CITY OF AUBURN
PUBLIC WORKS DEPARTMENT
ADDENDUM NO. #1 DATE: May 26, 2021
Project Number CP1922, Contract No. 21-14
Lead Service Line Replacement Project
Bid Opening Date: June 3, 2021
11:00 AM PT
The following revisions, additions, and/or deletions are hereby made a part of the
specifications and plans of the above-named contract and shall be taken into
consideration by the bidder in submitting their bid:
BID PROPOSAL PACKAGE:
1. REVISE all references to bid opening date from June 1, 2021 at 11:00 AM PT to
June 3, 2021 at 11:00 AM PT.
PART 1: GENERAL SPECIAL PROVISIONS:
1. REVISE all references to bid opening date from June 1, 2021 at 11:00 AM PT to
June 3, 2021 at 11 :00 AM PDT.
PART 2: TECHNICAL SPECIAL PROVISIONS:
1. REVISE the third paragraph in Section 2-03.4 (Measurement) to read:
"Roadway Excavation Including Haul" is calculated from the top bottom of existing
asphalt/cement concrete to the bottom elevation of the roadway section. "Roadway
Excavation Incl. Haul" only applies to excavation within the roadway prism (between the
lip of curb and gutter) as necessary to establish subgrade elevation for the pavement
section. Excavation required to establish subgrade for work elements outside the
roadway prism, including but not limited to curb and gutter, sidewalk, driveway
approaches, and curb ramps, shall not be considered "Roadway Excavation Incl. Haul"
and all costs associated with such excavation shall be included in the unit price for the
work element for which the excavation was required.
APPENDIX A STANDARD DETAILS & STANDARD PLANS:
1. ADD attached City of Auburn Construction Standard Detail T-27.1 to Appendix A.
CONTRACT PLANS:
1. REPLACE sheet no. 56 with the attached plan sheet; "Typical Section — CCP
Replacement". A note was added to reference Auburn Construction Standard Detail T-
27.1.
By signing the space provided in the "Receipt of Addenda" section of the "Bid Proposal",
bidders certify and acknowledge receipt of Addendum No. 1 and to due consideration
thereof in preparing and submitting the "Bid Proposal".
Failure to acknowledge receipt of this Addendum on the "Bid Proposal" may be
considered an irregularity in the "Bid Proposal".
Prepared By:
5/26/2021
Project Manager Date
Approved By:
�uNfilu rc�:. 05/27/2021
Jacob Sweeting, P.E. Date
City Engineer/Asst. Director of Engineering Services
12" EXIST. ASPHALT
TYP. 0
TYP CONCRETE PAVEMENT
EXIST. CEMENT
TYP. 9® CONCRETE
PAVEMENT
CENTERED ON Q QCYi9�!' P
EXIST SLAB • %
NO TOM ME.
COMM. ROW
W.p w NISIRngl twm WO NO-N Yfr O-!W I I. ..M MOS e' ie r rfW MOO MEW.MO 1
JI weak f1IaM IwlaNk j xl afY.
IA0./0 3 Of y
.vivMiu�.nr ......
OK -IMMO.
TOL IMO CL w rime r 1. a DAM Em w ar SEMI mss MM.,
TO ro TYPICAL SECTION A-SRO STREET NE
mea'oe ...ME.ro0SOOTN
DST
MI 110111111,11116
MO MOT MI r:
110• Ia 0k 0OORTCOM=Os a f[OaN.0a
Ra WOWSm•-N 1
I TYPICAL SECTION•CCP REPLACEMENT O
wan-u•MAS I -M I tar I - WOW
EMI aanNrofllkro[trt N7
SED'
P1II1
1�A 11M1 1Q
JIB
y,_-m l.i __..--P __ .. —"-1 JII[w
177
uM Ill
/f I ~i3 viiievu�ivrti�.en rii am�mv�evwrvi ro�iii�. viiiiiii iiviiiii3riii. I
J/ r COOT
�Ioiol.ml
�wsu
.ac uxrx raF rw a row- TYPICAL SECTION 0-2ND STREET NEWORN rlk amw
•csc ma .MOO mMOM MY 'L. IKW ., �•
irr OFR PO
OW TV
C01110.4 w
r.4 all•ro S.-12I WOWS-ar OM 0.-1rar al, Ufa-md i s-array r1.1..nt Men.-22
i ILSOLLS 11.L.
I NIL L.
SOM
1 WIWS�m1w WOWSa,. .1 x I. .....
_mrv)S7Sii arDPW f. r11.1 3 SW./WA"W I.',VW/YAW/MA/vii�rir. liF//tom/// I
r ao
r FO W-n
TYPICALwwwCM wOdw[M A nNWutg1
SECTION CI-IST STREET NE
r w1 a t roFROMMOO LOT
.n 'TYPICAL
vol.f OOTzr N 'TYPICAL OEC710N•AAThW.RHMA PAVEMENT O
oONOVJO IW [CCO.T FM fa STASOOtvl NAM A MR MNa
akrtw
MITTLICTOW n
SON�
m.0
MOO( !
wo-u EM 0...Sr m.'-mr I ac ac ar-ar WOWS-ar 1M 1
wmfA �N I w[..
WOWS�roaJi Ay wlluLw-u aw .�a1- _1
MORE.CALL
.- riiiriiioiiir.T�iuvvne mirviuivii.wiiiii� riiiiiiinriiiiiorI;,,;./..)////////MA I
WNW IMINOrt
r to CIL WPC W-ss —mml war
r wA n r PG 11.-22TYPICAL SECTION C2-IST STREET NFA
_ fimN 10[WPM N
00Nwlaka TO..[a m friar Iw LOSSINO UM
1113
Na D. N!rST �M- Rye OW OOlt DATE,
AUBURN LEAD SERVICE LINE REPLACEMENT Cp 922
1 awe .loo.a...a..rwcwaawna.l.I>,w Sae I. SW:
MALT AUBURN,WA wl:artw
1 i lams la
., r t., ',elk'''. aa�+wof[ I.r yC Pte^ UMW ROADWAY SECTIONS Se
1 ..a.... o Ila
-n
Memorandum
CITY OF
A- *N%-mv ; ,,, — -
* . W
WASHINGTON
To: City Council, Mayor
From: Ingrid Gaub, Public Works Director FOR
9"� o4 09/29/2021
Signed Date
CC: Ryan Vondrak, Capital &Construction Engineering Manager
Jacob Sweeting, City Engineer/Assistant Director Engineering Services
Re: Award of Public Works Contract 21-14, CP1922 Lead Service Line Replacement
Project
As delegated by the Mayor to award public works contracts within the authorization limits of
Auburn City Code 3.10.010, I hereby approve and award all schedules of work in Contract No.
21-14 to the lowest responsible bidder, Pivetta Brothers Construction, on their total low bid of
$5,702,050.93 including sales tax for Project No. CP1922 Lead Service Line Replacement
Project.
The project award includes the base bid and additive bids 1 and 2 as follows:
Base Bid Work—This work includes replacement of approximately 6,500 linear feet of
water main and associated water services, reconstruction and/or overlay of street
segments, storm drainage improvements, curb and gutter replacements, curb ramp
replacements, sidewalk improvements, and driveway improvements as shown on the
Vicinity map. The base bid work is included in Areas 1-4 shown in the attached vicinity
map.
Additive Bid 1 —The additive work is on 3rd Street NE between Auburn Ave and Auburn
Way North. The work includes replacement of approximately 350 linear feet of water
main and associated water services, reconstruction of street segments, storm drainage
improvements, curb and gutter replacements, curb ramp replacements, sidewalk
improvements, and driveway improvements. The additive work is shown adjacent to
Area 1 in the attached vicinity map.
Additive Bid 2—The additive work is on 2nd Street NE between Auburn Ave and Auburn
Way North. The work includes replacement approximately 450 linear feet of water main
and associated water services, reconstruction of street segments, storm drainage
improvements, curb and gutter replacements, curb ramp replacements, sidewalk
improvements, and driveway improvements. The additive work is shown adjacent to
Area 1 in the attached vicinity map.
ENG-003, Revised 9/21
The City received eight responsive bids and the low bid was approximately 3% below the
engineer's estimate. Staff performed verifications to determine that Pivetta Brothers
Construction meets the responsible bidding criteria.
The total estimated project costs are within the total project budget and is partially funded by a
Drinking Water State Revolving Fund Loan administered by the Department of Health.
Staff will provide construction status updates on the monthly Capital Project Status Report.
Enclosure(s): Bid Tab Summary Sheet, Vicinity Map
ENG-003, Revised 9/21
Bid Tabulation - Bid Totals Summary
Project:CP1922,Lead Service Line Replacement,21-14
Prepared By:City of Auburn
Bid Date:Sept.21,2021
W/O Tax Inc.Tax
ENGINEER'S ESTIMATE: $5,535,23150 $5,925,370.31
AVERAGE BID AMOUNT: $5,837,847.82 $6,223,636.33
w.... m _M. Basic BID Amount M.... Total BID Amount Total BID Spread$ Total BID Spread%
LOW BIDDER: Pivetta Brothers Construction,Inc $5,331,70868 $5,702,050.93 -$223,319.38 -3.77%
Second Bidder. SCI Infrastructure,LLC $5,608,002.75 $5,949,109.72 $23,739.41 0.40%
Basic BID Total BID
(Tax not included) (Including tax)
1. Pivetta Brothers Construction,Inc $5,331,708.68 $5,702,050.93
2. SCI Infrastructure,LLC $5,608,002.75 $5,949,109.72
3. Ceccanti,Inc. KK $5,903,738.00 $6,225,417.75
4. Johansen Construction Company,Inc $5,886,172.60 $6,264,403.98
.................................................................................................................................................................................................
S. Northwest Cascade,Inc. $5,902,087.65 $6,316,367.20
6. Rodarte Construction,Inc. $5,952,507.00 $6,354,636.28
7. Miles Resources,LLC $6,071,895.85 $6,488,010.17
8. Laser Underground&Earthworks,Inc. $6,046,670.00 $6,489,094.64
NOTE:An evaluation of whether a bidder is responsible or non-responsible was only made for the low bidder.This does not indicate,one way or the other,how other bidders would be considered if they were the low bidder.
9/28/2021 Page 46/46
Printed Date: 10/3/2019
CP1922 LEAD SERVICE LINE REPLACEMENT PROJECT Map Created by City ofAubumeG1S
Imagery Date:May 2015
t <
• .
' _ +' f. ' ' 3rd Street NE'Auburn Way N&E Street NE "'"", ,::
� t
'. .A' Scope:Replace Watermain and services,
Reconstruct Street between Auburn Way N and „ r = }.3
D St NE. Replace concrete panels between D St '',7:;r1
t ° ' £
.,:
. . NE
and E St NE.
•
i• ,i.^„,,, S�iM.ST NE -•-- t' Pike Street NE:E Main St to 4th Street NE
Additive Bid 1: Scope:Replace Watermain and services,Grind&
3rd Street NE:Auburn Ave and Auburn Way N ' 2nd Street NE:Auburn Way N&E Street NE • overlay street.
Scope:Replace Watermain and services,and Scope:Replace Watermain and services,and
Reconstruct Street. „„,-.-x Replace concrete panels. '7 , ,
y"'W”
... <t 1Ar ..
eat is
i.
.3 may, ��$ t .. ,..,W t '_ ,{
Additive Bid 2: ,• Area I _" —''
2nd Street NE:Auburn Ave • " • ,, ' ' _'•
• and Auburn Way N F.. awr::r: � �._ N4
Scope:Replace Watermain and '/ ' _ ," , 1 t 1„ d '`sy,A.
services,and Reconstruct Street : iy :,L„•,_•. ._ i',
, _ ....-', ,,..wr""""y'^" r 7Yc t�., t '�*
i t
}
E
1St Street NE:Auburn way N and E street NE i— ':tar
Scope:Replace Watermain and services, t�re3 N 1 i 1-
Reconstruct Street. .- r
''�:*, *14`•4•Y•?,, :'"' { ' ' ' N Street NE:E Main St to 2nd Street NE .•'
, '" Watermain and services,
t
�,.•
:', „.� ' £.. "1 Reconstruct Street.Scope:Replace '
._„; ,. »»,,,^ .mac,
t Street SE:Auburn Way s and D St NE
4th
--« ' &D Street SE:2nd St SE and 4th St SE
' ' Scope:Replace Watermain and services,
•
I; Reconstruct Street.
.t
• ' r ' >.. • • •
:. , 10th Street SE:A St SE to B St SE
Scope:Replace Watermain and services,Grind&
• ;- overlay street. ,
r ' i -""._ ' 11th Street SE:A St SE to B st SE
't, t < Scope:Replace Watermain and services,Grind&
€ overlaystreet.st e t
� 14th Street SE:B St SE to c St SE
Scope:Replace Watermain and services,Grind& •
i4 <
overlaystreet
/•• .- SE --
s
, rt
? x
S Ys.
t ' -,
.. gg
2,666.7 0 1333.3 2,666.7 Feet Information shown is for general reference
I I I purposes a and doesa hic necessarilyrcartographic
representexact geographic or cartographic
NAD_1983 StatePlane_Washington_North_FIPS 4601 Feet data as mapped.The City of Auburn makes
0
no warranty as to its accuracy.