Loading...
HomeSearchMy WebLinkAbout 2019 Storm Filter Cleaning and Cartridge Replacement Contract No. 19-25A Street SE Preservation WSDOT LA-9397AG-C-481 with Materials Testing & ConsultingAG-C-507 Facility Needs Study and Master Plan with MAKERS Architecture and Urban Designs, LLPAG-C-507 with MAKERS Architecture and Urban Design, LLP - Facility Needs Study & Master PlanAG-C-510 Engineering Services - Dave Evans and Associates, Inc.AG-C-511 On-Call Geotechnical Services - GEODESIGN INCAG-C-512 Professional Engineering Services - KPG, IncAG-C-513 Hart Crowser Inc.AG-C-513 with Hart Crowser Inc. - Related On-Call Environmental and Wetland ServicesAG-C-514 Consultant Services with National Plant Services, Inc.AG-C-515 Hydrogeologic Study Prologis-Hunt Site CARA ReportAG-C-516 2019 Bridge Load Rating Analysis and Reports for Various LocationsAG-C-516 with KPFF Consulting Engineers - Bridge Load Rating Analysis and ReportsAG-C-517 with Carollo Engineers CP1916 Academy Pump Station 1 ReplacementAG-C-518 with Parametric, Inc. CP1812 Sewer Pump Station Electrical ImprovementsAG-C-519 with Echologics LLC - Pipeline Inspections Services Relating to CP1934AG-C-520 Agreement with Jacobs Engineering Group, Inc. 2020-2021 Local Street Pavement Reconstruction and Overlay ProjectAgreement AG-C-518 Sewer Pump Station Electricl Improvements related to Project CP1812Agreement SW19-L-012 Recology Cleanscapes IncAgreement WQSWCAP-1921-ACDPWD-00082AG-S-109 Awarness and Understanding of Stormwater Management - ECOSSAG-S-110 Provider Invoices - Valbridge Property AdvisorsAG-S-111 / CP1416 F Street SE Non-Motorized ImprovementAG-S-113 Provide Average Daily Counts for Various Locations - Traffic Count Consultants, Inc.AG-S-114 Mosquito Larval Surveillance - Western Exterminator CompanyAG-S-115 with IMS Infrastructure Management Services, LLC - Pavement and Asset Data Collection ServicesAG-S-118 / Vehicle Maintenance Services with Cummins, Inc.Auburn Way N Preservation Ph 3 WSDOT LA-9557Comcast Programming ChangeContract No. 19-09 Emergency Sewer Repair at 1101 3rd ST SEContract No. 19-17 Project MS1821 Airport Tree TrimmingContract No. 19-23 Auburn Way South and 12th ST SE Signal Pole ReplacementCP1516 #16-34 Runway 16-34 ExtensionCP1705 #19-18 Auburn Way S (SR164) Sidewalk ImprovementsCP1719 #19-08 Sewer Pump StationCP1724 Amendment to Grant Award 37th ST NW Flooding EliminationCP1726 #19-05 2019 Local Street ReconstructionCP1801 West Auburn Lake ImprovementsCP1802 #19-01 Green River Pump StationCP1804 #19-06 Auburn Way North Sidewalk ImprovementsCP1805 #19-19 2019 Sewer Repair and ReplacementCP1815 #19-03 2018 Citywide Ada & Sidewalk ImprovementsCP1819 #19-02 A Street SE PreservationCP1823 #19-20 2018 Storm Repair & ReplacementCP1824 #18-19 44th ST NW and Interurban RRFBCP1829 #19-07 2019 Arterial Patch and Overlay ProjectCP1913 #19-14 Sewer Manhold Ring & Cover ReplacementCP1925 #20-07 2020 Local Street Reconstruction & PreservationCP1930 #19-24 2019 Citywide Crack Seal ProjectDCT Hudson Construction, Installation, Operation, Maintenance and Repair of Temp Traffic Signal - West Valley Highway N. & S. 287thDepartment of EcologyExhibits and Amendment to FAC17-0013Indemnification Agreement - South 287th Street ImprovementsNational Plant Services, Inc. AG-C-514Payback Agreement BP West Coast ProductsRobinson Noble, Inc. AG-C-515SR 164 East Auburn Access Project - Muckleshoot Indian Tribe