Loading...
HomeMy WebLinkAbout2023, AG-C-539 - CP2110, Amendment No. 3, Transpo Group USA, Inc.----------------------------------------------------------------- Amendment No. 2 for Agreement No. AG-C-539 Transpo Group USA, Inc. ENG-182, Revised 12/22 Page 1 of 1 THE CITY OF AUBURN AND TRANSPO GROUP USA, INC. AMENDMENT TO AGREEMENT FOR SERVICES AG-C-539 RELATING TO PROJECT NO. CP2110, AUBURN REGIONAL GROWTH CENTER ACCESS IMPROVEMENTS THIS AMENDMENT TO THE AGREEMENT is made and entered into by and between the CITY OF AUBURN, a municipal corporation of the State of Washington (hereinafter referred to as the “CITY”), and Transpo Group USA, Inc. (hereinafter referred to as the “PROVIDER”). The City and Provider agree to amend the Agreement AG-C-539 executed on the 7th day of September 2021. The changes to the Agreement are described as follows: 1. SCOPE OF SERVICES: See Exhibit A, which is attached hereto and by this reference made part of this Amendment. 2. COMPENSATION: The amount of this amendment is $26,132.97. As total compensation for the Provider’s performance of the services provided based on this Amended Agreement, the City shall pay the Provider fees and costs not-to-exceed $428,048.97. See Exhibit B, which is attached hereto and by this reference made part of this Agreement. REMAINING TERMS UNCHANGED: All other provisions of the Agreement between the parties for AG-C-539 executed on the 7th day of September 2021, shall remain unchanged, and in full force and effect. IN WITNESS WHEREOF the parties hereto have executed this Agreement as of the day and year first above written. TRANSPO GROUP USA, INC. CITY OF AUBURN By: ___________________________ ____________________________ Authorized signature Nancy Backus, Mayor Date:__________________________ Date:________________________ Approved as to form (Optional): Approved as to form: ________________________________ _____________________________ Attorney for (Other Party) Harry Boesche, Deputy City Attorney DocuSign Envelope ID: 888944B4-4CE7-4EAD-B57E-BE20E7B6E3C4 8/23/2023 8/27/2023 1 Exhibit A-2: Amendment to Agreement for Services Client Name: City of Auburn Project Name: Auburn Regional Growth Center Access Improvements Original Agreement Dated: 09/07/21 Amendment Dated: 05/23/23 TG: 1.21091.00 The existing Agreement for Services between Transpo Group (Consultant) and City of Auburn (Client) is amended to include the following additional services. All terms and conditions described in the Agreement remain in force and are not modified by this Amendment. Scope of Services Task 02 – Data Gathering B. Geotechnical Engineering The Consultant is requesting a budget increase to complete geotechnical engineering, finalize the Auburn RGC geotechnical engineering report, and provide a reevaluation of geotechnical recommendations associated with traffic signal pole locations. The authorized budget for the original scope of services was exceeded due to: · Additional and unforeseen pre-exploration site reconnaissance work to adjust exploration locations due to site constraints, utilities, subcontractor logistics; · Preparation and attendance for a draft report comments resolution meeting; and, · Reanalysis of the pavement section recommendations based on revised traffic counts and growth rate data. Additional geotechnical work is also needed for: · Meeting with the Client and KPFF; · Reevaluation of geotechnical recommendations associated with traffic signal pole foundation designs; and, · Updating draft geotech report to incorporate the applicable items above. Task 08 – 90% Design A. 90-percent-complete Plans At the Client’s request following the 60% design submittal, the following additional scope items have been added to the Consultant’s scope of services: · Additional street improvements along the western half of Auburn Ave. south of 3rd Street NE, to include: o Replacing approximately 115’ of existing sidewalk o Modifying the wing of one existing driveway o Replacing approximately 60’ of existing roadway pavement · Additional street improvements along the western half of B Street and including the intersection of B Street and 3rd Street NE, to include: o Replacing approximately 70’ of existing roadway pavement o Sidewalk, planter strip, and curb/gutter restoration necessary to install new fire hydrant on the northwest corner B Street/3rd Street NE · Additional utility improvements along Auburn Avenue, to include: o Reconstructing the 12” water main within Auburn Avenue to avoid conflicts with the Client’s preferred stormwater design to include: DocuSign Envelope ID: 888944B4-4CE7-4EAD-B57E-BE20E7B6E3C4 2  Plan/profile design details of approximately 20-30 LF of 12” water main to be vertically reconstructed within Auburn Avenue is located approximately at station 17+25 to 17+50.  References to necessary Client details.  Updates to specifications and cost estimates. · Additional utility improvements along B Street, to include: o Reconstructing the water main within B Street within the areas of current work limits to include:  Plan/profile design details of approximately 60 LF of water main to be reconstructed within B Street.  References to necessary Client details.  Updates to specifications and cost estimates. o Relocation of one fire hydrant including appropriate detail and callouts. Assumptions: · Full driveway replacement is not required. · The added scope items will not require additional right of way acquisition and/or temporary construction easement(s). · Existing landscaping between the back of sidewalk and adjacent parking lot will not be impacted. · Overhead utilities within the area of sidewalk replacement will not be undergrounded. · Existing utility lids within the new sidewalk and pavement areas will only require minor vertical adjustments to finished grade. · Pothole data will be provided by the Client. · The curb existing curb ramp at the northwest corner of B Street/3rd Street NE intersection will not be impacted by project improvements and does not require replacement. Task 09 – 100% Design and Final PS&E A. 100-percent-complete Plans The Consultant will incorporate the additional design elements described in this Amendment into the Final plans, project specifications, and Engineer’s Estimate. B. Final PS&E The Consultant will incorporate the additional design elements described in this Amendment into the Final plans, project specifications, and Engineer’s Estimate. DocuSign Envelope ID: 888944B4-4CE7-4EAD-B57E-BE20E7B6E3C4 Transpo Group USA, Inc. Cost Estimate Worksheet Number / Project Name 1.21091.PR - Auburn RGC Improvements Only key staff are shown and other staff may work on and charge to the project as needed by the project manager. Project Manager Quality Control - Traffic Quality Control - Civil Project Engineer - Civil Project Engineer - Traffic CAD/ Graphics - Civil CAD/ Graphics - Traffic Proj Admin initials RP KRC BAS CAC2 JKHC TN DGN AMC job title Prin L7 Prin L7 Eng L6 Eng L5 Eng L4 Eng L4 Eng L3 Proj Admin cost rate $84.86 $105.05 $74.52 $67.79 $60.10 $54.09 $50.00 $57.21 Labor: Work Task Hours Cost 1 Task 1:Project Management 2 --A. Project Coordination 0 $0 3 --B. Progress Reports and Invoicing 0 $0 4 --C. Meetings 0 $0 5 Task 2: Data Gathering 6 --A. Topographic Survey 0 $0 7 --B. Geotechnical Engineering 0 $0 8 Task 3: Preliminary Engineering 9 --A. Concept Development 0 $0 10 --B. 30% Design 0 $0 13 Task 4: Utility Coordination 14 --A. Design Coordination 0 $0 15 Task 5: Environmental Permitting 16 --A. SEPA Checklist Support 0 $0 17 Task 6: Preliminary ROW Activities 18 --A. Title-Ownership Review 0 $0 19 --B. ROW Planning - Meetings/Coordination 0 $0 20 --C. Public Outreach 0 $0 21 Task 7: 60% Design 22 --A. 60% Plans 0 $0 25 --D. 60% Opinion of Probable Cost 0 $0 26 --E. 60% Quality Control 0 $0 27 Task 8: 90% Design 28 --A 90% Plans 2 7 10 19 $1,144 31 --D. Project Specifications 0 $0 32 --E. 90% Opinion of Probable Cost 0 $0 33 --90% Quality Control 0 $0 34 Task 9: 100% Design and Final PS&E 35 --A. 100% Plans 1 5 8 14 $824 36 --B. Final PS&E 1 3 6 10 $588 37 Task 10: Bid Assistance 38 --Bid Assistance 0 $0 39 Task 11: Construction Management 40 --A. RFI's 0 $0 41 --B. Change Orders 0 $0 42 --C. Record Drawings 0 $0 43 0 $0 Total Hours 4 0 0 15 0 0 24 0 0 43 Labor Costs $339 $0 $0 $1,017 $0 $0 $1,200 $0 $0 $2,556.29 Overhead Rate 174.45%$4,459.45 Fee (as a % of labor)29.00%$741.32 Miscellaneous Expenses:Reimbursable Subconsultants:Subs Item Cost Cost 1 Federal Express / Courier $0 1 LDC $6,925.91 2 Phone $0 2 Universal Field Services 3 Fax $0 3 WSP (formerly Wood)$11,450.00 4 Postage $0 4 5 Graphic supplies $0 5 6 Photography $0 7 Travel expenses (mileage)$0 $18,375.91 8 Reproduction $0 9 Traffic counts $0 10 Traffic accident data $0 11 Spec. MPS model run $0 12 Transportation Concurrency Application $0 Total Reimbursable Expenses $0 TOTAL ESTIMATE $26,132.97 Firm Total Subconsultants Cost Estimate Prepared on: 4/12/2023 DocuSign Envelope ID: 888944B4-4CE7-4EAD-B57E-BE20E7B6E3C4 Client Name: City of Auburn Project Name: Auburn Regional Growth Center Access Improvements - Change Order #1 Date: 04/11/2023 Director of Civil Engineering Senior Project Manager Project Manager Design Engineer Civil EIT Director of Land Surveying Professional Land Surveyor Senior Designer Senior CAD Technician Survey CAD Project Admin. Hours Darrell Smith Joe Hopper Tom Abbott Cooper Danby Nathaniel Martin Vince Townsend Nigel Young Brian Nelson Jeff Grossman N/A N/A $94.10 $57.56 $45.72 $35.92 $32.24 $59.80 $45.00 $36.04 $32.96 $28.68 $25.76 3 6 8 4 16 $1,262.22 $1,979.54 $378.67 $3,620.43 2 6 4 12 $1,023.96 $1,605.88 $307.19 $2,937.02 5 0 12 8 8 0 0 28 0 0 0 $470.50 $0.00 $548.64 $287.36 $257.92 $0.00 $0.00 $1,009.12 $0.00 $0.00 $0.00 LDC Consulting Cost: Subtotal: LDC Direct Labor Costs 2,573.54$ Over Head (140.12%)3,606.04$ Fee (29%)746.33$ Total: LDC Direct Labor, OH & Fee 6,925.91$ Subconsultant(s): 1 APS -$ 2 Underground Utility Vendor -$ 3 Landscape Architecture Firm -$ 4 Structural Engineering Firm -$ Subtotal -$ Overhead (10%)-$ Total: Subconsultants -$ Direct Non-Salary Cost: Mileage & Expenses (Mileage @ Current IRS Rate) -$ Printing -$ Total: Direct Non-Salary -$ TOTAL ESTIMATED COST 6,925.91$ * Fee (30%) Total $3,585.42 $685.85 $6,557.45 Over HeadTask Hours Estimate $2,286.18Total Labor Cost: Task 10 - Water Main Reconstruction Design Task 11 - Additional Water Main Design Direct Rate (per hour) Direct Labor Costs EXHIBIT B: Proposed Budget / Fee DocuSign Envelope ID: 888944B4-4CE7-4EAD-B57E-BE20E7B6E3C4 Level of Effort Hours Estimate Personnel and Maximum Hourly Rates Per Category Principal Geotechnical Engineer (624 to 625) Associate Geologist/ Engineer (620 to 623) Senior Geologist/ Engineer (616 to 619) Project Geologist/ Engineer (615) Staff Geologist/ Engineer (613 to 614) Tech Ed & CAD Drafter (517) Clerical/ Word Processor (808 to 809) totals by task Task Task Description $77.19 $66.13 $51.36 $42.53 $39.17 $34.65 $26.24 hours 1 Additional Field Exploration Work Site Reconnaisance & Subcontractor Logistics (Completed)4 4 2 Foundations & Pavement Sections - Redesigns Engineering Analysis (1st Redesign - Completed)4 4 8 Engineering Analysis (2nd Redesign - Not Completed)4 4 8 Engineering Analysis (Foundation Redesign - Not Completed)15 5 20 7 Reporting Initial Report Revisions - (Completed) 4 4 Final report (Not Completed)2 2 3 3 10 8 Project Management PM, Consultation Meetings and Admin (Completed)3 2 5 PM, Consultation Meetings and Admin (Not Completed)4 4 4 12 Total hours per category 29 15 15 0 0 3 9 71 DSC (Direct Salary Cost)2,239$ 992$ 770$ -$ -$ 104$ 236$ 4,341$ OH = DSC X 1.3475 3,016$ 1,337$ 1,038$ -$ -$ 140$ 318$ 5,850$ FF = 0.29 X (DSC)649$ 288$ 223$ -$ -$ 30$ 68$ 1,259$ Total burdened labor 5,904$ 2,616$ 2,032$ -$ -$ 274$ 623$ 11,450$ Subtotal WSP -$ Subtotal Subcontract Expenses -$ 10% markup -$ TOTAL ODCs -$ TOTAL ESTIMATED FEE 11,450$ \\woodplc.net\Wood\US\SEA\WordProc\_Projects\20000s\20492 Transpo Group\REPORTS\002\Additional Work_Auburn RGC Geo Budget.rev4 WSP Page 1 of 1 DocuSign Envelope ID: 888944B4-4CE7-4EAD-B57E-BE20E7B6E3C4