • Kick-off meeting • Introduction/briefing run-through with the mayor • Council project initiation briefing • Kick-off summary • Monthly coordination meeting agendas and summaries • Monthly invoices and progress reports + Project schedule (updated quarterly, if needed) • Communication plan (PDF) • Council project initiation briefing presentation (PowerPoint or PDF) 13. N I S ASSI?SSMENT (Quantity: 13; 1 hour; 2 MAKERS staff) (Quantity: 1; 1.5 hours; 3 MAKERS staff) (Quantity: 1; 1 hour; 2 MAKERS staff) (Quantity: 1; 0.75 hours; 2 MAKERS staff) MAKERS will review Auburn's property and facilities portfolio and how it is organized to deliver City services, work with department leadership to identify underutilized areas and shortfalls, discuss how implementation of the City's comprehensive plan will impact service delivery, and identify facilities projects needed to achieve the City's vision. As is stated in the project purpose, though all property will be considered, properties used by the four areas of focus will be reviewed in more detail. Background review. Review relevant City -provided data and studies, including available building maintenance records and CIP projects. If the data requested is unavailable, MAKERS and the PT will work together to develop reasonable assumptions to support decision-making. • The City will provide necessary background information, including existing site and building plans (as available), staffing and vehicle counts if needed, organizational charts, and anticipated staff growth. Reconciliation of staff and vehicle counts, staff growth assumptions, and space usage will be limited to one round. • The City will provide historic facilities maintenance and capital investment funding levels and current plans for maintenance and capital investment within the context of total City spending. Data shall be provided in an editable format (e.g. an Excel document) and include spending by year and by funding source and a project purpose or description for each expenditure. Reconciliation of historical finances will be limited to one round. • The City will provide a list of known facilities maintenance needs with cost estimates if available. • The level of effort for this task assumes information will be organized in a comprehensive, consolidated, and editable format with minimal reconciliation or processing by MAKERS required. Stakeholder Interviews and facility tours. Prepare for, conduct, and summarize interviews with key department stakeholders to discuss existing facility deficiencies and space short -falls, future growth projections and potential operational changes, phasing considerations, finding challenges, and other project considerations. Tour facilities to observe space use, functional, and department adjacency issues. • Individual interview durations may be adjusted according to the complexity of issues to be discussed but the total duration of all interviews and facility tours should not exceed three working days (24 total hours). For efficiency, the City will endeavor to schedule interviews and site visits consecutively to result in no more than four consultant trips. The site tour(s) and interviews for each specific department will ideally be scheduled for the same day or time period. • The City will identify the most qualified stakeholders to be interviewed. Multiple departments may be interviewed in a single meeting. • A 90 -minute interview with facilities maintenance should be included. • A 90 -minute interview with individuals knowledgeable about City budgeting and finance should be included. (_.TI'Y OF ACil.. URN FqACll,l'1'Y NEI D >`1'C..I gDgY" & 1\4AS "1::;1� PLAN June 21, 2019 • Other interviewees will be selected to represent the following departments as needed to understand facility function, facility needs, and ongoing or future planning around facilities. Interview duration will range from 60 to 90 minutes and be commensurate with interviewee relationship to areas of focus addressed by this study. Interviews will be organized according to areas of expertise and/or the facilities they use; e.g.: • Interview 1: Public Safety • Interview 2: Courts • Interview 3: Public Works Maintenance & Operations Services • Interview 4: Parks Maintenance & Operations • Interview 5: Representatives for Administration, Public Works Engineering Services, Finance, Human Resources, Legal, and Community Development. Information Technology should also be represented to provide insight on any planning considerations around facilities investment, e.g., location of communication infrastructure. The City will organize a tour of existing facilities with knowledgeable staff to review functional needs and deficiencies. Tour durations may range from one to three hours per site/facility and will be commensurate with facility complexity and relationship to project areas of focus. Most facilities will be toured at an overview level (quick walk through), except the police/court, public works operations yards, and parks operations yards, which will be toured in more detail. 3. Best practices research. Research recent civic investments in similar municipalities to highlight recent trends in civic facility use, sizing, design, and funding. This information will be used to support the space needs assessment and visioning. 4. Space needs assessment. Develop and document projected City facilities space needs for project areas of focus. Space needs projections will be based on industry standards given facility types and projected staffing levels based on existing projections for population and service demand growth. Space needs projections will provide square footage assumptions at a level appropriate to generate rough -order -of -magnitude cost estimates and support strategic planning and decision-making but will not include detailed programming. Space needs assumptions and projections summary must be reviewed and approved by the City prior to the commencement of Task C. Though revisions to the space needs assessment memo will be limited to one round, MAKERS will correct any errors in incorporating draft comments noted by the PT. 5. Financial situation baseline. Identify funding limitations and develop assumptions around budgeting, financing options, and implementation phasing for the study. Financial situation baseline assumptions will establish estimated average allowable spending by year and funding source. This work task is initiated through interviews. • Assumptions will be developed in consultation with staff knowledgeable about what is politically and fiscally reasonable for City and staff knowledgeable about the City's facilities spending trends and plans. 6. Visioning workshop. Prepare and conduct a visioning workshop with the LT and other stakeholders as deemed appropriate by the PT. The workshop will last no more than four hours and be attended by up to four MAKERS staff. Workshop activities will inform development of master plan alternatives and will likely include: Reviewing needs assessment findings, best practice examples, and financial baseline assumptions. • Drafting evaluation criteria with which to evaluate master plan alternatives and guide recommendations. • Envisioning ideal facilities needed to support City goals, desired service, and future growth. 7. Council needs assessment briefing. Prepare and conduct a milestone briefing for city council at a study session meeting that will cover the major findings from the needs assessment, financial baseline, and visioning workshop. A one-hour run-through via phone with the PT, a one-hour run-through via phone with the mayor, and two rounds of updates to the briefing are assumed. One round of updates will be limited to minor adjustments and editorial tweaks. Total briefing duration (presentation and questions) not to exceed 45 minutes; briefing to be attended by two MAKERS staff. X11 TINGS • Stakeholder interviews and facility tours (Total duration up to 24 hours; 2 MAKERS staff per interview) c l'Y OF AUl3tJRN FACILITY 1'Y NI EDS S'i tJDY <� MASTER PLAN June 21, 201.9 • Visioning workshop (Quantity: 1; duration up to 4 hours; up to 4 MAKERS staff) • Council needs assessment briefing run-through (Quantity: 1; 1. hour; 2 MAKERS staff] phone call with PT • Council needs assessment briefing run-through (Quantity: 1; 1 hour; 2 MAKERS staff) phone call with mayor • Council needs assessment briefing (Quantity: 1; 0.75 hours; 2 MAKERS staff) • Space needs assessment assumptions memo (PDF) • Visioning workshop presentation, to include relevant best practices information and the project's financial baseline assumptions (PowerPoint or PDF) • Council needs assessment presentation (PowerPoint or PDF) VERSE 11 (-5 MONTHS) C, KEY DECISION ALITANATIVES This phase will focus on developing and analyzing alternative approaches to key facilities decisions. `Key facilities decisions' encompass areas where there are a variety of approaches to meeting a facility need. (Maintaining a facility that is working well and needs predictable maintenance and modernization investments is not a `key facilities decision' — these projects will be included in the project's baseline assumptions.) Key facilities decisions analysis will be completed for up to four functional areas that will likely include public works operations yards, parks operations yards, and public safety facilities. 1. Key decision projects alternatives concept development. • Prepare for and conduct a phone call with the PT to discuss key decision alternative concepts for development and evaluation. • Gather more detailed information to develop or evaluate alternatives. This task includes up to two days (16 total hours) of phone calls, data review, and site tours as needed. • Develop the concepts and evaluate the benefits and drawbacks associated with the function, cost, and likely phasing for each alternative concept. • Cost estimates will be planning -level estimates of probable costs. It is assumed these estimates will be refined by the City as projects move forward into design. • Cost estimates will be developed based on generic per -square -foot costs by facility typology (e.g. police station, community center, etc.). Soft cost markups to be provided and agreed upon by the City. • Site development cost estimates will be generic for decision-making purposes and will not reflect specific site characteristics, e.g., stormwater infrastructure requirements or utility service needs. • Land value estimates will be provided by the City real estate experts. Estimated values are for strategic planning decision-making purposes only. 2. Key decision project alternatives directors review phone calls. Conduct up to four one-hour phone calls with the PT and the individual department directors and facilities coordinators impacted by key decision projects. Calls to be attended by up to three MAKERS staff. Refine materials as needed. 3. Alternatives evaluation workshop. Conduct an alternatives evaluation workshop to discuss key decision alternative concepts and select preferred directions. Workshop participants will be.selected from the LT and could include department directors, City executive leadership, and other stakeholders as deemed appropriate by the PT. Workshop duration will be attended by up to four MAKERS staff and will last a maximum of three hours. 4. Public outreach: Open house (optional task). Prepare and conduct a two-hour public open house to present outcomes from the alternatives phase and solicit feedback on select aspects of the project as appropriate. Prepare up to four display posters and adapt alternatives workshop materials as appropriate. Open house to be attended by two MAKERS staff. CITY OF AU1I3tJIeN I AC:"11..,ITY iti'ItI?I¢ S S I t pDY &MAS_I'ER- 1'I..,AN June 21, 2019 PT and council alternatives briefings. Conduct a one-hour run-through of the alternatives evaluation outcomes and draft preferred direction milestone briefing with the PT via phone. Update the briefing based on PT feedback and present the briefing to the LT or team of department directors, facilities coordinators, and other stakeholders as deemed appropriate by the PT. Update the briefing presentation based on LT feedback and present the briefing to the mayor via a one-hour phone call. Update the presentation based on mayor feedback and present the briefing to the city council at a study session meeting. • One round of updates to the briefing after the run-through PT briefing, one round of updates after the LT briefing, and one round of updates after the mayor briefing are assumed. • One round of updates to the briefing will be limited to minor adjustments and editorial tweaks. • Each total briefing duration (presentation and questions) not to exceed one hour; briefing to be attended by two MAKERS staff. Key decision project alternatives approach review PT phone call (Quantity: 1; 1 hour; 3 MAKERS staft) • Key decision project alternatives directors review phone calls (Quantity: 4; 1 hour; 3 MAKERS staff) • Alternatives evaluation workshop (Quantity: 1; duration up to 3 hours; up to 4 MAKERS staff) • LT alternatives briefing run-through phone call with PT (Quantity: 1; 1 hour; 2 MAKERS staff) • LT alternatives briefing (Quantity: 1; 1 hour; 2 MAKERS staff) • Council alternatives briefing run-through phone call with mayor (Quantity 1; 1 hour; 2 MAKERS staff) Council alternatives briefing (Quantity: 1; 1 hour; 2 MAKERS staff) • Public open house (Quantity: 1 optional; 1.5 hours; 2 MAKERS staff) • Alternatives evaluation workshop presentation (PowerPoint or PDF) • Council alternatives briefing (PowerPoint or PDF) P1 IASE 111 (--6 MC:DNT IS) D. PREFERRED RR1,D CON ;PT & PLAN DOC:1J ENY This phase will identify and refine a preferred master plan concept that will likely be a combination of desirable features gleaned from the alternatives. An important aspect of this phase will be providing the opportunity for City staff to review and comment on the recommended plan while it is being developed. Once support is built for the recommendations, MAKERS will compile findings into a user-friendly plan document. The plan will include the needs analysis, a sequence of recommended short- and long-term actions, costs, and timeline. It will also describe how the plan supports Auburn's 2035 Core Plan vision and aligns with other relevant City policies. L Refine cost and/or land value estimates (optional task). If needed to support decision-making, cost estimates may be refined and augmented through additional engineering analysis (e.g., civil, structural, transportation) or cost estimation support. 2. Identify and refine draft concept and phased implementation plan. Prepare for and conduct one one-hour phone working session with the PT to identify and refine the preferred master plan concept and phasing approach based on feedback received at the alternatives workshop, from the LT, from the mayor, and from city council. Prepare for and conduct one one-hour phone conference with the City's PT and City finance/budget experts to review and ensure draft implementation plan is financially viable. 3. Draft recommendations briefings. Conduct a one-hour run-through of the draft concept and phased implementation strategy recommendations milestone briefing with the PT via phone. Update the briefing presentation per PT comments and present the briefing to the LTand department representatives as determined by the PT. Update the briefing presentation per LT comments and present to the mayor via a one-hour phone call. Update the briefing presentation per the mayor's comments and present to city council at a study session meeting. CITY OF AL B1JR'N 1 A.(:`ltXl Y NEEDS S'H J13Y & MAST R Pt.AhI June 21, 2019 • One round of updates to the briefing after the run-through briefing, one round of updates after the LT briefing, and one round of updates after the run-through with the mayor are assumed. • One round of updates to the briefing will be limited to minor adjustments and editorial tweaks. • Each total briefing duration (presentation and questions) not to exceed one hour; briefing to be attended by two MAKERS staff. 4. Public open house (optional task). Prepare and conduct a two-hour public open house to present draft plan recommendations. 5. Draft report. Report document will compile the needs assessment, recommended actions, and implementation strategy. The City will distribute this document and compile responses for discussion with MAKERS. 6. Prefinal plan. Discuss comments with PT as needed, update the plan, and issue a prefinal document for final PT review. Prefinal review comments are limited to changes made in response to draft comments. 7. Prefinal plan briefings. Conduct a one-hour run-through of the prefinal milestone briefing with the PT via phone. Prefinal milestone briefing will highlight changes since draft. Update the briefing presentation per PT comments and present the briefing to the LT and department representatives as determined by the PT. Update the briefing presentation per LT comments and present to city council at a study session meeting. • One round of updates to the briefing after the run-through briefing and one round of updates after the LT briefing are assumed. • One round of updates to the briefing will be limited to minor adjustments and editorial tweaks. • Each total briefing duration (presentation and questions) not to exceed one hour; briefing to be attended by two MAILERS staff 8. Final plan. Discuss comments with PT as needed, update the plan, and issue the final document. • Preferred concept PT phone working session • Implementation plan review phone conference with Finance • LT draft recommendations briefing run-through with PT • LT draft recommendations briefing • Council draft recommendations briefing • Public open house • LT prefinal plan briefing run-through with PT • LT prefinal plan briefing • Council prefinal plan briefing with the mayor • Council prefinal plan briefing (Quantity: 1; 1 hour; 3 MAKERS staff) (Quantity: 1; 1 hour; 2 MAILERS staff) (Quantity: 1; 1 hour; 2 MAILERS staff) (Quantity: 1; 1. hour; 2 MAILERS staff) (Quantity: 1; 1 hour; 2 MAKERS staff) (Quantity: I optional; 2 hour; 2 MAKERS staff) (Quantity: 1; 1 hour; 2 MAKERS staff) (Quantity: 1; 1 hour; 2 MAKERS staff;) (Quantity: 1; 1 hour; 2 MAILERS staff) (Quantity: 1; 1 hour; 2 MAKERS staff). • Draft recommendations presentation (PowerPoint or PDF) • Prefinal plan presentation (PowerPoint or PDF) • Draft and prefinal facilities master plan document (PDF) • Final facilities master plan document (Up to five print copies and one PDF) ASSUMPTIONS Specific assumptions related to a work task are imbedded in the task description above; assumptions that apply to multiple tasks are listed below. • Per the project goal, this project includes space needs assessment and facility master planning for the following City facilities: o Public Works Maintenance & Operations Facility CITY OF A.t.;B(JR.N FACILITY 7yL;l?I)`> STUDY & M HSTF'RPI.,AN Sl`0III F t.IlWORK DRAI', , .. June 21, 2019 o Municipal Court/Police Headquarters o Parks Maintenance & Operations Facilities ■ Game Farm Park ■ C Street SE • Per the project goal, this project includes a cursory review of facility needs, property assets, and future plans for the following City facilities: o City Hall o City Hall Annex o Parks & Recreation Complex ■ Youth Center ■ Community Center ■ Activity Center ■ Les Gove Storage Building o GSA Building • Plan recommendations will be focused on major capital investments and will not include minor or major maintenance recommendations or costs. • To keep project on schedule, the City will endeavor to provide information requested within two weeks from the date of request. The consultant team will notify the City of information requests as they arise to ensure the City has the maximum amount of time to respond to requests. The consultant team will work with the City to mitigate schedule impacts where information requests take longer to fulfill. • The City shall keep MAKERS apprised of parallel planning efforts of consequence to this project. Any new information arising over the course of the project shall be provided to MAKERS as soon as feasible. If this new information impacts the content of a substantially developed work product, MAKERS will endeavor to incorporate such new information into the final work product, if possible, given available budget. • The City will be responsible for organizing meetings and facility tours, reserving rooms, and sending all meeting invites. The City will also provide public notice to advertise public open houses and City council presentations, • MAKERS will prepare meeting materials for project progress meetings, workshops, City council study session meetings and open houses, including agendas, presentations, and visual aids. • The schedule makes the following assumptions with respect to City scheduling and review times. Longer review periods and meeting scheduling delays may impact the overall project schedule. o Meetings can be scheduled within target timeframes o City reviews of minor deliverables (presentations and memos) can occur within one week, with an additional week allocated for MAKERS' revisions in response to City comments. o City reviews and comment consolidation of the draft plan can occur within three weeks, with an . additional three weeks allocated for MAKERS' revisions in response to City comments. o City reviews and comment consolidation of the prefinal master plan can occur within two weeks, with an additional twoweeks allocated for MAKERS' revisions in response to City comments. Any space plans or concepts will developed at a planning level as appropriate to facilitate decision-making. This project will not require new technical analysis (including, but not limited to, an assessment of building condition, geotechnical analysis, site environmental assessments, real estate appraisal/land value estimate, or transportation evaluation) unless scoped within optional task D1 and able to be funded within the budget allocated for this item. CITY OF AUBURN 1 A(:'ll..,t`l Y NEEDS S'1't.JDY & MASTER P1..,AN June 21, 2019 • MAKERS will provide draft copies of presentation materials for advance review by the PT and revise materials based on PT comments. No more than one review -revision cycle will be provided. • The City will distribute the draft and prefinal plans for review and coordinate/consolidate comments received. • No more than two versions (draft and final) of any deliverable will be provided, except for the final master plan document, for which no more than three versions (draft, prefinal, and final) will be provided, Exhibit B FA1C H 1) !t_<A iA BA`x t'IIR PE..AN June 21, 2019 Partner -in Project I Project Charge Manager Coordinator Hourly rate $200 $130 1 $100 Contract A. Project Kick -Off, Management & Coordination 1 Management (monthly meetings, invoicing, prog rpts) 33 52 15 $ $ 37,670 14,760 2 Schedule 2 2 12 $ 1,860 3 Coordination 6 36 12 $ 7,080 4 Kick-off meeting 7 12 30 $ 5,960 5 Communication plan 1 4 12 $ 1,920 Council project initiation briefing (and in person run- 6 through with mayor) B. Needs Assessment 1 Background review 13 4 13 8 18 20 $ $ $ 6,090 59,650 3,840 2 Interviews and facility tours 32 40 40 $ 15,600 3 Best practices research 2 6 32 $ 4,380 4 Space needs assessment 6 44 20 $ 8,920 5 Financial situation baseline 6 32 $ $ 5,360 6 Visioning workshop 8 32 72 $ 12,960 7 Council milestone briefing 11 23 1 34 $ 8,590 C. Alternatives 1 Key decision projects concept development 8 40 80 $ $ 57,610 14,800 2 Alternatives evaluation review calls (up to 4) 12 32 24 $ 8,960 3 Alternatives evaluation workshop 10 32 72 $ 13,360 4 Public open house #1 (optional) 6 18 32 $ 6,740 5 Alternative evaluation milestone briefings (LT, mayor & council) 15 35 62 $ 13,750 D 1 Preferred Concept &Plan Document Refine cost and/or land value estimates (optional) subconsultant costs included below $ $ 76,090 _ 2 Identify and refine draft concepts & phasing 12 40 40 $ 11,600 3 Draft concept and phasing briefings (LT & Council) 12 32 60 $ 12,560 4 Public open house #2 (optional) 6 18 32 $ 6,740 5 Prepare draft plan report 8 60 120 $ 21,400 6 Prefinal plan 4 24 60 $ 9,920 7 Prefinal briefings (LT, mayor, and council) 9 23 34 $ 8,190 8 Final plan and project closeout 2 16 32 $ 5,680 Supplemental Expenses Subconsultants for Dl (cost includes 10% markup) $ $ 16,112 15,000 MAKERS travel (17 trips x 66.4 miles round trip x $0,58/mile x 10% markup) $ 612 Professional printing allowance (5 final reports and meeting materials) $ 500 Total Cost $ 247,132 EXHIBIT C DIRECT NON -SALARY REIMBURSABLE EXPENSES • Outside Reproduction Fees • Courier Fees • Subconsultant Fees • Materials and Supplies • Mileage at $0.58/mile or the current approved IRS rate. It is understood that all reimbursements are at cost and will be marked -up 10%. Subcontracts; The CONSULTANT, at the CITY'S request shall enter into subcontracts with other consultants, such as appraisers and/or environmental consultants, etc. If approved, the CITY shall reimburse the CONSULTANT for the actual cost of the subcontracts plus a 10% markup to cover the CONSULTANT'S additional overhead expense associated with the Subcontract. Exhibit C Agreement No. AG -C-507 Page 1 of 1 CONSULTANT INVOICES CONSULTANT invoices should contain the following information: • On CONSULTANT letterhead. • A cover letter stating the status of each task. This should include items completed, percent completed during the billing period and completion along with funding status. • Internal invoice number and/or sequential numeric number (i.e.: progress payment # 10). • Invoice date. • Period of time invoice covers. • Consultant Agreement # (i.e.: AG -C-115). • Project number(s) listed (i.e.: PR562). • CITY'S project manager listed, • The hour(s) per person broken down by task(s) (attach timesheets, spreadsheet detailing timesheets, or some other form of proof) along with type of work done (i.e.: design, right-of-way, or construction) or task order number, • Direct salary (base salaries) • Indirect salary (benefits) • Direct non -salary (i.e.: mileage, reproduction fees (i.e.: printing, copying), communication fees (i.e.: telephone), supplies, computer charges, subconsultants), indirect non -salary (overhead). The CITY does not pay for CONSULTANT meals unless part of a task requires travel outside of the greater Seattle, Tacoma, and Everett area. These costs are to be broken down and backup information is to be attached to invoice. Project managers are to inform CONSULTANTS as to what is required for break down information and if backup information is to be attached. Break out the same for subconsultant charges. • Previous and remaining base contract amounts left in each task and total contract — total authorized amount (bottom line figure). Add amendments to this base contract amount for total authorized amount. • Percentage of work completed to date compared to total amount of work (if required by the project manager). • Status of Management Reserve Fund (MRF) (i.e.: a certain task) until we can get an amendment in place. • Invoices for previous year are due by January 15th • For grant/special funded projects there might be other special information needed, reference the LAG manual. Consultant Invoices Agreement No. AG -C-507 Page 1 of 2 City of Auburn 25 West Main Auburn WA 98001 Attn: Scott Nutter (Project Engineer) Agency Agreement #: AG -C-010 SAMPLE INVOICE Invoice #: 5222 Progress Payment #: 2 Invoice Date: February 10, 2002 Project Name: Thomas Nelson Farm Project #: PR562 Engineering Services performed during the period of: January 2002 SAMPLE ENGINEERING, INC. Personnel Hours Multiplier Hourly Rate Amount Amount Mike Jones, Principal in Charge 1 $ 125.00 $ 125.00 Carla Maker, Architect 5 $ 72.00 $ 144.00 Joe Smith, Word Processing 10 $ 48.00 $ 480.00 Consultant Personnel Subtotal 1 $100.00 MRF1,000.00 1 $ 749.00 Expenses (see attached documentation) Charge s Multiplier Amount Amount Mike Jones, Principal in Charge 20 miles x1.1 $ 7.59 Carla Maker, Architect $ 30.00 x1.1 $ 33.00 Joe Smith, Word Processing $ 29.00 x1.1 $ 31.90 Consultant Expenses Subtotal 1 $ 72.49 Consultant Total: SUB CONSULTANTS (see attached documentation) $ 821.49 Subconsultant Hours Hourly Amount Rate ABC Environmental, Inc., Civil 10 $100.00 $ 1,000.00 Engineer Electrical Consulting, Electrical 5 $100.00 500.00 Engineer Mechanical Solutions, Mechanical 10 $100.00 MRF1,000.00 Engineer Moving Company, Moving 2 $ 50.00 100.00 Consultant Subconsultant Subtotal $ 2,600.00 Subtotal x 1.1 Multiplier $ 2,860.00 Subconsultant Total: Consultant Invoices Agreement No. AG -C-507 Page 2 of 2 $ 2,860,00 TOTAL DUE THIS INVOICE CONTRACT BREAKDOWN $ 3,681.49 Note: MRF=Management Reserve Fund * Received a written authorization of MRF on 1/10101 for Mechanical Engineer task in the amount of $2,000.00. Exhibit C Agreement No. AG -C-507 Page 1 of 1 Amount Total % % Amount Task Authorize Prior This Invoiced To Expended Completed Remainin d Invoiced Invoice Date Original Contract $ $1,025.00 $2,681.49 $ 3,706.49 20% 25% $ 18,293.5 22, 000.00 1 MRF* 2,500.00 0.00 1,000.00 1,0000.00 40% 45% 1,500.00 TOTAL $ $1,025.00 $3,681.49 $ 4,706.49 $ 19,793.5 24,500.00 1 Note: MRF=Management Reserve Fund * Received a written authorization of MRF on 1/10101 for Mechanical Engineer task in the amount of $2,000.00. Exhibit C Agreement No. AG -C-507 Page 1 of 1