AMENDMENT # 2 TO AGREEMENT # AG-C-170 BETWEEN
THE CITY OF AUBURN AND GREENMAN-PEDERSE~ INC.
RELATING TO C211A, RESERVOIR CORROSIO
CONTROL COATING PROJECT
/j/
THIS AMENDMENT is made and entered into this f day of February 2004, by and
between the CITY OF AUBURN, a municipal corporation of the State of Washington
(hereinafter referred to as the "CITY"), and Greenman-Pedersen, Inc. (hereinafter
referred to as the "CONSUL TANT"), as an Amendment to the Agreement between the
parties for AG-C-170 executed on the 25th day of February 2002, and amended by
agreement dated 24th day of February 2003.
The changes to the agreement are described as follows:
1. CONTRACT TERM: The term of the Agreement for Professional Services is
extended to July 31, 2004.
2. SCOPE OF WORK: See Exhibit A, attached and by this reference made part of this
Agreement.
3. COMPENSATION: The amount of this amendment is $2,775.00. The total contract
amount is increased to a total of $64,315.00.
REMAINING TERMS UNCHANGED: That all other provisions of the Agreement
between the parties for AG-C-170 executed on the 25th day of February 2002, and
amended by agreement dated 24th day of February 2003, shall remain unchanged, and
in full force and effect.
IN WITNESS WHEREOF the parties hereto have executed this Agreement as of the
day and year first above written.
GREENMAN-PEDERSEN, INC. Clt~~ ~~:
By:
Authorized signature Peter B. Lewis, Mayor
--------------------------------------------------------------------
Amendment NO.2 for Agreement No. AG-C-170
GREENMAN-PEDERSEN, INC.
Page 1 of 2
- ----_.._.._..._~_._._-
ATTEST (Optional): ATTEST:
By: ~~
Its: Danielle E. Daskam, Auburn City Clerk
Approved as to form (Optional):
Attorney for (Other Party)
law
H:\ConsultantslAgreements\2004\agc170 amendment 2.doc
--------------------------------------------------------------------
Amendment NO.2 for Agreement No. AG-C-170
GREENMAN-PEDERSEN, INC.
Page 2 of 2
Exhibit A
The Fee is based on providing the following services in connection with the warranty
inspection of the Academy and Lea Hill Water Reservoirs.
1. Be present during the wet dive inspection of all three reservoirs, (2 - Academy, 1
- Lea Hill). During the live TV camera inspection participate in the monitor
viewing, providing suggestions if necessary, on certain features inside the tank.
Make special note of any coating defects so as to describe type, size and
location inside the tank.
2. The exterior inspection of the Academy Reservoirs will be done the same day as
the interior, using binoculars to look at questionable areas from either the ground
or on top of the tank. Note any coating defects. Take digital photos as
necessary.
3. Inspect the exterior security screening added to both Lea Hill Reservoirs.
4. Provide the City with an on-site verbal report followed within two or three days
with two copies of a written report on all three tanks (interior/exterior of Academy
and interior only of Lea Hill). Photos with captions, if applicable, will be included.
It is anticipated that the interior inspection of each tank will take one day. Therefore a
daily travel fee (mileage and time) is quoted at $205.00. An hourly rate of $90.00 shall
be charged for onsite inspection and preparation of the report and photos. All costs for
report preparation, including but not limited to materials, copying and delivery shall be
covered by the hourly rate. The maximum number of hours of inspection and report
preparation shall not exceed 24.
The total fee shall not exceed $2,775.00