Loading...
HomeMy WebLinkAboutCP1922 #21-14 Lead Service Line Replacement Project D kA'1, 1' CITY OF AUBURN PUBLIC WORKS DEPARTMENT ADDENDUM NO. #1 DATE: May 26, 2021 Project Number CP1922, Contract No. 21-14 Lead Service Line Replacement Project Bid Opening Date: June 3, 2021 11:00 AM PT The following revisions, additions, and/or deletions are hereby made a part of the specifications and plans of the above-named contract and shall be taken into consideration by the bidder in submitting their bid: BID PROPOSAL PACKAGE: 1. REVISE all references to bid opening date from June 1, 2021 at 11:00 AM PT to June 3, 2021 at 11:00 AM PT. PART 1: GENERAL SPECIAL PROVISIONS: 1. REVISE all references to bid opening date from June 1, 2021 at 11:00 AM PT to June 3, 2021 at 11 :00 AM PDT. PART 2: TECHNICAL SPECIAL PROVISIONS: 1. REVISE the third paragraph in Section 2-03.4 (Measurement) to read: "Roadway Excavation Including Haul" is calculated from the top bottom of existing asphalt/cement concrete to the bottom elevation of the roadway section. "Roadway Excavation Incl. Haul" only applies to excavation within the roadway prism (between the lip of curb and gutter) as necessary to establish subgrade elevation for the pavement section. Excavation required to establish subgrade for work elements outside the roadway prism, including but not limited to curb and gutter, sidewalk, driveway approaches, and curb ramps, shall not be considered "Roadway Excavation Incl. Haul" and all costs associated with such excavation shall be included in the unit price for the work element for which the excavation was required. APPENDIX A STANDARD DETAILS & STANDARD PLANS: 1. ADD attached City of Auburn Construction Standard Detail T-27.1 to Appendix A. CONTRACT PLANS: 1. REPLACE sheet no. 56 with the attached plan sheet; "Typical Section — CCP Replacement". A note was added to reference Auburn Construction Standard Detail T- 27.1. By signing the space provided in the "Receipt of Addenda" section of the "Bid Proposal", bidders certify and acknowledge receipt of Addendum No. 1 and to due consideration thereof in preparing and submitting the "Bid Proposal". Failure to acknowledge receipt of this Addendum on the "Bid Proposal" may be considered an irregularity in the "Bid Proposal". Prepared By: 5/26/2021 Project Manager Date Approved By: �uNfilu rc�:. 05/27/2021 Jacob Sweeting, P.E. Date City Engineer/Asst. Director of Engineering Services 12" EXIST. ASPHALT TYP. 0 TYP CONCRETE PAVEMENT EXIST. CEMENT TYP. 9® CONCRETE PAVEMENT CENTERED ON Q QCYi9�!' P EXIST SLAB • % NO TOM ME. COMM. ROW W.p w NISIRngl twm WO NO-N Yfr O-!W I I. ..M MOS e' ie r rfW MOO MEW.MO 1 JI weak f1IaM IwlaNk j xl afY. IA0./0 3 Of y .vivMiu�.nr ...... OK -IMMO. TOL IMO CL w rime r 1. a DAM Em w ar SEMI mss MM., TO ro TYPICAL SECTION A-SRO STREET NE mea'oe ...ME.ro0SOOTN DST MI 110111111,11116 MO MOT MI r: 110• Ia 0k 0OORTCOM=Os a f[OaN.0a Ra WOWSm•-N 1 I TYPICAL SECTION•CCP REPLACEMENT O wan-u•MAS I -M I tar I - WOW EMI aanNrofllkro[trt N7 SED' P1II1 1�A 11M1 1Q JIB y,_-m l.i __..--P __ .. —"-1 JII[w 177 uM Ill /f I ~i3 viiievu�ivrti�.en rii am�mv�evwrvi ro�iii�. viiiiiii iiviiiii3riii. I J/ r COOT �Ioiol.ml �wsu .ac uxrx raF rw a row- TYPICAL SECTION 0-2ND STREET NEWORN rlk amw •csc ma .MOO mMOM MY 'L. IKW ., �• irr OFR PO OW TV C01110.4 w r.4 all•ro S.-12I WOWS-ar OM 0.-1rar al, Ufa-md i s-array r1.1..nt Men.-22 i ILSOLLS 11.L. I NIL L. SOM 1 WIWS�m1w WOWSa,. .1 x I. ..... _mrv)S7Sii arDPW f. r11.1 3 SW./WA"W I.',VW/YAW/MA/vii�rir. liF//tom/// I r ao r FO W-n TYPICALwwwCM wOdw[M A nNWutg1 SECTION CI-IST STREET NE r w1 a t roFROMMOO LOT .n 'TYPICAL vol.f OOTzr N 'TYPICAL OEC710N•AAThW.RHMA PAVEMENT O oONOVJO IW [CCO.T FM fa STASOOtvl NAM A MR MNa akrtw MITTLICTOW n SON� m.0 MOO( ! wo-u EM 0...Sr m.'-mr I ac ac ar-ar WOWS-ar 1M 1 wmfA �N I w[.. WOWS�roaJi Ay wlluLw-u aw .�a1- _1 MORE.CALL .- riiiriiioiiir.T�iuvvne mirviuivii.wiiiii� riiiiiiinriiiiiorI;,,;./..)////////MA I WNW IMINOrt r to CIL WPC W-ss —mml war r wA n r PG 11.-22TYPICAL SECTION C2-IST STREET NFA _ fimN 10[WPM N 00Nwlaka TO..[a m friar Iw LOSSINO UM 1113 Na D. N!rST �M- Rye OW OOlt DATE, AUBURN LEAD SERVICE LINE REPLACEMENT Cp 922 1 awe .loo.a...a..rwcwaawna.l.I>,w Sae I. SW: MALT AUBURN,WA wl:artw 1 i lams la ., r t., ',elk'''. aa�+wof[ I.r yC Pte^ UMW ROADWAY SECTIONS Se 1 ..a.... o Ila -n Memorandum CITY OF A- *N%-mv ; ,,, — - * . W WASHINGTON To: City Council, Mayor From: Ingrid Gaub, Public Works Director FOR 9"� o4 09/29/2021 Signed Date CC: Ryan Vondrak, Capital &Construction Engineering Manager Jacob Sweeting, City Engineer/Assistant Director Engineering Services Re: Award of Public Works Contract 21-14, CP1922 Lead Service Line Replacement Project As delegated by the Mayor to award public works contracts within the authorization limits of Auburn City Code 3.10.010, I hereby approve and award all schedules of work in Contract No. 21-14 to the lowest responsible bidder, Pivetta Brothers Construction, on their total low bid of $5,702,050.93 including sales tax for Project No. CP1922 Lead Service Line Replacement Project. The project award includes the base bid and additive bids 1 and 2 as follows: Base Bid Work—This work includes replacement of approximately 6,500 linear feet of water main and associated water services, reconstruction and/or overlay of street segments, storm drainage improvements, curb and gutter replacements, curb ramp replacements, sidewalk improvements, and driveway improvements as shown on the Vicinity map. The base bid work is included in Areas 1-4 shown in the attached vicinity map. Additive Bid 1 —The additive work is on 3rd Street NE between Auburn Ave and Auburn Way North. The work includes replacement of approximately 350 linear feet of water main and associated water services, reconstruction of street segments, storm drainage improvements, curb and gutter replacements, curb ramp replacements, sidewalk improvements, and driveway improvements. The additive work is shown adjacent to Area 1 in the attached vicinity map. Additive Bid 2—The additive work is on 2nd Street NE between Auburn Ave and Auburn Way North. The work includes replacement approximately 450 linear feet of water main and associated water services, reconstruction of street segments, storm drainage improvements, curb and gutter replacements, curb ramp replacements, sidewalk improvements, and driveway improvements. The additive work is shown adjacent to Area 1 in the attached vicinity map. ENG-003, Revised 9/21 The City received eight responsive bids and the low bid was approximately 3% below the engineer's estimate. Staff performed verifications to determine that Pivetta Brothers Construction meets the responsible bidding criteria. The total estimated project costs are within the total project budget and is partially funded by a Drinking Water State Revolving Fund Loan administered by the Department of Health. Staff will provide construction status updates on the monthly Capital Project Status Report. Enclosure(s): Bid Tab Summary Sheet, Vicinity Map ENG-003, Revised 9/21 Bid Tabulation - Bid Totals Summary Project:CP1922,Lead Service Line Replacement,21-14 Prepared By:City of Auburn Bid Date:Sept.21,2021 W/O Tax Inc.Tax ENGINEER'S ESTIMATE: $5,535,23150 $5,925,370.31 AVERAGE BID AMOUNT: $5,837,847.82 $6,223,636.33 w.... m _M. Basic BID Amount M.... Total BID Amount Total BID Spread$ Total BID Spread% LOW BIDDER: Pivetta Brothers Construction,Inc $5,331,70868 $5,702,050.93 -$223,319.38 -3.77% Second Bidder. SCI Infrastructure,LLC $5,608,002.75 $5,949,109.72 $23,739.41 0.40% Basic BID Total BID (Tax not included) (Including tax) 1. Pivetta Brothers Construction,Inc $5,331,708.68 $5,702,050.93 2. SCI Infrastructure,LLC $5,608,002.75 $5,949,109.72 3. Ceccanti,Inc. KK $5,903,738.00 $6,225,417.75 4. Johansen Construction Company,Inc $5,886,172.60 $6,264,403.98 ................................................................................................................................................................................................. S. Northwest Cascade,Inc. $5,902,087.65 $6,316,367.20 6. Rodarte Construction,Inc. $5,952,507.00 $6,354,636.28 7. Miles Resources,LLC $6,071,895.85 $6,488,010.17 8. Laser Underground&Earthworks,Inc. $6,046,670.00 $6,489,094.64 NOTE:An evaluation of whether a bidder is responsible or non-responsible was only made for the low bidder.This does not indicate,one way or the other,how other bidders would be considered if they were the low bidder. 9/28/2021 Page 46/46 Printed Date: 10/3/2019 CP1922 LEAD SERVICE LINE REPLACEMENT PROJECT Map Created by City ofAubumeG1S Imagery Date:May 2015 t < • . ' _ +' f. ' ' 3rd Street NE'Auburn Way N&E Street NE "'"", ,:: � t '. .A' Scope:Replace Watermain and services, Reconstruct Street between Auburn Way N and „ r = }.3 D St NE. Replace concrete panels between D St '',7:;r1 t ° ' £ .,: . . NE and E St NE. • i• ,i.^„,,, S�iM.ST NE -•-- t' Pike Street NE:E Main St to 4th Street NE Additive Bid 1: Scope:Replace Watermain and services,Grind& 3rd Street NE:Auburn Ave and Auburn Way N ' 2nd Street NE:Auburn Way N&E Street NE • overlay street. Scope:Replace Watermain and services,and Scope:Replace Watermain and services,and Reconstruct Street. „„,-.-x Replace concrete panels. '7 , , y"'W” ... <t 1Ar .. eat is i. .3 may, ��$ t .. ,..,W t '_ ,{ Additive Bid 2: ,• Area I _" —'' 2nd Street NE:Auburn Ave • " • ,, ' ' _'• • and Auburn Way N F.. awr::r: � �._ N4 Scope:Replace Watermain and '/ ' _ ," , 1 t 1„ d '`sy,A. services,and Reconstruct Street : iy :,L„•,_•. ._ i', , _ ....-', ,,..wr""""y'^" r 7Yc t�., t '�* i t } E 1St Street NE:Auburn way N and E street NE i— ':tar Scope:Replace Watermain and services, t�re3 N 1 i 1- Reconstruct Street. .- r ''�:*, *14`•4•Y•?,, :'"' { ' ' ' N Street NE:E Main St to 2nd Street NE .•' , '" Watermain and services, t �,.• :', „.� ' £.. "1 Reconstruct Street.Scope:Replace ' ._„; ,. »»,,,^ .mac, t Street SE:Auburn Way s and D St NE 4th --« ' &D Street SE:2nd St SE and 4th St SE ' ' Scope:Replace Watermain and services, • I; Reconstruct Street. .t • ' r ' >.. • • • :. , 10th Street SE:A St SE to B St SE Scope:Replace Watermain and services,Grind& • ;- overlay street. , r ' i -""._ ' 11th Street SE:A St SE to B st SE 't, t < Scope:Replace Watermain and services,Grind& € overlaystreet.st e t � 14th Street SE:B St SE to c St SE Scope:Replace Watermain and services,Grind& • i4 < overlaystreet /•• .- SE -- s , rt ? x S Ys. t ' -, .. gg 2,666.7 0 1333.3 2,666.7 Feet Information shown is for general reference I I I purposes a and doesa hic necessarilyrcartographic representexact geographic or cartographic NAD_1983 StatePlane_Washington_North_FIPS 4601 Feet data as mapped.The City of Auburn makes 0 no warranty as to its accuracy.